HomeMy WebLinkAboutR-436701Q0
0
w
FIELD BOOK:
SURVEYED:
0
SURVEY BASE MAP
o
DESIGN ENTERED: -
DESIGNED
a
CHECKED:
La
110 SH 167
BEGIN PROJEC T
S TA . 2+ 990
(ENGLISH STA. 98+ 10)
z
c
F
lklr1r—y
VICINITY MAP
END PROJECT
STA. 3+600m
-- (ENGLISH STA, 118+ T 1)
SHEET
DESCRIPTION
1
COVER SHEET
2
SUMMARY OF QUANTITIES
3
ROADWAY SECTIONS
4
MISC. DETAIL
5-9
PLAN AND PROFILE
10
STRUCTURE NOTES
11
ROCK FACT NG/BIOSWALE DETAILS
12
EASEMENT/ARD DESCRIPTIONS
13-14
DRIVEWAY PROFILES
15-17
CHANNELIZATION PLAN
18
7- 1 1 PAVEMENT DETAILS
19
METRO BUS PAD DETAILS
20-22
SE 168th STREET TRAFFIC SIGNALIZATION PLAN
23-25
SE 168th STREET TRAFFIC SIGNALIZATION DETAILS
26-28
TEMP. EROSION AND SEDIMENT CONTROL/LANDSCAPE PLAN (S.W.P.P.P.)
1626&1628
GAM M ELL
91-94
S.B.—GROSS
5/94
—
_
KUNIHIRO
99-00
—
—
-
NGUYEN
99-00
M ITCH ELL
04/00
-
-
-�; Aa A.".I DATE
IW01-11[a]?
FED. AID No,
PROJECT No.
SURVEY No..
400593
25---23-05-27
MAINTENANCE DIVISION No. 4
KING COUNTY
DEPT. OF TRANSPORTATION
PAUL TOLIVEF
r oiREc-oR
116th AVENUE S.E. - PHASE II
V • + J`j
of wASy�
�r �21532
G13T�Q4
�pIVAL
EXPIRES 3/9/02
COUNTY ROAD ENGINEER
INTERIM IMPROVEMENTS
SE 172nd ST. TO SE 166th ST.
METRIC UNITS
KING COUNTY DEPT. OF TRANSPORTATION
PAUL TOLIVER, DIRECTOR
116th AVENUE S.E. -PHASE II
INTERIM IMPROVEMENTS
COVER SHEEP
Fi-4:ib / U 1
SHEET
OF
28
SHEETS
310-30(01)
RC_ DiREC-iORY-NA,1C