Loading...
HomeMy WebLinkAboutT-432621NM c T i O rr DocuSign Envelope ID: 9D9BODA8-0385-4664-AE66-57BFF1561D7F INSTALL DECAL NUMBERS/LETTERS VERTICALLY. DECAL NUMBERS/LETTERS, SEE NUMBERING EXAMPLE, THIS SHEET. SHALL BE INSTALLED IN 9a. DRY WEATHER, 50' F OR ABOVE PEDESTRIAN SCALE CURB DECAL TRAFFIC FLOW DECAL ORIENTATION FOR POLES SHOWN ON STD PLAN 116.1 iO—PEDESTRIAN SCALE CURB DECAL TRAFFIC FLOW DECAL ORIENTATION FOR POLES SHOWN ON STD PLAN 117.2 TRAFFIC FLOW MOUNTING HEIGHT DETAIL PEDESTRIAN SCALE DECAL �O CURB TRAFFIC FLOW DESTRIAN SCALE CAL ,ADWAY SCALE CAL FOR POLES SHOWN ON STD PLAN 117.1 & 117.1A 1-3/4" TO 2" *C)c"� LUMINAIRE STANDARD DECAL PUBLIC WORKS NUMBERING SYSTEM STD. PLAN - 121 APPROVED:7/27/2022 1 DEPARTMENTMartin Pastucha DATE 1TH TYP. CONC. PAD R/W LINE SIDEWALK CURB � ROADWAY CURB SIDEWALK R/W LIINE 10' MIN. CLEARANCE FROM DRIVEWAY ALTERNATE PLAN VIEW H 25 30' 35' 40' SL 18'-3" 23'-3" 28'-3" '33 =3" T 0.188 1 0.188 0.219 0.219 TAPERED ALUM. POLE 'T' WALL ALLOY 6063-TB SATIN GROUND FINISH rHANDHOLE 4"x6" OPENING W/COVER & S.S. SCREWS GROUND LUG INSIDE POLE INSIDE POLE 2' TO 4' OVERHANG 1-2 3'-6" H. FACE OF CURB TO CENTER OF POLE ski ROADWAY PLANTER STRIP STREET LIGHT CONDUIT TRENCH DEPTH 24" TYPICAL STREET LIGHT FOUNDATION LOCATION 2' TO 4' OVERHANG L STREET LIGHT CONDUIT TRENCH DEPTH 24" 1'-2': ALTERNATE STREET CROSS SECTION Y O + j+ PUBLIC WORKS - DEPARTMENT N.112INN DL LIGHT BASE AND JUNCTION BOX LOCATION i UT SURVEYED: DESIGNED: NS DRAWN: NS CHECKED: BP AP P R APPROVED: BP I 'SL' SCALE: NONE ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL* NAVD 1988 HORIZONTAL NAD 1983/1991 DATUM DocuSign Envelope ID: 894DB72E-3255-4A63-AOF1-38A20AAF74CA GENERAL NOTES: 1. ALL EXISTING TRANSPORTATION INFRASTRUCTURE FEATURES SHALL BE MAINTAINED ON LEVEL GRADE IF THE SURFACE LEVEL FROM CONSTRUCTION IS CHANGED (I. E. JUNCTION BOXES, LUMINAIRE POLES, TRAFFIC SIGNAL POLES, SIGN POSTS). 2. ALL TRANSPORTATION INFRASTRUCTURE SHALL BE PROVIDED ON LEVEL GRADE ONCE CONSTRUCTION IS COMPLETE. 3. ALL EXISTING OR PROPOSED TRANSPORTATION INFRASTRUCTURE FEATURES WITHIN THE PROJECT CONSTRUCTION LIMITS SHALL MEET CURRENT PROWAG ADA STANDARDS (I.E. JUNCTION BOXES SHALL HAVE NON—SKID LIDS). 4. ALL NEW TRAFFIC SIGNALS SHALL BE CONSTRUCTED WITH FIBER COMMUNICATION CONNECTION TO CITY OF RENTON TRANSPORTATION FIBER OPTIC NETWORK. 5. ALL TRANSPORTATION INFRASTRUCTURE FEATURES THAT ARE TO BE REMOVED AND REINSTALLED AT A LATER DATE SHALL BE RE —INSTALLED TO CURRENT STANDARDS. 6. ALL CONDUIT SHALL BE PVC SCHEDULE 80. 7. SIGNAL POLE, LUMINAIRE, AND CABINET FOUNDATIONS SHALL BE CLASS 4000P CONCRETE. 8. ALL PROPOSED SIGNAL POLE FOUNDATIONS AND EXISTING MODIFIED SIGNAL POLE FOUNDATIONS SHALL INCLUDE A CONCRETE PAD AROUND THE FOUNDATION. PROPOSED OR EXISTING SIDEWALK SHALL BE CONSIDERED PART OF THE FOUNDATION PAD. FOUNDATION PAD SHALL BE AT LEAST 2 FEET OFFSET FROM THE SIGNAL POLE FOUNDATION, AS SPACE ALLOWS OR UNLESS OTHERWISE APPROVED. 9. WHEN THE TRAFFIC SIGNAL IS OPERATIONAL, ALL DETECTION SHALL BE MAINTAINED AND REMAIN FUNCTIONAL FOR ALL SIGNAL PHASES. NEW PERMANENT/TEMPORARY VIDEO DETECTION SHALL BE INSTALLED AND OPERATIONAL PRIOR TO DESTROYING ANY EXISTING DETECTION. 10. ALL TRAFFIC SIGNAL SYSTEMS, ILLUMINATION SYSTEMS, OR OTHER ELECTRICAL TRANSPORTATION SYSTEMS ARE SUBJECT TO INSPECTION BY CITY OF RENTON PUBLIC WORKS/TRANSPORTATION MAINTENANCE PRIOR TO FINAL ACCEPTANCE. CONTRACTOR TO COORDINATE INSPECTION WITH THE TRANSPORTATION MAINTENANCE MANAGER OR OTHER TRANSPORTATION REPRESENTATIVE. 11. NEW PTZ CAMERA SHALL BE REQUIRED WHEN A NEW TRAFFIC SIGNAL SYSTEM IS INSTALLED, WHEN LANE CONFIGURATION IS MODIFIED WITH NEW SIGNAL PHASING, AND/OR WHEN EXISTING PTZ CAMERA(S) REQUIRE RELOCATION. 12. ARROW BOARDS SHALL BE REQUIRED TEMPORARY TRAFFIC CONTROL WHEN CLOSING A TRAVEL LANE AND SHALL BE MUTCD COMPLIANT. o�� Y o� TRANSPORTATION NOTES STD. PLAN - 135 PUBLIC WORKS . . PP OVED: DEPARTMENT 5/2/2024 1 p Z Martin Pastucha FN �o �� DATE CITY OF IR RENTON • Planning/Building/Public Works Dept. 4 T-432621 IN COMPLIANCE WITH CITY OF RENTON STANDARDS TRANSPORTATION OPERATION cbarnes 08/07/2025 HAZEN HIGH SCHOOL MODERNIZATION ELECTRICAL DETAILS DATE: 07.11.25 PAGE: E903 SHEET: OF, 74 OF 76 T O O N u C) `71- co O O 4 a J co O O O O t 4 N