Loading...
HomeMy WebLinkAboutRedline Summary.pdf121-18 Permit Set (r0).pdf Markup Summary Page Label: 1 Page Index: 1 1 (7) Page Label: 1 Page Index: 1 R-417501 Page Label: 1 Page Index: 1 please confirm the name of the project Page Label: 1 Page Index: 1 Please provide title report and copies of the existing easements for review. Based on plan set, access and utility easements will be necessary as the proposed improvements are across another property. As such, the other property owner will need to be part of this application or provide consent for the work being proposed and constructed on their property. An easement sits on top of the property and the property owner still owns the property. Additional coordination with the other property owner will be necessary to determine who can authorize and sign the consent/application and the easements due to the property being a condominium. The existing access easement may need to be released or relinquished. Will provide more information on this after reviewing the documents requested. Please provide additional information regarding the future purpose of these properties - rentals or condos. This will impact addressing which needs to be assigned. Page Label: 1 Page Index: 1 The project is required to demonstrate compliance with tree retention regulations. A tree retention and land clearing plan is required per the civil construction permit checklist. A landscape plan is required to be submitted per the civil construction permit checklist. the landscape plan must be prepared by a landscape architect registered in the State of Washington, a certified nurseryman, or other similarly qualified professional and be consistent with RMC 4-8-120.TED-40-4175R-417501 please confirm thename of the project Please provide title report and copies of the existing easements for review. Based on plan set, access and utility easements will be necessary as theproposed improvements are across another property. As such, the other property owner will need to be part of thisapplication or provide consent for the work being proposed andconstructed on their property. An easement sits on top of the property and the property owner still owns the property. Additional coordination with the other property owner will be necessary to determine who can authorize and sign theconsent/application and the easements due to the property being a condominium. The existing access easement may need to be released or relinquished. Will provide more information on this after reviewing the documentsrequested. Please provide additional information regarding the future purpose ofthese properties - rentals or condos. This will impact addressing whichneeds to be assigned. The project is required to demonstrate compliance with tree retention regulations. A tree retention and land clearing plan is required per the civilconstruction permit checklist. A landscape plan is required to be submitted per the civil construction permitchecklist. the landscape plan must be prepared by a landscape architectregistered in the State of Washington, a certified nurseryman, or other similarlyqualified professional and be consistent with RMC 4-8-120. Page Label: 1 Page Index: 1 C20002431 Page Label: 1 Page Index: 1 Use current 2020 versions of these standard plans found on the City's website. Page Label: 2 Page Index: 2 2 (7) Page Label: 2 Page Index: 2 R-417502 Page Label: 2 Page Index: 2 Page Label: 2 Page Index: 2 Page Label: 2 Page Index: 2 Page Label: 2 Page Index: 2 Page Label: 2 Page Index: 2 Page Label: 3 Page Index: 3 3 (4) C20002431 Use current 2020versions of thesestandard plans foundon the City's website.TED-40-4175R-417502 TED-40-4175 Page Label: 3 Page Index: 3 R-417503 Page Label: 3 Page Index: 3 Proposed work is located in the dripline of protected and off site trees. An arborist report prepared by a certified arborist or licensed landscape architect is required that demonstrates that the project proposal will have not impacts to off site and retained trees. The report shall correlate with the Tree Retention/Land Clearing Plan and identifies size, species, health, and reason for any removal. The report shall identify the limits of disturbance for all retained trees. Page Label: 3 Page Index: 3 You cannot work outside of the recorded access easement, without a private agreement/easement from the neighboring property. see survey on previous page Page Label: 4 Page Index: 4 4 (12) Page Label: 4 Page Index: 4 R-417504 Page Label: 4 Page Index: 4 replace with new detail: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=990430&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 replace with new detail: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=990439&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 replace with new detail: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=990437&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 replace with new detail: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=990433&dbid=0&repo=CityofRenton R-417503 Proposed work islocated in thedripline of protectedand off site trees. Anarborist reportprepared by acertified arborist orlicensed landscapearchitect is requiredthat demonstratesthat the projectproposal will havenot impacts to offsite and retainedtrees. The reportshall correlate withthe TreeRetention/LandClearing Plan andidentifies size, species,health, and reasonfor any removal. Thereport shall identifythe limits ofdisturbance for all retained trees. You cannot workoutside of the recorded accesseasement, without aprivateagreement/easementfrom theneighboringproperty. see surveyon previous page TED-40-4175R-417504 replace with newdetail: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=990430&dbid=0&repo=CityofRenton replace with newdetail: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=990439&dbid=0&repo=CityofRenton replace with newdetail: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=990437&dbid=0&repo=CityofRenton replace with newdetail: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=990433&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 Page Label: 4 Page Index: 4 Page Label: 4 Page Index: 4 delete Page Label: 4 Page Index: 4 ADD stockpile detail: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=990428&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 replace these notes with city of renton notes (you included these notes on the cover sheet, move them here): https://edocs.rentonwa.gov/Documents/DocView.a spx?id=1249572&dbid=0&repo=CityofRenton Page Label: 4 Page Index: 4 Include project-specific ESC construction sequence. Page Label: 5 Page Index: 5 5 (3) Page Label: 5 Page Index: 5 R-417505 Page Label: 5 Page Index: 5 demo plan requires a separate building permit. this plan will be reviewed under that permit, once you apply. Page Label: 6 Page Index: 6 6 (5) delete ADD stockpile detail: https://edocs.rentonwa.gov/ Documents/DocView.aspx?id= 990428&dbid=0&repo=Cityof Renton replace these noteswith city of rentonnotes (you includedthese notes on thecover sheet, movethem here): https://edocs.rentonwa.gov/Documents/DocView.aspx?id=1249572&dbid=0&repo=CityofRenton Include project-specific ESC construction sequence.TED-40-4175R-417505 demo plan requires a separate building permit. this plan will be reviewed under that permit, once you apply.TED-40-4175 Page Label: 6 Page Index: 6 R-417506 Page Label: 6 Page Index: 6 AS STATED IN THE PRE-APPLICATION MEETING, FIRE FLOW IS 3,000 GPM WITH FIRE SPRINKLERS REQUIRED. THIS REQUIRES A LOOPED WATER MAIN AND THREE FIRE HYDRANTS. THERE IS NOT ENOUGH ROOM AROUND THE BUILDING FOR A LOOPED WATER MAIN. STATE LAW HAS CHANGED MANDATING FIRE SPRINKLERS IN BUILDINGS OVER 4 UNITS. FURTHER CONSTRUCTION DETAILS REQUIRED. PROVIDE IBC TYPE OF CONSTRUCTION. PROVIDE BUILDING TOTAL SQUARE FOOTAGE. THIS IS A DIFFERENT SITE LAYOUT FROM THE PRE-APPLICATION MEETING. LAYOUT AFFECTS FIRE FLOW REQUIREMENTS FROM NEIGHBORING EXPOSING BUILDINGS. Page Label: 6 Page Index: 6 R-417506 AS STATED IN THE PRE-APPLICATION MEETING, FIRE FLOW IS 3,000 GPM WITH FIRE SPRINKLERS REQUIRED. THIS REQUIRES A LOOPED WATER MAIN AND THREE FIRE HYDRANTS. THERE IS NOT ENOUGH ROOM AROUND THE BUILDING FOR A LOOPED WATER MAIN. STATE LAW HAS CHANGED MANDATING FIRE SPRINKLERS IN BUILDINGS OVER 4 UNITS. FURTHER CONSTRUCTION DETAILS REQUIRED. PROVIDE IBC TYPE OF CONSTRUCTION. PROVIDE BUILDING TOTAL SQUARE FOOTAGE. THIS IS A DIFFERENT SITE LAYOUT FROM THE PRE-APPLICATION MEETING. LAYOUT AFFECTS FIRE FLOW REQUIREMENTS FROM NEIGHBORING EXPOSING BUILDINGS. Page Label: 6 Page Index: 6 Compliance with the Residential design standards of RMC 4-2-115 is required, as indicated in the pre-application meeting comments (PRE18-000682). Per CI-159, effective October 30, 2020, Open space(s) shall be contiguous to the majority of the dwellings in the development and accessible to all dwellings. For sites one acre or smaller in size, open space(s) shall be no less than thirty feet (30') in any dimension. For sites larger than one acre in size, open space(s) shall be no less than forty feet (40') in any dimension. For all sites, to allow for variation, open space(s) of less than the minimum dimensions (thirty feet (30') or forty feet (40'), as applicable) are allowed; provided, that when all of a site’s open spaces are averaged, the applicable dimension requirement is met. For each unit in the development, three hundred fifty (350) square feet of common open space shall be provided. Open space shall be designed as a park, common green, pea-patch, pocket park, or pedestrian entry easement in the development and shall include picnic areas, space for recreational activities, and other activities as appropriate. Open space shall be located in a highly visible area and be easily accessible to the neighborhood. Common open space areas shall have a maximum slope of five percent (5%). Obstructions, such as retaining walls and fences, shall not be placed in common open spaces. Grass-crete or other pervious surfaces may be used in the common open space for the purpose of meeting the one hundred fifty feet (150') distance requirement for emergency vehicle access but shall not be used for personal vehicle access or to meet off-street parking requirements. Developments of four (4) or more dwelling units: Each ground-related dwelling shall have a private yard that is at least two hundred fifty (250) square feet in size with no dimension less than eight feet (8') in width. (Not counted towards open space) All of the following are required: 1. Sidewalks shall be provided throughout the neighborhood. The sidewalk may disconnect from the road, provided it continues in a logical route throughout the development. Permeable pavement sidewalks shall be used where feasible, consistent with the Surface Water Design Manual. 2. Front yards shall have entry walks that are a minimum width of three feet (3') and a maximum width of four feet (4'). 3. Pathways shall be used to connect common parks, green areas, and pocket parks to residential access streets, limited residential access streets, or other pedestrian connections. They may be used to provide access to homes and common open space. They shall be a minimum three feet (3') in width and made of paved asphalt, concrete, or porous material such as: porous paving stones, crushed gravel with soil stabilizers, or paving blocks with planted joints. Sidewalks or pathways for parks and green spaces shall be located at the edge of the common space to allow a larger usable green and easy access to homes. 4. Pedestrian Easement Plantings: Shall be planted with plants and trees. Trees are required along all pedestrian easements to provide shade and spaced twenty feet (20') on center. Shrubs shall be planted in at least fifteen percent (15%) of the easement and shall be spaced no further than thirty six inches (36") on center. 5. For all homes that do not front on a residential access street, limited residential access street, a park, or a common green: Pedestrian entry easements that are at least fifteen feet (15') wide plus a five-foot (5') sidewalk shall be provided. The entry shall take access from and face a street, park, common green, pocket park, pedestrian easement, or open space. Compliance with the Residential designstandards of RMC 4-2-115 is required, asindicated in the pre-application meetingcomments (PRE18-000682). Per CI-159, effective October 30, 2020,Open space(s) shall be contiguous to themajority of the dwellings in thedevelopment and accessible to alldwellings. For sites one acre or smallerin size, open space(s) shall be no lessthan thirty feet (30') in any dimension. Forsites larger than one acre in size, openspace(s) shall be no less than forty feet(40') in any dimension. For all sites, toallow for variation, open space(s) ofless than the minimum dimensions (thirtyfeet (30') or forty feet (40'), asapplicable) are allowed; provided, thatwhen all of a site’s open spaces areaveraged, the applicable dimensionrequirement is met. For each unit in the development, threehundred fifty (350) square feet ofcommon open space shall be provided. Open space shall be designed as a park,common green, pea-patch, pocket park, orpedestrian entry easement in thedevelopment and shall include picnicareas, space for recreational activities,and other activities as appropriate. Open space shall be located in a highlyvisible area and be easily accessible tothe neighborhood. Common open space areas shall have amaximum slope of five percent (5%). Obstructions, such as retaining wallsand fences, shall not be placed incommon open spaces. Grass-crete or other pervious surfacesmay be used in the common open space forthe purpose of meeting the one hundredfifty feet (150') distance requirement foremergency vehicle access but shall notbe used for personal vehicle access orto meet off-street parking requirements. Developments of four (4) or moredwelling units: Each ground-relateddwelling shall have a private yard that isat least two hundred fifty (250) squarefeet in size with no dimension less thaneight feet (8') in width. (Not countedtowards open space)All of the following are required: 1. Sidewalks shall be providedthroughout the neighborhood. Thesidewalk may disconnect from the road,provided it continues in a logical routethroughout the development. Permeablepavement sidewalks shall be used wherefeasible, consistent with the SurfaceWater Design Manual. 2. Front yards shall have entry walksthat are a minimum width of three feet (3')and a maximum width of four feet (4'). 3. Pathways shall be used to connectcommon parks, green areas, and pocketparks to residential access streets,limited residential access streets, orother pedestrian connections. They maybe used to provide access to homes andcommon open space. They shall be aminimum three feet (3') in width and madeof paved asphalt, concrete, or porousmaterial such as: porous paving stones,crushed gravel with soil stabilizers, orpaving blocks with planted joints.Sidewalks or pathways for parks andgreen spaces shall be located at theedge of the common space to allow alarger usable green and easy access tohomes. 4. Pedestrian Easement Plantings: Shallbe planted with plants and trees. Treesare required along all pedestrianeasements to provide shade and spacedtwenty feet (20') on center. Shrubs shallbe planted in at least fifteen percent(15%) of the easement and shall bespaced no further than thirty six inches(36") on center.5. For all homes that do not front on aresidential access street, limitedresidential access street, a park, or acommon green: Pedestrian entryeasements that are at least fifteen feet(15') wide plus a five-foot (5') sidewalkshall be provided. The entry shall take access from andface a street, park, common green,pocket park, pedestrian easement, oropen space. Page Label: 7 Page Index: 7 7 (85) Page Label: 7 Page Index: 7 R-417507 Page Label: 7 Page Index: 7 S-417501 Page Label: 7 Page Index: 7 W-417501 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 identify proposed height of all retaining walls and demonstrate compliance with height regulations per RMC 4-4-040. Retaining walls are not permitted in open space. Page Label: 7 Page Index: 7 rotate scale Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 if geotech walls exceed 4' in height, they will require a separate building permit application for structural review.TED-40-4175R-417507 S-417501 W-417501 WWP-27-4175WTRP-27-4175identify proposed height of all retaining walls and demonstrate compliance with height regulations per RMC 4-4-040. Retaining walls are not permitted in open space. rotate scale if geotech walls exceed 4' in height, they will require a separate building permit application for structural review. Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 ??? Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 ??? Page Label: 7 Page Index: 7 NEW WATER MAIN EXTENSION REQUIRED SIZING OF MAIN IS DEPENDING ON FINAL FIRE FLOW DEMAND AS DETERMINED BY FIRE AUTHORITY FINAL NUMBER AND LOCATION OF HYDRANTS TO BE DETERMINED BY FIRE AUTHORITY FIRE SPRINKLER SYSTEM REQUIRED Page Label: 7 Page Index: 7 THIS METER CONFIGURATION IS NOT PERMITTED. METERS MUST BE ADJACENT TO THE PROPERTY/UNIT SERVED WITHOUT EXCESSIVELY LONG SERVICE LINES. ALL METERS SHALL BE LOCATED IN A COR UTILITY EASEMENT. Page Label: 7 Page Index: 7 CITY CODE REQUIRES A LOOPED WATER MAIN WHEN REQUIRED FIRE FLOWS EXCEEDS 2,500 GPM. THE CURRENT LAYOUT DOES NOT PROVIDE ADEQUATE ROOM FOR A FEASIBLE LOOPED WATER MAIN. PER THE RENTON REGIONAL FIRE AUTHORITY (RRFA), THE REQUIRED FIRE FLOW IS 3,000 GPM. APPLICANT SHALL WORK WITH RRFA TO BRING REQUIRED FIRE FLOW TO 2,500 GPM OR LESS. THE CITY CAN SUPPLY UP TO 2,850 GPM WITH A 12" MAIN EXTENDING FROM THE CITY'S 12" MAIN IN SW 5TH PLACE. ALL WATER MAINS NOT IN RIGHT OF WAY SHALL BE IN A 15' WATER UTILITY EASEMENT. PROVIDE ADEQUATE FIRE HYDRANT COVERAGE PER RRFA STANDARDS. ALL HYDRANTS SHALL BE LOCATED IN A WATER UTILITY EASEMENT. PROVIDE FIRE SPRINKLER SERVICE LINE WITH DETECTOR DOUBLE CHECK VALVE ASSEMBLY (DDCVA) PER COR STANDARD PLANS. PROVIDE ALL APPLICABLE COR WATER STANDARD PLANS IN PLAN SET. Page Label: 7 Page Index: 7 the only way you can disperse concentrated flows onto a neighboring property is via an easement from the owner of the neighboring property or a really wide dispersion device that spreads the flow across the property line (mimicking the existing condition). in addition, discharge onto a regulated slope is not allowed. NEW WATER MAIN EXTENSION REQUIRED SIZING OF MAIN IS DEPENDING ON FINAL FIRE FLOWDEMAND AS DETERMINED BY FIRE AUTHORITY FINAL NUMBER AND LOCATION OF HYDRANTS TO BEDETERMINED BY FIRE AUTHORITY FIRE SPRINKLER SYSTEM REQUIRED THIS METER CONFIGURATION IS NOT PERMITTED. METERS MUST BE ADJACENT TO THE PROPERTY/UNIT SERVED WITHOUT EXCESSIVELY LONG SERVICE LINES. ALL METERS SHALL BE LOCATED IN A COR UTILITY EASEMENT. CITY CODE REQUIRES A LOOPED WATER MAIN WHEN REQUIRED FIRE FLOWS EXCEEDS 2,500 GPM. THE CURRENT LAYOUT DOES NOT PROVIDE ADEQUATE ROOM FOR A FEASIBLE LOOPED WATER MAIN. PER THE RENTON REGIONAL FIRE AUTHORITY (RRFA), THE REQUIRED FIRE FLOW IS 3,000 GPM. APPLICANT SHALL WORK WITH RRFA TO BRING REQUIRED FIRE FLOW TO 2,500 GPM OR LESS. THE CITY CAN SUPPLY UP TO 2,850 GPM WITH A 12" MAIN EXTENDING FROM THE CITY'S 12" MAIN IN SW 5TH PLACE. ALL WATER MAINS NOT IN RIGHT OF WAY SHALL BE IN A 15' WATER UTILITY EASEMENT. PROVIDE ADEQUATE FIRE HYDRANT COVERAGE PER RRFA STANDARDS. ALL HYDRANTS SHALL BE LOCATED IN A WATER UTILITY EASEMENT. PROVIDE FIRE SPRINKLER SERVICE LINE WITH DETECTOR DOUBLE CHECK VALVE ASSEMBLY (DDCVA) PER COR STANDARD PLANS. PROVIDE ALL APPLICABLE COR WATER STANDARD PLANS IN PLAN SET. the only way you can disperseconcentrated flows onto a neighboringproperty is via an easement from theowner of the neighboring property or areally wide dispersion device thatspreads the flow across the propertyline (mimicking the existing condition). in addition, discharge onto a regulatedslope is not allowed. Page Label: 7 Page Index: 7 use a piped storm conveyance system to collect runoff. trench drains are only allowed if there are elevation constraints, which are not evident here. Page Label: 7 Page Index: 7 is this a footing drain or a trench drain to collect runoff from the driveway? call out properly and provide dimensions. Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 12" diameter water main extension. provide connection detail. Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 PROVIDE PROFILE VIEWS WITH STATIONING, INVERT/RIM ELEVATIONS, AND ALL CONNECTIONS/APPURTENANCES FOR WATER, SEWER, AND STORM LINES. Page Label: 7 Page Index: 7 10'-3" use a piped storm conveyance system to collect runoff. trench drains are onlyallowed if there are elevation constraints, which are not evident here. is this a footing drainor a trench drain tocollect runoff fromthe driveway? call out properly and provide dimensions. 10'-0" 12" diameter watermain extension. provide connectiondetail. PROVIDE PROFILE VIEWS WITH STATIONING, INVERT/RIM ELEVATIONS, AND ALL CONNECTIONS/APPURTENANCES FOR WATER, SEWER, AND STORM LINES.10'-3" Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 concrete blocking Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 10'-0" concrete blocking 10'-0"10'-0"10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 provide cap and concrete blocking Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 water line will require a 15-foot utility easement. please provide the easement document and legal description, see our form: https://edocs.rentonwa.gov/Documents/1/edoc/955 882/Easement%20-%20Public%20Utilities.pdf provide cap and concrete blocking 10'-0"10'-0"water line will require a 15-foot utility easement. please provide the easement document and legal description, see our form: https://edocs.renton wa.gov/Documents/1/ edoc/955882/Easeme nt%20-%20Public%20U tilities.pdf Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 move catch basin to maintain 10 ft horizontal separation with water lines. Page Label: 7 Page Index: 7 each townhome unit requires and individual side sewer connection to the sewer main in the shared driveway. sewer stubs must be a min of 6" diameter and run at 2% slope to the main. the sewer main must be a min 8" diameter pipe to grinder pump manhole. Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 this is not a water main extension. see sketch in blue for reference Page Label: 7 Page Index: 7 provide grinder pump detail as part of this civil set. provide pump flow specs, alarm system, wet vault requirements. also, label entire sewer system as private. Page Label: 7 Page Index: 7 you need another hydrant per renton fire authority's fire flow requirements. Page Label: 7 Page Index: 7 provide cap and concrete blocking Page Label: 7 Page Index: 7 sewer force main must have 10ft separation from water main. see sketch in green for reference. move catch basin to maintain 10 ft horizontal separation with water lines. each townhome unit requires and individual side sewer connection to the sewer main in the shared driveway. sewer stubs must be a min of 6" diameter and run at 2% slope to the main. the sewer main must be a min 8" diameter pipe to grinder pump manhole. this is not a watermain extension. seesketch in blue forreference provide grinder pump detail as part of this civil set. provide pump flow specs, alarm system, wet vault requirements. also, label entire sewer system as private. you need anotherhydrant per renton fire authority's fire flow requirements. provide cap and concrete blocking sewer force main must have 10ft separation from water main. see sketch in green for reference. Page Label: 7 Page Index: 7 10'-0" Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 Page Label: 7 Page Index: 7 cleanouts must be installed in the driveway/landscaped area for each sewer stub, typ. add the following std plans to this set: Cleanouts: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=8237714&dbid=0&repo=CityofRenton sewer stub: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=8237719&dbid=0&repo=CityofRenton Page Label: 7 Page Index: 7 upgrade this to a manhole. provide rim/invert elevations. add the following std plan: manhole: https://edocs.rentonwa.gov/Documents/DocView.a spx?id=8237727&dbid=0&repo=CityofRenton10'-0"cleanouts must be installed in thedriveway/landscaped area for each sewer stub, typ. add the following std plans to this set: Cleanouts:https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8237714&dbid=0&repo=CityofRenton sewer stub:https://edocs.rentonwa.gov/Documents/DocView. aspx?id=8237719&dbid=0&repo=CityofRenton upgrade this to amanhole. providerim/invert elevations.add the following stdplan: manhole:https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8237727&dbid=0&repo=CityofRenton Page Label: 7 Page Index: 7 Note footing drains to be minimum 4" and roof drains to be minimum 6". Page Label: 7 Page Index: 7 PVC pipe requires 3' cover. If cover remains <2', use DI pipe. Page Label: 7 Page Index: 7 8" Page Label: 8 Page Index: 8 8 (2) Page Label: 8 Page Index: 8 R-417508 Page Label: 9 Page Index: 9 9 (5) Page Label: 9 Page Index: 9 R-417509 Page Label: 9 Page Index: 9 W-417502 Page Label: 9 Page Index: 9 Page Label: 9 Page Index: 9 Replace all standard plans with current versions per the City's website. Note footing drains to be minimum 4" and roof drains to be minimum 6". PVC pipe requires 3' cover. If cover remains <2', use DI pipe. 8"TED-40-4175R-417508 TED-40-4175R-417509 W-417502 WTRP-27-4175Replace all standard plans with current versions per the City's website. Page Label: 10 Page Index: 10 10 (6) Page Label: 10 Page Index: 10 R-417510 Page Label: 10 Page Index: 10 S-417502 Page Label: 10 Page Index: 10 W-417503 Page Label: 10 Page Index: 10 Page Label: 10 Page Index: 10TED-40-4175R-417510 S-417502 W-417503 WWP-27-4175WTRP-27-4175 121-18 5th Pl West TIR (r0).pdf Markup Summary Page Label: 15 Page Index: 15 you must connect this flow to a public system, ie storm system on sw 5th pl. the only way you can disperse concentrated flows onto a neighboring property is via an easement from the owner of the neighboring property. 15 (4) Page Label: 15 Page Index: 15 Page Label: 15 Page Index: 15 there are other bmps that the geotech report recommends. please go through core requirement #9, Section 1.2.9.2 in the renton surface water design manual. Page Label: 15 Page Index: 15 Replace with actual value Page Label: 20 Page Index: 20 Fix conflicting sentence. 20 (2) Page Label: 20 Page Index: 20 Consider and evaluate BMPs as recommended in geotechnical report, see comment of page 15 of TIR. Section 2 – Conditions and Requirements Summary 1. Discharge at the natural location: This site currently discharges via surface sheet flow into the adjacent railroad right of way. All surface flows collected on this site will continue to be conveyed to the railroad right of way. Discharge to the natural location will be maintained. 2. Off-site Analysis: A Level 1 off-site analysis was completed for this project and is included in Section 3 of this report. 3. Flow control: The site is exempt under the historical flow control analysis of the increase of the 100-yr flow from the existing condition (pre-1979) to the proposed developed condition. The analysis yielded a value of an increase of only xxxxx cfs which is less than the 0.15cfs allowed using the 15-munite time step. Flow control will not be required for this project. 4. Conveyance system: Conveyance will be provided by the proposed new tight line to be discharged to the railroad right of way using a rock splash pad. 5. Erosion and sedimentation control: An erosion and sediment control plan has been provided with the submittal. 6. Maintenance and Operations: The storm water facilities for this project shall be maintained in accordance with the requirements of Appendix A of the 2016 KCSWDM. 7. Financial guarantees and liability: Financial guarantees and liability will be provided as required by the City of Renton. 8. Water Quality: This project is adding less than 5000 sf (4,435 sf) of new plus replaced PGIS and less than 3/4 of an acre of new pervious surface and is therefore exempt from Core Requirement #8. 9. Flow Control BMPs: Per the soils report, this site is not suitable for infiltration BMP’s. Special Requirements 1. Other adopted area-specific requirements: None 2. Floodplain/Floodway delineation: None 3. Flood protection facilities: None 4. Source controls: None 5. Oil Control: None you must connectthis flow to a publicsystem, ie stormsystem on sw 5th pl.the only way you candisperseconcentrated flowsonto a neighboringproperty is via aneasement from theowner of theneighboring property. 121-18 TIR.DOCX May 14, 2020 Page 15 of 27 Renton. 8. Water Quality: This project is adding less than 5000 sf (4,435 sf) of new plus replaced PGIS and less than 3/4 of an acre of new pervious surface and is therefore exempt from Core Requirement #8. 9. Flow Control BMPs: Per the soils report, this site is not suitable for infiltration BMP’s. Special Requirements 1. Other adopted area-specific requirements: None 2. Floodplain/Floodway delineation: None 3. Flood protection facilities: None 4. Source controls: None 5. Oil Control: None Water Quality: This project is adding less than 5000 sf (4,435 sf) of new plus replaced P an acre of new pervious surface and is therefore exempt from Core Requirement #8. Flow Control BMPs: Per the soils report, this site is not suitable for infiltration BMP’s. Requirements Other adopted area-specific requirements: None Floodplain/Floodway delineation: None Flood protection facilities: None Source controls: None Oil Control: None there are other bmps that the geotech report recommends. please go through core requirement #9, Section 1.2.9.2 in the renton surface water design manual. Section 2 – Conditio 1. Discharge at the natural l right of way. All surface f Discharge to the natural l 2. Off-site Analysis: A Leve report. 3. Flow control: The site is e the existing condition (pre increase of only xxxxx cfs not be required for this pr 4. Conveyance system: Con right of way using a rock 5. Erosion and sedimentatio 6. Maintenance and Operati the requirements of Appe Replace with actual value This site is less th Full Disp the 15% Full infilt report. Limited per the s Fix conflicting sentence. application on the site/lot. This required implementation of flow control BMPs must occur as part ect and provisions must be made for their future maintenance as specified in Section 1.2.9.2. than 22,000 SF. The project must be evaluated under the Small Lot BMP Requirements of Section spersion is not applicable as there is not any forest area available within a threshold discharge ar % ratio of fully dispersed impervious area to native vegetated surface. filtration of roof runoff is not applicable as the underlying soils are not suitable for infiltration per . d infiltration is not applicable and will be utilized as the underlying soils are suitable for limited in e soils report. OL in the peak flow control area and is exempt from flow control. The site is also exempt under the nalysis of the increase of the 100-yr flow from the existing condition (pre-1979) to the proposed e analysis yielded a value of an increase of only 0.072 cfs which is less than the 0.15cfs allowed us me step. Flow control will not be required for this project. is the analysis used to establish the exemption: Consider and evaluate BMPs as recommended in geotechnical report, see comment of page 15 of TIR. Geotechnical Report.pdf Markup Summary Page Label: 5 Page Index: 5 High landslide hazards and sensitive slopes are mapped within 50 feet of the project site. Whenever a proposed development requires a development permit and a geologic hazard is present on the site of the proposed development or on abutting or adjacent sites within fifty feet (50') of the subject site, geotechnical studies by licensed professionals, such as a geotechnical engineer and/or engineering geologist, shall be required. Specifically, geotechnical studies are required for developments proposed on sites with any of the following geologically hazardous areas: (a) Sensitive and protected slopes; (b) Medium, high, or very high landslide hazards; (c) High erosion hazards; (d) High seismic hazards; (e) Medium or high coal mine hazards. The required studies shall address each geologic hazard and demonstrate the following review criteria can be met: (a) The proposal will not increase the threat of the geological hazard to adjacent or abutting properties beyond pre-development conditions; and (b) The proposal will not adversely impact other critical areas; and (c) The development can be safely accommodated on the site. 5 (1) High landslide hazards and sensitive slopes are mapped within 50 feet ofthe project site. Whenever a proposed development requires a development permit and a geologic hazard is present on the site of the proposed development oron abutting or adjacent sites within fifty feet (50') of the subject site, geotechnical studies by licensed professionals, such as a geotechnicalengineer and/or engineering geologist, shall be required. Specifically, geotechnical studies are required for developments proposed on siteswith any of the following geologically hazardous areas: (a) Sensitive and protected slopes;(b) Medium, high, or very high landslide hazards;(c) High erosion hazards;(d) High seismic hazards;(e) Medium or high coal mine hazards. The required studies shall address each geologic hazard anddemonstrate the following review criteria can be met: (a) The proposal will not increase the threat of the geological hazard to adjacent or abutting properties beyond pre-development conditions;and (b) The proposal will not adversely impact other critical areas; and(c) The development can be safely accommodated on the site. Surety - Bond Quantity Worksheet.pdf Markup Summary Page Label: 2 Page Index: 2 update quantities based on civil plan redlines. re-submit 2 (2) Page Label: 2 Page Index: 2 C20002431 Page Label: 12 Page Index: 12 all water improvements are public. move these to the left column and update quantities based on civil plan redlines 12 (1) Page Label: 13 Page Index: 13 update based on civil plan redlines 13 (1) ve original wet stamp and signatur update quantities based on civil plan redlines. re-submit Project Owner: Phone: Address:  Addt'l Project Owner: Phone: Address:  Engineer Stamp (all cost estimates must have origin Project Location and Description Project Owner In 5th Place West Seattle, WA 98115 2143702200 Lee Property Inves ##‐######(206) 816‐5042 2/10/2020 Prepared by: FOR APPProject Phase 1 mark@plogengineering.com Mark X. Plog 31976 Plog Engineering, PLLC P.O. Box 412, Ravensdale, WA 98051 (206) 420‐7130 521 5th Pl, Renton, WA 1037 NE 65th St, U Stevens Ave SW ######## Lots 13 & 14, Block 16, Earlington C20002431 Existing Future PublicPrivate Right‐of‐Way Improvements Improvements(D) (E)Unit Quant. Cost Quant. Cost Quant. Cost Quant. Cost 0 Each 1 2,000.00 0 LF 0 LF 95 5,320.00 0 LF0LF0LF 0 Each 0 Each 1 700.00 0 Each 0 Each0Each 0 Each 1 4,000.00 0 Each 0 Each 0 Each 0 Each0Each 0 Each 0 Each BTOTAL:12,020.00 T BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining  (Bond Reduction) (B)(C) all waterimprovements arepublic. move these tothe left column and update quantitiesbased on civil planredlines cPrivate s Improvements update based on civil plan redlines