HomeMy WebLinkAboutMFP25004172.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25004172
IVR Number: 25004172
Permit Information
Permit Name: Puget Sound Energy - Electric, PSE POTELCO 111030070 1602 RAYMOND AVE SW
Address/Location:08/15/2025Application Date:3340404003Parcel Number: 1602 RAYMOND AVE SW
Permit Type:09/03/2025Issue Date:Franchise
Permit Work Class:09/03/2026Expiration Date:Minor Utility
Job Number: 111030070Franchise Type:Electric
Description: Puget Sound Energy Electric REPLACING AND RELOCATING TRANSMISSION POLE(4/2) @ GRID 317317 165561
TRANSFERRING ALL OVERHEAD WORK AND INSTALLING NEW HELIX ANCHOR AND GUYING AS STAKED (ONTO
PVT PROPERTY). ASPHLUND TO COMPLETE REQUIRED TREE TRIMMING. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Permits Central 355 110th Ave NE
Bellevue, WA 98004
B: (425) 620-6742
H: (425) 620-6742
C: (425) 620-6742
Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
8/15/25
Katie Zimmerman
PSE POTELCO 111030070 1602 RAYMOND AVE SW
1602 RAYMOND AVE SW
RICHARD MILLER 253-355-6930
SEE ABOVE
9/15/25 9/19/25
MFP25004172
Monday Friday 8:00am 3:00pm
Scott Warlick CED 9/3/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
1602 Raymond Ave SW Renton WA 98057 USA4/2121212RAYMOND AVE SW
RAYMOND AVE SW
12 12 12 18181212 12 12 STOP
W20-1ROAD
WORK
AHEAD
BEPREPARED
TOSTOP W3-4X'≥X'≥X'≥W20-7ASTOPSTOP
W20-1
ROADWORKAHEADBEPREPAREDTOSTOPW3-4
X'≥X'≥X'≥
W20-7A
STOP
W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7A151215W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW21-1
W21-1SW 16TH STSW 16TH ST1212C/WCLOSEDR9-3C/WCLOSEDR9-3NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVJason Bisenius425-424-7316jason.bisenius@pse.com1 OF 11602 RAYMOND AVE SW, RENTON, WA 980570 12063524 06/13/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPPOLEMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Jason BiseniusCard No. ES2 000394Card Exp. 01/31/2028Jason.Bisenius@pse.com(425)424-7316MFP25004172
RAYMOND AVE SWP#3340405150
1602
P#3340404003UGPxUGPx
UGPxUGPxUGPxUGPx
UGPx
UGP
x
UGPx UGPx UGPx UGPx UGPx
UGPx
UGPx
UGPxUGPxUGPxUGPxUGTx
UGTx
UGTx UGTx UGTx UGTx
OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxROW = 60'SW 16TH ST
CL
UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx
TO BE
RELOCATED
NEW LOCATION
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
OVERHEAD CIRCUIT MAP:2305E076
SCALE: 6" = 1 MILE
Additional Work Order Code Numbers:
WO#: 108163363, 571022070
SITE PLAN
SCALE: 1:50
FOREMAN (CHECK BOX WHEN COMPLETED)
Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
JOB SITE
VICINITY MAP
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
No
No
Yes
Yes
"Joint Trench Coordination Req'd"
"Vegetation Management Req'd"
K. BARTENHAGEN 253-561-4641 6/11/25
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. MILLER 253-355-6930 6/11/25
K. BARTENHAGEN 253-561-4641 6/11/25
---
R. MILLER 253-355-6930 6/11/25
REQ-CITY OF RENTON
TLN-74 RELOCATE #4/2
REMOVE/REPLACE DIST UB
1602 RAYMOND AVE SW, RENTON, WA 98057
--
- 111030070
AS NOTED 1/1
KING N/A -QCSOKE
SW-19-23-5 --
2305E075NW 2305E076 2305E075 EAR-13
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
POTELCO - PM, Inc.DESIGNED BY W.O.:111030070THIS PAGE FOR DISTRIBUTION UNDERBUILD ONLY.
SEE TRANSMISSION WO# 111030070 PRINT FOR TRANSMISSION
DETAILS AND POLE LOCATION OFFSETS.
SITE SPECIFIC NOTES
(317317-165561 4/2)
-REPLACE/RELOCATING EXIST 75' FT CL H1 POLE (SEE TRANSMISSION DESIGN)
- REPLACE EXIST 3Ø 12 KV SINGLE ARM UB W/ NEUTRAL (6034.1010 - TANU313)
- REPLACE EXIST 3Ø UB W/12 KV DE, UB W/ NEUTRAL (6034.1042 - DEH015)
- (MATCH EXISTING DISTRIBUTION MOUNTING HEIGHTS)
- TRANSFER EXIST OH PRIMARY (E) EXTEND AS REQUIRED (______ / L = ______')
- TRANSFER EXIST OH PRIMARY (W) EXTEND AS REQUIRED (______ / L = ______')
- TRANSFER EXIST OH PRIMARY (N) EXTEND AS REQUIRED (______ / L = ______')
- INSTALL 10" SINGLE HELIX ANCHOR (6012.1000 - ANDH1) (S), LOCATION STAKED
- (MATCH EXISTING DISTRIBUTION PRIMARY GUY MOUNTING HEIGHT)
- INSTALL 3/8” DOWN GUY (S) W/14' LEAD (6013.0100 - GYD3SA)
NOTE: POLE LOCATION STAKED PER TRANSMISSION WO#111030070 OFFSETS
MFP25004172
RESTORATION PER CITY OF RENTON STANDARDS
Plotted:4/25/2025@1:06:46 AMP09446111030070.dgnTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
K BARTENHAGEN
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
1"=100'
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
/2
0
07C 111030070111030070
74KING
111030070
108163363
12606352
571022070
SHUFFLETON - OBRIEN (115 KV)
F. GU
M. BORNDAHL
425-681-6854
925-949-5929 04/25/25
253-561-4641
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC
DESIGNED BY: FRANK GU
PROJECT SCOPE:
RELOCATE POLE 4/2 AT ROUNDABOUT
STAMPPE
Black & Veatch
19801 SW 72nd Ave, Suite 200
Tualatin, OR 97062-8344
(503) 443-4400
R
R
PRECONSTRUCTION
WORK DRAWINGS AND DOCUMENTS
SAFETY
AT ALL TIMES.
- WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE
COMPLETION OF JOB.
- RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT
INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH.
- MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE
GENERAL NOTES PROJECT NOTES
VERT
W/
W
UG
TPLX
XMSN
XFMR
X-FER
TERM
TEL/TV
TAN
SW#
SW GRDS
SWBD
S
SA
SGL
SVC
R/C
REMV
REPL
RELOC
PRI
PTP
PH
OH
N
NEUT
MT
LB
LATL
INST
E
DWN GUY
DDE
DA
DBL
DISC
DE
C/O
CU
C/N
CL
CHG
BRKT
ANCH
VERTICAL
WITH
WEST
UNDERGROUND
TRIPLEX
TRANSMISSION
TRANSFORMER
TRANSFER
TERMINATION
TELEPHONE/TELEVISION
TANGENT
SWITCH NUMBER
SWITCH GROUNDS
SWITCH BOARDS
SOUTH
SINGLE ARM
SINGLE
SERVICE
RIGID CLEVIS
REMOVE
REPLACE
RELOCATE
PRIMARY
POLE TOP PIN
PHASE
OVERHEAD
NORTH
NEUTRAL
MOUNT
LOADBREAK
LATERAL
INSTALL
EAST
DOWN GUY
DOUBLE DEADEND
DOUBLE ARM
DOUBLE
DISCONNECT
DEADEND
CUTOUT
COPPER
COMMON NEUTRAL
CLASS
CHANGE
BRACKET
ANCHOR
ABBREVIATION KEYTRANSMISSION SYMBOL LEGEND
CONSTRUCTION NOTES
LINE CROSSING (PROFILE)
STREET LIGHT WITH POLE
STREET LIGHT
PUSH BRACE
SPAN GUY
MULTIPLE DOWN GUYS
DOWN GUY
REMOVED CONDUCTOR
NEW CONDUCTOR
EXISTING 230KV CONDUCTOR
EXISTING 115KV CONDUCTOR
EXISTING 55KV CONDUCTOR
NEW LATTICE TOWER
EXISTING LATTICE TOWER
NEW STEEL POLE
EXISTING STEEL POLE
NEW LAMINATE POLE
EXISTING LAMINATE POLE
REMOVED POLE
NEW POLE
EXISTING POLE
VICINITY MAP
- RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE.
IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
TO PSE STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY
- RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE
MATERIALS, EQUIPMENT AND PACKING SHALL BE REMOVED DAILY.
- WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION
OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST.
- ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES ENGINEER: FRANK GU PHONE: 425-681-6854
WITH PERMIT REGULATIONS AND LOCAL TRAFFIC REGULATIONS.
- PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE
INSTRUCTED BY THE SYSTEM OPERATOR.
RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE
- PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND
- REFER TO PSE STANDARDS 6275.xxxx FOR SYSTEM GROUND REQUIREMENTS.
- IDENTIFICATION LABEL NAMING "EAR-FLC" EARLINGTON SUB - 4/3 (SH2)
- INSTALL TRANSMISSION LINE LABELS PER STD 0900.1020
THE ALIGNMENT FOR DOUBLE CIRCUIT TRANSMISSION STRUCTURES.
- ALL STATIONING WILL BE CALCULATED ALONG THE CENTER LINE OF
REFERENCED IN THIS DRAWING.
- DESIGN DETAILS AND NOTES SHALL SUPPLEMENT THE STANDARDS
ANY AND ALL CONSTRUCTION CHANGES.
INFORMATION. THE ENGINEER SHALL HAVE SOLE AUTHORITY TO APPROVE
- THE ENGINEER SHALL BE CONTACTED WITH REGARDS TO ALL TECHNICAL
FOR WOOD POLES CONSTRUCTION, DWG D-12842 SH 1 OF 1.
- ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARD NOTES
PROJECT SCOPE
- RELOCATE POLE 4/2 AT ROUNDABOUT
1
BY THE PROJECT MANAGER.
HAVE BEEN SECURED. FINAL NOTIFICATION TO PROCEED SHALL BE GIVEN
- WORK SHALL NOT BEGIN UNTIL ALL EASEMENTS AND STREET USE PERMITS
"TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL".
THE MINIMAL REQUIREMENTS SPECIFIED IN PSE STD 0150.3200
- EROSION CONTROL PROCEDURES SHALL BE USED IN ACCORDANCE WITH
- NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
IN ADVANCE.
SWITCHING SHALL BE SCHEDULED WITH THE LOAD OFFICE A MINIMUM OF 3 WEEKS
OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE. ALL TRANSMISSION SYSTEM
- ALL DISTRIBUTION SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM
IN RIGHT-OF-WAY INVOLVING A PERMIT.
OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK
- NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS,
DISTRIBUTION SYMBOL LEGEND
- SEE 0300.1000 FIGURE 19 FOR
NOT TO BE USED FOR OPERATIONAL PURPOSES
FOR PROJECT LOCATION REFERENCE ONLY
SEE SHEET
SEE SHEET TRANSMISSION DRAWING SOURCE:SEE SHEETASBUILT TO:SEE SHEETSHEET 2SHEET 2
(EAR-FLC)
EARLINGTON - FALCON 115kV
(EAR-FLC)
EARLINGTON - FALCON 115kV
RENTON, WA 98057
RELOCATE POLE 4/2 AT ROUNDABOUT
5/1/2025
05/02/2025
MFP25004172
Plotted:4/25/2025@1:07:34 AMP09446111030070.dgnTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
K BARTENHAGEN
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
1"=100'
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
/2
0
07C 111030070111030070
74KING
111030070
108163363
12606352
571022070
SHUFFLETON - OBRIEN (115 KV)
F. GU
M. BORNDAHL
425-681-6854
925-949-5929 04/25/25
253-561-4641
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC
DESIGNED BY: FRANK GU
PROJECT SCOPE:
RELOCATE POLE 4/2 AT ROUNDABOUT
STAMPPE
Black & Veatch
19801 SW 72nd Ave, Suite 200
Tualatin, OR 97062-8344
(503) 443-4400
R
R
SW 16TH ST
RAYMOND AVE SWRAYMOND AVE SWSW 16TH ST
D-03501
EAR
4/2 13+144/3 15+91`RT 01°04'4/1 10+29`LT 75°27's4/210+29
75/1
VDE (LA)
4/1
15+91
75/1
HPA
4/3
13+14
75/H1
HPA
4/2
08+21
35/STEEL
SUB DE
EAR
285
276
208
233
52
1600# MAXIMUM RS=245'
4/0 COPPER 7 STRAND
3400# MAXIMUM RS=245'
4/0 COPPER 7 STRAND
3000# MAXIMUM NESC MEDIUM RS=273'
795 ACSR TERN
3000# MAXIMUM NESC MEDIUM RS=273'
795 ACSR TERN
2
2305E075
Sec 19 T23 R05E
RENTON, WA 98057
700 SW 16TH ST ASBUILT TO:T-01601 sh13TRANSMISSION DRAWING SOURCE:T-1282 sh11 5+00 10+00 15+00 20+00100
50
0
100
50
0
PROFILE SCALE
1002003004000VERT : 1"= 20'
HORIZ : 1"= 200'10015020001"= 100'50PLAN SCALE
DISPLAYED AT 100°C
DISPLAYED AT 0°C
DISPLAYED AT 50°C
REFER TO POLE TABLE FOR DISTRIBUTION ARM MOUNTING HEIGHT.
POTELCO TO PREPARE DISTRIBUTION DESIGN AS NEEDED TO ACCOMMODATE NEW TRANSMISSION POLE LOCATION.
NOTE:
4/2 65 1317317-165561
s4/2 30 1317323-165561
REMARKS
POLE RETIREMENT TABLE
STAKE NO
POLE OR GRID NUMBER
CLASS
POLE TEL TV FIBER ID NUMBERTRANRMVDTOPPEDRMVD
POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS
LENGTH
POLE
INSTALLED
YEAR
PLACE STRUCTURE 4/2 IN TRAVELERS, TRANSFER CONDUCTORS AND EQUALIZE TENSION.
CONDUCTOR NOTE:
10' EAST, 6.5' SOUTH OF EXISTING4/2 13+14 REPLACE H1 HPA 6085.1000 29.0 317317-165561FIG 1075100°C 47.4659243 -122.2273246
4/1 10+29 EXIST 1 VDE (LA)6085.1040 37.0 317317-165591FIG 1375100°C 47.4659620 -122.2261738
EAR 08+21 EXIST STEEL SUB DE35100°C
4/3 15+91 EXIST 1 HPA 6085.1000 25.0 317319-165523FIG 1075100°C 47.4658886 -122.2284410
s4/2 REMOVE 1 STUB 317323-165561 30 47.4660723 -122.2273186
POLE TABLE
STATION TYPE REMARKSACTIONGRID NUMBERPRACTICE
STANDARD
POLE TOP
FROM
FRAMING
DIST.DRILLING
SPECIFICATIONS
1025.1400CLASS
POLE
LENGTH
POLE
NO
STAKE
OR
POLE
TEMP
DESIGN
TRANS GPS
LAT LONG
s4/2
4/2
REMOVE
REMOVE
1
1
REMOVE
REMOVE
1 3 B REMOVE DOWN GUY AND ANCHOR
REMOVE SPAN GUY
PLATE 24 - 1 IN ROD - ANTP243/8 STUB DOWN - GYT3SB
3/8 SIDE SPAN 8' - GYT30S
3
1
8' N
56' N
0170
0170
GUYING TABLE
REMARKS
ACTION
GUYS
NO
STAKE
OR
POLE
SPAN
OR
LEAD
ACTION
FIG DET
ANCHORS
FIGQTY
DESCRIPTION
UNIT
CONSTRUCTION
DESCRIPTION
UNIT
CONSTRUCTION
QTY 6072.1000
STD.PRAC.
6073.xxxx
STD.PRAC.
5/1/2025
05/02/2025
MFP25004172