Loading...
HomeMy WebLinkAboutR-428107TM 00 CV I N rr 0 06 2 O z LU V a CU U a n T oo N O I 0 LU TESTING CONNECTION EXISTING WATER MAIN POLYPIG STATION PER STD PLAN 300.7 (1) VERTICAL CROSS (MJxFL) (1) BLIND FLANGE ON TOP WITH 2" TAP AND 2" PLUG (1) BLIND FLANGE ON BOTTOM (1) PLUG (M1) WITH 2" TAP AND TEMPORARY BLOW -OFF ASSEMBLY WITH TEMPORARY THRUST BLOCKING 8+ a a d • a Q/�/ �/� o � o NEW DI WATER MAIN 0 JU '9 TEMPORARY BLOCKING CONNECTION TO EXISTING MAIN (BY CITY APPROVED WET TAP CONTRACTOR) 3 x ID (1) TAPPING TEE (FL) PER STD PLAN 300.6 MIN (1) TAPPING GATE VALVE (FLxMJ) (1) PLUG (MJ) WITH 2" TAP AND TEMPORARY BLOW -OFF ASSEMBLY WITH CONCRETE THRUST BLOCKING PER STD PLAN 330.1 FINAL CONNECTION UPON COMPLETION OF POLYPIGGING, HYDROSTATIC TESTING, AND DISINFECTION, REMOVE TEMPORARY THRUST BLOCKING AND TEMPORARY BLOW -OFF ASSEMBLIES FINAL CONNECTION (BY CITY FORCES) (2) DI SPOOLS (1) LONG BODY DI SLEEVE (MJ) a d • Q o o0O o NEW DI WATER MAIN 0 d NOTES: 1. ALL CONNECTIONS TO EXISTING WATER MAINS WILL BE CONDUCTED BY CITY FORCES AS SPECIFIED IN SECTION 5-14.2 OF THE CITY OF RENTON WATER UTILITY CONSTRUCTION STANDARDS 2. LONG BODY DI SLEEVE FOR CONNECTION FROM DI TO DI PIPE AND FROM DI TO CI PIPE WITH SAME OUTSIDE DIAMETER STD. PLAN - 300.S .+ PUBLIC WORKS CONNECTION TO WATER MAIN APf�(j�J'PROVE�D: DEPARTMENT TAPPING TEE AND VALVE � ` `�JL 6/28/2023 Martin Pastucha DATE Public Works Administrator CONNECTION TO WATER MAIN NOT APPLICABLE FOR THIS PROJECT TAPPING TEE AND VALVE 4 COR STD PLAN 300.5 C-4.00 SAWCUT PAVEMENT 2' OUTSIDE OF TRENCH EDGES O OVOO� Q 3.0' PATCH SURFACING TO MATCH EXISTING. MINIMUM 4" ASPHALT OVER 6" CRUSHED ROCK BASE FINISH GRADE SAWCUT PAVEMENT 2' OUTSIDE OF TRENCH EDGES .................................... 0°0�0°0�0 0 0 ) 2.0' TRENCH BACKFILL PER SECTION 9-03.19 OF WSDOT STD SPECS BACKFILL IN 8" LOOSE LIFTS (95% MAX DENSITY) PIPE BEDDING PER SECTION 9-03.12(3) OF WSDOT STD SPECS. COMPACT IN 4" LAYERS (95% MAX DENSITY) ORANGE PERVIOUS GEOTEXTILE FABRIC ON SIDES AND BOTTOM. 2" MINIMUM LAP AT JOINTS NOTES 11 Y40 AND 22 12 ° BENDS PIPE CLAMP AND ANCHOR ROD D L A L vo Dv � o D / e L -A� 450 BEND PIPE CLAMP AND ANCHORROD o D 0 oL pv L'\^ o � D A D o v o D vo D c D -A� MINIMUM DIMENSIONS PIPE SIZE BEND VOLUME (CF) A D L 11 Yq 8 2.0' 3/q" 1.5' 4" 22 Yz 11 2.2' 2.0' 45° 30 3.1' 6" 11 Ya° 11 2.2' 3/4" 2.0' 221/z° 25 2.9' 45° 68 4.1' 8" 111/4 16 2.5' 3/q" 2.0' 22 Yz° 47 3.6' 45° 123 5.0' 12" 11 Y4 32 3.2' %11 2.0' 221/z° 88 4.5' 3.0' 45° 232 6.1' 2.5' 11 Y4* 70 4.1' 1" 3.0' 16" 22 Y2 184 5.7' 1 Y$ 4.0'" 45° 478 7.8' 20" 11 Ya° 91 4.5' 1 Y4" 3.0' 22 Yz° 225 5.1' 4.0' 45° 560 8.2' 11 Y4* 128 5.0' 11/4" 3.5' 24" 221/z° 320 6.8' 13/s" 4.5' 45° 820 9.4' * D = ANCHOR ROD DIAMETER NOTES: 1. CONCRETE BLOCKING SIZES BASED ON 200 PSI HYDROSTATIC PRESSURE AND 3,000 PSI CONCRETE. 2. ALL CONCRETE SHALL BE MECHANICALLY MIXED. JOB SITE MIXING, HAND -MIXED CONCRETE, AND MOBILE CONCRETE MIXERS ARE NOT ALLOWED. 3. PIPE CLAMPS AND ANCHOR RODS SHALL BE INSTALLED PER STD PLAN 330.4. 4. FITTINGS SHALL BE POLYWRAPPED AFTER INSTALLATION OF PIPE CLAMPS AND ANCHOR RODS PRIOR TO POURING CONCRETE BLOCKING. S. WATER MAIN SHALL NOT BE PRESSURIZED UNTIL ALL TRENCHING WITHIN 100' OF VERTICAL BEND IS BACKFILLED AND COMPACTED TO MINIMUM 3' COVER. 6. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS. PUBLIC WORKS CONCRETE BLOCKING 9 DEPARTMENT FOR VERTICAL FITTINGS CONCRETE BLOCKING FOR VERTICAL FITTINGS COR STD PLAN 330.1 1. EXCAVATED SOIL TO BE STOCKPILED AND TESTED FOR CONTAMINATION PER THE ENVIRONMENTAL REQUIREMENTS FOR THE RENTON SUPERFUND SITE PROVIDED BY THE PACCAR CORPORATE ENVIRONMENTAL DEPARTMENT. 2. ALL TRENCHING AND EXCAVATION WORK IN AREAS BELOW THE CLEAN CAP (IE WITHIN CONTAMINATED SOILS) SHALL BE IN STRICT CONFORMANCE WITH THE ENVIRONMENTAL REQUIREMENTS FOR THE RENTON SUPERFUND SITE PROVIDED BY THE PACCAR CORPORATE ENVIRONMENTAL DEPARTMENT. 3. ALL BACKFILL WORK AND MATERIALS ASSOCIATED WITH ALL TRENCHING AND EXCAVATION WORK SHALL BE IN STRICT CONFORMANCE WITH THE ENVIRONMENTAL REQUIREMENTS FOR THE RENTON SUPERFUND SITE PROVIDED BY THE PACCAR CORPORATE ENVIRONMENTAL DEPARTMENT. ALL BACK FILLED TRENCHING AND LARGE EXCAVATION AREAS WILL BE LINED WITH A PERVIOUS GEOTEXTILE FABRIC (ORANGE) TO DELINEATE CLEAN BACK FILL MATERIAL FROM EXISTING CONTAMINATED SOILS. STD. PLAN - 330.2 APPROVED: Martin Pastucha DATE Public Works Adminis-W, 11140 AND 2212 ° BENDS PIPE CLAMP AND ANCHOR ROD o T T L o v IA A 450 BEND PIPE CLAMP AND ANCHOR ROD L JJ�� A 7' D f - A -1 900 BEND PIPE CLAMP AND ANCHOR ROD MINIMUM DIMENSIONS PIPE SIZE BEND VOLUME (CF) A D L 4" 11 Ya BLOCKING NOT REQUIRED 16 1 2.5' '4" 2.0' 22 Yz° 45° 90° 6" 111/4 BLOCKING NOT REQUIRED 13 2.3' 3/4' 2.0' 22 Yz" 45° 90° 43 3.5' 3/a2.0' BLOCKING NOT REQUIRED 11 Y4 22 Yz 8" 45° 33 3.2' 3/4° 2.0' 90° 86 4.4' %ll 2.0' 11 % BLOCKING NOT REQUIRED 10" 22 YZ 13 2.3' 3j4' 2.0' 45° 64 4.0' 3j4' 2.0' 90° 141 5.2' V. 3.5' 11 Y4 BLOCKING NOT REQUIRED 22 YZ 20 2.7' 3j4' 2.0' 12" 45° 111 4.8' 3j4' 2.0' 90° 206 5.9' 1 Y., 4.0' * D = ANCHOR ROD DIAMETER MINIMUM DIMENSIONS BASED ON FOLLOWING CONDITIONS: D v B • PIPE RESTRAINED MINIMUM 36' ON EACH SIDE OF BEND D • SAFE BEARING LOAD = 1,000 SF D v o D L • CONCRETE STRENGTH = 3,000 PSI • CONCRETE WEIGHT= 150 PCF D A • HYDROSTATIC PRESSURE = 200 PSI • TRENCH = TYPE 2 FLAT BOTTOM TRENCH WITH LIGHTLY v v CONSOLIDATED BACKFILL PER ANSI/AWWA C150/A21.50 L -" D • FACTOR OF SAFETY = 1.5 • SOIL FRICTIONAL RESISTANCE BASED ON COHESIVE GRANULAR SOIL (GC+SC), SAND, GRAVEL, CLAY MIXTURE A CONCRETE BLOCKING DESIGN MUST BE ADJUSTED FOR NOTES: VARIANCES IN ANY OF THESE CONDITIONS. 1. NO CHANGE IN PIPE DIRECTION OR DIAMETER SHALL OCCUR WITHIN 36' OF THE VERTICAL BEND. BENDS, TEES, REDUCERS, ETC. BEYOND THE 36' LIMIT MAY BE RESTRAINED BY STANDARD CONCRETE BLOCKING PER STD PLANS 330.1 AND 330.2. 2. FITTINGS SHALL BE POLYWRAPPED AFTER INSTALLATION OF PIPE CLAMPS AND ANCHOR RODS PRIOR TO POURING CONCRETE BLOCKING. 3. PIPE CLAMPS AND ANCHOR RODS SHALL BE INSTALLED PER STD PLAN 330.4. 4. JOINT RESTRAINT SHALL BE MEGALUG SERIES 1100 OR EQUAL. 5. WATER MAIN SHALL NOT BE PRESSURIZED UNTIL ALL TRENCHING WITHIN 100' OF VERTICAL BEND IS BACKFILLED AND COMPACTED TO MINIMUM 3' COVER. 6. 90° VERTICAL BENDS SHALL ONLY BE INSTALLED WHERE GIVEN PRIOR APPROVAL BY THE CITY. 7. ALL CONCRETE SHALL BE MECHANICALLY MIXED. JOB SITE MIXING, HAND -MIXED CONCRETE, AND MOBILE CONCRETE MIXERS ARE NOT ALLOWED. 8. BACKFILL TRENCH BEYOND 90° VERTICAL BLOCK WITH CRUSHED SURFACING TOP COURSE MATERIAL COMPACTED TO 95% MDD. CRUSHED BACKFILL SHALL EXTEND 20' BEYOND BLOCK OR TO FIRM BEARING TRENCH WALL, WHICHEVER IS LESS. 9. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS. CONCRETE BLOCKING STD. PLAN - 330.3 0PUBLIC WORKS APPROVED: DEPARTMENT FOR VERTICAL FITTINGS - 6/28/2023 WITH RESTRAINED JOINTS Main Pastucha Public Works Administrator DATE CONCRETE BLOCKING FOR VERTICAL 5 FITTINGS WITH RESTRAINED JOINTS 6 C-4.00 COR STD PLAN 330.1 k C-4.00 UTILITY TRENCH r7 SCALE: 1" = 2' C-4.00 E SURVEYED: SCALE: xxx DESIGNED: 1 »=20' HORIZOM� HAD 1983/1991 • Call 811DROWN: SAG N • a two business days 02 PERMIT CORRECTION 02 DRv 5/24/2o2a PK HS/SAG ONE INCH before you dig 01 PERMIT CORRECTION 01 DRv 11/30/2023 PK CHECKED: AT FULL SCDATUM ALE N IF NOT ONE INCH NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY o PKS mm 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com SH I STERN' , V SSIONAL ECG 05/24/2024 O LO N W, u CM Q J e R-428107 W-428107 0 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 06 DEVELOPMENT ENGINEERING �' yqi 07/01 /2024 O WATER UTILITY ABDOUL GAFOUR 07/16/2024 z W • CITY OF PACCAR-KENWORTH R&D DA5/24/2024 Y RENTON R&D BUILDING OFFICE REMODEL FIELDBOOK: Q PAGE • DRAWING NO: U Planning/Building/Public Works Dept. DETAILS C-4.2 1 Q SHEET: OF: 07 07