HomeMy WebLinkAboutWTR272890(3)CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Utility Systems Division / Water Utility
December 3, 2001
Agenda Status
Staff Contact...... Abdoul Gafour (x. 7210)
Consent .............. X
Public Hearing...
Correspondence.. CONCURRENCE
Subject:
CAG 01-043 Relocation of 10-inch Boeing Water Meters
Contractor: Archer Construction, Inc.
Ordinance ............. DATE I
Resolution............ NIAPJiE IrVITIAUDAT
Old Business........ \` 1/61
New Business.......'
Exhibits:
Final Pay Estimate
Study Sessions...... GI
Notice of Completion of Public Works Contract
Information.........
Recommended Action:
Approvals:
Refer to Utilities Committee for Approval of Transfer of
Legal Dept.........
Funds
Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... $1,175.04 (for final pay estimate only) Transfer/Amendment....... $120,000
$220,000 (total project cost)
Amount Budgeted.......... $100,000 (project budget in 2001) Revenue Generated.........
Total Project Budget $100,000 (2001 CIP appropriation for project) City Share Total Project..
Summary of Action:
The project started on June 25, 2001, and was completed on October 28, 2001. The original
contract amount was $123,344.38 and the final contract amount is $180,111.87. The
$56,767.49 increase in construction cost is due to additional work, including the relocation of
sewer lines required to clear conflicts with existing utilities encountered during construction.
The Water Utility requests the transfer of $120,000 of unused funds from other projects to
cover the increase in costs associated with the additional work and extensive staff time required
for the coordination of this project with Boeing and Seattle Public Utilities.
STAFF RECOMMENDATION:
The Utility Systems Division of the Planning/Building/Public Works Department recommends
that the project be accepted, the final pay estimate be approved, and the retainage of $8,277.20
be released after 60 days, subject to the receipt of all required authorizations.
The Department also recommends that Council authorize the transfer of $120,000 of unused
funds from other projects to cover the additional work and staff time required for this project.
H/water/abdoul/boeing/final_agendabill . doc/AG:lf
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: November 9, 2001 NAME 17 IAVDAT-
TO: Dan Clawson, President
City Council Members 1F0, 2 VD-1
a;
VIA: Mayor Jesse Tanner I -
FROM: Gregg Zimmerman, Administrator
STAFF CONTACT: Abdoul Gafour (X-7210)
SUBJECT: Council's Acceptance of Project and Final Payment for Boeing
Meter Relocation Project and Request for Transfer of Funds
ISSUE:
The Water Utility requests Council's acceptance of the project and authorization of final payment to
the contractor, Archer Construction, Inc.
In addition, we request Council's approval to transfer $120,000 from funds available from other
capital improvement accounts to cover additional cost of the project.
RECOMMENDATION:
• Staff recommends that Council accept the project and authorize the final payment to the
contractor.
• Staff further recommends that Council authorize the transfer of funds to this project from existing
capital project accounts that are underspent to cover additional cost due to unanticipated field
conditions.
BACKGROUND SUMMARY:
This project consists of the installation of two large concrete vaults in Logan Avenue South and
relocating two 10-inch water meters serving the Boeing Renton Plant. Water Utility staff designed the
project without accurate record information on the actual location and depth of several existing public,
private and Boeing utilities in the area of the work. During the construction of the project, the
contractor found several side sewer stubs that were in conflict with the proposed water lines and the
existing Boeing water lines were deeper than expected. The contractor was directed to relocate and
replace the sewer stubs with new ductile iron pipe to meet the Health Department codes.
November 9, 2001
Page 2
The contractor also had to install additional water pipe and fittings to connect the new meters to the
Boeing lines since the lines were deeper than expected. As a result of the above side sewer
replacement and additional piping, the final asphalt restoration of Logan Ave. S. was much larger
than anticipated. The entire width of the street had to be overlaid instead of installing a smaller trench
patch.
The total cost of the project, including design, administration and construction is $220,000.
The original construction contract amount was $123,344.38 and our 2001 appropriation for this
project was $100,000. The Water Utility had requested and received Council's approval to transfer
$25,000 from unexpended funds from another project for the award of the construction contract.
The final construction cost is $57,000 over the original contract cost due to the above field conflicts.
In addition, the cost for City staff time was $38,000 more than estimated because of extensive
coordination with Boeing and Seattle Public Utilities during the design and construction of the project.
The Water Utility requests the transfer of unused funds from three other accounts to cover the
increase in costs. These funds have money available due to lower than anticipated cost for the work
performed and to changes in schedule.
Projects to transfer funds from:
Description of Project
Work Order No.
Available Funds
Highlands Reservoir recoat
55260
$68,000
N. Talbot Pump Station Rehab.
55530
$32,000
Pie Oversizin
55100
$20,000
Total Transfer
$120,000
The Highlands Reservoir recoat project will be delayed until 2002 because both the Highlands and
Rolling Hills elevated tanks need repairs and seismic upgrade due to earthquake damage in February,
2001. The recoat of the reservoir will be done after the completion of the repair work in 2002.
The North Talbot Hill pump station rehabilitation is also postponed until 2002 because the station had
to be kept operational until the recent completion of the new Rolling Hills 490 zone pump station and
reservoir.
The City did not receive requests in 2001 for reimbursement from developers for the "oversizing" of
new water mains. Therefore, funds are available from this project.
CONCLUSION:
The completion of the Boeing water meter relocation project was required to meet the terms of the
franchise agreement between the City of Renton and Seattle Public Utilities. As a result, the City will
receive a lower wholesale water rate for water purchased from SPU to serve the Boeing plant. The
City's cost saving is estimated at $40,000/year.
The Water Utility staff underestimated the cost of this project including all the extra cost related to
unexpected field conditions. The coordination effort with Boeing and Seattle Public Utilities was
much more extensive than expected. The request to transfer funds from other projects will have no
impact on future rate increases.
H/division. s/utilitie. s/water/abdoul/boeing/issue_paperO I.doc/AG:If
/
CITY OF RENTON COUNCIL AGENDA BILL COPY�V'
Al #:
Submitting Data: Planning/Building/Public Works
For Agenda of:
DepvDiviBoard.. Utility Systems Division / Water Utility
December 3, 2001
Agenda Status
Staff Contact...... Abdoul Gafour (x. 7210)
Consent .............. X
Public Hearing...
Subject:
CAG 01-043 Relocation of 10-inch Boeing Water Meters
Correspondence..
Contractor: Archer Construction, Inc.
Ordinance .............
Resolution............
Old Business........
New Business.......
Exhibits:
Final Pay Estimate
Study Sessions......
Notice of Completion of Public Works Contract
Information.........
Recommended Action: Approvals:
Refer to Utilities Committee for Approval of Transfer of Legal Dept.........
Funds Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... $1,175.04 (for final pay estimate only) Transfer/Amendment....... $120,000
$220,000 (total project cost)
Amount Budgeted.......... $100,000 (project budget in 2001) Revenue Generated.........
Total Project Budget $100,000 (2001 CIP appropriation for project) City Share Total Project..
Summary of Action:
The project started on June 25, 2001, and was completed on October 28, 2001. The original
contract amount was $123,344.38 and the final contract amount is $180,111.87. The
$56,767.49 increase in construction cost is due to additional work, including the relocation of
sewer lines required to clear conflicts with existing utilities encountered during construction.
The Water Utility requests the transfer of $120,000 of unused funds from other projects to
cover the increase in costs associated with the additional work and extensive staff time required
for the coordination of this project with Boeing and Seattle Public Utilities.
STAFF RECOMMENDATION:
The Utility Systems Division of the Planning/Building/Public Works Department recommends
that the project be accepted, the final pay estimate be approved, and the retainage of $8,277.20
be released after 60 days, subject to the receipt of all required authorizations.
The Department also recommends that Council authorize the transfer of $120,000 of unused
funds from other projects to cover the additional work and staff time required for this project.
H/water/abdoul/boeing/final agendabill.doc/AG:If
STATg O� State of Washington Reg.No.:
o Department of Revenue
wAudit Procedures & Administration Date:
PO Box 47474
1889 �Dy Olympia, Washington 98504-7474
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
City of Renton
Finance Department
1055 South Grady Way
Renton, WA 98055
Assigned To
Date Assigned
Notice is hereby given relative to the completion of contract or project described below.
Description of Contract CAG 01-043 - Relocation of 10" Water Meters for Boeing Renton Plant
City of Renton Water Project No. WTR-27-2890
Contractor's Name
Archer Construction, Inc.
Telephone No. (253) 872-7222
Contractor's Address
7855 - S 2066 Street, Kent WA. 98032
Date Work Commenced
June 25, 2001
Date Work Completed
October 28, 2001
Date Work Accepted
December 10, 2001
Surety or Bonding Co.
Insurance Company of the West, San Diego, California
Agent's Address
Holly Ulfers — USI Northwest-20415 — 72' Ave S., Kent, WA 98032
Bond # 1840881
Contract Amount: $113,368.00 Amount Disbursed:
Additions or Reductions: $52,176.00 Amount Retained:
Sales Tax: $14,567.87 Total:
Total $180,111.87
Phone No:
$171,834.67
$ 8,277.20
$180,111.87
(Disbursing Officer)
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, Olympia, Washington 98504-7474,
immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until
receipt of Department's certificate, and then only in accordance with said certificate.
FORM REV 31 0020 (12-92)
H: division. s/utilitie.s/water/laszlo/boeing-vault/notcomplt/
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043 ESTIMATE NO. 4 & Final
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 10/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $1,080.00
2. SALES TAX @ 8.80% $95.04
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $1,175.04
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $156,240.80
5. ' EARNINGS DUE CONTRACTOR THIS ESTIMATE $1,026.00
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS
8. "' RETAINAGE ON EARNINGS THIS ESTIMATE
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID
11. SALES TAX DUE THIS ESTIMATE
12. SUBTOTAL - SALES TAX
(95% x LINE 1)
(RETAINAGE: 5%)
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
$8,223.20
$54.00
$14,472.83
$95.04
GRAND TOTAL:
$1,121.04 # 4 & Final
$157,266.80
$8,277.20
$14,567.87
$180,111.87
$1,121.04
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $54.00 # 4 & Final
$54.00
TOTAL THIS ESTIMATE: $1,175.04
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT 1 AM
AUTHORIZED TO AUTHENTICATE ND CERTIFY TO SAID LAIM
Signed: Ut/ (A Rokk ti 2Q01
L�
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Project: Relocation of 10' water meter for Boeing
Contractor. Archer Construction, Inc.
Item Description
No.
Contract Number. CAG 01-M
Pay Estimate Final Closing Date: 10/28/O7
Unit Est. Unit Previous Previous This This Total
Total
Amount
1 Mobilization, Demolition
Lump Sum
1
$8,000,00
1.00
$8,000.00
0.00
$0.00
1.00
$8,000.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,000.00
3 Vault Shoring
Lump Sum
1
$1,000.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,000.00
4 Constnucton Survey Staking, and As-Buih Data
Lump Sum
1
$1,900.00
1.00
$1,900.00
0.00
$0.00
1.00
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
1.00
$8,100.00
0.00
$0.00
1.00
$8,100.00
6 Remove 10' Water meter
Each
4
$400.00
4.00
$1,600.00
0.00
$0.00
4.00
$1,600.00
7 Remove Pavement
Square Yard
82
$4.00
240.00
$960.00
0.00
$0.00
240.00
$960.00
8 14' DI Pipe CL 52, FLxFL CL 250. In place of existing
Linear feet
23
$200.00
23.00
$4,600.00
0.00
$0.00
23.00
$4,600.00
9 14' DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
90.50
$27,150.00
0.00
$0.00
90.50
$27,150.00
10 Furnish and install 14'x6'x6'-6' Concrete meter Vauh
Each
2
$12,000.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
11 Install removed 10' water meter
Each
2
$12,000.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
12 Furnish and install 14' gate Valve w/box
Each
2
$3,700.00
2.00
$7,400.00
0.00
$0.00
2.00
$7,400.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
43.00
$516.00
0.00
$0.00
43.00
$516.00
14 Connection to Existing Water Main
Each
4
$1,300.00
4.00
$5,200.00
0.00
$0.00
4.00
$5,200.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
Cubic Yard
4
$100.00
36.00
$3,600.00
0.00
$0.00
36.00
$3,600.00
16 Cathodic protection Test Station
Each
4
$489.00
6.00
$2,934.00
0.00
$0.00
6.00
$2,934.00
17 Joint Bond Thermite Weld
Lump Sum
1
$800.00
1.00
$800.00
0.00
KOO
1.00
$800.00
18 Asphah Patch Class B
Ton
9
$100.00
77.00
$7,700.00
0.00
$0.00
77.00
$7,700.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
201.00
$8,040.00
0.00
$0.00
201.00
$8,040.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
77.00
$1,694.00
0.00
$0.00
77.00
$1,694.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
65.00
$3,250.00
0.00
$0.00
65,00
$3,250.00
22 Restore Landscape
Lump Sum
1
$500.00
1.00
$500.00
0.00
$0.00
1
$500.00
Change Replacement of side sewers, Vauh lid modification and
Order #1 Boeing valves adjustment
Lump Sum
1
$21,600.00
0.95
$20,520.00
0.05
$1,080.00
1
$21,600.00
Sub Total
$164,464.00
$1,080.00
$165,544.00
Sales Tax 8.80%
$14,472.83
$95.04
$14,567.87
Total Amount 'I $178,936.83 $1,175.04 $180,111.87
LG
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: November 9, 2001
TO: Dan Clawson, President
City Council Members
VIA: Mayor Jesse Tanner
FROM: Gregg Zimmem , yAdministrator
STAFF CONTACT: Abdoul Gafour (X-7210)
SUBJECT: Council's Acceptance of Project and Final Payment for Boeing
Meter Relocation Project and Request for Transfer of Funds
ISSUE:
The Water Utility requests Council's acceptance of the project and authorization of final payment to
the contractor, Archer Construction, Inc.
In addition, we request Council's approval to transfer $120,000 from funds available from other
capital improvement accounts to cover additional cost of the project.
RECOMMENDATION:
Staff recommends that Council accept the project and authorize the final payment to the
contractor.
Staff further recommends that Council authorize the transfer of funds to this project from existing
capital project accounts that are underspent to cover additional cost due to unanticipated field
conditions.
BACKGROUND SUMMARY:
This project consists of the installation of two large concrete vaults in Logan Avenue South and
relocating two 10-inch water meters serving the Boeing Renton Plant. Water Utility staff designed the
project without accurate record information on the actual location and depth of several existing public,
private and Boeing utilities in the area of the work. During the construction of the project, the
contractor found several side sewer stubs that were in conflict with the proposed water lines and the
existing Boeing water lines were deeper than expected. The contractor was directed to relocate and
replace the sewer stubs with new ductile iron pipe to meet the Health Department codes.
November 9, 2001
Page 2
The contractor also had to install additional water pipe and fittings to connect the new meters to the
Boeing lines since the lines were deeper than expected. As a result of the above side sewer
replacement and additional piping, the final asphalt restoration of Logan Ave. S. was much larger
than anticipated. The entire width of the street had to be overlaid instead of installing a smaller trench
patch.
The total cost of the project, including design, administration and construction is $220,000.
The original construction contract amount was $123,344.38 and our 2001 appropriation for this
project was $100,000. The Water Utility had requested and received Council's approval to transfer
$25,000 from unexpended funds from another project for the award of the construction contract.
The final construction cost is $57,000 over the original contract cost due to the above field conflicts.
In addition, the cost for City staff time was $38,000 more than estimated because of extensive
coordination with Boeing and Seattle Public Utilities during the design and construction of the project.
The Water Utility requests the transfer of unused funds from three other accounts to cover the
increase in costs. These funds have money available due to lower than anticipated cost for the work
performed and to changes in schedule.
Projects to transfer funds from:
Description of Project
Work Order No.
Available Funds
Highlands Reservoir recoat
55260
$68,000
N. Talbot Pump Station Rehab.
55530
$32,000
Pie Oversizin
55100
$20,000
Total Transfer
$120,000
The Highlands Reservoir recoat project will be delayed until 2002 because both the Highlands and
Rolling Hills elevated tanks need repairs and seismic upgrade due to earthquake damage in February,
2001. The recoat of the reservoir will be done after the completion of the repair work in 2002.
The North Talbot Hill pump station rehabilitation is also postponed until 2002 because the station had
to be kept operational until the recent completion of the new Rolling Hills 490 zone pump station and
reservoir.
The City did not receive requests in 2001 for reimbursement from developers for the "oversizing" of
new water mains. Therefore, funds are available from this project.
CONCLUSION:
The completion of the Boeing water meter relocation project was required to meet the terms of the
franchise agreement between the City of Renton and Seattle Public Utilities. As a result, the City will
receive a lower wholesale water rate for water purchased from SPU to serve the Boeing plant. The
City's cost saving is estimated at $40,000/year.
The Water Utility staff underestimated the cost of this project including all the extra cost related to
unexpected field conditions. The coordination effort with Boeing and Seattle Public Utilities was
much more extensive than expected. The request to transfer funds from other projects will have no
impact on future rate increases.
1-1/division. s/utilitie. s/water/abdouUboeing/issue_paper0l .doc/AG:1f
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043 ESTIMATE NO. 4 & Final
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 10/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $1,080.00
2. SALES TAX @ 8.80% $95.04
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $1,175.04
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $156,240.80
5. ' EARNINGS DUE CONTRACTOR THIS ESTIMATE $1,026.00
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS $8,223.20
8. " RETAINAGE ON EARNINGS THIS ESTIMATE $54.00
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID $14,472.83
11. SALES TAX DUE THIS ESTIMATE $95.04
12. SUBTOTAL - SALES TAX
(95% x LINE 1)
(RETAINAGE: 5%) GRAND TOTAL:
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $1,121.04 # 4 & Final
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $54.00 # 4 & Final
TOTAL THIS ESTIMATE
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE&NDERTIFY TO SAID LAIM
Signed: w W G� Ruvemtiuv k 2Do l
$157,266.80
$8,277.20
$14,567.87
$180,111.87
$1,121.04
$54,00
$1,175.04
LC
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Project: Relocation of 10' water meter for Boeing
Contractor. Archer Construction, Inc.
Rem Description
No.
1 Mobilization, Demolition
2 Trench Excavation Safety System
3 Vault Shoring
4 Construction Survey Staking, and As-BuiR Data
5 Traffic Control
6 Remove 10' Water meter
7 Remove Pavement
8 14' DI Pipe CL 52, FLxFL CL 250. In place of existing
9 14' DI Pipe CL 52, Poly Wrapped
10 Furnish and install 14'x8'x6'-6" Concrete meter Vault
11 Install removed 10" water meter
12 Furnish and install 14' gate Valve w/box
13 Abandon and Fill pipe with CDF
14 Connection to Existing Water Main
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
16 Cathodic protection Test Station
17 Joint Bond Thermite Weld
18 Asphalt Patch Class B
19 Select Imported Backfill (Gravel Borrow)
20 Remove and Replace Curb and Gutter
21 Remove and replace Sidewalk and Driveway
22 Restore Landscape
Change Replacement of side sewers, Vault lid modification and
Order #1 Boeinq valves adjustment
Contract Number. CAG 01-043
Pay Estimate Final Closing Date: 10/28/01
Unit Est. Unit Previous Previous This
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Each
Square Yard
Linear feet
Linear feet
Each
Each
Each
Linear feet
Each
Cubic Yard
Each
Lump Sum
Ton
Cubic Yard
Linear feet
Square Yard
Lump Sum
Lump Sum
Sub Total
Sales Tax 8.8
Total Amount
1
$8,000.00
1.00
$8,000.00
1
$1,000.00
1.00
$1,000.00
1
$1,000.00
1.00
$1,000.00
1
$1,900.00
1.00
$1,900.00
1
$8,100.00
1.00
$8.100.00
4
$400.00
4.00
$1,600.00
82
$4.00
240.00
$960.00
23
$200.00
23.00
$4,600.00
57
$300.00
90.50
$27,150.00
2
$12,000.00
2.00
$24,000.00
2
$12,000.00
2.00
$24,000.00
2
$3,700.00
2.00
$7,400.00
54
$12.00
43.00
$516.00
4
$1,300.00
4.00
$5,200.00
4
$100.00
36.00
$3,600.00
4
$489.00
6.00
$2,934.00
1
$800.00
1.00
$800.00
9
$100.00
77.00
$7,700.00
28
$40.00
201.00
$8,040.00
53
$22.00
77.00
$1,694.00
33
$50.00
65.00
$3,250.00
1
$500.00
1.00
$500.00
1
$21.600.00
0.95
$20.520.00
This Total Total
mount Quantity Amount
0.00
$0.00
1.00
$8,000.00
0.00
$0.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,900.00
0.00
$0.00
1.00
$8,100.00
0.00
$0.00
4.00
$1,600.00
0.00
$0.00
240.00
$960.00
0.00
$0.00
23.00
$4,600.00
0.00
$0.00
90.50
$27,150.00
0.00
$0.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
0.00
$0.00
2.00
$7,400.00
0.00
$0.00
43.00
$516.00
0.00
$0.00
4.00
$5,200.00
0.00
$0.00
36.00
$3,600.00
0.00
$0.00
6.00
$2,934.00
0.00
$0.00
1.00
$800.()0
0.00
$0.00
77.00
$7,700.00
0.00
$0.00
201.00
$8,040.00
0.00
$0.00
77.00
$1,694.00
0.00
$0.00
65.00
$3,250.00
0.00
$0.00
1
$500.00
0,05
$1.080.00
1
$21.600.00
$164,464.00 $1,080.00 $165,544.00
$14,472.83 $95.04 $14,567.87
$178,936.83 $1,175.04 $180,111.87
LC
STATg
State of Washington Reg.No.:
O�
04
Department of Revenue
x
Audit Procedures & Administration Date:
PO Box 47474
Olympia, Washington 98504-7474
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
City of Renton
Finance Department
1055 South Grady Way
Renton, WA 98055
Assigned To
Date Assigned
LY
Notice is hereby given relative to the completion of contract or project described below.
Description of Contract CAG 01-043 - Relocation of 10" Water Meters for Boeing Renton Plant
City of Renton Water Project No. WTR-27-2890
Contractor's Name
Archer Construction, Inc.
Telephone No. (253) 872-7222
Contractor's Address
7855 - S 206d' Street, Kent WA. 98032
Date Work Commenced
June 25, 2001
Date Work Completed
October 28, 2001
Date Work Accepted
December 10, 2001
Surety or Bonding Co.
Insurance Company of the West, San Diego, California
Agent's Address
Holly Ulfers — USI Northwest-20415 — 72"d Ave S., Kent, WA 98032
Bond # 1840881
Contract Amount: $113,368.00 Amount Disbursed
Additions or Reductions: $52,176.00 Amount Retained:
Sales Tax: $14,567.87 Total:
Total $180,111.87
I:1
Phone No:
$171,834.67
$8,277.20
$180,111.87
(Disbursing Officer)
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, Olympia, Washington 98504-7474,
immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until
receipt of Department's certificate, and then only in accordance with said certificate.
FORM REV 310020 (12-92)
H:division.s/utilitie. s/water/laszlo/boeing-vault/notcomplt/
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277; Sep 27 01 4:40FM; Page 2
—` CITY OF RENTON PBPIJ 4GD 43b
SEP-25-2001 16:05
CITY OF RENTON
Public works DePutment
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG-01-043 RELOCATION OF 10" WATER METERS FOR BOEINQ C.O.# 1
RENTON PLANT (WTR-27-2890)
CONTRACTOR: ARCHER CONSTRUCTION INC. 7855 S. 2oO ST. 'K'ENT, WA., 98032
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment and materiaals,subcontractors, caLion a5nd Boeing O vmes bonding,jd insurance for
Replacemtnt of 2 sick sewers, Vault Lid
Lump Sum Cost
8.8% Sales Tax
Total C.O. #1
ORJGTNAL CONTRACT
AMOUNT
Contractor:
Project Enginear;
$21,600.00
$1,900.80
$23,500.80
z 1MATED�NETANGE BrNATCD CONTRACT
CURRENT CONKTRACT =S 1i7tAL AFTER CHANGE
AD30UI�T TH1S
23.500.9 146.845.1
Date:
Date:
Date:
Approved By:
nnsw a,wo. H�4
a
Department ofIaborandIndustries AFFIDAVIT OF WAGES PAID
PrevailingWagePO Box 44540
Olympia WA 98504-4540 Public Works Contract
THIS FORM MUST BE TYPED OR PRINTED IN INK $25.00 Filing Fee Required
IncaMlete forms cannot be processed and will be returned without approval.
Large, bold numbers match instructions on back of form. 2 Project Name
Pkaw Mows mirimuin of 10 woding days for proceadng from the dab dw Depar&nmtreceivas your tonn& RELOCATE 10" WATER METERS
ALL FORMS 'MLL BE MAILED TO THIS ADDRESS contract# Date Intent Oed
1 Organization name, address, city, state & ZIP+ a CAG01043 91 271 01
.'- ......- ...................... ...............................................................- - ..\ Contract Awarding Agency
ARCHER CONSTRUCTION, INC. CITY OF RFNTQN
Address
7855 SOUTH 2O6TH STREET D56 SOUTH GRADY WAY
erty state 2IP+4
KENT, WA. 98032-1354
...................-•----.....% l omty w ere wbrt was pcorm City where work was performed
Prime contractor
_ARCHER CONSTRUCTION, INC.
Contractor Registration No.
)r+ur=1*')-1 nno
KING
RENTON
contract awarded I Date work completed
Indicate total dollar amount of your contract —� I $
8 532.12
4 Number 5 Total # hrs 6 Rate of % Rate of Hourly 8 Apprentices:
3 Craft/trade/occupation of Workers worked -ea trade Hourly Pay Fringe Benefits (see #s on bads of form)
TEAMSTER (10 CY DUMP)
........... ------------------------------------------
LABORER (GENERAL)
--------------- _..... .... ... .............._...._.....
I hereby certify that the above information is correct and that all workers.I
employed on this Public Worts Project were paid no less than the Prevailing
- Wage Rate(s) as determined by the Industrial Statistician of the Department
of Labor and Industries. I understand that contractors who violate Prevailing
Wage Laws, i.e., incorrect classification%scope itteticvil(Qrkers, improper
payment of prevailing wages, etc., are suh}peit �i �arment and
will be required to pay any back wages —re jee. 0
10 NOTARY: Complete all 4 S905 1 4111
\ A .
Subscribed and sworn to before nk this• N ARt�rtrjlibn ex 'res on
OCOTBER 17-2001 : o � �/20 95
Notary Public in and for the Stat f PUB
Of WASHING ON /tl d,' S
sign 't �"9Y _ ••••• � '
CERTIFIED: Department of Labor and Industries
v
9 Company name
HOT MIX PAVERS, INC.
Address
4400 SOUTH 131 ST PLACE
City TUKWILAi WA 98168
Phone number
( 20d 324-0106
Check Number:
Issued By: _
Amount[
(I fndastrial Sran.gician I 111
F700-007-ODO affidavit of wages 6-95 Distribution: White- Awarding Awnry Canary - L&1 Pink - Prime Cmtactor Gddemod - Subcontracts
® 18
Department of Labor and IndustriessTAreF AFFIDAVIT OF WAGES PAID
Prevailing, Wage
(360) %2-5335 � = Public Works Contract
3yt ieB9 aY
THIS FORM MUST BE TYPED OR PRINTED IN INK $25.00 Filing Fee Required
Inrom»lete forms cannot beprocessed and will be returned without approval.
Large, bold numbers match instructions on back of form. 2 Project Name 10" Water Meter Relocation
Plwa alfatr a mWmum of 10 wodmq days far pmosaaep hoe On doleft Daporlew itecaaw yaw bras — at Renton Bc�.Jnq
ALL FORMS WILL BE MAILED TO THIS ADDRESS Contract* Date Intent filed
1 Organization name, address, city, state &ZIP + 4
CAG01-043 6 17 01
Contract Awarding Agency
Archer Construction, Inc. City of Renton
7855 South 206th Street Address
Kent, WA 98032-1354 1055 South Grady Way
City
Renton
state Z" + 4
WA 98055
_..................._....._ _._ .__....._......... _........_.............
'County where work was perfomted
where wort was performed
King
Re ton
Prime contractor Contractor Registration No.
Bid due date
ate contract awarded
ate wort completed
Archer Construction, Inc. ARCHEI*219DR
4 18
0
4 24
01
9 27 01
rt�i�au c«at dotty amwuti of you co�tra�c .
,._
-►
J(O
,.
3 Craft/trade/occupation
4 Number 5 Total N hrs
of Wokers i worked -ea trade
6 Rate of
Hourly Pay
7 Rate of Hourly
Fringe Benefits
g Apprentices:
(see Mg m baa of iorm)
Backhoe Operator (75HP & Over)
lli mr%i-Tn irlr nri -,oar
Flaaaer
I hereby certify that the above information is correct and that all worker[ I
employed on this Public Worts Project were paid no less than the Prevailing
'- Wage Rates) as determined by the Industrial Statistician of the Department
of Labor and Industries. I understand that contractors who violate Prevailing
Wage Laws, i.e., incorrect cI' ification/scope of wort of workers, improper
payment of prevailing wages, e, are subject to fines and/or debarment and
will be required to pay any back wages due to workers. RCW 39.12.050
10 NOTARY: Complete all copies and notarize gbh,
page with stamp or seal
Subscribed and sworn to before me this date: My commission expires on
10-26-01 6-15-05
Notary Public in and for the State
of Washington
41
Signature
I CERTIFIED: Department of Labor and Industries
By
riw-�nr�-vw ar..w.n ui wagca �-»
602.50
460.00
108.00
NIM
9 Company name
Archer Construction, Inc.
Address
7855 South 206th Street
City Kent, \ WA zIP0032-1354
Phone number Contractor Registration No.
( 253) 872-7222 ARCHEI*219DR
Check Number.
Issued By:
„ors_ CCT 2001
U.oat,.
Dbdnr tim: White - Awarding Agemy Canary - LAI Pick - Prase Coub cuw
President
nat,outtt_
Goldenrod - subcontactor
Departure ' of Labor and Industries tan srAre AFFIDAVIT OF WAGES PAID
Pt-,zvailing �e o
c360' -s _,j s Public Works Contract
ddyt lees a�Y
THIS FORM MUST BE TYPED OR PRINTED IN INK $25.00 Filing Fee Required
Inca=leteforms cannot be processed and will be returned without approval.
Large, bold numbers match instructions on back of form. project Name
Pbaw Mows mktknum at 10 woA ft days hrpmaskg Brock dw dab The Deparb wi mothw yow forma 2 -QELp Gq-1-I o tJ O F 10„ O147-t--R l4 e- 17--
ALL FORMS W1LL BE MAILED 70 THIS ADDRESS ContractN
, , 0#30
1 Organization name, address, city, state & Z[P + 4
GA G-of-043
Contract Awarding Agency
C 1k�R Co G-r (Lo CTt o r3 , -S�a C-, C''r4 OF -V," -ro A
r7$SS �jts-I-t-1 - 11 �� AaarrBa
KE�7 WA C) City State ZIP+4
.. ........................................................................................ - County where work was performed City where wort was performed
16 A Gr I IIIRIZ0-70 tJ
Prime contractor
Contractor Registration No.
Bid due date
Date contract awarded
Date work completed
--AR-C-Hoe
A(ZcHE:*2Iq V'9,
Cf 18
p I
oyi ;lq of
1 09 1 12 v1
Indicate total dollar amount of your contract —►
$ �, ��� SLl
4 Number 5 Total # hrs
6 Rate o
Rate of Hourly 8 Apprentices:
$ Craft/trade/occupation
of Workers worked -ea trade
Hourly Pay
X Fringe Benefits 't (see N8 an back or tom)
p—��a�
.. �.. .
= °r3 : 'OG�'�: m
. e 9`#I',a
ap •
I hereby certify that ormati is c t that all workers I
employed on this Pub ere�a1*n s than the Prevailing
-- Wage Rate(s) as dete • S ian of the Department
of Labor and Industries. I is who violate Prevailing
Wage Laws, i.e., incorrect class of work of workers, improper
payment of prevailing wages, etc., are subject to fines and/or debarment and
will be required to pay any back wages due to workers. RCW 39.12.050
10 NOTARY: Complete all 4 copies and notarize each
page with stamp or seal
Subscribed and swom to before me this date: J My commission expires on
Nota�7(xs
lic in and for the StaW
Of WI
Signature - A J A
CERTI -IED- Department of Labor and Industries
9 Company name
AfMCeAr.A I (�OacZrr COWAR-!Y
Address
City State LIP + 4
C-la V3Pr 98332-90(>9
Phone number Contractor Registration No.
1'- 3) $S -18zz AHE2iCcp 3i M G
Stor,a Title
��,�°OCC,�
r Amount:
Check Number .:: L�I C.���
Issued By: 'l
1 F M�sw NOV 6 2��i ��" t>kooti t;
By A
Eea 1! ti 1i11: U ion
F700-OW-000 affidavit of wages 7-99 Distribution: White - Awarding Agency Canary - L I yids - Rine Contractor Goldenrod -
nt By: ARCHER CONSTRUCTION INC; 253 812 1211; sep-2/-Ul 4:4UrM; rdye c
_ 4G7 4J10 IGVI r.ril�w
�SEP-25-2001 16 : OS CITY CI� OF ��ON
Public works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG-01-043 RELOCATION OF 10" WATER METERS FOR BOEING C.O.# 1
RENTON PLANT (WTR-27-2890)
CONTRACTOR: ARCHER CONSTRUCTION INC. 7855 S. 206"' ST, KENT, WA., 98032
SUMMARY OF PROPOSED CHANGE:
an
Provide all labor, equipment and materials, Modification nand Boeing vOaTa a and [Stems bing, and msur CC for
Replacement of 2 side sewers, Vault Lids,dc
Lump Sum Cost
8.8% Sales Tax
Total C.O. #1
ORIGINAL CONTRACT
AMOUNT
123.344.30 _
Contractor:
Project Engineer:
Approved By:
$21,600-00
$1,900.80
$23,500.80
CURRENT CO2�I'RACT ETIMATED NET CHANGE BYMATV) CONTRACT
ADdOtJI�T TH15 ORDER T(7rAL AFIER CHANGE
123,344,38
z3.500.8 I4b.b45.IP
(Vtsp� 6r.es N�a.'1
Date:
Date:
Date. � /Z��6)
DATE:
TO:
VIA:
FROM:
STAFF CONTACT:
SUBJECT:
ISSUE:
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
November 9, 2001
Dan Clawson, President
City Council Members
Mayor Jesse Tanner
Gregg Zimmerman, Administrator
Abdoul Gafour (X-7210)
Council's Acceptance of Project and Final Payment for Boeing
Meter Relocation Project and Request for Transfer of Funds
The Water Utility requests Council's acceptance of the project and authorization of final payment to
the contractor, Archer Construction, Inc.
In addition, we request Council's approval to transfer $120,000 from funds available from other
capital improvement accounts to cover additional cost of the project.
RECOMMENDATION:
Staff recommends that Council accept the project and authorize the final payment to the
contractor.
• Staff further recommends that Council authorize the transfer of funds to this project from existing
capital project accounts that are underspent to cover additional cost due to unanticipated field
conditions.
BACKGROUND SUMMARY:
This project consists of the installation of two large concrete vaults in Logan Avenue South and
relocating two 10-inch water meters serving the Boeing Renton Plant. Water Utility staff designed the
project without accurate record information on the actual location and depth of several existing public,
private and Boeing utilities in the area of the work. During the construction of the project, the
contractor found several side sewer stubs that were in conflict with the proposed water lines and the
existing Boeing water lines were deeper than expected. The contractor was directed to relocate and
replace the sewer stubs with new ductile iron pipe to meet the Health Department codes.
November 9, 2001
Page 2
The contractor also had to install additional water pipe and fittings to connect the new meters to the
Boeing lines since the lines were deeper than expected. As a result of the above side sewer
replacement and additional piping, the final asphalt restoration of Logan Ave. S. was much larger
than anticipated. The entire width of the street had to be overlaid instead of installing a smaller trench
patch.
The total cost of the project, including design, administration and construction is $220,000.
The original construction contract amount was $123,344.38 and our 2001 appropriation for this
project was $100,000. The Water Utility had requested and received Council's approval to transfer
$25,000 from unexpended funds from another project for the award of the construction contract.
The final construction cost is $57,000 over the original contract cost due to the above field conflicts.
In addition, the cost for City staff time was $38,000 more than estimated because of extensive
coordination with Boeing and Seattle Public Utilities during the design and construction of the project.
The Water Utility requests the transfer of unused funds from three other accounts to cover the
increase in costs. These funds have money available due to lower than anticipated cost for the work
performed and to changes in schedule.
Projects to transfer funds from:
Description of Project
Work Order No.
Available Funds
Highlands Reservoir recoat
55260
$68,000
N. Talbot Pump Station Rehab.
55530
$32,000
Pie Oversizin
55100
$20,000
Total Transfer
$120,000
The Highlands Reservoir recoat project will be delayed until 2002 because both the Highlands and
Rolling Hills elevated tanks need repairs and seismic upgrade due to earthquake damage in February,
2001. The recoat of the reservoir will be done after the completion of the repair work in 2002.
The North Talbot Hill pump station rehabilitation is also postponed until 2002 because the station had
to be kept operational until the recent completion of the new Rolling Hills 490 zone pump station and
reservoir.
The City did not receive requests in 2001 for reimbursement from developers for the "oversizing" of
new water mains. Therefore, funds are available from this project.
CONCLUSION:
The completion of the Boeing water meter relocation project was required to meet the terms of the
franchise agreement between the City of Renton and Seattle Public Utilities. As a result, the City will
receive a lower wholesale water rate for water purchased from SPU to serve the Boeing plant. The
City's cost saving is estimated at $40,000/year.
The Water Utility staff underestimated the cost of this project including all the extra cost related to
unexpected field conditions. The coordination effort with Boeing and Seattle Public Utilities was
much more extensive than expected. The request to transfer funds from other projects will have no
impact on future rate increases.
H/div ision. s/util itie. s/water/abdoul/boeing/issue_paperO .doc/AG:lf
CITY OF RENTON COUNCIL AGENDA BILL
Al /#:
Submitting Data: Planning/Building/Public Works
For Agenda of:
DepvDiv/Board.. Utility Systems Division / Water Utility
December 3, 2001
Agenda Status
Staff Contact...... Abdoul Gafour (x. 7210)
Consent .............. X
Public Hearing...
Correspondence.. CONCURRENCE
Subject:
CAG 01-043 Relocation of 10-inch Boeing Water Meters
Contractor: Archer Construction, Inc.
Ordinance............ DATE I 1
Resolution........... ;
TAME I I IAVDA
Old Business........; \��gr01
New Business.......!
Exhibits:
Final Pay Estimate
Study Sessions......
Notice of Completion of Public Works Contract
Information.........
Recommended Action:
Approvals:
Refer to Utilities Committee for Approval of Transfer of
Legal Dept.........
Funds
Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required...
$1,175.04 (for final pay estimate only) Transfer/Amendment....... $120,000
$220,000 (total project cost)
Amount Budgeted..........
$100,000 (project budget in 2001) Revenue Generated.........
Total Project Budget
$100,000 (2001 CIP appropriation for project) City Share Total Project..
Summary of Action:
The project started on June 25, 2001, and was completed on October 28, 2001. The original
contract amount was $123,344.38 and the final contract amount is $180,111.87. The
$56,767.49 increase in construction cost is due to additional work, including the relocation of
sewer lines required to clear conflicts with existing utilities encountered during construction.
The Water Utility requests the transfer of $120,000 of unused funds from other projects to
cover the increase in costs associated with the additional work and extensive staff time required
for the coordination of this project with Boeing and Seattle Public Utilities.
STAFF RECOMMENDATION:
The Utility Systems Division of the Planning/Building/Public Works Department recommends
that the project be accepted, the final pay estimate be approved, and the retainage of $8,277.20
be released after 60 days, subject to the receipt of all required authorizations.
The Department also recommends that Council authorize the transfer of $120,000 of unused
funds from other projects to cover the additional work and staff time required for this project.
H/water/abdoul/boeing/final_agendabill . doc/AG:lf
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data: Planning/Building/Public Works
Dept/Div/Board.. Utility Systems Division / Water Utility
Staff Contact...... Abdoul Gafour (x. 7210)
Subject:
CAG 01-043 Relocation of 10-inch Boeing Water Meters
Contractor: Archer Construction, Inc.
Exhibits:
Final Pay Estimate
Notice of Completion of Public Works Contract
Al #:
For Agenda of:
December 3. 2001
Agenda Status
Consent........
Public Hearing...
Correspondence..
Ordinance .............
Resolution............
Old Business........
New Business.......
Study Sessions......
Information........ .
Recommended Action: Approvals:
Refer to Utilities Committee for Approval of Transfer of Legal Dept.........
Funds Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... $1,175.04 (for final pay estimate only) Transfer/Amendment....... $120,000
$220,000 (total project cost)
Amount Budgeted.......... $100,000 (project budget in 2001) Revenue Generated.........
Total Project Budget $100,000 (2001 CIP appropriation for project) City Share Total Project..
Summary of Action:
The project started on June 25, 2001, and was completed on October 28, 2001. The original
contract amount was $123,344.38 and the final contract amount is $180,111.87. The
$56,767.49 increase in construction cost is due to additional work, including the relocation of
sewer lines required to clear conflicts with existing utilities encountered during construction.
The Water Utility requests the transfer of $120,000 of unused funds from other projects to
cover the increase in costs associated with the additional work and extensive staff time required
for the coordination of this project with Boeing and Seattle Public Utilities.
STAFF RECOMMENDATION:
The Utility Systems Division of the Planning/Building/Public Works Department recommends
that the project be accepted, the final pay estimate be approved, and the retainage of $8,277.20
be released after 60 days, subject to the receipt of all required authorizations.
The Department also recommends that Council authorize the transfer of $120,000 of unused
funds from other projects to cover the additional work and staff time required for this project.
H/water/abdoul/boeing/final agendabill.doc/AG:lf
sTA7, State of Washington Reg.No.:
04 Department of Revenue
w Audit Procedures & Administration Date:
0
PO Box 47474
y
�'t 1889 Olympia, Washington 98504-7474
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
City of Renton
Finance Department
1055 South Grady Way
Renton, WA 98055
Assigned To
Date Assigned
Notice is hereby given relative to the completion of contract or project described below.
Description of Contract CAG 01-043 - Relocation of 10" Water Meters for Boeing Renton Plant
City of Renton Water Project No. WTR-27-2890
Contractor's Name
Archer Construction, Inc.
Telephone No. (253) 872-7222
Contractor's Address
7855 - S 206d' Street, Kent WA. 98032
Date Work Commenced
June 25, 2001
Date Work Completed
October 28, 2001
Date Work Accepted
December 10, 2001
Surety or Bonding Co.
Insurance Company of the West, San Diego, California
Agent's Address
Holly Ulfers — USI Northwest-20415 — 72"d Ave S., Kent, WA 98032
Bond # 1840881
Contract Amount:
Additions or Reductions:
Sales Tax:
Total
$113,368.00
$52,176.00
$14,567.87
$180,111.87
LM
Phone No:
Amount Disbursed:
Amount Retained:
Total:
$171, 834.67
$8,277.20
$180,111.87
(Disbursing Officer)
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, Olympia, Washington 98504-7474,
immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until
receipt of Department's certificate, and then only in accordance with said certificate.
FORM REV 31 0020 (12-92)
H:division.s/util i tie.s/water/laszlo/boeing-vault/notcompl t/
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043 ESTIMATE NO. 4 & Final
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 10/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $1,080.00
2. SALES TAX @ 8.80% $95.04
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $1,175.04
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $156,240.80
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $1,026.00
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID
11. SALES TAX DUE THIS ESTIMATE
12. SUBTOTAL - SALES TAX
* (95% x LINE 1)
** (RETAINAGE: 5%)
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
$8,223.20
$54.00
$14,472.83
$95.04
GRAND TOTAL:
$1,121.04 # 4 & Final
$54.00 # 4 & Final
TOTAL THIS ESTIMATE:
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE&NDCERTIFYTOSAIDLAIM
Signed: Pow A4) (.A
$157,266.80
$8,277.20
$14, 567.87
$180,111.87
$1,121.04
$54.00
$1,175.04
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Project: Relocation of 10" water meter for Boeing Contract Number. CAG 01-043
Contractor. Archer Construction, Inc. Pay Estimate Final Closing Date: 10/28/Ot
Item Description Unit Est. Unit Previous Previous This This Total Total
No. Quantity Price Quantity Amount Quantity Amount Quantity Amour
1 Mobilization, Demolition
2 Trench Excavation Safety System
3 Vault Shoring
4 Construction Survey Staking, and As -Built Data
5 Traffic Control
6 Remove 10' Water meter
7 Remove Pavement
8 14' DI Pipe CL 52, FLxFL CL 250. In place of existing
9 14" DI Pipe CL 52, Poly Wrapped
10 Fumish and install 14'x8'x6'-6' Concrete meter Vault
11 Install removed 10" water meter
12 Furnish and install 14' gate Valve w/box
13 Abandon and Fill pipe with CDF
14 Connection to Existing Water Main
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
16 Cathodic protection Test Station
17 Joint Bond Thermite Weld
18 Asphalt Patch Class B
19 Select Imported Backfill (Gravel Borrow)
20 Remove and Replace Curb and Gutter
21 Remove and replace Sidewalk and Driveway
22 Restore Landscape
Change Replacement of side sewers, Vault lid modification and
Order #1 Boeino valves adiustment
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Each
Square Yard
Linear feet
Linear feet
Each
Each
Each
Linear feet
Each
Cubic Yard
Each
Lump Sum
Ton
Cubic Yard
Linear feet
Square Yard
Lump Sum
Sub Total
Sales Tax 8.8
Total Amount
1 $8,000.00
1 $1,000.00
1 $1,000.00
1 $1,900.00
1 $8,100.00
4 $400.00
82 $4.00
23 $200.00
57 $300.00
2 $12,000.00
2 $12,000.00
2 $3,700.00
54 $12.00
4 $1,300.00
4 $100.00
4 $489.00
1 $800.00
9 $100.00
28 $40.00
53 $22.00
33 $50.00
1 $500.00
1.00
$8,000.00
0.00
1.00
$1,000.00
0.00
1.00
$1,000.00
0.00
1.00
$1,900.00
0.00
1.00
$8,100.00
0.00
4.00
$1,600.00
0.00
240.00
$960.00
0.00
23.00
$4,600.00
0.00
90.50
$27,150.00
0.00
2.00
$24,000.00
0.00
2.00
$24,000.00
0.00
2.00
$7,400.00
0.00
43.00
$516.00
0.00
4.00
$5,200.00
0.00
36.00
$3,600.00
0.00
6.00
$2,934.00
0.00
1.00
$800.00
0.00
77.00
$7,700.00
0.00
201.00
$8,040.00
0.00
77.00
$1,694.00
0.00
65.00
$3,250.00
0.00
1.00
$500.00
0.00
$164,464.00
$14,472.83
$178,936.83
$0.00
1.00
$8,000.00
$0.00
1.00
$1,000.00
$0.00
1.00
$1,000.00
$0.00
1.00
$1,900.00
$0.00
1.00
$8,100.00
$0.00
4.00
$1,600.00
$0.00
240.00
$960.00
$0.00
23.00
$4,600.00
$0.00
90.50
$27,150.00
$0.00
2.00
$24,000.00
$0.00
2.00
$24,000.00
$0.00
2.00
$7,400.00
$0.00
43.00
$516.00
$0.00
4.00
$5,200.00
$0.00
36.00
$3,600.00
$0.00
6.00
$2,934.00
$0.00
1.00
$800.00
$0.00
77.00
$7,700.00
$0.00
201.00
$8,040.00
$0.00
77.00
$1,694.00
$0.00
65.00
$3,250.00
$0.00
1
$500.00
$1,080.00 $165,544.00
$95.04 $14,567.87
$1,175.04 $180,111.87
LG
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043 ESTIMATE NO. 4 & Final
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 10/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $1,080.00
2. SALES TAX @ 8.80% $95.04
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $1,175.04
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $156,240.80
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $1,026.00
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS $8,223.20
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE $54.00
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID $14,472.83
11. SALES TAX DUE THIS ESTIMATE $95.04
12. SUBTOTAL - SALES TAX
* (95% x LINE 1)
** (RETAINAGE: 591o) GRAND TOTAL
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160) $1,121.04 4 4 & Final
RETAINED AMOUNT (Line 8):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160) $54.00 # 4 & Final
TOTAL THIS ESTIMATE
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE&NDERTIFY TO SLAIM
Signed: � W SAID IV) (A V t6u k 2401
$157,266.80
$8,277.20
$14,567.87
$180,111.87
$1,121.04
$54.00
$1,175.04
L L
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Printed On: 11/13/01 City of Renton Public Works Department Page 1
Project: Relocation of 10' water meter for Boeing
Contractor. Archer Construction, Inc.
Item Description
No.
1 Mobilization, Demolition
2 Trench Excavation Safety System
3 Vault Shoring
4 Construction Survey Staking, and As -Built Data
5 Traffic Control
6 Remove 10' Water meter
7 Remove Pavement
8 14' DI Pipe CL 52, FLxFL CL 250. In place of existir
9 14' DI Pipe CL 52, Poly Wrapped
10 Furnish and install 14'x8'x6'-6' Concrete meter Vaul
11 Install removed 10' water meter
12 Furnish and install 14' gate Valve w/box
13 Abandon and Fill pipe with CDF
14 Connection to Existing Water Main
15 Concrete for Thrust Blocking, Dead -man Anchor Bol
16 Cathodic protection Test Station
17 Joint Bond Thermite Weld
18 Asphalt Patch Class B
19 Select Imported Backfill (Gravel Borrow)
20 Remove and Replace Curb and Gutter
21 Remove and replace Sidewalk and Driveway
22 Restore Landscape
Change Replacement of side sewers, Vault lid modification a
Contract Number. GAG 01-043
Pay Estimate Final Closing Date: 10/28/01
Unit Est. Unit Previous Previous This
Quantity Price Quantity Amount Quantity
Sub Total
Sales Tax 8.8
Total Amount
1 $8,000.0(
1 $1,000.0(
1 $1,000.0(
1 $1,900.0(
1 $8,100.0(
4 $400.0(
82 $4.0(
23 $200.0(
57 $300.0(
2 $12,000.0(
2 $12,000.0(
2 $3,700.0(
54 $12.0(
4 $1,300.0(
4 $100.0(
4 $489.0(
1 $800.0(
9 $100.0(
28 $40.0(
53 $22.0(
33 $50.0(
1 $500.00
1 $21.600.00
This Total Total
Amount Quantity Amount
1.00
$8,000.00
0.00
$0.00
1.00
$8,000.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,000.00
1.00
$1,000.00
0.00
$0.00
1.00
$1,000.00
1.00
$1,900.00
0.00
$0.00
1.00
$1,900.00
1.00
$8,100.00
0.00
$0.00
1.00
$8,100.00
4.00
$1,600.00
0.00
$0.00
4.00
$1,600.00
240.00
$960.00
0.00
$0.00
240.00
$960.00
23.00
$4,600.00
0.00
$0.00
23.00
$4,600.00
90.50
$27,150.00
0.00
$0.00
90.50
$27,150.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
2.00
$7,400.00
0.00
$0.00
2.00
$7,400.00
43.00
$516.00
0.00
$0.00
43.00
$516.00
4.00
$5,200.00
0.00
$0.00
4.00
$5,200.00
36.00
$3,600.00
0.00
$0.00
36.00
$3,600.00
6.00
$2,934.00
0.00
$0.00
6.00
$2,934.00
1.00
$800.00
0.00
$0.00
1.00
$800.00
77.00
$7,700.00
0.00
$0.00
77.00
$7,700.00
201.00
$8,040.00
0.00
$0.00
201.00
$8,040.00
77.00
$1,694.00
0.00
$0.00
77.00
$1,694.00
65.00
$3,250.00
0.00
$0.00
65.00
$3,250.00
1.00
$500.00
0.00
$0.00
1
$500.00
0.95
$20,520.00
0,05
$1,080.00
1
$21,600.00
$164,464.00
$1,080.00
$165,544.00
$14,472.83
$95.04
$14,567.87
$178,936.83 $1,175.04 $180,111.87
LC,
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
COPY
ESTIMATE NO. 1 �P)
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 07/31/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $24,125.00
2. SALES TAX @ 8.80% $2,123.00
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $26,248.00
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $0.00
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $22,918.75
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS $0.00
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE $1,206.25
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID $0.00
11. SALES TAX DUE THIS ESTIMATE $2,123.00
12. SUBTOTAL - SALES TAX
* (95% x LINE 1)
** (RETAINAGE 59/.) GRAND TOTAL
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $25,041.75 # 1
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $1,206.25 # 1
TOTAL THIS ESTIMATE:
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFYTOSAID CLAIM
Signed: WNW 1�0t�U�v✓ g �'L(0�
$22,918.75
$1,206.25
$2,123.00
$26,248.00
$25,041.75
$1,206.25
$26,248.00
Printed On: 8/2/01 City of Renton Public Works Department Page 1
Printed On: 8/1/01
Project Relocation of 10" water meter for Boeing
Contractor. Archer Construction, Inc.
Item Description
No.
City of Renton Public Works Department
Contract Number CAG 01-043
Pay Estimate 1 Closing Date: 7131/O1
Unit Est. Unit Previous Previous This
Page 1
This Total Total
Amount Quantity Amount
1 Mobilization, Demolition
Lump Sum
1
$8,000.00
0.00
$0.00
0.90
$7,200.00
0.90
$7,200.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
0.00
$0.00
0.50
$500.00
0.50
$500.00
3 Vault Shoring
Lump Sum
1
$1,000.00
0.00
$0.00
0.50
$500.00
0.50
$500.00
4 Construction Survey Staking, and As -Built Data
Lump Sum
1
$1,900.00
0.00
$0.00
1.00
$1,900.00
1.00
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
0.00
$0.00
0.25
$2,025.00
025
$2,025.00
6 Remove 6" Water meter
Each
4
$400.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
7 Remove Pavement
Square Yard
82
$4.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
8 14" DI Pipe CL 52, FLxFL CL 250. In place of existing
Linear feet
23
$200.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
9 14" DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
10 Furnish and install 14'x8'x6'$' Concrete meter Vault
Each
2
$12.000.00
0.00
$0.00
1.00
$12,000.00
1.00
$12,000.00
11 Install removed10"water meter
Each
2
$12,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
12 Furnish and install 14" gate Valve w/box
Each
2
$3,700.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
14 Connection to Existing Water Main
Each
4
$1,300.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolls
Cubic Yard
4
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
16 Cathodic protection Test Station
Each
4
$489.00
0.00
$0.00
0.00
$0.00
U00
$0.00
17 Joint Bond ThennIte Weld
Lump Sum
1
$800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
18 Asphalt Patch Class B
Ton
9
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
22 Restore Landscape
Lump Sum
1
$500.00
0.00
$0.00
0.00
$0.00
$0.00
$0.00
Sub Total
$0.00
$24,125.0D
$24,125.00
Sales Tax 8.8%
$0.00
$0.00
$2,123.00
$2,123.00
Total $0.00
$0.00 $26,248.00 $26,248.00
ARCHER
CONSTRUCTION, INC.
7855 So, 206th St. - Kent, WA 98032-1354
(253) 872-7222
AR-CH-EI-219-DR
RECEIVED
AUG - 2 2001
CITY OF RENTON
CITY OF RENTON
UTILITY SYSTEMS
1055 South Grady Way
Renton, WA 98055
Attn: Laszlo Csuha
ARCHER
CONSTRUCTION, INC.
7855 So, 206th St. • Kent, WA 98032-1354
(253) 872-7222
AR-CH-EI-219-DR
CITY OF REN CN
055 Scpbh Grad We—,
'enton , 4A 98055
Attn: Laszlo Csu!'
N° 10077
W
O
Z
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
0000000000000
0
0
0
0
0
0
0
0
0
0
O
0
0
O
O
Ci
Z
Z000
O
o0
uiO00
1-ON00
0.
Co.
0000000(0000(fl0
000
It
00
U')00N
0
L00
0
M
It
QWLO
0
0
W
M
0
—
0O
it0N
—
WLO
N
Q
O
r
N
N
I-
00
m
W
0:
69
69
69
619,609
69
69
69
69
69
69
N9
E9
69
69
69
69
69
69
69
69
69
69
F.
o
0
0
0
0
00
o
o
O
pjNLOLO00i0
O
-
N
N
N
N
N
Q
69f9696969b9696969
696969N969E9E9E9El9E9EA6969
69
69
w
D
U_
j0
W>
Ix?
69
6969
EAf(
9
gRG.
6969
Z00000
0
0
0
fA
0
0
0
O
N
O
C
uj
Z
Nt0
L00)0
O
W
F-
I
N
N
'IT
v
X
W
f9
N9
69
69
&q.
6C
E9
fA
f,9
69
69
69
69
69
69
69
EA
E9
E9
f9
69
69
O
M
c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
0
L
•3
W
N
0
CD
O
N
CD
O
Op
LO
ao
O
t
a)
V
CL
V0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0000000000000
O
O
O
o
0
0
0
0
0
0
0
0
0
0
O
0o
Cl)M
co
(D
QZOO00000000
mo00000N
00
000W0,0
000
V
00
00000,00
OOON
WOO
00
(O
CO
f-
M
O
0
0
0
M
—
0
M
0
O
O
�t
(O
N
rn
0)
00
0
�
�
(O
�
�O
Cl)
0)
O
O
0
Z0Oo�
�
�C6
d
NNr
�
N
0
Q
—
V
o
69
E!9
fA
d9
E9
E9
69
69
69
fi9
69
69
69
69
E9
69
69
f9
69
69
b9
69
69
E!9
M
U
U
W
U
O
000000000
O
o
0
0
0
0
0
0
O
O
O
O
O
o
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0)
N
�y
Y.
0
O
0
O
0
O
0
O
0
O
0
O
1T
0
00
0
O
O
O
o
O
o—
N
O
0
O
0
O
00
O
0
o
0
O
IT
N
N
0
V 0
0
0
N
0.0000)—
it
NM
0011-
M
—
'VOO
—
W)
to
�00
e-
�
�00
NNM
'(p
Z
p696964fAf96031b96969
69(469
69
69
69
69
6%69
69
69
69
69
N
U
tom_
C
\\m
m
L
F'
Z
m
W
/
w
L
00
Oo
Jp
o
m
0)
g
c
Q
m
X
0
m
Z
m
a
m
o
3
-0
a`�i
U
m
fA
_
n.
fL0
a
U
x
.0
L
>
7
_
(O
_
O
WO
y
Q
c
}�
0
3
c
m
L
L
(n
(A
F-
w
m
C
C)
V
O
..
0)
LL _
�
p
O
N
>'
N
LO
Ja
O
��
0)
>
@U
Q
rnm
mC�Y
otS
U
C
O
U
O
L
U
C14
X
O
N�
".'
N
(p
Y
'�
(D
06
3
'0
Z
W
a�i
Y
cn
?:
LL
�
oO
m
'3
m
�i
rnm��m
0
�UUn
Lo
co
T
-)v
ly
N
ay-o��
x3c�
-
O
•�
y
j
0
Nco
mm
a
3
O
c
w?
U)
r
Z
O
>
U
p>
2
N
>
LO
U
O
-c
Il
y
j)u�
O
O
F-
L
.O•+
OL
L
L
w
r
0
N
C
O
O
w
a,OwL13
C
C
p;�
����
C
NaS
C
_co
C
O
06
Ca
W
W.
N(D
d
N
C
O
N
N
U
'O
COa
E
y
NJ
O)
W
m
N
V
co
U
O
O
0
t
Ln
t
tN
C
0)
U
0
m
t�
>
0
>
0
0
LO
(�
y
7
y
C
E
E_
-1
U`
�
0)
C
C
C
p.
E
E
v,
C
w
W
O
W
GAF->UF-w��c-
O
L
(0
O
L
N
N
V�
_
7
LL.
N`
cLL_QUUU-5Qfn���
7
.0
O
O
N
'p
N
0)
N
N
N
U
Q�op
o
O
N
U)
W
N
u!
N
f0
N
T
N--
.r
M
f0
(6
r-
f6
T
f6
N
u)
C
T
w
T
N
m
U
?
e
ppQ�N
C9
N
0
ZZ
Z
F-�����
�c(14
o
CO
LO
NNN
LO
7��ON
U')co
W
O
1-
#
O
U
m
oQ:F=t��V
0
LL.�V
W
3
O
OZO
W
000000000
N
M�'t0
(D
i-00
07
O�-
�-0�-�c-��r-��-NNN
NMd•LO
(O
t—a00)O
N
w
W
O
a'
V
0
�
0
0
0
0
0
0
0
o
O
0
0
0
0
0
0
0
0
0
0
0
0
0
O
Sent By: ARCHER CONSTRUCTION INC" 253 872 7277; Jul-30-01 12:22PM; Paae 1/3
ARCHER
CONSTRUCTION, INC.
7855 So. 206th St. • Kent, WA 98032 • (253) 872-7222 / FAX (253) 872-7277
AR-CH-EI-219-DR
DATE: V JD _ O I
TO: FAX NO.:
ATTN: C.(J
FROM- �C1-rnG�
NO. OF PAGES:
RE:
Rt� tea&
UTILITIES • FIRE PROTECTION
Sent By: ARCHER CONSTRUCTION INC;
253 872 7277; Jul-30-01 12:22PM, Paae 2i3
ARCHER
CONSTRUCTION, INC -
7855 So. 2061h St. • Kent, WA 98032-1354
(253) 872-7222
AR-CH-EI-219-DR
CITY OF RENTON
1055 South Grady Wa
Renton WA 98055
�M0?91� c
�n
P rr
0 000000000o c`�ogo$$BgSSi$3i mg�,
0 �.. L A
�v'�1��oc�noo•amcnawn� no
NN
A.NN WDoZ�-
�1 � � fD � � ' o � � � ib• r g � � O n(� qn to �}{'�' � � I -1
CA�
rn
NCa
G so O �i% 6Ci Q4 r I rpi ZI
C — G
d��W�x !V0 y (� ZI I
Q nl Qo y W'010
Of C wo
rL
[� w
Q m W a O aI�I3 W
Ca
I `" c I�
I oI m I I I l Ill a
o I rt 00 I m
� o Il o i s I
� I � in 69 fA fA EA 46 40 to 4AZ
Q I �a .J � •J -1 J —4 '
O •O O
NI o�NggSc00SNSOQ OSASSO, �
m I III gog$g'go$$$Sog o$o$v$oSSm
in v► da u► t� to F» M d4 V! to v+ N► v�
an fA Vf v� M to iA v► to M
CO .r _. po Z
4 O
CO
rQpo Ip� I
I O O.S 0 0 0 0 0 S p O SOND S o O C O ,� L1
01 I Io ��ogS� �Sa$oSoSS
�, $ loBoSooSo E o
��-ORa3 1 III
6 ( 9 N O V
_o O O O
p�001p�pp0 �0 , '
4A 4A 441,K1 II
Ck
N N IN I
i ,m (A I I I
�! MINI 1 � H -
i i ����������69 ��w 641) 40
T N I I I N N�-401
I( N + p 0 S
d9 to 40
iN ffl d! :A to 4A d► EA to di df d! M d) fl! FA tod► .I I
� m
I � I I If I � IaCWp I• I�S�., N.oa ��ol$ggotNgT IovO$NA$oNgvgASiWoCS) �0o
LA
O C— �CO p!pp oS$�
� ► i l lol a�a a .�s�•�
�uaS
E/E abed `VV�Z� �V lO-OE-Tnf `LLZL ZLB ESZ `•ONI NOIiond1SN00 83HObv 48
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
CONIM-NIF
ESTIMATE NO. 1 V1
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 07/31/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $24,125.00
2. SALES TAX @ 8.80% $2,123.00
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $26,248.00
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $0.00
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $22,918.75
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID
11. SALES TAX DUE THIS ESTIMATE
12. SUBTOTAL - SALES TAX
" (95% x LINE 1)
** (RETAINAGE: 5%)
FINANCE DEPARTMENT ACTION:
$0.00
$1,206.25
$22,918.75
$1,206.25
$0.00
$2,123.00
$2,123.00
GRAND TOTAL: $26,248.00
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $25,041.75 # 1
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $1,206.25 # 1
TOTAL THIS ESTIMATE:
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed: 60owj � � 811-101
$25, 041.75
$1,206.25
$26,248.00
Printed On: 8/2/01 City of Renton Public Works Department Page 1
Printed On: 8/1/01 City of Renton Public Works Department Page 1
Project Relocation of 10" water meter for Boeing
Contractor: Archer Construction, Inc.
Item Description
No.
1 Mobilization, Demolition
2 Trench Excavation Safety System
3 Vault Shoring
4 Construction Survey Staking, and As -Built Data
5 Traffic Control
6 Remove 6" Water meter
7 Remove Pavement
8 14" DI Pipe CL 52, FLxFL CL 250. In place of existi
9 14" DI Pipe CL 52, Poly Wrapped
10 Furnish and install 14'x8'x6'b" Concrete meter Vai
11 Install removed 10" water meter
12 Furnish and install 14" gate Valve w/box
13 Abandon and Fill pipe with CDF
14 Connection to Existing Water Main
15 Concrete for Thrust Blocking, Dead -man Anchor Bc
16 Cathodic protection Test Station
17 Joint Bond Thermite Weld
18 Asphalt Patch Class B
19 Select Imported Backfll (Gravel Borrow)
20 Remove and Replace Curb and Gutter
21 Remove and replace Sidewalk and Driveway
22 Restore Landscape
Contract Number: CAG 01-043
Pay Estimate 1 Closing Date: 7/3l/01
Unit Est_ Unit Previous Previous This This Total Total
Quantity Price Quantity Amount Quantity Amount Quantity Amount
Sub Total
Sales Tax 8.8%
Total
1 $8,000
1 $1,000.
1 $1,000.
1 $1,900.
1 $8,100.
4 $400.
82 $4,
23 $200
57 $300
2 $12,000.
2 $12,000.
2 $3,700
54 $12
4 $1,300,
4 $100.
4 $489.
1 $800.
9 $100.
28 $40.
53 $22.
33 $50
1 $500 C
0.00
$0.00
0.90
$7,200.00
0,90
$7,200,00
0.00
$0.00
0.50
$500.00
0.50
$500.00
0.00
$0.00
0.50
$500.00
0.50
$500.00
0.00
$0.00
1.00
$1,900.00
1.00
$1,900.00
0.00
$0.00
0.25
$2,025.00
0.25
$2,025.00
0 00
$o.o0
0.00
$0.00
0.00
$0.00
0.00
$0.00
0,00
$0.00
0,00
$0.00
0.00
$0,00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
1.00
$12,000.00
1.00
$12,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0,00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0,00
$0.00
000
$0.00
0.00
$0.00
0.00
$0,00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0,00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0,00
0.00
$0.00
$0.00
$0.00
$0,00 $24,125.00 $24,125,00
$0.00 $0.00 $2,123.00 $2,123.00
$0.00 $0,00 $26,248.00 $26,248.00
LC "
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
ESTIMATE NO. 2
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 08/31/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $63,056.00
2. SALES TAX @ 8.80% $5,548.93
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $68,604.93
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $22,918.75
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $59,903.20
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID
11. SALES TAX DUE THIS ESTIMATE
12. SUBTOTAL - SALES TAX
* (95% x LINE 1)
** (RETAINAGE 5%)
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160)
RETAINED AMOUNT (Line 8):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160)
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
$1,206.25
$3,152.80
$82,821.95
$4,359.05
$2,123.00
$5,548.93
$7,671.93
GRAND TOTAL: $94,852.93
$65,452.13 # 2
$3,152.80 # 2
$65,452.13
$3,152.80
TOTAL THIS ESTIMATE: $68,604.93
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE ND CERTIFY TO SAID CLAIM
Signed:A-SPWI-�6tvtx'-I--� "GLLST Zq� l0fl
Printed On: 8/29/01 City of Renton Public Works Department Page 1
Printed On: 8/29/01 City of Renton Public Works Department Page 1
Project: Relocation of 10' water meter for Boeing
Contractor: Archer Construction, Inc.
Item Description
No.
Pay Estimate 2
Unit Est. Unit
Quantitv Price
Contract Number.
CAG 01-043
Closing Date:
8/31/01
Previous Previous
This
Quantity Amount
Quantity
This Total
Amount Quanti
Total
Amount
1 Mobilization, Demolition
Lump Sum
1
$8,000.00
0.90
$7,200.00
0.05
$400.00
0.95
$7,600.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
0.50
$500.00
0.35
$350.00
0.85
$850.00
3 Vault Shoring
Lump Sum
1
$1,000.00
0.50
$500.00
0.35
$350.00
0.85
$850.00
4 Construction Survey Staking, and As -Built Data
Lump Sum
1
$1,900-00
1.00
$1,900.00
0.00
$0.00
1.00
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
0.25
$2,025.00
0.60
$4,860.00
0.85
$6,885.00
6 Remove 10' Water meter
Each
4
$400.00
0.00
$0.00
3.00
$1,200.00
3.00
$1,200.00
7 Remove Pavement
Square Yard
82
$4.00
0.00
$0.00
70.00
$280.00
70.00
$280.00
8 14" DI Pipe CL 52, FLxFL CL 250. In place of existing
Linear feet
23
$200.00
0.00
$0.00
21.00
54,200.00
21.00
54,200.00
9 14" DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
0.00
$0.00
51.00
$15,300.00
51.00
$15,300.00
10 Furnish and install 14'x8'x6'-6" Concrete meter Vault
Each
2
$12,000.00
1.00
$12,000.00
1.00
$12,000.00
2.00
$24,000.00
11 Install removed 10" water meter
Each
2
$12,000.00
0.00
$0.00
1.00
$12,000.00
1.00
$12,000.00
12 Furnish and install 14' gate Valve w/box
Each
2
$3,700.00
0.00
$0.00
2.00
$7,400.00
2.00
$7,400.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
0.00
$0.00
43.00
$516.00
43.00
$516.00
14 Connection to Existing Water Main
Each
4
$1,300.00
0.00
$0.00
3.00
$3,900.00
3.00
$3,900.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
Cubic Yard
4
$100.00
0.00
$0.00
3.00
$300.00
3.00
$300.00
16 Cathodic protection Test Station
Each
4
$489.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
17 Joint Bond Thermite Weld
Lump Sum
1
$800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
18 Asphalt Patch Class B
Ton
9
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
22 Restore Landscape
Lump Sum
1
$500.00
0.00
$0.00
0.00
$0.00
$0.00
$0.00
Sub Total
Sales Tax 8.8%
Total Amount
$24,125.00
$63,056.00
$87,181.00
$2,123.00
$5,548.93
$7,671.93
$26,248.00 $68,604.93 $94,852.93
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
Copy
ESTIMATE NO. 3
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 09/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE $77,283.00
2. SALES TAX @ 8.80% $6,800.90
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $84,083.90
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $82,821.95
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $73,418.85
6. SUBTOTAL - CONTRACTOR PAYMENTS
7. RETAINAGE ON PREVIOUS EARNINGS
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE
9. SUBTOTAL - RETAINAGE
10. SALES TAX PREVIOUSLY PAID
11. SALES TAX DUE THIS ESTIMATE
12. SUBTOTAL - SALES TAX
* (95% x LINE 1)
** (RETAINAGE: 55/.)
$4,359.05
$3,864.15
$7,671.93
$6,800.90
$156,240.80
$8,223.20
$14,472.83
GRAND TOTAL: $178,936.83
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160) $80,219.75 4 3
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160) $3,864.15 4 3
TOTAL THIS ESTIMATE
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND ERTIFY TO SAID CLAI
/ f
Signed: ,pQU �,v 4 ✓V 2� / ��
2/K-
$80,219.75
$3,864.15
$84,083.90
7- ZS .o k
'Y- 2j'- e c
Printed On: 9/25/01 City of Renton Public Works Department Page 1
Printed On: 9/25/01 City of Renton Public Works Department Page 1
Project: Relocation of 10" water meter for Boeing
Contractor. Archer Construction, Inc.
Item Description
No.
Contract Number. CAG 01-043
Pay Estimate 3 Closing Date: 9/28/01
Unit Est. Unit Previous Previous This
This Total
Amount Ouanti
Total
Amount
1 Mobilization, Demolition
Lump Sum
1
$8,000.00
0.95
$7,600.00
0.05
$400.00
1.00
$8,000.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
0.85
$850.00
0.15
$150.00
1.00
$1,000.00
3 Vault Shoring
Lump Sum
1
$1,000.00
0.85
$850.00
0.15
$150.00
1.00
$1,000.00
4 Construction Survey Staking, and As -Built Data
Lump Sum
1
$1,900.00
1.00
$1,900.00
0.00
$0.00
1.00
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
0.85
$6,885.00
0.15
$1,215.00
1.00
$8,100,00
6 Remove 10" Water meter
Each
4
$400.00
3.00
$1,200.00
1.00
$400.00
4.00
$1,600.00
7 Remove Pavement
Square Yard
82
$4.00
70.00
$280.00
170.00
$680.00
240.00
$960.00
8 14" DI Pipe CL 52, FLxFL CL 250. In place of existing
Linear feet
23
$200.00
21.00
$4,200.00
2.00
$400.00
23.00
$4,600.00
9 14' DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
51.00
$15,300.00
39.50
$11,850.00
90.50
$27,150.00
10 Furnish and install 14'xB'x6'-6" Concrete meter Vault
Each
2
$12,000.00
2.00
$24,000.00
0.00
$0.00
2.00
$24,000.00
11 Install removed 10" water meter
Each
2
$12,000.00
1.00
$12,000.00
1.00
$12,000.00
2.00
$24,000.00
12 Furnish and install 14' gate Valve w/box
Each
2
$3,700.00
2.00
$7,400.00
0.00
$0.00
2.00
$7,400.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
43.00
$516.00
0.00
$0.00
43.00
$516.00
14 Connection to Existing Water Main
Each
4
$1,300.00
3.00
$3,900.00
1.00
$1,300.00
4.00
$5,200.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
Cubic Yard
4
$100.00
3.00
$300.00
33.00
$3,300.00
36.00
$3,600.00
16 Cathodic protection Test Station
Each
4
$489.00
0.00
$0.00
6.00
$2,934.00
6.00
$2,934.00
17 Joint Bond Thermite Weld
Lump Sum
1
$800.00
0.00
$0.00
1.00
$800.00
1.00
$800.00
18 Asphalt Patch Class B
Ton
9
$100.00
0.00
$0.00
77.00
$7,700.00
77.00
$7,700.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
0.00
$0.00
201.00
$8,040.00
201.00
$8,040.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
0.00
$0.00
77.00
$1,694.00
77.00
$1,694.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
0.00
$0.00
65.00
$3,250.00
65.00
$3,250.00
22 Restore Landscape
Lump Sum
1
$500.00
0.00
$0.00
1.00
$500.00
1
$500.00
Replacement of side sewers, Vault lid modification and
Change
Order#1 Boeing valves adjustment
Lump Sum
1
$21,600.00
0.00
$0.00
0.95
$20,520.00
0.95
$20,520.00
Sub Total
$87,181.00
$77,283.00
$164,464.00
Sales Tax 8.8%
$7,671.93
$6,800.90
$14,472.83
Total Amount 11 $94,852.93 $84,083.90 $178,936.83
G-C q• Z1�•d �
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
ESTIMATE NO. 2
PROJECT: Relocation of 10" water meter for Boeing Closing Date: 08/31/01
1.
CONTRACTOR EARNINGS THIS ESTIMATE
$63,056.00
2.
SALES TAX @ 8.80%
$5,548.93
3.
TOTAL CONTRACT AMOUNT THIS ESTIMATE
$68,604.93
4.
EARNINGS PREVIOUSLY PAID CONTRACTOR
$22,918.75
5. '
EARNINGS DUE CONTRACTOR THIS ESTIMATE
$59,903.20
6.
SUBTOTAL - CONTRACTOR PAYMENTS
$82,821.95
7.
RETAINAGE ON PREVIOUS EARNINGS
$1,206.25
8.
RETAINAGE ON EARNINGS THIS ESTIMATE
$3,152.80
9.
SUBTOTAL - RETAINAGE
$4,359.05
10.
SALES TAX PREVIOUSLY PAID
$2,123.00
11.
SALES TAX DUE THIS ESTIMATE
$5,548.93
12.
SUBTOTAL - SALES TAX
$7,671.93
(95% x LINE 1)
" (RETAINAGE: 5%)
GRAND TOTAL:
$94,852.93
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
$65,452.13 4 2
$65,452.13
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
$3,152.80 # 2
$3,152.80
TOTAL THIS ESTIMATE:
$68,604.93
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICA;&V6ttk'/
ERTIFY TO SAID CLAIM
Signed: 6tvItAxt,"�AU 6 u-aT
Printed On: 8/29/01 City of Renton Public Works Department Page 1
Printed On: 8/29/01 ' City of Renton Public Works Department
Page 1
Project: Relocation of 10' water meter for Boeing Contract Number. CAG 01-043
Contractor. Archer Constriction, Inc. Pay Estimate 2 Closing Date: 8/31/O1
Item Description Unit Est. Unit Previous Previous This
No. Quantity Price Quantity Amount Quantity
This Total
Total
Amount
1 Mobilization, Demolition
Lump Sum
1
$8,000.00
0.90
$7,200.00
0.05
$400.00
0.95
$7,600.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
0.50
$500.00
0.35
$350.00
0.85
$850.00
3 Vault Shoring
Lump Sum
1
$1,000.00
0.50
$500.00
0.35
$350.00
0.85
$850.00
4 Construction Survey Staking, and As -Built Data
Lump Sum
1
$1,900.00
1.00
$1,900.00
0.00
$0.00
too
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
025
$2,025.00
0.60
$4,860.00
0.85
$6,885.00
6 Remove 10' Water meter
Each
4
$400.00
0.00
$0.00
3.00
$1,200.00
3.00
$1,200.00
7 Remove Pavement
Square Yard
82
$4.00
0.00
$0.00
70.00
$280.00
70.00
$280.00
8 14' DI Pipe CL 52, FLxFL CL 250. In place at existing
Linear feet
23
$200.00
0.00
$0.00
21.00
$4,200.00
21.00
$4,200.00
9 14' DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
0.00
$0.00
51.00
$15,300.00
51.00
$15,300.00
10 Furnish and install 14'x8'x6'-6' Concrete meter Vault
Each
2
$12,000.00
1.00
$12,000.00
1.00
$12,000.00
2.00
$24,000.00
11 install removed 10' water meter
Each
2
$12,000.00
0.00
$0.00
1.00
$12,000.00
1.00
$12,000.00
12 Fumish and install 14' gate Valve w/box
Each
2
$3,700.00
0.00
$0.00
2.00
$7,400.00
2.00
$7,400.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
0.00
$0.00
43.00
$516.00
43.00
$516.00
14 Connection to Existing Water Main
Each
4
$1,300.00
0.00
$0.00
3.00
$3,900.00
3.00
$3,900.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolts
Cubic Yard
4
$100.00
0.00
$0.00
3.00
$300.00
3.00
$300.00
16 Cathodic protection Test Station
Each
4
$489.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
17 Joint Bond Themrte Weld
Lump Sum
1
$800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
18 Asphalt Patch Class B
Ton
9
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
22 Restore Landscape
Lump Sum
1
$500.00
0.00
$0.00
0-00
$0.00
$0.00
$0.00
Sub Total
$24,125.00
$63,056.00
$87,181.00
Sales Tax 8.81/6
$2,123.00
$5,548.93
$7,671.93
Total Amount 11 $26,248.00 $68,604.93 $94,852.93
qftA s-Z1-a(
L C 'P12 a lo �
ARCHER
/ CONSTRUCTION, INC.
N 10135
7855 So, 206th St. • Kent, WA 98032-1354
2-7222
AR CH) 8 219-DR RECEIVED
CITY OF RENTON
1055 South Grady Way
Renton, WA 98055
Attn: Laslo Csuha
AUG 2 7 2001
CITY OF RENTON
UTILITY SYSTEMS
ARCHER
CONSTRUCTION. INC.
7855 So, 206th St. • Kent, WA 98032-1354
(253) 872-7222
AR-CH-EI-219-DR
CITY OF RENTON
1.0.55 South Grady Way
Anton, WA 9P095
Attn: Ti-,
N° 10135
W
0
000
0
0
,
00000
00N00
O
0o0(oOoo000000
O
O
O
O
O
O
O
O
O
O
O
O
o
00
U?
O
O
O
6
O
C).
O
O_
0
0
0
C A
0
0
(0
0
0
0
C 0
0
0
t r )
ZZOtoto
Q
V
NN
,T't(D
Nrr
oO
(00
—
---O
NCW
000N(0U)0
OWM--Wu)
N
0
CN
m
W
64696969E96969
Oil.
69
6%
69
69
69
69
64
69696969696969
69
69
000
O
O
O
00000
0
0
co
O
O
000000
0
0
0
d;
O
O
O
N
o
O
O
N
to
N
t)
qq
�
O
o
o
to
0
to
i
0
co
0
CD
co
r-
0
d'
0
O)
0
0
0
O
0
O
00
-
0
(D
0
N
i
r`
N
M
O
t-
1
COMN-
M
V
�Nto
-
CO
N
�
to
0
to
OQrMM
Q
d
to
a0
N
(ID(0
N
n
r`
CID
Q
69
69
69
69
6%
vi
64
69
69
E9
H4
69
6%
69
69
to
69
69
69
69
69)-69
69
69
VT
69
tH
i
i
iLO
U)
W
O
O
C
O
to
i
i
i
i
'i
i
i
i
05N00LOM0
0
-N
cli
`-
N
War
Z
d.
69
69
E9
N9
69
E9
is
69
69
69
69
69
69
69
d4
40
69
69
69
69
69
60.
to
E9
Z000000o00
Q0000000D00
000000
000'T
0CD
0
N
0
O
t/l0totn0ODCD1-
OOoOtoo0D00
V
0
OOOODOO
000)-CDN
N
N
04
uj
Z(DOCOmwmNr-0')
V
�Nto
-
M
Wry
F
o-7
vto
NN(D
v
rn
N
i
co
X
W
E9
649,6R
E9
E9
E9
69
69
69
69
69
69.
69
69
69
69
69
to
64
69
69
69
is
69
0
M
C
Q
0
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
0
o
0
0
0
0
0
o
0
0
0
o
0
o
0
o
0
o
0
o
0
0
0
o
O
L
IjJ
ui
to
M
to
W
toO
o
o
LID
W
toto0
W
W
O
0
M
to
o
toto0000000000
0o
ao
co
00
ao
0
3
W
`-
ao
€
OQ.
t
m
U
Vo
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
o
O
0
O
0
O
0
O
0
O
0
O
0
O
0
o
0
O
0
O
0
O
0
O
O
O
O
O
O
O
N
to
C4
to
O
Z000000OD00
=000000
NOO
00CDOD00t0000C000
000900
t000N
oo
O
00
0
N
N
v
O
m
1-
O
(Q
to
w
CIDO
�QOOOM-(OMW
-
00�(ON
to
V
OWO�-
�
�-
00
Cl)
M
N
v
0aoa-e--o'-
d'!�
NNE
N
M
0
Q
U
69
69
69
69
69
69
69
69
69
69
to
69
vi
69
69
69
69
69
69
E9
69
69
69
69
w
69
H
0
U
U)
W
U
O
0
O
0
o
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
O
o
O
0
o
0
0
0
0
0
0
0
(D
0
0
0
0
0
0
0
0
0
0
0
a)
a)
4'000000
0
0
0
0
0
0
V
0
OO
0
0
000-OOWOO
0
0
(V
0
0
C A
0
0
0
V
C V
N
0
OO
0
N
MOOOO-
V
NM
001-
f')
OD
U
op
-
-
-
CO
CV
CV
cM
'm
Z
a)
Q
E9
E9
E9
E9
En
E9
E9
E9
E9
69
E9
E9
64!i
69
69
69
69
69
EA
69
69
69
U
uJ
U
()
0)
C
>
m
c
OL
`
LOD
Q
E
a
ti
d
(a
O
m
t`x-°
Q
c
Zm
3
m
d
Q
(
x(ci
c
w
Q
c�
c
3
c
c
•-
m
m
E
c
o
U
a)
LL
m
cc
0
c
m`
0
0
0
a;
C14c
o
.
Cl?C
2
(a
V-
03
20Yc
a
O°
30>i6
O
U
N
fL>U
p
C,a
OO
w
a%o
ILL
J
xOW
ao>iO
O
-O
O
�c
fa
U)
U
Xa
m
F-.
>
m
Y
U
O
.,
ILL
O
v
CL
V;
N
O
`.
N
m
00
U
U
a
3
0
U.
C
0
y
C
a)tNna
_a
N
c
-v
e-
-
=wt
€Uco
N
m
m
(a
(a
aD
t
0
>
O
C
y>
N
O
�""
d
L
L
N
N
-�0
O
_
tQ
0
p
C
o
O
V
0
LL
C
C
"W6
c
w
O
CL
F-
r
m
p0.
a
m
C
W
o
IL
0
x
0
.O
t
0
�
a
Cl.
p
U.)
S
E
a)
06
N
c�
)
U
a
CL
�
CtS
aS
O
m
H
W
(a
N
L
fn
U
U
a)
>O
w
p—
a.
U
3
N
J
L
to
—
L
N
O
O
O
a)
N
"0
0
m
mj
>>`
O
O
u1
O
CA
O
U
C
CL
N
N
t
0
p'
0
W
o
N
O
M
N
N��
N
7
0
0
N
0(D
4)
W
'
Q2H>UF-����
LL
CLL000
U�Qcn���
U
V
~
Z
E
M
r
N
V
r
t7
Q
—
cm
O
O
Q
~
C
Z
F
S
Z
r
r---
r-
—
V'
N
V)
TCII"
V)
Tlt
C
0)
co
t(j
M
L
Z
OF-9k0
CND
(Li
o�F=UFV
W
m
o1LQ�UW
3
NOUF,'
_
0
N
0
Cl)O
0
V'to(Or`OD
0
0
0
0
0
0
O.-NMto000-
v
r-
(Oh
O
e-
N
N
N
j
W
O
G'
F
000000000
O
O
O
O
O
O
CD
CD
O
O
O
C
-�UaUIL
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277;
ARCHER
/ CONSTRUCTION, INC.
7855 So. 206th St. - Kent, WA 98032-1354
(253) 872-7222
AR-C H-E I-219-DR
CITY OF K=N
1055 South Grady Way
Renton, WA 98055
Attn: Laslo Csuha
Aug-24-01 2:56PM; Pape 2
N 1 1 35
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277; Aug-24-01 2:55PM; Paae 1
ARCHER
CONSTRUCTION, INC.
7855 So, 2061h St. • Kent, WA 98032 • (253) 872-7222 / FAX (253) 872-7277
AR-CH-EI-219-DR
DATE: 0 rg LI'v l
TO: FAX NO.: /—� S' V30 - 7o7Y
ATTN: G7X.GI.L
FROM:
RE:
NO. OF PAGES: J
lqgajlu 'Ou-'/ atme4Q4556 /0� �",
-litarlt') t�xj ,
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277; Auq 24 01 2:56PM; Page 3%5
°-
cu
00o
2QC7
pt1D1
0x
O�m
0cr-
m
NC1Dmv
$04
LA
WN
�Q
-
p
-1O
N
N
N
V
4N1/
N
d'
J
J
z
00
�
T
�
N
.....
m
Ni
m ,.�
m
m
in i
m,
?.
�
y
N
1I1
N
Y1
q
C
,
v
D
mmm
��.
oQ�c
AAmm
-033��SW
oo�
om
s.
!
CL
w3C1
r'�-o
O
C,
.rn
ppp
3
�7a:M
-4
m
a
PrJ
a�i
{im
�_cn
a
m
o
a
OI
N
ID
N
0)tNl�
W
7
0�1
W
_-
d
O
A
-n
,(D
.�
l
V%Ci
C
c
W�
17C
G
x
Cir
X
_
U:
g
Z1
0
Qo
�
�
(/�
m
�
�
X
02
N
0m
!�
.�
n
l�0
S�
'Q�
i
Z
s
o-
CL
�.
>
QQ
>
ao
o
s
co
�
I
p
d
ZS�
�1
(
1;
<
c
I
I
4»��n�fAl(a
4i
4+
01"
a
4f
4►
a�►
r+
m
*A
4.
a
en
f+�
W
co
NiA
OC7
y
GONIOOO�GOONO00
O�$a000C
f
oo
ovld!vov000000o
i0l0000
o
o
000
0
c�00dovv0M
00000020
j
cn._...........
p
NI
Ib/►
fA
—
fA
fN
fA
fA�fAIfA
EA
fA
iN
M
fA
to
tH
to
d►
to
fA
fA
EA
ifl
W
to
fA
N
N
J
�'
JIB
ih
-4
A
..p9
J
J
Jpp
t,W�
riOIS
pJ;
S
pppp
O
tOWJI
AA
0
0O
Q��D
c�Jpp
pa'
w
W
O
'N
O
O
ON
OO
O
d
O
O
O
m000
O
S?
$
S
O
O$$$
Opw0cC
S
qq0
O
g00O0
O$
S
�n
N
iN
O
O
O
O10
0
0
0
O
_
..
a._......
Q
3
_
_-r-.....
1
1
0
w
`�'
cmi+c°ti+c°Di�$c0i�
min
.40
i
4i
69
4A
4A
4!i
40
49
4A
49
44
4A
4A
40
64
40
44
to
40�4n
48
40.4A
X
'N
OOOc000
V1(r(-pjp
-pb.
lWlpp
d
AA�
d
N
Cb
g�OOf7OQ
Go
co
$
N
Io,
8$$9$8
8$$$S$Q0$$2
4A
4N
�
i 4A
4A
4A
4A
4A
69
4i>
lA
4A
�
4A
G9
fA
to
4fl
Sii
4A
fA
ifl
N!
fA
to
�
I
J
N
d
..
I
N
b
N�
bipncQrcQ�,iQv
V
OC
0
NOOgQMca
S
44
40
44
44
44
$
IA
44
44
fA
iA
SSSSSO
iA
40
W
40
4A
F
N►
N
40
44
4►
140
44
40
40I40
iA
V
+O
N
.A
iV
-+
I
W
N8
A
4TNA
�4�pQp
m
tO
O
W
01
W
tJ
P,
n
Nf�
V
W
W
Am0
V
I
I
I
11
1
O
O
OD
O
O
O
P.
00
d
O
'
O
O
Op
Z
i
pN
8
O
000000
$C000
4061#A4A404P104644�
oO
OOS
i
fA
fA
69fAfAfAdldlNlA4ffA4fNM
N
-
•
N
_
N
G
OA
(��
NCO
cc<oou+
o
$$$$$$;$$$oo00
O0000�000
o0
00
o�8-n.
$$$a"'
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, Inc.
CONTRACT NO. CAG 01-043
ESTIMATE NO.
3
PROJECT: Relocation of 10" water meter for Boeing
Closing Date:
09/28/01
1. CONTRACTOR EARNINGS THIS ESTIMATE
$77,283.00
2. SALES TAX @ 8.80%
$6,800.90
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE
$84,083.90
4. EARNINGS PREVIOUSLY PAID CONTRACTOR
$82,821.95
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE
$73,418.85
6. SUBTOTAL - CONTRACTOR PAYMENTS
$156,240.80
7. RETAINAGE ON PREVIOUS EARNINGS
$4,359.05
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE
$3,864.15
9. SUBTOTAL - RETAINAGE
$8,223.20
10. SALES TAX PREVIOUSLY PAID
$7,671.93
11. SALES TAX DUE THIS ESTIMATE
$6,800.90
12. SUBTOTAL - SALES TAX
$14,472.83
* (95% x LINE 1)
** (RETAINAGE: 5%) GRAND TOTAL:
$178,936.83
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT 4 421.000500.018.5960.0034.65.055510 (55510/5160)
$80,219.75 # 3
$80,219.75
RETAINED AMOUNT (Line 8):
ACCOUNT # 421.000500.018.5960.0034.65.055510 (55510/5160)
$3,864.15 # 3
$3,864.15
TOTAL THIS
ESTIMATE:
$84,083.90
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed:
Printed On: 9/25/01 City of Renton Public Works Department Page 1
Printed On: 9/25/01 City of Renton Public Works Department Page 1
Project: Relocation of 10' water meter for Boeing
Contractor. Archer Construction, Inc.
hem Description
No.
Contract Number. CAG 01-043
Pay Estimate 3 Closing Date: 928/01
Unit Est. Unit Previous Previous This This
Quantity Price Quantity Amount Quantity Amount
Total Total
1 Mobilization, Demolition
Lump Sum
1
$8,000.00
0.95
$7,600.00
0.05
$400.00
1.00
$8,000.00
2 Trench Excavation Safety System
Lump Sum
1
$1,000.00
0.85
$850.00
0.15
$150.00
1.00
$1,000.00
3 Vault Shoring
Lump Sum
1
$1,000.00
0.85
$850.00
0.15
$150.00
1.00
$1,000.00
4 Construction Survey Staking, and As -Built Data
Lump Sum
1
$1,900.00
1.00
$1,900,00
0.00
$0.00
1.00
$1,900.00
5 Traffic Control
Lump Sum
1
$8,100.00
0.85
$6,885.00
0.15
$1.215.00
1.00
$8,100.00
6 Remove 10' Water meter
Each
4
$400.00
3.00
$1,200.00
1.00
$400.00
4.00
$1,600.00
7 Remove Pavement
Square Yard
82
$4.00
70.00
$280.00
170.00
$680.00
240.00
$960.00
8 14' DI Pipe CL 52, FLxFL CL 250. In place of existing
Linear feet
23
$200.00
21.00
$4,200.00
2.00
$400.00
23.00
$4,600.00
9 14' DI Pipe CL 52, Poly Wrapped
Linear feet
57
$300.00
51.00
$15,300.00
39.50
$11,850.00
90.50
$27,150.00
10 Furnish and install 14'x8'x6'-6' Concrete meter Vault
Each
2
$12,000.00
2.00
$24.000.00
0.00
$0.00
2.00
$24,000.00
11 Install removed 10' water meter
Each
2
$12,000.00
1.00
$12,000.00
1.00
$12,000.00
2.00
$24,000.00
12 Furnish and install 14' gate Valve w/box
Each
2
$3,700.00
2.00
$7,400.00
0.00
$0.00
2.00
$7,400.00
13 Abandon and Fill pipe with CDF
Linear feet
54
$12.00
43.00
$516.00
0.00
$0.00
43.00
$516.00
14 Connection to Existing Water Main
Each
4
$1,300.00
3.00
$3,900.00
1.00
$1,300.00
4.00
$5,200.00
15 Concrete for Thrust Blocking, Dead -man Anchor Bolls
Cubic Yard
4
$100.00
3.00
$300.00
33.00
$3,300.00
36.00
$3,600.00
16 Cathodic protection Test Station
Each
4
$489.00
0.00
$0.00
6.00
$2,934.00
6.00
$2,934.00
17 Joint Bond Themute Weld
Lump Sum
1
$800.00
0.00
$0.00
1.00
$800.00
1.00
$800.00
18 Asphalt Patch Class B
Ton
9
$100.00
0.00
$0.00
77.00
$7.700.00
77.00
$7,700.00
19 Select Imported Backfill (Gravel Borrow)
Cubic Yard
28
$40.00
0.00
$0.00
201.00
$8,040.00
201.00
$8,040.00
20 Remove and Replace Curb and Gutter
Linear feet
53
$22.00
0.00
$0.00
77.00
$1,694.00
77.00
$1,694.00
21 Remove and replace Sidewalk and Driveway
Square Yard
33
$50.00
0.00
$0.00
65.00
$3,250.00
65.00
$3,250.00
22 Restore Landscape
Lump Sum
1
$500.00
0.00
$0.00
1.00
$500.00
1
$500.00
Replacement of side sewers, Vault lid modification and
Change
Order #1 Boeing valves adjustment
Lump Sum_
1
$21,600.00
0.00
$0.00
0.95
$20.520.00
0.95
S20.520.00
Sub Total
$87,181.00
$77,283.00
$164,464.00
Sales Tax 8.8%
$7.671.93
$6,800.90
$14,472.83
Total Amount
$94,852.93
$84,083.90
$178,936.83
�/✓1 q'2S'o\
G-C q� z��•a�
Sent By: ARCHER CONSTRUCTION INC;
253 872 7277; Sep-27-01 4:40PM; Page 1
ARCHER
DATE:
CONSTRUCTION, INC.
7855 So. 20610 St. • Kent, WA 96032 • (253) 872-7222 / FAX (253) 872-7277
AR-CH-EI-219-DR
r
FAX NO-: Y21 i130—
TO:702�l
ATTN: Vd2
FROM:
NO. OF PACES: 3
RE:
UTILITIES - FIRE PROTECTION
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277;
SEP-25-2001 16:06 CITY OF RENTCN PBPW
TO: FINANCE DIRtt; i UK
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Archer Construction, InC.
CONTRACT NO. CAG 01-043
Sep-27-01 4:40PM, Page 3/4
42') 4,% (e4l r . YJG/ uJ
ESTIMATE NO. 3
PROJECT: Relocation of 10' wetor meter for Boeint}
Closing Date:
09128/01
1.
CONTRACTOR EARNINGS THIS ESTIMATE
$77,283.00
$6,800.90
2
SALES TAX 0 8.80%
,083.id0
3.
TOTAL CONTRACT AMOUNT THIS ESTIMATE
4.
EARNINGS PREVIOUSLY PAID CONTRACTOR
$82,821.95
$73,418.85
5. -
EARNINGS DUE CONTRACTOR THIS ESTIMATE
CONTRACTOR PAYMENTS
S156, 40.80
8.
SUBTOTAL -
7. RETAINAGE ON PREVIOUS EARNINGS $4,359.05
8. " RETAINAGE ON EARNINGS THIS ESTIMATE $3,864.15
9.
SUBTOTAL - RETAINAGE $8,22320 .
10. SALES TAX PREVIOUSLY PAID $7,671.93
11. SALES TAX DUE THIS ESTIMATE $6'$00.90
12 SUBTOTAL -SALES TAX $14,a72.83
(95%x LINE 1) GRAND TOTAL: $178,936.83
(RETAINAGE.* 5%)
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT 4 421.000500.018.6960.0034.65.05551 o (55510/5160) $80,219,75 # 3 $80219 75
RETAINED AMOUNT (Line a):
ACCOUNT 0 421.000500-018.g960.0034.t,6.056510 (5S510/5160) $3,884.15 * 3
$3, 884.1 S
TOTAL THIS ESTIMATE: W, 83.90
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
L THE UN064,%opg-D OQ HU&S, DEAMFY UN eR ►04&TY OF
PFJ3XJTIY, TTIAT rMA WtTUM&S HAVS IM PURM81ED. THE
90V$ i np&XD4E0 ON THi IADOM TEPWOR WO At 06 CA10lD
NlkJN, MID THAT THC CLAW IS AAJ8T, DUE AND UN/A(D
OALIOATMN A44L+lrT TWE CRY OF n W T OK AND THAT I AM
AUTWA ZFD TO AJTHWTIC.ATs AND CCHT1FY TO -IAA) CLAIM
Signed:
�i+'t �'- z s •o t
Printed On: 925/01 City of Minton Public Works Departmont Page 1
Sent By: ARCHER CONSTRUCTION INC;
253 872
7277,
Sep-27-01
4:41PM,
Paae 414
42t) 460 I�41
r.,j,U
e
.�
16"06 CITY OF REM'ON PBPLJ
SEP-25-2001
p�� 1
City of Renton Public Works DoPartr►wnt
Printod On: 9t2b101
M~
C.#n 01.011
►t1i0cO1r/` of Cr Cr•rr re>ref soB0�t0
Cam
' G%Wv DSW
Q/1M01
p rgrz
Kr Cos� AICW COMIMC M, M1e,
Pq GaWilw
Ply This
This TOW
TOW
UnM
UrA PnlvfO�M
mm
P
110,
O D6
r7 aw 00
0.06
yOD.00
1.00
gL000.00
lar.o 9v++
>IB,000.00
t MoEUz_, Or^+o#jv^
ia30,00
0,15
5130.00
Jim
t1.00D-00
�1
limp n
i1,00D.00
OAS
2 Tnnch EXIVOW SSWY 3Ye1er1
1.00
SIDW-00
II app.00
O.iS
�u0.00
0.16
i150.00
t.m/n0 Gijon,
9 VwI1
MOO
1.00
11 00-00
t
��00,p1
1,00
31.o0o,00,
0,00
borotn+abM1 lktvuY � Ar8111R Dw
`" Sim
1
S4M&DO
CL15
%ixa.w
1.00
Al0o.00
1,,410 >>w" ,
iA t 00.00
o-M
b Tmk1c Cknud
1.00
yi00.0p
AAO
51,�0000
E� 1
yg0,00
5,00
Slow -go
6 MRvn t0'W�1rn+NM
SWO-00
P�OAO
t060.00
ya,mmVwd 52
$4,00
70DO
WBOL00
1TO,OO
7 0rrfow va.�rrnm
SWO1 00
OD 22.
i,t,900.m
a pig,Ct 62, � Ca. T40. In a.a� d wOwYnO
Lk"w1w 23
3000.00
21.00
SAAM-M
2DO
1 11'
61.00
11i,000A0
39.50
611.w7a.00
90.f0
$v,1%OD
L lrw IBM �
r3mmoo
9 1 �� GN pip* Cl 62. PoM W rnpp�e
2
y,z,000,oa
7.00
su.�.m
0.00
so.00
2D0
s�x�,000.00
o wmirn end how 1'rid"�A'-0' ConOti1 irrir v.ue
Fid1
612,00000
1.00
y12-000,00
1.00
612,000,00
2,00
L2i,00o00
nRlo+�
tl �v1d+d t0' �Wr '
lath^2
2
30,T1i0.00
2.00
i7,100,00
0.00
30.00
2-00
t7,a00.00
12 /i+nIK1 W I/aoM 1 4' QM V" vDOa
E,pi
sl2.00
Iaoo
vsltoo
0.00
20.00
AXW
Ys1e.m
10 ADW4,+ "Fs *e 41h Ws
lJh.m f" s.
,
1
$11oww
3.0o
ca9oaoo
,.00
i,.�oo.00
I.oa
p&D° m
t � Con+�oYo^ u 19oMhp wr« WWA
EACH
Ci00A0
3.00
SJ00.00
DaDO
51,300.00
woo
�.000.00
1 b CorovM fOr Ttvuat BIOO�dnti �^�^ A411Dom
oAkYrd /
>�Y0..0
0.00
so.Oo
6,00
$2-034A0
8.06
L2.11Sf.00
16 C.&.da poot�00am 7&M PAMA
iatll
t
s800,00
0,00
>f0.00
, 00
W00.00
1.00
UM.00
17 J04E SMG W�fO
Larq IS111n
y
i100,00
ODD
Moo
77,90
i7,70&00
T7,010
S7.700.00
I ANPAN PMM C7w B
Ton
28
510.00
0.90
MOO
201.00
SBA O.M
201.00
SH O&C-01
to 9wtl wpa+ed Did IQ" Oone•1
Cuelc YW
63
izz. ro
Q00
S>,OD
77.00
21.091.D0
77.00
31,691,00
20 Aww v am Amp— C- — W—
LAW k"
ODD
90.00
96•09
91,m.00
65.00
i0�i0A0
21 Rwvam gm no— S-wjA -4 D04"n
S*we Yud 33
3G0A0
Lump slur'+ 1
s90 m
0,00
W,00
1.00
f600A0
1
SS00.00
22 qubon uv,4wspu
p�N d Sib, rrrOlL V&A t0 mOdJl "M
0n0
Ob
620.OD
C01in90
L ft" t
$21 00
0.0010,00O.b6
287,1111.00
17T.2b2.00
11 b• �.�
$vy Taw
57,67i90
SQ000.90
214AMW
SNM Tic s.!%
3StASL93
tO�Ot1>i0
irnO7fLSf
TOW Arrnuti
Sent By: ARCHER CONSTRUCTION INC, 253 872 7277; Aug-24-0' 2:56PM; Pace 4/5
,r
ARCHER
CONSTRUC'I`ION,INC.
7855 So. 206t1r) St, • Kent, WA 98032 • (253) 872-7222 / FAX (253) 872-7277
AR-CH-E-219-DR
August 8, 2001
Mr. Abdoul Gafour
City of Renton
1055 South Grady Way
Renton, WA 98055
Via Fax #425-430-7241
Re: Change order request for contract #GAG-01-043
Project WTR-27-2890
Dear Mr. Gafour:
We are requesting a change order in the amount of $12,422.50 for additional work
performed at the above project as outlined in the attached.
Please call if you have any questions.
Sincerely,
Wade Archer
President
UTILITIES • FIRE PROTECTION
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277; Aug-24-01 2:56PM; Page 5/5
AUGUST 2001
CITY OF RENTON
JOB- RELOCATION OF 10" WATER METERS
ARCHER CONSTRUCTION JOB #01-21
gTY
UM
PRICE EXTENSION
DATE DESCRIPTION.
7/25/01 TICKET #003902
8
HRS
$
100.00 $
800.00
490 EXCAVATOR WITH OPERATOR
8
HRS
$
92.00 $
736.00
410 BACKHOE WITH OPERATOR WITH BREAKER
DAY
$
50.00 $
50.00
SERVICE TRUCK
8
HRS
$
44.00 $
35200
PIPELAYERS
8
HRS
$
56.00 $
448.00
FOREMAN
8
HRS
$
67.00 $
536.00
SOLO DUMPTRUCK
1
LS
$
420.00 $
420.00
DUMP FEES
1
LS
$
180.00 $
180,CO
5/8" CRUSHED ROCK
1
LS
$
330.00 $
330,00
COLD MIX
1
LS
$
50.00 $
50,00
TRAFFIC CONTROL SIGNS AND CONES
HRS
$
26.00 $
416.00
(2) FLAGGERS 8 HRS EACH
16
7/26101 TICKET #003903
8
HRS
$
100.00 $
800.00
490 EXCAVATOR WITH OPERATOR
HRS
$
92 00 $
736.00
410 BACKHOE WITH OPERATOR WITH BREAKER
8
$
67,OC $
536.00
8
DAY
SOLO DUMPTRUCK
8
HRS
$
44 CO $
352.00
PIPELAYER
8
HRS
$
56.00 $
44800
FOREMAN
1
LS
$
478 OC $
478.00
6" PIPE CL 50
1
LS
$
17.00 $
17.00
8" X 6" TAP TEE & ACCES
16
HRS
$
26.00 $
41600
(2) FLAGGERS 8 HRS EACH
LS
$
50.00 $
50.00
TRAFFIC CONTROL SIGNS AND CONES
1
DAY
$
50.00 $
50.00
SERVICE TRUCK
1
1
LS
$
50 00 $
50,00
6" X 6" DI X PVC FERNCO
1
LS
$
6.50 $
8.50
6" CAP & PLUG (PVC)
1
LS
$
245.00 $
245.00
DUMP FEES
1
LS
$
85.00 $
8500
5/8" CRUSHED ROCK
7127/01 TICKET #003904
8
HRS
$
100 00 $
80000
490 EXCAVATOR WITH OPERATOR
HRS
$
92.00 S
736.00
410 BACKHOE WITH OPERATOR WITH BREAKER
8
$
67.00 $
536.00
HRS
SOLO DUMPTRUCK
8
HRS
$
44.00 $
352.00
PIPELAYER
8
HRS
$
56,00 $
445.00
FOREMAN
1
LS
$
120.00 $
120 00
DUMP FEES - CONCRETE/ASPHALT
1
LS
$
325.00 $
32500
5/8" CRUSHED ROCK
t6
HRS
$
26.00 $
416.00
(2) FLAGGERS 8 HRS EACH
LS
$
50 CO $
50.00
TRAFFIC CONTROL SIGNS & CONES
1
DAY
$
50.00 $
50.00
SERVICE TRUCK
1
TOTAL
$12,422.50
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277; Jun-28-01 7:09AM; Paae 1/3
t
ARCHER
s
DATE:
TU:
ATTN:
FROM:
are
CONSTRUCTION, INC.
7855 So. 206th St. • Kent, WA 98032 • (253) 872-7222 / FAX (253) 872-7277
AR-CH-EI-219-DR
FAX NO.
��z o
NO. OF PAGES:
/ Cle.,e- �1 //'
UTILITIES • FIRE PROTECTION
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277' Jun-28-01 7:10AM; Page 3/3
3'-7
3.-3.
1�
I �
II I I
MII I I
II
I I
I I
II I
I
I�
I
b
-T
(�
7.`O.
I J
II
4-Ton BURKE
1'-6 1/2-
9' LONG SUpER un
4-tt'
(4) PLACES N TOP
5'-3'
PLAN VIEW
014 TOP (SPECIAL)
514 3OR (STANDARD)
814 48R (STANDARD)
814 BAST w/ORAIK (SKCIAL)
18'-G' 4 8' COVER SLAB
W/ 3' . 7' Lh r1A7p1
MAIK AV COVEN UV03620-H2O
4' RISER Uv138D4
T
�
SPECIAL SCUD
TOP w/BLM(Iil
STMAARO 30'
+
MSEII
(No. 814-30R)
24's SLOcKOV7 24-4 BLDCICOUT
o *
C
4-TOM 7' LC. ME
(1) EAON CORNER
STANDARD 4B' AW
(4) CORNERS
MTN p) 24-4 HOLIS
t EACH SIDE
t, +
(Ty?) BOTH MSERS
(No. 814-48R)
SPECIAL LA
ARSE •/%wP
l 4-7 BUp S
ORANN
9 1/2 LC. PEAD ANDtOR
2"f DRANN
HOLE CENTER
(4) PLACES IM FLOOR
1/4'4 AOOcFT INSERT
sm
im)
SECTION AA
807m mscRs
coo/coo IZ
I6� �lltl-AII TOZI SCL C9Z YNd 4i:0T To/1Z/90
Sent By: ARCHER CONSTRUCTION INC; 253 872 7277, Jun-28-01 7:09AM; Pape 2/3
KK,on OAV ( lor
P V�G111r
`3/4-0 FERRuLE Loop MSE$tTS
PLM VIEW (A) PIKES IM 40E
LE ANO COVER UVpUO-42O
TRiH 4' RISER UY/39p4
8-6' r 6'-6" a S' COVER S1;A9
W/ S' . 7' LW HATCH
MC
ft ft N rgs
2e GAY COMPRESSIVE MNGTH re - 4500 ed
I.
CONCRETE -
2
REBAR -
ASTM A -BLS GRADE 60
3,
him -
ASITE A-las GRADE OS
4,
MOI -
Act-311-" BUuhc CODE
057 -WNNUM STRUCNRAI DESIGN LOADPFG FOR
UNDEROROUNO PRECAST CONCRETE U7UTY STRUCTURES'
S
LOADS -
M-20 TRVC% WELL ./M NPACT PER AASITO
NETTE$
1. CONTRACTOR TO - W�'d16 %OCKG OFOVT SIM AND LOCAMNS
SUPPLY i INSTALL ALL PIPINQ k aicTTRISCh
#MALL ALL LADDERS
2 PROOUMN QUANTITY: 0) ASSEAHBLED VAULT
VlPPlNH3 q! it
COVER SLAB .
3.210 ba
TOP SECTION •
11,82EI "
48' CENTER SECTION n
120E0 IDf.
3(' CENTER SECTION -
9140 Aa
BASE SECTO s
)MOM Ip4,
W4 a' RIMR .
190 bo
FRAAHE AND COKA =
BOO bs
TOTAL WEIG4(T = IX204 The
I
COVER SLAB ■
(4) 3/4's F6TL W LOOP INSERT
3BO4 4' MSER •
(7) 3/4-r FEIMLE LDOP RM7
TOP SECTION .
(4) -TON BURKE 9' LONG SUPER LOT
,GR SECTION.
(4) 4-TON r L0, OLANE
SUPER LIFT ANCHOR A (4) 1-I/4't AOCKETS
39R SECPOM=
(4) 4-TON r Le. PAW
SUPER UrT ANCHOR h (4)1-1/4'0 ROCKETS
BASE SEC11oM =
(4) 4-TON 9 1/2' La MAKE
SPREAD ANCHOR
PAA1 0EYAV11aA I avow j ya T
BILL OF MATERIAL
lE.+ �A,mry
514 LA MM VAULT SPEGAL
EAST VAULT
RENTON R(LOCAnON OF 1HY WATERWER5
SALES INFORMATION
a+siarn At"R
1uu M
- I ---
sit 3 �8'•-0'
Nreaxa
o"' M
�, /1— 2 819
ACV.
7DA41I .AID
CARES 7 1
IUi I a 2
liionr
ue eaus+rt a rt Haan a n.
wtx t 1.1Arnie m.
�„�„ �„.�. �.
.ee a ys \i waens
• unuTY v,�UtT coMPANY
O01/cNW� Pl.ca(N¢
MA�OJI>• M
►A am am Loin a YMl-ama
AIbu ,fa / 444F Di / ►MM im. CA / a'a o, Al / Fw^ CA
C00/Z00lz
IVX RAV-Ail TOZt 9CL CSZ YVd VT:01 TO/LZ/90