Loading...
HomeMy WebLinkAboutSR_Solera_Final_Plat_250807DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SR_Solera_Final_Plat_250808_v3 A.ADMINISTRATIVE DECISION Decision: APPROVED APPROVED SUBJECT TO CONDITIONS DENIED Report Date: August 7, 2025 Project File Number: PR18-000333 Project Name: Solera Final Plat Land Use File Number: LUA24-000221, FP Project Manager: Michael Sippo, Civil Engineer III Owner/Applicant: Solera Manager, LLC, 10900 NE 8th St #1200, Bellevue, WA 98004 Contact: Dalton Arndt, Devco, LLC, 10900 NE 8th St #1200, Bellevue, WA 98004 Project Location: 2806 NE Sunset Blvd #B, Renton, WA 98056 (PID 722780-1205, 722780-1235, 722780-1785 & 722780-1405) B.EXHIBITS: Exhibit 1: Solera Final Plat Administrative Decision Exhibit 2: Final Plat Map Exhibit 3: Compliance with Preliminary Plat Conditions Summary (LUA18-000490) Exhibit 4: Compliance with Preliminary Plat Conditions Summary (LUA20-000305) Exhibit 5: Declaration of Restrictive Density Covenant C.FINDINGS OF FACT (FOF): 1.Conformance with Preliminary Plat: Compliance Conformance with Preliminary Plat Compliant if Conditions of Approval are met The final plat shall: 1. Conform with only minor modifications to the preliminary plat. 2. The lot configuration and number of lots remain unchanged from the approved preliminary plat. 3. The lots meet development standards of the Zoning Code. 4. Conditions of approval have been met as identified in Exhibits 3 and 4. D.DECISION: The Solera Final Plat File No. LUA24-000221, FP, as depicted in the Final Plat Map (Exhibit 2), is approved and is subject to the following conditions: 1.Closeout of Civil Construction Permit C21001020, which includes all plat infrastructure, lighting, franchise permits, streets, sidewalks, and punchlist items, shall occur prior to recording of the final plat. Docusign Envelope ID: C5D4083C-CC96-44F0-B15E-FA883EED8E02 City of Renton Department of Community & Economic Development Solera Final Plat Administrative Report & Decision LUA24-000221, FP Report of August 7, 2025 Page 2 of 3 DATE OF DECISION ON LAND USE ACTION: SIGNATURE AND DATE: Gina Estep Community and Economic Development Administrator Date TRANSMITTED on August 7, 2025 to the Owner/Applicant/Contact: Owner/Applicant: Contact: Solera Manager, LLC 10900 NE 8th St #1200, Bellevue, WA 98004 dalton.arndt@devcous.com Dalton Arndt Devco LLC 10900 NE 8th St #1200, Bellevue, WA 98004 dalton.arndt@devcous.com TRANSMITTED on August 7, 2025 to the following: Matthew Herrera, Planning Director Stephanie Rary, Property Services Specialist Brianne Bannwarth, Development Engineering Director Nathan Janders, Development Engineering Manager Michael Sippo, Civil Engineer III Rob Shuey, Building Official Anjela Barton, Fire Marshal E.LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION: The administrative land use decision will become final if the decision is not appealed within 14 days of the decision date. This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on August 21, 2025. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: The administrative final plat decision will expire six (6) months from the date of decision. To revitalize the expired plat, the plat shall be resubmitted as a preliminary plat. One extension to the six (6) month period may be granted by the Administrator pursuant to RMC 4-7-110.F. RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original SR_Solera_Final_Plat_250808 Docusign Envelope ID: C5D4083C-CC96-44F0-B15E-FA883EED8E02 8/7/2025 | 5:35 PM PDT City of Renton Department of Community & Economic Development Solera Final Plat Administrative Report & Decision LUA24-000221, FP Report of August 7, 2025 Page 3 of 3 SR_Solera_Final_Plat_250808 decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing through the Hearing Examiner. All communications are public record and this permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could result in the invalidation of the appeal by the Court. Docusign Envelope ID: C5D4083C-CC96-44F0-B15E-FA883EED8E02