Loading...
HomeMy WebLinkAboutVCG Bid & Budget 6.11.25Soundview Excavation Project Name:High Ave Sewer Extention Prepared By: Justin Stensby Address:2224 High Ave Ne City, State:Renton Wa 98056 Bid Date:6/11/2025 SF:500lf Bid Time:11:00:00 AM Duration:3 months DIVISION DESCRIPTION PRICE NOTES ALT #1 Surveying $9,250 ------------------ Locates $400 TESC $6,200 ------------------ Clear and Grub $4,300 Sawcutting $14,750 ------------------ Shoring & Life Safety $7,250 ------------------ Trench Excavation $32,000 ------------------ Sewer Pipe Installation $62,000 ------------------ Manhole Installation & Lining $48,000 ------------------ Backfill & Compaction $12,000 Asphalt Patching w/ Seam sealer $87,500 ------------------ Traffic Control $13,250 ------------------ Subtotal: $296,900 $0 General Conditions:$27,500 $0 ------------------------------------------------------------------------------ Subtotal:$324,400 $0 10.00%Overhead & Profit:$32,440 $0 ------------------------------------------------------------------------------ Subtotal:$356,840 $0 3.00%Insurance:$10,705.20 $0 Subtotal:$367,545 $0 0.471%State B&O Tax:$1,731.14 $0 0.215%Local B&O Tax:$790.22 $0 Total Bid:$370,067 $0 10.30%WSST:$38,117 $0 Total w/ Tax : $408,183 $0