HomeMy WebLinkAboutMFP25001454.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP25001454
IVR Number: 25001454
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:03/24/2025Application Date:1623059130Parcel Number: 3001 NE 4TH ST
Permit Type:08/08/2025Issue Date:Franchise
Permit Work Class:08/08/2026Expiration Date:Major Utility
Job Number: 109155161Franchise Type:Natural Gas
Description: PSE Gas PRE CONSTRUCTION MEETING REQUIRED. CREW TO CUT AND CAP RS 2361 INLET AND CUT AND
CAP EXISTING MAIN. CREW WILL RETIRE EXISTING RS 2361 STATION. CREW TP Tie in 2" MDPE IP Main Tie in to
ex. 2" STW IP Main 25's C/L & 16'W C/L.Install 28' of new 2" IP MDPE Main 15' W C/L Jefferson Ave.Install 58' of new 2'
IP MDPE Main 52'S C/L NE 3rd St.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
6905 S 228th St Kent, WA 98466
Please See Attached
Infrasource, Inc
Corrie Rydberg
3/24/25
109155161
3001 NE 4TH ST
VANESSA GAYLORD 360-389-8915
Monday Friday 3:00pm9:00am
Scott Warlick CED 8/7/2025
MFP25001454
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
3001 NE 4th St Renton WA 98056 USA222223232323171710101010101110101011
18181515POLICEUPOARRW-BRDBEPREPAREDTOSTOPW3-4X'
≥
X'
≥W20-7AW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'
≥
X'≥X'≥STOP
W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1
ROADWORKAHEADBEPREPAREDTOSTOPW3-4
X'≥X'≥X'≥
W20-7A
W20-1ROAD
WORK
AHEAD
BE
PREPARED
TO
STOP W3-4X'≥X'≥X'≥W20-7AC/WCLOSEDR9
-
3 DETOURM4
-
9
B
S/W
CLOS
E
D
R9-9THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREA2323NE 4TH STNE
3
R
D
S
T
JEFFERSON AVE NEINDEX PL NEJEFFERSON AVE NENE 4TH STNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVIna Ustemchuk425-398-6063ina.ustemchuk@pse.com1 OF 23001 NE 4th St, Renton, WA0 11945557 02/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.9. Work area will be 25' SCL of NE 3rd St & 16' WCL ofJefferson Ave NE.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 012928Card Exp. 07/31/2025Ina.Ustemchuk@pse.com(425)424-6063MFP25001454
3001 NE 4th St Renton WA 98056 USANE 4TH ST222223232323171710101010101110101011
1818
NE 4TH STN
E
3
R
D
S
T
JEFFERSON AVE NE1515INDEX PL NEPOLICEUPO
ARRW-BRDBEPREPAREDTOSTOPW3-4X'
≥
X'
≥W20-7AW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'
≥
X'
≥
X'≥W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1
ROADWORKAHEADBEPREPAREDTOSTOPW3-4
X'≥X'≥X'≥
W20-7A
C/WCLOSEDR9-
3 DETOURM4-
9
B
S/W
CLOSEDR9-9SIDEWALKCLOSEDAHEADR9-11S/WCLOSE
D R9-9SIDEWALKCLOSEDAHEADR9-11 THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAJEFFERSON AVE NEW20-1ROAD
WORK
AHEAD
BE
PREPAREDTOSTOP W3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7ASTOPProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVIna Ustemchuk425-398-6063ina.ustemchuk@pse.com2 OF 23001 NE 4th St, Renton, WA0 11945557 02/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.9. Work area will be:53' SCL of NE 3rd St & 46' ECL of Jefferson Ave NE;25' SCL of NE 3rd St & 86' ECL of Jefferson Ave NE.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 012928Card Exp. 07/31/2025Ina.Ustemchuk@pse.com(425)424-6063NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP25001454
CB TYPE 1
RIM=325.02
8" CONC NW IE=320.9
UTIL
WV
S
TS26"M
36"M
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
W
W
W
W
W
W
W
W
W
WWGGGGGG
GSIG
SIG
SIG
SIG
SIG
SIG
SIG SIG
SIG
SIG
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
T
T SIG
SIG
SIGSIG
SIG
SIG
PUNCH IN 2" BRASS DISC
IN CONC MONUMENT IN CASE
-0.5' BELOW GRADE
N=180952.16
E=1307710.76
NE 4TH ST
35 MPH
NE 3R
D
ST
35 MPH
JE
F
F
E
R
S
O
N
A
V
E
N
E
25
M
P
H
NE 4TH ST
25 MPH
ECB
ECB
FOFOUTIL
FO
FO
FO FO
FO
CG
CG
CG CGCG
CG
CG
CG
CG
S
S
PEPB
GV
GV GGM
GV
GV
GV
CW
CW
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
GRASS
GRASS
GRASS
CW
CW
CW
GRASSCW
CW
C
C
ASPH
ASPH
ASPH
ASPH
ASPH
3
0
'
R/W
30
'
1623059130
1623059130
1623059130
R/W30'50'
CB TYPE 1
RIM=327.65
8" CONC NW IE=322.3
CB TYPE 1
SDMH
RIM=326.39
12" CONC SW, E IE=321.0
8" CONC W, E IE=321.5
CB TYPE 1
RIM=325.05
8" CONC NE IE=322.1
8" CONC E IE=322.0
24" DI SW IE=318.7
24" DI NE IE=319.0
SSMH
RIM=325.19
24" DI SW IE=316.1
24" DI NE IE=316.3
SD SD
SD
24" DI
24" DI
24" DI CCSSCW
TT
T
SDSD24" DI2" STW
IP
SD
SD
SD
SD
SD
SD
SD
SD
D
8" ST
W
H
P
2" STW IP1 1/4" STW16" DI12" D
I
12" D
I
16" DI
16" DI
S
S
ECC
8" STW
H
P
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
2" IP MPE MAIN INSTALLATION
NE 3RD ST AND JEFFERSON AVE NE
RENTON, WA 98056
109155161
109155161
1/4
PLOT PLAN
GAS MAIN PRESSURE AND TESTING
REVISIONS
FITTER'S CHECKLIST
DRAWING SHEET INDEX
SAP ORDER #109155161INSTALL 2"MDPE 86'
TYPE/
WORK
PIPE
SIZE TYPE EST
LENGTH
ACT
LENGTH MANUFACTURER
GAS MAIN INSTALLATION/RETIREMENT
PROJECT CONTACT LIST FOR JOB#109155161
DETAIL
SECTION
DETAIL CALLOUT
DETAIL LABEL
SECTION CALLOUT
SECTION LABEL
MFP25001454
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
RESTORATION PER CITY OF RENTON STANDARDS
CB TYPE 1
RIM=325.02
8" CONC NW IE=320.9
UTIL
WV
S
TS26"M
36"M
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
W
W
W
W
W
W
W
W
W
WWGGGGGG
GSIG
SIG
SIG
SIG
SIG
SIG
SIG SIG
SIG
SIG
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
T
T SIG
SIG
SIGSIG
SIG
SIG
PUNCH IN 2" BRASS DISC
IN CONC MONUMENT IN CASE
-0.5' BELOW GRADE
N=180952.16
E=1307710.76
NE 4TH ST
35 MPH
NE 3R
D
ST
35 MPH
JE
F
F
E
R
S
O
N
A
V
E
N
E
25
M
P
H
NE 4TH ST
25 MPH
ECB
ECB
FOFOUTIL
FO
FO
FO FO
FO
CG
CG
CG CGCG
CG
CG
CG
CG
S
S
PEPB
GV
GV GGM
GV
GV
GV
CW
CW
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
GRASS
GRASS
GRASS
CW
CW
CW
GRASSCW
CW
C
C
ASPH
ASPH
ASPH
ASPH
ASPH
3
0
'
R/W
30
'
1623059130
1623059130
1623059130
R/W30'50'
CB TYPE 1
RIM=327.65
8" CONC NW IE=322.3
CB TYPE 1
SDMH
RIM=326.39
12" CONC SW, E IE=321.0
8" CONC W, E IE=321.5
CB TYPE 1
RIM=325.05
8" CONC NE IE=322.1
8" CONC E IE=322.0
24" DI SW IE=318.7
24" DI NE IE=319.0
SSMH
RIM=325.19
24" DI SW IE=316.1
24" DI NE IE=316.3
SD SD
SD
24" DI
24" DI
24" DI CCSSCW
TT
T
SDSD24" DI2" STW
IP
SD
SD
SD
SD
SD
SD
SD
SD
D
8" ST
W
H
P
2" STW IP1 1/4" STW16" DI12" D
I
12" D
I
16" DI
16" DI
S
S
ECC
8" STW
H
P
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
2" IP MPE MAIN INSTALLATION
NE 3RD ST AND JEFFERSON AVE NE
RENTON, WA 98056
109155161
109155161
1/4
PLOT PLAN
GAS MAIN PRESSURE AND TESTING
REVISIONS
FITTER'S CHECKLIST
DRAWING SHEET INDEX
SAP ORDER #109155161INSTALL 2"MDPE 86'
TYPE/
WORK
PIPE
SIZE TYPE EST
LENGTH
ACT
LENGTH MANUFACTURER
GAS MAIN INSTALLATION/RETIREMENT
PROJECT CONTACT LIST FOR JOB#109155161
DETAIL
SECTION
DETAIL CALLOUT
DETAIL LABEL
SECTION CALLOUT
SECTION LABEL
PRELIMINARY DRAWING REVIEW (90%)
Changes NeededRoleName
Engineer
CAD Checker
Approving Engineer
Cathodic Protection
Pressure Control
Construction
Management
Project Manager
Gas System Integrity &
Planning
Industrial Meter
Operations
Instrumentation
OK as Designed
Date
IN CAD:
- CHANGE SURVEY TO XREF LAYER
- OVERKILL/PURGE/AUDIT
- RUN STANDARDS CHECKER AND RESOLVE ANY
ISSUES
- LOCK PLOT PLAN VIEWPORT
- ON SHT 1, RECONCILE XREF (SURVEY) LAYERS
- ON SHT 1, REMOVE VP COLOR OVERRIDE FOR LAYER:
V-ANNO-PATT-NPLT
✓
✓
✓
✓
✓
MICHAEL RADI | 425-453-4915 | 406-855-2239 | michael.radi@pse.com
ADD SANTI AS THE CHECKER
ON ALL DRAWINGS.
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
RICHARD SHARP | N/A | 206-730-4172 | richard.sharp@pse.com
✓✓
✓✓✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
ADD INITIALS "SA" AS THE
CHECKER ON ALL DRAWINGS.
MFP25001454
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
2" IP MPE MAIN INSTALLATION
NE 3RD ST AND JEFFERSON AVE NE
RENTON, WA 98056
109155161
109155161
2/4
GAS MAIN PRESSURE AND TESTING
FITTER'S CHECKLIST
REVISIONS
STANDARD GAS CONSTRUCTION NOTES:
1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO
CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER
FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE
OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS
OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE
APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
7.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST
LEAD) INSTALLATION.
8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY
ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG
12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400.
15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
16.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE
BETWEEN FITTINGS.
17.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)
NOTES FOR JOB: 109155161
SCOPE OF JOB: INSTALL 6" MPE IP MAIN PER 109155161. THIS JOB TO BE INSTALLED IN CONJUNCTION WITH THE
RETIREMENT OF RS-2361 PER 108649723, SEE DWG 3D08-600.
✓
✓
✓
✓
✓
✓
✓✓
✓✓✓
✓
✓
✓
✓
✓
IN CAD:
- OVERKILL/PURGE/AUDIT
- RUN STANDARDS CHECKER AND RESOLVE ANY
ISSUES
MFP25001454
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
2" IP MPE MAIN INSTALLATION
NE 3RD ST AND JEFFERSON AVE NE
RENTON, WA 98056
109155161
109155161
3/4
GAS MAIN PRESSURE AND TESTING
FITTER'S CHECKLIST
WELDER
REVISIONS
✓
✓
✓
✓
✓
✓
✓✓
✓✓✓
✓
✓
✓
✓
✓
✓
✓✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
IN CAD:
- OVERKILL/PURGE/AUDIT
- RUN STANDARDS CHECKER AND RESOLVE ANY
ISSUES
IN SAP:
- ENTER IN MATERIALS
MFP25001454
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
2" IP MPE MAIN INSTALLATION
NE 3RD ST AND JEFFERSON AVE NE
RENTON, WA 98056
109155161
109155161
4/4
GAS MAIN PRESSURE AND TESTINGFITTER'S CHECKLIST
REVISIONS
1
BDETAIL1
ADETAIL
✓
✓
✓
✓
✓
✓
✓✓
✓✓✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
IN CAD FILE:
- SINCE DRAWING IS 2-LINE, UNITS NEED TO
BE SET TO ARCHITECTURAL
- LOCK ALL VIEWPORTS
- OVERKILL/PURGE/AUDIT
- RUN STANDARDS CHECKER AND RESOLVE
ANY ISSUES
✓
Add bond between
HP and IP, wires
coming up into test
lead box
MFP25001454