HomeMy WebLinkAboutR-433423M
M
O
0
Lu
M. P OR �V,
CO INC
Z
o N o
Ory � l l
�`2s do 697
Fp EXP. PSG
LANDSCAPE
GP_
TRENCHING FOR --
CATENARY ELECTRICAL
CONNECTIONS, REFER
TO CIVIL AND '
ELECTRICAL PLANS ,
/ of
KB-10
LID 35.38
ELEV 35.11 @ TOP OF PVC
1 1 \VI VIJL✓ V/-1 I LI mf-%I \ 1 1 VLL V, I I I .
LANDSCAPE KEY PLAN
1 If
= 20'-011
HEWITT
106 Lenora Street
Seattle, WA 98121
(206) 624-8154
info@hewittseattle.com
NO.
REVISION
V VI\V V I I\" I
/ DASHED LINE REPRESENTS ZONE WHEREIN
NO PROPOSED TREES OR LIGHT POLE
Mw6 LID 37.00 FOOTINGS ARE LOCATED. CLEAR AREA IS
ELEV 36.69 @ TOP OF PVC 10' FROM EDGE OF SPU WATER PIPES, 5'
FROM SPU HEADER CABLE, TYP.
SURVEYED:
DESIGNED:
DRAWN.
CHECKED:
BY I DATE APPR I APPROVED:
SCALE.
PER PLAN
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
1 11 Ij
EXISTING PEDESTRIAN
LIGHTS TO REMAIN
PROPOSED MAST
LIGHT POLES
EXISTING
PEDSTRIAN LIGHTS
TO BE REMOVED
t Y O,p
CITY C� OF
aTIF RENTON
FNTo
Planning/Building/Public Works Dept.
SHEET INDEX
L0.00 LANDSCAPE KEY PLAN
L0.01 TREE RETENTION PLAN - MARKET
L0.02 TREE RETENTION PLAN - PIAZZA
L0.11 SELECTIVE DEMOLITION PLAN - MARKET
L0.12 SELECTIVE DEMOLITION PLAN - PIAZZA
L0.13 SELECTIVE DEMOLITION PLAN ENLARGEMENTS - MARKET
L0.14 SELECTIVE DEMOLITION PLAN ENLARGEMENTS - PIAZZA
L1.01 MATERIALS PLAN - MARKET
L1.02 MATERIALS PLAN - PIAZZA
L2.02 GRADING PLAN - PIAZZA
L3.01A PLANTING PLAN - MARKET - TREES + GC
L3.01 B PLANTING PLAN - MARKET - SHRUBS + PERENNIALS
L3.02A PLANTING PLAN - PIAZZA - TREES + GC
L3.02B PLANTING PLAN - PIAZZA - SHRUBS + PERENNIALS
L3.03 PLANTING SCHEDULE
L3.04 PLANTING DETAILS
L3.05 PLANTING DETAILS
L3.06 PLANTING DETAILS
L4.01 IRRIGATION PLAN - MARKET
L4.02 IRRIGATION PLAN - PIAZZA
L4.03 IRRIGATION DETAILS
L4.04 IRRIGATION DETAILS
L5.01 MATERIALS DETAILS
L5.02 MATERIALS DETAILS
L6.01 LAYOUT PLAN - MARKET
L6.02 LAYOUT PLAN - PIAZZA
L6.03 LAYOUT PLAN - PIAZZA SCORING AND JOINTING ENLARGEMENT -
WEST
L6.04 LAYOUT PLAN - PIAZZA SCORING AND JOINTING ENLARGEMENT -
EAST
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR ALL EXISTING AND PROPOSED
UTILITY LINES, POLES, METERS, VAULTS, AND STRUCTURES.
2. REFER TO CIVIL DRAWINGS FOR ALL HARDSCAPE GRADING
INFORMATION.
3. REPORT ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND
ACTUAL FIELD CONDITIONS TO LANDSCAPE ARCHITECT PRIOR
TO CONSTRUCTION/INSTALLATION.
R-433423
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
CURRENT PLANNING DEVELOPMENT ENGINEERING � �'
08/12/amorg025 ' msi O 08/13/2025
08/12/2025 I�p
RENTON MARKET & PIAZZA
CIVIL CONSTRUCTION PERMIT
LANDSCAPE KEY PLAN
DATE:
07/16/25
FIELDBOOK:
PAGE:
DRAWING NO:
L0.00
SHEET: OF
23 61
M
M
N
O
O
O
LO
N
A,
u
N
co
O
O
O
O
N
rrid
ri1