Loading...
HomeMy WebLinkAboutContract 2 pagesAgreement AGREEMENT CONTRACT NO. CAG-25-048 THIS AGREEMENT, made and entered into this _30th_ day of _July, 20 25__ _ by and between the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "City" and Mike McClung Construction Co. hereinafter referred to as "Contractor." WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: 1.The Contractor shall do all work and furnish all tools, materials, and equipment for: 116th Ave SE Sidewalk in accordance with and as described in the attached plans and specifications, and the 2025 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation (WSDOT) and the Washington State ChapteroftheAmerican PublicWorksAssociation (APWA )which are by this reference incorporated herein and made part hereof and, shall perform any changes in the work in accord with the Contract Documents. The Contractor shall provide and bear the expense of all equipment, work and labor, of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in these Contract Documents except those items mentioned therein to be furnished by the City. 2.The City hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and furnish the same in accord with the attached plans andspecifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices at the time and in the manner and upon the conditions provided for in this contract The sum total of all progress payments is not to exceed the Total Bid Amount listed in the Schedule of Prices incorporated into this contract, unless the Total Bid Amount is amended by change order(s) prepared and executed in accordance with these Contract Documents. 3.The Contractor for himself/herself, and for his/her heirs, executors, administrators, successors, and assigns, does hereby agree to full performance of all covenants required of the Contractor in the contract. City of Renton 116th Avenue SE Sidewalk Project (SE 160th St to SE 162nd St) TRO4104285 Contract Provisions Page I 31 CAG-25-048 Agreement 4.It is further provided that no liability shall attach to the City by reason of entering into this contract, except as provided herein. 5.In the event litigation is commenced to enforce this contract, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees. 6.This contract is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed and original. IN WITNESS WHEREOF, the Contractor has executed this instrument, on the day and year first below written and the Mayor has caused this instrument to be executed by and in the name of the City of Renton the day and year first above written. CITY OF RENTON [Signature of Authorized Armando Pavone, Mayor Vice President [Title] ATTEST Mike McClung Construction Co. [Business Name] Jason Seth, City Clerk 7/16/2025 [Date] *NOTE:Evidence of the signatory's authority to sign the Agreement on behalf of the business entity shall be submitted. CONTRACTOR ADDRESS FOR GIVING NOTICE CITY OF RENTON ADDRESS FOR GIVING NOTICE Mike McClung Construction Co PO Box 1189 Buckley, WA 98321 City of Renton Transportation System Division Renton City Hall - 5 th Floor 1055 South Grady Way Renton, WA 98057 116th Avenue SE Sidewalk Project (SE 160th St to SE 162nd St) TRO4104285 Contract Provisions Page/ 32 7/30/2025