EXISTING IRRIGATION
WATER METER
OGP
INS
m
L-u
EXISTING IRRIGATION PIPING
AND SPRINKLERS IN THIS AREA
ARE CONSIDERED ABANDONED
AND NOT OPERATIONAL
EXISTING IRRIGATION BACKFLOW
PREVENTION ASSEMBLY AND
VALVES
A
FIELD VERIFY EXISTING IRRIGATION
CONTROLLER LOCATION WITHIN
MARKET BUILDING.
DESIGN AND INSTALL NEW SPRINKLER
IRRIGATION IN THIS PLANTING AREA.
LOCATE SPRINKLERS TO AVOID OVERSPRAY
ONTO PAVEMENTS AND ARCHITECTURAL
ELEMENTS WHILE PROVIDING HEAD -TO -HEAD
COVERAGE OVER ALL NEW PLANTS.
T
0
— I
OU -
♦ n iFq
MATCH LINE, SEE SHEET L4.02 4, T
YJ
—
II
1 IRRIGATION PLAN - MARKET
1 If
= 10'-011
�`N M. PMO,Q PVC
a�l V�T 0 2
U1
o o
Fp 97 EXP. 13 PQ`G O
�AMOSCAPE
106 Lenora Street
Seattle, WA 98121
(206) 624-8154
info@hewittseattle-com
SS (RECORD)
NO.
.. 2'
REVISION
\
�P
P
OSS
771
�1GP
1
�' 00,
GP doo, /
I
GP GP GP
o I
HAND -WATER NEW PLANTERS
UNTIL HANDOFF TO OWNER U P
091 IT
O GP
GP P GPO O O GP P O GP �/ O G -
G —� —. .,. I
--——————————————————————————— — — — — —— ---0-- �I
\ I
IRRIGATION NOTES - MARKET
1. THE RENOVATION OF THE EXISTING IRRIGATION ON THIS PLAN IS DESIGN/BUILD BY
THE CONTRACTOR. INVESTIGATE LOCATIONS OF EXISTING IRRIGATION EQUIPMENT
AND CONFIRM OPERATION IN AREA NOTED FOR RENOVATION BEFORE DEMOLITION
OR OTHER SITE PREPARATION ACTIVITIES DISTURB THE EXISTING IRRIGATION.
2. SELECTIVE DEMOLITION AND PROTECTION IS REQUIRED TO PREPARE THE
EXISTING SYSTEM FOR RENOVATION. PREPARATION ACTIVITIES INCLUDE, BUT ARE
NOT LIMITED TO: CUTTING AND CAPPING OF PIPES; CUTTING, LABELING AND
SPLICING OF IRRIGATION CONTROL WIRES, AND MODIFYING WIRING AND
PROGRAMMING AT CONTROLLER. THE FINAL RENOVATION OF THE SYSTEM SHALL
RESULT IN AN OPERATION IRRIGATION SYSTEM FOR THE PLANTING AREAS NOTED
WITHOUT LEAKS AT ABANDONED PIPE LOCATIONS.
3. CONFIRM AVAILABLE WATER PRESSURE AND FLOW, METER SIZE AND WATER
SUPPLY SIZE. DESIGN AND INSTALL ONE OR MORE ZONES TO CORRESPOND WITH
AVAILABLE PRESSURE, RESULT IN EXCESS PRESSURE LOSS, AND NOT EXCEED 5
FEET PER SECOND FLOW IN THE NEW PIPES.
4. MATCH THE VALVES, PIPING, SPRINKLERS, AND WIRING AS NOTED ON L4.02 AND
THE SPECIFICATIONS. INSTALL, TEST AND RECORD NEW LAYOUT ON DRAWINGS IN
ACCORDANCE WITH REQUIREMENTS IN 328400 PLANT IRRIGATION.
SS (RECuRD)
I
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
BY DATE APPR APPROVED:
SCALE:
VERTICAL: NAVD 1988
HORIZONTAL: NAD 198311991
PER PLAN
ONE INCH DAT U M
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
j
4
1
El
SSA 2-
w
LU
Q
LU
Z
ry
D
m
SS
0 5' 10,
R-433441
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
CURRENT PLANNING � -r LESLOPMENT ENGINEERING
amorganroth
08/12/2025 ippo 08/13/2025 [j]
EER UTILITY 0,GAFOUR 08/13/2025
RENTON MARKET & PIAZZA D07/16/25
ATE:
CITY OF FIELDBOOK:
CIVIL CONSTRUCTION PERMIT PAGDB
RENTON DRAWING NO:
IRRIGATION PLAN - MARKET L4.01
Planning/Building/Public Works Dept. SHEET: oF:
41 61
M
N
O
O
LO
N
A,
u
M
O
0
4
Q
J
N
co
O
O
4
N
TIA
ril