HomeMy WebLinkAboutT-432621NM
c
T
i
O
rr
DocuSign Envelope ID: 9D9BODA8-0385-4664-AE66-57BFF1561D7F
INSTALL DECAL NUMBERS/LETTERS VERTICALLY.
DECAL NUMBERS/LETTERS, SEE NUMBERING
EXAMPLE, THIS SHEET. SHALL BE INSTALLED IN 9a.
DRY WEATHER, 50' F OR ABOVE
PEDESTRIAN SCALE
CURB DECAL
TRAFFIC
FLOW
DECAL ORIENTATION
FOR POLES SHOWN ON STD PLAN 116.1
iO—PEDESTRIAN
SCALE
CURB DECAL
TRAFFIC
FLOW
DECAL ORIENTATION
FOR POLES SHOWN ON STD PLAN 117.2
TRAFFIC
FLOW
MOUNTING HEIGHT DETAIL
PEDESTRIAN SCALE
DECAL
�O
CURB
TRAFFIC
FLOW
DESTRIAN SCALE
CAL
,ADWAY SCALE
CAL
FOR POLES SHOWN ON STD PLAN 117.1 & 117.1A
1-3/4" TO 2"
*C)c"� LUMINAIRE STANDARD DECAL
PUBLIC WORKS NUMBERING SYSTEM STD. PLAN - 121
APPROVED:7/27/2022 1
DEPARTMENTMartin Pastucha
DATE
1TH
TYP. CONC. PAD
R/W LINE
SIDEWALK
CURB
� ROADWAY
CURB
SIDEWALK
R/W LIINE
10' MIN.
CLEARANCE FROM DRIVEWAY
ALTERNATE PLAN VIEW
H
25
30'
35'
40'
SL
18'-3"
23'-3"
28'-3"
'33 =3"
T
0.188
1 0.188
0.219
0.219
TAPERED ALUM. POLE 'T' WALL
ALLOY 6063-TB SATIN GROUND FINISH
rHANDHOLE 4"x6" OPENING
W/COVER & S.S. SCREWS
GROUND LUG INSIDE POLE
INSIDE POLE
2' TO 4'
OVERHANG 1-2
3'-6"
H. FACE OF
CURB TO
CENTER
OF POLE
ski ROADWAY
PLANTER STRIP
STREET LIGHT CONDUIT
TRENCH DEPTH 24"
TYPICAL STREET LIGHT
FOUNDATION LOCATION
2' TO 4'
OVERHANG
L
STREET LIGHT CONDUIT
TRENCH DEPTH 24"
1'-2':
ALTERNATE STREET CROSS SECTION
Y O
+ j+ PUBLIC WORKS
- DEPARTMENT
N.112INN DL
LIGHT BASE AND JUNCTION BOX
LOCATION
i UT
SURVEYED:
DESIGNED:
NS
DRAWN:
NS
CHECKED:
BP
AP P R APPROVED:
BP
I 'SL'
SCALE:
NONE
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL* NAVD 1988
HORIZONTAL NAD 1983/1991
DATUM
DocuSign Envelope ID: 894DB72E-3255-4A63-AOF1-38A20AAF74CA
GENERAL NOTES:
1. ALL EXISTING TRANSPORTATION INFRASTRUCTURE FEATURES SHALL BE MAINTAINED ON LEVEL
GRADE IF THE SURFACE LEVEL FROM CONSTRUCTION IS CHANGED (I. E. JUNCTION BOXES,
LUMINAIRE POLES, TRAFFIC SIGNAL POLES, SIGN POSTS).
2. ALL TRANSPORTATION INFRASTRUCTURE SHALL BE PROVIDED ON LEVEL GRADE ONCE
CONSTRUCTION IS COMPLETE.
3. ALL EXISTING OR PROPOSED TRANSPORTATION INFRASTRUCTURE FEATURES WITHIN THE PROJECT
CONSTRUCTION LIMITS SHALL MEET CURRENT PROWAG ADA STANDARDS (I.E. JUNCTION BOXES
SHALL HAVE NON—SKID LIDS).
4. ALL NEW TRAFFIC SIGNALS SHALL BE CONSTRUCTED WITH FIBER COMMUNICATION CONNECTION
TO CITY OF RENTON TRANSPORTATION FIBER OPTIC NETWORK.
5. ALL TRANSPORTATION INFRASTRUCTURE FEATURES THAT ARE TO BE REMOVED AND REINSTALLED
AT A LATER DATE SHALL BE RE —INSTALLED TO CURRENT STANDARDS.
6. ALL CONDUIT SHALL BE PVC SCHEDULE 80.
7. SIGNAL POLE, LUMINAIRE, AND CABINET FOUNDATIONS SHALL BE CLASS 4000P CONCRETE.
8. ALL PROPOSED SIGNAL POLE FOUNDATIONS AND EXISTING MODIFIED SIGNAL POLE FOUNDATIONS
SHALL INCLUDE A CONCRETE PAD AROUND THE FOUNDATION. PROPOSED OR EXISTING SIDEWALK
SHALL BE CONSIDERED PART OF THE FOUNDATION PAD. FOUNDATION PAD SHALL BE AT LEAST
2 FEET OFFSET FROM THE SIGNAL POLE FOUNDATION, AS SPACE ALLOWS OR UNLESS
OTHERWISE APPROVED.
9. WHEN THE TRAFFIC SIGNAL IS OPERATIONAL, ALL DETECTION SHALL BE MAINTAINED AND REMAIN
FUNCTIONAL FOR ALL SIGNAL PHASES. NEW PERMANENT/TEMPORARY VIDEO DETECTION SHALL
BE INSTALLED AND OPERATIONAL PRIOR TO DESTROYING ANY EXISTING DETECTION.
10. ALL TRAFFIC SIGNAL SYSTEMS, ILLUMINATION SYSTEMS, OR OTHER ELECTRICAL TRANSPORTATION
SYSTEMS ARE SUBJECT TO INSPECTION BY CITY OF RENTON PUBLIC WORKS/TRANSPORTATION
MAINTENANCE PRIOR TO FINAL ACCEPTANCE. CONTRACTOR TO COORDINATE INSPECTION WITH
THE TRANSPORTATION MAINTENANCE MANAGER OR OTHER TRANSPORTATION REPRESENTATIVE.
11. NEW PTZ CAMERA SHALL BE REQUIRED WHEN A NEW TRAFFIC SIGNAL SYSTEM IS INSTALLED,
WHEN LANE CONFIGURATION IS MODIFIED WITH NEW SIGNAL PHASING, AND/OR WHEN EXISTING
PTZ CAMERA(S) REQUIRE RELOCATION.
12. ARROW BOARDS SHALL BE REQUIRED TEMPORARY TRAFFIC CONTROL WHEN CLOSING A TRAVEL
LANE AND SHALL BE MUTCD COMPLIANT.
o�� Y o� TRANSPORTATION NOTES STD. PLAN - 135
PUBLIC WORKS
. . PP OVED:
DEPARTMENT 5/2/2024 1
p Z Martin Pastucha
FN �o ��
DATE
CITY OF
IR RENTON
•
Planning/Building/Public Works Dept.
4
T-432621
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
TRANSPORTATION OPERATION
cbarnes 08/07/2025
HAZEN HIGH SCHOOL MODERNIZATION
ELECTRICAL DETAILS
DATE:
07.11.25
PAGE:
E903
SHEET: OF,
74 OF 76
T
O
O
N
u
C)
`71-
co
O
O
4
a
J
co
O
O
O
O
t
4
N