EROSION & SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD
AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S
CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY ( ECOLOGY)
CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE
THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION
STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE
FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST- PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC
REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION
PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING
AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN
MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE
APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED
FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR
WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK- OUT TO ROAD RIGHT
OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS
SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS
NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS
ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON- SITE
DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/ OR
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING
AND/ OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE
REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -
SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL
OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE
DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT
SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL
ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE
NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO
THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS
DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON ( MAY 1ST
THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH,
UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN
24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS
REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.
30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYER TO A SEDIMENT POND OR
TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY
FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH
BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH
THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO
ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE
ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE
PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON- SITE BMPS ( AMENDED
SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO
AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO
IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS
SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS
TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN
WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE
SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL
DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A
MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL
DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED
BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL
NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS- OF- WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS- OF- WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
25002557
SURFACE WATER STANDARD PLAN NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD
AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S
CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO
CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST
EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC),
AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND
THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO
CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL
CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY
OTHER CONSTRUCTION (E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). THE SURFACE WATER DRAINAGE SYSTEM SHALL
BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE
COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED
FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY
COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S CONTRACTOR TO INDEPENDENTLY
VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER
UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL
RECORD ON THE AS- BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE
APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS
OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE
PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER
SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN
PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN
NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY
APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE
WITH THE CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION.
WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS
SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY
CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE
CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL
INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS
PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF
THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE
AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 220. 20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT -
LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10, 204. 20, 204. 30, 204. 40, AND 204. 50. STRUCTURES SHALL HAVE:
14.1. RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY.
14.2. ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE
CURB/ GUTTER LINE.
14.3. ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT- OF- WAY OR IN AN EASEMENT TO
THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF- WAY AND EASEMENTS TO THE CITY SHALL NOT
DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND
BUILDING SETBACKS LINES OF THE RENTON SWDM.
16. LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL
AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES,
UNLESS OTHERWISE SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF- WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A
MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK
PLACED TO A MINIMUM DEPTH OF ONE ( 1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS:
18.1. 4 - 8 INCH ROCK / 40 - 70% PASSING;
18.2. 2-4 INCH ROCK / 30 - 40% PASSING; AND
18.3. LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL
SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE,
UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON- SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED "
STORM" OR " DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM
DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227. 00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON
STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE
INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266. 00. CCTV INSPECTIONS AND
REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS
AND/ OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1)
OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN
STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS ( COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO
MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND
NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264. 00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE
CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT
ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED
DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO
PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE
PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT- OF- WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE
WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT
# 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET
TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS
SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL
BE FITTED WITH A NOW SLIP OR NOW SKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE
APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20
INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10
MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE
PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED
ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE,
THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE
CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER
TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY
BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR
TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781.
/� BULLETIN 1 TB 6.24.25 SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
NO. REVISION BY DATE APPR APPROVED:
SOOS CREEK WATER & SEWER DISTRICT WATER NOTES
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE SOOS CREEK WATER & SEWER
DISTRICT, ALSO REFERRED HEREINAFTER AS "DISTRICT".
2. THE DEVELOPER SHALL FURNISH THE DISTRICT A COPY OF THE COMMERCIAL AND/OR SUBDIVISION PLANS APPROVED BY
THE GOVERNING AGENCY PRIOR TO ANY WATER MAIN CONSTRUCTION.
3. PRIOR TO CONSTRUCTING ANY WATER MAINS, THE APPROPRIATE STREETS AND LOTS SHALL BE CLEARED, GRADED, AND
STAKED BY THE DEVELOPER/CONTRACTOR AND ALL EXISTING UTILITIES SHALL BE LOCATED.
4. FOLLOWING WATER MAIN CONSTRUCTION, ANY REVISION OF ROADWAY OR EASEMENT GRADES REQUIRING THE MAINS
TO BE DEVELOPER'S/CONTRACTORS EXPENSE.
5. RECONSTRUCTION SHALL CONFORM TO THE SPECIFICATIONS OF THE DISTRICT. ALL COSTS FOR INSPECTING SUCH
RECONSTRUCTION SHALL BE CHARGED TO THE DEVELOPER IN ADDITION TO THE STANDARD CHARGES, AND SHALL BE
PAID BEFORE ACCEPTANCE BY THE DISTRICT.
6. NO WATER SERVICE CONNECTIONS SHALL BE MADE TO THE EXISTING SYSTEM UNTIL COMPLETION OF THE BILL OF SALE
AND ALL EASEMENTS. MAKE APPLICATION TO THE DISTRICT FOR WATER METER INSTALLATION FOR EACH WATER
SERVICE CONNECTION PRIOR TO MAKING CONNECTION. BILL OF SALE WILL NOT BE PROCESSED UNTIL PUGET SOUND
ENERGY HAS EITHER PROVIDED A WORK SKETCH OR INSTALLED THEIR VAULTS, HAND HOLES AND LIGHT STANDARDS, OR
THE DEVELOPER HAS PROVIDED A SIGNED HOLD HARMLESS AGREEMENT (FORM SUPPLIED BY THE DISTRICT).
7. ALL COSTS OF WATER MAIN RE -STAKING SHALL BE PAID BY THE DEVELOPER/CONTRACTOR.
8. PROPERTY CORNERS SHALL BE PINNED WITH REFERENCE TACK ON CURBS BY THE DEVELOPER/CONTRACTOR.
9. THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT AT (253) 630-9900 TO SCHEDULE A PRECONSTRUCTION
MEETING AT THE DISTRICT OFFICE. AFTER THE PRE -CONSTRUCTION MEETING, THE DEVELOPER/CONTRACTOR SHALL
NOTIFY THE DISTRICT'S FIELD REPRESENTATIVE AT LEAST 48 HOURS (REGULAR WORKING DAYS) BEFORE STARTING
WORK.
10. THE DEVELOPER/CONTRACTOR SHALL OBTAIN ALL REQUIRED FINAL INSPECTION TO MEET PERMIT REQUIREMENTS.
INSPECTIONS MUST BE SCHEDULED AT LEAST 48 HOURS IN ADVANCE.
SOOS CREEK WATER & SEWER DISTRICT SEWER NOTES
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS OF SOOS CREEK WATER AND SEWER
DISTRICT, ALSO REFERRED TO HEREINAFTER AS "DISTRICT"/
2. THE DEVELOPER SHALL FURNISH THE DISTRICT A COPY OF THE COMMERCIAL AND/OR SUBDIVISION PLANS APPROVED BY
THE GOVERNING AGENCY PRIOR TO ANY SEWER MAIN CONSTRUCTION.
3. PRIOR TO CONSTRUCTING ANY SEWER MAINS, THE APPROPRIATE STREETS AND LOTS SHALL BE CLEARED, GRADED, AND
STAKED BY THE DEVELOPER/CONTRACTOR AND ALL EXISTING UTILITIES SHALL BE LOCATED.
4. FOLLOWING SEWER MAIN CONSTRUCTION, ANY REVISION OF ROADWAY OR EASEMENT GRADES REQUIRING THE MAINS
TO BE RECONSTRUCTED SHALL BE MADE AT THE DEVELOPER'S/CONTRACTOR'S EXPENSE.
5. RECONSTRUCTION SHALL CONFORM TO THE SPECIFICATIONS OF THE DISTRICT. ALL COSTS FOR INSPECTING SUCH
RECONSTRUCTION SHALL BE CHARGED TO THE DEVELOPER IN ADDITION TO THE STANDARD CHARGES, AND SHALL BE
PAID BEFORE ACCEPTANCE BY THE DISTRICT.
6. NO SIDE SEWER CONNECTIONS SHALL BE MADE TO THE EXISTING SYSTEM UNTIL COMPLETION OF THE BILL OF SALE AND
ALL EASEMENTS. OBTAIN SIDE SEWER PERMIT FROM THE DISTRICT FOR EACH SIDE SEWER CONNECTION PRIOR TO
MAKING CONNECTION. BILL OF SALE WILL NOT BE PROCESSED UNTIL PUGET SOUND ENERGY HAS EITHER PROVIDED A
WORK SKETCH OR INSTALLED THEIR VAULTS, HAND HOLES AND LIGHT STANDARDS, OR THE DEVELOPER HAS PROVIDED
A SIGNED HOLD HARMLESS AGREEMENT (FORM SUPPLIED BY THE DISTRICT).
7. ALL COSTS OF SEWER MAIN RE -STAKING SHALL BE PAID BY THE DEVELOPER/CONTRACTOR.
8. PROPERTY CORNERS SHALL BE PINNED WITH REFERENCE TACK ON CURBS BY THE DEVELOPER/CONTRACTOR.
9. THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT'S FIELD REPRESENTATIVE AT LEAST 48 HOURS (REGULAR
WORKING DAYS) BEFORE STARTING WORK.
10. THE DEVELOPER/CONTRACTOR SHALL OBTAIN ALL REQUIRED FINAL INSPECTIONS TO MEET PERMIT REQUIREMENTS.
INSPECTIONS MUST BE SCHEDULED AT LEAST 48 HOURS IN ADVANCE.
11. CONNECTION TO EXISTING SEWER MAINS SHALL BE MADE ONLY WITH THE WRITTEN APPROVAL OF THE DISTRICT AND
ONLY AFTER AT LEAST 48 HOURS (TWO REGULAR WORKING DAYS) ADVANCE NOTICE.
12. EXISTING SEWERS TO REMAIN IN SERVICE AT ALL TIMES.
13. ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND SHALL NOT BE PERMITTED TO
ENTER THE EXISTING SYSTEM.
DECISION (CITY OF RENTON CONDITION OF APPROVAL):
THE REDEVELOPMENT OF FORMER BANK OF AMERICA AT BENSON CENTER CONDITIONAL USE PERMIT AND STREET
STANDARDS WAIVER, FILE NO. LUA25-000052, CUP -A, W, AS DEPICTED IN EXHIBIT 2, IS APPROVED AND IS SUBJECT TO THE
FOLLOWING CONDITIONS:
1. A DETAILED LANDSCAPE PLAN SHALL BE SUBMITTED WITH THE CIVIL CONSTRUCTION PERMIT SUBMITTAL THAT PROVIDES
FINAL LOCATIONS, SIZES, QUANTITIES, PLANTING DETAILS, AND OTHER APPLICABLE ITEMS AS SET FORTH IN THE RMC
4-8-120 SUBMITTAL REQUIREMENTS. THE DETAILED LANDSCAPE PLAN SHALL BE SUBMITTED TO THE CURRENT PLANNING
PROJECT MANAGER FOR REVIEW AND APPROVAL.
2. THE APPLICANT SHALL SUBMIT A RETAINING WALL DETAIL WITH THE CIVIL PLAN SET SUBMITTED AT THE TIME OF
CONSTRUCTION PERMIT REVIEW. THE RETAINING WALL DETAIL SHALL BE PROVIDED TO THE CURRENT PLANNING
PROJECT MANAGER FOR REVIEW AND APPROVAL.
3. THE APPLICANT SHALL SUBMIT A REVISED REFUSE AND RECYCLING PLAN WITH THE BUILDING PERMIT APPLICATION THAT
PROVIDES A DETAIL SHEET INDICATING THE SELF -CLOSING DOOR MECHANISM. THE REVISED PLAN SHALL BE REVIEWED
AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER, PRIOR TO BUILDING PERMIT ISSUANCE.
4. THE APPLICANT SHALL PROVIDE DETAILS REGARDING THE DESIGN, COLOR, AND BRAND FOR THE PROPOSED OUTDOOR
SEATING AND FURNITURE, FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER, PRIOR TO
BUILDING PERMIT ISSUANCE.
5. A SIGN PACKAGE IN COMPLIANCE WITH THE URBAN DESIGN DISTRICT D STANDARDS SHALL BE SUBMITTED WITH THE SIGN
PERMIT APPLICATION, PROPOSED SIGNAGE SHOULD BE COORDINATED WITH THE OVERALL BUILDING DESIGN. THE SIGN
PACKAGE SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER FOR REVIEW AND APPROVAL.
6. THE APPLICANT SHALL SUBMIT A DETAILED LIGHTING PLAN AT THE TIME OF CIVIL CONSTRUCTION PERMIT APPLICATION
THAT ADEQUATELY PROVIDES FOR PUBLIC SAFETY WITHOUT CASTING EXCESSIVE GLARE ON ADJACENT PROPERTIES.
THIS PLAN SHOULD INCLUDE DETAILS REGARDING PEDESTRIAN -SCALE LIGHTING AROUND THE PRIMARY BUILDING
ENTRANCE. THE LIGHTING PLAN SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING
PROJECT MANAGER AT THE TIME OF BUILDING PERMIT REVIEW.
7. PROJECT CONSTRUCTION BE REQUIRED TO COMPLY WITH THE RECOMMENDATIONS FOUND IN THE LIMITED
GEOTECHNICAL REPORT, PREPARED BY PANGEO, INC. JANUARY 13, 2025, AND ANY FUTURE ADDENDA.
8. THE APPLICANT'S GEOTECHNICAL ENGINEER SHALL REVIEW THE PROJECT'S CONSTRUCTION AND BUILDING PERMIT
PLANS TO VERIFY COMPLIANCE WITH THE GEOTECHNICAL REPORT(S). THE GEOTECHNICAL ENGINEER SHALL SUBMIT A
SEALED LETTER OR MEMO STATING THAT HE/SHE HAS REVIEWED THE CONSTRUCTION AND BUILDING PERMIT PLANS AND
IN THEIR OPINION THE PLANS AND SPECIFICATIONS MEET THE INTENT OF THE REPORT(S).
9. THE APPLICANT'S GEOTECHNICAL ENGINEER SHALL PROVIDE NOTES ON THE CONSTRUCTION AND BUILDING PERMIT
PLANS IDENTIFYING WHEN ON -SITE GEOTECHNICAL ENGINEER SUPERVISION OF CONSTRUCTION EVENTS IS
RECOMMENDED.
10. UNLESS OTHERWISE APPROVED BY THE CURRENT PLANNING PROJECT MANAGER THROUGH THE MODIFICATION
APPLICATION PROCESS, THE CIVIL PLANS SHALL BE REVISED TO INCLUDE AN EIGHT -FOOT (8') WIDE SIDEWALK AND AN
EIGHT -FOOT (8') WIDE STREET TREE PLANTER STRIP. THE REVISED CIVIL PLANS SHALL BE SUBMITTED AT THE TIME OF
CONSTRUCTION PERMIT REVIEW FOR THE REVIEW AND APPROVAL BY THE DEVELOPMENT ENGINEERING PLAN
REVIEWER.
SCALE:
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991 CITY OF
RENTON
ONE INCH DATU M 0
AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY
1
R-436202
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING f,7
HHuynh 07/22/2025 wi
CHIPOTLE 108TH AVE SE
GENERAL NOTES
DATE:
6/24/25
FIELDBOOK:
PAGE:
C1.1
SHEET: OF:
2 15
T
N
O
N
O
O
LO
N
CU
2025/0