HomeMy WebLinkAboutContract 2 pagesAgreement
AGREEMENT
CONTRACT NO. CAG-25-048
THIS AGREEMENT, made and entered into this _30th_ day of _July, 20 25__ _ by and between
the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as
"City" and Mike McClung Construction Co.
hereinafter referred to as "Contractor."
WITNESSETH: That in consideration of the terms and conditions contained herein and attached and
made a part of this agreement, the parties hereto covenant and agree as follows:
1.The Contractor shall do all work and furnish all tools, materials, and equipment for: 116th
Ave SE Sidewalk in accordance with and as described in the attached plans and
specifications, and the 2025 Standard Specifications for Road, Bridge, and Municipal
Construction, as prepared by the Washington State Department of Transportation (WSDOT)
and the Washington State ChapteroftheAmerican PublicWorksAssociation (APWA )which are
by this reference incorporated herein and made part hereof and, shall perform any changes
in the work in accord with the Contract Documents.
The Contractor shall provide and bear the expense of all equipment, work and labor, of any
sort whatsoever that may be required for the transfer of materials and for constructing and
completing the work provided for in these Contract Documents except those items
mentioned therein to be furnished by the City.
2.The City hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described work
and to complete and furnish the same in accord with the attached plans andspecifications
and the terms and conditions herein contained and hereby contracts to pay for the same
according to the attached specifications and the schedule of unit or itemized prices at the
time and in the manner and upon the conditions provided for in this contract
The sum total of all progress payments is not to exceed the Total Bid Amount listed in the
Schedule of Prices incorporated into this contract, unless the Total Bid Amount is amended by
change order(s) prepared and executed in accordance with these Contract Documents.
3.The Contractor for himself/herself, and for his/her heirs, executors, administrators, successors,
and assigns, does hereby agree to full performance of all covenants required of the Contractor
in the contract.
City of Renton
116th Avenue SE Sidewalk Project (SE 160th St to SE 162nd St)
TRO4104285 Contract Provisions Page I 31
CAG-25-048
Agreement
4.It is further provided that no liability shall attach to the City by reason of entering into this
contract, except as provided herein.
5.In the event litigation is commenced to enforce this contract, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.This contract is executed in two (2) identical counterparts, by the parties, each of which shall for
all purposes be deemed and original.
IN WITNESS WHEREOF, the Contractor has executed this instrument, on the day and year first below
written and the Mayor has caused this instrument to be executed by and in the name of the City of
Renton the day and year first above written.
CITY OF RENTON
[Signature of Authorized Armando Pavone, Mayor
Vice President
[Title] ATTEST
Mike McClung Construction Co.
[Business Name] Jason Seth, City Clerk
7/16/2025
[Date]
*NOTE:Evidence of the signatory's authority to sign the Agreement on behalf of the business entity shall
be submitted.
CONTRACTOR ADDRESS FOR GIVING NOTICE CITY OF RENTON ADDRESS FOR GIVING NOTICE
Mike McClung Construction Co
PO Box 1189
Buckley, WA 98321
City of Renton
Transportation System Division
Renton City Hall - 5
th Floor
1055 South Grady Way
Renton, WA 98057
116th Avenue SE Sidewalk Project (SE 160th St to SE 162nd St)
TRO4104285 Contract Provisions Page/ 32
7/30/2025