HomeMy WebLinkAboutRC 20180518000595Instrument Number: 20180518000595 Document:COV Rec: $78.00 Page -1 of 5
Record Date:5/18/2018 11:16 AM
Electronically Recorded King County, WA
City Clerk's Office
City of Renton
FOR INSPECTION AND MAINTENANCE OF DRAINAGE FACILITIES ANt
ON-SITE BMPS
Grantor: Harbour Homes LLC
Grantee: City of Renton, a Washinglon municipal corporation
Legal Description: LOT13, WILDWOOD VIEW, ACCORDING TO THE PLAT THEREOF RECORDED IN VOL. 282
,-OF PLATS, PAGES 33 TOHROUGH 37, UNDER RECORDING NUMBER 20180426000102, RECORDS OF KING CO., WA
Assessor's Tax Parcel ID#: 941540- 0 13 0
ov� Residential Building Permit []commercial Building Permit —
[I Clearing and Grading Permit M Civil Construction or Utility Permit
for Permit(s) (ConstructionlBuildinglutility Permit#) relating to the rgealprope
and obligations set forth and described in Paragraphs 1 through 9 below with regard to the
Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants (grant), covenants (covenant), and agrees (agree) as follows:
1. The Grantor(s) or his/her (their) successors in interest and assigns ("Owners ") shall at their own
cost, operate, maintain, and keep in good repair, the Property's drainage facilities constructed
as required in the approved construction plans and specifications (Project
Plan #) on file with the City of Renton and submitted to the City of Renton for the review and
approval of permit(s) (ConstructionlBuddinglUtility Permit#). The
Property's drainage facilities are shown and/or listed on Exhibit A — Site Plan, The Property's
drainage facilities shall be maintained in compliance with the operation and maintenance
schedule included and attached herein as Exhibit B — Operations and Maintenance. Drainage
facilities include pipes, channels, flow control facilities, water quality facilities, on-site best
management practices (BMPs) and other engineered structures designed to manage and/or
Instrument Number: 20180518000595 Document:COV Rec: $78.00 Page -2 of 5
Record Date:5/18/2018 11:16 AM King County, WA
i Fill;11, "I "I
1 If City of Renton determines from its inspection, or from an engineer's report provided
accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work
required to be done to any of the drainage facilities, City of Renton shall notify the Owners
the specific maintenance, repair, restoration, and/or mitigation work ("Work") requir
pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for t
Owners to complete the Work, or to provide an engineer's report that verifies completion
the Work, After the deadline has passed, the Owners shall allow the City access to re-inspe
the drainage facilities unless an engineer's report has been provided verifying completion
the Work, If the Work is not completed within the time frame set by the City, the City m
initiate an enforcement action and/or perform the Work and hereby is given access to t
Property for such purposes. Written notice will be sent to the Owners stating the City
intention to perform such Work. This Work will not commence until at least seven (7) days aft
such notice is mailed. if, within the sole discretion of the City, there exists an imminent
present danger, the seven (7) day notice period will be waived and Work will begi
immediately.
4. The Owners shall assume all responsibility for the cost of any Work, or any measures taken
the City to address conditions as described in Paragraph 3. Such responsibility shali inclu
reimbursement to the City within thirty (30) days of the receipt of the invoice forany such Wo
performed. Overdue payments will require payment of interest at the maximum legal ra
allowed by RCW 19.52.020 (currently twelve percent (12%)). If the City initiates legal action
enforce this agreement, the prevailing party in such action is entitled to recover reasonab
litigation costs and attorney's fees,
5The Owners are required to obtain written approval from City of Renton prior to filling, pipin
cutting, or removing vegetation (except in routine landscape maintenance) in open vegetat
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing ar
alterations or modifications to the drainage facilities referenced in this Declaration of Covena
Instrument Number: 20180518000595 Document:COV Rec: $78.00 Page -3 of 5
Record Date:5/18/2018 11:16 AM King County, WA
& Any notice or consent required to be given or otherwise provided for by the provisions of t
Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certifi
Mail, return receipt requested.
7With regard to the matters addressed herein, this agreement constitutes the entire agreeme
between the parties, and supersedes all prior discussions, negotiations, and all agreemen
whatsoever whether oral or written,
& This Declaration of Covenant is intended to protect the value and desirability and promo
efficient and effective management of surface water drainage of the real property describ
above, and shall inure to the benefit of all the citizens of the City of Renton and its successo
and assigns. This Declaration of Covenant shall run with the land and be binding up•
Grantor(s), and Grantor's(s') successors in interest, and assigns,
9This Declaration of Covenant may be terminated by execution of a written agreement by t -
Owners and the City that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Inspection and Maintenance of
Drainage Facilities is executed this--iL day of Apl5 20_LL_.
V
GR)(NTOR, owner of the Property GRANTOR, owner of the Property
STATE OF WASHINGTON
COUNTY OF KING )ss.
Riklinl' VP to me known to be the individual(s)
described in and who executed the within and foregoing instrument and acknowledged that they
signed the same as their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this day of Aer; 1 20 19
""kj* Mt I Ito
...... Printed name
to Notary Public in and for the State of
A
Washington, residing at
Sic,
PUB��c 0�
(P %
28,
T '/'Z My appointment expires
$
Instrument Number: 20180518000595 Document:COV Rec: $78.00 Page -4 of 5
Record Date:5/18/2018 11:16 AM King County, WA
TOTAL LOT AREA: 5,266 S.F.
ADDRESS: 4768 SMITHERS AVE S, RENTON, WA 98055
PARCEL NUMBER: 0
PERMI T J:
EXISTING PERVIOUS AREA: 0 S.F.
PROPOSED PERVIOUS AREA: 3,221 S.F
EXISTING IMPERVIOUS AREA: 0 S.F.
PROPOSED IMPERVIOUS AREA: 2,043 S.F.
HARBOUR HOMES, LLC
400 N 34TH STREET SUITE 300
SEATTLE, WA 98103
LEGAL DESCRIPTION:
LOT 73, WILDWOOD VIEW
ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME2122OF
PLATS, PAGES 33 THROUGH 13 -
UNDER RECORDING NUMBER
RECORDS OF
KING COUNTY, WASHINGTON,
THIS PROPERTY CONTAINS A
S TORM WA TER MA NA GEMEN T FL 0 W
CONTROL BMP KNOWN AS
"RESTRICTED FOOTPRINT". THE
TOTAL IMPERVIOUS SURFACE ON
THIS PROPERTY MAY NOT EXCEED
3,330 SF.
THIS PROPERTY ALSO CONTAINS A
FLOW CONTROL 8MP KNOWN AS A
PERFORATED PIPE CONNECTION.
Instrument Number: 20180518000595 Document:COV Rec: $78.00 Page -5 of 5
Record Date:5/18/2018 11:16 AM King County, WA
RESTRICTIVE FOOTPRINT MAINTENANCE INSTRUCTIONS
Your property contains a story water management flow control BMP (best management
practice) known as "restricted footprint," the practice of restricting the amount of impervious
surface that may be added to a property so as to minimize the stormwater runoff impacts
caused by impervious surface. The total impervious surface On YOUr property may not exceed
3330 square feet without written approval from the City of Renton,
PERFORATED PIPE CONNECTION MAINTENANCE INSTRUCTIONS
This lot contains stormwater management flow control BMP (best management practice) caged
a "perforated pipe connect6on," which was installed to reduce the stormwater runoff impacts of
some or all of the impervious surface on your property, A perforated pipe connection is a length
of drainage conveyance pipe with holes in the bottom, designed to leak" runoff, conveyed by
the pipe, into a gravel filled trench where it can be soaked into the surrounding sofl. The
connection is intended to provide opportunity for infiltration of any runoff that is being
conveyed from an impervious surface (usually a roof) to a local drainage system such as a ditch
or roadway pipe system.
The size and composition of the perforated pipe connection as depicted by the flow control BMP
site plan and design details must be maintained and may not be changed without written
approval from the City of Renton, The soil overtop of the perforated portion of the system must
not be compacted or covered with impervious materials,
/Olpe 5 6, �c 5