SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE
IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY
OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH
THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER"
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF
VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S)
SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN
THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH
APPENDIX D OF THE 2009 KING COUNTY SURFACE WATER DESIGN
MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS
SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR
THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED
AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH
AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY
BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT
OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES
MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
CLEARING AND/OR CONSTRUCTION TO PREVENT
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE
SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND
SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING
AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR
ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE
RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS
DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT
MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL
BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON
THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION,
IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL
FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY
BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION
CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS
DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH
30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST
TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED
WITH THE APPROVED ESC COVER METHODS (E. G., SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL
REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING
BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT
PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH
APPENDIX D OF THE 2009 KING COUNTY SURFACE WATER DESIGN
MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED
AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24
HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE
ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH
BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO
PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH
30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT
ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL
BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A
TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE
NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE
ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS
TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE
TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE
BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL
DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH
ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE
BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE
AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
17. ALL ESC MEASURES MUST BE REMOVED AFTER CONSTRUCTION
ACTIVITY IS COMPLETE.
A PORTION OF SECTION 10, TOWNSHIP 23 N., RANGE 05 E., W.M.
JOINTS IN FILTER FABRIC SHALL BE SPLICED
AT �Z STS Si _T USE
SnrrnLEu:n RE RTN'GRS, Ore
2W" BY 14 Ge. WIRE OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
FILTER FABRIC
NOTES
1. CONDITION OF USE
1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2. SLT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW.
ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE
AVAILABLE ON SITE.
AOS(ASTM D4751) 30-10051EVESIZE (O.fiO-a15MM) FOR SILTFILM
50-10051EVESIZE (0.30-B15MM) FOR OTHER FABRICS
WATERPERMRTIVITY ASTM 3491 0.02SEC-1 MINIMUM
GRABTENSILESTRENCHT(ASTMD4632) 18DLBS.MIN. FOR DRRASTRENGH FABRIC
100 LBS. MIN. FOR STANDARD STRENGHT FABRIC
GRAB TENSILE ELONGATION ASTM D4632)130% MAX.
ULTRAVIOLATE RESISTANCE (ASTM D4355)170% MIN.
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST
SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 21HAV
2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4X4 TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE
IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT
FENCE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY.
3.2. IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND
THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP
SEDIMENT.
3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
8pti Y S
� � � PUBLIC WORKS SILT FENCE TD. PLAN - 214.00
DEPARTMENT
,t0 MARCH 2008
ROLL
DEPEI
TYPE
kY.
8"-10" DIA.
(2001
SEDIMENT, ORGANIC MATTER,
AND NATIVE SEEDS ARE
CAPTURED BEHIND THE ROLLS
STRAW ROLLS MUST BE
PLACED ALONG SLOPE
CONTOURS
LIVE STAKE
ADJACENT ROLLS
SHALL TIGHTLY
ABUT
NOTES 1"x 1" STAKE
1.CONDITION OF USE
1.1. SEEDING SHALL BE USED THROUGH THE PROJECT ON DISTURBED AREAS THAT HAVE REACHED FINAL GRADE OR THAT WILL REMAIN
UNWORKED FOR MORE THAN 30 DAYS.
1.2. VEGETATION -LINED CHANNELS SHALL BE SEEDED. CHANNELS THAT WILL BE VEGETATED SHOULD BE INSTALLED BEFORE MAJOR
EARTHWORK AND HYDROSEEDED OR COVERED WITH A BONDED FIBER MATRIX (BFM)
1.3. RETENTION / DETENTION PONDS SHALL BE SEEDED AS REQUIRED.
1.4. AT THE CITY'S DISCRETION, SEEDING WITHOUT MULCH DURING THE DRY SEASON IS ALLOWED EVEN THOUGH IT WILL TAKE MORE
THAN SEVEN DAYS TO DEVELOP AN EFFECTIVE COVER.
1.5. AT THE BEGINNING OF THE WET SEASON, ALL DISTURBANCES AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED
IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHOULD BE SEEDED WITHIN A WEEK OF BEGINNING OF THE WET
SEASON. AT FINAL SITE STABILIZATION, ALL DISTURBED AREAS NOT OTHERWISE VEGETATED OR STABILIZED SHALL BE SEEDED AND
MULCHED.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE BEST TIME TO SEED IS APRIL 1 THROUGH JUNE 30, AND SEPTEMBER 1 THROUGH OCTOBER 15. AREAS MAYBE SEEDED BETWEEN
JULY 1 AND AUGUST 31, BUT IRRIGATION MAYBE REQUIRED IN ORDER TO GROW ADEQUATE COVER. AREAS MAY ALSO BE SEEDED
DURING THE WINTER MONTHS, BUT IT MIGHT TAKE SEVERAL MONTHS TO DEVELOP A DENSE GROUNDCOVER DUE TO COLD
TEMPERATURES.
2.2. TO PREVENT SEED FROM BEING WASHED AWAY CONFIRMED THAT ALL REQUIRED SURFACE WATER CONTROL MEASURES HAVE BEEN
INSTALLED.
2.3. THE SEEDBED SHOULD BE FIRM BUT NOT COMPACTED.
2.4. IN GENERAL, 10 -20 -20N -P -K FERTILIZER MAY BE USED AT A RATE OF 90 POUNDS PER ACRE. IT IS RECOMMENDED THAT AREAS BEING
SEEDED FOR FINAL LANDSCAPING CONDUCT SOIL TO DETERMINE THE EXACT TYPE AND QUANTITY OF FERTILIZER NEEDED.
DISTURBED AREAS WITHIN 200 FEET OF WATER BODIES AND WETLANDS MUST USE SLOW RELEASE LO -PHOSPHORUS FERTILIZER.
2.5. THE FOLLOWING REQUIREMENTS APPLY FOR MULCHING
2.5.1. MULCH IS ALWAYS REQUIRED FOR SEEDING SLOPES GREATER THAN 31HA V
2.5.2. IF SEEDING DURING WET SEASON MULCH IS REQUIRED
2.5.3. THE USE OF MULCH MAY BE REQUIRED DURING WET SEASON AT THE CITY'S DISCRETION IF GRASS GROWTH IS EXPECTED TO BE
SLOW, THE SOILS ARE HIGHLY ERODIBLE DUE TO SOIL TYPE OR GRADIENT, THERE IS A WATER BODY CLOSE TO THE DISTURBED
AREA, OR SIGNIFICANT PRECIPITATION IS ANTICIPATED BEFORE THE GRASS WILL PROVIDE EFFECTIVE COVER.
2.5.4. MULCH MAY BE APPLIED IN TOP OF THE SEED OR SIMULTANEOUSLY BY HYDROSEEDING.
2.6. HYDROSEEDING IS ALLOWED AS LONG AS TRACKIFIER IS INCLUDED. HYDROSEEDING WITH WOOD FIBER MULCH IS ADEQUATE DURING
THE DRY SEASON. HYDROSEEDING WITH WOOD FIBER MULCH IS ADEQUATE DURING THE DRY SEASON. DURING THE WET SEASON,
THE APPLICATION RATE SHOULD BE DOUBLED. IT MIGHT BE NECESSARY IN SOME APPLICATIONS TO INCLUDE STRAW WITH THE
WOOD FIBER, BUT THIS CAN BE DETERMINED TO GERMINATION.
2.7. AREAS TO BE PERMANENTLY LANDSCAPED SHALL USE SOIL AMENDMENTS. GOOD QUALITY TOPSOIL SHALL BE TILLED INTO THE TOP
SIX INCHES TO REDUCE THE NEED FOR FERTILIZER AND IMPROVED THE OVERALL SOIL QUALITY. MOST NATIVE SOILS WILL REQUIRE
THE ADDITION OF 4 INCHES OF WELL -ROTTED COMPOST TO BE TILLED INTO THE SOIL TO PROVIDE A GOOD QUALITY TOPSOIL.
S
PUBLIC WORKS STRAW WATTLES STD. PLAN - 213.40
DEPARTMENT
MARCH 2008
6/MMAAX.
MINIMUM 4X4' TRENCH -
H/
10T020HAV
BACKFILLTRENCHWITH
POST SPACING MAY BE INCREASED
(4TO 10)HAV
NATIVE SOIL
TO V IF WIRE BACKING IS USED
�QP�
OF R -O -W PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO AVOID
`S,1tNG
F* /
DAMAGING OF THE ROADWAY
2"x4" WOOD POSTS, STEEL FENCE
IT IS RECOMMENDED THAT THE
R = 26 MIN.
POSTS, REBAR OR EQUIVALENT
NOTES
1. CONDITION OF USE
1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2. SLT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW.
ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE
AVAILABLE ON SITE.
AOS(ASTM D4751) 30-10051EVESIZE (O.fiO-a15MM) FOR SILTFILM
50-10051EVESIZE (0.30-B15MM) FOR OTHER FABRICS
WATERPERMRTIVITY ASTM 3491 0.02SEC-1 MINIMUM
GRABTENSILESTRENCHT(ASTMD4632) 18DLBS.MIN. FOR DRRASTRENGH FABRIC
100 LBS. MIN. FOR STANDARD STRENGHT FABRIC
GRAB TENSILE ELONGATION ASTM D4632)130% MAX.
ULTRAVIOLATE RESISTANCE (ASTM D4355)170% MIN.
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST
SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 21HAV
2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4X4 TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE
IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT
FENCE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY.
3.2. IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND
THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP
SEDIMENT.
3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
8pti Y S
� � � PUBLIC WORKS SILT FENCE TD. PLAN - 214.00
DEPARTMENT
,t0 MARCH 2008
ROLL
DEPEI
TYPE
kY.
8"-10" DIA.
(2001
SEDIMENT, ORGANIC MATTER,
AND NATIVE SEEDS ARE
CAPTURED BEHIND THE ROLLS
STRAW ROLLS MUST BE
PLACED ALONG SLOPE
CONTOURS
LIVE STAKE
ADJACENT ROLLS
SHALL TIGHTLY
ABUT
NOTES 1"x 1" STAKE
1.CONDITION OF USE
1.1. SEEDING SHALL BE USED THROUGH THE PROJECT ON DISTURBED AREAS THAT HAVE REACHED FINAL GRADE OR THAT WILL REMAIN
UNWORKED FOR MORE THAN 30 DAYS.
1.2. VEGETATION -LINED CHANNELS SHALL BE SEEDED. CHANNELS THAT WILL BE VEGETATED SHOULD BE INSTALLED BEFORE MAJOR
EARTHWORK AND HYDROSEEDED OR COVERED WITH A BONDED FIBER MATRIX (BFM)
1.3. RETENTION / DETENTION PONDS SHALL BE SEEDED AS REQUIRED.
1.4. AT THE CITY'S DISCRETION, SEEDING WITHOUT MULCH DURING THE DRY SEASON IS ALLOWED EVEN THOUGH IT WILL TAKE MORE
THAN SEVEN DAYS TO DEVELOP AN EFFECTIVE COVER.
1.5. AT THE BEGINNING OF THE WET SEASON, ALL DISTURBANCES AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED
IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHOULD BE SEEDED WITHIN A WEEK OF BEGINNING OF THE WET
SEASON. AT FINAL SITE STABILIZATION, ALL DISTURBED AREAS NOT OTHERWISE VEGETATED OR STABILIZED SHALL BE SEEDED AND
MULCHED.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE BEST TIME TO SEED IS APRIL 1 THROUGH JUNE 30, AND SEPTEMBER 1 THROUGH OCTOBER 15. AREAS MAYBE SEEDED BETWEEN
JULY 1 AND AUGUST 31, BUT IRRIGATION MAYBE REQUIRED IN ORDER TO GROW ADEQUATE COVER. AREAS MAY ALSO BE SEEDED
DURING THE WINTER MONTHS, BUT IT MIGHT TAKE SEVERAL MONTHS TO DEVELOP A DENSE GROUNDCOVER DUE TO COLD
TEMPERATURES.
2.2. TO PREVENT SEED FROM BEING WASHED AWAY CONFIRMED THAT ALL REQUIRED SURFACE WATER CONTROL MEASURES HAVE BEEN
INSTALLED.
2.3. THE SEEDBED SHOULD BE FIRM BUT NOT COMPACTED.
2.4. IN GENERAL, 10 -20 -20N -P -K FERTILIZER MAY BE USED AT A RATE OF 90 POUNDS PER ACRE. IT IS RECOMMENDED THAT AREAS BEING
SEEDED FOR FINAL LANDSCAPING CONDUCT SOIL TO DETERMINE THE EXACT TYPE AND QUANTITY OF FERTILIZER NEEDED.
DISTURBED AREAS WITHIN 200 FEET OF WATER BODIES AND WETLANDS MUST USE SLOW RELEASE LO -PHOSPHORUS FERTILIZER.
2.5. THE FOLLOWING REQUIREMENTS APPLY FOR MULCHING
2.5.1. MULCH IS ALWAYS REQUIRED FOR SEEDING SLOPES GREATER THAN 31HA V
2.5.2. IF SEEDING DURING WET SEASON MULCH IS REQUIRED
2.5.3. THE USE OF MULCH MAY BE REQUIRED DURING WET SEASON AT THE CITY'S DISCRETION IF GRASS GROWTH IS EXPECTED TO BE
SLOW, THE SOILS ARE HIGHLY ERODIBLE DUE TO SOIL TYPE OR GRADIENT, THERE IS A WATER BODY CLOSE TO THE DISTURBED
AREA, OR SIGNIFICANT PRECIPITATION IS ANTICIPATED BEFORE THE GRASS WILL PROVIDE EFFECTIVE COVER.
2.5.4. MULCH MAY BE APPLIED IN TOP OF THE SEED OR SIMULTANEOUSLY BY HYDROSEEDING.
2.6. HYDROSEEDING IS ALLOWED AS LONG AS TRACKIFIER IS INCLUDED. HYDROSEEDING WITH WOOD FIBER MULCH IS ADEQUATE DURING
THE DRY SEASON. HYDROSEEDING WITH WOOD FIBER MULCH IS ADEQUATE DURING THE DRY SEASON. DURING THE WET SEASON,
THE APPLICATION RATE SHOULD BE DOUBLED. IT MIGHT BE NECESSARY IN SOME APPLICATIONS TO INCLUDE STRAW WITH THE
WOOD FIBER, BUT THIS CAN BE DETERMINED TO GERMINATION.
2.7. AREAS TO BE PERMANENTLY LANDSCAPED SHALL USE SOIL AMENDMENTS. GOOD QUALITY TOPSOIL SHALL BE TILLED INTO THE TOP
SIX INCHES TO REDUCE THE NEED FOR FERTILIZER AND IMPROVED THE OVERALL SOIL QUALITY. MOST NATIVE SOILS WILL REQUIRE
THE ADDITION OF 4 INCHES OF WELL -ROTTED COMPOST TO BE TILLED INTO THE SOIL TO PROVIDE A GOOD QUALITY TOPSOIL.
S
PUBLIC WORKS STRAW WATTLES STD. PLAN - 213.40
DEPARTMENT
MARCH 2008
INSTALL DRIVEW1
IS A ROADSIDE DI
PER CITY ROAD S
'x -" '^"'^"'=RR ----------- PROVIDEFULLWIDTHOF
NOTES INGRESS/EGRESS AREA
1. CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
GRABTENSILE STREBNGTH(ASTM D4751) 1 200 PSI MIN.
GRABTENSILE ELONGATION(ASTM D4632) 30%MAX.
MULLEN BURST STRENGTH (ASTM D3786 -80A) 1400 PSI MIN.
AOS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE)
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED
FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY
AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY
INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE
STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE
ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH
CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY
SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A
SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND
DISCHARGED APPROPRIATELY.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE
INSTALLED TO CONTROL TRAFFIC.
pti Y
PUBLIC WORKS STABILIZED STD. PLAN - 215.10
DEPARTMENT CONSTRUCTION ENTRANCE
,t0 MARCH 2008
2:1 MAX. SLOPE
Y MIN.
SWALE SPACING DEPENDS ON SLOPE GRADIENT
NOTES
1. CONDITION OF USE
1.1. REQUIRED AT:
1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW.
AVERAGESLOPE SLOPEPERCENT FLOWPATHIENGTH
20H:1V
3-5%
300 FEET
10T020HAV
5-10%
200 FEET
(4TO 10)HAV
10-25%
DRIVEWAYS SHALL BE PAVED TO THE EDGE
�QP�
OF R -O -W PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO AVOID
`S,1tNG
F* /
DAMAGING OF THE ROADWAY
IT IS RECOMMENDED THAT THE
R = 26 MIN.
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
INSTALL DRIVEW1
IS A ROADSIDE DI
PER CITY ROAD S
'x -" '^"'^"'=RR ----------- PROVIDEFULLWIDTHOF
NOTES INGRESS/EGRESS AREA
1. CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
GRABTENSILE STREBNGTH(ASTM D4751) 1 200 PSI MIN.
GRABTENSILE ELONGATION(ASTM D4632) 30%MAX.
MULLEN BURST STRENGTH (ASTM D3786 -80A) 1400 PSI MIN.
AOS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE)
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED
FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY
AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY
INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE
STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE
ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH
CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY
SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A
SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND
DISCHARGED APPROPRIATELY.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE
INSTALLED TO CONTROL TRAFFIC.
pti Y
PUBLIC WORKS STABILIZED STD. PLAN - 215.10
DEPARTMENT CONSTRUCTION ENTRANCE
,t0 MARCH 2008
2:1 MAX. SLOPE
Y MIN.
SWALE SPACING DEPENDS ON SLOPE GRADIENT
NOTES
1. CONDITION OF USE
1.1. REQUIRED AT:
1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW.
AVERAGESLOPE SLOPEPERCENT FLOWPATHIENGTH
20H:1V
3-5%
300 FEET
10T020HAV
5-10%
200 FEET
(4TO 10)HAV
10-25%
100 FEET
(2TO4)H:IV 1
25-50%
50 FEET
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. FOR SLOPES STEEPER THAN 2H:1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAYBE CONSTRUCTED OR CLOSER
SPACED INTERCEPTOR SWALES MAYBE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY
INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP.
2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED.
3. MAINTENANCE STANDARDS
3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE
NCREASED.
pti Y
� � � PUBLIC WORKS INTERCEPTOR SWALE STD. PLAN - 217.10
DEPARTMENT
t0 MARCH 2008
4/25/18
Know what's below.
0111 before you dig.
SURVEYED: SCALE:
BEYLER CONSULT. 1 "=20'
DESIGNED:
DTY/KRD
DRAWN:
DTY/KRD
ONE INCH
CHECKED: AT FULL SCALE
DRB IF NOT ONE INCH
NO. REVISION BY DATE AP P R APPROVED: DRB SCALE ACCORDINGLY
4' MIN
V OVERFLOW DEPTH
1'DEPTH Y-4"ROCK OUTFLOW
CHANNEL IF
CONSTRUCTED BY
DEPTH 3 9'-T
EXCAVATION.
1 r 1 5'MAX
�TSETTIUNG
EDIMENT STORAGE 1 \
_V FILTER FABRIC FENCING
V DEPTH 3t4"- 1-V2" WASHED GRAVEL
CROSS SECTION
NTS
NOTE:
MAY BE CONSTRUCTED BY EXCAVATION
OR BY BUILDING A BERM
8o~ Y „�, STD. PLAN
PUBLIC WORKS SEDIMENT TRAP - 211.00
DEPARTMENT
,tp MARCH 2008
(REFERENCE 2005 WASHINGTON STATE DOE STORMWATER MANUAL)
PURPOSE: CONCRETE WORK CAN GENERATE PROCESS WATER AND SLURRY
THAT CONTAIN FINE PARTICLES AND HIGH pH, BOTH OF WHICH
CAN VIOLATE WATER QUALITY STANDARDS IN THE RECEIVING
WATER. THIS BMP IS INTENDED TO MINIMIZE AND ELIMINATE
CONCRETE PROCESS WATER AND SLURRY FROM ENTERING WATERS
OF THE STATE.
DESIGN: CONCRETE TRUCK CHUTES, PUMPS AND INTERNALS SHALL BE
WASHED OUT ONLY INTO FORMED AREAS AWAITING INSTALLATION
OF CONCRETE OR ASPHALT. (CONCRETE TRUCK CHUTES, PUMPS,
ETC. SHALL NOT BE WASHED IN SUBGRADE AREAS OF PROPOSED
POROUS ASPHALT/INFILTRATION)
WHEN NO FORMED AREAS ARE AVAILABLE, CONTAIN WASHWATER
AND LEFTOVER PRODUCT IN A LINED CONTAINER. DISPOSE OF
WASHWATER INA MANNER THAT DOES NOT VIOLATE
GROUNDWATER OR SURFACE WATER QUALITY STANDARDS.
UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP SHALL BE
RETURNED TO THE ORIGINATING BATCH PLANT FOR RECYCLING.
HAND TOOLS SHALL BE WASHED OFF ONLY INTO FORMED AREAS
AWAITING INSTALLATION OF CONCRETE OR ASPHALT.
EQUIPMENT THAT CANNOT BE EASILY MOVED, SUCH AS CONCRETE
PAVERS, SHALL BE WASHED IN AREAS THAT DO NOT DIRECTLY
DRAIN TO A NATURAL OR CONSTRUCTED STORMWATER
CONVEYANCES.
WASHDOWN FROM AREAS SUCH AS CONCRETE AGGREGATE
DRIVEWAYS SHALL NOT DRAIN DIRECTLY TO NATURAL OR
CONSTRUCTED STORMWATER CONVEYANCES.
BEYLER
CONSULTING
CONTACT
phone: 253-301-4157 OFFICE
fax: 253-336-3950 5920 100TH ST SW, STE 25
beylerconsulting.com Lakewood, WA 98499
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
(REFERENCE 2005 WASHINGTON STATE DOE STORMWATER MANUAL)
PURPOSE: SAWCUTTING AND SURFACING OPERATIONS GENERATE SLURRY AND
PROCESS WATER THAT CONTAINS FINE PARTICLES AND HIGH pH
(CONCRETE CUTTING), BOTH OF WHICH CAN VIOLATE WATER QUALITY
STANDARDS IN THE RECEIVING WATER. THIS BMP IS INTENDED TO
MINIMIZE AND ELIMINATE CONCRETE PROCESS WATER AND SLURRY
FROM ENTERING WATERS OF THE STATE.
DESIGN: VACUUM SLURRY AND CUTTINGS DURING CUTTING AND SURFACING
OPERATIONS.
DO NOT LEAVE SLURRY AND CUTTINGS ON PERMANENT CONCRETE OR
ASPHALT PAVEMENT OVERNIGHT.
DO NOT DRAIN SLURRY AND CUTTINGS TO ANY NATURAL OR
CONSTRUCTED DRAINAGE CONVEYANCES.
DISPOSE OF COLLECTED SLURRY AND CUTTINGS IN A MANNER THAT
DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY
STANDARDS.
DO NOT DRAIN PROCESS WATER THAT IS GENERATED DURING
HYDRO -DEMOLITION, SURFACE ROUGHENING, OR SIMILAR OPERATIONS
TO ANY NATURAL OR CONSTRUCTED DRAINAGE CONVEYANCE. DISPOSE
OF PROCESS WATER IN A MANNER THAT DOES NOT VIOLATE
GROUNDWATER OR SURFACE WATER QUALITY STANDARDS.
HANDLE AND DISPOSE OF CLEANING WASTE MATERIAL AND
DEMOLITION DEBRIS IN A MANNER THAT DOES NOT CAUSE
CONTAMINATION OF WATER. IF THE AREA IS SWEPT WITH A PICK-UP
SWEEPER, HAUL THE MATERIAL OUT OF THE AREA TO AN APPROPRIATE
DISPOSAL SITE.
R-392403
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
N
T
O
O
O
�J
T
Q
J
DEVELOPMENT ENGINEERING + 1 SURFACE WATER UTILITY
(Fitz -James 04/30/2018 krevans 05/04/2018 Q
J
DATE: O
BOUN SHORT PLAT 12/14/2017 =
CONSTRUCTION PLANS FIELDBOOK:NA Cf)
LUA16-000124 SHPL-A U16-006297 PAGENA
TESC NOTES & DETAILS DRAWING NO:NA
O
SHEET: 3 OF, 19
CO
5" MAX.
w
DRAINAGE GRATE TRIM
GRATE FRAME
4S
a d
SEDIMENT AND DEBRIS
a
OVERFLOW BYPASS
BELOW INLET GRATE DEVICE
FILTERED
WATER
.a o
A 0
SECTION VIEW
DRAINAGE GRATE
- RECTANGULAR GRATE SHOWN RETRIEVAL SYSTEM (TYP.)
BELOW INLET GRATE DEVICE OVERFLOW BYPASS (TYP.)
ISOMETRIC VIEW
NOTES
1. Size the Below Inlet Grate Device (BIGD) for the storm water structure it will service.
2. The BIGD shall have a built-in high-flow relief system (overflow bypass).
3. The retrieval system must allow removal of the BIGD without spilling the collected material.
4. Perform maintenance In accordance with Standard Specification 8-01.3(15).
pti�Y
CATCH BASIN FILTER
STD. PLAN - 216.30
PUBLIC WORKS
DEPARTMENT
Ntp
MARCH 2008
Know what's below.
0111 before you dig.
SURVEYED: SCALE:
BEYLER CONSULT. 1 "=20'
DESIGNED:
DTY/KRD
DRAWN:
DTY/KRD
ONE INCH
CHECKED: AT FULL SCALE
DRB IF NOT ONE INCH
NO. REVISION BY DATE AP P R APPROVED: DRB SCALE ACCORDINGLY
4' MIN
V OVERFLOW DEPTH
1'DEPTH Y-4"ROCK OUTFLOW
CHANNEL IF
CONSTRUCTED BY
DEPTH 3 9'-T
EXCAVATION.
1 r 1 5'MAX
�TSETTIUNG
EDIMENT STORAGE 1 \
_V FILTER FABRIC FENCING
V DEPTH 3t4"- 1-V2" WASHED GRAVEL
CROSS SECTION
NTS
NOTE:
MAY BE CONSTRUCTED BY EXCAVATION
OR BY BUILDING A BERM
8o~ Y „�, STD. PLAN
PUBLIC WORKS SEDIMENT TRAP - 211.00
DEPARTMENT
,tp MARCH 2008
(REFERENCE 2005 WASHINGTON STATE DOE STORMWATER MANUAL)
PURPOSE: CONCRETE WORK CAN GENERATE PROCESS WATER AND SLURRY
THAT CONTAIN FINE PARTICLES AND HIGH pH, BOTH OF WHICH
CAN VIOLATE WATER QUALITY STANDARDS IN THE RECEIVING
WATER. THIS BMP IS INTENDED TO MINIMIZE AND ELIMINATE
CONCRETE PROCESS WATER AND SLURRY FROM ENTERING WATERS
OF THE STATE.
DESIGN: CONCRETE TRUCK CHUTES, PUMPS AND INTERNALS SHALL BE
WASHED OUT ONLY INTO FORMED AREAS AWAITING INSTALLATION
OF CONCRETE OR ASPHALT. (CONCRETE TRUCK CHUTES, PUMPS,
ETC. SHALL NOT BE WASHED IN SUBGRADE AREAS OF PROPOSED
POROUS ASPHALT/INFILTRATION)
WHEN NO FORMED AREAS ARE AVAILABLE, CONTAIN WASHWATER
AND LEFTOVER PRODUCT IN A LINED CONTAINER. DISPOSE OF
WASHWATER INA MANNER THAT DOES NOT VIOLATE
GROUNDWATER OR SURFACE WATER QUALITY STANDARDS.
UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP SHALL BE
RETURNED TO THE ORIGINATING BATCH PLANT FOR RECYCLING.
HAND TOOLS SHALL BE WASHED OFF ONLY INTO FORMED AREAS
AWAITING INSTALLATION OF CONCRETE OR ASPHALT.
EQUIPMENT THAT CANNOT BE EASILY MOVED, SUCH AS CONCRETE
PAVERS, SHALL BE WASHED IN AREAS THAT DO NOT DIRECTLY
DRAIN TO A NATURAL OR CONSTRUCTED STORMWATER
CONVEYANCES.
WASHDOWN FROM AREAS SUCH AS CONCRETE AGGREGATE
DRIVEWAYS SHALL NOT DRAIN DIRECTLY TO NATURAL OR
CONSTRUCTED STORMWATER CONVEYANCES.
BEYLER
CONSULTING
CONTACT
phone: 253-301-4157 OFFICE
fax: 253-336-3950 5920 100TH ST SW, STE 25
beylerconsulting.com Lakewood, WA 98499
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
(REFERENCE 2005 WASHINGTON STATE DOE STORMWATER MANUAL)
PURPOSE: SAWCUTTING AND SURFACING OPERATIONS GENERATE SLURRY AND
PROCESS WATER THAT CONTAINS FINE PARTICLES AND HIGH pH
(CONCRETE CUTTING), BOTH OF WHICH CAN VIOLATE WATER QUALITY
STANDARDS IN THE RECEIVING WATER. THIS BMP IS INTENDED TO
MINIMIZE AND ELIMINATE CONCRETE PROCESS WATER AND SLURRY
FROM ENTERING WATERS OF THE STATE.
DESIGN: VACUUM SLURRY AND CUTTINGS DURING CUTTING AND SURFACING
OPERATIONS.
DO NOT LEAVE SLURRY AND CUTTINGS ON PERMANENT CONCRETE OR
ASPHALT PAVEMENT OVERNIGHT.
DO NOT DRAIN SLURRY AND CUTTINGS TO ANY NATURAL OR
CONSTRUCTED DRAINAGE CONVEYANCES.
DISPOSE OF COLLECTED SLURRY AND CUTTINGS IN A MANNER THAT
DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY
STANDARDS.
DO NOT DRAIN PROCESS WATER THAT IS GENERATED DURING
HYDRO -DEMOLITION, SURFACE ROUGHENING, OR SIMILAR OPERATIONS
TO ANY NATURAL OR CONSTRUCTED DRAINAGE CONVEYANCE. DISPOSE
OF PROCESS WATER IN A MANNER THAT DOES NOT VIOLATE
GROUNDWATER OR SURFACE WATER QUALITY STANDARDS.
HANDLE AND DISPOSE OF CLEANING WASTE MATERIAL AND
DEMOLITION DEBRIS IN A MANNER THAT DOES NOT CAUSE
CONTAMINATION OF WATER. IF THE AREA IS SWEPT WITH A PICK-UP
SWEEPER, HAUL THE MATERIAL OUT OF THE AREA TO AN APPROPRIATE
DISPOSAL SITE.
R-392403
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
N
T
O
O
O
�J
T
Q
J
DEVELOPMENT ENGINEERING + 1 SURFACE WATER UTILITY
(Fitz -James 04/30/2018 krevans 05/04/2018 Q
J
DATE: O
BOUN SHORT PLAT 12/14/2017 =
CONSTRUCTION PLANS FIELDBOOK:NA Cf)
LUA16-000124 SHPL-A U16-006297 PAGENA
TESC NOTES & DETAILS DRAWING NO:NA
O
SHEET: 3 OF, 19
CO