Loading...
HomeMy WebLinkAboutR-432636Q0 N CO C) I W I - m E 0 a E VI 2 v C4 N ON I 0, U O7 .O a 0, 0 0 m v & (il Q Z J EL GENERAL NOTES: 1. STRUCTURE PROXIMITY LOADING DISCLAIMER: STORMTRAP MODULES AND FOUNDATION ARE NOT DESIGNED TO ACCEPT ANY ADDITIONAL LOADING FROM ANY NEARBY STRUCTURES NEXT TO OR OVER THE TOP OF STORMTRAP. EXAMPLES OF NEARBY STRUCTURES MAY INCLUDE BUT ARE NOT LIMITED TO BUILDINGS, FOUNDATION ELEMENTS, RETAINING WALLS, LIGHT POLES, BOLLARDS, SIGNPOSTS, FENCES. ADDITIONALLY, STORMTRAP IS NOT RESPONSIBLE FOR INSTALLATION CONFLICTS ARISING FROM ANY OF THESE NEARBY STRUCTURES. IF ADDITIONAL LOADING CONSIDERATIONS ARE REQUIRED FOR STRUCTURAL DESIGN OF STORMTRAP, PLEASE CONTACT STORMTRAP IMMEDIATELY. FOR LIGHT POLES SHOWN OVER THE TOP OF THE SYSTEM, STORMTRAP WILL PROVIDE A 5'-0" LATERAL DISTANCE CAVITY AROUND THE LIGHT POLE TO ACCOMMODATE IT. THE FOR TO TAKE RESPONSIBILITY FOR ENSURING THE LIGHT POLE IS NOT INFLICTING ANY LOADING ON THE STORMTRAP MODULES AND FOUNDATION. 2. TREE LOADING DISCLAIMER: THE NUMBER OF TREES OR WEIGHT OF TOTAL PLANT MATERIAL PRESENT ON TOP OF A SINGLE STORMTRAP MODULE SHALL NOT EXCEED 16,000 LBS. THE REQUIREMENTS LISTED HERE APPLY AT BOTH THE TIME OF INSTALLATION AND FOR THE LIFE OF THE TREES AND PLANTS IN QUESTION. THE FOR AND LANDSCAPE ARCHITECT ARE RESPONSIBLE FOR ENSURING THAT TREE AND OTHER PLANT ROOTS DO NOT INTERFERE WITH OR COMPROMISE THE FUNCTIONAL AND STRUCTURAL INTEGRITY OF STORMTRAP'S UNDERGROUND MODULES. APPROPRIATE MEASURES SHOULD BE TAKEN TO PREVENT ROOT GROWTH INTO THE STORMTRAP SYSTEM FROM ADJACENT OR OVERHEAD TREES. FURTHERMORE, THE ROOTS OF THE TREES MUST BE CONTAINED TO PREVENT FUTURE DAMAGE TO THE STORMTRAP SYSTEM. STORMTRAP ACCEPTS NO LIABILITY FOR DAMAGES CAUSED BY TREES OR OTHER VEGETATION PLACED AROUND OR ON TOP OF THE SYSTEM. 3. PRE-TREATMENT/SEDIMENT/FILTER CHAMBER DISCLAIMER: FOR SYSTEMS CONTAINING PRE-TREATMENT, SEDIMENTATION AND/OR FILTER CHAMBERS; IF REQUIRED TO BE SEALED TO PREVENT SAND AND/OR PRE-TREATED WATER FROM MIGRATING INTO ADJOINING MODULES, IT IS THE SOLE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THOSE MODULES ARE SEALED. 4. OUTLET CONTROL STRUCTURE DISCLAIMER (IF SHOWN ON THESE PLANS): IF A WATERTIGHT SOLUTION IS REQUIRED FOR AN OUTLET CONTROL STRUCTURE, ALL EXTERIOR COLD JOINTS, INCLUDING JOINT BETWEEN TOP AND BASE MODULES, BETWEEN TOP AND BASE OF ADJOINING SYMONS WALLS, AND JOINTS BETWEEN MODULE AND ADJACENT END PANELS WILL BE THE SOLE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO PROVIDE AND INSTALL THE WATERTIGHT APPLICATION PER THE EOR'S SPECIFICATION. BILL OF MATERIALS OTY. UNIT TYPE DESCRIPTION TOP WEIGHT BASE WEIGHT 27 I 10'-0" DOUBLETRAP 15493 15291 1 II 10'-0" DOUBLETRAP 17906 17704 15 III 10'-0" DOUBLETRAP 15412 15311 2 IV 10'-0" DOUBLETRAP 16618 16517 5 SPIV 10'-0" DOUBLETRAP <16618 <16517 4 T2 PANEL 8" THICK PANEL 9258 7 T4 PANEL 8" THICK PANEL 7288 12 POINT WRA 150' PER ROLL 48 POINT TAPE14.5' PER ROLL TOTAL PIECES = 100 TOTAL PANELS = 11 HEAVIEST PICK WEIGHT = 17906 A B C D E F G 18"0 OPENING 12" HDPE f INVERT-" H 18"0 OPENING 12" HDPE I J INVERT=45: DESIGN CRITERIA ALLOWABLE MAX GRADE = 457.64' ALLOWABLE MIN GRADE = 455.39' INSIDE HEIGHT ELEVATION = 453.50' SYSTEM INVERT=443.50' NOTES: 1. DIMENSIONING OF STORMTRAP SYSTEM SHOWN BELOW ALLOW FOR A 3/4" GAP BETWEEN EACH MODULE. 2. ALL DIMENSIONS TO BE VERIFIED IN THE FIELD BY OTHERS. 3. SEE SHEET 3.0 FOR INSTALLATION SPECIFICATIONS. 4. SP - INDICATES A MODULE WITH MODIFICATIONS. 5. P - INDICATES A MODULE WITH A PANEL ATTACHMENT. 6. CONTRACTORS RESPONSIBILITY TO ENSURE CONSISTENCY/ACCURACY TO FINAL ENGINEER OF RECORD PLAN SET. 7. IN ORDER FOR STORMTRAP TO GENERATE APPROVAL DRAWINGS, CIVIL ENGINEERING DRAWINGS MUST BE PROVIDED TO STORMTRAP AND SHALL INCLUDE ALL PIPE SIZES, PIPE MATERIAL, PIPE INVERT ELEVATIONS, ACCESS OPENING SIZE AND SHAPE. IN ADDITION, FINAL GRADING PLANS SHALL ALSO INCLUDE MINIMUM AND MAXIMUM GRADES OVER THE TOP OF THE STORMTRAP SYSTEM. 1 2 3 4 5 6 7 8 NOTE: VAULT PENETRATIONS FOR INLET AND OUTLET PIPES, AND ALL NECESSARY VENTS AND LIDS TO BE COORDINATED WITH STORMTRAP PRIOR TO ORDER PLACEMENT 43667 9 ,isTE4�' 6 IVA1, 1TO REVISION StormTrap. PAM uslm m pn0yVs1a01wmyt m01 1287 WIDHAM PARKWAY ROIEOVILLE, IL 60446 P.815-941-4549 / F.331 3183347 ENGINEER INFORMATION: Jacobson Consulting Engineers 255 S. King St. Suite 800 Seattle, WA 98104 206-426-2600 PROJECT INFORMATION: Hazen High School 1101 Hoquiam Ave NE Renton, WA 98059 CURRENT ISSUE DATE: 6/12/2025 ISSUED FOR: CONSTRUCTION REV. DATE: ISSUED FOR: BY: )0(/XX/XX CONSTRUCTION DG 5 5/19/2025 APPROVAL SB 4 5/13/2025 APPROVAL SB 3 3/19/2025 PRELIMINARY ZM 2 2/11/2025 PRELIMINARY ZM 1 10/25/2D24 PRELIMINARY DG SCALE: NTS SHEET TITLE: GENERAL NOTES SHEET NUMBER: Lo StormTrap• 1287 WINGHAM PARKWAY ROMEOVILLE, IL 60446 P.815-941-4549 / F.331-318-5347 ENGINEER INFORMATION: Jacobson Consulting Engineers 255 S. King St. Suite 800 Seattle, WA 98104 206-426-2600 PROJECT INFORMATION: Hazen High School 1101 Hoquiam Ave NE Renton, WA 98059 CURRENT ISSUE DATE: 6/12/2025 ISSUED FOR: CONSTRUCTION REV. DATE: ISSUED FOR. OWN XX/XX/XX CONSTRUCTION DG 5 5/19/2025 APPROVAL SB 4 5/13/2025 APPROVAL SB 3 3/19/2025 PREUMIKARY ZM 2 2/11/2025 PRELIMINARY ZM 1 10/25/2024 PRELIMINARY DG SCALE: NTS SHEET TITLE: DOUBLETRAP SYSTEM LAYOUT SHEET NUMBER: 2.0 STRUCTURAL DESIGN LOADING CRITERIA LIVE LOADING: AASHTO HS-20 HIGHWAY LOADING GROUND WATER TABLE: BELOW INVERT OF SYSTEM SOIL BEARING PRESSURE:3000PSF SOIL DENSITY: 120 PCF EQUIVALENT UNSATURATED LATERAL ACTIVE EARTH PRESSURE:35 PSF / FT. EQUIVALENT SATURATED LATERAL ACTIVE EARTH PRESSURE:80 PSF/FT. (IF WATER TABLE PRESENT) APPLICABLE CODES:ASTM C857 ACI-318 BACKFILL TYPE: SEE SHEET 4.0 FOR BACKFILL OPTIONS SEE SHEET 4.0 FOR BACKFILL SPECIFICATIONS STORMTRAP SYSTEM INFORMATION UNIT HEADROOM: 10'-0" DOUBLETRAP TOTAL STORAGE PROV: 52,632.52 CUBIC FEET STORMTRAP SYSTEM LIVE STORAGE PROV: 47,369.27 CUBIC FEET MIN. 3000 PSF BEARING CAPACITY TO BE VERIFIED IN FIELD BY OTHERS SITE SPECIFIC DESIGN CRITERIA 1. STORMTRAP UNITS SHALL BE MANUFACTURED AND INSTALLED ACCORDING TO SHOP DRAWINGS APPROVED BY THE INSTALLING CONTRACTOR AND ENGINEER OF RECORD. THE SHOP DRAWINGS SHALL INDICATE SIZE AND LOCATION OF ROOF OPENINGS AND INLET/OUTLET PIPE TYPES, SIZES, INVERT ELEVATIONS AND SIZE OF OPENINGS. 2. COVER RANGE: MIN. 1.39' MAX. 3.64' CONSULT STORMTRAP FOR ADDITIONAL COVER OPTIONS. 3. ALL DIMENSIONS AND SOIL CONDITIONS, INCLUDING BUT NOT LIMITED TO GROUNDWATER AND SOIL BEARING CAPACITY ARE REQUIRED TO BE VERIFIED IN THE FIELD BY OTHERS PRIOR TO STORMTRAP INSTALLATION. 4. FOR STRUCTURAL CALCULATIONS THE GROUND WATER TABLE IS ASSUMED TO BE BELOW INVERT OF SYSTEM IF WATER TABLE IS DIFFERENT THAN ASSUMED, CONTACT STORMTRAP. 5. SYSTEM DESIGN INTENT IS TO CONTAIN WATER WITH AN ALLOWABLE LEAKAGE RATE OF 15% OVER A 24-HOUR PERIOD. A THIRD PARTY WATER -PROOFING SOLUTION IS REQUIRED FOR SEALING OF SYSTEM / MODULE JOINT AND SEAMS. SOLUTION TO BE PROVIDED AND INSTALLED BY CONTRACTOR IN ACCORDANCE WITH THIRD PARTY WATER -PROOFING SUPPLIER'S PRODUCT SPECIFICATIONS. 6. WATER TIGHT TEST TO BE A WATER FILL TEST. ALL INLET AND OUTLET PIPES TO BE PLUGGED. AFTER ALL SIDES OF THE SYSTEM HAVE BEEN BACKFILLED UP TO THE TOP OF THE ROOF SLAB, THE SYSTEM IS TO BE FILLED WITH WATER TO THE HIGHEST CONNECTION INVERT. 24 HOURS FOLLOWING THE INITIAL FILL, CONTRACTOR HAS THE OPTION TO REFILL, UP TO THE HIGHEST CONNECTION INVERT. WATER LEVEL DEPTH TO BE MEASURED 24 HOURS AFTER COMPLETION OF FILL. IMPERMEABLE LINER AS SPECIFIED BY ENGINEER. PROVIDED AND INSTALLED BY OTHERS ---------------- FREEBOARD__-- 9,-0. LIVE STORAGE --------- ----6.------ 10'-0" DOUBLETRAP STORMTRAP INSTALLATION SPECIFICATION 1. STORMTRAP SHALL BE INSTALLED IN ACCORDANCE WITH ASTM C891 (STANDARD PRACTICE FOR INSTALLATION OF UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES). THE FOLLOWING ADDITIONS AND/OR EXCEPTIONS ARE PROVIDED FOR EMPHASIS. THE MENTION OF THESE ITEMS DOES NOT PRECLUDE THE INSTALLING CONTRACTOR FROM FOLLOWING ASTM C891 IN ITS ENTIRETY AND IMPLEMENTING ALL APPROPRIATE MEASURES. THE INSTALLING CONTRACTOR OWNS AND IS RESPONSIBLE FOR THE STORMTRAP SYSTEM UPON REMOVAL OF THE MODULES FROM THE DELIVERY TRUCK THROUGH 'FINAL CONSTRUCTION'. FINAL CONSTRUCTION IS ACHIEVED WHEN ALL MODULES ARE SET, FULLY BACKFILLED, AND WHEN FINAL FINISHED GRADES ARE REACHED. THE CONTRACTOR IS RESPONSIBLE FOR ANY COUNTERMEASURES NECESSARY TO RESIST UPLIFT/BUOYANCY BEFORE 'FINAL CONSTRUCTION' IS ACHIEVED. 2. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT PROPER/ADEQUATE EQUIPMENT IS USED TO SET/INSTALL THE MODULES. 3. STORMTRAP MODULES CAN BE PLACED ON A LEVEL, 6" FOUNDATION OF J" AGGREGATE EXTENDING 2'-0" PAST THE OUTSIDE OF THE SYSTEM (SEE DETAIL 1) AND SHALL BE PLACED ON PROPERLY COMPACTED SOILS (SEE SHEET 1.1 FOR SOIL BEARING CAPACITY REQUIREMENTS), AND IN ACCORDANCE WITH ASTM C891 STANDARD PRACTICE FOR INSTALLATION OF UNDERGROUND PRECAST UTILITY STRUCTURES. 4. THE STORMTRAP MODULES SHALL BE PLACED SUCH THAT THE MAXIMUM SPACE BETWEEN ADJACENT MODULES DOES NOT EXCEED }" (SEE DETAIL 2). IF THE SPACE EXCEEDS J", THE MODULES SHALL BE RESET WITH APPROPRIATE ADJUSTMENT MADE TO LINE AND GRADE TO BRING THE SPACE INTO SPECIFICATION. 5. STORMTRAP MODULES ARE NOT WATERTIGHT. IF A WATERTIGHT SOLUTION IS REQUIRED, CONTACT STORMTRAP FOR RECOMMENDATIONS. THE WATERTIGHT APPLICATION IS TO BE PROVIDED AND IMPLEMENTED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE SELECTED WATERTIGHT SOLUTION PERFORMS AS SPECIFIED BY THE MANUFACTURER. 6. THE HORIZONTAL JOINT BETWEEN THE TOP AND BASE LEG CONNECTIONS OF ALL PERIMETER STORMTRAP MODULES SHALL BE SEALED WITH PREFORMED MASTIC JOINT TAPE ACCORDING TO ASTM C891, 8.8 AND 8.12. (SEE DETAIL 3). THE MASTIC JOINT TAPE DOES NOT PROVIDE A WATERTIGHT SEAL. 7. ALL EXTERIOR ROOF AND EXTERIOR VERTICAL WALL JOINTS BETWEEN ADJACENT STORMTRAP MODULES SHALL BE SEALED WITH B" WIDE PRE -FORMED, COLD -APPLIED, SELF -ADHERING ELASTOMERIC RESIN, BONDED TO A WOVEN , HIGHLY PUNCTURE RESISTANT POLYMER WRAP, CONFORMING TO ASTM C891 AND SHALL BE INTEGRATED WITH PRIMER SEALANT AS APPROVED BY STORMTRAP (SEE DETAILS 2, 4, & 5). THE JOINT WRAP DOES NOT PROVIDE A WATERTIGHT SEAL. THE SOLE PURPOSE OF THE JOINT WRAP IS TO PROVIDE A SILT AND SOIL TIGHT SYSTEM. THE ADHESIVE EXTERIOR JOINT WRAP SHALL BE INSTALLED ACCORDING TO THE FOLLOWING INSTALLATION INSTRUCTIONS: 7.1. USE A BRUSH OR WET CLOTH TO THOROUGHLY CLEAN THE OUTSIDE SURFACE AT THE POINT WHERE JOINT WRAP IS TO BE APPLIED. 7.2. A RELEASE PAPER PROTECTS THE ADHESIVE SIDE OF THE JOINT WRAP. PLACE THE ADHESIVE TAPE (ADHESIVE SIDE DOWN) AROUND THE STRUCTURE, REMOVING THE RELEASE PAPER AS YOU GO. PRESS THE JOINT WRAP FIRMLY AGAINST THE STORMTRAP MODULE SURFACE WHEN APPLYING. 8. IF THE CONTRACTOR NEEDS TO CANCEL ANY SHIPMENTS, THEY MUST DO SO 48 HOURS PRIOR TO THEIR SCHEDULED ARRIVAL AT THE JOB SITE. IF CANCELED AFTER THAT TIME, PLEASE CONTACT THE PROJECT MANAGER. 9. IF THE STORMTRAP MODULE(S) IS DAMAGED IN ANY WAY PRIOR, DURING, OR AFTER INSTALL, STORMTRAP MUST BE CONTACTED IMMEDIATELY TO ASSESS THE DAMAGE AND TO DETERMINE WHETHER OR NOT THE MODULE(S) WILL NEED TO BE REPLACED. IF ANY MODULE ARRIVES AT THE JOBSITE DAMAGED DO NOT UNLOAD IT; CONTACT STORMTRAP IMMEDIATELY. ANY DAMAGE NOT REPORTED BEFORE THE TRUCK IS UNLOADED WILL BE THE CONTRACTOR'S RESPONSIBILITY. 10. STORMTRAP MODULES CANNOT BE ALTERED IN ANY WAY AFTER MANUFACTURING WITHOUT WRITTEN CONSENT FROM STORMTRAP. SURVEYED: DESIGNED: JAJ DRAWN: DJD/AJJ CHECKED: JAJ BY DATE AP P R APPROVED: JAJ SCALE: N/A ONE INCH AT FULL SGALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM STORMTRAP END PANEL 8" WIDE JOINT N (SEE NOTI 6 Y,IUL JVIIYI (SEE N( TOP OF STORMTRAP �• I (SEE .._._ DETAIL 2 CITY OF RENTON Planning/Building/Public Works Dept. 5.-0" 5'-D" ALLOWABLE MAX GRADE = 457.64' ALLOWABLE MIN GRADE = 455.39' 3.64 �6" INSIDE HEIGHT = 453.50' ELEV. = 453.00 10'-0" DOUBLETRAP LEV. = 444.00' 'STEM INVERT = 443.50' 6" STONE BASE ;SEE SHEET 4.0) DETAIL 3 DETAIL 1 StormTrap• na00 Us1m a, Dff1PJ/AN~m4V=0 1287 WINCHAM PARKWAY ROMEOVILLE, IL 60446 P.815-941-4549 / F.331-3183347 ENGINEER INFORMATION: Jacobson Consulting Engineers 255 S. King St. Suite 800 Seattle, WA 98104 206-426-2600 PROJECT INFORMATION: Hazen High School 1101 Hoquiam Ave NE Renton, WA 98059 CURRENT ISSUE DATE: 6/12/2025 ISSUED FOR: CONSTRUCTION EV DATE: ISSUED FOR: BY: XX/)O(/XX CONSTRUCTION DG 5 5/19/2025 APPROVAL SB 4 5/13/2025 APPROVAL SB 3 3/19/2025 PREUMINARV ZM 2 2/11/2025 PREUMINARY ZM 1 10/25/2024 PRELIMINARY DO SCALE: NTS SHEET TITLE: DOUBLETRAP DESIGN CRITERIA SHEET NUMBER: 1.1 StormTrap- IrseOs Us1m a D4whs140~4m4AriN0 1287 WINDHAM PARIMIAY ROME(MLLE, IL 60446 P.815-941-4549 / F.331-3183347 ENGINEER INFORMATION: Jacobson Consulting Engineers 255 S. King St. Suite 800 Seattle, WA 98104 206-426-2600 PROJECT INFORMATION: Hazen High School 1101 Hoquiam Ave NE Renton, WA 98059 CURRENT ISSUE DATE: 6/12/2025 ISSUED FOR: CONSTRUCTION REV. DATE: ISSUED FOR: BWN XX/XX/XX CONSTRUCTION DG 5 5/19/2025 APPROVAL SB 4 5/13/2025 APPROVAL SB 3 3/19/2025 PRELIMINARY ZM 2 2/11/2025 PRELIMINARY ZM 1 10/25/2D24 PRELIMINARY DG SCALE: NTS SHEET TITLE: DOUBLETRAP STONE BASE (SEE NOTE 3) INSTALLATION ( SPECIFICATION I" OVERHANG SHEET NUMBER: :E NOTE 3) 30 NTS StormTrap Details R-432636 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING msippo 08/07/2025 HAZEN HIGH SCHOOL MODERNIZATION DRAINAGE DETAILS 07.1 1 .2025 PAGE: C316 SHEET. OF. 36 OF 7 M O C) I N Q D J 00 1 ` C) C:) 0 N rr Is's