Loading...
HomeMy WebLinkAboutR-433441GP M i —� O O GP O O LU GP EXISTING IRRIGATION WATER METER OGP INS m L-u EXISTING IRRIGATION PIPING AND SPRINKLERS IN THIS AREA ARE CONSIDERED ABANDONED AND NOT OPERATIONAL EXISTING IRRIGATION BACKFLOW PREVENTION ASSEMBLY AND VALVES A FIELD VERIFY EXISTING IRRIGATION CONTROLLER LOCATION WITHIN MARKET BUILDING. DESIGN AND INSTALL NEW SPRINKLER IRRIGATION IN THIS PLANTING AREA. LOCATE SPRINKLERS TO AVOID OVERSPRAY ONTO PAVEMENTS AND ARCHITECTURAL ELEMENTS WHILE PROVIDING HEAD -TO -HEAD COVERAGE OVER ALL NEW PLANTS. T 0 — I OU - ♦ n iFq MATCH LINE, SEE SHEET L4.02 4, T YJ — II 1 IRRIGATION PLAN - MARKET 1 If = 10'-011 �`N M. PMO,Q PVC a�l V�T 0 2 U1 o o Fp 97 EXP. 13 PQ`G O �AMOSCAPE 106 Lenora Street Seattle, WA 98121 (206) 624-8154 info@hewittseattle-com SS (RECORD) NO. .. 2' REVISION \ �P P OSS 771 �1GP 1 �' 00, GP doo, / I GP GP GP o I HAND -WATER NEW PLANTERS UNTIL HANDOFF TO OWNER U P 091 IT O GP GP P GPO O O GP P O GP �/ O G - G —� —. .,. I --——————————————————————————— — — — — —— ---0-- �I \ I IRRIGATION NOTES - MARKET 1. THE RENOVATION OF THE EXISTING IRRIGATION ON THIS PLAN IS DESIGN/BUILD BY THE CONTRACTOR. INVESTIGATE LOCATIONS OF EXISTING IRRIGATION EQUIPMENT AND CONFIRM OPERATION IN AREA NOTED FOR RENOVATION BEFORE DEMOLITION OR OTHER SITE PREPARATION ACTIVITIES DISTURB THE EXISTING IRRIGATION. 2. SELECTIVE DEMOLITION AND PROTECTION IS REQUIRED TO PREPARE THE EXISTING SYSTEM FOR RENOVATION. PREPARATION ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO: CUTTING AND CAPPING OF PIPES; CUTTING, LABELING AND SPLICING OF IRRIGATION CONTROL WIRES, AND MODIFYING WIRING AND PROGRAMMING AT CONTROLLER. THE FINAL RENOVATION OF THE SYSTEM SHALL RESULT IN AN OPERATION IRRIGATION SYSTEM FOR THE PLANTING AREAS NOTED WITHOUT LEAKS AT ABANDONED PIPE LOCATIONS. 3. CONFIRM AVAILABLE WATER PRESSURE AND FLOW, METER SIZE AND WATER SUPPLY SIZE. DESIGN AND INSTALL ONE OR MORE ZONES TO CORRESPOND WITH AVAILABLE PRESSURE, RESULT IN EXCESS PRESSURE LOSS, AND NOT EXCEED 5 FEET PER SECOND FLOW IN THE NEW PIPES. 4. MATCH THE VALVES, PIPING, SPRINKLERS, AND WIRING AS NOTED ON L4.02 AND THE SPECIFICATIONS. INSTALL, TEST AND RECORD NEW LAYOUT ON DRAWINGS IN ACCORDANCE WITH REQUIREMENTS IN 328400 PLANT IRRIGATION. SS (RECuRD) I SURVEYED: DESIGNED: DRAWN: CHECKED: BY DATE APPR APPROVED: SCALE: VERTICAL: NAVD 1988 HORIZONTAL: NAD 198311991 PER PLAN ONE INCH DAT U M AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY j 4 1 El SSA 2- w LU Q LU Z ry D m SS 0 5' 10, R-433441 IN COMPLIANCE WITH CITY OF RENTON STANDARDS CURRENT PLANNING � -r LESLOPMENT ENGINEERING amorganroth 08/12/2025 ippo 08/13/2025 [j] EER UTILITY 0,GAFOUR 08/13/2025 RENTON MARKET & PIAZZA D07/16/25 ATE: CITY OF FIELDBOOK: CIVIL CONSTRUCTION PERMIT PAGDB RENTON DRAWING NO: IRRIGATION PLAN - MARKET L4.01 Planning/Building/Public Works Dept. SHEET: oF: 41 61 M N O O LO N A, u M O 0 4 Q J N co O O 4 N TIA ril