Loading...
HomeMy WebLinkAboutAddendum - 2 Amendment Department of Commerce Grant Number: 22-92601-008 Amendment: B Energy Division Buildings Unit Energy Efficiency Retrofits 1.Grantee 2.Grantee Doing Business As (optional) City of Renton 1055 South Grady Way Renton, WA 98507-3232 N/A 3. Grantee Representative (only if updated)4.COMMERCE Representative (only if updated) Jeff Minisci, Facilities Director City of Renton // Public Works Email: jmisici@rentonwa.gov Ph: (425) 766-6159 5. Original Grant Amount (including any previous amendments) 6.Amendment Amount 7.New Grant Amount $267,626.00 (94,115)$173,511.00 8.Amendment Funding Source 9.Amendment Start Date 10.Amendment End Date Federal: State: x Other: N/A: 7/28/2025 06/15/2026 11. Federal Funds (as applicable): N/A Federal Agency: N/A ALN: N/A 12. Amendment Purpose: Removes the M&V requirement to allow for project delays and replaces it with final report w/professional assessment of savings projections. Reduces funding amount by $94,115 to a level available as of the signed 25-27 Washington biennium budget. Funding is subject to reappropriation of funds. COMMERCE, defined as the Department of Commerce, and the Grantee, as defined above, acknowledge and accept the terms of this Grant as Amended and attachments and have executed this Grant Amendment on the date below to start as of the date and year referenced above. The rights and obligations of both parties to this Grant as Amended are governed by this Grant Amendment and the following other documents incorporated by reference: Grantee Terms and Conditions including Attachment “A” – Scope of Work, Attachment “B” – Budget. A copy of this Grant Amendment shall be attached to and made a part of the original Grant between COMMERCE and the Grantee. Any reference in the original Grant to the “Grant” shall mean the “Grant as Amended”. FOR GRANTEE FOR COMMERCE Armondo Pavone, Mayor Date Jennifer Grove, Assistant Director, Energy Date APPROVED AS TO FORM ONLY Sandra Adix Assistant Attorney General 3/20/2014 Date "!#         $  $   CAG-24-018, Adden #2-25 Amendment 2 This Grant is amended as follows: Attachment B Budget Estimated total project cost: $2,695,674.00 ALL OTHER TERMS AND CONDITIONS OF THIS GRANT REMAIN IN FULL FORCE AND EFFECT. Milestone Project Activity and Task Key Deliverables Deliverable Description Expected Completion Date Amount ADevelopment & ContractingConstruction contract Primary contractor engaged Collaboration confirmed If applicable; shared venture/partner agreements in place 2/28/2023 7/30/2025 11,797.00$ B Design & Permitting Design approval Confirmation Grantee organization has accepted design Copy of permits Permit applications submitted (permits or receipts) Intent ID # Intent to pay prevailing wage filed with L&I 8/30/2023 8/30/2025 25,258.00$ C Materials Ordered Supplier Invoice Documentation that materials have been ordered 1/5/2024 9/30/24 9/30/25 30,561.00$ DConstruction and CompletionTesting & Commissioning Report/s from Contractor Inspection passed Documentation from applicable jurisdiction Photos Photographs of completed installation Notice of Substantial Completion Issued by Contractor Commencement of Energy Savings Issued by Contractor Close out Report Commerce form Fact Sheet Commerce template completed and submitted $188,667.00 Certification of Match Letter signed by grantee official stating final project costs and amount of match provided 5/23/2024 5/30/25 5/30/2026 $92,561.00 $13,384.00 E Analytics and Monitoring Measurement and Verification (M&V) Final Report Payable on demonstration of energy savings targets being met after 1 year; M&V period may be extended for second year if needed to reach energy savings targets. A Final Report to include consultant/contractor post- construction projections of energy savings. 6/27/2025 5/30/2026 6/15/2026 $13,334.00 $267,676.00 Grant Total $173,511.00 "!#