Loading...
HomeMy WebLinkAboutW_Waiver_Request_Form_042525_v1.pdf Radiance Learning CUP Waiver Request Waiver Request List: 1. Arborist Report – No trees will be removed 2. Biological Assessment – Site is already developed. Existing site elements and structure are to remain. 3. Calculations – N/A 4. Colored Renderings – Site is already developed. Existing site elements and structure are to remain. 5. Construction Mitigation Description – Site is already developed. Existing site elements and structure are to remain. 6. Deed of Right-of-Way Dedication – No changes to Right-of-Way Dedication 7. Density Worksheet – Site is already developed. Existing site elements and structure are to remain. 8. Drainage Control Plan – No changes to existing drainage on the site. Site already developed with drainage in place. 9. Drainage Report – No changes to existing drainage on the site. Site already developed with drainage in place. 10. Elevations, Architectural – Structure is existing. No change in footprint. 11. Environmental Checklist – This project does not trigger SEPA as it is under 5,000 SF. 12. Existing Covenants ( Recorded Copy) – No covenants on site. 13. Flood Hazard Data – N/A 14. Floor Plans – Structure is existing, and utilities are existing to the site. The interior tenant improvement layout will be submitted under a building permit. 15. Geotechnical Report – Site is already developed. Existing site elements and structure are to remain. 16. Grading Elevations & Plan, Conceptual – Site is already developed. No new grading required. 17. Grading Elevations & Plan, Detailed – Site is already developed. No new grading required. 18. Habitat Data Report – Site is already developed. 19. Hazardous Materials Management Statement – No Hazardous Materials in this project. 20. Improvement Deferral – N/A 21. Irrigation Plan – Site is already developed. Existing irrigation to remain and is not modified. 22. King County Assessor' s Map Indicating Site – Site is already developed. 23. Landscape Plan, Conceptual – Site is already developed. All existing landscaping to remain. 24. Landscape Plan, Detailed – Site is already developed. All existing landscaping to remain. 25. Letter of Understanding of Geological Risk – Site is already developed. 26. Monument Cards ( one per monument) – N/A 27. Neighborhood Detail Map – N/A 28. Overall Plat Plan – Site already developed. 29. Parking, Lot Coverage & Landscaping Analysis – Site already developed. No changes to existing parking lot, lot coverage or landscaping. 30. Post Office Approval – Site is already developed and serviced by the post office. 31. Plat Name Reservation – N/A 32. Plat Plan – Site already developed. 33. Public Works Approval Letter – All utilities are already connected to the site. No Public works scope required. 34. Rehabilitation Plan – N/A 35. Screening Detail – N/A 36. Shoreline Tracking Worksheet – No shoreline on property. 37. Stream or Lake Study, Standard – No wetlands on property. 38. Stream or Lake Study, Supplemental – No wetlands on property. 39. Stream or Lake Mitigation Plan – No wetlands on property. 40. Street Profiles -N/A 41. Topography Map – Site already developed. Refer to Site plan for existing topography information. 42. Tree Cutting/ Land Clearing Plan – No trees will be removed. 43. Urban Design Regulations Analysis – N/A 44. Utilities Plan, Generalized – All utilities are existing. No utility work required. 45. Wetlands Mitigation Plan, Final – No wetlands on property. 46. Wetlands Mitigation Plan, Preliminary – No wetlands on property.