Loading...
HomeMy WebLinkAboutTIR-4334 Renton Market and Piazza City of Renton, WA Technical Information Report April 2025 | Civil Contruction Permit Report DEVELOPMENT ENGINEERING msippo 08/13/2025 Surface Water Enginering jfarah 08/14/2025 Renton Market and Piazza – City of Renton i Technical Information Report April 2025 Prepared for: City of Renton Prepared by: KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 Heather Lewison, PE Mariam Saghafian 2025-04-15 Renton Market and Piazza – City of Renton iii Table of Contents 1. Project Overview ........................................................................................................................................... 1 Existing Conditions ......................................................................................................................................... 2 Proposed Conditions ....................................................................................................................................... 2 2. Conditions and Requirements Summary ................................................................................................... 3 Core Requirement No. 1: Discharge at the Natural Location ......................................................................... 3 Core Requirement No. 2: Off-Site Analysis .................................................................................................... 3 Core Requirement No. 3: Flow Control ........................................................................................................... 3 Core Requirement No. 4: Conveyance System .............................................................................................. 4 Core Requirement No. 5: Construction Stormwater Pollution Prevention ...................................................... 4 Core Requirement No. 6: Maintenance and Operations ................................................................................ 4 Core Requirement No. 7: Financial Guarantees and Liability ........................................................................ 4 Core Requirement No. 8: Water Quality ......................................................................................................... 4 Core Requirement No. 9: On-Site BMPs ........................................................................................................ 5 Full Dispersion .......................................................................................................................................... 5 Full and Limited Infiltration ....................................................................................................................... 5 Rain Gardens ........................................................................................................................................... 5 Bioretention .............................................................................................................................................. 5 Permeable Paving .................................................................................................................................... 5 Basic Dispersion ....................................................................................................................................... 5 Special Requirement No. 1: Other Adopted Area-Specific Requirements ..................................................... 6 Special Requirement No. 2: Flood Hazard Area Delineation ......................................................................... 6 Special Requirement No. 3: Flood Protection Facilities ................................................................................. 6 Special Requirement No. 4: Source Control ................................................................................................... 7 Special Requirement No. 5: Oil Control .......................................................................................................... 7 Special Requirement No. 6: Aquifer Protection Area ..................................................................................... 7 3. Off-Site Analysis (N/A) .................................................................................................................................. 7 4. Flow Control, Low Impact Development (LID), and Water Quality Facility Analysis and Design (N/A) ........................................................................................................................................................................ 7 Flow Control Exemption .................................................................................................................................. 7 5. Conveyance System Analysis and Design................................................................................................. 8 6. Special Reports and Studies (N/A) .............................................................................................................. 9 7. Other Permits ................................................................................................................................................ 9 8. Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design ........................ 9 Part 8.A: Erosion and Sediment Control Plan Analysis and Design ............................................................... 9 Part 8.B: Stormwater Pollution Prevention and Spill Control Plan Design ................................................... 10 9. Bond Quantities, Facility Summaries, and Declaration of Covenant .................................................... 11 10. Operations and Maintenance Manual ....................................................................................................... 11 KPFF Consulting Engineers iv List of Figures Figure 1-1: Vicinity Map ....................................................................................................................................... 1 List of Tables Table 1-1: Project’s Existing Surface Areas ........................................................................................................ 2 Table 1-2: Project’s Proposed Surface Areas ..................................................................................................... 3 Table 2-1: On-site BMPs Infeasibility Criteria ...................................................................................................... 6 Table 4-1: Site Peak Flows ................................................................................................................................... 8 Table 7-1: Required Permits ................................................................................................................................. 9 Appendices Appendix A – TIR Worksheet Appendix B – Existing and Proposed Conditions Map Appendix C – Minimum Requirements Appendix D – Civil Plans Appendix E – Flow Control Appendix F – Conveyance Calculations Appendix G – Bond Quantity Worksheet Appendix H – Operations and Maintenance Manual Appendix I – Geotechnical Report Renton Market and Piazza – City of Renton 1 1. Project Overview The Renton Market and Piazza project is located at 233 Burnett Avenue South in Renton, Washington. The project site is bounded by Renton Transit Center to the north, Burnett Avenue South to the east, Logan Avenue South to the west, and South 3rd Street to the south. The site covers parcels no. 5696000055, 5696000065, 5696000120, 0007200188, and 5696000050 per parcel records of King County, Washington. Parcel no. 0007200188 is owned by Seattle Public Utilities (SPU) located in the south portion of the project site. The project site includes Renton Pavilion Events Center building (Market), concrete paving parking stalls, concrete pedestrian walkways and plaza, one driveway, landscaping, and Piazza Park. The park contains concrete pedestrian walkways, water features, trees, and landscaping. Refer to Figure 1-1 for a vicinity map. The project proposes minor site, utility, and right-of-way improvements associated with the renovation of the existing Market building and Piazza Park. Site improvements include a new driveway on Burnett Avenue South, a new temporary trash enclosure, parking lot restriping to the north of the Market, and a new vestibule entry on the south side of the building. Utility improvements associated with the Market building include installation of new grease interceptor and associated side sewer piping. Site improvements on Piazza Park include existing pavement restoration and park reconfiguration including new pedestrian walkways, landscaping, and drainage collection. Utility improvements associated with the Piazza Park include installation of new pedestrian lighting within the Piazza Park and Logan Avenue South right-of-way, and new drainage infrastructure. Refer to Appendix A for the TIR Worksheet. Figure 1-1: Vicinity Map KPFF Consulting Engineers 2 EXISTING CONDITIONS The site consists of the Renton Pavilion Events Center building, parking area, and the Piazza Park. The site slopes from east to west at 1.0 to 5.0%. Runoff from the site is collected via catch basins and area drains on-site and is conveyed to storm drainage infrastructure along the western and eastern property frontages in Logan Avenue South and Burnett Avenue South. The majority of the site’s runoff north of the Market building is collected via catch basins and then discharges to the existing 18-inch public storm drain in Logan Avenue South. The eastern edge of the site’s runoff, sheet flows to catch basins located in the Burnett Avenue South right-of-way, which are collected by a 12-in public storm drain. Both systems ultimately discharge to Cedar River. The northern portion of the Piazza Park site’s storm drainage system discharges to an existing catch basin in Logan Avenue South right-of-way and drains to the same 18-inch public storm drain in Logan Avenue South, which ultimately discharges to Cedar River. The southern portion of the Piazza Park site’s storm drainage system discharges to an existing 12-inch public storm drain in Logan Avenue South that drains to the west and ultimately discharges to Black River. Refer to Appendix B for a GIS map of the existing storm drainage system. The on-site improvements area is approximately 19,683 square feet (0.452 acres). Refer to Appendix B for an existing conditions map. Refer to Table 1-1 for a summary of existing surfaces. Table 1-1: Project’s Existing Surface Areas No. Surface Description Area (sf) Area (acre) 1 Impervious Surface 9,802 0.225 2 Pervious Surface 9,881 0.227 Total 19,683 0.452 Soil conditions for the site are interpreted to be Urban Land soil category per the USDA Web Soil Survey. Refer to Appendix B for the soils map. PROPOSED CONDITIONS The site improvements consist of pedestrian pavement replacement at the Market building vestibule and Piazza Park, utility trenching for sewer, parking lot restriping, new pedestrian lighting and associated utility trenching, and new trees and landscaping at Piazza Park. A new concrete vehicle driveway will be constructed on Burnett Avenue South for additional site access. New pedestrian lighting along with minor sidewalk replacement is proposed on Logan Avenue South right-of-way. The proposed site improvements will continue to maintain the existing drainage pattern. Refer to Table 1-2 for a summary of the project’s proposed surface areas. Renton Market and Piazza – City of Renton 3 Table 1-2: Project’s Proposed Surface Areas No. Surface Description Area (sf) Area (acre) 1 Non-Pollution-Generating Impervious Surface (NPGIS): Pedestrian Pavement 10,275 0.236 2 Pollution-Generating Impervious Surface (PGIS): Road and Driveway 579 0.013 3 Pollution-Generating Pervious Surface (PGPS): Landscape 8,829 0.203 Total 19,683 0.452 Refer to Appendix B for a proposed conditions exhibit. The proposed project follows the requirements of the 2022 City of Renton Surface Water Design Manual (RSWDM). The minimum requirements for drainage review were determined using the manual and are detailed in the following sections of this report. 2. Conditions and Requirements Summary The proposed redevelopment project results in more than 2,000 square feet but less than 50 acres of new plus replaced impervious surface; therefore, a “Full Drainage Review” is required per the RSWDM, Section 1.1.2.4. The following is a summary of how the project will comply with the nine core requirements and six special requirements. Refer to Appendix C for minimum requirements and Appendix D for civil plans. CORE REQUIREMENT NO. 1: DISCHARGE AT THE NATURAL LOCATION The project will maintain the existing topography and drainage patterns of the site. Runoff from the project site will continue to be discharged to the existing public stormwater conveyance systems in Logan Avenue South and Burnett Avenue South. The existing systems ultimately discharge to Cedar River and Black River. Therefore, the project meets the discharge requirements in Section 1.2.1 of the RSWDM. Refer to Appendix C for a GIS map of the downstream drainage system. CORE REQUIREMENT NO. 2: OFF-SITE ANALYSIS Per RSWDM, Section 1.2.2, the project does not significantly change the rate, volume, duration, or location of discharges to and from the project site, therefore is exempt from off-site analysis. Proposed improvements include replacing existing impervious surface in kind with impervious surface having similar runoff-generating characteristics and adding minimal new impervious surface. Refer to Appendix C for a GIS map of the downstream drainage system. CORE REQUIREMENT NO. 3: FLOW CONTROL Per RSWDM, Section 1.2.3, The project proposes more than 5,000 square feet of new plus replaced impervious surface, therefore flow control facilities are required. However, because the site is located within KPFF Consulting Engineers 4 the Peak Rate Flow Control Standard Area and has minimal increase in site runoff, this project is exempt from flow control. Refer to Section 4 for flow control exemption calculations. CORE REQUIREMENT NO. 4: CONVEYANCE SYSTEM Per RSWDM, Section 1.2.4.1, the proposed project is required to provide conveyance system analysis for all new conveyance system elements. The project proposes replacing a portion of the existing storm drainage system with new area drains, storm drainage pipes, a new trench drain in the building vestibule and a new catch basin in Logan Street right-of-way. Refer to Section 5 of this report for conveyance design and calculation details. CORE REQUIREMENT NO. 5: CONSTRUCTION STORMWATER POLLUTION PREVENTION Temporary Erosion and Sediment Control (TESC) best management practices (BMPs) will be implemented during construction to prevent the transport of sediment from the project site to the maximum extent practicable. TESC BMPs are anticipated to include silt fences, straw wattles, catch basin inserts, and other measures as necessary. Refer to Appendix D for Civil TESC plans. Refer to Section 8 of this report for the Construction Stormwater Pollution Prevention Plan (CSWPPP) analysis and design. CORE REQUIREMENT NO. 6: MAINTENANCE AND OPERATIONS The owner is responsible for the maintenance and operations of the proposed drainage structures. Refer to Section 9 of this report for maintenance and operations discussion. CORE REQUIREMENT NO. 7: FINANCIAL GUARANTEES AND LIABILITY The project will post a construction bond, assignment of funds, or a certified check before a building permit is issued in accordance with the COR Municipal Code 4-6-030. The applicant will also maintain liability insurance throughout the duration of construction. A maintenance bond will also be submitted to the COR before receiving acceptance of any newly constructed on-site private storm drain improvements. Refer to Section 9 of this report for bond quantities, facility summaries, and declaration of covenant discussion. CORE REQUIREMENT NO. 8: WATER QUALITY Per RSWDM, the proposed project has less than 5,000 square feet of new plus replaced impervious surface (PGIS), and less than ¾ acres of pollutant generation pervious surface (PGPS), therefore is exempt from the water quality requirement. Renton Market and Piazza – City of Renton 5 CORE REQUIREMENT NO. 9: ON-SITE BMPS Per RSWDM, all proposed projects, including redevelopment projects, must provide on-site BMPs to mitigate the impacts of storm and surface water runoff generated by new impervious surface, new pervious surface, existing impervious surfaces, and replaced impervious surface targeted for mitigation. For non-subdivision projects making improvements on an individual site/lot, implementation of this requirement shall be in accordance with the “Individual Lot BMP Requirements” in Section 1.2.9.2 of the RSWDM. On-site BMP requirements may be satisfied through two methods: (1) application of BMPs to the maximum extent feasible, or (2) complying with the Low Impact Development (LID) Performance Standard. The project will provide on-site BMPs to the maximum extent feasible for the replaced impervious surfaces. Following is the evaluation of feasibility and applicability of small lot BMPs for this project per Section 1.2.9.2.1 of the RSDM. Refer to Table 2-1 for infeasibility criteria per the RSWDM. Full Dispersion The site cannot accommodate the required minimum native vegetated flowpath; therefore, full dispersion is considered infeasible per Section C.2.1.1 of the RSWDM. Full and Limited Infiltration The project site is located within Wellhead Protection Area, Zone 1 of the Aquifer Protection Area (APA), per City of Renton GIS maps. Per Section 1.3.6, Special Requirement No. 6, it is prohibited to provide on-site BMPs that rely on infiltration, such as bioretention and permeable pavement. Also, per Section C2.2, this BMP is not allowed in Zone 1 of the APA. Rain Gardens The project site is located within Wellhead Protection Area, Zone 1 of the APA, per City of Renton GIS maps. This BMP is not allowed in Zone 1 of the APA per Section C2.12 of the RSWDM. Bioretention The project site is located within Wellhead Protection Area, Zone 1 of the APA, per City of Renton GIS maps. Per Section 1.3.6, Special Requirement No. 6, it is prohibited to provide on-site BMPs that rely on infiltration, such as bioretention and permeable pavement. Also, per Section C2.6, this BMP is not allowed in Zone 1 of the APA. Permeable Paving The project site is located within Wellhead Protection Area, Zone 1 of the APA, per City of Renton GIS maps. Per Section 1.3.6, Special Requirement No. 6, it is prohibited to provide on-site BMPs that rely on infiltration, such as bioretention and permeable pavement. In addition, per Section C2.7, this BMP is not allowed in Zone 1 of the APA. For this project, the replaced impervious surface consists of replacing/patching portions of existing conditions and matching in kind. Basic Dispersion The site cannot accommodate the required minimum native vegetated flowpath; therefore, basic dispersion is considered infeasible per Section C.2.4.1 of the RSWDM. KPFF Consulting Engineers 6 Table 2-1: On-site BMPs Infeasibility Criteria No. BMP Feasibility Infeasibility Criteria 1 Full Dispersion Infeasible Section C.2.1: Full dispersion is considered infeasible and not required for projects that cannot meet the minimum design requirements listed below. • Minimum Design Requirement No. 3: A native vegetated flowpath segment of at least 100 feet in length (25 feet for sheet flow from a nonnative pervious surface) must be available along the flowpath that runoff would follow upon discharge from a dispersion device. 2 Full Infiltration Infeasible Section C2.2: This BMP is not allowed in Zone 1 of the Aquifer Protection Area. 3 Rain Gardens Infeasible Section C2.12: This BMP is not allowed in Zone 1 of the Aquifer Protection Area. 4 Bioretention Infeasible Section C.2.6: This BMP is not allowed in Zone 1 of the Aquifer Protection Area. 5 Permeable Paving Infeasible Section C2.7: This BMP is not allowed in Zone 1 of the Aquifer Protection Area. 6 Basic Dispersion Infeasible Section C.2.4: Basic dispersion is considered infeasible and not required for projects that cannot meet the minimum design requirements listed below. • Minimum Design Requirement No. 2: Each dispersion device must discharge runoff such that it flows over a minimum distance of vegetated area called the “vegetated flowpath segment.” The minimum distance, or length of the flowpath segment, is specified in the design specifications for each device. SPECIAL REQUIREMENT NO. 1: OTHER ADOPTED AREA -SPECIFIC REQUIREMENTS There are no adopted area-specific regulations for the site. Therefore, Special Requirement No. 1 is not applicable to the project. SPECIAL REQUIREMENT NO. 2: FLOOD HAZARD AREA DELINEATION Per the City of Renton GIS Maps, the project does not contain and is not adjacent to a flood hazard area. Per the FEMA Flood Map Service Center, the project site is within the “Other Flood Areas,” Zone X, with the annotation of 500-year flood chance. Per RSWDM, flood hazard areas are composed of the 100-year floodplain, zero-rise flood fringe, zero-rise floodway, and FEMA floodway. Since Zone X is not considered a 100-year flood hazard area, Special Requirement No. 2 is not applicable to this project. Refer to Appendix C for the FEMA FIRM Map. SPECIAL REQUIREMENT NO. 3: FLOOD PROTECTION FACILITIES The project will not rely on existing or proposed flood protection facilities for protection against hazards posed by erosion or inundation. Therefore, Special Requirement No. 3 is not applicable to this project. Renton Market and Piazza – City of Renton 7 SPECIAL REQUIREMENT NO. 4: SOURCE CONTROL Water quality source controls applicable to this project will be applied in accordance with the King County Stormwater Pollution Prevention Manual and Renton Municipal Code, Title IV. The proposed trash enclosure includes roof to prevent rainwater interaction with dumpster/trash receptacles. SPECIAL REQUIREMENT NO. 5: OIL CONTROL The site is not considered high-use because its anticipated average daily traffic count is less than 100 vehicles per 1,000 square feet of gross building area; therefore, Special Requirement No. 5 is not applicable. SPECIAL REQUIREMENT NO. 6: AQUIFER PROTECTION AREA Per the City of Renton GIS Maps, the site is located within the Wellhead Protection Area, Zone 1 of the APA. The project does not propose any type of prohibited systems including flow control facilities, on-site BMPs that rely on infiltration, or open channel conveyance systems. Refer to Appendix C for the City of Renton Critical Areas Map. 3. Off-Site Analysis (N/A) As mentioned in Section 2, Core Requirement No. 2, this project is exempt from off-site analysis. Therefore, this section is not applicable. 4. Flow Control, Low Impact Development (LID), and Water Quality Facility Analysis and Design (N/A) As mentioned in the Core Requirements summary, this project is exempt from flow control and water quality requirements. Refer to Section 2 of this report. FLOW CONTROL EXEMPTION Per City of Renton GIS maps, the projects site is located in subsection “Peak Rate (Existing)” of the Area- Specific Flow Control Facility Requirement. Refer to Appendix E for City of Renton Flow Control Application GIS map. Per RSWDM, Section 1.2.3.1, the exception criteria for the Peak Rate Flow Control Standard Areas are as follows: “The facility requirement in Peak Rate Flow Control Standard Areas may be waived for any threshold discharge area of a redevelopment project in which all of the following criteria are met: a) The target surfaces subject to the Peak Rate Flow Control Standard Areas facility requirement will generate no more than a 0.15-cfs increase (when modeled using 15 -minute time steps) in the existing site conditions 100 -year peak flow (modeled using same time step unit (e.g., 15 -minute) used to calculate the developed flow) at any natural discharge location from the project site. KPFF Consulting Engineers 8 b) The increased runoff from target surfaces will not significantly impact a critical area, severe flooding problem, or severe erosion problem.” The project is increasing the impervious area by approximately 925 square feet. MGSFlood model results for existing conditions and proposed conditions show that the 100-year peak flow rate is increased by approximately 0.02-cfs (cubic feet per second). The increased runoff will not significantly impact a critical area, severe flooding problem, or severe erosion problem. Therefore, the project meets the exemption criteria for flow control. Refer to Table 4-1 for the increase in peak flow rates from the existing to proposed conditions. Table 4-1: Site Peak Flows Peak Flow Rate Existing Conditions Proposed Conditions Delta 2-yr 0.105-cfs 0.112-cfs 0.007-cfs 25-yr 0.170-cfs 0.179-cfs 0.009-cfs 100-yr 0.356-cfs 0.372-cfs 0.016-cfs Refer to Appendix E for flow rates MGSFlood calculations. 5. Conveyance System Analysis and Design The project will replace the existing area drain adjacent the south vestibule entry with a 4-inch trench drain. The grading has been revised to move the low point away from the doors to the Market but will continue to collect the same area. The proposed trench drain will be connected to an existing 8-inch storm drain. The total drainage area for the trench drain is approximately 5,720-square feet, which results in a 0.38-cfs during a 25- year 24-hour rainfall event. The 4-inch trench drain will have a minimum depth of 9.8-inches and will have the minimum capacity of 0.38-cfs with 9.7-inches of minimum nominal upstrem depth. The existing 8-inch storm drain at the proposed south vestibule will be rerouted to avoid the proposed structural foundations. Approximately 3,500-square feet of existing roof will also be redirected to the existing 8-inch storm drain at the south vestibule entry. The total drainage area for the proposed 8-inch storm drain is approximately 16,855- square feet and will result in the flow rate of 0.96-cfs during a 25-year 24-hour rainfall event. The proposed 8- inch storm drain, sloped at 0.4%, has a full flow capacity rate of 0.99-cfs, therefore has sufficient capacity to drain the contributing area. The runoff at Piazza Park will be collected through existing and proposed area drains and proposed french drains on-site. The proposed storm drainage pipe system will be connected to an existing catch basin in Logan Street right-of-way. This area collected by the proposed storm drainage system is approximately 10,613-sf resulting in 0.83-cfs during a 25-year 24-hour rainfall event. The proposed 8-inch storm drain, sloped at a minimum slope of 0.65%, has a full flow capacity of 1.06-cfs, therefore has sufficient capacity to carry the flow. Refer to Appendix F for basin map and conveyance calculations. Renton Market and Piazza – City of Renton 9 6. Special Reports and Studies (N/A) A Geotechnical Engineering Report was prepared by Associated Earth Sciences titled “Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report - City of Renton Pavilion” dated October 31, 2024. The explorations found soils to consist of existing fill and Holocene alluvial deposits. It determined that on-site infiltration for surface water drainage is infeasible due to the presence of existing fill and shallow groundwater level. Refer to Appendix I for a copy of the Geotechnical Engineering Report. 7. Other Permits The required permits associated with the project are listed below. This report covers the requirements pertaining to the “Civil Construction Permit” submitted to the City of Renton. Table 7-1: Required Permits Agency Permit/Approval City of Renton Civil Construction Permit City of Renton Building Permit DOE (Department of Ecology) SEPA (State Environmental Policy Act) 8. Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design PART 8.A: EROSION AND SEDIMENT CONTROL PLAN ANALYSIS AND DESIGN Temporary and permanent erosion and sediment control (ESC) measures will be implemented per Appendix D, Section D.2.1, of the RSWDM. 1. Clearing Limits: Prior to any site clearing or grading, areas to remain undisturbed during project construction shall be delineated on the project’s ESC plan and physically marked on the project site. 2. Cover Measures: Temporary and permanent cover measures shall be provided when necessary to protect disturbed areas. The intent of these measures is to prevent erosion by having as much area as possible covered during any period of precipitation. 3. Perimeter Protection: Perimeter protection to filter sediment from sheet flow shall be provided downstream of all disturbed areas prior to upslope grading. 4. Traffic Area Stabilization: Unsurfaced entrances, roads, and parking areas used by construction traffic shall be stabilized to minimize erosion and tracking of sediment off-site. 5. Sediment Retention: Surface water collected from all disturbed areas of the site shall be routed through a sediment pond or trap prior to release from the site, except those areas at the perimeter of the site small enough to be treated solely with perimeter protection. Sediment retention facilities shall be installed prior to grading any contributing area. 6. Surface Water Collection: Surface water collection measures (e.g., ditches, berms, etc.) shall be installed to intercept all surface water from disturbed areas, convey it to a sediment pond or trap, and KPFF Consulting Engineers 10 discharge it downstream of any disturbed areas. Areas at the perimeter of the site, which are small enough to be treated solely with perimeter protection, do not require surface water collection. Significant sources of upstream surface water that drain onto disturbed areas shall be intercepted and conveyed to a stabilized discharge point downstream of the disturbed areas. Surface water collection measures shall be installed concurrently with or immediately following rough grading and shall be designed, constructed, and stabilized as needed to minimize erosion. 7. Dewatering Control: The water resulting from construction site dewatering activities must be treated prior to discharge or disposed of as specified. 8. Dust Control: Preventative measures to minimize wind transport of soil shall be implemented when a traffic hazard may be created or when sediment transported by wind is likely to be deposited in water resources. 9. Flow Control: Surface water from disturbed areas must be routed through the project’s on-site flow control facility or other provisions must be made to prevent increases in the existing site conditions 2-year and 10-year runoff peaks discharging from the project site during construction (flow control facility, runoff treatment facility, and on-site BMP areas [existing or proposed] shall not be used for this purpose). 10. Control Pollutants: Stormwater pollution prevention (SWPPS) measures are required to prevent, reduce, or eliminate the discharge of pollutants to on-site or adjacent stormwater systems or watercourses from construction-related activities such as materials delivery and storage, on-site equipment fueling and maintenance, demolition of existing buildings and disposition of demolition materials and other waste, and concrete handling, washout and disposal. Section D.2.2 describes BMPs specific to this purpose; additionally, several of the ESC BMPs described herein are applicable. 11. Protect Existing and Proposed Stormwater Facilities and On-Site BMPs: Sedimentation and soil compaction reduce the infiltration capacity of native and engineered soils. Protection measures shall be applied/installed and maintained so as to prevent adverse impacts to existing stormwater facilities and on-site BMPs and areas of proposed stormwater facilities and on-site BMPs for the project. Adverse impacts can prompt the requirement to restore or replace affected stormwater facilities and on-site BMPs. 12. Maintain Protective BMPs: Protection measures shall be maintained to ensure continued performance of their intended function, to prevent adverse impacts to existing BMPs/facilities and areas of proposed BMPs/facilities, and protect other disturbed areas of the project. 13. Manage the Project: Coordination and timing of site development activities relative to ESC concerns, and timely inspection, maintenance and update of protective measures are necessary to effectively manage the project and ensure the success of protective ESC and SWPPS design and implementation. PART 8.B: STORMWATER POLLUTION PREVENTION AND SPILL CONTROL PLAN DESIGN Stormwater pollution prevention and spill control (SWPPS) measures will be implemented per Section D.2.2 of the RSWDM. • Follow effective pollutant handling and disposal procedures. • Provide cover and containment for materials, fuel and other pollutants. • Manage the project site to maximize pollutant control and minimize pollutant sources. • Protect from spills and drips of petroleum products and other pollutants. Renton Market and Piazza – City of Renton 11 • Avoid overapplication or untimely application of chemicals and fertilizers. • Prevent or treat contamination of stormwater runoff by pH modifying sources. 9. Bond Quantities, Facility Summaries, and Declaration of Covenant The Site Improvement Bond Quantity Worksheet is included in Appendix G. A drainage facility declaration of covenant and grant of easement will be recorded at the King County office of Records and Elections for the privately maintained drainage facilities on-site. Flow Control and Water Quality Facility Summary Sheets are not applicable to this project, since the project does not propose any flow control and water quality facilities. 10. Operations and Maintenance Manual The proposed stormwater structures on-site consist of a trench drain for collection and storm drainage pipes for conveyance. A copy of RSWDM “maintenance requirements for stormwater facilities and on-site BMPs” for on-site structures is included in Appendix H. a bond and declaration of covenant are not required for city owned property Renton Market and Piazza – City of Renton Appendix A Appendix A TIR Worksheet CITY OF RENTON SURFACE WATER DESIGN MANUAL 2022 City of Renton Surface Water Design Manual 6/22/2022 8-A-1 REFERENCE 8-A TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner _____________________________ Phone ___________________________________ Address __________________________________ _________________________________________ Project Engineer ___________________________ Company _________________________________ Phone ___________________________________ Project Name __________________________ CED Permit # ________________________ Location Township ________________ Range __________________ Section _________________ Site Address __________________________ _____________________________________ Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS  Land Use (e.g., Subdivision / Short Subd.)  Building (e.g., M/F / Commercial / SFR)  Grading  Right-of-Way Use  Other _______________________  DFW HPA  COE 404  DOE Dam Safety  FEMA Floodplain  COE Wetlands  Other ________  Shoreline Management  Structural Rockery/Vault/_____  ESA Section 7 Part 5 PLAN AND REPORT INFORMATION Technical Information Report Site Improvement Plan (Engr. Plans) Type of Drainage Review (check one): Date (include revision dates): Date of Final:  Full  Targeted  Simplified  Large Project  Directed __________________ __________________ __________________ Plan Type (check one): Date (include revision dates): Date of Final:  Full  Modified  Simplified __________________ __________________ __________________ Heather Lewison KPFF Consulting Engineers 206.926.0648 Renton Market and Piazza 233 Burnett Avenue South, Renton, WA 98057 ü Civil Construction Permit ü City of Renton 1055 S Grady Way, Renton, WA 98057 18 23 North 05 East 04/16/2025 ü 425.430.6400 04/16/2025 REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-2 Part 6 SWDM ADJUSTMENT APPROVALS Type (circle one): Standard / Blanket Description: (include conditions in TIR Section 2) ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Approved Adjustment No. ______________________ Date of Approval: _______________________ Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: _______________________ Completion Date: _______________________ Describe: _________________________________ _________________________________________ _________________________________________ Re: SWDM Adjustment No. ________________ Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan: ____________________________________________________________________ Special District Overlays: ______________________________________________________________ Drainage Basin: _____________________________________________________________________ Stormwater Requirements: _____________________________________________________________ Part 9 ONSITE AND ADJACENT SENSITIVE AREAS  River/Stream ________________________  Lake ______________________________  Wetlands ____________________________  Closed Depression ____________________  Floodplain ___________________________  Other _______________________________ _______________________________  Steep Slope __________________________  Erosion Hazard _______________________  Landslide Hazard ______________________  Coal Mine Hazard ______________________  Seismic Hazard _______________________  Habitat Protection ______________________  _____________________________________ ü Aquifer Protection Area (Zone 1) N/A Lower Cedar River and Black River REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2022 City of Renton Surface Water Design Manual 6/22/2022 Ref 8-A-3 Part 10 SOILS Soil Type ______________________ ______________________ ______________________ ______________________ Slopes ________________________ ________________________ ________________________ ________________________ Erosion Potential _________________________ _________________________ _________________________ _________________________  High Groundwater Table (within 5 feet)  Other ________________________________  Sole Source Aquifer  Seeps/Springs  Additional Sheets Attached Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE  Core 2 – Offsite Analysis_________________  Sensitive/Critical Areas__________________  SEPA________________________________  LID Infeasibility________________________  Other________________________________  _____________________________________ LIMITATION / SITE CONSTRAINT _______________________________________ _______________________________________ _______________________________________ _______________________________________ _______________________________________ _______________________________________  Additional Sheets Attached Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: (name or description) Core Requirements (all 9 apply): Discharge at Natural Location Number of Natural Discharge Locations: Offsite Analysis Level: 1 / 2 / 3 dated:__________________ Flow Control (include facility summary sheet) Standard: _______________________________ or Exemption Number: ____________ Conveyance System Spill containment located at: _____________________________ Erosion and Sediment Control / Construction Stormwater Pollution Prevention CSWPP/CESCL/ESC Site Supervisor: _____________________ Contact Phone: _________________________ After Hours Phone: _________________________ Maintenance and Operation Responsibility (circle one): Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Liability Provided: Yes / No N/A N/A Renton Market and Piazza project site has two Threshold Discharge Areas, Cedar River and Black River. 2 Aquifer Protection Area (Zone 1) The site is within Wellhead Protection Area. Therefore, Infiltration is prohibited. N/A Urban Land The project is addressing Core Requirement No. 9 (On-site BMPs) through application of BMPs to the maximum extent feasible, however applicable and available BMP's are not feasible. ü ü ü ü REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-4 Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Water Quality (include facility summary sheet) Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog or Exemption No. _______________________ On-site BMPs Describe: Special Requirements (as applicable): Area Specific Drainage Requirements Type: SDO / MDP / BP / Shared Fac. / None Name: ________________________ Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None 100-year Base Flood Elevation (or range): _______________ Datum: Flood Protection Facilities Describe: Source Control (commercial / industrial land use) Describe land use: Describe any structural controls: Oil Control High-Use Site: Yes / No Treatment BMP: _________________________________ Maintenance Agreement: Yes / No with whom? _____________________________________ Other Drainage Structures Describe: N/A All on-site BMPs are infeasible. N/A N/A N/A N/A REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2022 City of Renton Surface Water Design Manual 6/22/2022 Ref 8-A-5 Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION  Clearing Limits  Cover Measures  Perimeter Protection  Traffic Area Stabilization  Sediment Retention  Surface Water Collection  Dewatering Control  Dust Control  Flow Control  Control Pollutants  Protect Existing and Proposed BMPs/Facilities  Maintain Protective BMPs / Manage Project MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION  Stabilize exposed surfaces  Remove and restore Temporary ESC Facilities  Clean and remove all silt and debris, ensure operation of Permanent BMPs/Facilities, restore operation of BMPs/Facilities as necessary  Flag limits of sensitive areas and open space preservation areas  Other _______________________ Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch) Flow Control Description Water Quality Description On-site BMPs Description  Detention  Infiltration  Regional Facility  Shared Facility  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________  Vegetated Flowpath  Wetpool  Filtration  Oil Control  Spill Control  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________  Full Dispersion  Full Infiltration  Limited Infiltration  Rain Gardens  Bioretention  Permeable Pavement  Basic Dispersion  Soil Amendment  Perforated Pipe Connection  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ Infeasible N/A N/A Infeasible Infeasible Infeasible Infeasible Infeasible Infeasible Infeasible Infeasible Infeasible ü ü ü ü üü ü ü ü ü ü ü ü ü REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-6 Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS  Drainage Easement  Covenant  Native Growth Protection Covenant  Tract  Other ____________________________  Cast in Place Vault  Retaining Wall  Rockery > 4′ High  Structural on Steep Slope  Other _______________________________ Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. ____________________________________________________________________________________ Signed/Date N/A Light Pole Foundationsü 2025-04-15 Renton Market and Piazza – City of Renton Appendix B Appendix B Existing and Proposed Conditions Map Existing Drainage System GIS Map Soils Map • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • S 3RD ST LO G A N A V E S BU R N E T T A V E S LEGEND - RENTON PAVILION SITE SURFACE AREA (SF)AREA (AC) IMPERVIOUS AREA 9,802 0.225 PERVIOUS AREA 9,881 0.227 TOTAL ON-SITE AREA 19,683-SF 0.452-AC LIMITS OF WORK RENTON MARKET & PIAZZA EXISTING CONDITIONS April 2025 0 1 inch = 10 feet 5'10'20' APRIL 2025 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 37.8 37. 6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36.8 37. 0 37. 2 3 7 . 4 37. 2 37. 4 37.6 37.8 37.6 37.8 38.0 38.2 38. 4 38.2 3 8 . 4 3 8 . 6 38 . 6 38 . 8 39. 0 38.8 38.6 38.8 38.4 38.6 38.8 38.8 38.6 37.6 37.4 37.2 37.0 36.8 S 3RD ST LO G A N A V E S BU R N E T T A V E S LO G A N A V E S RENTON PAVILION EVENT CENTER LEGEND - RENTON PAVILION SITE SURFACE AREA (SF)AREA (AC) NON-POLLUTION GENERATING IMPERVIOUS SURFACE (NPGIS)10,275 0.236 POLLUTION-GENERATING IMPERVIOUS SURFACE (PGIS)579 0.013 POLLUTION-GENERATING PERVIOUS SURFACE (PGPS)8,829 0.203 TOTAL ON-SITE AREA 19,683-SF 0.452-AC LIMITS OF WORK RENTON MARKET & PIAZZA PROPOSED CONDITIONS April 2025 0 1 inch = 10 feet 5'10'20' APRIL 2025 2,257 188 WGS_1984_Web_Mercator_Auxiliary_Sphere Notes Legend 128 0 64 128 Feet All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. None City and County Labels Addresses Parcels City and County Boundary Renton <all other values> Network Structures Public Access Riser Private Access Riser Public Inlet Private Inlet Public Manhole Private Manhole Public Utility Vault Private Utility Vault Public Clean Out Private Clean Out Public Unknown Private Unknown Pump Station Public Pump Station Private Pump Station Discharge Point Public Discharge Point Private Discharge Point Water Quality Public Water Quality Private Water Quality Detention Facilities Public Detention Facility Private Detention Facility Pipe Flow Direction Pipe Public Pipe Private Pipe Public Culvert Private Culvert Public Roofdrain Private Roofdrain Open Drains Virtual Drainline Facility Outline Vegetated COR GIS Map - Storm Drainage System Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2024 Page 1 of 3 52 5 8 3 0 0 52 5 8 4 0 0 52 5 8 5 0 0 52 5 8 6 0 0 52 5 8 7 0 0 52 5 8 8 0 0 52 5 8 9 0 0 52 5 9 0 0 0 52 5 9 1 0 0 52 5 9 2 0 0 52 5 9 3 0 0 52 5 9 4 0 0 52 5 8 3 0 0 52 5 8 4 0 0 52 5 8 5 0 0 52 5 8 6 0 0 52 5 8 7 0 0 52 5 8 8 0 0 52 5 8 9 0 0 52 5 9 0 0 0 52 5 9 1 0 0 52 5 9 2 0 0 52 5 9 3 0 0 52 5 9 4 0 0 558900 559000 559100 559200 559300 559400 559500 559600 559700 559800 559900 560000 560100 560200 560300 560400 560500 560600 558900 559000 559100 559200 559300 559400 559500 559600 559700 559800 559900 560000 560100 560200 560300 560400 560500 560600 560700 47° 29' 9'' N 12 2 ° 1 3 ' 7 ' ' W 47° 29' 9'' N 12 2 ° 1 1 ' 3 9 ' ' W 47° 28' 30'' N 12 2 ° 1 3 ' 7 ' ' W 47° 28' 30'' N 12 2 ° 1 1 ' 3 9 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 400 800 1600 2400 Feet 0 100 200 400 600 Meters Map Scale: 1:8,440 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. Project Site MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 19, Aug 29, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 31, 2022—Aug 8, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2024 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AkF Alderwood and Kitsap soils, very steep 12.2 3.3% AmC Arents, Alderwood material, 6 to 15 percent slopes 16.0 4.3% BeD Beausite gravelly sandy loam, 15 to 30 percent slopes 10.8 2.9% Pc Pilchuck loamy fine sand 5.4 1.4% Rh Riverwash 3.6 1.0% Ur Urban land 314.6 85.1% W Water 7.3 2.0% Totals for Area of Interest 369.9 100.0% Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2024 Page 3 of 3 Renton Market and Piazza – City of Renton Appendix C Appendix C Core Requirements • Drainage Review Required Flow Chart • Minimum Requirements Table • Downstream Drainage System Map • Critical Areas Map- Wellhead Protection Area Zones • FEMA Flood Insurance Rate Map (FIRM) SECTION 1.1 DRAINAGE REVIEW 6/22/2022 2022 City of Renton Surface Water Design Manual 1-14 FIGURE 1.1.2.A FLOW CHART FOR DETERMINING TYPE OF DRAINAGE REVIEW REQUIRED 1.1.2 DRAINAGE REVIEW TYPES AND REQUIREMENTS 2022 City of Renton Surface Water Design Manual 6/22/2022 1-15 TABLE 1.1.2.A REQUIREMENTS APPLIED UNDER EACH DRAINAGE REVIEW TYPE Simplified Single family residential projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity but do not exceed the new plus replaced PGIS, new PGPS, and new pervious surface thresholds specified in Sec. 1.1.2.1. Note: The project may also be subject to Targeted Drainage Review. Directed Single family residential projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity that are not subject to Simplified Drainage Review or Large Project Drainage Review. The project may also be subject to Targeted Drainage Review. Targeted New and redevelopment projects that are not subject to Directed, Full or Large Project Drainage Review, AND have characteristics of one or more of the following categories of projects: 1. Projects containing or adjacent to a flood, erosion, or steep slope hazard area; or projects within a Landslide Hazard Drainage Area or Aquifer Protection Area. 2. Projects that construct or modify a drainage pipe/ditch that is 12″ or larger or receive runoff from a 12″ or larger drainage pipe/ditch. 3. Redevelopment projects with $100,000 in improvements to a high-use site.(1) Full All projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity but are not subject to Simplified Drainage Review, Directed Drainage Review, OR Large Project Drainage Review. Large Project Projects that result in 50 acres of new impervious surface within a subbasin or multiple subbasins that are hydraulically connected. DRAINAGE REVIEW TYPE Simplified Directed Targeted Full Large Project Categ 1 Categ 2 Categ 3 SIMPLIFIED DRAINAGE REQUIREMENTS SEE NOTE 4 CORE REQUIREMENT #1 Discharge at Natural Location (4)  (2,3) *(2)    CORE REQUIREMENT #2 Offsite Analysis (4)  (2,3) *(2) (3) (3) (3) CORE REQUIREMENT #3 Flow Control Facilities (4)  (2,3) *(2) (3) (3) CORE REQUIREMENT #4 Conveyance System (4)  (2,3) *(2)    CORE REQUIREMENT #5 Construction Stormwater Pollution Prevention (4)  (2,3)      CORE REQUIREMENT #6 Maintenance & Operations (4)  (2,3) *(2)     CORE REQUIREMENT #7 Financial Guarantees & Liability (4)  (2,3) *(2) (3) (3) (3) (3) CORE REQUIREMENT #8 Water Quality Facilities (4)  (2,3) *(2) (3) (3) CORE REQUIREMENT #9 On-site BMPs (4)    SECTION 1.1 DRAINAGE REVIEW TABLE 1.1.2.A REQUIREMENTS APPLIED UNDER EACH DRAINAGE REVIEW TYPE DRAINAGE REVIEW TYPE Simplified Directed Targeted Full Large Project Categ 1 Categ 2 Categ 3 SPECIAL REQUIREMENT #1 Other Adopted Area-Specific Requirements (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #2 Flood Hazard Area Delineation (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #3 Flood Protection Facilities (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #4 Source Control (4)  (2,3) (3) (3) (3) (3) (3) SPECIAL REQUIREMENT #5 Oil Control (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #6 Aquifer Protection Areas  (2,3) (3) (3) (3) (3) (3) (1) Category 3 projects installing oil controls that construct or modify a 12-inch pipe/ditch are also Category 2 projects. (2) May be applied by CED based on project or site-specific conditions. Documentation of compliance required. (3) These requirements have exemptions or thresholds that may preclude or limit their application to a specific project. (4) A proposed project subject to Simplified Drainage Review that complies with the Simplified drainage requirements detailed in Appendix C is presumed to comply with all the core and special requirements in Sections 1.2 and 1.3 except those requirements that would apply to the project if it is subject to Targeted Drainage Review as specified in Section 1.1.2.2. 9,1801530 Map Title All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. WGS_1984_Web_Mercator_Auxiliary_Sphere Notes None Legend 1040 0 520 1040Feet City and County Labels Parcels City and County Boundary Renton <all other values> Pump Station Public Pump Station Private Pump Station Discharge Point Public Discharge Point Private Discharge Point Pipe Public Pipe Private Pipe Public Culvert Private Culvert Public Roofdrain Private Roofdrain Open Drains Facility Outline Vegetated Non-Vegetated Facility Transfer Inactive Pipe Inactive Discharge Point Streets Waterbodies 2023.sid Red: Band_1 Green: Band_2 Blue: Band_3 Project Site Storm drainage Conveyance System Outfall Location: Black River COR GIS Map - Downstream Drainage System 4,800800 Map Title All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. WGS_1984_Web_Mercator_Auxiliary_Sphere Notes Legend 544 272 Feet5440 City and County Labels Parcels City and County Boundary Renton <all other values> Network Structures Public Access Riser Private Access Riser Public Inlet Private Inlet Public Manhole Private Manhole Public Utility Vault Private Utility Vault Public Clean Out Private Clean Out Public Unknown Private Unknown Pump Station Public Pump Station Private Pump Station Discharge Point Public Discharge Point Private Discharge Point Water Quality Public Water Quality Private Water Quality Detention Facilities Public Detention Facility Private Detention Facility Pipe Public Pipe Private Pipe Public Culvert Private Culvert Public Roofdrain Private Roofdrain Open Drains Facility Outline Vegetated Non-Vegetated Fence Facility Transfer Inactive Structure Inactive Pipe Inactive Water Quality Project Site Storm drainage Conveyance System Storm drainage Conveyance System Outfall Location: Cedar River COR GIS Map - Downstream Drainage System 2,400 200 WGS_1984_Web_Mercator_Auxiliary_Sphere Map Title Notes None Legend 136 0 68 136 Feet All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. Wellhead Protection Area Zones Zone 1 Zone 1 Modified Zone 2 Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) S - Shoreline F - Fish Np - Non-Fish Ns - Non-Fish Seasonal Unclassfied Wetlands Streets Points of Interest Parks Waterbodies 2023.sid Red: Band_1 Green: Band_2 Blue: Band_3 Project Site COR GIS Map - Critical Areas D D D D D D : : : : : : : : : : : : : : : : :: :: : : : : : : : : , , ,, ,, , , , , b b b b b b b b b bb bbb bb b bbb b b b bbbbb b b b b b b b b b b b b b b b b b bbbb bbbb bbbb b b b b b b bbbbb b b bb b bbbb b b b b bb b b bb b b b b b b b b b b b bbbbbbb b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb b b b b b b b b b b b b b b b b b b b b bbbbbbbbbbbbbbbb b b b b b b b b b b b bbb b b b bbbbb bbbbbb b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbb b b b b b b b b b b b bbbbbb b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbbbbb b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbbbb b b b b b b b b b b b b b b b b b b b b b b b bb b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb b b b b b b b b b b b b b b b b b b b b b b b b b b b b bb b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b bbbbbbbbbb b bbb b bbbbbbbbbbbbb b b b b b bb b b bbbb b b b b b b b b b b b b b b b b b b b b b bb b b b b b b b b AVENUE 114TH S W A Y SUNSET H I LLS DAYTON 1ST STREET S T R E E T AVENUE RENTON AVENUE NE INDEX COUR T 3RD 2ND AVENU E GLENWOOD HARRINGTON EDMONDS AVENUE NE ZONE X 7 R. 4 E. R. 5 E. 23 85TH NE 8 North BoeingBridge AVENUE STREET 87TH S 7AVENUE S STREET 88TH ZONE X 114TH AVE A C C E S S PLACE ¥k405 24 N 22 R O A D BOEING N ENEDRIVE S Cedar River 19 N ZONE X STREET 115TH S PARK N 20 21 10TH BOULEV A R D A PARK ZONE X STRE E T STREET P L A C E NE NE 2 N D S T R E E T NE 2ND SUNSE T 49 S U N S ET 8 T H 17 P L A C E PLACE D RIVE S E FERNDALE PLACE 9TH AVENUE AVENUE NE 10TH PLACE 50 W I N D S OR SE 8 T H INDEX 5TH NE A VENUE HARRINGTO N SE JEFFERSON 6TH NE IN D E X ZONE AE SE 8 T H EDMONDS PLA CE P L A C E ZONE X 4TH PLAC E NE G L E N W OOD 5TH AVENUE N E 54 INDEX PLACE SE P L A C E S E N E NE STREET PLACE NE CEDAR RIVER N E NE AVENUE 52 NE SE 4 T H SE S E N E 53 STREET CAMAS DRIVE AVENUE INDEX SE NE NE C O URT STREET N E 6 T H NE PROFILE BASELINE AVENUE SE CEDAR I N D E X FERNDALE P L A C E AVENUE NE W I N D S OR I N D E X COURT CIRCLE S E LAN E NE 6TH P L A C E PLACE AE INDEX 3 R D ST R E E T NE FERNDALE EDMONDS SE N E NE FERNDALE NE NE NE 9TH NE ZONE X ZONE X SE ROYA L SE RID GE NE RAILROAD FERNDALE PLAC E 51 P L A C E N E 9TH NE G L ENWOOD AVENUE 4TH NE AVENUE AC NE A V ENUE PLACE NE FE R N DALE BOULEVARD SE A C NE NE 10TH STREET NE CT NE 20 FE R N D ALE 8 AVENUE Riverview ParkBridge W AY C O U R T NE SE 2ND INDE X AVENUE NE COURT AF A D AVENUE INDEX AB SE ROYAL STREET H A R RINGTO N HILLS DRIVE BEACON S 2 5 130TH S AVENUE 117TH N W A Y S NE 17 SE PELLY B E A C O N NE WAY A 10TH ZONE AE 3 0 ACCESS TOBIN ST N W 115TH STREET 5TH MONTEREY STREET STREET N E S P ARKING PLACE T A Y L O R DRIVE C E N T E R WHITWORTH AVE EXT 3RD MOSES S C O U RT BOULEVARD 37 AVENUE SUNSET N ¥k405 C OURT S BRONSON VILLAGE 4 7 2ND ST AVENUE W A Y TILLICUM CEMETARY S H NW 5THSTREET SW13THST (EL 24) (EL 24) (EL 24) OP167 SMITHERSAVENUE S AA W Z Y T U K I NE AVENUE GRANT 7TH MORRIS 4TH R I V E R BOEING AVENUE STREET D R I V E SY0152 LANE S RAILROAD S NE W A Y AVENUE SW 4TH 5TH ROAD STREET J I H G F P L A C E SW AVENUE 4TH STREET PLACE STREET STREET AVENUE PLACE AVENUE STEVENS NW RAILROAD 119TH NW 3RD COURT 530088 STREET SENECA SW SW VICTORIA STR S 123RD AVENUE PLACE SENECA AVE SW ZONE X 8 9 T H SW 121ST S AVENUE S LANGSTON N S A V E N U E AVENUE NW STREET S STREET PLACE NW G R A D Y 84TH 19 ZONE X STREET A V E N U E STR S AVENUE S TREET6TH SW BOULEVARD SENECA N W NW 2ND NW 5 TH S AVENUE NW 132ND AVENUE 134TH S P L A C E AV E N U E LIND SW AVENUE A V E N U E PLACE AVENUE SW PLA C E4TH W A Y NW AVENUE LANGSTON PLACE 116TH S AVENUE 1 2 T H S MAPLE S E N E C A NW STREET 4TH PLACE S W 88TH TAYLOR NW 7TH NW SW NW 124THSTREET MAPLE SW S W S NW 121ST LIND HA R D I E P L A C E 5 T H 118TH PLACE SW SY0151 STREET R E N T O N AVENUE NE R E NT O N N NE NW S 116TH STR NW 4TH STREET S AVENUE 8TH P HOUSER PLACE BLAINE BOULEVARD L ZONE AE 530088 N E 44 38 GARDEN ZONE AE 8TH SW CEDAR WIN D S O R 4TH ZONEX STREET S AVENUE TILLICUM CITY OF RENTONSTREET KENWORTH PLACE S PLACE C O U R T N E N CITY OF RENTON N N N 530088 H AR DIE PLACE S LIND 2ND STREET N MARION 2 7 4 T H N ABERDEEN AVENUE NE BLAINELibrary Bridge 20 ZONE X ZONE AE ZONE AH AVENUE M T.OLIVET MILL 2ND M P L A C E N W STEVENS SUNSET AVENUE STREET C A M A S D 3RD 7TH CEDA R STREET STREET AVENUE N BEAC O N S ZONE X AVENUE N 4 5 S N DRIVE SW 12TH ST ZONE X BURNETT CITY OF RENTON 3RD A V E N U E HIGH B RIVER HOUSER S E H O U S E R PLACE 2ND STREET NE SW RENTON S A V E N U E S ROAD NW 88TH HARDIE NW AVENUE W A Y 7TH NE AVENUE R A I NI E R SW 2ND PLACE ZONE WAY WHITWORTH OF R A I N I E R S RAINIER SY0619 RAILRO A D ZONE X MORRIS AVENUE S E BRONSON S S T R E E T S W PELLY MEADOW PARK ZONE X B L AINE AVENUE ABERDEEN 9TH N SW N STREET AVENUE PLACE AVENUE C 3 R D 3 1 3RD NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 23 NORTH, RANGE 5 EAST. MILL B AVENUE SW S SW 1 0 T H 43 18 SUNSET D R I V E CAPRI 87TH S T R E E T RENTON S S S NE 10TH RIVER STREET S STREET 123RD 2 6 PedestrianBridge N 2ND STREET STREET AVENUE S GRADY S 123RD PLACE S 7 A V E N U E N STREET N S G R A D Y AVENUE S PLACE NE PLACE S STREET NE 9TH BLVD N E PLACE PLACES 116TH S ST REET S 6TH 8TH AVENUE ZONE X ¥k405 C E D A R VALLEY X N STREET STREET NE RAILROAD TILLICUM ST 117TH R A I N I E R EARLINGTON PLACE AVENUE AVENUE C BURNETT AVENUE R A I L R O A D 36 S STREET S S 120TH W A Y S 530088 N AVENUE 2 9 7TH 85TH ZONE X N WILLIAMS S 7 N 5TH R A I L R O A D 87TH N W 4 T H S T R E E T CHAMPIONS S AVENUE 8TH ZONE X R I V E R S I D E GRANDE Y S 10TH STR PedestrianBridge R O A D MAPLE AVE SW NW S E PLACE O NE S COURT 18 ZONE R A Y M O N D R AIL R O A D S 1ST 6TH LOGAN SE WILLIAMS AVENUE N E TALB O T ZONEX S W AY NE R I V E R 9 TH AIRPORT 4 6 V AVENUE TRAIL ZONE X RENTON MUNICIPAL AIRPORT STREET STREET N AVENUE 33 CITY OF RENTON MAPLE PLACE BURNETT WAY P A R K S LAKE STREE T STREET AVENUE 7TH B RONSON S SY0150 NE SMITHERS 35 B YPASS NE R ¥k405 AVENUE R A I L R O A D 7TH N SE STREET 6TH SHATTUCK STREET STREET C E D A R S Q CED A R S E 2ND S ZONE X NE S S CEDAR SW SW STREET 3 R D N NW 5TH STREET S R AILROAD 8 AVENUE PROFILE BASELINE 4 T H 8TH 5TH JONES STREET S DRIVE R AILROAD AVENUE A V E N U E AVENUE BURNETT AVENUE WAY N NE WHITWORTH AVENUE S BOULEVARD STREET D ZONE AH LAKE 7TH P L A C E HIGHWAY MONTEREY B L A I N E W AY LOT S HARDIE N S 34 NE 41 28 G A R D E N ROAD ZONE X 3RD STREET S D R N 6 T H S N E 19 AVENUE FACTORY 727 South Boeing Bridge 2 N D MAIN RIVER W AY STREET STREET TOBIN 32 N ST SY0624 STREET PL A C E AVENUE LOGAN R AIL R O A D W A Y AVENUE X SY0625 AVENUE P L A C E WELLS S STREET E CIRCLE 6TH WAY S 6TH S AVENUE PLACE NE 6TH SUNSET 4TH LANE S COURT BENSON S WELLS S S ZONE AH 757 AE VUEMONT H O U S E R AVENUE 40 N 48 N R. 4 E.S W 1 2 T H S T R E E T S W Culvert B S T R E E T S W S T R. 5 E. 1 3 T H 1 3 T H AVENUE S ¥k405 DETAILED STUDY S SMITHERS AVENUE S ZONE AE S T R E E TA AVENUE S BEACON WAY LIMIT OF S ROAD T ALBOTC NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 23 NORTH, RANGE 5 EAST. D S 1 4 T H WHITWORTH LIMIT OF DETAILEDSTUDY LeveeLevee L e v e e L e v e e ZONE X 39 42 (EL 28) Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ 122° 13' 07.5"47° 30' 00" 122° 11' 15" NW 3RDPLACE NELSONPLACE NW NOTE: THIS AREA IS SHOWN AS BEING PROTECTED FROM THE 1-PERCENT-ANNUAL-CHANCE OR GREATER FLOOD HAZARD BY A LEVEE SYSTEM THAT HAS BEENPROVISIONALLY ACCREDITED. OVERTOPPING OR FAILURE OF ANY LEVEE SYSTEM IS POSSIBLE. FOR ADDITIONAL INFORMATION SEE THE "PROVISIONALLY ACCREDITED LEVEE NOTE" IN NOTES TO USERS. B FLOODING EFFECTS FROMROLLING HILLS CREEK JOINS PANEL 0979 JOINS PANEL 0664 JOINS PANEL 0981 JOINS PANEL 0976 5261000mN . 5260000mN . 5259000mN . 5258000mN . 561000mE 7 560000mE 7 559000mE 7 47° 28' 07.5" 122° 11' 15"47° 28' 07.5" NW 3RDPLACE NELSONPLACE NW B FLOODING EFFECTS FROMROLLING HILLS CREEK . . . . 777 122° 13' 07.5" 47° 30' 00" King CountyUnincorporated Areas530071 COMMUNITY NUMBER PANEL SUFFIX CONTAINS: (SEE MAP INDEX FOR FIRM PANEL LAYOUT) Federal Emergency Management Agency FLOOD INSURANCE RATE MAPFIRM MAP REPOSITORIESRefer to Map Repositories list on Map Index EFFECTIVE DATE OF COUNTYWIDEFLOOD INSURANCE RATE MAPSeptember 29, 1989 EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANELMay 16, 1995 - to update map format.(Date of Revision) - to change Base Flood Elevations, to update corporate limits, to add roads and road names, to update the effects of wave action, to change Special Flood Hazard Areas, to change zone designations and to incorporate previously issued Letters of Map Revision. For community map revision history prior to countywide mapping, refer to the CommunityMap History table located in the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in this community, contact your insurance agentor call the National Flood Insurance Program at 1-800-638-6620. Notice to User: The Map Number shown belowshould be used when placing map orders; theCommunity Number shown above should beused on insurance applications for the subject community. MAP REVISED MAP NUMBER53033C0977G KING COUNTY,WASHINGTONAND INCORPORATED AREAS KING COUNTY 530071 0977 GRENTON, CITY OF 530088 0977 G NFIP NATIONAL FLOOD INSURANCE PROGRAM PANEL 0977G PANEL 977 OF 1700 250 10000FEET 150 3000METERS MAP SCALE 1" = 500'500 150 NOTES TO USERS This map is for use in administering the National Flood Insurance Program. It doesnot necessarily identify all areas subject to flooding, particularly from local drainagesources of small size. The community map repository should be consulted forpossible updated or additional flood hazard information. To obtain more detailed information in areas where Base Flood Elevations (BFEs)and/or floodways have been determined, users are encouraged to consult the FloodProfiles and Floodway Data and/or Summary of Stillwater Elevations tables containedwithin the Flood Insurance Study (FIS) Report that accompanies this FIRM. Usersshould be aware that BFEs shown on the FIRM represent rounded whole-footelevations. These BFEs are intended for flood insurance rating purposes only andshould not be used as the sole source of flood elevation information. Accordingly,flood elevation data presented in the FIS Report should be utilized in conjunction withthe FIRM for purposes of construction and/or floodplain management. Coastal Base Flood Elevations shown on this map apply only landward of 0.0’North American Vertical Datum of 1988 (NAVD 88). Users of this FIRM should beaware that coastal flood elevations are also provided in the Summary of StillwaterElevations table in the Flood Insurance Study Report for this jurisdiction. Elevationsshown in the Summary of Stillwater Elevations table should be used for constructionand/or floodplain management purposes when they are higher than the elevationsshown on this FIRM. Boundaries of the floodways were computed at cross sections and interpolatedbetween cross sections. The floodways were based on hydraulic considerations withregard to requirements of the National Flood Insurance Program. Floodway widthsand other pertinent floodway data are provided in the Flood Insurance Study Reportfor this jurisdiction. Certain areas not in Special Flood Hazard Areas may be protected by flood controlstructures. Refer to Section 2.4 "Flood Protection Measures" of the Flood InsuranceStudy Report for information on flood control structures for this jurisdiction. Provisionally Accredited Levee Notes to Users: Check with your localcommunity to obtain more information, such as the estimated level of protectionprovided (which may exceed the 1-percent-annual-chance level) and EmergencyAction Plan, on the levee system(s) shown as providing protection for areas onthis panel. To maintain accreditation, the levee owner or community is requiredto submit the data and documentation necessary to comply with Section 65.10 ofthe NFIP regulations by November 01, 2018. If the community or owner doesnot provide the necessary data and documentation or if the data anddocumentation provided indicate the levee system does not comply withSection 65.10 requirements, FEMA will revise the flood hazard and riskinformation for this area to reflect de-accreditation of the levee system. Tomitigate flood risk in residual risk areas, property owners and residents areencouraged to consider flood insurance and floodproofing or other protectivemeasures. For more information on flood insurance, interested parties shouldvisit the FEMA Website at http://www.fema.gov/national-flood-insurance-program. The projection used in the preparation of this map was Universal TransverseMercator (UTM) zone 10. The horizontal datum was NAD 83, GRS 1980spheroid. Differences in datum, spheroid, projection or UTM zones used in theproduction of FIRMs for adjacent jurisdictions may result in slight positionaldifferences in map features across jurisdiction boundaries. These differences do notaffect the accuracy of this FIRM. Flood elevations on this map are referenced to the North American Vertical Datum of1988. These flood elevations must be compared to structure and ground elevationsreferenced to the same vertical datum. For information regarding conversionbetween the National Geodetic Vertical Datum of 1929 and the North AmericanVertical Datum of 1988, visit the National Geodetic Survey website athttp://www.ngs.noaa.gov or contact the National Geodetic Survey at the followingaddress: NGS Information ServicesNOAA, N/NGS12National Geodetic SurveySSMC-3, #92021315 East-West HighwaySilver Spring, Maryland 20910-3282(301) 713-3242 To obtain current elevation, description, and/or location information for bench marksshown on this map, please contact the Information Services Branch of the NationalGeodetic Survey at (301) 713- 3242, or visit its website at http://www.ngs.noaa.gov. Base Map information shown on the FIRM was derived from multiplesources. Base map files were provided in digital format by King County GIS, WADNR, WSDOT, and Pierce County GIS. This information was compiled at scales of1:12,000 to 24,000 during the time period of 1994-2012. The profile baselines depicted on this map represent the hydraulic modeling baselines that match the flood profiles in the FIS report. As a result of improved topographic data, the profile baseline, in some cases, may deviate significantly from the channel centerline or appear outside the SFHA. Based on updated topographic information, this map reflects more detailed andup-to-date stream channel configurations and floodplain delineations thanthose shown on the previous FIRM for this jurisdiction. As a result, the FloodProfiles and Floodway Data tables for multiple streams in the FloodInsurance Study Report (which contains authoritative hydraulic data) may reflectstream channel distances that differ from what is shown on the map. Also, the road to floodplain relationships for unrevised streams may differ from what isshown on previous maps. Corporate limits shown on this map are based on the best data available at the timeof publication. Because changes due to annexations or de-annexations may haveoccurred after this map was published, map users should contact appropriatecommunity officials to verify current corporate limit locations. Please refer to the separately printed Map Index for an overview map of thecounty showing the layout of map panels; community map repository addresses;and a Listing of Communities table containing National Flood Insurance Programdates for each community as well as a listing of the panels on which each communityis located. For information on available products associated with this FIRM visit the MapService Center (MSC) website at http://msc.fema.gov. Available products mayinclude previously issued Letters of Map Change, a Flood Insurance Study Report,and/or digital versions of this map. Many of these products can be ordered orobtained directly from the MSC website. If you have questions about this map, how to order products, or the NationalFlood Insurance Program in general, please call the FEMA Map InformationeXchange (FMIX) at 1-877-FEMA-MAP (1-877-336-2627) or visit the FEMAwebsite at http://www.fema.gov/business/nfip. Zone D boundary Floodway boundary 1% Annual Chance Floodplain Boundary 0.2% Annual Chance Floodplain Boundary *Referenced to the North American Vertical Datum of 1988 D ! !!!!!!!!!!!!! LEGEND SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TOINUNDATION BY THE 1% ANNUAL CHANCE FLOOD ZONE A ZONE AE ZONE AH ZONE AO ZONE AR ZONE A99 ZONE V ZONE VE ZONE X FLOODWAY AREAS IN ZONE AE OTHER FLOOD AREAS OTHER AREAS ZONE XZONE D The 1% annual chance flood (100-year flood), also known as the base flood, is the flood that hasa 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area isthe area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazardinclude Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water-surfaceelevation of the 1% annual chance flood. No Base Flood Elevations determined. Base Flood Elevations determined. Flood depths of 1 to 3 feet (usually areas of ponding); Base Flood Elevationsdetermined. Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); averagedepths determined. For areas of alluvial fan flooding, velocities also determined. Special Flood Hazard Areas formerly protected from the 1% annual chanceflood by a flood control system that was subsequently decertified. ZoneAR indicates that the former flood control system is being restored to provideprotection from the 1% annual chance or greater flood.Area to be protected from 1% annual chance flood by a Federal floodprotection system under construction; no Base Flood Elevations determined. Coastal flood zone with velocity hazard (wave action); no Base Flood Elevationsdetermined. Coastal flood zone with velocity hazard (wave action); Base Flood Elevationsdetermined. The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free ofencroachment so that the 1% annual chance flood can be carried without substantial increases inflood heights. Areas of 0.2% annual chance flood; areas of 1% annual chance flood withaverage depths of less than 1 foot or with drainage areas less than 1 squaremile; and areas protected by levees from 1% annual chance flood. Areas determined to be outside the 0.2% annual chance floodplain. Areas in which flood hazards are undetermined, but possible. CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. CBRS and OPA boundary Boundary dividing Special Flood Hazard Area Zones and boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths, or flood velocities. Base Flood Elevation value where uniform within zone; elevation infeet* Cross section line Transect line Geographic coordinates referenced to the North American Datum of1983 (NAD 83) Western Hemisphere 1000-meter Universal Transverse Mercator grid values, zone 104989000m N Bench mark (see explanation in Notes to Users section of this FIRMpanel) River Mile Base Flood Elevation line and value; elevation in feet* COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAs) 513 (EL 987) 45° 02’ 08”, 93° 02’ 12” DX5510 M1.5 A A 23 23 PRELIMINARY 9/15/2017 Project Site Renton Market and Piazza – City of Renton Appendix D Appendix D Civil Plans BU R N E T T A V E S WELLS AVE S BU R N E T T P L S MILL AVE S N RIVERSIDE DR MAIN AVE S S 2ND ST S 2ND ST N 1ST ST CEDAR AVE S WIL L I A M S A V E S BURNETT AVE S SHATTUCK AVE S MORRIS AVE S S 3RD ST MORRIS AVE S S 3RD ST S TOBIN ST WE L L S A V E S SH A T T U C K A V E S S 4TH ST MO R R I S A V E S SH A T T U C K A V E S BURNETT AVE S S 3RD PL MIL L A V E S HOUSER WAY SWILLIAMS AVE S S 4TH ST HOUSER WAY S LOGAN AVE S S 3RD ST S 2ND ST BURNETT AVE S S 2ND ST BURNETT AVE S S 3RD ST S 2ND ST N RIVERSIDE DR S TOBIN ST S 4TH ST SM I T H E R S A V E S WILLIAMS AVE S S 3RD ST PELLY AVE N MAIN AVE S S 4TH ST WILLIAMS AVE S HOUSER WAY S LO G A N A V E S MILL AVE S WHITWORTH AVE S MAIN AVE S WELLS AVE S S 4TH ST BRONSON WAY N S 3RD ST S 4TH ST MA I N A V E S WILLIAMS AVE S S 4TH ST S 3RD ST S 3RD ST WHITWORTH AVE S SMITHERS AVE S WELLS AVE S WH I T W O R T H A V E S S 2ND ST HOUSER W A Y S WILLIAMS AVE S S 2ND ST LOGAN AVE S S 2ND ST MAIN AVE S S 2ND ST HOUSER WAY S S TOBIN STS TOBIN ST MORRIS AVE S WELLS AVE S WELLS AVE S N 1ST ST SHATTUCK AVE S S 4TH PL HOUSER WAY S HOUSER WAY S SHATTUCK AVE S BRONSON WAY N MAIN AVE S S 3RD ST S 3RD ST BRONSON WAY N S 2ND STS 2ND ST S 2ND ST SMITHERS AVE S S 2ND ST S 2ND ST I-405 FWY PROJECT LOCATION Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 VICINITY MAP 1" = 500'±RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT COVER R-433401 2025-04-15 NOTESCall 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: (STD PLAN 268.00) 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST- PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK- OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON- SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/ OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/ OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON- SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216. 30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON- SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. CITY OF RENTON WASTEWATER UTILITY STANDARD NOTES (STD PLAN 413) 1.ALL WORK AND MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/ APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON STANDARD PLANS& SPECIFICATIONS.A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2.DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988. HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/ 1991 UNLESS OTHERWISE APPROVED BY THE CITY. BENCHMARKS AND MONUMENTS SHALL BE REFERENCED ON THE APPROVED PLANS. 3.A PRE- CONSTRUCTION CONFERENCE AND A 24- HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR' S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS, INCLUDING STREET USE PERMITS, PRIOR TO STARTING CONSTRUCTION. INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY. IT SHALL BE THE CONTRACTOR' S RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 4.THE HOURS OF WORK IN THE STREET RIGHT- OF- WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT. AN APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT- OF-WAY. 5.CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 6.ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR' S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF RCW 19. 122. A DIG TICKET SHALL BE OBTAINED A MINIMUM OF TWO BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION. THE CONTRACTOR SHALL HAVE A COPY OF THE DIG TICKET ON SITE AT ALL TIMES. 7.BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 12- INCHES, MAXIMUM DEPTH 18- INCHES, THOROUGHLY COMPACTING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL BE EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL( 9- 03. 19). 8.SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE( PVC) RUBBER- GASKETED ASTM D 3034, SDR 35, C900/ C905 OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE CITY. 9.SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE( WALL, BUILDING FOUNDATION, ETC.) UNLESS APPROVED BY THE CITY. IF A SANITARY SEWER IS TO BE LOCATED UNDER ANY STRUCTURE( WALL, BUILDING FOUNDATION, ETC.), IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412. 10.OPEN- CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAYS SHALL BE BACKFILLED WITH CRUSHED SURFACING AGGREGATE( WSDOT SPECIFICATION 9-03. 9( 3) AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE CITY. 11.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY AND THE LATEST EDITION OF THE WSDOT/ APWA STANDARDS AND SPECIFICATION AS APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS& SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN 405. 12.ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE CITY FOR THE PREVENTION OF ON- SITE EROSION BOTH DURING CONSTRUCTION AND AFTER THE COMPLETION OF CONSTRUCTION IN ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL. 13.THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. R-433402 2025-04-15 NOTESCall 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 CITY OF RENTON CCTV INSPECTION STANDARD NOTES: 1.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/ OR PAVEMENT. 2.THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES ( NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM ( PACP). 3.ALL CCTV OPERATORS SHALL HAVE CURRENT NASSCO PACP CERTIFICATION. 4.CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE. 5.ALL CCTV INSPECTION REPORTS SHALL BE WITHIN +/- TWO ( 2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE. 6.ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FULLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE- CCTV THE WORK. 7.THE DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC. NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT. 8.THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO " PAUSING" OF THE VIDEO RECORDING DURING EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO THE CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURE, AND OBSERVATIONS ARE SEEN AND LOGGED. 9.JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER ( CONTAINING DYE) SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST THE CAMERA' S FIELD OF VISION IN ITS ENTIRETY. 10.THE CCTV CAMERA SHALL HAVE A WATER- LEVEL MEASURING DEVICE ( BALL, CYLINDER, ETC.) ATTACHED THAT HAS 1/4" MARKINGS TO SHOW THE DEPTH OF WATER IN THE PIPE DURING THE CCTV INSPECTION. 11.ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION. 12.PER CITY OF RENTON SPECIFICATION 7-08. 3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN 1/2" OF PONDING TO BE CONSIDERED ACCEPTABLE. CITY OF RENTON SURFACE WATER STANDARD NOTES: (STD PLAN 267.00 AND 267.10) 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2.THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3.ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ( RENTON SWDM), RENTON MUNICIPAL CODE ( RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION ( APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4.APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION ( E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5.A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT' S CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS- BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS. 7.VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 ( WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 8.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 9.OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11.ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 220. 20. 13.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 14.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT- LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10, 204. 20, 204. 30, 204. 40, AND 204. 50. STRUCTURES SHALL HAVE: ·RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. ·ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/ GUTTER LINE. ·ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT- OF- WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF- WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. 15.BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM. 16.LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF- WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. 18.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: •4 - 8 INCH ROCK / 40 - 70% PASSING; •2 - 4 INCH ROCK / 30 - 40% PASSING; AND •LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 19.FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON- SITE BMPS. 20.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED " STORM” OR " DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227. 00. 21.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266. 00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/ OR PAVEMENT. 23.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24.FOR ALL DISTURBED PERVIOUS AREAS ( COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264. 00. 25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT- OF- WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 27.PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA ( APA) SHALL COMPLY WITH SPECIAL REQUIREMENT # 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS ( RMC 4-3-050). 28.PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON- SLIP OR NON- SKID LID PER ADA REQUIREMENTS. 29.CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31.CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS ( E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. R-433403 2025-04-15 NOTESCall 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 CONTRACTOR IS ALERTED TO THE FACT THAT WORK WILL BE ACCOMPLISHED AROUND ACTIVE PSE GAS AND ENERGIZED FACILITIES THAT ARE SERVING EXISTING CUSTOMERS. CONTRACTOR SHALL COORDINATE WITH PSE TO DETERMINE WHICH FACILITIES ARE ACTIVE AND ENERGIZED AND SHALL IMPLEMENT SAFETY PROCEDURES PER PSE REQUIREMENTS. CONTRACTOR SHALL COORDINATE WITH PSE TO ENSURE THAT FACILITIES ARE IN PLACE TO MAINTAIN SERVICE TO CUSTOMERS THROUGHOUT CONSTRUCTION. AD AREA DRAIN AVE AVENUE CB CATCH BASIN CL CENTER LINE COR CITY OF RENTON CSBC CRUSHED SURFACE BASE COURSE DEMO DEMOLISH DI DUCTILE IRON ELECT ELECTRICAL EL/ELEV ELEVATION EX/EXIST EXISTING FD FRENCH DRAIN FH FIRE HYDRANT GB GRADE BREAK GI GREASE INTERCEPTOR HMA HOT MIX ASPHALT IE INVERT ELEVATION IRR IRRIGATION LF LINEAR FOOT LS LANDSCAPE/LANDSCAPING MAX MAXIMUM MIN MINIMUM NTS NOT TO SCALE PLUMB PLUMBING POC POINT OF CONNECTION ROW RIGHT OF WAY SD STORE DRAIN SS SANITARY SEWER STD STANDARD TYP TYPICAL W WATER #NUMBER ABBREVIATIONS:BASIS OF DESIGN: CIVIL DESIGN IS BASED ON THE FOLLOWING DOCUMENTS: TOPOGRAPHIC SURVEY PROVIDED BY KPG PSOMAS, DATED 2025-04-03 ARCHITECTURAL BACKGROUNDS PROVIDED BY GRAHAM BABA ARCHITECTS LANDSCAPE BACKGROUNDS PROVIDED BY HEWITT GEOTECHNICAL CONDITIONS DOCUMENTED IN GEOTECHNICAL REPORT BY ASSOCIATED EARTH SCIENCES, DATED 2024-10-31 R-433404 PROVIDE KC METRO A MINIMUM 30 DAY NOTICE BEFORE CONSTRUCTION BEGINS. CONTACT DAVE KORTHALS – SOUTHEAST DISTRICT PLANNER - TRANSIT ROUTE FACILITIES - MOBILITY DIVISION – TRANSIT DEPARTMENT 201 S. JACKSON ST. - MS: KSC-TR-0413 - SEATTLE, WA 98104-3856 206-477-5776 LEGEND: LIMITS OF WORK RIGHT-OF-WAY LINE STORM DRAINAGE PIPE (SD) ROOF DRAIN (RD) FRENCH DRAIN (FD) TRENCH DRAIN (TD) SANITARY SEWER PIPE (SS) FLOW DIRECTION LIGHTING CONDUIT (ELEC) AREA DRAIN (AD) CATCH BASIN (CB), TYPE 1 CLEANOUT (SSCO, SDCO, CO) PIPE FLOW DIRECTION PEDESTRIAN CONCRETE PAVEMENT VEHICULAR CONCRETE PAVEMENT EXISTING CONCRETE PAVEMENT PERMEABLE SURFACING AT EXISTING TREE, REFER TO LS PLANS PERMEABLE SURFACING AT PROPOSED TREE, REFER TO LS PLANS LANDSCAPING, REFER TO LS PLANS FLUSH CURB VERTICAL CURB REMOVABLE BOLLARD, REFER TO LS PLANS 2025-04-15 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1 C2.50 2 C2.50 4 C2.50 3 C2.50 S 3RD ST BU R N E T T A V E S RENTON MARKET PARCEL #5696000055 LO G A N A V E S PARCEL #5696000050 SP U P A R C E L #0 0 0 7 2 0 - 0 1 8 8 DEMO EXIST CURB, TYP PROTECT EXIST STREET LIGHT TO REMAIN, TYP PROTECT ELEC, COMM, AND WATER INFRASTRUCTURE SAWCUT PAVEMENT FOR DRIVEWAY AND BOLLARDS PROTECT EXIST POWER, TYP PROTECT EXIST GAS LINE, TYP PROTECT EXIST BUILDING AND FOUNDATION, TYP SAWCUT PAVING FOR SOUTH ENTRY VESTIBULE, REFER TO ARCH PLAN FOR LIMITS EXIST RENTON TRANSIT CENTER REMOVE STRIPING AND SIGNAGE FOR EVENT PARKING STALLS. RELOCATE EVENT PARKING SIGNAGE, REFER TO C3.00, PROTECT ADA SIGNAGE AND STRIPING DEMO EXIST DRAIN AND ASSOCIATED SD PIPES, TEMPORARILY REROUTE FLOWS AS NEEDED REMOVE STRIPING FOR PARKING STALLS, TYP PROTECT EXIST PARKING SIGNAGE, UNLESS OTHERWISE NOTED PROTECT EXIST EVENT PARKING SIGNAGE, AND AUTHORIZED VEHICLE SIGNAGE. RELOCATE 2HR PARKING SIGNAGE REFER TO C3.00 CAP PIPE, TYP LIMITS OF WORK, TYP RIGHT-OF-WAY LINE, TYP REMOVE BOLLARDS SAWCUT TO THE NEAREST JOINT, TYP PROTECT EXIST FOUNTAIN STRUCTURE AND STONE WALLS, REFER TO LS PLAN FOR DETAILS EXIST CONCRETE PAVING TO REMAIN, TYP CATCH BASIN INSERT, TYP PROTECT EXIST FH PROTECT EXIST WATER METER AND INFRASTRUCTURE STRAW WATTLE, TYP EXIST WATER FEATURE TO BE DEMOLISHED. CUT AND CAP WATER SUPPLY AND DRAINS FOR THE EXIST WATER FEATURE. REMOVE ALL ASSOCIATED UTILITY VAULTS. PROTECT EXIST SITE WALL AND ASSOCIATED LANDSCAPE BOULDERS, REFER TO LS PLANS FOR DETAILS CUT AND CAP WATER SUPPLY AND DRAINS FOR THE EXIST WATER FEATURE EXIST DRINKING FOUNTAIN TO BE SALVAGED AND REUSED, REFER TO SHEET C3.01 AND LS PLAN PROTECT SPU MAINS AND ASSOCIATED VAULTS, TYP SAWCUT TO THE NEAREST JOINT, TYP PROTECT EXIST ELECT, LIGHTING, AND CONDUITS UNLESS NOTED TO BE DEMOLISH ON ELECT PLANS, TYP REFER TO LS FOR LS DEMO, TYP RETIRE AND REMOVE EXIST WATER METER. CAP EXIST WATER SERVICE. REMOVE EXIST LIGHT POLES AND ASSOCIATED HH'S. PROTECT CONTINUATION OF CONDUITS FOR LIGHTING TO REMAIN. 1 1 1 TEMPORARY CONSTRUCTION FENCE STOCKPILE AREA NORTH CONSTRUCTION ACCESS WITH WHEEL WASH CONSTRUCTION ACCESS WITH WHEEL WASH PROTECT EXIST UTILITIES, SIDEWALK, CURB, AND ROADWAY DEMO AND CAP EXIST SS PIPE Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 20 feet 10'20'40' LEGEND: DEMO AND TESC PLAN R-433405 RIGHT-OF-WAY LINE LIMITS OF WORK STRAW WATTLE TEMPORARY CONSTRUCTION FENCE CATCH BASIN INSERT SAWCUT LINE REMOVE EXISTING STRUCTURE DEMOLISH EXISTING CURB DEMOLISH EXISTING UTILITY DEMOLITION NOTES: 1 REMOVE AND DEMOLISH AREA DRAIN AND ASSOCIATED STORM DRAINAGE PIPES. NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. REFER TO LANDSCAPE PLANS FOR TREE REMOVAL AND TREE PROTECTION. REFER TO ELECTRICAL FOR LIGHTING DEMOLITION. 2.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING/SITE PRE-CONSTRUCTION SURVEYS NECESSARY, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 3.PROTECT ALL UTILITIES AND SURFACE IMPROVEMENTS ONSITE, WITHIN THE RIGHT OF WAY, AND ON ADJOINING PROPERTIES UNLESS OTHERWISE NOTED. DEMOLISH OR ABANDON UTILITIES, AS NOTED ON PLAN, PER COR STANDARD REQUIREMENTS. 4.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 5.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AND CONTROL AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 6.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT-LADEN RUNOFF FROM LEAVING THE SITE AND SHALL INSTALL, MAINTAIN, AND UPGRADE EROSION AND SEDIMENT CONTROL (ESC) FACILITIES AND BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS, STORM EVENTS, AND THE PROGRESSION OF WORK DURING THE CONSTRUCTION PERIOD. THE ESC FACILITIES SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS; THESE MEASURES SHALL BE AMENDED, RELOCATED, AND/OR UPGRADED AS NEEDED, INCLUDING THE ADDITION OF PUMPS IF NECESSARY, TO PREVENT SEDIMENT AND SEDIMENT-LADEN WATER FROM LEAVING THE SITE AND TO PREVENT EROSION AND DAMAGE TO SUBGRADE. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR REQUIREMENTS. 7.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE AND DAMAGE BEYOND THE LIMITS OF WORK. 8.STORMWATER RUNOFF AND DEWATERING FLOWS, IF GENERATED, SHALL BE DIRECTED TO TEMPORARY PUMPS FOR CONVEYANCE TO TREATMENT SYSTEM. CONTRACTOR SHALL FIELD LOCATE AND SIZE PUMPS TO ACCOMMODATE FLOWS ENCOUNTERED. CONTRACTOR SHALL SUPPLY BACKUP PUMPS AS NEEDED. 9.FOR THE CATCH BASINS THAT ARE TO BE REMOVED, PROVIDE CATCH BASIN/INLET PROTECTION UP UNTIL THEY ARE REMOVED. 10.CONTRACTOR SHALL PROVIDE COVER AND CONTAINMENT TO PROTECT DOWNSTREAM SYSTEMS AND SOILS FROM POLLUTANTS GENERATED DURING, AND AS A RESULT OF CONSTRUCTION ACTIVITIES, AND PREVENT SEDIMENT AND POLLUTANTS FROM LEAVING THE SITE. 11.ALL TEMPORARY STOCKPILES, CUT SLOPES, AND FILL SLOPES SHALL BE PROTECTED WITH PLASTIC SHEETING, UNLESS STABILIZED BY OTHER APPROVED METHODS. 12.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY STABILIZED IN FINAL CONDITION. 13.CITY STREETS AND SIDEWALKS SHALL BE KEPT CLEAN AT ALL TIMES. MATERIAL SHALL NOT BE STORED WITHIN THE RIGHT-OF-WAY, ON CITY STREETS OR SIDEWALKS WITHOUT A STREET USE PERMIT FROM THE COR. 14.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATIONS, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 15.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER IN ACCORDANCE WITH APPLICABLE JURISDICTIONS. 16.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED AND PROTECT PAVEMENT TO REMAIN. REPLACE ANY DAMAGED IMPROVEMENTS IN KIND. PRIOR TO SAWCUTTING, CONTRACTOR SHALL SUBMIT A CUTTING AND JOINTING PLAN FOR ALL PAVEMENT BEING DISTURBED. 17.ANY DAMAGE RESULTING FROM PROJECT CONSTRUCTION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE AND IN A TIME FRAME DICTATED BY THE OWNER. 18.IF EXISTING IMPROVEMENTS ARE DISTURBED WITHIN THE RIGHT-OF-WAY BY CONSTRUCTION ACTIVITY, REPLACE PER COR STANDARDS AND PROJECT PLANS AT CONTRACTOR'S EXPENSE. 19.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO CONFIRM SYSTEMS ARE NOT ENERGIZED, TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 20.REMOVE STRIPING ON REMAINING EXISTING PAVEMENT TO INSTALL FULL EXTENTS OF PROPOSED STRIPING AS INDICATED ON PLANS. REMOVAL OF EXISTING STRIPING SHALL NEGATIVELY IMPACTING EXISTING PAVEMENT TO REMAIN. 21.CONTRACTOR SHALL COORDINATE WITH OWNER FOR EXISTING ITEMS TO BE SALVAGED. SALVAGED ITEMS SHALL BE PROTECTED AND STORED IN LOCATION ON-SITE, OR AT AN AGREED TO LOCATION, PER OWNER DIRECTION. IF SALVAGED ITEMS ARE TO BE RELOCATED, INSTALL SALVAGED ITEMS WITHIN LIMIT OF WORK WHERE NOTED ON PLANS. REFER TO LANDSCAPE PLANS FOR ADDITIONAL ITEMS TO BE SALVAGED. REMOVE FULL DEPTH CONCRETE PAVING OR LANDSCAPING REMOVE EXISTING SITE WALL, REFER TO LS PLANS LANDSCAPE REMOVAL, REFER TO LS PLANS 2025-04-15 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 1CATCH BASIN INSERT NTS 2STRAW WATTLE NTS DEMO AND TESC DETAILS R-433406 6' - 0 " 8'-0" MIN 12'-0" MAX TWISTED SELVAGE TOP AND BOTTOM NOTES: 1.CHAINLINK FABRIC TO BE MIN 11 GAUGE, GALVANIZED. NO RUSTED OR EXCESSIVELY MALFORMED FABRIC. 2.FENCE BASES SHALL BE OF SUFFICIENT WEIGHT AND/OR SPREAD TO ADEQUATELY SUPPORT EACH PANEL. 3.PANEL-TO-PANEL CONNECTIONS SHALL BE MADE AT A MIN TWO LOCATIONS PER CONNECTION UNLESS OTHERWISE APPROVED. 4.INSTALL 11'-8" X 5'-6" MESH CONSTRUCTION SCRIM PER FENCE PANEL AND/OR CONSTRUCTION WARNING SIGN 50' OC BASED ON CONSTRUCTION GRAPHIC PLAN. 4 TEMPORARY CONSTRUCTION CHAINLINK FENCE DETAIL NTS 3CONSTRUCTION ENTRANCE NTS 2025-04-15 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1 C3.111 C3.12 LO G A N A V E S BU R N E T T A V E S 10+00 11+00 12+00 12+87.13 18 . 7 ' ± RENTON MARKET 55.0' 22.0'± EXIST SIDE SEWER, REFER TO ADD ALT #2 EXIST MH RIM 35.59 6" IE 31.7 E,N @ CL REMOVABLE BOLLARD, REFER TO LS PLAN TEMPORARY ENCLOSURE, REFER TO ARCH PLAN DRIVEWAY ENLARGEMENT EXIST RENTON TRANSIT CENTER EXIST BUILDING, TYP ADA PARKING ENLARGEMENT APPROXIMATE LOCATION OF EXIST ADA PARKING STALLS. PROTECT EXIST ADA SIGN AND STRIPING . SERVICE VEHICLE EGRESS, RIGHT TURN ONLY VEHICLE INGRESS AND EGRESS WORK LIMITS, TYP UNMARKED LOADING ZONE RIGHT-OF-WAY LINE TYP REMOVABLE BOLLARD MOUNTING BASE PLATE, REFER TO LS PLAN 1 C3.13 SIDE SEWER ENLARGEMENT 3 C3.20SS LINE 10 EXIST SS CO AND SIDE SEWER, REFER TO ADD ALT #2 SS CO, TYP 3 C4.50 RESTRIPE EXIST PARKING STALLS. PROTECT EXIST PARKING SIGNAGE, UNLESS OTHERWISE NOTED ON C2.00 RELOCATE EXIST EVENT CENTER SIGN, REUSE EXIST POLE RELOCATE EXIST 2 HR PARKING SIGN TO EXIST LIGHT POLE RELOCATE EXIST EVENT CENTER PARKING SIGN, INSTALL NEW POLE. NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. REFER TO C3.00 FOR CIVIL IMPROVEMENT'S LEGEND AND NOTES. 2.CONTRACTOR SHALL CONFIRM POC'S PRIOR TO CONSTRUCTION WHEN CONNECTING TO EXISTING SYSTEMS AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PRIOR TO CONSTRUCTION, FIELD VERIFY DOWNSTREAM INVERTS FOR ALL EXISTING AREA DRAINS AND CATCH BASINS WITH PROPOSED UPSTREAM CONNECTIONS. CONFIRM EXISTING OUTLET INVERTS PROVIDE POSITIVE DRAINAGE FOR ALL UPSTREAM PIPES. 3.PROJECT ASSUMES THAT ALL CITY EXISTING UTILITY INFRASTRUCTURE IS ADEQUATELY SIZED TO SUPPORT THE PROJECT. 4.PRIOR TO DEMOLITION, CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES TO REMAIN WITHIN AND ADJACENT TO LIMIT OF WORK. 5.ALL EXISTING PAVEMENT STRIPING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. PRODUCTS SHALL BE PER CITY OF RENTON PUBLIC WORKS DEPARTMENT STANDARD PLANS AND SPECIFICATIONS, AND WSDOT STANDARD PLANS AND SPECIFICATIONS. CONTRACTOR SHALL SUBMIT A PAVEMENT RESTORATION PLAN INCLUDING, CUTTING AND JOINTING, FOR ALL PAVEMENT BEING DISTURBED. 6.FULL DEPTH PAVEMENT REPLACEMENT, AND TRENCH RESTORATION AT UTILITY CUTS, SHALL BE PER CITY OF RENTON STD DETAILS. PAVEMENT SECTION SHALL BE PER CITY OF RENTON STD DETAILS, OR MATCH EXISTING WHICHEVER IS GREATER. MATCH EXISTING PAVEMENT MATERIAL PER ASSOCIATED STANDARD DETAILS. TRENCH AND BACKFILL SHALL BE PER CITY OF RENTON RENTON STD. PLAN 220.20. PEDESTRIAN CONCRETE PAVEMENT SHALL BE PER CITY OF RENTON STD. PLAN 102. VEHICULAR CONCRETE PAVING SHALL BE PER CITY OF RENTON RENTON STD. PLAN 110, 110.1 AND 111 AND PROJECT DETAILS. 7.PEDESTRIAN CONCRETE, MINIMUM SECTION: 4" CONCRETE 6" CSBC REFER TO LANDSCAPE FOR CONCRETE SCORING, COLOR, AND FINISHES. 8.THE RENTON MARKET AND PIAZZA PROJECT IS REQUIRED TO MEET STORMWATER REQUIREMENTS PER THE 2022 CITY OF RENTON SURFACE WATER DESIGN MANUAL (RSWDM). 8.1.FLOW CONTROL: THE PROJECT PROPOSES MORE THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE AND IS LOCATED IN THE PEAK FLOW RATE CONTROL STANDARD AREA. TARGET SURFACES DO NOT GENERATE MORE THAN A 0.15-CFS INCREASE IN THE EXISTING SITE CONDITIONS 100-YR PEAK FLOW, THEREFORE FLOW CONTROL IS NOT REQUIRED. 8.2.WATER QUALITY: THE PROJECT PROPOSES LESS THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE (PGIS), AND LESS THAN ¾ ACRES OF POLLUTANT GENERATION PERVIOUS SURFACE (PGPS), THEREFORE WATER QUALITY IS NOT REQUIRED. 8.3.ON-SITE BMPS: THE PROJECT PROPOSES MORE THAN 2,000-SF OF NEW PLUS IMPERVIOUS SURFACE, THEREFORE ON-SITE STORMWATER MANAGEMENT (OSM) IS REQUIRED. ALL AVAILABLE OSM BMP'S WERE EVALUATED AND ARE NOT FEASIBLE FOR THE SITE. 8.4.THE PROJECT IS LOCATED IN AN AQUIFER PROTECTION AREA, THEREFORE STORMWATER MITIGATION FACILITIES SHALL NOT INFILTRATE AND SHALL BE COLLECTED VIA STORMWATER CONVEYANCE AND DISCHARGE TO THE CITY MAIN. 9.GREASE INTERCEPTOR SIZE AND VAULT PER MECHANICAL. 10.ELECTRICAL SERVICE FOR THE SITE IS PER ELECTRICAL. 11.STORM, SEWER, AND WATER INFRASTRUCTURE SHALL BE PER CITY OF RENTON STANDARDS AND WSDOT STANDARD SPECIFICATIONS, UNLESS OTHERWISE NOTED. 8" STORM DRAIN SHALL BE PLASTIC PIPE, UNLESS OTHERWISE NOTED. 12.ALL STORM DRAINAGE WITH 2-FT OR LESS OF COVER SHALL BE ADS N12 OR APPROVED EQUIVALENT. 13.ALL REGULATORY SIGNAGE AND PAVEMENT STRIPING SHALL CONFORM TO CITY OF RENTON AND MUTCD SPECIFICATIONS. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 20 feet 10'20'40' ADDITIVE ALTERNATE #2: SIDE SEWER REPLACEMENT EXISTING SS CO ELEVATION TO BE FIELD VERIFIED. A CCTV INSPECTION OF THE EXISTING SIDE SEWER IS REQUIRED TO SURVEY CONDITION OF PIPE. A CIPP LINER MAY BE REQUIRED DEPENDING ON THE CONDITION OF THE PIPE. IF EXISTING SS CO IS AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE OUT OF THE SITE (EXISTING SS PIPE MUST BE AT MIN 2.0% OR APPROVED BY THE CITY) AND ALLOWS FOR THE ONSITE GREASE INTERCEPTOR PIPING TO BE INSTALLED AT A 1.0% MINIMUM SLOPE, AND EXISTING PIPE IS IN SUFFICIENT CONDITION THEN EXISTING SS MAY BE USED. IF SIDE SEWER REPLACEMENT IS REQUIRED, NEW PIPE, CLEANOUT, AND PAVEMENT RESTORATION (INCLUDING FULL CONCRETE PANEL REPLACEMENT), SHALL BE PER COR STANDARDS. CIVIL IMPROVEMENT PLAN R-433407 REFER TO SHEET C3.01 FOR CONTINUATION REFER TO SHEET C3.02 FOR CONTINUATION 2025-04-15 • • • • • • • • • • • • • • • • 37.8 37. 6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36. 8 37. 0 37. 2 3 7 . 4 37. 2 37.4 37.6 37.8 37.6 37.4 37.2 37.0 36.8 3 C3.51 1 C3.20 2 C3.20 1 C3.10 37 20+00 21+00 PARCEL #5696000050 LO G A N A V E S SP U P A R C E L #0 0 0 7 2 0 - 0 1 8 8 3 7 S 3RD ST 8" SD, TYP 17 . 9 ' ± RIGHT-OF-WAY LINE, TYP PROP LANDSCAPING, REFER TO LS PLAN, TYP PROP SITE SEATING, TYP REFER TO LS PLANS CLEAN OUT (CO) 4" IE 35.2 0UT, NE AD 10 (EXIST) ADJUST RIM TO FG PROP LIGHT POLE POC, TYP REFER TO ELEC PLANS PROP LIGHT POLE AND FOOTING, TYP REFER TO ELEC AND STRUCT PLANS PROP LIGHTING ROUTING (2)-1" PVC CONDUIT (2)-3 4" PVC CONDUIT REFER TO ELEC PLANS PROP LIGHTING ROUTING (2)-3 4" PVC CONDUITS (2)-1" PVC CONDUITS REFER TO ELEC PLANS INTERCEPT EXIST 3/4" CONDUIT REFER TO ELEC PLANS INTERCEPT EXIST 3 4" CONDUIT TO SERVICE PROP LIGHT REFER TO ELEC PLANS PROP ELEC ENCLOSURE REFER TO ELEC PLANS MATCH EXIST GRADES, TYP REFER TO LS PLANS FOR SOFTSCAPE GRADING, TYP AD 11 CO 4" IE 35.48 0UT, NW AD 12 PROP LIGHT POLE, REFER TO LS AND ELEC PLAN, TYP CONNECT TO EXIST CB EXIST RIM 35.58 ± 8" IE 33.6 ± IN,N EXIST 12" IE 33.6 ± OUT,S EXIST 12" IE 33.6 ± OUT,E SDCB 100 AD 20 AD 13 RIM 37.55± 4" IE 35.0 IN,NE 4" IE 35.0 OUT,SE PROP LIGHTING ROUTING (1)-3 4" PVC CONDUITS (2)-1" PVC CONDUITS REFER TO ELEC PLANS 66" SPU WATER MAIN 52" SPU WATER MAIN ELECTROLYSIS TEST STATION, PER CITY OF SEATTLE STD PLAN 360. REROUTE EXIST SPU ELECTROLYSIS TEST STATIONS CONDUIT AND WIRING TO PROP LOCATION. COORDINATE WITH SPU. PROTECT EXIST SPU CATHODIC PROTECTION RECTIFIER, TYP SD LINE 10 SD LINE 20 CONTRACTOR SHALL COORDINATE WITH SPU PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE SPU PARCEL 12" SPU WATER MAIN MATCH EXIST GRADES, TYP SOUTH ENTRY ENLARGEMENT PEDESTRIAN CONCRETE PAVING, REFER TO NOTE 7, TYP 1 C3.14 PIAZZA PARK PIAZZA PARK GRADING ENLARGEMENT WEST LIMITS OF WORK, TYP 1 C3.51 4" FRENCH DRAIN (FD), TYP SLOPE @ 0.5% MIN PROP PERMEABLE SURFACING AT EXIST TREE, TYP EXIST CONCRETE PAVING TO REMAIN, TYP PROP FLUSH CONCRETE CURB, TYP 2 C4.50 PROP PERMEABLE SURFACING AT PROP TREE, TYP 2 C4.50 PROP VEHICULAR PAVING, CONCRETE PANEL REPLACEMENT, TYP. REFER TO NOTE 6. PROP FACE OF CONCRETE TRAFFIC CURB, PER COR STD PLAN 101 1 C4.50 PARCEL #5696000055RELOCATE EXIST WATER DRINKING FOUNTAIN, LOCATE PER LS PLAN CONNECT WATER, AND SS SERVICE TO EXIST ONSITE INFRASTRUCTURE, MATCH EXIST SERVICE SIZES FOR FOUNTAIN NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. REFER TO C3.00 FOR CIVIL IMPROVEMENT'S LEGEND AND NOTES. 2.CONTRACTOR SHALL CONFIRM POC'S PRIOR TO CONSTRUCTION WHEN CONNECTING TO EXISTING SYSTEMS AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PRIOR TO CONSTRUCTION, FIELD VERIFY DOWNSTREAM INVERTS FOR ALL EXISTING AREA DRAINS AND CATCH BASINS WITH PROPOSED UPSTREAM CONNECTIONS. CONFIRM EXISTING OUTLET INVERTS PROVIDE POSITIVE DRAINAGE FOR ALL UPSTREAM PIPES. 3.PROJECT ASSUMES THAT ALL CITY EXISTING UTILITY INFRASTRUCTURE IS ADEQUATELY SIZED TO SUPPORT THE PROJECT. 4.PRIOR TO DEMOLITION, CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES TO REMAIN WITHIN AND ADJACENT TO LIMIT OF WORK. 5.ALL EXISTING PAVEMENT STRIPING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. PRODUCTS SHALL BE PER CITY OF RENTON PUBLIC WORKS DEPARTMENT STANDARD PLANS AND SPECIFICATIONS, AND WSDOT STANDARD PLANS AND SPECIFICATIONS. CONTRACTOR SHALL SUBMIT A PAVEMENT RESTORATION PLAN INCLUDING, CUTTING AND JOINTING, FOR ALL PAVEMENT BEING DISTURBED. 6.FULL DEPTH PAVEMENT REPLACEMENT, AND TRENCH RESTORATION AT UTILITY CUTS, SHALL BE PER CITY OF RENTON STD DETAILS. PAVEMENT SECTION SHALL BE PER CITY OF RENTON STD DETAILS, OR MATCH EXISTING WHICHEVER IS GREATER. MATCH EXISTING PAVEMENT MATERIAL PER ASSOCIATED STANDARD DETAILS. TRENCH AND BACKFILL SHALL BE PER CITY OF RENTON RENTON STD. PLAN 220.20. PEDESTRIAN CONCRETE PAVEMENT SHALL BE PER CITY OF RENTON STD. PLAN 102. VEHICULAR CONCRETE PAVING SHALL BE PER CITY OF RENTON RENTON STD. PLAN 110, 110.1 AND 111 AND PROJECT DETAILS. 7.PEDESTRIAN CONCRETE, MINIMUM SECTION: 4" CONCRETE 6" CSBC REFER TO LANDSCAPE FOR CONCRETE SCORING, COLOR, AND FINISHES. 8.THE RENTON MARKET AND PIAZZA PROJECT IS REQUIRED TO MEET STORMWATER REQUIREMENTS PER THE 2022 CITY OF RENTON SURFACE WATER DESIGN MANUAL (RSWDM). 8.1.FLOW CONTROL: THE PROJECT PROPOSES MORE THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE AND IS LOCATED IN THE PEAK FLOW RATE CONTROL STANDARD AREA. TARGET SURFACES DO NOT GENERATE MORE THAN A 0.15-CFS INCREASE IN THE EXISTING SITE CONDITIONS 100-YR PEAK FLOW, THEREFORE FLOW CONTROL IS NOT REQUIRED. 8.2.WATER QUALITY: THE PROJECT PROPOSES LESS THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE (PGIS), AND LESS THAN ¾ ACRES OF POLLUTANT GENERATION PERVIOUS SURFACE (PGPS), THEREFORE WATER QUALITY IS NOT REQUIRED. 8.3.ON-SITE BMPS: THE PROJECT PROPOSES MORE THAN 2,000-SF OF NEW PLUS IMPERVIOUS SURFACE, THEREFORE ON-SITE STORMWATER MANAGEMENT (OSM) IS REQUIRED. ALL AVAILABLE OSM BMP'S WERE EVALUATED AND ARE NOT FEASIBLE FOR THE SITE. 8.4.THE PROJECT IS LOCATED IN AN AQUIFER PROTECTION AREA, THEREFORE STORMWATER MITIGATION FACILITIES SHALL NOT INFILTRATE AND SHALL BE COLLECTED VIA STORMWATER CONVEYANCE AND DISCHARGE TO THE CITY MAIN. 9.GREASE INTERCEPTOR SIZE AND VAULT PER MECHANICAL. 10.ELECTRICAL SERVICE FOR THE SITE IS PER ELECTRICAL. 11.STORM, SEWER, AND WATER INFRASTRUCTURE SHALL BE PER CITY OF RENTON STANDARDS AND WSDOT STANDARD SPECIFICATIONS, UNLESS OTHERWISE NOTED. 8" STORM DRAIN SHALL BE PLASTIC PIPE, UNLESS OTHERWISE NOTED. 12.ALL STORM DRAINAGE WITH 2-FT OR LESS OF COVER SHALL BE ADS N12 OR APPROVED EQUIVALENT. 13.ALL REGULATORY SIGNAGE AND PAVEMENT STRIPING SHALL CONFORM TO CITY OF RENTON AND MUTCD SPECIFICATIONS. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 CIVIL IMPROVEMENT PLAN 0 1 inch = 10 feet 5'10'20' MA T C H L I N E : R E F E R T O S H E E T C3 . 0 2 R-433408 REFER TO SHEET C3.00 FOR CONTINUATION 2025-04-15 • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 37.6 37.8 38.0 38.2 38. 4 38.2 3 8 . 4 3 8 . 6 38 . 6 38 . 8 39. 0 38.8 38.6 38.8 38.4 38.6 38.8 38.8 38.6 2 C3.15 1 C3.51 PARCEL #5696000055 38 22+00 23+00 23+17.14S 3RD ST BU R N E T T A V E S EXIST WATER FEATURE, RE-PURPOSED AS A LANDSCAPE PLANTER, REFER TO LS PLANS PIAZZA PARK PIAZZA PARK GRADING ENLARGEMENT EAST ADJUST RIM TO FG PROP RIM 38.6± PROP LIGHTING ROUTING (1)-3 4" PVC CONDUIT REFER TO ELEC PLANS PROP LIGHTING ROUTING (2)-3 4" PVC CONDUITS (2)-1" PVC CONDUITS REFER TO ELEC PLANS INTERCEPT EXIST 3 4" CONDUIT REFER TO ELEC PLANS INTERCEPT EXIST 3 4" CONDUIT REFER TO ELEC PLANS INTERCEPT EXIST 3 4" CONDUIT REFER TO ELEC PLANS PROP ELEC SERVICE POC CONNECT TO EXIST MARKET SERVICE REFER TO ELEC PLANS RIGHT-OF-WAY LINE, TYP REFER TO LS PLANS FOR SOFTSCAPE GRADING, TYP PROP LIGHTING ROUTING (1)-3 4" PVC CONDUITS (2)-1" PVC CONDUITS REFER TO ELEC PLANS PROP LIGHT POLE, REFER TO LS AND ELEC PLAN, TYP AD 14 RIM 37.4 4" IE 35.15 OUT,W 4" FRENCH DRAIN (FD), TYP SLOPE @ 0.5% MIN 66" SPU WATER MAIN 52" SPU WATER MAIN PROP LIGHTING ROUTING (2)-3 4" PVC CONDUITS (2)-1" PVC CONDUITS REFER TO ELEC PLANS 1 C3.10 SOUTH ENTRY ENLARGEMENT LIMITS OF WORK, TYP PROP FLUSH CONCRETE CURB, TYP 1 C4.50 SPU PARCEL #000720-0188 CONTRACTOR SHALL COORDINATE WITH SPU PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE SPU PARCEL NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. REFER TO C3.00 FOR CIVIL IMPROVEMENT'S LEGEND AND NOTES. 2.CONTRACTOR SHALL CONFIRM POC'S PRIOR TO CONSTRUCTION WHEN CONNECTING TO EXISTING SYSTEMS AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PRIOR TO CONSTRUCTION, FIELD VERIFY DOWNSTREAM INVERTS FOR ALL EXISTING AREA DRAINS AND CATCH BASINS WITH PROPOSED UPSTREAM CONNECTIONS. CONFIRM EXISTING OUTLET INVERTS PROVIDE POSITIVE DRAINAGE FOR ALL UPSTREAM PIPES. 3.PROJECT ASSUMES THAT ALL CITY EXISTING UTILITY INFRASTRUCTURE IS ADEQUATELY SIZED TO SUPPORT THE PROJECT. 4.PRIOR TO DEMOLITION, CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES TO REMAIN WITHIN AND ADJACENT TO LIMIT OF WORK. 5.ALL EXISTING PAVEMENT STRIPING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. PRODUCTS SHALL BE PER CITY OF RENTON PUBLIC WORKS DEPARTMENT STANDARD PLANS AND SPECIFICATIONS, AND WSDOT STANDARD PLANS AND SPECIFICATIONS. CONTRACTOR SHALL SUBMIT A PAVEMENT RESTORATION PLAN INCLUDING, CUTTING AND JOINTING, FOR ALL PAVEMENT BEING DISTURBED. 6.FULL DEPTH PAVEMENT REPLACEMENT, AND TRENCH RESTORATION AT UTILITY CUTS, SHALL BE PER CITY OF RENTON STD DETAILS. PAVEMENT SECTION SHALL BE PER CITY OF RENTON STD DETAILS, OR MATCH EXISTING WHICHEVER IS GREATER. MATCH EXISTING PAVEMENT MATERIAL PER ASSOCIATED STANDARD DETAILS. TRENCH AND BACKFILL SHALL BE PER CITY OF RENTON RENTON STD. PLAN 220.20. PEDESTRIAN CONCRETE PAVEMENT SHALL BE PER CITY OF RENTON STD. PLAN 102. VEHICULAR CONCRETE PAVING SHALL BE PER CITY OF RENTON RENTON STD. PLAN 110, 110.1 AND 111 AND PROJECT DETAILS. 7.PEDESTRIAN CONCRETE, MINIMUM SECTION: 4" CONCRETE 6" CSBC REFER TO LANDSCAPE FOR CONCRETE SCORING, COLOR, AND FINISHES. 8.THE RENTON MARKET AND PIAZZA PROJECT IS REQUIRED TO MEET STORMWATER REQUIREMENTS PER THE 2022 CITY OF RENTON SURFACE WATER DESIGN MANUAL (RSWDM). 8.1.FLOW CONTROL: THE PROJECT PROPOSES MORE THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE AND IS LOCATED IN THE PEAK FLOW RATE CONTROL STANDARD AREA. TARGET SURFACES DO NOT GENERATE MORE THAN A 0.15-CFS INCREASE IN THE EXISTING SITE CONDITIONS 100-YR PEAK FLOW, THEREFORE FLOW CONTROL IS NOT REQUIRED. 8.2.WATER QUALITY: THE PROJECT PROPOSES LESS THAN 5,000 SQUARE FEET OF NEW PLUS REPLACED IMPERVIOUS SURFACE (PGIS), AND LESS THAN ¾ ACRES OF POLLUTANT GENERATION PERVIOUS SURFACE (PGPS), THEREFORE WATER QUALITY IS NOT REQUIRED. 8.3.ON-SITE BMPS: THE PROJECT PROPOSES MORE THAN 2,000-SF OF NEW PLUS IMPERVIOUS SURFACE, THEREFORE ON-SITE STORMWATER MANAGEMENT (OSM) IS REQUIRED. ALL AVAILABLE OSM BMP'S WERE EVALUATED AND ARE NOT FEASIBLE FOR THE SITE. 8.4.THE PROJECT IS LOCATED IN AN AQUIFER PROTECTION AREA, THEREFORE STORMWATER MITIGATION FACILITIES SHALL NOT INFILTRATE AND SHALL BE COLLECTED VIA STORMWATER CONVEYANCE AND DISCHARGE TO THE CITY MAIN. 9.GREASE INTERCEPTOR SIZE AND VAULT PER MECHANICAL. 10.ELECTRICAL SERVICE FOR THE SITE IS PER ELECTRICAL. 11.STORM, SEWER, AND WATER INFRASTRUCTURE SHALL BE PER CITY OF RENTON STANDARDS AND WSDOT STANDARD SPECIFICATIONS, UNLESS OTHERWISE NOTED. 8" STORM DRAIN SHALL BE PLASTIC PIPE, UNLESS OTHERWISE NOTED. 12.ALL STORM DRAINAGE WITH 2-FT OR LESS OF COVER SHALL BE ADS N12 OR APPROVED EQUIVALENT. 13.ALL REGULATORY SIGNAGE AND PAVEMENT STRIPING SHALL CONFORM TO CITY OF RENTON AND MUTCD SPECIFICATIONS. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 CIVIL IMPROVEMENT PLAN 0 1 inch = 10 feet 5'10'20' RE F E R T O S H E E T C3 . 0 1 F O R C O N T I N U A T I O N R-433409 REFER TO SHEET C3.00 FOR CONTINUATION 2025-04-15 2 C3.51 VA R I E S 0. 9 % - 1 . 8 % VA R I E S 0. 9 % - 1 . 8 % 3 C3.51 3 7 . 7 4 G B 1. 8 0 % 37. 7 0 FFE: 37.83 3 7 . 7 3 ( E X ) 37.43 (E X ) 37. 5 1 ( E X ) 37. 7 5 ( E X ) 37. 6 6 ( E X ) 37. 6 8 ( E X ) 37. 8 0 ( E X ) 3 7 . 8 7 37. 8 4 1. 8 1 % 37.8 0 ( E X ) 0. 9 7 % 0.31% 37. 9 3 ( E X ) 37. 7 2 37. 6 1 G B 0.60% 1. 8 0 % 37.8 0 G B 37. 9 1 G B 60 LF 6" SD 24 LF 8" SD @ 0.4% ± RENTON MARKET 0.75 % REFER TO ARCH FOR BUILDING VESTIBULE AND ENCLOSURE PEDESTRIAN CONCRETE PAVING, TYP GRADE IN PLANAR FASHION BETWEEN SPOTS PROVIDED, TYP MATCH EXIST GRADE AT EXIST PAVEMENT, TYP INLINE CATCH BASIN. CONNECT TO EXIST SD RIM 37.4± 8" IE OUT 35.13 63 LF 4" TRENCH DRAIN (TD) SLOPE BOTTOM OF TD @ 0.5% MIN TOWARDS INLINE CATCH BASIN TD RIM 37.7± IE 36.89 GRADE BREAK, TYP OVERHANG EXTENTS PER ARCH 6" ROOF DRAIN, SLOPE @ 0.5% MIN AREA DRAIN (AD) WITH SOLID LID REROUTE EXIST 8" SD RIM 37.6± 8" IE 34.49 ± IN, SE (EX) 8" IE 34.49 ± OUT, W AREA DRAIN WITH SOLID LID CONNECT TO EXIST 8" SD RIM: 37.6± 6" IE 34.68± IN (N) 6" IE 34.68± IN (E) 8" IE 34.35± IN (S) 8" IE 34.35± OUT (SW,EX) 9 LF 8" SD @ 0.4% ± DOWNSPOUT CONNECTION ROOF DRAIN POC REFER TO ARCH FOR CONTINUATION, TYP CLEANOUT (CO), TYP ADJUST ELEC AS NEEDED, REPLACE IN KIND, TYP 2 LF 8" SD @ 0.5% MIN 37. 7 1 G B 37.4 2 G B NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 5 feet 2.5'5'10' 1 - SOUTH ENTRY ENLARGEMENT ENLARGEMENT PLAN R-433410 2025-04-15 2 C4.51 BU R N E T T A V E S BC 37. 6 3 ( E X ) TC 38 . 1 6 ( E X ) 37.70 ( E X ) 37.70 ( E X ) BC 37. 6 7 ( E X ) TC 38. 1 6 ( E X ) 38.3 5 ( E X ) 38.42 ( E X ) 7.39% 6.83% 0. 3 1 % ± 0. 0 6 % ± 7. 8 6 % 7. 6 7 % 12+00 2. 1 ' 7. 5 ' 3.0' 6. 0 ' 6. 0 ' 22.5' DRIVEWAY PER CITY OF RENTON STANDARD PLAN 104.2 PROTECT EXIST UTILITIES, TYP INSTALL RIGHT TURN ONLY SIGN, R3-5R EXIST BOLLARD, TYP MATCH EXIST GRADES, TYP RIGHT-OF-WAY, TYP REMOVABLE BOLLARDS, REFER TO LS PLAN LOCATE EXIST UTILITIES PRIOR TO CONSTRUCTION, NOTIFY ENGINEER OF ANY CONFLICTS EQ EQ 2. 0 ' 9.1' ± 22 . 5 ' CONCRETE PAD, REFER TO LS PLANS NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 5 feet 2.5'5'10' 1 - DRIVEWAY ENLARGEMENT ENLARGEMENT PLAN R-433411 REMOVABLE BOLLARD MOUNTING BASE PLATE FOR BOLLARD STORAGE, REFER TO LS PLAN. LOCATE EXIST UTILITIES PRIOR TO CONSTRUCTION, NOTIFY ENGINEER OF ANY CONFLICTS 2025-04-15 EXIST BOLLARD, TYP 11+00 1.6 6 % 1.6 6 % 2. 2 3 % * 2. 0 4 % * 1. 7 9 % 1.29% 1.59% 1.82% 1.38% VA R I E S 0- 2 . 5 % ± * VARIES 1.3-1.6 5 % ± UNMARKED LOADING ZONE PROP TRASH ENCLOSURE WITH PLANTERS REFER TO ARCH AND LS PLANS 3 7 . 8 2 ( E X ) 37.9 4 ( E X ) 37.6 1 ( E X ) 3 7 . 4 7 ( E X ) 37 . 7 8 ( E X ) 38 . 0 7 ( E X ) 1.35% APPROXIMATE LOCATION OF ADA PARKING PER 9/23/24 SITE VISIT EXIST LIGHT POLE AND HH, TYP VARIES 0.6-1.5%± VARIES 0.9-3.3%± 9.0' 6.6' EQ II 6.6' EQ II EQ I EQ I REPLACE ADA STALL STRIPING IN KIND, TYP 14 . 0 ' 45.0' 6. 0 ' BUILDING ENTRY BUILDING ENTRY CROSSWALK, TYP 1 C4.53 2 C4.53 PROTECT EXIST BIKE LOCKERS LOCATE ENCLOSURE ADJACENT TO BIKE LOCKER WITH MIN 6' CLEARANCE FOR BIKE ACCESS AND OUTSIDE OF ADA STALLS RIGHT-OF-WAY LINE, TYP NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 5 feet 2.5'5'10' 1 - ADA PARKING STALL ENLARGEMENT ENLARGEMENT PLAN R-433412 *EXISTING GRADING EXCEEDS MAXIMUM ADA REQUIREMENTS. SLOPES HAVE BEEN INTERPOLATED FROM SURVEYED SURFACE. PROJECT TO CONFIRM EXISTING SLOPES IN FIELD AND COORDINATE RESOLUTION. 2025-04-15 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 3 C3.20 2 C3.50 LO G A N A V E S 10+00 11+00 4.0'6" SS @ 1.0% MIN EXIST SS CO AND SIDE SEWER, 6" IE ~ 31.76 ± REFER TO ADD ALT #2 ON SHEET C3.00 EXIST SIDE SEWER REFER TO ADD ALT #2 ON SHEET C3.00 GREASE INTERCEPTOR (GI) VAULT REFER TO PLUMB PLAN CIVIL POC 6" IE OUT: 34.22 REPLACE LANDSCAPE, REFER TO LS PLAN PEDESTRIAN CONCRETE PAVING, TYP EXIST BUILDING, TYP SS LINE 10 SSCO, TYP EX SSMH NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 0 1 inch = 5 feet 2.5'5'10' 1 - SIDE SEWER ENLARGMENT ENLARGEMENT PLAN R-433413 2025-04-15 • • • • • • • • • • • • • • • • 37.8 37.6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36. 8 37. 0 37. 2 3 7 . 4 37.2 37.4 37.6 37.8 37.6 37.4 37.2 37.0 36.8 37.41 GB MATCH EXIST GRADES AT EXIST PAVEMENT, TYP 37 . 5 ± G B ( E X ) 37.6± G B ( E X ) 37.5± ( E X ) 37.0± ( E X ) 3 . 7 2 % 0. 7 5 % 0.7 5 % 1.50% 0.6 0 % 3 7 . 0 ± ( E X ) 36.6 ± ( E X ) 36.6 ± ( E X ) 0. 1 5 % 1.19% 1.50% 0.6 8 % 0. 5 0 % 1.0 % ± ( E X ) EXI S T VA R I E S ±0. 0 % E X I S T V A R I E S ± 0 . 7 % 37.6± ( E X ) EX I S T V A R I E S ±0 . 0 % EXIST VARIES ±2.7% 10 . 0 0 ' 8.50' 37.6± ( E X ) 0. 4 8 % MATCH EXIST GRADES AT EXIST PAVEMENT, TYP REFER TO LS PLANS FOR SOFTSCAPE GRADING, TYP FLUSH CURB, TYP REFER TO C3.01 AND C3.02 36.6 ± ( E X ) 37.5± (EX) 37. 4 ± ( E X ) 37 . 5 ± G B ( E X ) 0.0%± (EX) 0.8%± (EX)0.7%± (EX) 0. 3 % ± ( E X ) 0. 2 4 % 0.80% 0.51% 36 . 8 3 7 . 0 36. 6 3 6 . 8 3 7 . 2 3 7 . 4 37.32 G B 37.4 37 . 4 37.2 37.4 VA R I E S 1. 4 % - 3 . 3 % VARIES 0.5%-2.0% 36 . 7 8 37.31 37.35 G B 37.14 36.6 6 G B 36.6 4 G B MATCH EXIST GRADES AT EXIST PAVEMENT, TYP 37.55± 37 . 4 ± 37.3± 36. 7 5 ± 36 . 6 ± ( E X ) NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 ENLARGEMENT PLAN 0 1 inch = 10 feet 5'10'20' 1 C3.01 PIAZZA PARK GRADING ENLARGEMENT WEST SCALE: 1" = 10' R-433414 2025-04-15 37.6 37.8 38.0 38.2 38. 4 38.2 3 8 . 4 3 8 . 6 38 . 6 38 . 8 39. 0 38.8 38.4 38.6 38.8 38.8 38.6 MATCH EXIST GRADES AT EXIST PAVEMENT, TYP 37.7 ± ( E X ) 38.8± ( E X ) 38. 8 ± ( E X ) 37. 9 9 G B 38.5± G B ( E X ) 38.6± ( E X ) 38.22 G B 38. 6 2 38.9± ( E X ) 38.9± ( E X ) 38. 6 2 G B 38.07 G B 38.48 G B 38.26 G B 38. 5 8 G B 0. 7 6 % 0.89 % 1.33% 1. 7 1 % 4.72% 3.8 1 % 2.13% 0. 0 2 % 1.27% 1.55% 0.2 9 % 2. 5 9 % 1.48% 1.78 % 2.07% 0. 7 % ± ( E X ) 1. 0 % ± ( E X ) 38.8± ( E X ) 37. 4 ± ( E X ) 37.4 ± ( E X ) 3 7 . 4 ± G B ( E X ) 2. 0 5 % EXIST VARIES ±2.3% EX I S T VA R I E S ±1 . 1 % E X I S T V A R I E S ± 2 . 1 % 0. 2 % ± ( E X ) 38.5± (EX ) 3 . 3 3 % 37. 3 ± ( E X ) 37. 8 ± ( E X ) 37.8± (EX) 37.5± (EX) 37.5± (EX ) 2. 3 6 % REFER TO LS PLANS FOR SOFTSCAPE GRADING, TYP FLUSH CURB, TYP REFER TO C3.01 AND C3.02 37 . 8 ± ( E X ) 37.8 ± ( E X ) 37.8 ± ( E X ) 37.9± G B ( E X ) 37.95 38.00 G B 0. 7 5 % 1. 5 5 % 38. 0 0 EXIST VARIES ±1.8% 38.8 38.0 37.6 37.8 38 . 2 38 . 4 38 . 6 38 . 8 37.6 8. 8 0 ' 38. 6 ± 37. 4 ± NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 ENLARGEMENT PLAN 1 C3.02 PIAZZA PARK GRADING ENLARGEMENT EAST SCALE: 1" = 5' 0 1 inch = 5 feet 2.5'5'10' R-433415 2025-04-15 20 30 40 50 20 30 40 50 0+00 0+50 1+00 1+50 20 30 40 50 20 30 40 50 12" IE OUT=33.60 (S) 8" IE IN=33.60± (N) EXIST SDCB RIM=35.58 13 LF 8" SD @ 0.65% 8" IE OUT=33.68 (S) 8" IE IN=33.68 (E) SDCB 100, TYPE 1 RIM=35.59 8" IE OUT=34.29 (W) 8" IE IN=34.29 (S) AD 10 RIM=37.47 39 LF 8" SD @ 0.65% 8" IE OUT=34.55 (N) 6" IE IN=34.55 (NE) AD 11 RIM=37.30 27 LF 6" SD @ 1.00% 6" IE OUT=34.82 (SW) AD 12 RIM=37.40 0+00 8" IE OUT=34.27 (N) AD 20 RIM=36.75 94 LF 8" SD @ 0.65% 20 30 40 50 20 30 40 50 0+00 0+50 1+00 1+50 6" IE OUT=31.76± (W), EX 6" IE IN=31.76± (N) EXIST SSCO RIM=36.19 6" IE=31.91 (S) SSCO RIM=36.23 85 LF 6" SS @ 1.25% 1 C3.01 SD PROFILE 10 SCALE: H: 1"=10' V: 1"=10' 2 C3.01 SD PROFILE 20 SCALE: H: 1"=10' V: 1"=10' 3 C3.00 SS PROFILE 10 SCALE: H: 1"=10' V: 1"=10' EXIST POWER ASSUMED DEPTH EXIST POWER AND COMM ASSUMED DEPTH BUILDING POC REFER TO PLUMB PLAN GI VAULT, REFER TO PLUMB PLAN 6" IE=34.2211 LF 6" SS @ 1.25% EX 4" W EX 1.5" W EX 1" IRR PROP GRADE, TYP EXIST GRADE, TYP PROP GRADE, TYP EXIST GRADE, TYP MATCH EXIST GRADE, TYP EXIST WATER ASSUMED DEPTH, ADJUSTMENT OF WATER AND SS MAY BE NEEDED, COORDINATE WITH ENGINEER, REFER TO NOTE 4 EXIST SS 8" IE=31.4± EXIST SD 6" IE=32.2± EXIST MARKET BLDG 6" SS @ 1.0% MIN REFER TO PLAN FOR LANDSCAPE FD 31 LF 8" SD @ 1.00% 6" IE=33.16 (E) 1 LF 6" SS @ 89.07% NOTES: 1.REFER TO C1.00 TO C1.02 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS. 2.REFER TO C3.00 FOR CIVIL IMPROVEMENT'S NOTES. 3.INSTALL ETHAFOAM AT CROSSING WITH LESS THAN 12" OF CLEARANCE. REFER TO DETAIL 4/C3.51. 4.CONTRACTOR TO LOCATE EXISTING UTILITIES PRIOR TO INSTALLING PIPES. NOTIFY ENGINEER OF DISCREPANCIES AND COORDINATE CONFLICTS WITH DESIGN TEAM. Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 STORM & SEWER PROFILES R-433416 2025-04-15 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 1TYPICAL TRENCH AND BACKFILL NTS 2CLEANOUT FOR SANITARY SEWER SERVICE NTS 3PIPE BEDDING FOR SANITARY SEWERS NTS CIVIL IMPROVEMENT DETAILS R-433417 2025-04-15 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 CIVIL IMPROVEMENT DETAILS 6" VARIES (6" MIN) 6" 12" MIN PLANTING SOIL, REFER TO LS PLANS GRAVEL BACKFILL FOR DRAINS SLOTTED PIPE @ 0.5% MIN SIZE PER PLAN TYPICAL FRENCH DRAIN IN LANDSCAPE AREA FINISH GRADE PER PLAN 1FRENCH DRAIN NTS 4" BELOW GRADE (TYP) PLUG OR PIPE EXTENSION HARDSCAPE CLEANOUT SOFTSCAPE CLEANOUT HARDSCAPE AREA 45° BEND CLEANOUT NOTES: 1.CLEANOUT SIZE SHALL BE 4-INCH FOR ALL PIPE SIZES IN HARDSCAPE AREAS. PROVIDE PIPE REDUCER OR 4-INCH BRANCH ON WYE AS APPLICABLE. 2.SHALLOW CLEANOUTS AND CLEANOUTS IN SOFTSCAPE AREAS SHALL BE SIZED TO MATCH PIPE SIZE FOR PIPES EQUAL TO OR LESS THAN 6-INCHES. PIPES LARGER THAN 6-INCHES SHALL USE 6-INCH CLEANOUT WITH PIPE REDUCER OR 6-INCH BRANCH ON WYE AS APPLICABLE PIPE AND SIZE PER PLAN WYE, REFER TO CLEANOUT NOTE 1 SOFTSCAPE CLEANOUT, REFER TO CLEANOUT NOTE 2 PIPE AND SIZE PER CLEANOUT NOTE 2 4" PIPE HARDSCAPE PER PLAN PLUG OR PIPE EXTENSION PIPE AND SIZE PER PLAN WYE, REFER TO CLEANOUT NOTE 2 45° BEND 3STORM DRAIN CLEANOUT NTS R-433418 TRENCH DRAIN PER PLAN PAVEMENT PER LANDSCAPING, TYP #4 NOSING BAR, TYP 1 1 6" 6" 6" EXPANSION JOINT, TYP EQ EQ #4 BAR, 12" O.C., TYP EQEQ 2TRENCH DRAIN NTS UPPER UTILITY LOWER UTILITY 0.5" MIN LESS THAN 12" CLEARANCE PACK GAP BETWEEN UTILITIES AT CROSSING W/ 6" THICK POLYETHYLENE PLASTIC FOAM PAD 4ETHAFOAM INSTALLATION DETAIL NTS 2025-04-15 4' WHITE PAINTED STRIPE CURB FACE/BACK OF STALL 18 . 0 ' 9.0' Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 LANDSCAPE, REFER TO LS PLANS, TYP NOTES: 1.CONCRETE CURB SHALL BE CLASS 3000 CEMENT CONCRETE. 2.CURBS SHALL HAVE THRU-JOINTS AT 10 FT O.C. 6" R=1/2"R=1/2" 1FLUSH CURB DETAIL NTS PAVING DETAIL 2-4" PERMEABLE SURFACING BASE COURSE REFER TO LS PLANS FOR DETAILING OF PAVEMENT RELATIONSHIP TO TRUNK AND FLARE. 1" OF LOOSE 3/8" RUBBER GRANULE WITH NO BINDER IN AN 18" DIAMETER CIRCLE AROUND TREE TRUNK. 2" PERMEABLE SURFACING WEARING COURSE GEO-GRID GEOTEXTILE FABRIC EXISTING TREE 2" PERMEABLE SURFACING WEARING COURSE HARDSCAPE PER PLAN, TYP 2PERMEABLE PAVING TYPICAL SECTION NTS PRIME EDGES PER MANUFACTURES RECOMMENDATIONS, TYP HARDSCAPE PER PLAN, TYP PRIME EDGES PER MANUFACTURES RECOMMENDATIONS, TYP 2-4" PERMEABLE SURFACING BASE COURSE REFER TO LS PLANS FOR SOIL CELLS, SUBBASE, AND LANDSCAPE SECTION TREE PER LANDSCAPE PLANS NOTES: 1.PERMEABLE SURFACING SHALL BE FLEXI-PAVE POROUS FLEXIBLE PAVING OR APPROVED EQUIVALENT. INSTALL PER MANUFACTURES SPECIFICATIONS. 2.COORDINATE AND CONFIRM ALL WORK ASSOCIATED WITH EXISTING AND PROPOSED TREES WITH LANDSCAPE ARCHITECT. FOR EXISTING TREES, COORDINATE PAVEMENT REMOVAL, PREPARATION, AND PAVEMENT PLACEMENT AROUND TRUNK AND FLARE WITH ARBORIST TO PROTECT AND PREVENT DAMAGE TREES. AT EXISTING TREES AT PROPOSED TREES 1' - 4 " 1" TYP 8" REFER TO LS PLANS FOR DETAILING OF PAVEMENT RELATIONSHIP TO TRUNK AND FLARE. 1/2" POLYETHYLENE FOAM EXPANSION JOINT MATERIAL WRAPPED AROUND TREE TRUNK. REFER TO LS PLANS FOR DETAILING OF PAVEMENT RELATIONSHIP TO TRUNK AND FLARE. 1/2" POLYETHYLENE FOAM EXPANSION JOINT MATERIAL WRAPPED AROUND TREE TRUNK. REFER TO LS PLANS FOR DETAILING OF PAVEMENT RELATIONSHIP TO TRUNK AND FLARE. 1" OF LOOSE 3/8" RUBBER GRANULE WITH NO BINDER IN AN 18" DIAMETER CIRCLE AROUND TREE TRUNK. R-433419 3STANDARD PARKING STALL NTS 2025-04-15 2CEMENT CONCRETE DRIVEWAY NOTES NTS 3CEMENT CONCRETE CURBS NTS PAVING DETAILCall 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 R-433420 1CEMENT CONCRETE SIDEWALK NTS 2025-04-15 2TYPICAL LONGITUDINAL PATCH NTS 3TYPICAL CONCRETE PATCH NTS PAVING DETAILCall 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 R-433421 1TYPICAL TRANSVERSE PATCH NTS 2025-04-15 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON MARKET & PIAZZA CIVIL CONSTRUCTION PERMIT PR 2 4 - 0 0 0 0 8 2 LU A 2 4 - 0 0 0 3 6 4 C2 5 0 0 0 2 3 3 TE D - 4 0 - 4 3 3 4 PAVING DETAIL R-433422 2INTERSECTION CROSSWALK NTS 1MID-BLOCK CROSSWALK NTS 2025-04-15 Renton Market and Piazza – City of Renton Appendix E Appendix E Flow Control • Flow Control Application Map • RSWDM-Peak Rate Flow Control Standard Area Exceptions • WWHM Calculations – Existing vs Proposed Conditions 36,112 3009 WGS_1984_Web_Mercator_Auxiliary_Sphere Map Title Notes None Legend 2046 0 1023 2046Feet All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. Pipe Public Pipe Private Pipe Public Culvert Private Culvert Public Roofdrain Private Roofdrain Flow Control Application Peak Rate (Existing) Flow Control Duration (Existing) Flow Control Duration (Forested) Flood Problem Flow Water Main Wastewater Gravity Main Renton Private Citations PROJECT SITE COR GIS Map - Flow Control Application SECTION 1.2 CORE REQUIREMENTS 6/22/2022 2022 City of Renton Surface Water Design Manual 1-40 flow. This level of control is also intended to prevent creation of new conveyance system nuisance problems as described in Section 1.2.2.1. Effectiveness in Addressing Downstream Drainage Problems While the Peak Rate Flow Control Standard provides reasonable protection from many development-induced conveyance problems (up to the 100-year event), it does not prevent increases in runoff volumes or flow durations that tend to aggravate the three types of downstream drainage problems described in Section 1.2.2.1. Consequently, if one or more of these problems are identified through offsite analysis per Core Requirement #2, additional onsite flow control and/or offsite improvements will likely be required (see “Drainage Problem-Specific Mitigation Requirements” in Section 1.2.2.2). Target Surfaces Facilities in Peak Rate Flow Control Standard Areas must mitigate (either directly or in effect) the runoff from the following target surfaces within the threshold discharge area for which the facility is required: 1. New impervious surface that is not fully dispersed per the criteria in Section 1.2.3.2.C as specified in Appendix C. For individual lots within residential subdivision projects, the extent of new impervious surface shall be assumed as specified in Chapter 3. Note, any new impervious surface such as a bridge or boardwalk that spans the ordinary high water of a stream, pond, or lake may be excluded as a target surface if the runoff from such span is conveyed to the ordinary high water area in accordance with Criteria (b), (c), (d), and (e) of the “Direct Discharge Exemption“ (p 1-39). 2. New pervious surface that is not fully dispersed as specified in Appendix C. For individual lots within residential subdivision projects, the extent of new pervious surface shall be assumed to be the entire lot area, except the assumed impervious portion and any portion in which native conditions are preserved by covenant, tract, or easement. In addition, the new pervious surface on individual lots shall be assumed to be 100% grass. Exceptions The following exceptions apply only in Peak Rate Flow Control Standard Areas: 1. The facility requirement in Peak Rate Flow Control Standard Areas is waived for any threshold discharge area in which the target surfaces subject to this requirement will generate no more than a 0.15-cfs increase (when modeled using 15 minute time steps) in the existing site conditions 100 -year peak flow (modeled using same time step unit (e.g., 15 -minute) used to calculate the developed flow). Note: for the purposes of this calculation, target surfaces served by on-site BMPs per Appendix C may be modeled in accordance with the on-site BMP sizing credits in Core Requirement #9, Table 1.2.9.A. 2. The facility requirement in Peak Rate Flow Control Standard Areas may be waived for any threshold discharge area of a redevelopment project in which all of the following criteria are met: a) The target surfaces subject to the Peak Rate Flow Control Standard Areas facility requirement will generate no more than a 0.15-cfs increase (when modeled using 15 -minute time steps) in the existing site conditions 100 -year peak flow (modeled using same time step unit (e.g., 15 -minute) used to calculate the developed flow) at any natural discharge location from the project site (note: for the purposes of this calculation, target surfaces served by on-site BMPs per Appendix C may be modeled in accordance with the on-site BMP sizing credits in Core Requirement #9, Table 1.2.9.A, AND b) The increased runoff from target surfaces will not significantly impact a critical area, severe flooding problem, or severe erosion problem. RSWDM Peak Rate Flow Control Standard Area Exceptions ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.64 Program License Number: 200410007 Project Simulation Performed on: 03/17/2025 2:09 PM Report Generation Date: 03/17/2025 2:09 PM ————————————————————————————————— Input File Name: Market&Piazza_MGSFlood.fld Project Name: Renton Piazza Analysis Title: Flow Control Rates Comments: MS ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Full Period of Record Available used for Routing Climatic Region Number: 15 Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : Ecology Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.452 0.452 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 0.452 0.452 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- C, Lawn, Flat 0.227 SIDEWALKS/FLAT 0.225 Market & Piazza Full Site Existing Conditions vs Proposed Conditions Existing Conditions ---------------------------------------------- Subbasin Total 0.452 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- C, Lawn, Flat 0.203 SIDEWALKS/FLAT 0.249 ---------------------------------------------- Subbasin Total 0.452 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 0 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 27.759 _____________________________________ Total: 27.759 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 24.824 _____________________________________ Total: 24.824 Market & Piazza Full Site Existing Conditions vs Proposed Conditions Proposed Conditions Total Predevelopment Recharge is Greater than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.176 ac-ft/year, Post Developed: 0.157 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 0 ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Subbasin: Subbasin 1 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 0.105 2-Year 0.112 5-Year 0.137 5-Year 0.145 10-Year 0.170 10-Year 0.179 25-Year 0.230 25-Year 0.246 50-Year 0.283 50-Year 0.295 100-Year 0.356 100-Year 0.372 200-Year 0.359 200-Year 0.378 500-Year 0.362 500-Year 0.385 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals Flow rate increase: 2-year: 0.007 10-year: 0.009 100-year: 0.016 ~ 0.02cfs Market & Piazza Full Site Existing Conditions vs Proposed Conditions Renton Market and Piazza – City of Renton Appendix F Appendix F Conveyance Calculations • Basin Map • Rational Method • Flow Master Pipe Capacity Calculations • 25-yr, 100-yr Isopluvial Maps • Rational Method Coefficients • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • S 3RD ST LO G A N A V E S BU R N E T T A V E S EXISTING RENTON TRANSIT CENTER RENTON PAVILION EVENT CENTER 37.8 37.6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36. 8 37. 0 37. 2 3 7 . 4 37.2 37.4 37.6 37.8 37.6 37.8 38.0 38.2 38.4 38.2 3 8 . 4 38 . 6 38. 6 38. 8 39.0 38.8 38.6 38.8 38.4 38.6 38.8 38.8 38.6 37.6 37.4 37.2 37.0 36.8 LEGEND - RENTON MARKET SITE SURFACE AREA (SF) TRENCH DRAIN - NPGIS 5,720 TOTAL BASIN AREA 5,720-SF 0.13-AC BASIN BOUNDARY 0 1 inch = 20 feet 10'20'40' RENTON MARKET & PIAZZA TRENCH DRAIN BASIN AREA MARCH 2025APRIL 2025 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • S 3RD ST LO G A N A V E S BU R N E T T A V E S EXISTING RENTON TRANSIT CENTER RENTON PAVILION EVENT CENTER 37.8 37.6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36. 8 37. 0 37. 2 3 7 . 4 37.2 37.4 37.6 37.8 37.6 37.8 38.0 38.2 38.4 38.2 3 8 . 4 38 . 6 38. 6 38. 8 39.0 38.8 38.6 38.8 38.4 38.6 38.8 38.8 38.6 37.6 37.4 37.2 37.0 36.8 LEGEND - RENTON PAVILION SITE SURFACE AREA (SF) EXIST 8-INCH SD - NPGIS 9,101 EXISTING CONTRIBUTING ROOF AREA - NPGIS 3,500 PROPOSED VESTIBULE CANOPY - NPGIS 1,200 LANDSCAPE AREA - PGPS 3,053 TOTAL BASIN AREA 16,854-SF 0.39-AC BASIN BOUNDARY 0 1 inch = 20 feet 10'20'40' RENTON MARKET & PIAZZA EXISTING 8-INCH STORM DRAIN PIPE BASIN AREA MARCH 2025APRIL 2025 KPFF Consulting Engineers, Inc Renton Market KPFF 2300622 April 2025 Drainage Calculations - Runoff Calculation for Project Site Basin Name:Trench Drain and South Entry Vestibule Inline CB Basin Description: Assumptions & Constants Pr 25yr =3.4 in. ( RSWDM Figure 3.2.1.D 25-yr/24-hr Isopluvial Map) ar 25yr =2.66 (for 25-year event per RSWDM Table 3.2.1.B) br 25yr =0.65 (for 25-year event per RSWDM Table 3.2.1.B) Tc =5 minutes (minimum Tc per RSWDM pg. 3-12) C impervious =0.90 (per RSWDM Table 3.2.1.A for Pavement and Roofs) C pervious =0.25 (per RSWDM Table 3.2.1.A for Lawns) Runoff Calculations Area, impervious =5,720 sf Area, impervious =0.13 ac Area, pervious =0 sf Area, pervious =0.00 ac Area, total =0.13 ac C, average =0.90 i 25-yr =0.93 I25-yr =3.18 in/hr Total Flow, Q 25yr =0.38 cfs Description: 25yr Rational Method runoff calculations Total plaza area, existing and proposed paving contributing to Inline CB Renton Market RM Calcs.xls | TD Full Plaza 1 of 2 4/15/2025 | 10:52 AM KPFF Consulting Engineers, Inc Renton Market KPFF 2300622 April 2025 Drainage Calculations - Runoff Calculation for Project Site Basin Name:Proposed 8" SD Basin Description: Assumptions & Constants Pr 25yr =3.4 in. ( RSWDM Figure 3.2.1.D 25-yr/24-hr Isopluvial Map) ar 25yr =2.66 (for 25-year event per RSWDM Table 3.2.1.B) br 25yr =0.65 (for 25-year event per RSWDM Table 3.2.1.B) Tc =5 minutes (minimum Tc per RSWDM pg. 3-12) C impervious =0.90 (per RSWDM Table 3.2.1.A for Pavement and Roofs) C pervious =0.25 (per RSWDM Table 3.2.1.A for Lawns) Runoff Calculations Area, impervious =13,801 sf Area, impervious =0.32 ac Area, pervious =3,053 sf Area, pervious =0.07 ac Area, total =0.39 ac C, average =0.78 i 25-yr =0.93 I25-yr =3.18 in/hr Total Flow, Q 25yr =0.96 cfs Description: 25yr Rational Method runoff calculations Area Contributing to Proposed 8" SD Renton Market RM Calcs.xls | Proposed 8" 2 of 2 4/15/2025 | 10:52 AM 4" Trench Drain Minium Depth Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.011Roughness Coefficient %0.500Channel Slope in9.8Constructed Depth in4.00Constructed Top Width cfs0.38Discharge Results in9.7Normal Depth ft²0.2Flow Area ft1.7Wetted Perimeter in1.3Hydraulic Radius in3.96Top Width in6.9Critical Depth %1.711Critical Slope ft/s2.14Velocity ft0.07Velocity Head ft0.88Specific Energy 0.516Froude Number SubcriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in9.7Normal Depth in6.9Critical Depth %0.500Channel Slope %1.711Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 9/20/2024 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterTD FM.fm8 Trench Drain Basin 25yr flow: 0.38 cfs Trench drain min depth is 9.8", Therefore OK Proposed 8" SD Reroute Project Description Manning FormulaFriction Method DischargeSolve For Input Data 0.010Roughness Coefficient %0.400Channel Slope in8.0Normal Depth in8.0Diameter Results cfs0.99Discharge ft²0.3Flow Area ft2.1Wetted Perimeter in2.0Hydraulic Radius in0.00Top Width in5.7Critical Depth %100.0Percent Full %0.551Critical Slope ft/s2.85Velocity ft0.13Velocity Head ft0.79Specific Energy (N/A)Froude Number cfs1.07Maximum Discharge cfs0.99Discharge Full %0.400Slope Full UndefinedFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss %0.0Average End Depth Over Rise %100.0Normal Depth Over Rise ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in8.0Normal Depth in5.7Critical Depth %0.400Channel Slope %0.551Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/10/2024 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterTD FM.fm8 8" SD Reroute Basin 25yr flow: 0.96 cfs Therefore Ok • • • • • • • • • • • • • • • • 37.8 37. 6 37 . 4 37 . 2 37 . 0 36 . 8 36 . 6 36. 8 37. 0 37. 2 3 7 . 4 37. 2 37.4 37.6 37.8 37.6 37.8 38.0 38.2 38.4 38.2 3 8 . 4 3 8 . 6 38 . 6 38 . 8 39. 0 38.8 38.6 38.8 38.4 38.6 38.8 38.8 38.6 37.6 37.4 37.2 37.0 36.8 S 3RD ST LO G A N A V E S BU R N E T T A V E S AD 10 (EXIST) AD 11 AD 12 CB 100, TYPE 1 AD 20 LEGEND - RENTON PIAZZA SITE SD STRUCTURE IMPERVIOUS AREA (SF) PERVIOUS AREA (SF) AD 12 0 3,277 AD 11 2,063 233 AD 10 1,199 0 AD 20 2,662 3,317 TOTAL ON-SITE AREA 2,895 7,718 LIMITS OF WORK RENTON PIAZZA BASIN EXHIBIT MARCH 2025 0 1 inch = 10 feet 5'10'20' APRIL 2025 KPFF Consulting Engineers, Inc Renton Piazza KPFF 2300622 April 2025 Drainage Calculations - Runoff Calculation for Project Site Basin Name:Catch Basin 100 Basin Description: Assumptions & Constants Pr 25yr =3.4 in. ( RSWDM Figure 3.2.1.D 25-yr/24-hr Isopluvial Map) ar 25yr =2.66 (for 25-year event per RSWDM Table 3.2.1.B) br 25yr =0.65 (for 25-year event per RSWDM Table 3.2.1.B) Tc =5 minutes (minimum Tc per RSWDM pg. 3-12) C impervious =0.90 (per RSWDM Table 3.2.1.A for Pavement and Roofs) C pervious =0.25 (per RSWDM Table 3.2.1.A for Lawns) Runoff Calculations Area, impervious =7,987 sf Area, impervious =0.18 ac Area, pervious =16,891 sf Area, pervious =0.39 ac Area, total =0.57 ac C, average =0.46 i 25-yr =0.93 I25-yr =3.18 in/hr Total Flow, Q 25yr =0.83 cfs Description: 25yr Rational Method runoff calculations Total piazza area, existing and proposed paving contributing to CB-100 Renton Piazza RM Calcs.xls | CB-100 1 of 1 4/15/2025 | 10:56 AM CB-100 Project Description Manning FormulaFriction Method Full Flow CapacitySolve For Input Data 0.012Roughness Coefficient %0.650Channel Slope in8.0Normal Depth in8.0Diameter cfs1.06Discharge Results cfs1.06Discharge in8.0Normal Depth ft²0.3Flow Area ft2.1Wetted Perimeter in2.0Hydraulic Radius ft0.00Top Width in5.8Critical Depth %100.0Percent Full %0.830Critical Slope ft/s3.02Velocity ft0.14Velocity Head ft0.81Specific Energy (N/A)Froude Number cfs1.14Maximum Discharge cfs1.06Discharge Full %0.650Slope Full SubcriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss %0.0Average End Depth Over Rise %100.0Normal Depth Over Rise ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in8.0Normal Depth in5.8Critical Depth %0.650Channel Slope %0.830Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2/13/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterPiazza FM.fm8 Pipe Capacity: 1.06-cfs > 25-yr flow rate: 0.83-cfs Therefore ok SECTION 3.2 RUNOFF COMPUTATION AND ANALYSIS METHODS 6/22/2022 2022 City of Renton Surface Water Design Manual 3-16 FIGURE 3.2.1.C 25-YEAR 24-HOUR ISOPLUVIALS SITE 25 yr 24hr: 3.4 in 3.2.1 RATIONAL METHOD 2022 City of Renton Surface Water Design Manual 6/22/2022 3-17 FIGURE 3.2.1.D 100-YEAR 24-HOUR ISOPLUVIALS SITE 100 yr 24hr: 3.9 in Renton Market and Piazza – City of Renton Appendix G Appendix G Bond Quantities 1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA): Phone: CED Permit # (C): Address: Site Address: Street Intersection: Addt'l Project Owner: Parcel #(s): Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: Total Estimated Construction Costs E A + B + C + D 243,480.85$ Estimated Civil Construction Permit - Construction Costs2 Stormwater (Drainage)C 65,641.74$ As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance. Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees. Roadway (Erosion Control + Transportation)D 150,595.02$ Water A -$ Wastewater (Sanitary Sewer)B 27,244.10$ Abbreviated Legal Description: MOTOR LINE ADD TO RENTON 2-3 & 16-17-18 LESS ST 233 Burnett Ave S, Renton, WA 98057 1055 S Grady Way Burnett Ave S/S 3rd St 425.430.6400 4/16/2025 Prepared by: FOR APPROVALProject Phase 1 jenifer.clapham@kpff.com Jenifer Clapham 40799 KPFF Consulting Engineers 1601 5th Ave, Suite 1600, Seattle, WA 98101 206.926.0549 SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION CITY OF RENTON CITY OF RENTON 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information Renton Market and Piazza Renton, WA 98057 5696000055, 5696000065, 5696000120,0007200188, and 5696000050 City of Renton Page 2 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 4/15/2025 2025-04-15 10.3%2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is: Page 3 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 4/15/2025 CED Permit #: Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 7.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each Catch Basin Protection ESC-3 145.00$ Each 15 2,175.00 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY Ditching ESC-5 10.50$ CY Excavation-bulk ESC-6 2.30$ CY Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF Fence, Temporary (NGPE)ESC-8 1.75$ LF 986 1,725.50 Geotextile Fabric ESC-9 3.00$ SY Hay Bale Silt Trap ESC-10 0.60$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY Interceptor Swale / Dike ESC-12 1.15$ LF Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY Level Spreader ESC-14 2.00$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY Piping, temporary, CPP, 6"ESC-17 13.75$ LF Piping, temporary, CPP, 8"ESC-18 16.00$ LF Piping, temporary, CPP, 12"ESC-19 20.50$ LF Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each 1 2,050.00 Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY TESC Supervisor ESC-30 125.00$ HR Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR Unit Reference #Price Unit Quantity Cost SWDM D.2.1.2.5 4.00$ LF 1,276 5,104.00 EROSION/SEDIMENT SUBTOTAL:11,054.50 SALES TAX @ 10.3%1,138.61 EROSION/SEDIMENT TOTAL:12,193.11 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) Straw Wattle WRITE-IN-ITEMS Page 4 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Version: 4/01/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 7.00$ CY Backfill & Compaction- trench GI-2 10.25$ CY 32 328.00 107 1,096.75 Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY 68 78.20 1108 1,274.20 Bollards - fixed GI-4 275.00$ Each Bollards - removable GI-5 520.00$ Each 2 1,040.00 Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre Excavation - bulk GI-7 2.30$ CY Excavation - Trench GI-8 5.75$ CY 32 184.00 107 615.25 Fencing, cedar, 6' high GI-9 23.00$ LF Fencing, chain link, 4'GI-10 44.00$ LF Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each Fill & compact - common barrow GI-13 28.75$ CY Fill & compact - gravel base GI-14 31.00$ CY Fill & compact - screened topsoil GI-15 44.75$ CY Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY Grading, fine, by hand GI-19 2.90$ SY Grading, fine, with grader GI-20 2.30$ SY 68 156.40 1,108 2,548.40 Monuments, 3' Long GI-21 1,025.00$ Each Sensitive Areas Sign GI-22 8.00$ Each Sodding, 1" deep, sloped ground GI-23 9.25$ SY 995 9,203.75 Surveying, line & grade GI-24 975.00$ Day Surveying, lot location/lines GI-25 2,050.00$ Acre Topsoil Type A (imported)GI-26 32.75$ CY Traffic control crew ( 2 flaggers )GI-27 137.75$ HR Trail, 4" chipped wood GI-28 9.15$ SY Trail, 4" crushed cinder GI-29 10.25$ SY Trail, 4" top course GI-30 13.75$ SY Conduit, 2"GI-31 5.75$ LF Wall, retaining, concrete GI-32 63.00$ SF Wall, rockery GI-33 17.25$ SF SUBTOTAL THIS PAGE:262.20 484.40 15,778.35 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) Page 5 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY AC Removal/Disposal RI-4 40.00$ SY Barricade, Type III ( Permanent )RI-5 64.25$ LF Guard Rail RI-6 34.50$ LF Curb & Gutter, rolled RI-7 19.50$ LF 40 780.00 Curb & Gutter, vertical RI-8 14.25$ LF 5 71.25 300 4,275.00 Curb and Gutter, demolition and disposal RI-9 20.50$ LF 45 922.50 Curb, extruded asphalt RI-10 6.25$ LF Curb, extruded concrete RI-11 8.00$ LF Sawcut, asphalt, 3" depth RI-12 3.00$ LF Sawcut, concrete, per 1" depth RI-13 5.00$ LF 270 1,350.00 1,025 5,125.00 Sealant, asphalt RI-14 2.25$ LF Shoulder, gravel, 4" thick RI-15 17.25$ SY Sidewalk, 4" thick RI-16 43.50$ SY 20 870.00 1,108 48,198.00 Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY 20 740.00 1,108 40,996.00 Sidewalk, 5" thick RI-18 47.00$ SY Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY Sign, Handicap RI-20 97.00$ Each Striping, per stall RI-21 8.00$ Each Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF Striping, 4" reflectorized line RI-23 0.55$ LF Additional 2.5" Crushed Surfacing RI-24 4.15$ SY HMA 1/2" Overlay 1.5" RI-25 16.00$ SY HMA 1/2" Overlay 2"RI-26 20.75$ SY HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY HMA Road, 4", 4.5" ATB RI-31 43.50$ SY Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY Thickened Edge RI-34 10.00$ LF SUBTOTAL THIS PAGE:3,012.50 1,721.25 98,594.00 (B)(C)(D)(E) Page 6 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY 4" select borrow PL-3 5.75$ SY 1.5" top course rock & 2.5" base course PL-4 16.00$ SY SUBTOTAL PARKING LOT SURFACING: (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION: (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 Street Light System ( # of Poles)TR-2 Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING: (B)(C)(D)(E) WRITE-IN-ITEMS Vehicular Concrete Pavement 75.00$ SY 75 5,625.00 SUBTOTAL WRITE-IN ITEMS:5,625.00 STREET AND SITE IMPROVEMENTS SUBTOTAL:3,274.70 7,830.65 114,372.35 SALES TAX @ 10.3%337.29 806.56 11,780.35 STREET AND SITE IMPROVEMENTS TOTAL:3,611.99 8,637.21 126,152.70 (B)(C)(D)(E) Page 7 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 30.00$ SY * (CBs include frame and lid) Beehive D-2 103.00$ Each Through-curb Inlet Framework D-3 460.00$ Each CB Type I D-4 1,725.00$ Each 1 1,725.00 CB Type IL D-5 2,000.00$ Each CB Type II, 48" diameter D-6 3,500.00$ Each for additional depth over 4' D-7 550.00$ FT CB Type II, 54" diameter D-8 4,075.00$ Each for additional depth over 4'D-9 570.00$ FT CB Type II, 60" diameter D-10 4,225.00$ Each for additional depth over 4'D-11 690.00$ FT CB Type II, 72" diameter D-12 6,900.00$ Each for additional depth over 4'D-13 975.00$ FT CB Type II, 96" diameter D-14 16,000.00$ Each for additional depth over 4'D-15 1,050.00$ FT Trash Rack, 12"D-16 400.00$ Each Trash Rack, 15"D-17 470.00$ Each Trash Rack, 18"D-18 550.00$ Each Trash Rack, 21"D-19 630.00$ Each Cleanout, PVC, 4"D-20 170.00$ Each 4 680.00 Cleanout, PVC, 6"D-21 195.00$ Each Cleanout, PVC, 8"D-22 230.00$ Each Culvert, PVC, 4" D-23 11.50$ LF Culvert, PVC, 6" D-24 15.00$ LF 145 2,175.00 Culvert, PVC, 8" D-25 17.00$ LF 75 1,275.00 Culvert, PVC, 12" D-26 26.00$ LF Culvert, PVC, 15" D-27 40.00$ LF Culvert, PVC, 18" D-28 47.00$ LF Culvert, PVC, 24"D-29 65.00$ LF Culvert, PVC, 30" D-30 90.00$ LF Culvert, PVC, 36" D-31 150.00$ LF Culvert, CMP, 8"D-32 22.00$ LF Culvert, CMP, 12"D-33 33.00$ LF SUBTOTAL THIS PAGE:1,725.00 4,130.00 (B)(C)(D)(E) Quantity Remaining (Bond Reduction) (B)(C) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Page 8 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Quantity Remaining (Bond Reduction) (B)(C) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES DRAINAGE (Continued) Culvert, CMP, 15"D-34 40.00$ LF Culvert, CMP, 18"D-35 47.00$ LF Culvert, CMP, 24"D-36 64.00$ LF Culvert, CMP, 30"D-37 90.00$ LF Culvert, CMP, 36"D-38 150.00$ LF Culvert, CMP, 48"D-39 218.00$ LF Culvert, CMP, 60"D-40 310.00$ LF Culvert, CMP, 72"D-41 400.00$ LF Culvert, Concrete, 8"D-42 48.00$ LF Culvert, Concrete, 12"D-43 55.00$ LF Culvert, Concrete, 15"D-44 89.00$ LF Culvert, Concrete, 18"D-45 100.00$ LF Culvert, Concrete, 24"D-46 120.00$ LF Culvert, Concrete, 30"D-47 145.00$ LF Culvert, Concrete, 36"D-48 175.00$ LF Culvert, Concrete, 42"D-49 200.00$ LF Culvert, Concrete, 48"D-50 235.00$ LF Culvert, CPE Triple Wall, 6" D-51 16.00$ LF Culvert, CPE Triple Wall, 8" D-52 18.00$ LF Culvert, CPE Triple Wall, 12" D-53 27.00$ LF Culvert, CPE Triple Wall, 15" D-54 40.00$ LF Culvert, CPE Triple Wall, 18" D-55 47.00$ LF Culvert, CPE Triple Wall, 24" D-56 64.00$ LF Culvert, CPE Triple Wall, 30" D-57 90.00$ LF Culvert, CPE Triple Wall, 36" D-58 149.00$ LF Culvert, LCPE, 6"D-59 69.00$ LF Culvert, LCPE, 8"D-60 83.00$ LF Culvert, LCPE, 12"D-61 96.00$ LF Culvert, LCPE, 15"D-62 110.00$ LF Culvert, LCPE, 18"D-63 124.00$ LF Culvert, LCPE, 24"D-64 138.00$ LF Culvert, LCPE, 30"D-65 151.00$ LF Culvert, LCPE, 36"D-66 165.00$ LF Culvert, LCPE, 48"D-67 179.00$ LF Culvert, LCPE, 54"D-68 193.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 9 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Quantity Remaining (Bond Reduction) (B)(C) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES DRAINAGE (Continued) Culvert, LCPE, 60"D-69 206.00$ LF Culvert, LCPE, 72"D-70 220.00$ LF Culvert, HDPE, 6"D-71 48.00$ LF Culvert, HDPE, 8"D-72 60.00$ LF Culvert, HDPE, 12"D-73 85.00$ LF Culvert, HDPE, 15"D-74 122.00$ LF Culvert, HDPE, 18"D-75 158.00$ LF Culvert, HDPE, 24"D-76 254.00$ LF Culvert, HDPE, 30"D-77 317.00$ LF Culvert, HDPE, 36"D-78 380.00$ LF Culvert, HDPE, 48"D-79 443.00$ LF Culvert, HDPE, 54"D-80 506.00$ LF Culvert, HDPE, 60"D-81 570.00$ LF Culvert, HDPE, 72"D-82 632.00$ LF Pipe, Polypropylene, 6"D-83 96.00$ LF Pipe, Polypropylene, 8"D-84 100.00$ LF Pipe, Polypropylene, 12"D-85 100.00$ LF Pipe, Polypropylene, 15"D-86 103.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 119.00$ LF Pipe, Polypropylene, 30"D-89 136.00$ LF Pipe, Polypropylene, 36"D-90 185.00$ LF Pipe, Polypropylene, 48"D-91 260.00$ LF Pipe, Polypropylene, 54"D-92 381.00$ LF Pipe, Polypropylene, 60"D-93 504.00$ LF Pipe, Polypropylene, 72"D-94 625.00$ LF Culvert, DI, 6"D-95 70.00$ LF Culvert, DI, 8"D-96 101.00$ LF 12 1,212.00 95 9,595.00 Culvert, DI, 12"D-97 121.00$ LF Culvert, DI, 15"D-98 148.00$ LF Culvert, DI, 18"D-99 175.00$ LF Culvert, DI, 24"D-100 200.00$ LF Culvert, DI, 30"D-101 227.00$ LF Culvert, DI, 36"D-102 252.00$ LF Culvert, DI, 48"D-103 279.00$ LF Culvert, DI, 54"D-104 305.00$ LF Culvert, DI, 60"D-105 331.00$ LF Culvert, DI, 72"D-106 357.00$ LF SUBTOTAL THIS PAGE:1,212.00 9,595.00 (B)(C)(D)(E) Page 10 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Quantity Remaining (Bond Reduction) (B)(C) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Specialty Drainage Items Ditching SD-1 10.90$ CY Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF French Drain (3' depth)SD-4 30.00$ LF 130 3,900.00 Geotextile, laid in trench, polypropylene SD-5 3.40$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each Pond Overflow Spillway SD-7 18.25$ SY Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each Riprap, placed SD-11 48.20$ CY Tank End Reducer (36" diameter)SD-12 1,375.00$ Each Infiltration pond testing SD-13 143.00$ HR Permeable Pavement SD-14 45.00$ 100 4,500.00 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS:8,400.00 (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 Each Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES: (B)(C)(D)(E) Page 11 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Quantity Remaining (Bond Reduction) (B)(C) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) Area Drain WI-1 2,000.00$ Each 9 18,000.00 TrenchDrain WI-2 250.00$ LF 63 15,750.00 In-line Catch Basin WI-3 700.00$ Each 1 700.00 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS:34,450.00 DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:1,212.00 1,725.00 56,575.00 SALES TAX @ 10.3%124.84 177.68 5,827.23 DRAINAGE AND STORMWATER FACILITIES TOTAL:1,336.84 1,902.68 62,402.23 (B) (C) (D) (E) Page 12 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 3,400.00$ Each Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF Gate Valve, 4 inch Diameter W-7 1,225.00$ Each Gate Valve, 6 inch Diameter W-8 1,350.00$ Each Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each Fire Hydrant Assembly W-12 5,000.00$ Each Permanent Blow-Off Assembly W-13 1,950.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each WATER SUBTOTAL: SALES TAX @ 10.3% WATER TOTAL: (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 13 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Version: 4/1/2024 Printed 4/15/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,150.00$ Each 2 2,300.00 Grease Interceptor, 500 gallon SS-2 9,200.00$ Each 1 9,200.00 Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF 120 13,200.00 Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF Manhole, 48 Inch Diameter SS-11 6,900.00$ Each Manhole, 54 Inch Diameter SS-13 6,800.00$ Each Manhole, 60 Inch Diameter SS-15 7,600.00$ Each Manhole, 72 Inch Diameter SS-17 10,600.00$ Each Manhole, 96 Inch Diameter SS-19 16,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF Outside Drop SS-24 1,700.00$ LS Inside Drop SS-25 1,150.00$ LS Sewer Pipe, PVC, ____ Inch Diameter SS-26 Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL:24,700.00 SALES TAX @ 10.3%2,544.10 SANITARY SEWER TOTAL:27,244.10 (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 14 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Version: 4/1/2024 Printed 4/15/2025 1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (C): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b) (b)3,611.99$ Future Public Improvements Subtotal (c)8,637.21$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d) (d)65,641.74$ (e) (f) Site Restoration Existing Right-of-Way and Storm Drainage Improvements Maintenance Bond 15,578.19$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead, profit, and taxes. EST1 ((b) + (c) + (d)) x 20% -$ MAINTENANCE BOND */** (after final acceptance of construction) 12,193.11$ 3,611.99$ 71,059.73$ 12,193.11$ -$ 65,641.74$ -$ 83,252.84$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 4/16/2025 Jenifer Clapham 40799 KPFF Consulting Engineers R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) 206.926.0549 jenifer.clapham@kpff.com Renton Market and Piazza 233 Burnett Ave S, Renton, WA 98057 5696000055, 5696000065, 5696000120,0007200188, and 5696000050 FOR APPROVAL 1601 5th Ave, Suite 1600, Seattle, WA 98101 Page 15 of 15 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Version: 4/1/2024 Printed 4/15/2025 Renton Market and Piazza – City of Renton Appendix H Appendix H Operations and Maintenance Manual APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 6/22/2022 2022 City of Renton Surface Water Design Manual A-10 NO. 5 – CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Structure Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Sump of catch basin contains no sediment. Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%. No Trash or debris blocking or potentially blocking entrance to catch basin. Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. No trash or debris in the catch basin. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). No dead animals or vegetation present within catch basin. Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents. Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb. Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab. Frame is sitting flush on top slab. Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch basin is unsound. Catch basin is sealed and is structurally sound. Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards. Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of inlet/outlet pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2022 City of Renton Surface Water Design Manual 6/22/2022 A-11 NO. 5 – CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Inlet/Outlet Pipe (cont.) Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards. Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. Damaged or missing grate Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance. Grate is in place and meets design standards. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance. Cover/lid protects opening to structure. Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 6/22/2022 2022 City of Renton Surface Water Design Manual A-12 NO. 6 – CONVEYANCE PIPES AND DITCHES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes. Vegetation/root growth in pipe Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe. Pipe repaired or replaced. Damaged pipes Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Pipe repaired or replaced. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches. Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Excessive vegetation growth Vegetation that reduces free movement of water through ditches. Water flows freely through ditches. Erosion damage to slopes Any erosion observed on a ditch slope. Slopes are not eroding. Rock lining out of place or missing (If applicable) One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil. Replace rocks to design standards. APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 6/22/2022 2022 City of Renton Surface Water Design Manual A-16 NO. 10 – GATES/BOLLARDS/ACCESS BARRIERS MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Chain Link Fencing Gate Damaged or missing members Missing gate. Gates in place. Broken or missing hinges such that gate cannot be easily opened and closed by a maintenance person. Hinges intact and lubed. Gate is working freely. Gate is out of plumb more than 6 inches and more than 1 foot out of design alignment. Gate is aligned and vertical. Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in place. Locking mechanism does not lock gate Locking device missing, non-functioning or does not link to all parts. Locking mechanism prevents opening of gate. Openings in fabric Openings in fabric are such that an 8-inch diameter ball could fit through. Fabric mesh openings within 50% of grid size. Bar Gate Damaged or missing cross bar Cross bar does not swing open or closed, is missing or is bent to where it does not prevent vehicle access. Cross bar swings fully open and closed and prevents vehicle access. Locking mechanism does not lock gate Locking device missing, non-functioning or does not link to all parts. Locking mechanism prevents opening of gate. Support post damaged Support post does not hold cross bar up. Cross bar held up preventing vehicle access into facility. Bollards Damaged or missing bollards Bollard broken, missing, does not fit into support hole or hinge broken or missing. No access for motorized vehicles to get into facility. Bollards do not lock Locking assembly or lock missing or cannot be attached to lock bollard in place. No access for motorized vehicles to get into facility. Boulders Dislodged boulders Boulders not located to prevent motorized vehicle access. No access for motorized vehicles to get into facility. Evidence of vehicles circumventing boulders Motorized vehicles going around or between boulders. No access for motorized vehicles to get into facility. Renton Market and Piazza – City of Renton Appendix I Appendix I Geotech Report associated earth sciences incorporated Associated Earth Sciences, Inc. www.aesgeo.com Kirkland | Mount Vernon | Tacoma Subsurface Exploration, Geologic Hazards, and   Geotechnical Engineering Report  CITY OF RENTON PAVILION  Renton, Washington  Prepared For:  CITY OF RENTON  Project No. 20240102E001  October 31, 2024  Kirkland | Tacoma | Mount Vernon  425‐827‐7701 | www.aesgeo.com October 31, 2024  Project No. 20240102E001  City of Renton  1055 South Grady Way  Renton, Washington 98057  Attention: Ms. Debbie Boodell  Subject:  Subsurface Exploration, Geologic Hazards, and     Geotechnical Engineering Report  City of Renton Pavilion  233 Burnett Avenue South  Renton, Washington  Dear Ms. Boodell:  We are pleased to present the enclosed copy of our geotechnical report. This report summarizes  the results of our subsurface exploration, geologic hazard, and geotechnical engineering studies  and offers geotechnical recommendations for the design of the proposed project.  We have enjoyed working with you on this study and are confident that the recommendations  presented in this report will aid in the successful completion of your project. Please contact me  if you have any questions or if we can be of additional help to you.  Sincerely,  ASSOCIATED EARTH SCIENCES, INC.  Kirkland, Washington  ______________________________  Jeffrey P. Laub, P.E., L.G., L.E.G.  Associate Engineer/Geologist   JPL/jh – 20240102E001‐002  SUBSURFACE EXPLORATION, GEOLOGIC HAZARDS, AND  GEOTECHNICAL ENGINEERING REPORT  CITY OF RENTON PAVILION Renton, Washington  Prepared for:  City of Renton  1055 South Grady Way  Renton, Washington 98057  Prepared by:  Associated Earth Sciences, Inc.  911 5th Avenue  Kirkland, Washington 98033  425‐827‐7701  October 31, 2024  Project No. 20240102E001  Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Project and Site Conditions  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 1  I.PROJECT AND SITE CONDITIONS 1.0  INTRODUCTION  This report presents the results of Associated Earth Sciences, Inc.’s (AESI’s) subsurface  exploration, geologic hazard, and geotechnical engineering study for the proposed  improvements to the City of Renton Pavilion, located at 233 Burnett Avenue South in Renton,  Washington (King County Parcel No. 5696000055). The site location is shown on the “Vicinity  Map,” Figure 1. The approximate locations of explorations completed for this study are shown  on the “Existing Site and Exploration Plan,” Figure 2 and the “Site and Exploration Plan,” Figure 3.  Interpretive exploration logs of the subsurface explorations completed to date at the site are  included in Appendix A.  1.1  Purpose and Scope  The purpose of this study was to provide subsurface soil and groundwater data to be utilized in  the design of the above‐referenced project. Our study included reviewing available geologic  literature and previous explorations nearby, drilling three exploration borings, and performing  geologic studies to assess the type, thickness, distribution, and physical properties of the  subsurface soils and shallow groundwater. Geotechnical engineering studies were completed to  determine site preparation and structural fill recommendations, types of suitable foundations,  anticipated foundation settlements, appropriate floor slab support, drainage considerations,  pavement design, and to provide an opinion regarding stormwater infiltration feasibility. This  report summarizes our current fieldwork and offers recommendations based on our present  understanding of the project. We recommend that we be allowed to review our  recommendations and revise them, if needed, when a project design has been finalized.  1.2  Authorization  Our work was performed in general accordance with our scope of work dated May 2, 2024 and  authorized by means of City of Renton agreement CAG‐24‐258 signed August 14, 2024. This  report has been prepared for the exclusive use of the City of Renton and their agents, for specific  application to this project. Within the limitations of scope, schedule, and budget, our services  have been performed in accordance with generally accepted geotechnical engineering and  engineering geology practices in effect in this area at the time our report was prepared. No other  warranty, express or implied, is made.   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Project and Site Conditions      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 2  2.0  PROJECT AND SITE DESCRIPTION    The subject site is that of the existing pavilion building at 233 Burnett Avenue South in Renton,  Washington. The site encompasses approximately 0.9 acres and is currently occupied by the  approximately 15,000‐gross‐square‐foot pavilion building, associated paved driveway and  parking to the north, and landscaped Piazza Park to the south (Figure 2). The pavilion building  was originally built in 1948 and last renovated in 2010.    Based on review of the provided site survey by KPG PSOMAS (dated 08/13/2024), the site  topography is relatively flat and gently descends toward the northwest, from an approximate  elevation of 39 feet near the stone fountain at the southeast corner of the site, to an approximate  elevation of 36 feet at the northwestern property boundary adjacent to Logan Avenue South.    We understand that that the currently‐proposed project includes a renovation of the pavilion  building, including the addition of a vestibule and canopy to the southern (market) entrance of  the building and improvements to the interior of the building which will include pouring new  floor slab portions, the addition of a trash enclosure in the northern parking lot, and updates to  existing landscaping and hardscaping elements (Figure 3). We understand that final grades will  be close to existing grades without the need for large cuts/fills or retaining structures.      3.0  SITE EXPLORATION    Our field study was conducted on October 2 and 3, 2024, and included advancing three  exploration borings (EB‐1 to EB‐3) across the site. The exploration locations were determined by  approximate measurements from known site features and are shown on the “Existing Site and  Exploration Plan” (Figure 2) and the “Site and Exploration Plan (Figure 3). The various types of  soils, as well as the depths where characteristics of the soils changed, are indicated on the  exploration logs presented in Appendix A. The depths indicated on the logs where conditions  changed may represent gradational variations between sediment types in the field.    The conclusions and recommendations presented in this report are based, in part, on the  explorations completed for this study. The number, locations, and depths of the explorations  were completed within site and budgetary constraints. Because of the nature of exploratory work  below ground, extrapolation of subsurface conditions between field explorations is necessary. It  should be noted that differing subsurface conditions might be present due to the random nature  of deposition and the alteration of topography by past grading and/or filling. The nature and  extent of variations between the field explorations may not become fully evident until  construction. If variations are observed at that time, it may be necessary to re‐evaluate specific  recommendations in this report and make appropriate changes.        Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Project and Site Conditions      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 3  3.1  Exploration Borings    The exploration borings were completed by Geologic Drill Partners, Inc., an independent driller  working under subcontract to AESI, by advancing a 6‐inch outside‐diameter, hollow‐stem auger  with a track‐mounted drill rig. During the drilling process, samples were generally obtained at  2½‐ to 5‐foot‐depth intervals. After drilling, each borehole was backfilled with bentonite chips,  and the surface was patched using turf and bark in existing landscape areas and cement patch in  the existing pavement area.    Disturbed, but representative samples were obtained by using the Standard Penetration Test  (SPT) procedure in accordance with ASTM International (ASTM) D‐1586. This test and sampling  method consists of driving a standard 2‐inch, outside‐diameter, split‐barrel sampler a distance of  18 inches into the soil with a 140‐pound hammer free‐falling a distance of 30 inches. The number  of blows for each 6‐inch interval is recorded, and the number of blows required to drive the  sampler the final 12 inches is known as the Standard Penetration Resistance (“N”) or blow count.  If a total of 50 is recorded within one 6‐inch interval, the blow count is recorded as the number  of blows for the corresponding number of inches of penetration. The resistance, or N‐value,  provides a measure of the relative density of granular soils or the relative consistency of cohesive  soils; these values are plotted on the attached exploration boring logs.    The borings were continuously observed and logged by a geologist from our firm. The samples  obtained from the split‐barrel sampler were classified in the field and representative portions  placed in watertight containers. The samples were then transported to our laboratory for further  visual classification and laboratory testing. The exploration logs presented in Appendix A are  based on the N‐values, field observations, and drilling action.      4.0  SUBSURFACE CONDITIONS    Subsurface conditions at the project site were inferred from the field explorations accomplished  for this study, visual reconnaissance of the site, and review of selected geologic literature. The  following sections describe current site stratigraphy, regional geology, and local groundwater.    4.1  Stratigraphy    The soils encountered in our explorations consisted primarily of existing fill and Holocene alluvial  deposits. The following section presents more detailed subsurface information organized from  the shallowest (youngest) to the deepest (oldest) soil types.     Fill/Sod/Bark/Concrete    At the ground surface, each of the exploration locations had surfacing materials of either sod  (EB‐1), landscape bark (EB‐2), or concrete (EB‐3) which was up to approximately 6 inches thick.   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Project and Site Conditions      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 4  Underlying the sod in exploration boring EB‐3, we observed a loose, brown, silty, sandy, gravel  interpreted to be fill to a depth of approximately 4 feet below the existing ground surface.     Existing fill, sod, and landscaping materials are not considered suitable for foundation support.  Overexcavation and replacement of near surface fill soils with structural fill will be required  where pavement or soil supported foundations are planned. Excavated existing fill material is  suitable for reuse in structural fill applications if such reuse is specifically allowed by project plans  and specifications, if excessively organic and any other deleterious materials are removed, and if  moisture content is adjusted to allow compaction to the specified level and to a firm and  unyielding condition. Existing fill is not suitable for infiltration of stormwater.    Holocene Alluvium (Qac) – Cedar River Overbank Deposits    Sediments encountered below the surfacing materials within EB‐1 and EB‐2, and beneath the  existing fill in EB‐3, generally consisted of interbedded very soft to medium stiff silt and loose fine  sand. These sediments occasionally displayed fine stratification and contained scattered fine  organics. We interpret these sediments as over bank deposits associated with the Cedar River.    Holocene Alluvium (Qac) – Cedar River Channel Deposits    Beneath the finer‐grained overbank deposits, at depths of 12 to 17 feet below the existing ground  surface, each of the three exploration borings generally encountered medium dense to very  dense, gravelly sand and sandy gravel with trace silt. We interpret these sediments as channel  deposits associated with the Cedar River. We infer that the N‐values indicating a dense condition  were overstated due to an elevated gravel content and we often encountered broken gravels in  the sampler and in‐tact gravels wedged in the sampler. For geotechnical considerations, the  Cedar River channel deposits are in a medium dense condition.     4.2  Regional Geologic and Soils Mapping    Review of the geologic map of the project area (Geologic Map of the Renton Quadrangle, King  County, Washington, U.S. Geological Survey, Geologic Quadrangle Map GQ‐405, by D.B.  Mullineaux, [1965]) indicates that the site is expected to be underlain by modified land with  Holocene alluvial sediments from the Cedar River mapped nearby. Our interpretation of the  sediments encountered in our recent explorations is in general agreement with the regional  geologic map in that we encountered a layer of fill overlying native Holocene alluvial sediments.    A review of regional soils mapping (U.S. Department of Agriculture [USDA] Web Soil Survey)  indicates that the subject site is underlain by Urban Land (Ur). Urban Land is soil that has been  modified by disturbance of the natural layers with additions of fill material several feet thick. Our  observations of the near‐surface sediments encountered in our explorations are in general  agreement with the soils mapping.    Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Project and Site Conditions  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 5  4.3  Hydrology  Groundwater was encountered within the alluvial sediments in all three of the explorations  completed for this study, at depths of 11, 12, and 14 feet below existing grade in EB‐1, EB‐2, and  EB‐3 respectively. The groundwater observed at these boring locations is interpreted to be  representative of the localized unconfined aquifer underlying the site within the alluvial deposits.  Perched groundwater may also be present seasonally above localized finer‐grained sediment  zones, such as within the fill at the contact with the alluvium.  It should be noted that groundwater conditions can vary considerably across short distances, and  fluctuations in groundwater conditions may occur due to the time of the year, on‐ and off‐site  land use, and variations in the amount of rainfall. Explorations were conducted in October when  groundwater levels are typically rising but not at seasonal high levels. Monitoring wells from  previous explorations in the vicinity of the site have indicated groundwater level fluctuations on  the order of 3 feet seasonally.      Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington Geologic Hazards and Mitigations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 6  II.  GEOLOGIC HAZARDS AND MITIGATIONS    The following discussion of potential geologic hazards is based on the geologic conditions as  observed and discussed herein.      5.0  LANDSLIDE HAZARDS AND MITIGATIONS    Based on our visual reconnaissance of the site and review of the client‐provided site survey, the  site is flat to gently sloping to the northwest with less than 3 feet of vertical relief. No areas of  the site meet criteria for classification as Landslide Hazard Areas by the City of Renton Municipal  Code. No detailed quantitative assessment of site slopes was completed as part of this study, and  none is warranted, in our opinion.      6.0  SEISMIC HAZARDS AND MITIGATIONS    The following discussion is a general assessment of seismic hazards that is intended to be useful  to the project design team in terms of understanding seismic issues, and to the structural  engineer for design.    6.1  Regional Seismicity    All of Western Washington is at risk of strong seismic events resulting from movement of the  tectonic plates associated with the Cascadia Subduction Zone (CSZ), where the offshore Juan de  Fuca plate subducts beneath the continental North American plate. The site lies within a zone of  strong potential shaking from subduction zone earthquakes associated with the CSZ. The CSZ can  produce earthquakes up to magnitude 9.0, and the recurrence interval is estimated to be on the  order of 500 years. Geologists infer the most recent subduction zone earthquake occurred in  1700 (Goldfinger et al., 20121). Three main types of earthquakes are typically associated with  subduction zone environments: crustal, intraplate, and interplate earthquakes. Seismic records  in the Puget Sound region document a distinct zone of shallow crustal seismicity (e.g., the Seattle  Fault Zone[SFZ]). These shallow fault zones may include surficial expressions of previous seismic  events, such as fault scarps, displaced shorelines, and shallow bedrock exposures. The shallow  fault zones typically extend from the surface to depths ranging from 16 to 19 miles. A deeper  zone of seismicity is associated with the subducting Juan de Fuca plate. Subduction zone seismic  events produce intraplate earthquakes at depths ranging from 25 to 45 miles beneath the Puget  Lowland including the 1949, 7.2‐magnitude event; the 1965, 6.5‐magnitude event; and the 2001,  6.8‐magnitude event) and interplate earthquakes at shallow depths near the Washington coast  including the 1700 earthquake, which had a magnitude of approximately 9.0.    1 Goldfinger, C., Nelson, C.H., Morey, A.E., Johnson, J.E., Patton, J.R., Karabanov, E., Gutierrez‐Pastor, J., Eriksson, A.T., Gracia, E.,  Dunhill, G., Enkin, R.J, Dallimore, A., and Vallier, T.,2012, Turbidite Event History—Methods and Implications for Holocene  Paleoseismicity of the Cascadia Subduction Zone: U.S. Geological Survey Professional Paper 1661–F, 170     Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington Geologic Hazards and Mitigations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 7  The 1949 earthquake appears to have been the largest in this region during recorded history and  was centered in the Olympia area. Evaluation of earthquake return rates indicates that an  earthquake of the magnitude between 5.5 and 6.0 is likely within a given 20‐year period.    Generally, there are four types of potential geologic hazards associated with large seismic events:  1) surficial ground rupture, 2) seismically induced landslides, 3) liquefaction, 4) ground motion.  The potential for each of these hazards to adversely impact the proposed project is discussed  subsequently.    6.2  Surficial Ground Rupture    Seattle Fault    The SFZ is a broad east – west oriented zone that extends from approximately Issaquah to Alki  beach, and is approximately 2.5 to 4 miles in width from north to south. The SFZ is speculated to  contain multiple distinct fault “strands”, some of which are well understood and some of which  may be poorly understood or unknown. Mapping of individual fault strands is imprecise, as a  result of pervasive modification of the land surface by development, which has obscured possible  surficial expression of past seismic events. Studies by the U.S. Geological Survey and others have  provided evidence of surficial ground rupture along strands of the Seattle Fault (USGS, 20102;  Pratt et al., 20153; Haugerud, 20054; Liberty et al., 20085). According to USGS studies the latest  movement of this fault was about 1,100 years ago when about 20 feet of surficial displacement  took place. This displacement can presently be seen in the form of raised, wave‐cut beach  terraces along Alki Point in West Seattle and Restoration Point at the south end of Bainbridge  Island. Based on our review of the Washington State Department of Natural Resources (WADNR)  website, inferred fault traces associated with the SFZ are located about 3 miles north of the site.  Due to the suspected long recurrence interval, and the distance of the site to fault traces, the  potential for damage due to surficial ground rupture along the SFZ is considered to be low during  the expected life of the project, in our opinion.    6.3  Seismically Induced Landslides    It is our opinion that the potential risk of damage to the proposed development by seismically  induced slope failures is low during a design‐level seismic event due to the lack of slopes at the    2 U.S. Geological Survey, 2010, Quaternary fault and fold database for the United States, accessed November 10, 2010, from  USGS web site: http://earthquake.usgs.gov/hazards/qfaults/.  3 Pratt, et al., 2015, Kinematics of shallow backthrusts in the Seattle fault zone, Washington State: Geosphere, v. 11, no. 6,  p. 1‐27).  4 Haugerud, R.A., 2005, Preliminary geologic map of Bainbridge Island, Washington: U.S. Geological Survey Open‐File Report  2005‐1387, version 1.0, 1 sheet, scale 1:24,000.  5 Liberty, Lee M.; Pratt, Thomas L., 2008, Structure of the eastern Seattle fault zone, Washington State ‐New insights from seismic  reflection data:  Bulletin of the Seismological Society of America, v. 98, no. 4, p. 1681‐1695.     Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington Geologic Hazards and Mitigations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 8  project site and vicinity. No detailed slope stability analysis was completed for this project, and  none is warranted, in our opinion.    6.4  Liquefaction    Liquefaction is a process through which unconsolidated soil loses strength as a result of  vibrations, such as those which occur during a seismic event. During normal conditions, the  weight of the soil is supported by both grain‐to‐grain contacts and by the fluid pressure within  the pore spaces of the soil below the water table. Extreme vibratory shaking can disrupt the  grain‐to‐grain contact, increase the pore pressure, and result in a temporary decrease in soil  shear strength. The soil is said to be liquefied when nearly all of the weight of the soil is supported  by pore pressure alone. Liquefaction can result in deformation of the sediment and settlement  of overlying structures. Areas most susceptible to liquefaction include those areas underlain by  very soft to stiff, non‐cohesive silt and very loose to medium dense, non‐silty to silty sands with  low relative densities, accompanied by a shallow water table.    Based on the explorations completed for this study and review of published geologic mapping of  the area, the site is underlain by deep alluvial deposits with a shallow groundwater table, making  the site susceptible to liquefaction induced settlement during a seismic event. Assuming the  pavilion building was built on shallow, conventional foundations, we recommend that the  proposed additions, such as the vestibule, also be supported on shallow foundations. The intent  is to have the proposed additions “match” the existing foundations response to liquefaction  induced settlement. While this does not fully mitigate the liquefaction hazard at the site, it allows  relatively uniform performance of the existing and new foundations if liquefaction occurs,  mitigating the risk posed by differential movement between the new and old structure. If the  existing building is supported by a deep foundation system, we recommend the new additions  be designed match that foundation type.    6.5  Ground Motion/Seismic Site Class     Based on the subsurface stratigraphy and visual reconnaissance of the site, it is our opinion that  earthquake damage to the proposed structures when founded on suitable bearing strata in  accordance with the recommendations contained herein, would likely be caused by the intensity  and acceleration associated with the event. Structural design of the building should follow  2018 International Building Code (IBC) standards using Site Class “F” as defined in Table 20.3‐1 of  American Society of Civil Engineers (ASCE) 7‐16 Minimum Design Loads and Associated Criteria  for Buildings and Other Structures.    ASCE 7‐16 provides an exception to performing a site‐specific site response analysis for projects  where liquefiable‐prone soils are present and the fundamental period of the planned building is  0.5 seconds or less. The exception allows the site class to be determined based on the average  N‐value and/or average shear wave velocity within the upper 100 feet of the site as outlined in     Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington Geologic Hazards and Mitigations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 9  ASCE 7‐16 Section 20.3. If the fundamental period is greater than 0.5 seconds, we will need to  perform a site‐specific response analysis in accordance with ASCE 7‐16, Sections 20.3.1 and  21.1. We are available to perform this analysis and reporting under a separate scope of work if  required.    For proposed structures that will have a building period of less than 0.5 seconds, the simplified  procedure for site class determination using N‐values from our explorations indicates that Site  Class E can be used to determine values of Fa and Fv for structural design.      7.0  EROSION HAZARDS AND MITIGATION    Based on our review of the City of Renton “Sensitive Areas Map: Erosion Hazard,” the subject site  is not mapped as an erosion hazard area. Erosion Hazards are defined in the Renton Municipal  Code (RMC) Section 4‐3‐050G.5.c. as the following:    i. Low Erosion Hazard (EL): Areas with soils characterized by the Natural Resource  Conservation Service (formerly U.S. Soil Conservation Service) as having slight or  moderate erosion potential, and a slope less than fifteen percent (15%).    ii. High Erosion Hazard (EH): Areas with soils characterized by the Natural Resource  Conservation Service (formerly U.S. Soil Conservation Service) as having severe or very  severe erosion potential, and a slope more than fifteen percent (15%).    As stated in the “Regional Geologic and Soils Mapping” section of this report, the site is identified  as Urban Land. The NRCS indicates that the erosion hazard rating for Urban Land soils is slight to  moderate. Due to the lack of slopes at the site and the erosion hazard rating of slight to moderate  for on‐site material, the subject site classifies as a Low Erosion Hazard according to the RMC.    Despite being identified as a Low Erosion Hazard, the existing fill and underlying native alluvial  sediments at the site generally contain significant quantities of silt and fine sand. These  sediments will be susceptible to erosion and off‐site sediment transport when exposed during  construction. Therefore, the project should follow best management practices (BMPs) to mitigate  erosion hazards and potential for off‐site sediment transport.    If the site will result in over one acre of soil disturbance, we anticipate that the project will be  required to obtain an Ecology Construction Stormwater General Permit (also known as the  National Pollutant Discharge Elimination System [NPDES] permit) which may require weekly  Temporary Erosion and Sedimentation Control (TESC) inspections and turbidity monitoring at the  site be completed by a Certified Erosion and Sediment Control Lead (CESCL) for the duration of  the construction.       Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington Geologic Hazards and Mitigations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 10  To mitigate the erosion hazards and potential for off‐site sediment transport, we recommend the  following:    1. Construction activity should be scheduled or phased as much as possible to avoid  earthwork activity during the wet season.  2. The winter performance of a site is dependent on a well‐conceived plan for control of site  erosion and stormwater runoff. The site plan should include ground‐cover measures and  staging areas. The contractor should be prepared to implement and maintain the required  measures to reduce the amount of exposed ground.  3. Temporary erosion and sedimentation control (TESC) elements and perimeter flow  control should be established prior to the start of grading.  4. During the wetter months of the year, or when significant storm events are predicted  during the summer months, the work area should be stabilized so that if showers occur,  it can receive the rainfall without excessive erosion or sediment transport. The required  measures for an area to be “buttoned‐up” will depend on the time of year and the  duration that the area will be left unworked. During the winter months, areas that are  to be left unworked for more than 2 days should be mulched or covered with  plastic. During the summer months, stabilization will usually consist of seal‐rolling the  subgrade. Such measures will aid in the contractor’s ability to get back into a work area  after a storm event. The stabilization process also includes establishing temporary  stormwater conveyance channels through work areas to route runoff to the approved  treatment/discharge facilities.  5. All disturbed areas should be revegetated as soon as possible. If it is outside of the  growing season, the disturbed areas should be covered with mulch. Straw mulch provides  a cost‐effective cover measure and can be made wind‐resistant with the application of a  tackifier after it is placed.  6. Surface runoff and discharge should be controlled during and following development.  Uncontrolled discharge may promote erosion and sediment transport.  7. Soils that are to be reused around the site should be stored in such a manner as to reduce  erosion from the stockpile. Protective measures may include, but are not limited to,  covering stockpiles with plastic sheeting, or the use of silt fences around pile perimeters.    It is our opinion that with the proper implementation of the TESC plans and by field‐adjusting  appropriate erosion mitigation (BMPs) throughout construction, the potential adverse impacts  from erosion hazards on the project should be mitigated.  Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Design Recommendations  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 11  III.DESIGN RECOMMENDATIONS 8.0  INTRODUCTION  Our explorations indicate that, from a geotechnical engineering standpoint, the proposed project  is feasible provided the recommendations contained herein are properly followed.   Sediments suitable for foundation support were encountered in our explorations at a relatively  shallow depth and conventional spread footings, placed as recommended in the “Foundations”  section of this report, may be used for foundation support. Liquefaction‐prone sediments are  present below the entire property. To reduce the potential for differential settlement between  the new building additions and the existing building, we recommend that the new additions be  supported on the same type of foundation as the existing building. This report assumes that the  existing building is supported on a conventional shallow foundation system with a slab‐on‐grade  lower floor.  It should be noted that the fine‐grained nature of the soils that will be exposed at subgrade  elevation may be very difficult to work during wet weather conditions. Additionally, a shallow  groundwater table is present beneath the site and will be shallowest during the wet season. If  construction will proceed during the wet season, the project team should plan for cost increases  and schedule impacts that would accompany wet weather construction.  9.0  SITE PREPARATION AND GRADING  Prior to site work, erosion and surface water control should be established around the perimeter  of the excavation to satisfy City of Renton and Ecology requirements, as discussed in the “Erosion  Hazards and Mitigations” section of this report.  9.1  Clearing and Stripping  Existing buried utilities, vegetation, topsoil, and any other deleterious materials should be  removed where they are located below planned construction areas unless deep foundations are  used. Any disturbed soils below planned final grades should be compacted to a firm and  unyielding condition prior to placing structural fill discussed under the “Structural Fill” section of  this report.  Where excavated existing fill and native sediments are free of organics and near their optimum  moisture content for compaction they can be segregated and considered for reuse as structural  fill if allowed by project specifications. Portions of the native sediments encountered in our   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Design Recommendations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 12  explorations contained significant silt fractions and are moisture‐sensitive. These sediments may  be difficult to reuse as structural fill during periods of wet weather.    9.2  Existing Fill    After clearing, stripping, and any planned excavation have been completed, existing fill should be  addressed. Below planned structures, existing fill should be removed and replaced with structural  fill as needed to establish the building pad. Below areas of planned paving the existing fill should  be exposed, compacted, and proof‐rolled under the observation of AESI. Any areas that are soft,  yielding, or contain excessive organic material should be removed and replaced with structural  fill as needed prior to paving.    9.3  Temporary Cut Slopes    In our opinion, stable construction slopes should be the responsibility of the contractor and  should be determined during construction based on the conditions encountered at that time. For  estimating purposes, however, we anticipate that temporary, unsupported shallow cut slopes for  foundations in the existing fill or alluvial sediments can be planned at inclinations of 1.5H:1V  (Horizontal:Vertical) or flatter. Temporary cut slopes may need to be adjusted in the field at the  time of construction based on the presence of surface water or perched seepage zones. As is  typical with earthwork operations, some sloughing and raveling may occur, and cut slopes may  have to be adjusted in the field. In addition, WISHA/OSHA regulations should be followed at all  times. If steeper or deeper cuts are required, then temporary shoring may be necessary.    9.4  Site Disturbance    The existing fill and portions of the natural alluvium contain a high percentage of fine‐grained  material. These sediments are considered to be highly moisture‐sensitive and subject to  disturbance when wet. The contractor must use care during site preparation and excavation  operations so that the underlying soils are not softened. If disturbance occurs, the softened soils  should be removed and the area brought to grade with structural fill.    Consideration should be given to protecting access and staging areas with an appropriate section  of crushed rock or asphalt treated base (ATB). If crushed rock is considered for the access and  staging areas, it should be underlain by engineering stabilization fabric (such as TenCate Mirafi  500X or approved equivalent) to reduce the potential of fine‐grained materials migrating up  through the rock during wet weather and creating an area of saturated softened soils. The fabric  will also aid in supporting construction equipment, thus reducing the amount of crushed rock  required. We recommend that at least 10 inches of rock be placed over the fabric. Crushed rock  used for access and staging areas should be of at least 2‐inch size.        Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Design Recommendations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 13  9.5  Temporary Dewatering    It is possible that zones of perched seepage may be encountered during construction, particularly  within the fill or near the contact between the fill and the underlying less permeable sediments.  We anticipate that surface and groundwater can be managed during construction with  conventional ditches and sumps, and that more complex dewatering systems will not be needed  unless deep utility trenches are planned.      10.0  STRUCTURAL FILL    Structural fill should be placed and compacted according to the recommendations presented in  this section and requirements included in project specifications. All references to structural fill in  this report refer to subgrade preparation, fill type, placement, and compaction of materials, as  discussed in this section. If a percentage of compaction is specified under another section of this  report, the value given in that section should be used.    10.1  Subgrade Compaction    After clearing, stripping, and existing fill replacement have been completed in accordance with  the “Site Preparation” section of this report, the exposed ground should be recompacted to a  firm and unyielding condition. If the subgrade contains too much moisture, suitable  recompaction may be difficult or impossible to attain and should probably not be attempted. In  lieu of recompaction, the area to receive fill should be blanketed with washed rock or quarry  spalls to act as a capillary break between the new fill and the wet subgrade. Where the exposed  ground remains soft and further overexcavation is impractical, placement of an engineering  stabilization fabric may be necessary to prevent contamination of the free‐draining layer by silt  migration from below. After recompaction of the exposed ground is tested and approved, or a  free‐draining rock course is laid, structural fill may be placed to attain desired grades.    10.2  Structural Fill Compaction    Structural fill is defined as non‐organic soil compliant with project specifications, placed in  maximum 8‐inch loose lifts compacted to at least 95 percent of the modified Proctor maximum  dry density using ASTM D‐1557 as the standard. In the case of utility trenches, the backfill should  be placed and compacted in accordance with City of Renton standards.    10.3  Moisture‐Sensitive Fill    Soils in which the amount of fine‐grained material (smaller than No. 200 sieve) is greater than  approximately 5 percent (measured on the minus No. 4 sieve size) should be considered  moisture‐sensitive. Use of moisture‐sensitive soil in structural fills is not recommended under  Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Design Recommendations  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 14  wet site and weather conditions. Most of the near surface on‐site soils are moisture‐sensitive  and have natural moisture contents that range from near to over optimum for compaction and  will likely require moisture‐conditioning before use as structural fill. If, at the time of  construction, the moisture content of the on‐site soil remains above the optimum level to  achieve suitable compaction, it should be moisture‐conditioned prior to use as structural fill. This  could be achieved by either adding water if the soil is too dry, or aerating the soil during periods  of warm, dry weather if the soil is too wet.  Construction equipment traversing the site when the silty fill and native sediments are very moist  or wet can cause considerable disturbance. If fill is placed during wet weather or if proper  compaction of the on‐site soil cannot be attained, a select import material consisting of a clean,  free‐draining gravel and/or sand should be used. Free‐draining fill consists of non‐organic soil  with the amount of fine‐grained material limited to 5 percent by weight when measured on the  minus No. 4 sieve fraction and at least 30 percent retained on the No. 4 sieve.  10.4  Structural Fill Testing  The contractor should note that any proposed fill soils must be evaluated by AESI prior to their  use in fills. This would involve providing us with a sample of the material at least 3 business days  in advance to perform a Proctor test to determine its field compaction standard.  A representative from our firm should observe the subgrades and be present during placement  of structural fill to observe and document the work and perform a representative number of  in‐place density tests. In this way, the adequacy of the earthwork may be evaluated as filling  progresses and any problem areas may be corrected at that time. Such testing and observation  may be required by the governing municipality.  11.0  FOUNDATIONS  To help mitigate differential settlement performance, the new additions should be supported on  shallow foundations consistent with the existing building foundation. We recommend that the  new foundations match the bearing elevation of the existing building where possible. In our  opinion, this should mitigate differential movement between the new addition and the existing  building.  11.1  Allowable Soil Bearing Pressure  Spread footings may be used for the new additions when founded over at least 2 feet of  compacted, crushed, 2‐ to 4‐inch rock placed over the existing natural sediments. For footings  founded on at least 2 feet of compacted, crushed, 2‐ to 4‐inch rock, we recommend that an  allowable bearing pressure of 2,000 pounds per square foot (psf) be used for design purposes,   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Design Recommendations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 15  including both dead and live loads. An increase of one‐third may be used for short‐term wind or  seismic loading.    11.2  Footing Depths    Perimeter footings for the proposed additions should match the bearing elevation of the existing  building foundations where possible. Where not adjacent to the existing building the new  foundation should be buried a minimum of 18 inches into the surrounding soil for frost  protection. Interior footings should also extend 18 inches below grade. All footings must bear on  a compacted crushed rock pad, as described above. No footings should be founded in or above  loose, organic, or soft soil. Significant accumulations of water should be removed from the  foundation excavations prior to concrete placement.    11.3  Footings Adjacent to Cuts    The area bounded by lines extending downward at 1H:1V from any footing must not intersect  another footing or intersect a filled area that has not been compacted to at least 95 percent of  ASTM D‐1557. In addition, a 1.5H:1V line extending down from any footing must not daylight  because sloughing or raveling may eventually undermine the footing. Thus, footings should not  be placed near the edges of steps or cuts in the bearing soils.    11.4  Footing Settlement    Anticipated static settlement of footings founded as described above should be on the order of  1 inch or less. However, disturbed soil not removed from footing excavations prior to footing  concrete placement could result in increased settlements.    11.5  Footing Subgrade Bearing Verification    All footing subgrade areas should be observed by AESI prior to footing placement. Foundation  bearing verification may be required by the City of Renton.    11.6  Foundation Drainage    Perimeter footing drains should be provided as discussed under the “Drainage Considerations”  section of this report.      12.0  FLOOR SUPPORT    Slab‐on‐grade floors should be prepared as recommended in the “Site Preparation” section of  this report, and may be constructed either directly on the existing soils which have been   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Design Recommendations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 16  compacted to a firm and unyielding condition, or on structural fill placed above these soils. Areas  of the slab subgrade that are disturbed (loosened) during construction should be recompacted  to an unyielding condition prior to placing the pea gravel as described below. Where structural  fill is necessary to achieve desired grades, it should be placed as detailed in the “Structural Fill”  section of this report. If moisture intrusion through floor slabs is to be limited, we recommend  that the floor slabs be constructed atop a capillary break consisting of a minimum thickness of  4 inches of washed pea gravel. The pea gravel should be overlain by a 10‐mil (minimum thickness)  plastic vapor retarder.      13.0  LATERAL WALL PRESSURES    All backfill placed behind site walls and foundation walls should be placed in accordance with the  recommendations contained in the “Structural Fill” section of this report. Horizontally backfilled  walls, which are free to yield laterally at least 0.1 percent of their height, may be designed to  resist lateral earth pressure represented by an equivalent fluid pressure equal to 35 pcf. Fully  restrained, horizontally backfilled, rigid walls that cannot yield should be designed for an  equivalent fluid pressure of 55 pcf. Walls with sloping backfill up to a maximum gradient of 2H:1V  should be designed using an equivalent fluid pressure of 55 pcf for yielding conditions or 75 pcf  for fully restrained conditions.     As required by the 2018 IBC, retaining wall design should include a seismic surcharge pressure in  addition to the equivalent fluid pressures presented above. Considering the site soils and the  recommended wall backfill materials, we recommend a seismic surcharge pressure of 9H and  12H psf, where H is the wall height in feet for the “active” and “at‐rest” loading conditions,  respectively. The seismic surcharge should be modeled as a rectangular distribution with the  resultant applied at the midpoint of the walls.    The lateral pressures presented above are based on the conditions of a uniform backfill consisting  of excavated on‐site soils, or imported structural fill compacted to 90 percent of  ASTM D‐1557 within about 3 feet of the wall. A higher degree of compaction is not  recommended, as this will increase the pressure acting on the walls. A lower compaction may  result in settlement of the slab‐on‐grade or other structures supported above the walls. Thus,  the compaction level is critical and must be tested by our firm during placement. Surcharges from  adjacent footings or heavy construction equipment must be added to the above values.  Perimeter footing drains should be provided for all walls, as discussed under the “Drainage  Considerations” section of this report.    It is imperative that proper drainage be provided so that hydrostatic pressures do not develop  against the walls. Wall drainage recommendations are presented in Section 14.0 of this report.       Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Design Recommendations  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 17  13.1  Passive Resistance and Friction Factors  Lateral loads can be resisted by friction between the foundation and the natural soils or  supporting structural fill soils, and by passive earth pressure acting on the buried portions of the  foundations. The foundations must be backfilled with structural fill and compacted to at least  95 percent of the maximum dry density to achieve the passive resistance provided below. We  recommend the following allowable design parameters:  Passive equivalent fluid = 250 pcf Coefficient of friction = 0.35 14.0  DRAINAGE CONSIDERATIONS  Traffic across the on‐site soils when they are damp or wet will result in disturbance of the  otherwise firm stratum. Therefore, during site work and construction, the contractor should  provide surface drainage and subgrade protection, as necessary.  All footings and any retaining walls should be provided with a drain at the footing elevation.  Drains should consist of rigid, perforated, polyvinyl chloride (PVC) pipe surrounded by washed  gravel. The level of the perforations in the pipe should be set downward and at the bottom of  the footing at all locations, and the drain collectors should be constructed with sufficient gradient  to allow gravity discharge away from the structures. In addition, all cast‐in‐place concrete  foundation or retaining walls taller than 3 feet should be lined with a minimum, 12‐inch‐thick,  washed gravel blanket drain provided to within 1 foot of finish grade that ties into the footing  drain. Roof and surface runoff should not discharge into the footing drain system, but should be  handled by a separate, rigid, tightline drain.  In planning, exterior grades adjacent to foundations should be sloped downward away from the  structures to achieve surface drainage.  Runoff water from impervious surfaces should be collected by a storm drain system that  discharges into the site stormwater system.  15.0  PAVEMENT AND SIDEWALK RECOMMENDATIONS  The pavement sections included in this report section are for areas onsite and are not applicable  to right‐of‐way improvements. At this time, we are not aware of any planned right‐of‐way  improvements; however, if any new paving of public streets is required, we should be allowed to  offer situation‐specific recommendations.   Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion  and Geotechnical Engineering Report  Renton, Washington  Design Recommendations      October 31, 2024 ASSOCIATED EARTH SCIENCES, INC.  KAM/jh ‐ 20240102E001‐002 Page 18  Pavement and sidewalk areas should be prepared in accordance with the “Site Preparation”  section of this report. If the stripped native soil or existing fill pavement subgrade can be  compacted to 95 percent of ASTM D‐1557 and is firm and unyielding, no additional  overexcavation is required. Soft or yielding areas should be overexcavated to provide a suitable  subgrade and backfilled with structural fill. The upper 2 feet of all new pavement subgrades  should be recompacted to 95 percent of ASTM D‐1557. If required, structural fill may then be  placed to achieve desired subbase grades.    New paving may include areas subject only to light traffic loads from passenger vehicles driving  and parking, and may also include areas subject to heavier loading from vehicles that may include  buses, fire trucks, food service trucks, and garbage trucks. In light traffic areas, we recommend a  pavement section consisting of 3 inches of hot‐mix asphalt (HMA) underlain by 4 inches of  crushed surfacing base course over a subgrade consisting of 2 feet of recompacted site soils, as  the recommended minimum in areas of planned passenger car lanes and parking. In heavy traffic  areas, a minimum pavement section consisting of 4 inches of HMA underlain by 2 inches of  crushed surfacing top course and 4 inches of crushed surfacing base course over a subgrade  consisting of 2 feet of recompacted site soils is recommended. The crushed rock courses must be  compacted to 95 percent of the maximum density, as determined by ASTM D‐1557. All paving  materials should meet gradation criteria contained in the current Washington State Department  of Transportation (WSDOT) Standard Specifications.      16.0  INFILTRATION FEASIBILITY    The feasibility of stormwater infiltration depends upon the presence of a suitable native receptor  soil of sufficient thickness, extent, permeability, and vertical separation from groundwater. In our  opinion, the site does not appear suitable for the infiltration of stormwater. The existing fill is not  considered to be suitable receptor for shallow stormwater infiltration due to its variable  composition and density, and the presence of deleterious debris. Because of the elevated silt  content, the near‐surface alluvial sediments exhibit a low permeability and are also not  considered to be suitable receptor soils for stormwater infiltration. The deeper coarse‐grained  alluvial sediments are typically considered a suitable receptor soil for the infiltration of  stormwater but do not appear to be feasible at this site based on the shallow groundwater level.      17.0  PROJECT DESIGN AND CONSTRUCTION MONITORING    We are available to provide additional geotechnical consultation as the project design develops  and possibly changes from that upon which this report is based. If significant changes in grading  are made, we recommend that AESI perform a geotechnical review of the plans prior to final  design completion. In this way, our earthwork and foundation recommendations may be  properly interpreted and implemented in the design.  Subsurface Exploration, Geologic Hazard,  City of Renton Pavilion and Geotechnical Engineering Report  Renton, Washington Design Recommendations  October 31, 2024 ASSOCIATED EARTH SCIENCES, INC. KAM/jh ‐ 20240102E001‐002 Page 19  We are also available to provide geotechnical engineering and monitoring services during  construction. The integrity of the foundations depends on proper site preparation and  construction procedures. In addition, engineering decisions may have to be made in the field in  the event that variations in subsurface conditions become apparent. Construction monitoring  services are not part of this current scope of work. If these services are desired, please let us  know, and we will prepare a proposal.  18.0  CLOSURE  We have enjoyed working with you on this study and are confident these recommendations will  aid in the successful completion of your project. If you should have any questions or require  further assistance, please do not hesitate to call.  Sincerely,  ASSOCIATED EARTH SCIENCES, INC.  Kirkland, Washington  ______________________________  Kristen A. Marohl, L.G.  Senior Staff Geologist  ___________________________  Kurt Merriman, P.E.  Jeffrey P. Laub, P.E., L.G., L.E.G.  Principal Engineer Associate Engineer/Geologist   Attachments: Figure 1:  Vicinity Map  Figure 2:  Existing Site and Exploration Plan  Figure 3:  Site and Exploration Plan  Appendix A: Exploration Logs  G:\ G I S _ P r o j e c t s \ 2 0 2 4 \ 2 4 0 1 0 2 R e n t o n P a v i l i o n \ _ a p r x \ 2 0 2 4 0 1 0 2 E 0 0 1 F1 V M _ R e n t o n P a v i l i o n . a p r x | 2 0 2 4 0 1 0 2 E 0 0 1 F 1 V M _ R e n t o n P a v i l i o n | 2 0 2 4 - 1 0 - 0 2 | m t r o p COUNTY LOCALE LOCATION PROJECT NO.DATE FIGURE 110/2420240102E001 CITY OF RENTON PAVILION RENTON, WASHINGTON VICINITY MAP ESRI, USGS, NATIONAL GEOGRAPHIC,DELORME, NATURALVUE, I-CUBED, GEBCO:ARCGIS ONLINE BASEMAP. WADOT STATEROUTES 24K (12/20). KING CO: PARCELS,ROADS (8/24). NOTE: LOCATION AND DISTANCES SHOWNARE APPROXIMATE. BLACK AND WHITEREPRODUCTION OF THIS COLOR ORIGINALMAY REDUCE ITS EFFECTIVENESS AND LEADTO INCORRECT INTERPRETATION. KinJ CoXnt\ BURN ET T A VE S S 3RD ALY LO G A N A V E S WI L L I A M S A V E S WI L L I A M S A L Y S 40 00 1 1 1 Lake Washington KING COUNTY RENTON 0 2,000 FEET m SITE LOCATION AND DISTANCESSHOWN ARE APPROXIMATE. BLACK AND WHITE REPRODUCTION OFTHIS COLOR ORIGINAL MAY REDUCEITS EFFECTIVENESS AND LEAD TOINCORRECT INTERPRETATION.G:\ G I S _ P r o j e c t s \ 2 0 2 4 \ 2 4 0 1 0 2 R e n t o n P a v i l i o n \ _ a p r x \ 2 0 2 4 0 1 0 2 E 0 0 1 F2 E S _ R e n t o n P a v i l i o n . a p r x | 2 0 2 4 0 1 0 2 E 0 0 1 F 2 E S _ R e n t o n P a v i l i o n | 2 0 2 4 - 1 0 - 0 3 | m t r o p PROJECT NO.DATE FIGURE 210/2420240102E001 CITY OF RENTON PAVILION RENTON, WASHINGTON EXISTING SITE AND EXPLORATION PLAN DATA SOURCES/REFERENCES:KING COUNTY: PARCELS, PARKS, ROADS (8/24). EAGLEVIEWTECHNOLOGIES, INC.: AERIAL IMAGERY (2023). WA DNR LIDAR:KING_COUNTY_WEST_2021, ACQUIRED 4/21, 1.5' CELL SIZE.CONTOURS DERIVED FROM LIDAR. ±0 40 FEET RENTON TC ACRD LO G A N A V E S BURN E T T AV E S EB1 EB2 EB3 PIA==A PARK GA T E W A Y P A R K 38 3 38 3 3 3 38 3 3  LEGEND SITE EXPLORATION BORING CONTOUR 10 FT CONTOUR 2 FT PARCEL PARK LOCATION AND DISTANCESSHOWN ARE APPROXIMATE. BLACK AND WHITE REPRODUCTION OFTHIS COLOR ORIGINAL MAY REDUCEITS EFFECTIVENESS AND LEAD TOINCORRECT INTERPRETATION.G:\ G I S _ P r o j e c t s \ 2 0 2 4 \ 2 4 0 1 0 2 R e n t o n P a v i l i o n \ _ a p r x \ 2 0 2 4 0 1 0 2 E 0 0 1 F 3 S P _ R e n t o n P a v i l i o n . a p r x | 2 0 2 4 0 1 0 2 E 0 0 1 F 3 S P _ R e n t o n P a v i l i o n | 2 0 2 4 - 1 0 - 0 3 | m t r o p PROJECT NO.DATE FIGURE 310/2420240102E001 CITY OF RENTON PAVILION RENTON, WASHINGTON SITE AND EXPLORATION PLAN DATA SOURCES/REFERENCES:GRAHAM BABA ARCHITECTS, RENTON MARKET, SITE PLAN, SHEETA1.00, 10/17/2024. ±0 30 FEET EB-1 EB-2 EB-3 LEGEND SITE EXPLORATION BORING APPENDIX A   Exploration Logs  Classifications of soils in this report are based on visual field and/or laboratory observations, which include density/consistency, moisture condition, grain size, and plasticity estimates and should not be construed to imply field or laboratory testing unless presented herein. Visual-manual and/or laboratory classification methods of ASTM D-2487 and D-2488 were used as an identification guide for the Unified Soil Classification System. OH PT CH OL MH CL ML SM SC GW SP GC SW GM GP Well-graded gravel and gravel with sand, little to no fines Poorly-graded gravel and gravel with sand, little to no fines Clayey gravel and clayey gravel with sand Silty gravel and silty gravel with sand Well-graded sand and sand with gravel, little to no fines Poorly-graded sand and sand with gravel, little to no fines Clayey sand and clayey sand with gravel Organic clay or silt of low plasticity Organic clay or silt of medium to high plasticity Peat, muck and other highly organic soils Silty sand and silty sand with gravel Silt, sandy silt, gravelly silt, silt with sand or gravel Clay of low to medium plasticity; silty, sandy, or gravelly clay, lean clay Elastic silt, clayey silt, silt with micaceous or diatomaceous fine sand or silt Clay of high plasticity, sandy or gravelly clay, fat clay with sand or gravel (1 ) Hi g h l y Or g a n i c So i l s Fin e - G r a i n e d S o i l s - 5 0 % o r M o r e P a s s e s N o . 2 0 0 S i e v e (1 ) Co a r s e - G r a i n e d S o i l s - M o r e t h a n 5 0 % R e t a i n e d o n N o . 2 0 0 S i e v e Gr a v e l s - M o r e t h a n 5 0 % o f C o a r s e F r a c t i o n Re t a i n e d o n N o . 4 S i e v e 12 % F i n e s 5% F i n e s Sa n d s - 5 0 % o r M o r e o f C o a r s e F r a c t i o n Pa s s e s N o . 4 S i e v e Si l t s a n d C l a y s Li q u i d L i m i t L e s s t h a n 5 0 Sil t s a n d C l a y s Li q u i d L i m i t 5 0 o r M o r e (1 ) (1 ) 12 % F i n e s 5% F i n e s (2 ) (2 ) (2 ) (2 ) Terms Describing Relative Density and Consistency Estimated Percentage Moisture Content Percentage by Weight <5 5 to <12 12 to <30 30 to <50 Component Definitions Component Trace Some Modifier (silty, sandy, gravelly) Very modifier (silty, sandy, gravelly) Size Range and Sieve Number Larger than 12" Descriptive Term Smaller than No. 200 (0.075 mm) 3" to 12" Coarse- Grained Soils Fine- Grained Soils Density Very Loose Loose Medium Dense Dense Very Dense SPT blows/foot 0 to 4 4 to 10 10 to 30 30 to 50 >50 (3) 0 to 2 2 to 4 4 to 8 8 to 15 15 to 30 >30 Consistency Very Soft Soft Medium Stiff Stiff Very Stiff Hard SPT blows/foot(3) Test Symbols No. 4 (4.75 mm) to No. 200 (0.075 mm) Boulders Silt and Clay Gravel Coarse Gravel Fine Gravel Cobbles Sand Coarse Sand Medium Sand Fine Sand Dry - Absence of moisture, dusty, dry to the touch Slightly Moist - Perceptible moisture Moist - Damp but no visible water Very Moist - Water visible but not free draining Wet - Visible free water, usually from below water table G = Grain Size M = Moisture Content A = Atterberg Limits C = Chemical DD = Dry Density K = Permeability No. 4 (4.75 mm) to No. 10 (2.00 mm) No. 10 (2.00 mm) to No. 40 (0.425 mm) No. 40 (0.425 mm) to No. 200 (0.075 mm) 3" to No. 4 (4.75 mm) 3" to 3/4" 3/4" to No. 4 (4.75 mm) Symbols Sampler Type and Description Blows/6" or portion of 6"15 10 20 California Sampler Ring Sampler Continuous Sampling Grab Sample Portion not recovered Split-Spoon Sampler (SPT) Cement grout surface seal Bentonite seal Filter pack with blank casing section Screened casing or Hydrotip with filter pack End cap ATD At time of drilling Static water level (date) (1) Percentage by dry weight(2) Combined USCS symbols used for fines between 5% and 12%(3) (SPT) Standard Penetration Test (ASTM D-1586)(4) In General Accordance with Standard Practice for Description and Identification of Soils (ASTM D-2488) Groundwater depth i n c o r p o r a t e d e a r t h s c i e n c e s a s s o c i a t e d EXPLORATION LOG KEY FIGURE:A1Blo c k s \ d w g \ l o g _ k e y 2 0 2 2 . d w g L A Y O U T : L a y o u t 5 - 2 0 2 2 L o g d r a f t 0 5 10 15 20 25 30 35 1 2 3 4 5 6 7 8 9 Sod - 6 inches Holocene Alluvium - Cedar River Overbank Deposits Moist, brownish gray with oxidation staining, fine SAND, trace silt; occasional layers (up to 2 inches thick) of sandy, silt (SP). As above; scattered organics. Very moist, mottled grayish brown, clayey, SILT; scattered organics (ML). As above; ranges to wet, sandy, SILT in lower 3 inches. Increase in drill chatter at 12 feet. Holocene Alluvium - Cedar River Channel Deposits Driller begins adding mud. Wet, gray, fine to medium SAND, trace silt; interbedded (2 to 3 inches thick) layers (SP). Wet, gray, sandy, GRAVEL, trace silt; unsorted (GW). As above; brown; broken gravel in sampler; blow counts overstated. Wet, brown, gravelly, fine to medium SAND, trace silt; unsorted; poor recovery (»10 inches) (SP). Wet, brown, sandy, GRAVEL, trace silt (GW). 3 2 2 2 2 1 0 1 0 2 1 1 3 3 2 71210 51624 3 7 13 8 12 14 4 3 1 2 5 22 40 20 26 Associated Earth Sciences, Inc. Exploration Boring EB-1 City of Renton Pavilion 1 Renton, WA Start Date:10/2/24 Logged By:KAM 20240102E001 Ending Date:10/2/24 Approved By:CMM Driller/Equipment:GDP/Tracked rig w/HSA Total Depth (ft):47 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»37 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):11 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 1 of 2 40 45 50 55 60 65 70 75 10 11 As above; broken gravel in sampler; blow counts overstated. As above. Refusal on cobbles at 47 feet. Groundwater encountered at 11 feet ATD with auger in borehole. 919 27 8 7 9 46 16 Associated Earth Sciences, Inc. Exploration Boring EB-1 City of Renton Pavilion 2 Renton, WA Start Date:10/2/24 Logged By:KAM 20240102E001 Ending Date:10/2/24 Approved By:CMM Driller/Equipment:GDP/Tracked rig w/HSA Total Depth (ft):47 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»37 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):11 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 2 of 2 0 5 10 15 20 25 30 35 1 2 3 4 5 6 7 8 9 Landscape Bark - 12 inches Holocene Alluvium - Cedar River Overbank Deposits Moist, brown, fine SAND, trace silt; occasional layers (up to 2 inches thick) of sandy, silt (SP). Moist, mottled gray, clayey, SILT; scattered organics (ML). As above; very moist. Upper 16 inches: Moist, gray, fine SAND, trace silt; no fine layers (SP). Lower 2 inches: Mottled gray, SILT (ML). Wet, gray, SILT; rare fine sand, trace silt layers (up to 0.25 inches thick) (ML). Increased drill chatter at 17 feet; driller begins adding mud. Holocene Alluvium - Cedar River Channel Deposits Wet, gray, sandy, GRAVEL (GW). As above; brown. As above. Upper 6 inches: As above. Lower 12 inches: Wet, gray, gravelly, fine to medium SAND, trace silt; unsorted (SP). 2 2 2 2 1 1 0 1 1 2 4 6 2 1 1 5710 51014 8 10 12 3 4 14 4 2 2 10 2 19 24 22 18 Associated Earth Sciences, Inc. Exploration Boring EB-2 City of Renton Pavilion 1 Renton, WA Start Date:10/2/24 Logged By:KAM 20240102E001 Ending Date:10/2/24 Approved By:CMM Driller/Equipment:GDP/Tracked rig w/HSA Total Depth (ft):43 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»38 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):12 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 1 of 2 40 45 50 55 60 65 70 75 10 Wet, brown, sandy, GRAVEL, trace silt; unsorted; broken gravel stuck in sampler tip; blow counts overstated (GW). Refusal on cobbles at 43 feet. Groundwater encountered at 12 feet ATD with auger in borehole. 2950/5" 50/5" Associated Earth Sciences, Inc. Exploration Boring EB-2 City of Renton Pavilion 2 Renton, WA Start Date:10/2/24 Logged By:KAM 20240102E001 Ending Date:10/2/24 Approved By:CMM Driller/Equipment:GDP/Tracked rig w/HSA Total Depth (ft):43 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»38 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):12 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 2 of 2 0 5 10 15 20 25 30 35 1 2 3 4 5 6 7 8 9 Concrete - 6 inches Fill Moist, brown, silty, sandy, GRAVEL; unsorted; poor recovery (GM). Holocene Alluvium - Cedar River Overbank Deposits Slightly moist, mottled gray, clayey, SILT; laminated; scattered dark brown organics and rootlets (ML). Upper 12 inches: As above; no rootlets. Lower 6 inches: Ranges to moist, brown, fine SAND, trace silt (SP). Moist, mottled gray, sandy, SILT; laminated; scattered organics (ML). Increase in drill chatter at 14 feet. Holocene Alluvium - Cedar River Channel Deposits Wet, brown, sandy, GRAVEL, trace silt; unsorted; poor recovery; gravel stuck in sampler tip; blow counts overstated (GW). Upper 9 inches: Wet, brownish, fine to medium SAND, trace silt; upward fining (SP). Lower 9 inches: Wet, brownish sandy, GRAVEL, trace silt; upward fining; contact is gradational (GW). Driller adds mud at 25 feet. Wet, brownish gray, very gravelly, fine to medium SAND, trace silt; unsorted (SP). Increase in drill chatter at 29 feet. Wet, brown, sandy, GRAVEL, trace silt; unsorted; gravel stuck in sampler tip; blow counts overstated (GW). As above. 2 1 3 2 2 2 3 2 3 2 2 3 10 14 21 41113 31512 3 15 22 5 8 13 4 4 5 5 35 24 27 37 21 Associated Earth Sciences, Inc. Exploration Boring EB-3 City of Renton Pavilion 1 Renton, WA Start Date:10/3/24 Logged By:KAM 20240102E001 Ending Date:10/3/24 Approved By:CMM Driller/Equipment:GDP/Tracked rig w/HSA Total Depth (ft):51.5 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»38 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):14 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 1 of 2 40 45 50 55 60 65 70 75 10 11 12 As above; poor recovery; gravel stuck in sampler tip; broken gravel in sampler; blow counts overstated. Wet, brownish gray, silty, fine to coarse SAND, some gravel; unsorted; broken gravel in sampler; blow counts overstated (SM). Upper 14 inches: As above. Lower 4 inches: Very moist, brownish gray, SILT; contains one layer (0.5 inches thick) of silty, fine sand (ML). Groundwater encountered at 14 feet ATD with auger in borehole. 315 23 28 50/2" 3 9 4 38 50/2" 13 Associated Earth Sciences, Inc. Exploration Boring EB-3 City of Renton Pavilion 2 Renton, WA Start Date: 10/3/24 Logged By: KAM 20240102E001 Ending Date: 10/3/24 Approved By: CMM Driller/Equipment: GDP/Tracked rig w/HSA Total Depth (ft):51.5 Hammer Weight/Drop:140#/30"Ground Surface Elevation (ft):»38 Hole Diameter (in):6 Datum:NAVD 88 (client survey) Groundwater Depth ATD (ft):14 Groundwater Depth Post Drilling (ft) (Date): () De p t h ( f t ) Sa m p l e T y p e Sa m p l e % R e c o v e r y Gr a p h i c Sy m b o l Description Wa t e r L e v e l Bl o w s / 6 " Blows/Foot 1 0 2 0 3 0 4 0 5 0 + Ot h e r T e s t s 20 2 4 0 1 0 2 E 0 0 1 10 / 1 5 / 2 0 2 4 Sheet: 2 of 2