Loading...
HomeMy WebLinkAboutR-436719VERTICAL AERATION PIPI 2—PER TREE (SEE SPECIAL TEMPORARY EROSION AND SEDIMENTATION CONTROL NOTES PROVISIONS) (KC1) APPROVAL OF THIS TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND 50mm (2") x 1,B2m (s') LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, LODGEPOLE PINE STAKE WITH ETC.) RUBBER HOSE AND WERE TIE f R IO R GU REVIEW BACKFILL WITH 1/3 SOLI WALL FILTER MEDIA FOR DEWATERIP T T (KC2) THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSUCN, E AR TRUNK MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE COMPOST TOPSOIL AND RESPONSIBILITY OF THE TESC SUPERVISOR IN ACCORDANCE WITH COUNTY TESC STANDARDS 2/3 NATIVE SOIL Iwo 50mm (2") DEPTH 50mm x 1.B2m (2" X 6') UNTIL ALL CONSTRUCTION IS APPROVED. (SEE NOTE 18 WITH REGARD TO TESC BARK MULCH _ STAKEW� FIR SUPERVISORS) F-+4 TIME RELEASE RUBBER HOSE r� WATERING PACKET'S & 12 GAUGE (KC3) THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY 04 3—PER TREE WIRE TIE FLAGGED BY A CONTINUOUS LENGTH OF BRIGHTLY COLORED SURVEY TAPE (OR FENCING, IF (SEE SPECIAL REQUIRED) PRIOR TO CONSTRUCTION. VEGETATION OR STAKES CAN SUPPORT THE TAPE. THE - PROVISIONS) TAPE SHALL BE 1 TO 2 METERS HIGH. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE FINISH GRADE - 152 m (6'] 1 ..-.....: ;e/ MIN ( ) DEPTH MAINTAINED BY THE TESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION UNLESS f SBARK MULCH OTHERWISE NOTED OR DIRECTED BY ENGINEER. THE CLEARING LIMITS SHALL COINCIDE WITH THE GRADING LIMITS AT TOP & TOE OF "CUTS AND FILLS". AV/ r� (KC4) THE TESC FACILITIES SHOWN ON THIS PLAN SHALL BE CONSTRUCTED PRIOR TO OR IN... TURN BACK BURLAP—!L—/ CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES I5 1/3 BELOW SURFACE `` '' ''' I.:-. SCARIFY ROOTBALL & MINIMIZED. �— -- 101mm (4") MOUND ;� SPREAD ROOTS SCARIFY SIDE OF ZRATIVE SOIL OF COMPACTED (KC5) THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR PLANTING HOLE NATIVE SOIL UNDER ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC FACILITIES ROOTBALL (TYP.) SHALL BE UPGRADED AS FOR FOR CHANGING SITE CONDITIONS E(ED.G. ADDITIONAL SUMP PUMRPS, RELOCATION OEVETS ANDOFDIFIED DI DITCHES ANDD IUNT SILT FENCES, ETC,) 2 x ROOTBALL 2 X ROOT9ALL � !� E 'lP■jJ O ICC6 THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE TESC SUPERVISOR AND MAINTAINED r ( MOTE: ALL ROOTBALLS TO BE TREATED WITH VITAMIN 8-1 PRIOR TO PLANTING. TO ENSURE CONTINUED PROPER FUNCTIONING IN ACCORDANCE WITH ICING COUNTY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. EVERGREEN AND DECIDUOUS TREE PLANTING [DETAIL (KC7) AS A GENERAL RULE, ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS N.T.S. DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESC METHODS (E.G., SEEDING. MULCHING, PLASTIC COVERING, ETC.). THE COUNTY MAY REDUCE OR INCREASE THESE TIME LIMITS DEPENDING ON SITE CONDITIONS OR ANTICIPATED WEATHER CONDITIONS. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS UNLESS THE COUNTY DETERMINES THAT WINTER WEATHER MAKES VEGETATION ESTABLISHMENT INFEASIBLE. ALL AREAS THAT REACH FINAL GRADE OR WILL REMAIN UNWORKED FOR MORE THAN ONE YEAR SHALL BE STABILIZED WITHIN SEVEN DAYS. SEE THE LANDSCAPING PLANS AND COUNTY ESC STANDARD SECTION D.5.2 OF THE K.C. SWM MANUAL FOR PERMANENT STABILIZATION. (KC8) THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR IMMEDIATELY FOLLOWING A STORM EVENT. (19) AT A MINIMUM, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR'S TESC SUPERVISOR EVERY 30 DAYS DURING THE DRY SEASON, EVERY 7 DAYS DURING THE WET SEASON, AND WITHIN 24 HOURS OF (KC9) AT NO TIME SHALL MORE THAN 0.15 METER OF SEDIMENT BE ALLOWED TO ACCUMULATE SIGNIFICANT STORMS (>1.3 CM OF RAINFALL WITHIN 24—HOURS), A WRITTEN RECORD OF THESE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED INSPECTIONS SHALL BE KEPT ON --SITE WITH COPIES SUBMITTED TO THE ENGINEER. JUST PRIOR TO FINAL INSPECTION APPROVAL. THE CLEANING OPERATION SHALL NOT FLUSH {) 2O ANY PORTION OF THE SITE WITHOUT APPROVED PERMANENT STABILIZATION SHALL BE SEDIMENT —LADEN WATER INTO THE DOWNSTREAM SYSTEM. SUBJECT TO THE FOLLOWING WET SEASON REQUIREMENTS (OCTOBER 1 TO APRIL 30): (KC10) STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING A. THE ALLOWED TIME THAT A DISTURBED AREA CAN REMAIN UNWORKED WITHOUT COVER OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES IS REDUCED TO TWO DAYS, RATHER THAN SEVEN. MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE B. SLOPES AND STOCKPILES 3H:1V OR STEEPER AND WITH MORE THAN 3 METERS OF KEPT CLEAN FOR THE DURATION OF THE PROJECT. VERTICAL RELIEF ARE TO BE COVERED IF UNWORKED FOR MORE THAN 12 HOURS. C. COVER MEASURES SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED (KC11) MULCH SHALL BE APPLIED IN ACCORDANCE WITH COUNTY ESC STANDARD SECTION D.4.2.1 ON ON —SITE. DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS OR A5 A COVER D. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS. WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH OF THESE AREAS TO BE SEEDED SHALL BE SUBMITTED AND APPROVED BY THE COUNTY ENGINEER. E. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. (12) TEMPORARY AND/OR PERMANENT SEEDING SHALL BE APPLIED IN ACCORDANCE WITH COUNTY F. 40 LINEAR METERS OF SILT FENCE (AND THE NECESSARY STAKES) PER ONE HECTARE OF ESC STANDARD SECTION D.4.2.4 ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR DISTURBANCE MUST BE STOCKPILED ON —SITE. LESS THAN 30 DAYS OR HAS REACHED FINAL GRADE. AT COUNTY DISCRETION, SEEDING G. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES WITHOUT MULCH DURING THE DRY SEASON MAY BE ALLOWED. SEE COUNTY ESC STANDARD UNLESS THE SITE IS UNDERLAIN BY COARSE —GRAINED SOIL. SECTION D.4.2.4 FOR SEEDING SPECIFICATIONS AND CONSTRUCITON REQUIREMENTS. H. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFF —SITE DISCHARGE IS (13) SODDING SHALL BE APPLIED IN ACCORDANCE WITH COUNTY ESC STANDARD SECTION D.4.2.5 ON DISTURBED AREAS THAT REQUIRE IMMEDIATE VEGETATIVE COVER. SEE COUNTY ESC STANDARD SECTION D.4,2.5 FOR SODDING SPECIFICATIONS AND CONSTRUCTION REQUIREMENTS. (14) PERIMETER PROTECTION TO FILTER SEDIMENT FROM SHEETWASH SHALL BE LOCATED DOWNSLOPE OF ALL DISTURBED AREAS WHERE SHOWN ON THE PLAN. PERIMETER PROTECTION SHALL BE INSTALLED PRIOR TO UPSLOPE GRADING. SILT FENCE SHALL BE USED FOR PERIMETER PROTECTION, UNLESS OTHER MEASURES ARE APPROVED (E.G., 13RUSH BARRIERS, VEGETATED STRIPS, ETC.), AND SHALL BE APPLIED IN ACCORDANCE WITH COUNTY ESC STANDARD SECTION D.4.3. (15) INLET PROTECTION SHALL BE USED ON ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 150 METERS OF A DISTURBED AREA UNLESS THE SYSTEM DRAINS TO A SEDIMENT POND OR TRAP. SEE COUNTY ESC STANDARD SECTION D.4.5.3 FOR INLET PROTECTION SPECIFICATIONS AND CONSTRUCTION REQUIREMENTS. (16) PREVENTATIVE MEASURES TO MINIMIZE THE WIND TRANSPORT OF SOIL SHALL BE TAKE WHEN A TRAFFIC HAZARD MAY BE CREATED OR WHEN SEDIMENT TRANSPORTED BY THE WIND IS LIKELY TO BE DEPOSITED IN DRAINAGEWAYS OR WATER RESOURCES. WHEN USING WATER FOR DUST CONTROL, SPRAY UNTIL SOIL IS WET BUT RUNOFF IS NOT INITIATED. CALCIUM CHLORIDE MAY BE USED AND OIL SHALL NOT BE ALLOWED FOR DUST CONTROL. (17) THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL TESC MEASURES SUCH THAT NO SAND —SIZED SEDIMENT (SOIL PARTICLES COARSER THAN THE #200 SIEVE, 0.075MM) LEAVES THE SITE. A #200 SIEVE MUST BE KEPT ON —SITE UNTIL FINAL STABILIZATION HAS BEEN APPROVED. THE COUNTY MAY REQUIRE MEASURES BEYOND THOSE DETAILED ON THE TESC PLAN IF SUCH STANDARD MEASURES PROVE TO BE INADEQUATE OR A MORE STRINGENT SEDIMENT REMOVAL CRITERIA IS DEEMED NECESSARY TO PROTECT ADJACENT PROPERTY, DRAINAGE FACILITIES OR WATER RESOURCES. IF THE INTENT OF THE COUNTY ESC STANDARDS IS BEING MET, THE COUNTY MAY ACCEPT A FLEXIBLE COMPLIANCE WITHOUT A VARIANCE. (18) ALL TESC MEASURES SHALL BE INSPECTED AND MAINTAINED ON A REGULAR BASIS AS PRESCRIBED IN THE COUNTY ESC STANDARDS MAINTENANCE REQUIREMENTS SECTION FOR EACH SMP AND OUTLINED IN THE COUNTY ESC STANDARD SECTION 0.5,3, OF THE SWM MANUAL. A TESC SUPERVISOR SHALL BE DESIGNATED BY THE CONTRACTOR AND SHALL BE RESPONSIBLE FOR MAINTENANCE AND REVIEW OF TESC AND FOR COMPLIANCE WITH ALL PERMIT CONDITIONS RELATING TO TESC. THE TESC SUPERVISOR MUST BE AVAILABLE FOR RAPID RESPONSE TO ESC PROBLEMS. THE NAME, ADDRESS, AND PHONE NUMBER OF THE TESC SUPERVISOR SHALL BE SUPPLIED TO THE COUNTY PRIOR TO THE START OF CONSTRUCTION. A SIGN SHALL BE POSTED AT THE 168TH/116th AVE SE INTERSECTION IDENTIFYING THE TESC SUPERVISOR AND THEIR PHONE NUMBER. (19) AT A MINIMUM, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR'S TESC SUPERVISOR EVERY 30 DAYS DURING THE DRY SEASON, EVERY 7 DAYS DURING THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS (] 1.3 CM OF RAINFALL WITHIN 24—HOURS). A WRITTEN RECORD OF THESE INSPECTIONS SHALL BE KEPT ON —SITE WITH COPIES SUBMITTED TO THE ENGINEER. FIELD BOOK: SURVEYED: 8 SURVEY BASE MAP DESIGN ENTERED:_ Ot' DESIGNED a CHECKED: 1626 & 1628 GAMMELL 91--94 S.B. GROSS 5 94 KUNIHIRD 99--00 D.Wl LSON 99--00 M ITCH ELL 04/00 DATE REVISION ANTIPATED FOR THE SPECIFIED DESIGN FLOW. I. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONTRUCTION ACTIVITY NEAR SURFACE WATERS, J. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY. (21) DUST CONTROL- MINIMIZE THE PERIOD OF SOIL EXPOSURE THROUGH THE USE OF TEMPORARY GROUND COVER AND STABILIZATION PRACTICES, EXPOSED DUST PRODUCING SURFACES SHALL BE SPRINKLED DAILY UNTIL WET WHILE AVOIDING PRODUCING RUNOFF; REPEAT AS NEEDED. PAVED STREETS SHALL BE SWEPT DAILY FOLLOWING CONSTRUCTION ACTIVITIES. EXISTING OR INSTALLED CATCH BASINS OR INLETS SHALL BE PROTECTED FROM SEDIMENT DURING THE CONSTRUCTION SEQUENCE. THEY SHALL BE CHECKED AND CLEANED WEEKLY AND AFTER EACH STORM EVENT. CONTRACTOR SHALL DEVELOP A "SPILL RESPONSE" PLAN AND IDENTIFY PERSON(S) RESPONSIBLE FOR IMPLEMENTING THE PLAN IF A SPILL OF A DANGEROUS OR HAZARDOUS WASTE SHOULD (22) OCCUR. ANY SPILL THAT OCCURS REGARDLESS OF SIZE AND/OR TYPE OF SPILL SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER AND THE WASHINGTON STATE DEPARTMENT OF ECOLOGY —"SPILL RESPONSE UNIT" IN REDMOND AT THEIR 24—HOUR TELEPHONE #(425) 649-7000. IN THE CASE OF A SMALL ISOLATED SPILL THAT IS CONTAINED, COVER WITH AN ABSORBENT MATERIAL (I.E. SAWDUST, KITTY LITTER, ETC, NO STRAW) AND CONTACT ENGINEER IMMEDIATELY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COMPLIANCE WITH THE WASHINGTON STATE "DROPPING LOAD OR OTHER MATERIALS —COVERING" (RCW 46.61.655.3/4) AND KING COUNTY (23) CODE "UNSECURED LOADS" (KCC 10.12.040b), RECOMMENDED TEMPORARY EROSION AND S,EUlhdENTATION CONTROL C -US RUCTION SEQUENCE �1} PRE—CONSTRUCTION MEETING. 2 FLAG AND/OR FENCE CLEARING LIMITS AND INSTALL PERIMETER PROTECTION FOR INSPECTION BY ENGINEER. 3 POST CONSTRUCTION SIGN WITH NAME AND PHONE NUMBER OF TESC SUPERVISOR. 4 INSTALL INLET PROTECTION. 5 GRADE AND INSTALL CONSTRUCTION/PARKING ENTRANCE(S) AS NEEDED. 6 CONSTRUCT SEDIMENT TRAPS. 7 CONSTRUCT TEMPORARY AND PERMANENT SURFACE WATER CONTROLS (BERMS, DITCHES, BIOSWALES, AND STORM SYSTEM) SIMULTANEOUSLY WITH CLEARING AND GRADING. SEED AND INSTALL MATTING TD STABILIZE AS DIRECTED BY ENGINEER (8) RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE COUNTY ESC STANDARD REQUIREMENTS. SURFACE ROUGHEN OR TEXTURE ALL "GUT" SLOPES PRIOR TO SEEDING (9) ONCE ALL SURFACES HAVE BEEN STABILIZED, REMOVE SEDIMENT TRAPS AND CONSTRUCT BIOSWALES AND PONDS PER DRAINAGE PLANS. (10) UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED, AS DIRECTED BY THE ENGINEER. SEE THE TRAFFIC CONTROL PLANS FOR ADDITIONAL CONSTRUCTION SEQUENCING, FED, Al D No. PROJECT No SURVEY No. PLANT SCHEDULE SYMBOL QUANTITY COMMON- _NAMEZ(BOTANICAL NAME REMARKS - SHORE PINE/(PINUS CONTORTA) 1.52m--2m (5'-6.5') HT., B&B SYMMETRICAL, FULL INLET PROTECTION NOTE: THIS DETAIL Is ONLY SCHEMATIC. ANY INSERT IS ALLOWED THAT HAS A MIN. 0.014C.M. OF STORAGE, THE MEANS E TO DEWATER THE STORED SEDIMENT, AND CAN BE EASILY MAINTAINED. (�[� \�\ SPECIFIED SPACING, TYP. EDGE OF PLANTING BED OR PAVING - OROUNL OVER PLANTING AND SPADING PRUNE DEAD OR BROKEN BRANCHES ONLY �I. NTS SPECIFIED SPACING, TYP. i �- PLACE CROWN AT ORIGINAL PLANING DEPTH ----- 50mm (2") MULCH, AS SPECIFIED LEAVE CROWN OPEN TO AIR TIME RELEASE WATERING PACKET, 1—PER SHRUB UPLAND AND BUFFER AREAS ONLY (SEE SPECIAL PROVISIONS) FINISH GRADE BACKFILL WITH 2/3 NATIVE SOIL AND 1/3 COMPOST TOPSOIL 1 2 x DIAM ETER OF r ROOTBALL MIN. NOT PRUNE DEAD OR BROKEN ROOTS. SLICE THROUGH ROOTS CIRCLING THE BALL. SPREAD ("BUTTERFLY") ROOTS ON BARE ROOT AND CONTAINERIZED MATERIAL. ALL ROOTBALLS TO BE TREATED WITH VITAMIN B-1 PRIOR TO INSTALLATION. SHRUB PLANTING I A N.T.S. . d 22 17 24 SIo PACIFIC DOGWOOD/)CORNUS NUTs-,�LLII) 1.52m-2m (5'-6,5') HT., B&B SINGLE TRUNK, FULL 'VINE MAPLE/(ACER CIRCINATUM) 1 m (3') HT., CONTAINER, MULTI —TRUNK, MIN. 2 STEMS SNOWBERRY/(SYMPHORICARPOS AL.BA) 30cm — 38cm HT., CONTAINER EVERGREEN HUCKLEBERRY/(VACCINIUM OVATUM) 30cm — 38cm HT., CONTAINER RED FLOWERING CURRANT/(RIBE� ANGUINEUM) 30cm — 38cm HT., CONTAINER SALALAGAULTHERIA SHALLON) NOOTKA ROSE/(ROSE NUIKANA) SIIDSWALE SEED MIX SOD 3 LITER CONTAINER, MIN. 15cm HT. PLANT 0 1.5m O.C. 3 LITER CONTAINER, MIN. 2 STEMS AT 22cm HT PLANT 0 1.5m O.C. WHERE QUANTITIES ARE NOT SHOWN IN THE PLANT SHCEDULE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO jETERMINE THE REQUIRED QUANTITIES. JOINTS IN FILTER FABRIC SHALL BE SPUGED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. 2"x2" BY 14 Go. WIRE OR EQUIVALENT, IF STANDARD — % STRENGTH FABRIC USED FILTER FAI3RIC 1'83m MAX' MINIMUM 100mm x 104mm TRENCH — J BACKFILL TRENCH WITH POST SPACING MAY BE INCREASED NATIVE SOIL OR 19mm-38mVEL TO 2.44m IF WIRE BACKING IS USED WASHED GRAVEL 5umrrt X 100mm WOOD POSTS,ENCE DIISTS, REBAR, OR EQUIVALENT NOTE; FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE: CONSTRUCTION OEOTEXTILE FOR TEMPORARY SILT FENCE [NTS E E Q a 2= 2 E a (13) SODDING SHALL BE APPLIED IN ACCORDANCE WITH COUNTY ESC STANDARD SECTION D.4.2.5 ON DISTURBED AREAS THAT REQUIRE IMMEDIATE VEGETATIVE COVER. SEE COUNTY ESC STANDARD SECTION D.4,2.5 FOR SODDING SPECIFICATIONS AND CONSTRUCTION REQUIREMENTS. (14) PERIMETER PROTECTION TO FILTER SEDIMENT FROM SHEETWASH SHALL BE LOCATED DOWNSLOPE OF ALL DISTURBED AREAS WHERE SHOWN ON THE PLAN. PERIMETER PROTECTION SHALL BE INSTALLED PRIOR TO UPSLOPE GRADING. SILT FENCE SHALL BE USED FOR PERIMETER PROTECTION, UNLESS OTHER MEASURES ARE APPROVED (E.G., 13RUSH BARRIERS, VEGETATED STRIPS, ETC.), AND SHALL BE APPLIED IN ACCORDANCE WITH COUNTY ESC STANDARD SECTION D.4.3. (15) INLET PROTECTION SHALL BE USED ON ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 150 METERS OF A DISTURBED AREA UNLESS THE SYSTEM DRAINS TO A SEDIMENT POND OR TRAP. SEE COUNTY ESC STANDARD SECTION D.4.5.3 FOR INLET PROTECTION SPECIFICATIONS AND CONSTRUCTION REQUIREMENTS. (16) PREVENTATIVE MEASURES TO MINIMIZE THE WIND TRANSPORT OF SOIL SHALL BE TAKE WHEN A TRAFFIC HAZARD MAY BE CREATED OR WHEN SEDIMENT TRANSPORTED BY THE WIND IS LIKELY TO BE DEPOSITED IN DRAINAGEWAYS OR WATER RESOURCES. WHEN USING WATER FOR DUST CONTROL, SPRAY UNTIL SOIL IS WET BUT RUNOFF IS NOT INITIATED. CALCIUM CHLORIDE MAY BE USED AND OIL SHALL NOT BE ALLOWED FOR DUST CONTROL. (17) THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL TESC MEASURES SUCH THAT NO SAND —SIZED SEDIMENT (SOIL PARTICLES COARSER THAN THE #200 SIEVE, 0.075MM) LEAVES THE SITE. A #200 SIEVE MUST BE KEPT ON —SITE UNTIL FINAL STABILIZATION HAS BEEN APPROVED. THE COUNTY MAY REQUIRE MEASURES BEYOND THOSE DETAILED ON THE TESC PLAN IF SUCH STANDARD MEASURES PROVE TO BE INADEQUATE OR A MORE STRINGENT SEDIMENT REMOVAL CRITERIA IS DEEMED NECESSARY TO PROTECT ADJACENT PROPERTY, DRAINAGE FACILITIES OR WATER RESOURCES. IF THE INTENT OF THE COUNTY ESC STANDARDS IS BEING MET, THE COUNTY MAY ACCEPT A FLEXIBLE COMPLIANCE WITHOUT A VARIANCE. (18) ALL TESC MEASURES SHALL BE INSPECTED AND MAINTAINED ON A REGULAR BASIS AS PRESCRIBED IN THE COUNTY ESC STANDARDS MAINTENANCE REQUIREMENTS SECTION FOR EACH SMP AND OUTLINED IN THE COUNTY ESC STANDARD SECTION 0.5,3, OF THE SWM MANUAL. A TESC SUPERVISOR SHALL BE DESIGNATED BY THE CONTRACTOR AND SHALL BE RESPONSIBLE FOR MAINTENANCE AND REVIEW OF TESC AND FOR COMPLIANCE WITH ALL PERMIT CONDITIONS RELATING TO TESC. THE TESC SUPERVISOR MUST BE AVAILABLE FOR RAPID RESPONSE TO ESC PROBLEMS. THE NAME, ADDRESS, AND PHONE NUMBER OF THE TESC SUPERVISOR SHALL BE SUPPLIED TO THE COUNTY PRIOR TO THE START OF CONSTRUCTION. A SIGN SHALL BE POSTED AT THE 168TH/116th AVE SE INTERSECTION IDENTIFYING THE TESC SUPERVISOR AND THEIR PHONE NUMBER. (19) AT A MINIMUM, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR'S TESC SUPERVISOR EVERY 30 DAYS DURING THE DRY SEASON, EVERY 7 DAYS DURING THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS (] 1.3 CM OF RAINFALL WITHIN 24—HOURS). A WRITTEN RECORD OF THESE INSPECTIONS SHALL BE KEPT ON —SITE WITH COPIES SUBMITTED TO THE ENGINEER. FIELD BOOK: SURVEYED: 8 SURVEY BASE MAP DESIGN ENTERED:_ Ot' DESIGNED a CHECKED: 1626 & 1628 GAMMELL 91--94 S.B. GROSS 5 94 KUNIHIRD 99--00 D.Wl LSON 99--00 M ITCH ELL 04/00 DATE REVISION ANTIPATED FOR THE SPECIFIED DESIGN FLOW. I. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONTRUCTION ACTIVITY NEAR SURFACE WATERS, J. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY. (21) DUST CONTROL- MINIMIZE THE PERIOD OF SOIL EXPOSURE THROUGH THE USE OF TEMPORARY GROUND COVER AND STABILIZATION PRACTICES, EXPOSED DUST PRODUCING SURFACES SHALL BE SPRINKLED DAILY UNTIL WET WHILE AVOIDING PRODUCING RUNOFF; REPEAT AS NEEDED. PAVED STREETS SHALL BE SWEPT DAILY FOLLOWING CONSTRUCTION ACTIVITIES. EXISTING OR INSTALLED CATCH BASINS OR INLETS SHALL BE PROTECTED FROM SEDIMENT DURING THE CONSTRUCTION SEQUENCE. THEY SHALL BE CHECKED AND CLEANED WEEKLY AND AFTER EACH STORM EVENT. CONTRACTOR SHALL DEVELOP A "SPILL RESPONSE" PLAN AND IDENTIFY PERSON(S) RESPONSIBLE FOR IMPLEMENTING THE PLAN IF A SPILL OF A DANGEROUS OR HAZARDOUS WASTE SHOULD (22) OCCUR. ANY SPILL THAT OCCURS REGARDLESS OF SIZE AND/OR TYPE OF SPILL SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER AND THE WASHINGTON STATE DEPARTMENT OF ECOLOGY —"SPILL RESPONSE UNIT" IN REDMOND AT THEIR 24—HOUR TELEPHONE #(425) 649-7000. IN THE CASE OF A SMALL ISOLATED SPILL THAT IS CONTAINED, COVER WITH AN ABSORBENT MATERIAL (I.E. SAWDUST, KITTY LITTER, ETC, NO STRAW) AND CONTACT ENGINEER IMMEDIATELY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COMPLIANCE WITH THE WASHINGTON STATE "DROPPING LOAD OR OTHER MATERIALS —COVERING" (RCW 46.61.655.3/4) AND KING COUNTY (23) CODE "UNSECURED LOADS" (KCC 10.12.040b), RECOMMENDED TEMPORARY EROSION AND S,EUlhdENTATION CONTROL C -US RUCTION SEQUENCE �1} PRE—CONSTRUCTION MEETING. 2 FLAG AND/OR FENCE CLEARING LIMITS AND INSTALL PERIMETER PROTECTION FOR INSPECTION BY ENGINEER. 3 POST CONSTRUCTION SIGN WITH NAME AND PHONE NUMBER OF TESC SUPERVISOR. 4 INSTALL INLET PROTECTION. 5 GRADE AND INSTALL CONSTRUCTION/PARKING ENTRANCE(S) AS NEEDED. 6 CONSTRUCT SEDIMENT TRAPS. 7 CONSTRUCT TEMPORARY AND PERMANENT SURFACE WATER CONTROLS (BERMS, DITCHES, BIOSWALES, AND STORM SYSTEM) SIMULTANEOUSLY WITH CLEARING AND GRADING. SEED AND INSTALL MATTING TD STABILIZE AS DIRECTED BY ENGINEER (8) RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE COUNTY ESC STANDARD REQUIREMENTS. SURFACE ROUGHEN OR TEXTURE ALL "GUT" SLOPES PRIOR TO SEEDING (9) ONCE ALL SURFACES HAVE BEEN STABILIZED, REMOVE SEDIMENT TRAPS AND CONSTRUCT BIOSWALES AND PONDS PER DRAINAGE PLANS. (10) UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED, AS DIRECTED BY THE ENGINEER. SEE THE TRAFFIC CONTROL PLANS FOR ADDITIONAL CONSTRUCTION SEQUENCING, FED, Al D No. PROJECT No SURVEY No. PLANT SCHEDULE SYMBOL QUANTITY COMMON- _NAMEZ(BOTANICAL NAME REMARKS - SHORE PINE/(PINUS CONTORTA) 1.52m--2m (5'-6.5') HT., B&B SYMMETRICAL, FULL INLET PROTECTION NOTE: THIS DETAIL Is ONLY SCHEMATIC. ANY INSERT IS ALLOWED THAT HAS A MIN. 0.014C.M. OF STORAGE, THE MEANS E TO DEWATER THE STORED SEDIMENT, AND CAN BE EASILY MAINTAINED. (�[� \�\ SPECIFIED SPACING, TYP. EDGE OF PLANTING BED OR PAVING - OROUNL OVER PLANTING AND SPADING PRUNE DEAD OR BROKEN BRANCHES ONLY �I. NTS SPECIFIED SPACING, TYP. i �- PLACE CROWN AT ORIGINAL PLANING DEPTH ----- 50mm (2") MULCH, AS SPECIFIED LEAVE CROWN OPEN TO AIR TIME RELEASE WATERING PACKET, 1—PER SHRUB UPLAND AND BUFFER AREAS ONLY (SEE SPECIAL PROVISIONS) FINISH GRADE BACKFILL WITH 2/3 NATIVE SOIL AND 1/3 COMPOST TOPSOIL 1 2 x DIAM ETER OF r ROOTBALL MIN. NOT PRUNE DEAD OR BROKEN ROOTS. SLICE THROUGH ROOTS CIRCLING THE BALL. SPREAD ("BUTTERFLY") ROOTS ON BARE ROOT AND CONTAINERIZED MATERIAL. ALL ROOTBALLS TO BE TREATED WITH VITAMIN B-1 PRIOR TO INSTALLATION. SHRUB PLANTING I A N.T.S. . d 22 17 24 SIo PACIFIC DOGWOOD/)CORNUS NUTs-,�LLII) 1.52m-2m (5'-6,5') HT., B&B SINGLE TRUNK, FULL 'VINE MAPLE/(ACER CIRCINATUM) 1 m (3') HT., CONTAINER, MULTI —TRUNK, MIN. 2 STEMS SNOWBERRY/(SYMPHORICARPOS AL.BA) 30cm — 38cm HT., CONTAINER EVERGREEN HUCKLEBERRY/(VACCINIUM OVATUM) 30cm — 38cm HT., CONTAINER RED FLOWERING CURRANT/(RIBE� ANGUINEUM) 30cm — 38cm HT., CONTAINER SALALAGAULTHERIA SHALLON) NOOTKA ROSE/(ROSE NUIKANA) SIIDSWALE SEED MIX SOD 3 LITER CONTAINER, MIN. 15cm HT. PLANT 0 1.5m O.C. 3 LITER CONTAINER, MIN. 2 STEMS AT 22cm HT PLANT 0 1.5m O.C. WHERE QUANTITIES ARE NOT SHOWN IN THE PLANT SHCEDULE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO jETERMINE THE REQUIRED QUANTITIES. JOINTS IN FILTER FABRIC SHALL BE SPUGED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. 2"x2" BY 14 Go. WIRE OR EQUIVALENT, IF STANDARD — % STRENGTH FABRIC USED FILTER FAI3RIC 1'83m MAX' MINIMUM 100mm x 104mm TRENCH — J BACKFILL TRENCH WITH POST SPACING MAY BE INCREASED NATIVE SOIL OR 19mm-38mVEL TO 2.44m IF WIRE BACKING IS USED WASHED GRAVEL 5umrrt X 100mm WOOD POSTS,ENCE DIISTS, REBAR, OR EQUIVALENT NOTE; FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE: CONSTRUCTION OEOTEXTILE FOR TEMPORARY SILT FENCE [NTS E E Q a 2= 2 E a EROa' M AND SEEMMTATM CON TFO- FECKARMM31M BEST mkiAGmeqT manow -- mrs 1. STABILIZATION AND SEDIMENT TRAPPING CONSTRUCTION GEOTEXT1LE FOR TEMP. SILT FENCE, PERMANENT SEEDING, SOD, 5D 2. DELINEATE. CLEARING AND EASEMENT LIMITS — _ . GRADING LIMITS, HIGH VISI9ILFTY FENCING, SURVEY PRIOR TO CONSTRUCTION, VEGETATION PRESERVE. 3. PROTECTION OF ADJACENT PROPERTIES -� DUST CONTROL, CLEAR PLASTIC COVERING, CONSTRUCTION GEOTEKTILE„FOR TEMP, SILT FENCE, HIGi-�ISIBILTTY FENCING, 4. TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES INLET PROTECTION, GRADING, IMMEDIATE ASPHALT PAVING, SWALES CONSTRUCTED EARLY JUTE MATTING, CLEAR PLASTIC COVERING, PERMANENT SEEDING, TOPSOIL, Y SOD PERMANENT SEEDING, CLEAR PLASTIC COVERING, JUTE MATTING OUTLET PROTECTION, JUTE MATTING, SOLI _ _ ..._..-.._............. ._... - .... _........-..__ ....-...---- INLET PROTECTION RELOCATE AWAY FROM SENSITIVE AREAS DURING CONSTRUCTION IP 5. CUT AND FILL SLOPES 6. CONTROLLING OFFEITE EROSION 7, STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS `B. STORM DRAIN INLET PROTECTION 9. UNDERGROUND UTILITY CONSTRUCTION 10. CONSTRUCTION ACCESS ROUTES MINIMIZE SEDIMENT TRANSPORT AND ROUTINELY SWEEP PAVED AREAS, CONSTRUCTION ENTRANCE AT END OF CONSTRUCTION WHEN NO LONGER NEEDED, AS DETERMINED BY ENGINEER AS NEEDED, DIVERT TO BIOSWALE T.E.S.C., DITCHES OR TANK TRUCK Cg 11. REMOVAL OF TEMPORARY BMPS 12. DEWATERING CONSTRUCTION SITES 13. CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES USE OF BIOSWALE AND ROADSIDE DITCHES, REFUEL EQUIPMENT IN SECURE STAGING AREAS, OUTSIDE -5ENSITIVE AREAS. 14. MAINTENANCE CHECK, KEEP IN WORKING ORDER THROUGHOUT CONSTRUCTION, MODIFY AND RELOCATE FEATURES AS WORK do WEATHER DICTATES. CONTRACTOR BONDING 15. FINANCIAL LIABILITY 400593 28-23-05-27 MAINTENANCE DIVISION No._4 - xiou -EXPIRES 3/9/02 COUMY Roues e4GINM KING COUNTY DEFT. OF TRANSPORTATION PAUL TOLIVER, DIRECTOR 116th AVENUE S.E. -PHASE II INTEFiMA IMPROVEMENTS TEMP. EROSION AND SEDIMENT CONTROL\LANDSCAPE PLAN (SURFACE WATER POLLUTION PREVENTION PLAN—NPDES) SHEET 28 OF 28 SHEETS 310-30(28) 1S