Loading...
HomeMy WebLinkAboutAddendum - 2DATE:July 8, 2025 TO:Kristi Rowland, Deputy Chief Administrative Officer CC:Young Yoon, Information Technology Director FROM:Lacey Pires, IT Procurement &Contract Coordinator SUBJECT:Lenel SSA Software Renewal: Airport This memo is in lieu of our standard contract template which allows for signature by both parties. Attached for your review and signature is Amendment No. 2 to CAG-23-198 with Entrance Controls. This Amendment authorizes payment of Quote # 91860-5, in the amount of $1,932.73 ($1,752.25 plus tax), for the renewal of Lenel SSA Software. The Lenel System manages the ID security badge system at the Airport. Attached are the following documents: 1. Entrance Controls Quote # 91860-5 Approved By: ____________________________ Kristi Rowland Deputy Chief Administrative Officer _____________________________ Date              CAG-23-198, Adden #2-25 36748 36748 12562 105 1 17 17 USD 1 1 1 1 Quotation No.: 91860-5 Client No.: 12562 Todd Carlson toddcarlson@eci-nw.com Date: 7/3/2025 Quote Valid 30 days Lenel SSA Renewal Through 7-15-2025 Fax: (425)766-3338 Phone: (425)430-7476 Renton, WA 98057 Harry Barrett Jr. 616 West Perimeter Road, Unit A Renton Municipal Airport Special Terms listed below 702 Industry Drive Phone: (206) 622-0452 Fax: (206) 622-8727 Tukwila, WA 98188 SCOPE OF WORK Entrance Controls will provide the following: 1) Renew Dongle# 119289 through 7-15-2026. 2) Upgrade the customer to 8.3xxx 3) The upgrade will be done during normal business hours. 4) ECi will do the upgrade on T&M. ECI included 8hrs. Any additional time will be billed on T&M at a rate of $170 per hour. Any hours not used will be refunded back to the customer. Qty. Description Unit Price Total PriceManufacturerPart# 376.00 376.00Lenel32ES SUSP PLAN. Covers 32ES,SUSP-W-ES1 16.25 16.25LenelDV Channel SUSP PLAN; SW supportSUSP-DV1 1,360.00 Equipment Sub Total: Labor: 392.25 Installation 1,360.00Labor Sub Total: Labor & Equipment Total:1,752.25 Total value 1,752.25 plus Tax $ Payment Terms: Special Terms and Conditions Due upon receipt Exclusions: 1. Any other work than described and quoted 2. 120vac power 3. Conduit/Raceway/Wiremold 4. Core Drilling 5. Card holder programming 6. Cutting/Patching/Painting 7. Handling of Hazardous Materials 8. Existing Code Violations          9. Unforeseen/Hidden Conditions 10. After Hours Work 11. Sales Tax WARRANTY 1 YEAR PARTS AND LABOR (MONDAY-FRIDAY 7AM-4PM) Accepted By:______________________________________Date:________________________________ Printed Name:_______________________________PO Number:________________________________ SECURING YOUR ENVIRONMENT 392.25 1,360.00 Net Total Material: Net Total Labor: $ $