Loading...
HomeMy WebLinkAboutCM_Construction Mitigation_180516-Final.pdfINNOVA Architects Inc. (253) 572-4903 950 Pacific Avenue, Suite 450 Tacoma, WA 98402 Page 1 of 1 CONSTRUCTION MITIGATION DESCRIPTION May 16, 2018 Planning Division City of Renton 1055 South Grady Way Renton, WA 98057 Project Name: 601 Monster Road SW Building and Site Redevelopment Proposed Construction Dates: Demolition start spring of 2018, complete spring of 2018 (approximately 8 weeks) Hours and Days of Operation: The demolition contractor estimates 90-100 haul trips occurring over a duration of 6 to 8 weeks, Monday through Friday with tentative Saturday work days, hours of work limited from 7am to 5pm. Measures to be Implemented to Minimize Dust, Traffic impacts, Erosion, Mud, Noise: BMP and TESC measures will be implemented to maintain a clean working site. Any work requiring impacts to traffic will utilize flaggers and approved traffic control means. The proposed measures to reduce or control the noise impacts will be to limit the hours of operation during the construction phase of the project. The site is located in an Industrial area and in no proximity to a residential neighborhood. Existing adjacent freeway traffic and facility operations create significantly more noise than this site will produce. Any Special Hours proposed for Construction or hauling: It may be possible some work may be performed on weekends to take advantage of favorable weather conditions. Preliminary Traffic Plan: None but the anticipated haul route for general demolition debris via Monster Road SW to Oaksdale Ave SW, Oaksdale Ave SW to Grady Way to I-405. Haul route for concrete debris shall be via Monster Road SW to Renton Concrete Recycling just 1/4 mile north of the subject property.