Loading...
HomeMy WebLinkAboutP_Petro_Plans_250606_APPROVEDDEVELOPMENT ENGINEERING msippo 07/23/2025 conditions of approval: 1. site construction, including buildings, is limited to construction of detention vault only. once vault is complete and used as a sediment retention facility, other site, building and utility construction can occur. 2. sidewalk access shall be maintained at all times unless an approved traffic control plan and pedestrian detour route is approved by city traffic control division. any sidewalk closures or pedestrian detours shall be limited to only times when work along the sidewalk is occurring. a safe route must be provided at all other times. 3. a wet weather operating plan shall be submitted to the city of renton if any work is to occur during the wet season. otherwise, the site shall be closed and stabilized during the wet season months. REGIONAL FIRE AUTHORITY cthomas 07/23/2025 APPROVED Surface Water Enginering jfarah 07/23/2025 amorganroth 07/25/2025 CURRENT PLANNING CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR # 455 22" D. FIR # 448 76" MAPLE (PRUNE) # 449 94" POPLAR # 453 9" HAWTHORNE # 452 38" HAWTHORNE # 456 74" POPLAR # 457 15" CEDAR FOUND REBAR/ CAP LS# 13731 (HARSTAD)0.18W OF LINE & 0.25N FROM PROP COR 0.1.W OF LINE & 0.42N FROM PROP COR 30' ROADWAY EASEMENT AS SHOWN ON SURVEY, REC. NO. 8204079008 INGRESS-EGRESS EASEMENT REC. NO. 20030806000478 11 5 ' - 2 " S H A R E D O P E N SP A C E # 446 8" CHERRY # 465 26" CHERRY PARCEL 2923059029 30,105± SQ FT 0.69 ACRE(S) N88°18'53"W 135.00 N88°18'53"W135.00 N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' SE 176TH STREET SE PETROVITSKY RD EXIST. HOUSE # 459 39" CEDAR # 458 30" CEDAR # 460 39" CYPRESS SET REBAR/CAP TEL MB R/W (;,67,1*6,7(&21',7,216  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 R 427902 DEVELOPMENT ENGINEERING msippo 07/23/2025 AP A R T M E N T E N T R A N C E UN I T 4 UN I T 3 UN I T 2 UN I T 1 CA R P O R T CA R P O R T FI R E L A N E UN I T 5 UN I T 6 UN I T 7 UN I T 8 UN I T 9 LANDSCAPE AREA FDC CONNECTION 2" SADDLE 2" SADDLE 9-WM'S W/EASEMENTS FDC CONNECTION GA R A G E CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR # 455 22" D. FIR # 448 76" MAPLE (PRUNE) # 449 94" POPLAR # 453 9" HAWTHORNE # 452 38" HAWTHORNE # 456 74" POPLAR # 457 15" CEDAR FOUND REBAR/ CAP LS# 13731 (HARSTAD)0.18W OF LINE & 0.25N FROM PROP COR 0.1.W OF LINE & 0.42N FROM PROP COR 30' ROADWAY EASEMENT AS SHOWN ON SURVEY, REC. NO. 8204079008 INGRESS-EGRESS EASEMENT REC. NO. 20030806000478 11 5 ' - 2 " S H A R E D O P E N SP A C E # 446 8" CHERRY # 465 26" CHERRY PARCEL 2923059029 30,105± SQ FT 0.69 ACRE(S) N88°18'53"W 135.00 N88°18'53"W135.00 N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' SE 176TH STREET SE PETROVITSKY RD EXIST. HOUSE # 459 39" CEDAR # 458 30" CEDAR # 460 39" CYPRESS SET REBAR/CAP TEL MB R/W  :22')(1&( 81/(6627+(5:,6(127(' 75((6&$/,3(5,1,1&+(6 7<3( 6$1,7$5<6(:(50$1+2/(660+ 6327(/(9$7,21 :$7(59$/9(:9 +<' 33 32:(532/( +<'5$17 LEGEND ) :0 &&('$533,1()5)58,7 29(5+($'32:(5/,1( )),58'81.12:1'(&,'8286 :$7(50(7(5 32:(50(7(5 &$7&+%$6,1 3 )5 &% 30 (;,67,1*&251(5$6'(6&5,%(' &$6('02180(17 2&&83,(' TESC PLAN  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 THE 13 ELEMENTS OF A CONSTRUCTION SWPPP CONSTRUCTION SEQUENCE TOPSOIL: STOCKPILE EXISTING TOPSOIL DURNING GRADING AND REPLACE IT PRIOR TO PLANTING PER BMP 15.13 OPTION 3. R 427903 75((672%(5(029(' NOTE: CITY OF RENTON INSPECTOR MAY REQUIRE FURTHER EROSION CONTROL MEASURES AS NEEDED ALL DISTURBED PERVIOUS SURFACES TO RECEIVE SOIL AMENDMENTS PER COR STANDARD PLAN 264.00 1. Clearing Limits: Prior to any site clearing or grading, areas to remain undisturbed during project construction shall be delineated on the project's ESC plan and physically marked on the project site. BMP plastic or Metal Fencing 2. Cover Measures: Temporary and permanent cover measures shall be provided when necessary to protect disturbed areas. The intent of these measures is to prevent erosion by having as much area as possible covered during any period of precipitation. BMP: Temporary cover shall be installed if an area is to remain unworked for more than seven days during the dry season (May 1 to September 30) or for more than two consecutive working days during the wet season (October 1 to April 30). These time limits may be relaxed if an area poses a low risk of erosion due to soil type, slope gradient, anticipated weather conditions, or other factors. BMP: Mulching D.2.1.2.2 BMP: Plastic Covering D.2.1.2.4 3. Perimeter Protection: Perimeter protection to filter sediment from sheet flow shall be provided downstream of all disturbed areas prior to upslope grading. BMP: Silt Fence D.2.1.3.1 4. Traffic Area Stabilization: Unsurfaced entrances, roads, and parking areas used by construction traffic shall be stabilized to minimize erosion and tracking of sediment offsite. BMP: Stabilized Construction Entrance D.2.1.4.1 5. Sediment Retention: Surface water collected from all disturbed areas of the site shall be routed through a sediment pond or trap prior to release from the site, except those areas at the perimeter of the site small enough to be treated solely with perimeter protection. Sediment retention facilities shall be installed prior to grading any contributing area. BMP: Catch Basin Insert D.2.1.5.F BMP: D..2.1.5.2 Vault to be use as temporary sediment storage and to be pump and disposed of at a proper facility 6. Surface Water Collection: Surface water collection measures (e.g., ditches, berms, etc.) shall be installed to intercept all surface water from disturbed areas, convey it to a sediment pond or trap, and discharge it downstream of any disturbed areas. Areas at the perimeter of the site, which are small enough to be treated solely with perimeter protection, do not require surface water collection. Significant sources of upstream surface water that drain onto disturbed areas shall be intercepted and conveyed to a stabilized discharge point downstream of the disturbed areas. Surface water collection measures shall be installed concurrently with or immediately following rough grading and shall be designed, constructed, and stabilized as needed to minimize erosion. BMP: Pipe Slope Drains D.2.1.6.2 Direct surface water run off to vault. 7. Dewatering Control: The water resulting from construction site de-watering activities must be treated prior to discharge or disposed of as specified. BMP: No groundwater anticipated 8. Dust Control: Preventative measures to minimize wind transport of soil shall be implemented when a traffic hazard may be created or when sediment transported by wind is likely to be deposited in water resources. BMP: When using water for dust control, the exposed soils shall be sprayed until wet, but runoff shall not be generated by spraying. 9. Flow Control: Surface water from disturbed areas must be routed through the project's onsite flow control facility or other provisions must be made to prevent increases in the existing site conditions 2-year and 10-year runoff peaks discharging from the project site during construction (flow control facility, runoff treatment facility, and on-site BMP areas [existing or proposed] shall not be used for this purpose). BMP: None required due to the small size of the project 10. Control Pollutants: Stormwater pollution prevention (SWPPS) measures are required to prevent, reduce, or eliminate the discharge of pollutants to onsite or adjacent stormwater systems or watercourses from construction-related activities such as materials delivery and storage, onsite equipment fueling and maintenance, demolition of existing buildings and disposition of demolition materials and other waste, and concrete handling, washout and disposal. Section D.2.2 describes BMPs specific to this purpose; additionally, several of the ESC BMPs described herein are applicable. BMP: Concrete Handling (see notes below 11. Protect Existing and Proposed Stormwater Facilities and On-site BMPs: Sedimentation and soil compaction reduce the infiltration capacity of native and engineered soils. Protection measures shall be applied/installed and maintained so as to prevent adverse impacts to existing stormwater facilities and on-site BMPs and areas of proposed stormwater facilities and on-site BMPs for the project. Adverse impacts can prompt the requirement to restore or replace affected stormwater facilities and on-site BMPs. BMP: Protect all stormwater facilities and on-site BMPs and proposed stormwater facility and on-site BMP footprints from sedimentation through installation and maintenance of erosion and sediment control BMPs on portions of the site that drain into the BMPs/ facilities. BMP: Stormwater facilities and on-site BMPs shall be restored to their fully functioning condition if they accumulate sediment during construction. Restoring the stormwater facilities and on-site BMPs shall include, at a minimum, removal of sediment and any sediment-laden bioretention soils, and replacing the removed soils with soils meeting the design specification. Replacement with a new fully- functioning stormwater facility and/or on-site BMP may be required if restoration to the fully-functioning condition can't be accomplished. 12. Maintain Protective BMPs: Protection measures shall be maintained to ensure continued performance of their intended function, to prevent adverse impacts to existing BMPs/facilities and areas of proposed BMPs/facilities, and protect other disturbed areas of the project. 13. Manage the Project: Coordination and timing of site development activities relative to ESC concerns, and timely inspection, maintenance and update of protective measures are necessary to effectively manage the project and ensure the success of protective ESC and SWPPS design and implementation. DEVELOPMENT ENGINEERING msippo 07/23/2025 CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR # 455 22" D. FIR # 448 76" MAPLE (PRUNE) # 449 94" POPLAR # 453 9" HAWTHORNE # 452 38" HAWTHORNE # 456 74" POPLAR # 457 15" CEDAR FOUND REBAR/ CAP LS# 13731 (HARSTAD)0.18W OF LINE & 0.25N FROM PROP COR 0.1.W OF LINE & 0.42N FROM PROP COR 30' ROADWAY EASEMENT AS SHOWN ON SURVEY, REC. NO. 8204079008 INGRESS-EGRESS EASEMENT REC. NO. 20030806000478 11 5 ' - 2 " S H A R E D O P E N SP A C E # 446 8" CHERRY # 465 26" CHERRY PARCEL 2923059029 30,105± SQ FT 0.69 ACRE(S) N88°18'53"W 135.00 N88°18'53"W135.00 N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' SE 176TH STREET SE PETROVITSKY RD EXIST. HOUSE # 459 39" CEDAR # 458 30" CEDAR # 460 39" CYPRESS SET REBAR/CAP TEL MB R/W AP A R T M E N T E N T R A N C E UN I T 4 UN I T 3 UN I T 2 UN I T 1 CA R P O R T CA R P O R T FI R E L A N E UN I T 5 UN I T 6 UN I T 7 UN I T 8 UN I T 9 LANDSCAPE AREA GA R A G E FF 442.5 FF 448 FF 450 FF 452 FF 454 44 4 446 448 450 4 4 6 4 4 8 4 5 0 4 5 2 45 4 444 446 448 450 452 454 442 441 446 FILTERRA (FTPD) RIM 441.90 IE 437.32 12" DI OUT (SEE DETAIL C-5) DS DS DS 6" P V C R O O F D R A I N & DETENTION VAULT 16' X 98' FG 442.50 FG 446.32 FG 446.12 FG 448.70 FG 448.57 FG 448.43 FG 450.16 FG 450.10 FG 450.34 FG 456.98 FG 456.98 PROVIDE CONCRETE ADA PAD (4'X4') AND TIE INTO EXISTING SIDEWALK SAW CUT EX ASPHALT 2' MIN WIDE. PROVIDE CONCRETE ADA PAD (4'X4') AND TIE INTO EXISTING SIDEWALK WATERMAIN INSTALLATION SAW CUT AND PATCH EX ASPHALT AND RESTORATION SHALL BE PER COR TRENCH RESTORATION AND STREET OVERLAY REQUIREMENTS FG 446.00 TC 456.00 FF 442.5 FF 442.5 FF 442.5 FF 442.5 12' FTG DRAIN FTG DRAIN YD RIM 445.20 IE 442.50 6" ROOF DRAIN IE 443.50 4" FTG DRAIN PUMP MANHOLE SEE DETAIL (C7) CB#5 TYPE 1 W/SOLID LID RIM 451.50 IE IN 452.00 2" FORCEMAIN W/ DOWNTURNED ELBOW IE OUT 450.60 12" 24LF 12" DI S=0.67% TIE INTO EX CB TC 443.10 FG 442.60 6" CURB 6" P V C R O O F D R A I N DS CB#3 TYPE 1 W/SOLID LID RIM 442.50 IE 439.50 6" ROOF DRAIN IE OUT 439.50 6" ROOF DRAIN FG 442.50 IE 438.00 % IE 437.20 26 ' 6LF 6" PVC S=8.33%28LF 6" PVC S=10.7% TC 445.50 FG 445.00 6" CONC. CURB STA 1+35.06 REMOVE EXISTING CURB FROM STA 1+15 TO 1+55 AND INSTALL NEW 24' WIDE DRIVEWAY APPROACH (SEE DETAIL SHEET C10) TC 448.00 TC 442.80 FG 442.30 2" SCHD 80 FORCE MAIN TC 445.86 FG 445.36 FG 452.41 FG 452.37 FG 453.05 ADA RAMP SEE DETAIL SHEET 4 6LF 12" DI S=1.67% IE 4 3 7 . 2 0 CB # 5 T Y P E 1 W / S O L I D L I D RI M 4 5 4 . 0 0 IE I N 4 5 1 . 5 0 2 " F O R C E M A I N W / DO W N T U R N E D E L B O W IE O U T 4 5 0 . 9 1 1 2 " EX GROUND FINISHED GRADE 2" PVC S C H D 8 0 24LF 12" DI S=0.67% EX C B RI M 4 5 3 . 5 9 IE I N 1 2 " D I 4 5 0 . 7 5 ( N E W ) IE O U T 1 2 " C M P 4 5 0 . 4 4 ( E X I S T ) VAULT  :22')(1&( 81/(6627+(5:,6(127(' 75((6&$/,3(5,1,1&+(6 7<3( 6$1,7$5<6(:(50$1+2/(660+ 6327(/(9$7,21 :$7(59$/9(:9 +<' 33 32:(532/( +<'5$17 LEGEND ) :0 &&('$533,1()5)58,7 29(5+($'32:(5/,1( )),58'81.12:1'(&,'8286 :$7(50(7(5 32:(50(7(5 &$7&+%$6,1 3 )5 &% 30 (;,67,1*&251(5$6'(6&5,%(' &$6('02180(17 2&&83,(' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON GRADING AND DRAINAGE PLAN  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ 3" COMP DEPTH HMA 3" COMP DEPTH ATB 6" COMP DEPTH GRAVEL BORROW COMPACTED SUB GRADE 26 FT 2% R 427904 NOTE: ALL DISTURBED PERVIOUS SURFACES TO RECEIVE SOIL AMENDMENTS PER COR STANDARD PLAN 264.00 VARIES 3" COMP DEPTH HMA 3" COMP DEPTH ATB 6" COMP DEPTH GRAVEL BORROW COMPACTED SUB GRADE CONC CURB 24 FT4 FT WALK CONC CURB 8" 6"1"R1/2"R PAVEMENT FINISHED GRADE 6" 16 " SLOPE V A R I A B L E 5' 5' 7' 4' 5' 7 ' 5' 2% 7. 5 % 7. 5 % 2% 2% FG 454.00FG 453.90 FG 453.47FG 453.37 FG 453.47FG 453.37 FG 454.00FG 453.90 DEVELOPMENT ENGINEERING msippo 07/23/2025 Surface Water Enginering jfarah 07/23/2025 GU T T E R L I N E RO W L I N E CE N T E R L I N E S E P E T R O V I T S K Y R D BA C K O F W A L K EX GROUND DRIVEWAY GRADE PR O P E R T Y L I N E FI L T E R R A S Y S T E M  ST A 1 90 3 1 ' L T RI M 4 4 1 . 9 0 IE 4 3 7 . 3 2 1 2 " D I I N (S E E D E T A I L ) SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON STORM PROFILES  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ R 427905 DEVELOPMENT ENGINEERING msippo 07/23/2025 CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR D. FIR # 446 8" CHERRY # 465 26" CHERRY N88°18'53"W 135.00 SE 176TH STREET SE PETROVITSKY RD TEL MB R/W LANDSCAPE AREA $ STA: 1+35.06 REMOVE EXISTING CURB SECTION FROM STA 1+15 TO STATION 1+55 AND INSTALL NEW 24FT WIDE DRIVEWAY APPROACH (SEE DETAIL (SHEET C10) 10.5 FT ROW DEDICATION INSTALL 12FT CONC. SIDEWALK EX CURB AND GUTTER TO REMAIN FG 446.32 FG 446.12 FG 448.70 FG 448.57 FG 448.43 FG 450.16 FG 450.10 FG 450.34 FG 456.98 FG 456.98 PROVIDE TEMPORARY ADA ASPHALT PAD (4'X4') AND TIE INTO EXISTING SIDEWALK SAW CUT EX ASPHALT 2 FT MIN WIDE PROVIDE TEMPORARY ADA ASPHALT PAD (4'X4') AND TIE INTO EXISTING SIDEWALK SAW CUT AND PATCH EX ASPHALT AND RESTORATION SHALL BE PER COR TRENCH RESTORATION AND STREET OVERLAY REQUIREMENTS TC 446.00 TC 448.00 TC 452.00 TC 454.00 TC 456.00  :22')(1&( 81/(6627+(5:,6(127(' 75((6&$/,3(5,1,1&+(6 7<3( 6$1,7$5<6(:(50$1+2/(660+ 6327(/(9$7,21 :$7(59$/9(:9 +<' 33 32:(532/( +<'5$17 LEGEND ) :0 &&('$533,1()5)58,7 29(5+($'32:(5/,1( )),58'81.12:1'(&,'8286 :$7(50(7(5 32:(50(7(5 &$7&+%$6,1 3 )5 &% 30 (;,67,1*&251(5$6'(6&5,%(' &$6('02180(17 2&&83,(' SE PETROVITSKY PLAN AND PROFILE  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ R 427906 NEW CONC WALK EXISTING 5' CONC WALK EXISTING 5' CONC TO BE REMOVED 5' 5' FG 446.32 12 ' NEW CONC WALK EXISTING 5' CONC WALKEXISTING 5' CONC TO BE REMOVED 5' 5' 12 ' EXISTING CURB TO REMAIN EXISTING CURB TO REMAIN 1. 5 % 1. 5 % 12.8% FG 446.40 FG 446.40FG 446.12 1.5% 5.6% 1. 2 5 % 8' FG 446.00 FG 446.40 FG 446.08 FG 456.98FG 456.90 7.73% 1.6% 4.00% FG 456.98 FG 456.98 EX 456.90 EX 456.54 8' FG 456.68 1. 7 5 % EX 7.14%EX 9.08% DEVELOPMENT ENGINEERING msippo 07/23/2025 SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 )/2:5(675,&7252,/32//87,21 &21752/'(9,&(7((7<3( )5237 ,167$//$7,213(5.&56'(7$,/),* 9$8/7 5()(572.&56'(7$,/),* 9$8/73/$1 R 427907 C-5 DEVELOPMENT ENGINEERING msippo 07/23/2025 3/$1 7239,(:'225/2&$7,21 Z$/8073/$7( /$''(5+$1*(5 %2/73/$7(72 0+:$//:L$1&+25%2/76 ',$',3,3()/[3(:0(*$/8* 6(&7,21 $6(&7,21 %  ',$ 0$1+2/( 6((0$18)$&785(5663(&,),&$7,216)25(/(&75,&$/5(48,5(0(176 3,3($1'),77,1*6&+('8/( 38036 2))(/(9 $/$50(/(9  675$,15(/,()&25' 3527(&7,9(&$%/(6+528' &211(&725 5,0 3803)/2$721(/(9',6&+$5*(*30 +,*+:$7(5 *$/9$1,=('*8,'(5$,/:*8,'(%5$&.(76 &21(5<25(48$/  %277202)7$1.(/(9)7 :,7+($&+3803$/7(51$7,1* SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 PUMP SYSTEM MAINTENANCE PROCEDURES 1. IN ADDITION TO THE TWO ACTIVE PUMPS THERE SHALL BE TWO BACKUP PUMPS LOCATED ON SITE. 2. DURING ACTIVE RAIN STORMS THE PUMPS SYSTEM SHALL CHECKED FOR PROPER OPERATION. 3. THE NAME AND PHONE NUMBER OF THE PUMP INSTALLER SHALL BE MOUNTED ON THE HIGH WATER ALARM BOX AND CONTACTED IN THE EVENT OF PUMP OR SYSTEM FAILURE. 4. THE BACKUP EMERGENCY GENERATOR SHALL BE MAINTAINED AND SERVICED PER THE MANUFACTURE'S RECOMMENDATIONS. 5. THE BACKUP EMERGENCY GENERATOR SHALL BE CHECKED FOR PROPER OPERATION MONTHLY. APPLICANT SHALL CONDUCT A PUMP FLOW TEST DEMONSTRATING: · AVERAGE DISCHARGE RATE OF THE PUMPS SHALL BE EQUAL TO OR LESS THAN 5.0 GPM FOR THE RANGE OF FLOWS FROM PUMP-ON ELEVATION TO PUMP-OFF ELEVATION. PUMP STATION PLAN R 427908 DEVELOPMENT ENGINEERING msippo 07/23/2025 '(7$,/6   &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 5 PER CITY REVIEW 6-7-25 6-7-25 6-7-25 DEVELOPMENT ENGINEERING msippo 07/23/2025 '(7$,/6   &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 5 PER CITY REVIEW 6-7-25 6-7-25 6-7-25 DEVELOPMENT ENGINEERING msippo 07/23/2025 '(7$,/6   &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 5 DEVELOPMENT ENGINEERING msippo 07/23/2025 SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON 127(6   &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 5 DEVELOPMENT ENGINEERING msippo 07/23/2025 AP A R T M E N T E N T R A N C E UN I T 4 UN I T 3 UN I T 2 UN I T 1 CA R P O R T CA R P O R T FI R E L A N E UN I T 5 UN I T 6 UN I T 7 UN I T 8 UN I T 9 LANDSCAPE AREA SS M H 2 PR I V A T E M H ST A 0 + 0 0 SS M H 1 PR I V A T E M H 8" P V C S E W E R 8" PVC SEWER 8" WATER8" P V C S E W E R TO BE REMOVED FDC CONNECTION 2" GALV FIRE LINE 2" SADDLE 2" GALV FIRE LINE 2" SADDLE 9-WM'S W/EASEMENTS FDC CONNECTION C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . C0 T Y P . GA R A G E FG 442.0 FG 442.2 FF 442 FF 451 FF 451 FF 451 FF 451 FF 451 FF 442 FF 442 FF 442 FF 442 FG 441.8 FG 442.0 FF 448 FF 450 FF 452 FF 454 CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR # 455 22" D. FIR # 448 76" MAPLE (PRUNE) # 449 94" POPLAR # 453 9" HAWTHORNE # 452 38" HAWTHORNE # 456 74" POPLAR # 457 15" CEDAR FOUND REBAR/ CAP LS# 13731 (HARSTAD)0.18W OF LINE & 0.25N FROM PROP COR 0.1.W OF LINE & 0.42N FROM PROP COR 30' ROADWAY EASEMENT AS SHOWN ON SURVEY, REC. NO. 8204079008 INGRESS-EGRESS EASEMENT REC. NO. 20030806000478 11 5 ' - 2 " S H A R E D O P E N SP A C E # 446 8" CHERRY # 465 26" CHERRY PARCEL 2923059029 30,105± SQ FT 0.69 ACRE(S) N88°18'53"W 135.00 N88°18'53"W135.00 N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' SE 176TH STREET SE PETROVITSKY RD EXIST. HOUSE # 459 39" CEDAR # 458 30" CEDAR # 460 39" CYPRESS SET REBAR/CAP TEL MB R/W  :22')(1&( 81/(6627+(5:,6(127(' 75((6&$/,3(5,1,1&+(6 7<3( 6$1,7$5<6(:(50$1+2/(660+ 6327(/(9$7,21 :$7(59$/9(:9 +<' 33 32:(532/( +<'5$17 LEGEND ) :0 &&('$533,1()5)58,7 29(5+($'32:(5/,1( )),58'81.12:1'(&,'8286 :$7(50(7(5 32:(50(7(5 &$7&+%$6,1 3 )5 &% 30 (;,67,1*&251(5$6'(6&5,%(' &$6('02180(17 2&&83,(' CONCEPTUAL UTILITY PLAN  &,7<2)5(1721 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PETROVITSKY APARTMENTS PE T R O V I T S K Y A P A R T M E N T S 7( '         PE T R O V I T S K Y A P A R T M E N T S 6+ ( ( 7  1 8 0 % ( 5 5  ; ; ; ; ; ; R-XXXXX 17217 7TH AVENUE WEST BOTHELL, WA 98012 TEL. (206) 390-8374 FAX. (425) 741-8214 '(&&,2(QJLQHHULQJ C3 2 0 0 4 7 6 3 R 427913 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 amorganroth 07/25/2025 CURRENT PLANNING DEVELOPMENT ENGINEERING msippo 07/23/2025 amorganroth 07/25/2025 CURRENT PLANNING DEVELOPMENT ENGINEERING msippo 07/23/2025 amorganroth 07/25/2025 CURRENT PLANNING DEVELOPMENT ENGINEERING msippo 07/23/2025 amorganroth 07/25/2025 CURRENT PLANNING DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 DEVELOPMENT ENGINEERING msippo 07/23/2025 CUT INTO EX 8" WATER LINE 3- 8" GV (FLXMJ) 2-8" DI SPOOLS (MIN 24" LENGTH) 2-8" COUPLING ADAPTORS (MJ) 1-CONC. BLK SEE DETAIL W-1A 130 LF 8" DIP CL52 1-22 1/2 DEG EL MJ 1-CONC. BLK SEE DETAIL W - 1 A 1-90 DEG EL MJ 1-CONC. BLK PER DETAIL W-1A 1-8" GV (FLXMJ) 2-8" DI SPOOL 24" MIN LENGTH 1-8" TRANSITION COUPLING AC TO DI 1-8" COUPLING ADAPTER 1-CONC. BLK PER DETAIL W-1A 8"W DI AP A R T M E N T E N T R A N C E UN I T 4 UN I T 3 UN I T 2 UN I T 1 CA R P O R T CA R P O R T FI R E L A N E UN I T 5 UN I T 6 UN I T 7 UN I T 8 UN I T 9 LANDSCAPE AREA TO BE REMOVED FDC W/DCDA CONNECTION 2" B R A S S F I R E L I N E 5-WM'S GA R A G E 4-WM'S 2" B R A S S F I R E L I N E FDC W/DCDA CONNECTION 21 LF 8 " D I P CL52 ( R J ) 24 4 L F 8 " D I P C L 5 2 CB (TYPE 1) RIM 453.59 IE (N) 4" PVC=451.29 IE (S) 12" CMP=450.44 SLOPE EASEMENT PER REC. NO. 8307261110 FOUND 3.5" IRON PIPE AT PROP COR (7.2' ABOVE GROUND) FOUND REBAR/ CAP LS# 28101 0.1.W OF LINE & 0.42N FROM PROP COR # 455 22" D. FIR # 448 76" MAPLE (PRUNE) # 449 94" POPLAR # 453 9" HAWTHORNE # 452 38" HAWTHORNE # 456 74" POPLAR # 457 15" CEDAR FOUND REBAR/ CAP LS# 13731 (HARSTAD)0.18W OF LINE & 0.25N FROM PROP COR 0.1.W OF LINE & 0.42N FROM PROP COR 30' ROADWAY EASEMENT AS SHOWN ON SURVEY, REC. NO. 8204079008 INGRESS-EGRESS EASEMENT REC. NO. 20030806000478 11 5 ' - 2 " S H A R E D O P E N SP A C E # 446 8" CHERRY # 465 26" CHERRY PARCEL 2923059029 30,105± SQ FT 0.69 ACRE(S) N88°18'53"W 135.00 N88°18'53"W135.00 N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' N0 1 ° 4 4 ' 4 6 " E 22 3 . 0 0 ' SE 176TH STREET SE PETROVITSKY RD EXIST. HOUSE # 459 39" CEDAR # 458 30" CEDAR # 460 39" CYPRESS SET REBAR/CAP TEL MB R/W LOCATE WATERMAIN 5' FROM PROP TO EDGE OF PIPE 10' WATER EASEMENT TO SOOS CREEK 9-WM'S LOCATE WATERMAIN 5' FROM PROP TO EDGE OF PIPE10' WATER EASEMENT TO SOOS CREEK 20 ' SAW CUT EX PAVEMENT AND PROVIDE TRENCH RESTORATION PER CITY OF RENTON R/W PERMIT REPLACE EX AC PIPE WITH 8" DIP CLS 52TIE INTO EX 8" AC PIPE 1-8" GV (MJXFL) 1-8" DI SPOOL (24" MIN. LENGTH) 1-8" TRANSITION COUPLING FROM AC TO DI C3-108 ABANDON WATER METER 10' EASEMENT TO SOOS CREEK 1-8X2X8 TEE MJXFLXMJ 1-2" GV FL X TAP RESILIENT 6($7GV 1-CONC BLOCK 16-LF 8" DIP SET METERS AT 1.0 FEET FROM EDGE OF SIDEWALK AND MAINTAIN 1.5FT SEPERATION BETWEEN ('*(62) METERS%2;(6 ,167$//),5(+<'5$17$66(0%/< 3(5':*12: TIE INTO EX 8" WATER LINE 1-8" TEE (FL) 1- 8" GV (FLXFL) SET METERS AT EDGEOF ($6(0(17 AND MAINTAIN 1.5FTSEPERATION BETWEEN ('*(62)METERS%2;(6 1-8X2X8 TEE MJXFLXMJ 1-2" GV FL X TAP RESILIENT 6($7GV 1-CONC BLOCK VICINITY MAP SO O S C R E E K W A T E R & S E W E R D I S T R I C T PE T R O V I T S K Y A P A R T M E N T S WA T E R M A I N E X T E N S I O N WA T E R P L A N A N D N O T E S 13 1" = 2 0 ' 1 WATERMAIN PLAN, NOTES & VICINITY MAP SH.NO. DESCRIPTION SHEET INDEX WATER GENERAL NOTES: 1. 2. 3. (REVISED 05/16/11) 4. 5. 6. 7. 8. 9. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE SOOS CREEK WATER & SEWER DISTRICT, ALSO REFERRED HEREINAFTER AS “DISTRICT”. THE DEVELOPER SHALL FURNISH THE DISTRICT A COPY OF THE COMMERCIAL AND/OR SUBDIVISION PLANS APPROVED BY THE GOVERNING AGENCY PRIOR TO ANY WATER MAIN CONSTRUCTION. PRIOR TO CONSTRUCTING ANY WATER MAINS, THE APPROPRIATE STREETS AND LOTS SHALL BE CLEARED, GRADED, AND STAKED BY THE DEVELOPER/CONTRACTOR AND ALL EXISTING UTILITIES SHALL BE LOCATED. FOLLOWING WATER MAIN CONSTRUCTION, ANY REVISION OF ROADWAY OR EASEMENT GRADES REQUIRING THE MAINS TO BE RECONSTRUCTED SHALL BE MADE AT THE DEVELOPER'S/CONTRACTOR’S EXPENSE. RECONSTRUCTION SHALL CONFORM TO THE SPECIFICATIONS OF THE DISTRICT. ALL COSTS FOR INSPECTING SUCH RECONSTRUCTION SHALL BE CHARGED TO THE DEVELOPER IN ADDITION TO THE STANDARD CHARGES, AND SHALL BE PAID BEFORE ACCEPTANCE BY THE DISTRICT. NO WATER SERVICE CONNECTIONS SHALL BE MADE TO THE EXISTING SYSTEM UNTIL COMPLETION OF THE BILL OF SALE AND ALL EASEMENTS. MAKE APPLICATION TO THE DISTRICT FOR WATER METER INSTALLATION FOR EACH WATER SERVICE CONNECTION PRIOR TO MAKING CONNECTION. BILL OF SALE WILL NOT BE PROCESSED UNTIL PUGET SOUND ENERGY HAS EITHER PROVIDED A WORK SKETCH OR INSTALLED THEIR VAULTS, HAND HOLES AND LIGHT STANDARDS, OR THE DEVELOPER HAS PROVIDED A SIGNED HOLD HARMLESS AGREEMENT (FORM SUPPLIED BY THE DISTRICT). ALL COSTS OF WATER MAIN RE-STAKING SHALL BE PAID BY THE DEVELOPER/CONTRACTOR. PROPERTY CORNERS SHALL BE PINNED WITH REFERENCE TACK ON CURBS BY THE DEVELOPER/CONTRACTOR. THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT AT (253) 630-9900 TO SCHEDULE A PRECONSTRUCTION MEETING AT THE DISTRICT OFFICE. AFTER THE PRE-CONSTRUCTION MEETING, THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT’S FIELD REPRESENTATIVE AT LEAST 48 HOURS (REGULAR WORKING DAYS) BEFORE STARTING WORK. THE DEVELOPER/CONTRACTOR SHALL OBTAIN ALL REQUIRED FINAL INSPECTIONS TO MEET PERMIT REQUIREMENTS. INSPECTIONS MUST BE SCHEDULED AT LEAST 48 HOURS IN ADVANCE. 10. N 223 FT OF S 265 FT OF W 135FT OF SE 1/4 OF SE 1/4 EXEMT POR PER RCW 84.36.381-389 PARCEL NUMBER2923059029LOT SIZW 30,105 SF SITE ADDRESS11204 SE PETROVITSKY RDRENTON, WA. 98056 LEGAL DESCRIPTION &$6('02180(17 2&&83,(' (;,67,1*&251(5$6'(6&5,%(' 30 &% )5 3 &$7&+%$6,1 32:(50(7(5 :$7(50(7(5 )),58'81.12:1'(&,'8286 29(5+($'32:(5/,1( &&('$533,1()5)58,7 :0 LEGEND +<'5$17 32:(532/(33 +<' :9 :$7(59$/9( 6327(/(9$7,21 660+6$1,7$5<6(:(50$1+2/( 75((6&$/,3(5,1,1&+(6 7<3(  :22')(1&( 81/(6627+(5:,6(127(' '( & & , 2  ( Q J L Q H H U L Q J SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON PLAN REVIEW 12-916 BASE MAP C3 WATER DETAILS2 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 4 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W 5 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W WATER DETAILS3 FIRE ROOM FDC W/ DCDA CONNECTION FIRE ROOM FDC W/ DCDA CONNECTION soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction SO O S C R E E K W A T E R & S E W E R D I S T R I C T PE T R O V I T S K Y A P A R T M E N T S WA T E R M A I N E X T E N S I O N WA T E R D E T A I L S 23 1" = 5 0 ' 1" = 1 0 ' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON '( & & , 2  ( Q J L Q H H U L Q J PLAN REVIEW 12-916 BASE MAP C3 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 4 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W 5 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction SO O S C R E E K W A T E R & S E W E R D I S T R I C T :$ 7 ( 5 M A I N E X T E N S I O N WA T E R D E T A I L S 33 1" = 5 0 ' 1" = 1 0 ' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON '( & & , 2  ( Q J L Q H H U L Q J 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 4 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W 5 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W PLAN REVIEW 12-916 BASE MAP C3 6- 1 2 - 2 5 soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction EX GROUND DISTRICT SEWER SYSTEMPRIVATE SEWER SYSTEM CB ( T Y P E 1 ) RI M 4 5 3 . 5 9 IE ( N ) 4 " P V C = 4 5 1 . 2 9 IE ( S ) 1 2 " C M P = 4 5 0 . 4 4 FO U N D 3 . 5 " I R O N P I P E AT P R O P C O R (7 . 2 ' A B O V E G R O U N D ) FO U N D R E B A R / C A P LS # 2 8 1 0 1 0. 1 . W O F L I N E & 0 . 4 2 N FR O M P R O P C O R # 4 5 5 2 2 " D. F I R # 4 4 8 7 6 " MA P L E ( P R U N E ) # 4 4 9 9 4 " PO P L A R # 4 5 3 9 " HA W T H O R N E # 4 5 2 3 8 " HA W T H O R N E # 4 5 6 7 4 " PO P L A R # 4 5 7 1 5 " CE D A R FO U N D R E B A R / C A P LS # 1 3 7 3 1 ( H A R S T A D ) 0 . 1 8 W O F LI N E & 0 . 2 5 N F R O M P R O P C O R 0. 1 . W O F L I N E & 0 . 4 2 N F R O M PR O P C O R 30 ' R O SH O W RE C . N SPACE # 4 4 6 8 " CH E R R Y # 4 6 5 2 6 " CH E R R Y PA R C E L 2 9 2 3 0 5 9 0 2 9 30 , 1 0 5 ± S Q F T 0. 6 9 A C R E ( S ) N8 8 ° 1 8 ' 5 3 " W 13 5 . 0 0 N8 8 ° 1 8 ' 5 3 " W 13 5 . 0 0 N01°44'46"E 223.00' N01°44'46"E 223.00' EX I S T . HO U S E # 4 5 9 3 9 " CE D A R # 4 5 8 3 0 " CE D A R # 4 6 0 3 9 " CY P R E S S SE T R E B A R / C A P TE L MB SSMH 2 54" PRIVATE MH STA 0+00 SSMH 1 PRIVATE MH 8" PVC SEWER 8" P V C S E W E R 8" W A T E R 8" P V C S E W E R TO B E RE M O V E D 2" BRASS FIRE LINE C0 TYP. C0 TYP. C0 TYP. C0 TYP. C0 TYP.C0 TYP.C0 TYP.C0 TYP.C0 TYP. 2" BRASS FIRE LINE SS STUB MH STA 0+81 2% MIN SLOPE 4" PVC SS STUB MH STA 0+71 2% MIN SLOPE 4" PVC SS STUB MH STA 0+45 2% MIN SLOPE 4" PVC SS STUB MH STA 0+36 2% MIN SLOPE 4" PVC 10' PRIVATE SEWER EASEMENT UNIT 4 UNIT 3 UNIT 2 UNIT 1 CARPORT CARPORT CARPORT FIRE LANE FIRE LANE UNIT 5 UNIT 6 UNIT 7 UNIT 8 UNIT 9 FF 451FF 451FF 451 FF 451 FF 451 FF 448 FF 450 FF 452 FF 454 SS STUB 2% MIN SLOPE MH 696-12 EX SSMH RIM 438.76 IE=428.86 8" PVC N IE= 429.00 8" PVC SW CORE DRILL AND TIE INTO EX SSMH AND RECHANNEL KOR AND SEAL BOOT 20' MH 1468-1 10' SEWER EASEMENT TO SOOS CREEK STA 0+00 C 100 SSMH 1468-1 STA 2+04 RIM 442.00 IE IN = 431.00 8" PVC E IE OUT = 430.90 8" PVC NW VICINITY MAP SO O S C R E E K W A T E R & S E W E R D I S T R I C T SE W E R M A I N E X T E N S I O N PE T R O V I T S K Y A P A R T M E N T S SE W E R P L A N A N D P R O F I L E & N O T E S 13 1" = 2 0 ' 1" = 4 ' SEWER DETAILS 5 4 2 3 1 SH.NO. DESCRIPTION SHEET INDEX SEWER PLAN AND PROFILE & NOTES EXISTING SEWERS TO REMAIN IN SERVICE AT ALL TIMES. SEWER GENERAL NOTES: 1. 2. 3. 11. 12. 13. (REVISED 05/16/11) ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS OF SOOS CREEK WATER AND SEWER DISTRICT, ALSO REFERRED TO HEREINAFTER AS "DISTRICT". THE DEVELOPER SHALL FURNISH THE DISTRICT A COPY OF THE COMMERCIAL AND/OR SUBDIVISION PLANS APPROVED BY THE GOVERNING AGENCY PRIOR TO ANY SEWER MAIN CONSTRUCTION. CONNECTION TO EXISTING SEWER MAINS SHALL BE MADE ONLY WITH THE WRITTEN APPROVAL OF THE DISTRICT AND ONLY AFTER AT LEAST 48 HOURS (TWO REGULAR WORKING DAYS) ADVANCE NOTICE. ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM. PRIOR TO CONSTRUCTING ANY SEWER MAINS, THE APPROPRIATE STREETS AND LOTS SHALL BE CLEARED, GRADED, AND STAKED BY THE DEVELOPER/CONTRACTOR AND ALL EXISTING UTILITIES SHALL BE LOCATED. FOLLOWING SEWER MAIN CONSTRUCTION, ANY REVISION OF ROADWAY OR EASEMENT GRADES REQUIRING THE MAINS TO BE RECONSTRUCTED SHALL BE MADE AT THE DEVELOPER'S/CONTRACTOR'S EXPENSE. 4. NO SIDE SEWER CONNECTIONS SHALL BE MADE TO THE EXISTING SYSTEM UNTIL COMPLETION OF THE BILL OF SALE AND ALL EASEMENTS. OBTAIN SIDE SEWER PERMIT FROM THE DISTRICT FOR EACH SIDE SEWER CONNECTION PRIOR TO MAKING CONNECTION. BILL OF SALE WILL NOT BE PROCESSED UNTIL PUGET SOUND ENERGY HAS EITHER PROVIDED A WORK SKETCH OR INSTALLED THEIR VAULTS, HAND HOLES AND LIGHT STANDARDS, OR THE DEVELOPER HAS PROVIDED A SIGNED HOLD HARMLESS AGREEMENT (FORM SUPPLIED BY THE DISTRICT). 6. ALL COSTS OF SEWER MAIN RE-STAKING SHALL BE PAID BY THE DEVELOPER/CONTRACTOR.7. PROPERTY CORNERS SHALL BE PINNED WITH REFERENCE TACK ON CURBS BY THE DEVELOPER/CONTRACTOR.8. THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT AT (253) 630-9900 TO SCHEDULE A PRE-CONSTRUCTION MEETING AT THE DISTRICT OFFICE. AFTER THE PRE-CONSTRUCTION MEETING, THE DEVELOPER/ CONTRACTOR SHALL NOTIFY THE DISTRICT'S FIELD REPRESENTATIVE AT LEAST 48 HOURS (REGULAR WORKING DAYS) BEFORE STARTING WORK. 9. THE DEVELOPER/CONTRACTOR SHALL OBTAIN ALL REQUIRED FINAL INSPECTIONS TO MEET PERMIT REQUIREMENTS. INSPECTIONS MUST BE SCHEDULED AT LEAST 48 HOURS IN ADVANCE. 10. 5. RECONSTRUCTION SHALL CONFORM TO THE SPECIFICATIONS OF THE DISTRICT. ALL COSTS FOR INSPECTING SUCH RECONSTRUCTION SHALL BE CHARGED TO THE DEVELOPER IN ADDITION TO THE STANDARD CHARGES, AND SHALL BE PAID BEFORE ACCEPTANCE BY THE DISTRICT. 7.SEWER NOTES: 1.Comply with current Soos Creek Water & Sewer District approved Comprehensive Sewerage Plan and all amendments thereto. 2.Verify existing sewer main facility locations, sizes and type of pipes, and feasibility of use. 3.Utilize the aerial base map data to determine the sewer service area requirements. 4.Minimum separation between sewer and water shall be according to the Washington State Department of Ecology (DOE) requirements. 5.Minimum depth of manholes shall be 8 feet in public right-of-ways and other paved traffic areas; or 6 feet in non-traffic easements. 6.Pipe shall be PVC or D.I. Ductile iron pipe shall be used for all slopes greater than 20% and for sewer 18 feet and deeper. 7.Minimum slope on all 8-inch sewer lines shall be 0.4% (0.004). Minimum slope on all dead end lines shall be 1.0%. All other minimum slopes shall be per DOE requirements. 8.All main line sewers shall terminate with a manhole. 9.Main line sewers shall be extended to the boundaries of plat or commercial development as required for future connections. 10.Main line sewers shall be a minimum of 8-inches in diameter. Maximum design capacity for all sanitary lines shall not exceed d/D - 0.8. 11.According to King County Road or city standards, location for sewer main lines shall be 5 feet South and 5 feet West of street centerline (other locations subject to District, King County and/or city approvals). Sewer mains shall be located to not cross under storm detention vaults. 12.Minimum cover on all sewer main lines shall be 7 feet in public right-of-ways and other paved traffic areas and 5 feet on easements (out of paved areas). 13.Maximum distance between manholes shall be 400 feet 14.Pipe size, length and slopes of all main lines shall be shown on the profile. 15.Sewer mains shall maintain minimum 10 feet separation from power vaults, hand holes and light standards. 16.ALL SEWER LINES shall be subject to television testing for conformance to the District's standard specifications. Final acceptance of SEWERS will be subject to the District's Resolution No. 1904-S. SEWER STUB SERVICES 1.All stub services shall be 6-inch minimum diameter and terminate at the property and/or easement line with a 6-inch cap, or 10 feet past at option of Developer/Contractor. (Install TEE at property line/or easement line as directed.) 2.Minimum cover shall be 5 feet at the property line, or deeper, if required to provide sewer service and/or proper clearance from other utilities. 3.Minimum slope on stub services shall be 2%. 4.Each lot/unit shall have a single side sewer stub unless the District issues a special permit for double side sewer. 5.For one/two units, the side sewer stub shall connect directly to the sewer main with a tee (or to a manhole). 6.For commercial buildings, schools, and apartments, the side sewer stub shall connect directly to a manhole. 7.Provide one stub to each tract for OFFSITE sewers required in paved areas, and stubs for future lots shall be extended out from under any paved areas. 8.Maximum 6-inch side sewer length shall be 200 feet with a surface 1 cleanout at 100 foot intervals and at the end. 9.Puget Sound Energy vaults, hand holes and light standards shall be located no closer than 1O feet from sewer stub services. 10.Refer to Soos Creek Water and Sewer District current side sewer policy for other side sewer requirements. ALTERNATIVE SEWER SYSTEM 1.It is the District's policy that transporting sewage by gravity is the best system. Alternative pressure systems will be permitted only in those circumstances when a gravity system would be impractical, unreasonably expensive or otherwise infeasible. 2.A pre-design report, with system analysis to justify the installation of an alternative system, must be submitted prior to design. Approval of an alternative system must be given by the District's Board of Commissioners. 3.The District has selected the grinder pump pressure system as most suitable for its needs and has standardized on the "Environment One" grinder pump for all installations. 4.All pipe and fittings for the alternative system shall be High Density Polyethylene (HDPE). See Section C - Materials. 5.HDPE pipe location shall be identified by installation of a 16-gauge solid tracer wire attached to top of pipe and by "SEWER" warning tape installed 18 inches above the SEWER NOTES: SEWER PROFILE HORZ.: 1"=20' VERT 1"=4' LEGAL DESCRIPTION SITE ADDRESS11204 SE PETROVITSKY RDRENTON, WA. 98056 PARCEL NUMBER2923059029LOT SIZW 30,105 SF N 223 FT OF S 265 FT OF W 135FT OF SE 1/4 OF SE 1/4 EXEMT POR PER RCW 84.36.381-389 '( & & , 2  ( Q J L Q H H U L Q J  :22')(1&( 81/(6627+(5:,6(127(' 75((6&$/,3(5,1,1&+(6 7<3( 6$1,7$5<6(:(50$1+2/(660+ 6327(/(9$7,21 :$7(59$/9(:9 +<' 33 32:(532/( +<'5$17 LEGEND :0 &&('$533,1()5)58,7 29(5+($'32:(5/,1( )),58'81.12:1'(&,'8286 :$7(50(7(5 32:(50(7(5 &$7&+%$6,1 3 )5 &% 30 (;,67,1*&251(5$6'(6&5,%(' &$6('02180(17 2&&83,(' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON SEWER DETAILS 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 4 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W 5 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W PLAN REVIEW 12-916 BASE MAP C3 48 " PRIVATE PRIVATE DISTRICT DTL S2, S27 6" PVC 6" PVC DIA 48" 22 ' 10' EASEMENT TO SCWSD soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction SO O S C R E E K W A T E R & S E W E R D I S T R I C T SE W E R M A I N E X T E N S I O N DE T A I L S 23 1" = 5 0 ' 1" = 1 0 ' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON '( & & , 2  ( Q J L Q H H U L Q J 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 3 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W PLAN REVIEW 12-916 BASE MAP C3 6 - 1 2 - 2 5 4 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R E V I E W soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction SO O S C R E E K W A T E R & S E W E R D I S T R I C T SE W E R M A I N E X T E N S I O N DE T A I L S 33 1" = 5 0 ' 1" = 1 0 ' SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M CITY OF RENTON, STATE OF WASHINGTON '( & & , 2  ( Q J L Q H H U L Q J 1 R A D 4 - 1 4 - 2 4 R E V I S E D P E R D I S T R I C C O M M E N T S 2 R A D 1 - 3 - 2 5 R E V I S E D S I T E P L A N 3 R A D 2 - 2 6 - 2 5 R E V I S E D P E R D I S T R I C T 3 R D R E V I E W 4 R A D 4 - 5 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W 5 R A D 6 - 1 2 - 2 5 R E V I S E D P E R D I S T R I C T R E V I E W PLAN REVIEW 12-916 BASE MAP C3 soos creek plans for reference only. a copy of the approved soos creek water and sewer plans to be onsite at all times during construction