HomeMy WebLinkAboutRES 4343CITY OF RENTON, WASHINGTON
RESOLUTION NO.4343
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
TEMPORARY TOTAL CLOSURE OF NE 31ST STREET BETWEEN 2100 NE 31ST STREET
AND 3133 JONES AVE NE.
WHEREAS, the City of Renton plans to replace a structurally deficient bridge that carries
NE 3152 Street over May Creek, approximately 700 feet west of the intersection of NE 315t Street
and Jones Ave NE, with a new bridge; and
WHEREAS, this construction activity will require temporary street closure along NE 3111
Street, starting from approximately 150 feet east of the intersection of NE 315t Street and Jones
Ave NE and ending at approximately 50 feet west from the driveway to 2100 NE 315t Street; and
WHEREAS, pursuant to City Code section 9-9-3 the City Council is to authorize such
closures by means of a Resolution;
WHEREAS, the City wishes to provide full and adequate notice to the public of the extent
and nature of such closure;
NOW, THEREFORE, THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The City Council does hereby authorize the temporary closure of NE 315t
Street, from approximately 150 feet east of the intersection of NE 315t Street and Jones Ave NE
to approximately 50 feet west from the driveway to 2100 NE 315t Street for up to 120 calendar
1
RESOLUTION NO. 4343
days, anytime during the period of June 18, 2018, to December 31, 2018, to allow the City to
demolish the existing bridge and construction the new bridge and associated appurtenances.
PASSED BY THE CITY COUNCIL this 21 st dayof—,May , 2018.
J n A. Seth, City Clerk
APPROVED BY THE MAYOR this 21 st day of May , 2018.
Denis Law, Mayor
Approved as to form:
Z A
IL - *_
Shane Moloney, City AttorneyAp'''�,,,,,,,�,�````�
'47'ED'SEP` `ro`````�.
Date of Publication: -5/25/mil 8g (summary)
RES:1768:4/24/18:scr