Loading...
HomeMy WebLinkAboutWWP2700000(1) City Plans Spec's & Permits S- I+ BEGINNING OF FILE FILE TITLE CI 41?1 Sec s ct rmlts OF 1? l z BUILDING & ZONING DEPARTMENT too �- RONALD G. NELSON - DIRECTOR 2 A MUNICIPAL BUILDING 200 MILL AVE SO RENTON. WASH 98055 • 235-2540 9� " )tlBARBARA c 9O MICROFILMEU RA Y Y.. SHIHINpOCH MAYOR MEMORANDUM DATE: March 18, 1986 TO. Bob Bergstrom, Engineering Division FRCM: Ken Bi.ndara, Building 6 Zoning Department SUBJECT: GARAGE FOR HOUSING fF GENERATOR SET AT 3400 N.E. 12th STREFT (B-11=59) , ISSUED OCTOBER 21, 1985 The last inspection on this was a foundation on October 10, 1g885. Please have your cortractor arrange for all required inspections. i) KCeepllp 1 amity of Renton uilding & Zoning Department ne: 235-2540 BUILDING PERMIT PERMIT' B11559 JOB B11559 on is hereoy given to do the following described work, according to the condi- ISSUED 10/al/85 areon and according to the approved plans and specifications pertairing subject to compliance with the Ordinances of the City of Renton. GARAGE INSTALLATION FOR PORTABLE GENERATOR SET Job Address 3400 WE 12TH Sl Tenant Suite OWNER Name CITY OF RENTON P/iJORKS r � 400 .00 VOID IF WORM value of Construction 19, ACcress 200 MILL AV S RENTON WA 98955 IS NOT COMMENCED Permit Fee 140.00 Phone 206 235-2631 IN 180 DAYS OR IF I Plan Check Fee 91 .00 CONTRACTOR I DISCONTINUED Name PUGET CONSTRUCTORS FOR MORE THAN dd-on Fee Address lc'_?5 E 41H AV 10DAYS OLYMPIA WA 913504 Other Fee 1 .50 Phone 206 Contr. Lic. PUGETC216L.A TOTAL FEE 232.50 Tax No. Use District Sewer/Septic Special Restrictions Constructioi Type Vacant Site Occupancy Group Bu direr.&` ire f-eel Site Coverage Occupancy Load 'r vice 1 Shell of Building Height Limit Sprinklers Required Dwelling Count CO Required Parking Count Temporary Story Count le.�porary Days Misc. Code 1 potable Misc. Code 2 . Notable Day Y WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPEeI- FICATIONS AND THAT ALL WORK IS TO CONFORM 1O RENTON CODES ANDS Applicant nl 1BJECT TO COMPLIANCE WITH THE ORDINANCES OF THE OF RENTON AND INFORMATION FILED HEREWITH THIS T IS GRANTED f, BUILDING DIRECTOR W Westinghouse Electric Corporation, London, Ky. AUTOMATIC TRAMPER SWITCH TEST RE►OR"r '�7— (� {� nq IV Electrical Toots 3wrch m vomcal r osihoni Ship Order. �/ f /_S/ `^ Tattoo By y/_�. 1 Tarn on normal power; switch must transfer to Sepal Number: �5.,� ��L_—_— —_ - In.5pe ae0 By._-. 'Normal it not already there Turn norr ral off. 1 '+f v Turn on emergency 9 v power:switch frost transfer I. Insulation Check (1800 volts for 3 seconds) to emergency 1 .1. With emergency power on, restore normal power, 1. Transformor prmsnes and secondanei to grouts switch must return to r 'mo1 T • _ po;rbonwindings . r 2. Secondary translormerwindings one to the other 1 /r 4. Verify dal switch will t star from normal to 3. When trarsfarmefs are not used,Jack control emergency under the followma conditions. wiring to ground and phase to phase 1 1 4. Motor windings to ground(900 volts) I Y A Loss of voltage in a-y phase 8. If voltage inany of ase falls below 70% ( �" 11. visual Inspection 5. Verify that switch will rr turn to normal when 1 Verify tramtformer taps woad for specified system normal voltage reache,9n%of rating. i voltage aid frequency. 1 ''f 6. Record final settings: 2. Verify 0,it catalog number. nameplates,and wiring }� dagrsm: match order write-up. ! Pick up_ % 3. Check fit loose wee connections 1 T 4. Verity that wrong and paint finishes are neat 7. Check engine sit n contact for proper operetiat t and ordfoly_ 1 T 8. List oplrons sur plied. Verify proper operation 5. Check enclosure type and color with order write-up. of each. Set a',time delays as necessary.Check Open r 1 for proper vo tage and frequency ratings. Nema 1 Nema 3R q. Nema 12 1 1 Apr 8. Option 111. Mechan,ca Tests(Switch in vertical positron) 3G, C. Option_ 1. Apply'aced voltage to both normal emergency is line te•muralscor and verify correct inputt t to each D. Option, - I voltaW sensing relay. Simulate told operation by rR removing normal power and applying emergency power E. Option ✓e✓ - g .� Swncn should transfer to emergency. Reapply normal �D puwe ,witch should retransfer to the normal posiopn F. option_,,. f Repe:n the cycle 50 times. I /r— � 2. Verrill thatcontacts close in each position I e-1— G. Optiort__L).__G 3. Chat:a all auxiliary and limn switches in both / s normal and emergency posNons. I �7 X. floDdn i/` _ f rho 4 Check n m mechanical interlock with switch in both 3 60k no al and eerg ency ncy postvons for freedom of 1. opw le mm,v. nt and proper adjustment. i T ^ 5 Verify that operating mechanism is toned prnpwly f J. Option jRd-_ ,__ 6 Vee y that mechanism does not ovenfavei er bind I ) 7 aiiIIIIIIINVAINgIr man,,sv operate K. Optron�. _ switch to verity that breakers will reed from the tripped positron. ( L. Option______ ( 1 -_ ,' ' '- a r4 i I ALLArdeA: Au�as+ S IgBS CONIRACT NO. CAC: 0 11-85 AWARDED TO: r r �Y tom+- .__ SPECIFICATIONS, PROPOSAL, CONTRACT DOCUMENTS FOR: T WALTER PROJECT NC - W-815 � POR'I.ABLE ENGINE/GENERATOR SET lCR8FlLMall t W CITY OF RENTON E�gir�ee��ny 9 MUNICIPAL BIDG. 1410 MAMKET ST. }y 200 MILL AVE. S. YJRKL ND,WA 98033 RENTON,WA 9W55 1! CONTACT. RON OLSEN CONTACT. DAN EWAN 235.2631 RZT84W ` 453-0241 • �__ _ t. r CITY OF RENTON BID PROPOSAL AND SPECIFICATIONS FMFRGENCY GENERATOR SET �s WATER PROJECT NO. W-815 INDEX Li TITLE PAGE w INDEX SCOPE OF WORT; i CALL FOR !AIDS ii INSTRUCTIONS TO BIDDERS iii SUMMARY OF FAIR PRACTICES/CITY OF RENTON iv *CERTIFICATION BY CONTRACTOR/SUB-CONTRACTOR/SUPPLIER/REF. EEO *MINORITY AND WOMEN'S BUSINESS ENTERPRISE PARTICIPATION *CERTIFICATION OF EEO *CERTIFICATION OF BIODER'S AFFIRMATIVE ACTION PLAN *NON-COLLUSION AFFIDAVIT 1x *CERTIFICATION RE: ASSIGNMENT OF ANTITRUST CLAIMS TO PU.ZCHASER *MINIMUM WAGE FORM *BID BOND FORM *PROPOSAL *SCHEDULE OF PRICES BOND TO THE CITY OF RENTON CONTRACT AGREEMENT (OTHER THAN FEDERAL AID FHWA) *EEO COMPLIANCE REPORT SAMPLE FORM AND INSTRUCTIONS EP!VIRONMENTAL REGULATION LISTING HOURLY MINIMUM WAGE RATES SPECIAL PROVISIONS TECHNICAL SPECIFICATIONS PROJECT PLANS (ATTACHED) DOCUMENTS MARKED * ABOVE MUST BE EXECUTED BY THE CONTRACTOR, PRESIDENT AND VICE-PRESIDENT OR SECRETARY IF CORPORATION BY-LAWS PERMIT. ALL PAGES MUST BE SIGNED. IN FVENT ANOTHER DERSON HAS BEEN DULY AUTHORIZED TO EXECUTE CONTRACTS, A COPY OF THE CORPf,ZATION MINUTES ESTABLISHING THIS AUTHORITY MUST BE ATTACHED TO THE BID OOCUI;INT. ' CITY OF RENTON PUBLIC WORKS DEPARTMENT RENTON, WASHINGTON 98055 M 1111 L CITY OF RENTON WATER PROJECT NO. 815 PORTABLE ENGINE GENERATOR SET SCOPE OF WORK THE WORK INVOLVED UNDER THE TERMS OF THIS CONTRACT SHALL BE TO FURNISH AND INSTALL A TRAILER MOUNTED, PORTABLE EMERGENCY ENGINE GENERATOR SET, COMPLETE WITH DIESEL ENGINE, GENERATOR, TRAILER, WEATHERPROCF ENCLOSURE, ELECTRICAL CONNECTOR, AND ALL APPURTENANCES AND MISCELLANEOUS EQUIPMENT NECESSARY FOR P. COMPLETE, OPERATING PORTABLE EMERGENCY GENERATOR THAT WILL PROVIDE STANDBY POWER TO THE CITY ' S EXISTING HONEY CREEK SEWAGE LIFT STATION. THE ENGINE GENERATOR SET WILL NORMALLY BE STORED AT THE CITY'S EXISTING HIGHLANDS WATER BOOSTER PUMP STATION, AND THE ENGINE GENERATOR UN-T SHALL ALSO BE CAPABLE OF OPERATING THIS FACILITY DURING A NORMAL POWER FAILURE. CON1R170n SkAlL ALSO BE RESPONSIBLE FOR FURNISHING A NEW AUTOMATIC 'R%N FER SWITCH ti, TKE HIG ' 4NJS PUMP STATION FOR ENGINE GENERATOR SET CONNECTION, AND i "R STTF IMI ,JVEMENTS TO ALLOW STORAGE, INGRESS AND EGRESS OF T. HE ENGINE GENERATOR SET AT THE HIGHL,,NDS PUMP STATION SITE WHICH INCLUDES A SLAB-ON -GRADE PREFABRICATED METAL BALDING. THE WORK SHALL BF AS SHOWN OR AS CAN BE REASONABLY IMPLIED FROM THE..E SPECIFICATIONS AND ASSOCIATED CONS1mjCTION DRAWINGS. ANY CONTRACTOR ASSOCIATED WITH THIS PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE, CO'JNlY, AND CITY CODES OR REGULATIONS APPLI"ABLE TO SUCH WORK, AND SHALL PERFORM THE WOkK IN ACCORDANCE WITH THE P'_ANS AND SPECIFICATIONS OF THIS CONTRACT DOCUMENT. M w 6 . CITY OF RENTON CALL FOR B?DS PORTABLE ENGINE GENERATOR SET r, SEALED BIDS WILL BE RECEIVED UNTIL 2:30 P.M., JULY 19, 19E.5. AT THE CITY CLERK' S OFFICE AND WILL BE OPENED AND PUBLICLY READ IN THE 4TH FLOOR CONFERENCE ROOM, RENTON MUNICIPAL BUILDING, 200 MILL AVENUE SOUTH. I THE WORM TO BE PERFORMED WITHIN 90 WORKING DAYS FROM THE PATE OF COMMENCEMENT UNDER THIS CONTRACT SHALL INCLUDE, BUT NOT BE LIMITED TO: FURNISH AND INSTALL A 125 KW, PORTABLE EMERGENCY ENGINE GENERATOR SET COMPLETE WITH ENGINE, GENERATOR, 7'AILER, ERT-RIOR WEATHERPROOF HOUSING, LICENSE, COUPLVR AND ACCE` ")RIES. PROVIDE AN AUTOMATIC TRANSFER SWITCH AT THE lIGHLAN'DS PUMP STATION, AND PROVIDE "ITE IMPROVEMENTS FOR ENGINE GENERATOR SET STORAGE AND INGRESS AND EGRESS INCLUDING A SLAB-ON-GRADE PREFABRICATED METAL BUILDING. THE CITY RESERVES THE RIGHT TO DEJECT ANY AND!OR ALL BI'b , AND TO WAIVE ANY AND/OR ALL INFORMALITIE'_'. A0ROVEC PLANS AND SPECIFICATIONS AND CONTRACT UOCUMENTS MAY BE OBTAINED AT THE PUBLIC WORKS DEPARTMENT OFFICE AT THE RENTON MUNICIPAL BUII.DIN'' FOR A DEPOSIT OF $25.00 EACH SET, PLUS $2.50 TO COVER POSTAGE, IF MAILED. THE DEPOSIT WILL BE REFUNDED UPON RETURN OF THE PLANS AND SPECIFICATIONS IN GOOD CONDITION WITHIN 30 DAYS AFTER BID OPENING. THE MAILING CHARGE WILL NOT BE REFUNDED. A CERTIFIED CHECK OR BID BOND IN THE AMOUNT OF FIVE (5) PERCENT OF THE TOTAL AMOUNT OF EACH BID MUST ACCOMPANY EACH BID. THE CITY'S FAIR PRACTICES AND NON-DISCRIMINATION POLICIES SHALL APPLY. !s MAXIN r « ~ E MUT R, CITY CLERK oil PUBLISHED: RECORD CHRONICLE: July 5th & 11th, 1985 Iwo DAILY JOURNAL OF COMMERCE: Jily 5th & 11th, 1985 iw t INSTRUCTIONS TO BIDDERS 1 . Sealed bids_ for this proposal w 11 be received by the City of Renton at the office of the Renton Cicy Clerk, Renton City Hall , until 2:30 o'clock p.m. , on the date specified in the Call for Bids. At this time the bids will be publicly opened and read, after which the bids will be considered and the award made as early as practicable. No proposal may be changed or withdrawn after the time set for receiving bids. Proposals shall be submitted on the forms attached hereto. 1 2. The work to be done is shown on the plans. Quantities are understood to i ` be only approximate. Final payment will be based on field measurement of actual quantities and at the unit price bid. The City reserves the right Lto add or to elimina'n portions of that work as deemed necessary. 3. Plans may be examined and copies obtained at the Public Works Department Office. Bidders shall satisfy themselves as to the local conditions by inspection of the site. 4. The bid price for any item must include the performance of all work necessary for completion of that item as described in the specifications. 5. The bid price shall be stated in terms of the units indicated and as to a total amount. to the event of errors, the unit price bid will govern. Illegible figures will invalidate the bid. + 6. The right is reserved to reject any and/or all bids and to waive inform- alities if it is deemed advantageous to the City to do so, 7. A certified check or satisfactory bid bond made payable without reservation + t" to the Director of Finance of the City of Renton in an amount not less than 5% of the total amount of the bid shall accompany each bid proposal . Checks will be returned w unsuccessful bidders immediately following the decision + as to award of contract. The check of the successful bidder will be rr returned provided he enters into a contract and furnishes a satisfactory performance bond coveriig the full amount of the work within ten days after receipt of no ce of intention to award contract. Should he fail , or refuse to do so, the -heck shall be forfeited to the City of Renton as liquidated damage for such failure. All bids must be self-explanatory. No opportunity will be offered for oral tr explanation except as the City may request further information on particular points. 9. The bidder shall, upon request, furnish information to the City as to his financial and practical ability to satisfactorily perform the work. 10. Payment for this work will be made in Cash 'warrants. Rev. 7/15/81 a i MlBI2 "A" CITY OF RENTON �� 43 SUMMARY OF FAIR PRACTICES POLICY ADOPTED BY RESOLUTION NO. 2340 The policy of the City of Renton is to promote and afford equal treatment and service to all citizens and to assure equal employ- ment opportunity to all persons regardless of race; creed; color; ethnicity; nation. ' origin; sex; the presence of a non-job-related physical, eensory, or mental handicap; age; or marital status. This poZiey shill ,e based on the principles of equal employment opportunity and affirmative action guidelines as set forth in federaZ, state and local lams. All departments of the City of Renton shall adhere to the following guidelines: (1) EMPLOYMENT FR.:CTIC£5 - Ali. activities relating to employ- ment such as recruttment, selection, promotion, termination and training shalt be conducted in a non-discriminatory C manner. Personnel decisions will be based on individual performance, staffing requirements, and in accordance with governing Civil Service Lams and the agreement between the City of Renton and the Washington State Council of County and City Employees. (2) COOPERATIO. WITH HUMAN RIGHTS ORGANIZATIONS - The City of Renton min cooperate fully with all nrgantz-tions and eommiss`one organized to promote fair practices and equal opport.,,:ty in employment. (3) AFFIRMATIVE ACTION PROGRAM - The City of Renton Affirmative Action Program wtl a maintained to facilitate equitable representation within the City workforce and to assure equal employment opportunity to all. It ohalZ be the responsibility and dutg of all City offi.tals and employees to carry out the policies, guidelines and corrective measures as set forth by this program. Corrective employment programs may be established by the Mayor on the recommendation of an Affirmative Action Committee for those departments in which a protected class of employees i0 is under-represented. (4) CONTRACTORS' OBLIGATION - Contractors, suhvontractors and suppliers conducting uainese with the City of Renton shall af firm and subscribe to the Fair Practices and Non- 60 Discrimination poZiciee set forth by law and in the Affirmative Action Program. Copies of this policy shall be distributed to all City empZoyeee, he shall appear in all operational documentation of the City, including bid calls, and shalt be prominently diapZaye2 in appropriate City facilities. ke CONCURRED IN by the City Council of the City of Renton, Washington, this 2nd day of June _ 1980, ` CITY OF RENTON: RENTON CITY COUNCIL: Mayor Council President Attest: Issued: July 10, 1972 t Revised: February 9, 1976 224=d Revised: June 2, 1980 ,� City Clerk CERTIFICATION BY PROPOSED CONTRACTOR, SUBCONTRACTOR AND SUPPLIER REGARDING EQUA_+, EMPLOYMENT OPPORTUNITY ems o rlme Contractor � � rojeetWame INSTRUCTIONS This c+rtifice Lion is required pursuant to Federal Executive Order 11246. The re implementing rules and culations provide that any bidder or Prospective contractor, or any of their proposed subcontractors and suppliers, shall state as an initial part of the bid or negotiations of the contract whether it has Participated in any previous contract or subcontrmct aubject to the equal opportunity clause; and, if No, whether it has filed all compliance reports due under applicable instructions, The City has heretofore adopted Resolution 2340 under date of June 2, 1980, amending a 'Fair Practices Policy," as implemented by an "Affirmative Action Program" therein amending the policy Of the City of Renton to promote and afford equal treatment and service to all citirens and to assure equal employment Opportunity based on ability and fitness to all persons regareless of race; creed; color; ethnicity, 7 national origin; se• ; the presence of a non-job-slated physical, sensory or mental handicap: ace or marital status. This policy shell likewise apply to all contractors, subcontractors and suppliers is conducting business wi t.h the City of Renton who in turn shall affirm and subscribe to maid practices and Policies. The aforementioned provisions shall net apply to contracts or subcontracts for standard tnt ssaaaaaa commercial suppliers or raw materials or firms or oroanizations with less than eight employees or c0mmracts of less than $10,000 business per ahnum with the City. When the Contractor/Subcontractor/Supplier (hereinafter referred to as the Contractor) is required by the City of Renton to submit an Affitoetive Acton Plan, the minimum acceptable percentage of minority employment will be that percentage which is currently listed in "Appendix I" (City of Renton Goals and Timetat:esi in tte published City of Renton Affirmative Action Program, i.e. 9.1s. This Program is available for review at the Municipal Building. The undersigned contractor therefore covenants, stipulates and agrees that during the Performance of this contract he will not dicer iminate against any person in hiring, promoting, dischargino, compen- sating or any other term or condition of employment, by reason of such Person's status, re the (11) categories listed it,, para. 2 above. ierencc Coth sntra uch Policy and program. in all respects:ctor further agrees that he will take affirmative and continuous action to insure full compliance comply with any wi it being strictly understood and agreed that failure to contract. of the terms of said provisions shall be and constitute a materiel breach of this Contractor shall, upon request and/0r as soon as information and reports required by the Possible thereafter, furnish unto the City any and all contractor with City to determine whether full compliance has been made by the said policy a:.0 program and contractor will permit acciiss to his book r accounts by the City for the purp^se of investigatior to ascertain such compliance, s, records and ' .Contractor further acknowledges that he has received a true and complete copy of the City's "Fair Practices Policy." Contract raanti cation Number CERTIFICATION BY: CONTRACTOR or SUBCONTRACTOR or. SUPPLIER _ NAME: r .♦r i �.. ADDRESS: 41 t )L r , �b (-LC1 ci IQ REPRESENTATIVES: _ V �as TITLE: (Tj Lt_,yV Y PHONE: 264 4 — rib � 1 I. Contractor/Subcontractor/Supplier has,pa rticipated in a previous contract or subcontract 1 to the Equal Opportunity Clause; J` Yes _No subject �. Compliance reports were required to be filed in connection w,th such contract or subcontract: NO es _NO �i. Contractor/Subcont r,e ss tar/Supplier has filed all compliance reports due under applicable instructions: X�Yaa No �. If answer to item 3 is "No", please explain in detail on reverse side of this certification. M CERTIFICATION: The information above is true and complete t(o he best of my knowledge and belief. g: n 3t 0 lgner P ease type or ,print r lgnatuze Bbte kviewed by City Authority: Date: e v. 1,31/83 PUBLI; WORK OR IMPROVEMENT Rev. 4/83 PARTICIPATION CE:TIFICATION: REF. RCW 35.22.650 CCONTRACTS EXCEEDINC $10,000 (OR $15,000 FOR WATERMAIN CONSTRUCTIGa �y MINORITY BUSINESS ENTERPRISES (MBE) i♦ and WOMENS' MINORITY BUSINESS ENTERPRISES (WMBE) (BUSINESSES OWNED AND OPERATED BY WOMEN) Contractor agrees that he shall actively solicit the employment of minority group members. Contractor further agree:. that he shall actively solicit bids for the subcontracting of goods or services from qualified minority businesses. Contractor shall furnish evidence of his compliance with these requirements of minority employment and solicitation. Contractor further agrees to consider the grant of subcontractors to said minority bidders on the basis of substantially equal proposals in the light most favorable to said mino:ity businesses. The contractor r shall be required to submit evidence of compliance with thir section as part of the bid. As used in this section, the term "minority business" means a business at least fifty-one percent of which is owned by minority group members. Minority group members include, but are not limited to blacks, women, native Americans, Orientals, Eskimos, Aleuts and Spanish Americans. The City will consider sworn affidavits presented by subcontractors in advance of contract award as one means of esta')lishing minority status in accordance with criteria cited above. To be eligible for award of this contract, the bidder must execute and submit, rs a part of the bid, the following certification which will be deemed a part of the resulting contract. A bidder's failure to submit this certification or submission of a false certification shall render his bid nonresponsive. MINORITY BUSINESS ENTERPRISE CERTIFICATION L 5 L 11� �l Certifies that: Name of Bidder { (a) it (does) does not) `in[end to sublet a portion of the contract work and `r ( as�� (has at 48 en affirmative action to seek out and consider minority business enterprises as potential subcontractors. (b) the contacLc made with potential minority business enterprise rubcontractors y and the results thereof are listed below. Indicate whether MBE or WMBE and identify minority group. (If necessary, use additional sheet.) i MBE Min. Gr. WMBE 1• )(:),y✓t L<l V it t3�1YaJt (Name of Firm, `Bid Item, Results of Contacts) JVA t4ye Ali oe L 3.4. ���� ❑ ❑ � U1�c(4 _ ❑ ❑ w,�� `use Mr,ffle r^ hay been dtsignated as the liaison officer for :.he administration of the minority L mess enterprise program for this firm. 6 f . i, ` CERTIFICATION OF EQUAL EMPLOYMENT OPPORTUNITY REPORT Certification with regard to the Performance of Previous Contracts or Sub- contracts subject to the Equal Opportunity Clause and the filing of Required Reports. The bidder n , proposed subcontractor `, hereby certifies that he has has not , participated in a previous contract or subcontract subject to the equal opportunity clause �s required by Executive Orders 10925, 11114 or 11246, and that he has , has not filed with the Joint Reporting Committee the Director —of—the Office oT- ederal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. I� (Company (T1tle) date: Note: The above certification is required by the Equal Lmployment Opportunity Regulations of the ?ecretary of Labor ,41 CfR 60-1.7 (b) (1) , and must be submitted by bidders and proposed subcontractors only in connection with rt contracts and subcontract+ -•hich are subject to the equal opportunity cla :: Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt. ) Currently, Standard Form 100 (EEO-1) is the only repw t required by the Executive Orders or their implementing regulations. Pruposed prime contractors and subcontractors who have participated in a previous contra: or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1 .7 (b) (i) prevents r the avtrd of contracts and subcontracts unless such contractor submits a report covering the deliquent period or such other period specified by the Federal Highways Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. ■ CERTIFICATION OF BIDDERS AFFIR144TIVE ACTION PLAN Bidder is to indicate by check-mark which of the following statements pertains to this bid package, and is to sign the certification fcr that specific statement: u a) It is hereby certified that the bidder is exempt from the City's Affirmative Action Plan requirements because: "Average annual employment level is less than eight permanent employees, and the total contract amount with the City during the current vear is r less than $10,000." Y Company Date BY: Title OR b) It is hereby certified that an approved Affirmative Action Plan is on file with the City of Renton, and that said Plan specifies goals and timetables which are valid for the current calendar year. p Company Date Title OR_ c) It is hereby certified that an Affirmative Action Plan is supplied with this Bid Package. Said Plan will be subject to review and approval by the City as a prerequisite to the contract award, and it includes: a� 1) Present utilization of minorities and females by job classification, FM" 1) Goals and Timetables of Minority and Female Utilization, and 3) Specific Affirmative Action Steps directed at im reasing Minority and Female Utilization. Company a7 to BY: _ Title OR d) It is hereby certified that an Affirmative Action Plan will be supplied to the City of Renton within five (5) working days of receipt of notification of low-bidder status. Said Plan will be subject to review and approval c,y the f,ty as a prerequisite to the contract award, and it will include. 1) Present utilization of Minorities and Females by Job Classification, r 2) Goals and Timetables of Minority and Female Utilization, and 3) Specific Affirmative Action steps directed at increasing Minority a and Female Utilization. M Company Date BY: Title 16 Rev. 919175 City o1 Renton Combined Affidavit L Certification Fora; Mon-Col lusion,Ant I-Trust, and Minimum Page (Mon-Federal Aid) MDN-COLLUSION AFFIDAVIT 1MIl Being duly sworn, deposes and says, that he Is the identical person rh, submitted le the foregoing proposal or bid, and that such bid Is genuine and not sham or col- lusive or made in the Interest or on behalf of any person not therein named, and further, that the deponent has not directly Induced or solicited any other Bidder on the foregoing work or DQUipment to out In a sham bid, or any Other person or Corporation to refrain from bidding, and that deponent has not in any manner Sought by collusion to secure io himself or to isny other person any advantage over other Bidder Or Bidders. AND CERTIFICATION R ASSIGNWNT OF ANTI-TRUST CLA AS TO PURCHASER Vendor end purchaser recognise that In actual economic practice overcharges resulting from anti-trust violations ere In fact usually borne by The purchaser. Therefor&, vendor hereby assigns to purchaser any and all claims for such over- charges as to goods and materials purchased in connection with this order or contract, except as to overcharges resulting from anti-trust violations com- mencing after the date O1 the bid. Quoteti on, or Other event establishing the price under this order or contract. In addition, vendor warrants and represents that each of his suppliers and subcontractors shell assign any and all such claims to purchaser, subject to the aforementioned exception, AND IMINIMIM WAGE AFFIDAVIT F010f I, the undersigned, having been duly suorn, deposed, say ani certify that in Corns Cti On with the performance of the work of this project, 1 &III pay each Classification of laborer, workman, or mechanic employed in the performance of such work; not less than its prevailing rate of wage or not less Thar the minimum rate Of wages as specified In the principal contract; that I have reed the above and foregoing statement and certificate, know the contents thereof Brit the substance as set forth therein is true 10 my knorlodge and belief. li L FOR, ION COLLUSION AFFIDAVIT, ASSIFMKNT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT L Z212, w Naas of Project M _ :/7 r f Nor Of r sT 1rm to 1 signature of Author i#ed ReFlesentatfve of Bidder IN Subscribed and sworn to be fora r on this day of Ig _ Notary Public in and for the State of Washington Residing at 1 � t ; Contractor's Bonding & Insurance Company r i BID BOINVIi —� u KNOW ALL MEN BY THESE PRESENTS: That we..........Rl 7 C_( 1S iJL CBS....1235_E....47H.M.,...OLYW1A,._N41.......9850.1................................._ .................................................................................-.... .. . ..............a s....... ..-............. .... ... . ....._ as Principal, (here' )after called the "Principal'). and THE CONTRACTOR BON Dime $ 1NaUSANCE COMPANY OF SEATTLE,WA, A CORPORATION DULY ORGANIZED l! UNDER THE LAWS OF THE STATE OF WA., As SURETY, (HEREINAFTER CALLED THE "SURETY"), ARE HELD ANO ►IRMI.V sOUNO UNTO .........5.•..�.....CW RENrON....._.......... ...................................................................................... ... ......................... 51 Nvr 70 EOM: .. ..................... .... ...... ._ .............as Obligee, (hereinafter called the "Obligee"), ! in the atnn of....F,IV�..'tip(1, p.FI.l M AM 00/.100-. _..... ..._.. __..-.Dollars for the payment of which sum well and truly to be made, the said Principal and the said Surety,bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firnly by these presents. WHEREAS, the Principal has submitted a bid for........FORTlti LE. kxiGJ�1F,( ft1 ." ,._•_. mil!Q4'1,...loft................................ ................................................................................................................................................................_......................_... . ! .. ..........................................................................I........................ ........................................................................... ......................................................................................................... i NOW,THEREFORE,if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terns o, such bid and give such bond or bonds an may be 1 I specified in the bidding or contract .toculnents with good and sufficient surety for the faithful performance of such contrac• and for the prompt payment of labnr and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter into such contract and give such bond or bonds, if the Principal shall pay to the Obligee tl,e difference not to exceed the penalty hereof between the amount sp cified in said bid f I and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then thiA obligation shall be nail and void atherwise to remail, 61 full force and effect. � Signed and sealed this.... ... .. .. 1.671.. ............... ... .............day oC......._...J1A,X......_.. ..............,....A.n. 1985.1... PuGgr..(xx1slR[x-ltnss . .(SEAL) 1tkRars.............__.. P I Tidoo I TRACTOR'$ OoNOtNs & INaURANCE COMFANY Surety ( .//J. ...... . . . �.. ...._�.� jj- .. f , .............. ......... ..��:..., .... ...:............. IY .. C........(S6AL1 i rilllttt ri(k K, IARRAII�H?, cube-IaoH.etb Hem NrIU1046Y IN FMTI' Apgw.d b, TM A.nwir,. IAAM..M e1 ArcN4ct.. N. A-]Io r.e.,�.n nls Edelm S.� N 1000 11066 190 33 iPklt>#i4l v,'LEFIL �. '.C`�t qr;A tr24 !;;,7a' t'y, � �� �' ��f•�.E u J. - It�..•��E L ,Q�IJ • _ , ' • i ( , " •-� `8/15/85 Pnl+•+1 ICFR IHTS CI RIITICATF IS ISSUED AS A MATTER a nIFORAEAT N WILY AND CONFERS RIG CORROON 6 BLACK, INC. EXTEND No onjoTOR AL1 ER1 THE COVERAGEAFFORDED BY THE IFPOLICIES BEDoECA LOW AMENO, P.O. BoxC34201 --------------- _----" Seattle, WA. 98124 COMPANIES AFFORDING COVERAGE CCC'M A CONSOLIDATED AMERICAN INS COMPANY s Lloyds of London LETTER PUGET CONSTRUCTORS COMPANY Y C Federal Insurance Co. 1235 East 4th Ave. --- ------- II Olympia, Washington 98501 COMPANY D LETTER COMPANY LETTER THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEOTO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATFD. NOIWHUSTADLIRIG ANY REQUIREMEN I. IEnM On CVIIDHION OF ANY C014TRACI 0R UTHEH DOCUMEII, WII11 RFSPECI ID Wlll!:H 110S CEn Hr ICATE MAY BE ISTUEn OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TIIE TERMS.EXCLUSIONS.AND CONDI TIONS OF SUCH POLICIES. —__--------_—_-_.. FDIIE'I EIEEDINF PDL[Y FIIPIMTON LIABILITY LIMITS IN THOUSANDS CO TYPE OF INSURANCE POIICV NUMBERDAR 04.-O DAIS(wwT l —ET�Cn AGGREGATE LT ___ occLJ E GENERAL LIABILRY --_ BODILY C $ KuunY A COWRFHFNSNF FORIA CAL 169788 2/1/85 2/1/86 "- PNFMISESM14TUTOTIS EYIDOERTV $ $ ITRd UNUFRG IM) DAMPGF EXPLOSION A COLLAPSE HAZARD PRODUCTSMOMPL FIND OPERATIONS CC"'wD $ 500 $500 CONTRACTUAL IMXPENLKNT CONIRACTORS -- SRIVIO f7RM PMX'FRTY DMAAGF DC85-594429 2/1/85 2/1/86 500 PERSONAL N1,RJRY $ MRSONnL INJURY AUT E LI BILITY Bt>)lr $ KDky Y nn RMn ANY AUTO x AO (MWD AUTOS IPRN PASS I CAL 169788 2/1/85 2/1/86 -X 11ER THAN �Ra ARxTRO All QWNIP AUIRS' N PASS — --.—_ x x. RffD AUIOS DAMAGEry $ MIN OWNED AUIOS . . ___ -___— GARAGE LIABILITY 91 A PD y EXCESS LIABILITY at a -- UM0F1ILA«X4M 8/21 CCOMBPDINED $ 5,000 $5,000 C (86)79272217 /85 2/i/86 OTHER THAN UMBRELLA IORM _. STATUTORY TVI .A°{' WOR:'ERSL COMPENSATION ;, $ TEACH ACOOINT) AND . . - 105E ASE POLICV tIANI) EMPLOYERS'LIABILITY ,J •t:$ IOISEASE EAOHFMPLOYEE) OTHER IFSCRIPTrN OF nPF nATKINSII rX:ATIOHSNFHu'LFS/$PECIAI ITEMS PROJECTS Highlands pump station A SHOULD ANY OF T14F ABOVE DESCRIBED POLICIES RE CANCELLED BEFORE-THE F.X- The. City of Renton PIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENOFAVOR TO Tunicipal Building 2OO Mill Ave. S. MAIL 10 DAYS WRITTEN NCL I E TO 114E CERTIFICATE HOLDER NAMED 10 THE LEFT,BUT FAILURE TO MAIL SUCH,40TICE SHALL IMPOSE NO OBLIGATION On LIABILITY Renton, WA. 98055 OF ANY KIND UPON THE COMPANY,ITS AGENTS OR REPRESENTATIVES. AUTHOR17ED RFPNFSENTATIVF Kirby torrance III ' -�•� � ''�'�'�`- �L- I f PHONyEE GALL P.M FOR - oATF- TELEPHONED OF__._ `rt / RETURNED S `� YOUR CALL F4iONE _ EK*E�sa� nnen cc�ce '�� �y.,�� PLEASE GALL MESSAGE!J a� WILL CALL AGAIN —.-..___ CAME TO SEE.YOU WANTS TO SEE YOU SK_:NECJ PUBIACWORKS CONTRACT BOND t� STATE OF WASHINGTON Bond premium. $1,099.00 SBG #1000 11066 190 33 KNOW ALL MEN BY THESE PRESENTS: That we, P1XET (Il!'E�t1Y7Id2-4 1��5 y d'IH AVF a tH VtmiA- Mu+ as Principal, and 00NIMMURS BONDIM AND EWRI ANCE OD' — as Surety, are li,ld and firmly bound and obligated unto the State of Washington, CI1y OF n'M" --- in the full and just sum of SffVWN=7 11K)LIM D 7W0_t1�1�>iz@ � ` Ate Rn/1n0 (�5,72�41 Rn l lawful money of the United States,for the payment of which sum well and truly to be made, we do bind ourselves,our and each of our heirs, executors and administrators, successors and assigns,jointly and severally, firmly by these presents. o / This bond is executed in pursuance of Chapter 39,09, Revised Code of Washington. f The CONDITInNS OF rRIS OBLIGATION ARE SUCH,That whereas the Principal entered into a certain contract 57 with CITY OF F1121 d dated the ltLWa�y of Ili 85 forru. a" 'ICR SF'1` Fr1R HT(31I aaaYC )X IMP cTAT nm ARfJl N NOW, THEREFORE,if me Principal shall faithfully perform all the provisions of each contract and pay all laborers, mechanics and subcontractors and materialmen,and all persons who shall supply such person or persons, or subcontractors, with provisions and supplies for carrying on of such work, then this obligation is void;otherwise to remain in full force and effect. bbb PROVIDED, HOWEVER, that the conditions of this obligation shall not apply to any money loaned or advanced to the Principal or to any subcontractor or other person in the performance of any such work. +I I Signed and Sealed this 14141 day of A112IFE 19-A5.. Data & Staff Service Company GEl 0 U Ibdd Sirldn�Agent Principal p 1213 Valley St., Seattle,WA 98109 4 OXnitACTDRS BONDING&INSURANCE COMPANY !! Approved as to Form: 1l 111000L'9Bd6�RX 10M K. DOMAIM, A11XIOEY IN FA C7 I CONTRACTORS BONDING A INSURANCE CO. 1213 valley Street Seattle, Wdshingtrm 98100 GENERAL POWER OF ATTORNEY Know all men by these presents that Contractors Bonding& Insurance Company, a corporation duly organized and existing tinder the laws of the State of Washington and having its principal office in Seattle, King County, c a Washington, does by these presents make,constitute and appoint Janet K.Lorraine, of Seattle,Washington and Robert ( � M-Raymond, of Seattle, Washington its true and lawful attorneys imfact, with full Y power and authority hereby con- ferred in its name, place and stead, to execute, acknowledge and deliver contractors' license bonds issued pursuant r� to RCW Chapter 18.27; electricians' license bonds pursuant to RCW Chapter 19,28: miscellaneous bonds, as those bonds are generally understood in the trade, not exceeding the penal sum of i25,000; other license bonds not ex- seeding the penal sum of$25,AOO; permit bonds not exceeding the penal sum of$25,o00; performance rnnd payment bonds not exceeding the penal sum of$25,000: bid fonds for jobs which, if the contract is awarded, the performance and/or payment bond(s) (in the aggregate, if both are issued) will not exceed$25.000; SBA guaranteed performance and payment bonds not exceeding the penal sum of$250.000; and bid bonds for jobs which, if the contract is award- ed, the SBA guaranteed performance and/or payment bond(s) (in the aggregate, if both are issued) will not exceed S2501000: and to hind the Company thereby as fully and to !:re same extent as if such bonds were signed by the President, sealed with the corporate seal of the Company and duly attested by its Secretary; hereby ratifying and confirming all that the said attorneys-in-fact may do in the premises. Said appointment is made under and by authori- "' ty of the following resolution adopted by the Board of Directors of the Contractors Bonding & Insurance Company on January 1984: Resolved that the President is authorized to appoint as attorneys-in-Fact of the Company Janet K. Lor- raine and Robert M Raymond with power and authority to sign on behalf of the Company contrac- tors' license bonds issued pursuant to RCW Chapter 18.27; electricians' license bonds issued pursuant . to RCW Chapter 19.28; miscellaneous bonds, as those bonds are generally understood in the trade, �C(� not cceeding the penal sum of$2S,000; other license bonds not exceeding the penal sum of $25,000; , permit bonds not exceeding the penal sum of$25,000; performance and payment bonds not exceeding the penal sum of$25,000: bid bonds for jobs which if the contract is awarded, the performance and/or payment bond (in the aggregate, if both are issued) will not exceed$25.000; SBA guaranteed perfor- mance and payment bonds not exceeding the penal sum of$250,0oo; and bid bonds for jobs which, if the contract is awarded, the SBA guaranteed performance and/or payment bond(s)(in the aggregate, if both are issued) will not exceed $250,000. ' Resolved Further that the authority of the Secretary of the Company to certify the authenticity and effectiveness of the foregoing resolution in any General Power of Attorneyis hereby following persons, the s p ct tothed t the � signature of any of the following to bind the Company with respect to the authen- ticity and effectiveness of the foregoing resolution as 9 signed by the Secretary of the Company; Donald p Sirkin, Gary Bailey, Frank Dabovich, and Helen M. langvold. Resolved Further that the signatures of the President and Notary Public and the corporate and Notary seals appea,,ing on any General Power of Attorney containing this and the foregoing two resolutions may be by facsimile. 4 =; Resolved Further that all resolutions adopted prior to today appointing Janet K. Lorrain or Robert i M.Raymond as attorney-in-fact for Contractors Bonding&Insurance Company are hereby superseded. In Witness Whereof, Contractors Bonding & Insurance Company has caused these presents to be sigred by its President and its corporate seal to be hereto affixed this 9th day of January, 1984. _sapnoixG y A Contractors Bonding & Insurance Company — ' State of Washington I %i: BY _ ' SEAL Donald Sirkin, President s COWRY of Krr1B ) '44 f.... �--• a KING On this 9th day of January, 1984, personally appeared Donald Sirkin, to me known to be the President of the corporation that executed the foregoing General Power of Attorney and acknowledged said General Power of At- torney to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he is authorized to execute the said General Power of Attorney. In Witness Whereof, I have hereunto set my hand and affixed my official seal the day and year first above written. �'��' NK OABOV• �� r ,xOTRR �l•;B N\9,w, Notary Public in and for the State of Washington, f O! WA$1q residing at Seattle The undersigned, acting under authority of the Board of Directors of Contractors Bonding & Insurance Com- pany, hereby certifies, in lieu of Certificate of the Secretary of Contractors Bonding& Insurance Company, that the _ above and .oregoing is a full, true and correct copy of the Original Power of Attorney issued by said Company, and does hereby further certify that the said Power of Attorney is still in force and effect. Give* under my hand and the seal of said Company, at 7`<!lLt/t ee+� this day of _ /�tt."[[� - i9.�_. SAGO5:1/9/84(31.POA �� [ or . R , ISSU''i DATF.IMMIDDIYY) PRODUCER R/l5/85 CORROON i BLACA, INC. THIS CERTIFICATE IS ISSUEtl AS A MATTER OF INFORMATWN ONLY AND CONE ERS NO RIGHTS UPON THE CERTIFICATC HOLDEq.TNIS CERTIFICATE ODES NOT AMEND, P.O. BOZC34201 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Seattle, NA. 98124 COMPANIES AFFORDING COVERAGE LETTER A CMILIDATNEl A!D@I.J C IW It/f. COMPANY 'NSURFD LETTER N Llopda Of London -_ PMET CONSTRUCTORS COMPANY - --""---" 1235 Peet 4th AVe. LETTER �i Aral In/arsnee CO. I OlynPia, Washington 98501 COMPANY D LETTER COMPANY E - TICIA THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD DNGICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONO'TION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED SUCH MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRISCO HEREIN IS SUBJECT TO ALL TOE TERMS,EXCLUSIONS,AND CONOI- St I S OF 9UCH POLICIES. L TYPE OF INSURANCE POLICY NUMBER POLICY❑FECITYI POL"EXPPAIION LIABILITY LIMITS IN THOUSANDS _ a1E Da400/vn DATE INAUOdm _A N GENERAL LIABILITY * AOOREMTE COMPREHENSIVE FORM BODILY $ $ CA!- HA :, 169780 IIRY PRIMISESIOPIRATIONS 2/l/85 2/l/86 UNDERGROUND PRDPERiv EXPLOSION A COLLAPSE HAZARD DAMAGE $ $ PRODUCTSCOMttEEED OPERATIONS CONTRACTUAL CBIOHAAgIDHED $ 500 $S00 INDEPENDENT CONTRACTORS ' MAD FORM PROPERTY DAMAGE .. ky PERSONAL NJURI DC85-594429 2ZI/8S 2/1/86 PER$ONAI,INJURY $S00 _AUTOM E LI ILITY envANY AUTO a $ ALL OWNED AUTOS IPPR' PASS 1 CAT' 160798 2/l/85 2/1/86MR Rl" Soly All OWNED AUTOS(KHFRFTTHAN) SUP, $ i AEA Amm HIRED AUTOS NON OWNED AUTOC OETY $ GARAAE LIABILITY C WAR:)ED $S00 EXCESS LIABILITY C UMBRELLA FORM OTHER THAN UMBRELLA FORM (86/79272217 2/l/85 2/1185 BIcweINED $1,000 $1,000 INgmIERB COMPENSATION ErA!UIORY AND $ (EACH ACCIDENT) EMPLOYERS LIABILITY OSEASEAOLICY L'MIT) OTHER $ LDISFASE EACH EMPLOYEEI CLCRIPTION OF OPERATIONSILOCATPONSryE8iCLES9PECIAL ITEMS PROMMi Highlands pump station . . lie City Of Renton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX. PIRATICCyy11 DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO OWnicipal Building 200 HiL Ave. S. MAIL_ .0-DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE Renton, VA. 98055 LEFT,BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OSLNIATION OR LUUWYY OF ANY KIND UPON THE COMPANY,ITS AGENTS OR HEPRESENTA7 IVES. AUTHORIZED REPRESENT AnVE , ,� Kirby torrance III L A lication for Gen6ral Business License ' ee i NEW k RENEWED f r7 ,i t,f• License o. MO — Renton Business 5 1.� 1 IM.itaca Tax No. Cbnt� .,//License no. License No. t�^ lusimess haste 1414 r� �a1 S /R'u- A_' S Owner Naas L7c e, k, . I,,,. .:� P :',n'LOOation / �_ l r�i' -�l C Address r• r' ♦ ��IESUED 01 /18/85 CITY �F RENTON G 6457 BUSINESS LICENSE _M. J. MULCAftY lumbers .� f40e DD 123$ E 4Th AY FINANCE DIRECTOR _ ���:Lkemsa has made application for a City of Renton Business License in accordance with the provi. phk `lions of Title V.Business Regulations Chapter 1,Code of General Ordinances of the City of Renton he and agrees to comply witn al-the requirements of said ordinance.Licensee shad further comply with p an eno all other City Codes,Ordinances,State laws and Regulations applicable to the husiness ac. hereunder. 4 c, . PUGET CONSYRUCTORS A235 E 47N AV r — ;:OLYMPIA MA 98501 i` ICATED INSIDE GTv LIMITS) Insert below the tote] number of employees (including owners), the license fee, penalty, if any, and 1olaL ••e_due. Busineasec outside the City Limits, count only those employees working in the City. — --'"'^�u�•^ 'Anx—aaul< of date due is 56 of the -. tt to exceed 25%. '_ISSUED 08/28/84 CITY OF RENTON G 6457 PENALTY TOT'A., FEE r.. BUSINESS LICENSE — I EE $40 00 1235 E 4T%4., AV 1;j —��• NUICAHY - e .` � FINANCE DIRECTOR -- .t -ldtl/naa6 hes made application fora City Of Renton Business license in accordance with the provi- of Title V,Business Regulations Chapter 1,Code of General Ordinances of the City of Renton "YW agrees to comply with all the requirements of Said ordinance.Licensee shall further comply with 'hereunder S.arty and*I other City Codee,.Ordinances,State Laws and Regulations applicable to the business ac• IY.Ro6nNd _ -.PLIGET ' CONSTRUCTORS IZ3-C E 47N AV OLTNPIA MA 98501 I a _ bte. to the Mat of my knwledpe. - le enE ere avu lehle for pub1L: I.- { stun Title M -.-��/•{-�n.ua�_.=�ati-�. 'e. City of Renton License Divis♦on �. rn Completed Application to, 200 Mill Avenue South ' Renton, Washington 98055 ' 235-2600 , It OFFICE USE ONLY 1 l � I r M 1. r I �+ DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A tttl �E ;,HST CCN1 GENEPAL r- I� 11EO16tMTpN NJNEEII ENRMu�T10E 0RT[ l�•/. 1 1 - STATE OF WASHINGTON 1 CCC1 FL6Elt*l7CRM 121--2'1 PUGET CCN;TRU[TDRE t 1 N 1235 .1. 47I4 AVE. t ; 6LYMP1A 4A 9850 YYii 1 EEE��� � Ua76d:INl1 L � V YE tt W M t r 6 6 DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIF!ZS THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAN AS A ELEC CONTF PUNP i IRR NyMO*I EI T"DATE STATE OF WASHINGTON f_RjGllTRATl(�lN 3 PL6ETC*166G7 2131185 PUGET CONSTRUCT;ON 1235 E 4Th ,/AYE_,' OLYMPIA ' MA 4bSG1 is 0 NUGETCONSTRUCTORS Cr 1255 East Alm Avun.e Olympia Washington 90501 phc•ie(2061 754-4671 AFFIRMATIVE ACTION PLAN Puget Constructor : , hereina°ter Known as ' Contractor" agrc?s to the following plan in meeting its equal opportunity pursuant to Executive t Order 11246, and Title VI and VII of the Civil Right Act of 1964 . 1 . Equal Enployment Opportunity Policy Contractcrs Policy assures that applicants will be employed and will be treated during employment , without regard to race, creed, color enthincity , national origin , sex , the presence of a non -Job related physical , sensory or mental handicap, age or marital status . r This onlicy shall apply to every aspect of employment ; upgrading; demotion ; recruitment ; layoff or termination; pay ' scales; and apprenticeship or on the ,fob training. j 2. Equal Employment Opportunity Officer Contractor hereby designates Dennis A. Burke , Owner as EEO Officer with full authority to administer and promote an activr program of equal employment opportunity . 3. Dissemination of Policy ' ^ a. Corltr_.i.jrs personnel authorized to hire , supervise, promote , demote and terminate employees , who recommend such action, or are Involved In any of these actions will be made fully cognizant of, and 4111 implement Contractors policy cnd contractual responsibilities . To insure the advice is carried out , the following minimum actions will be taken: 14 1 . Meetings of foremen, leadmen and personnel indicated In 3a above, will be held periodically not less than semi-annually and contractors equal employment opportunity policy and. its w Implementation re:lewed and explained. These meetings willf be conducted by the EFO Officer. 1 v 2. All new foremen, leadmen and personnel indicated in )a above will be thoroughly indoctrinated by the EEO Officer L covering Contractors equal employment opportunity obligations within thirty days following hiring. 4. Recruitment F� a . Any advertisements for employment in the newspaper shall 4 ENGINEERING / CONSTRUCTION / MANAGEMENT include Puget Constructors an Equal Employment- Opportunity Employer. i , b . Contractor will encourage employees to refer minority group applicants for employmen, in discussions regarding the pro- , I cedu.e for such referral and by posting appropriate notes and briletins on employee bulletin boards . 5. Wages a. All benefits , monetary , and working conditions will be extended without regard to rare, color, religion , sex , or national origin, . The following actions will be taken: ( 1 ) Periodic ins ections of all facilities will be made c,, insure non-discriminatory treatment of personnel . (2) Wage evaluation made to insure non-discriminatory wage praCLices. (3) Periodically review personnel actions for evident of dl rimination and take corrective action where indicated. C (4) Investigate in full all complaints of alleged discrimination and take appropriate action where indicated and Inform all comolaints of avenues of appeal . 6. Training acid Promotion a. Contractor will endeavor to locate , qualify, and increase the skills of minority group employees and applicants. b.federal andsstatetregulatith onsLeContractnts orawillrfullydutilhin ize trainine programs for the contractual area and advise employees and applicants of these programs and their entrance requirements . c . A program of review of the training and promotion of minority group employees will be conducted and these employees encouraged to apply for same. 7. Subcontracting rContractor will strive to utilize minority group subcontractors or those with meaningful minority group persons in their employ and Use all effort to assure such subcontractor compliance with their equal opportunity obligations. 6. Reports and Records a . Contractor will keep those records necessary in determining compliance with .its equal opportunity obligations . n MY k ►' 9. Goals It is the policy of PUGET CONSTRUCOTRS to reafirm equal opportunity for all qualified personnel regardless of race, color , sex, religion, national origin, disabled veteran, and Vietnam era veteran. Puget will recruit, hire, promote, transfer, lay-off return from lay-off, compensate and provide bonuses, provide training, with (� full regard for equal employment . L+ It is our policy that all decisions affecting employees will be based soley upon qualifications without regard to race, etc. ICY rr C C L L ■ PROPOSAL TO THE CITY Of RENTON RENTON, WASHINGTON I Gentlemen: The undersigned hereby certifte; that - has examined the site of the r L proposed work and ha read and thoroughly understand g the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work, and hereby propose to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the money available, in accordance with the said plans, specifications and contract and the following schedule of -aces and prices: (Note: Unit prices for all items, all extensions, and total amount of bid should be shown. Show unit prices both in writing and in figures. ) i Signature i Address /z.zwD/�1 L �, Names of Members of Partnership: 9'q5c) k L OR r Name of President of Corporation _ r Name of Secretary of Corporation Corporation Organized under the laws of With Main Office in State of Washington at _ �� r L-ITY OF RENTON SCHEDULE OF PRICES ENGINE GENERATOR SET JULY, 1985 t� r SCHEDULE OF PRICES C' PORTABLE ENGINE GENERATOR SET L WATER PROJECT NO. 815 r I L (NOTE: UNIT PRICES FOR ALL ITEMS, ALL EXTENSIONS AND TOTAL AMOUNT OF BID MIST BE SHOWN. SHOW UNIT PRICES IN BOTH WORDS AND FIGURES, AND WHERE CONFLICTS OCCUR, THE WRITTEN OR TYPED WORDS SHALL PREVAIL.) APPROXIMATE j ITEM QUANTITY DESCRIPTION UNIT PRICE TOTAL PRICE of 1. LUMP SUM 125 KW PORTABLE TRAILER s V-094aiz 4Z S` - T MOONTED EMERGENCY GENERATOR SET A W CCOMPLETE (CATERPILLAR NO. 32O8T) 42,?ram L('I Auln ORDS Tk» \bl„�xlre<1 tkjvAs`1r 2. LUMP SUM ELECTRICAL MODIFICATIONS AT E ?nc)- s HIGHLANDS PUMP STATION L (WORDS L 3. LUMP SUM SITE IMPR04EMENTS AND E-G SET BUILDING AT HIGHLANDS PUMP L STATION (WORDS 62 SUBTOTAL s ,� SALES TAX (8.1%) r TOTAL V) A %n cent-s , 12 a� V 7 � ( ` SCHEDULE OF PRICES - 1 ' CITY OF RENTON SCHEDULE OF PRICES ENGINE GENERATOR SET JULY, 1985 THE UNDERSIGNED BIDDER HEREBY ASREES TO START CONSTRUCTION ON THIS PROJECT, IF AWARDED, WITHIN 10 DAYS OF NOTICE TO PROCEED AND TO COMPLETE THE WORK WITHIN 90 CALENDAR DAYS FROM DATE OF EXECUTION. DATED _1_1 DAY 19 SIGNED I %� TIT Le" ADDRESS TELEPHONE �244e--246 7/ CITY OF RENTON heiv, /rPy1ce ;*�- flat BUSINESS LICENSE NO. __�2Zed�llrEly STATE CONTRACTOR' S LICENSE NO. CT2; - /70 eO,(n ACKNOWLEDGMENT OF RECEIPT OF ADDENDA; '• NO. DATE INITI "'_S L NO. E INITIALS NO. it E INITIALS N0. E INITIALS 6. NO. DATE INITIALS w. M SCHEDULE OF PRICES - 2 r� CITY OF RENTON SCHEDULE OF PRICES ENGINE GENERATOR SET JULY, 1985 PA ALTERNATE FOR EQUIPMENT pa THE BASIC 810 SHALL BE FOR THE PORTARLE ENGINE GENERATOR SET COMPLETE (BID ITEM NO. 1) . BASED QN A CATERPILLAR 3208T. THE CONTRACTOR SHALL SUBMIT AN ALTERNATE ADD OR DEDUCT PRICE FOR THE ENGINE GENERATOR SETS LISTED BELOW AND WHICH CONFORM TO THE SPECIFICATIONS. THE ADD OR DEDUCT PRICE SHOWN SHALL MODIFY THE AMOUNT OF BID IT;M NO. I ONLY, AND SHALL COVER THE F COMPLETE COST OF THE EQUIPMENT AND ALL MOLIFICATIONS NECESSARY TO ACCOMMODATE THE SUBSTITUTED EQUIPMENT, INCLUDING ENGINEERING FEES, IF NECESSARY. r �.n ENGINE GENERATOR SET MANUFACTURER MODEL NO. ADD OR DEDUCT ONAN �Ao-i�.d $ CMITSUBISHI tt- to� NORTHERN LIGHTS T)ai,..� s I goo°` CKOHLER 40 a,A - t,,r���� eL� nrn ,ag 2oto f' 4 V fw L e)7Y L Aw��27 To C nor_ >^ IV SCHEDULE OF PRICES - 3 6 1of7 CONTRACTS OTHER THAN FEDERAL-AID FHWA THIS AGREEMENT, made and entered into this /i re day of lgrt_a; I by and between THE CITY OF RENTON, Washington, a municipal corporation of the State of Washington, hereinafter referred to as "CITY" and Puget _ Constructers, In,:. hereinafter referred to as "CONTRACTOR." WITNESSETH: 1 ) The Contractor shall within the time stipulated, (to-wit: within go working days from date of cowKncement hEreef as required by the Contract, of which this agreement is a component part) perform all the work and services required to be performed, and provide and furnish all of the labor, materials, appliances, machines, tools, equipment, utility and Ctransportation services necessary to perform the Contract, and shall complete the construction and installation work in a workmanlike manner, a in connection witti the City's Project (identified as No. 1J-81b for improvement by construction and installation of: pAIr able Engine/ Generator All the foregoing shall be timely performed, furnished, constructed, installed and completed in strict conformity with the plans and spec- M1. ifications, including any and all addenda issued L. the City and all other documents hereinafter enumerated, and in full compliance with all ►� applicable nodes, ordinances and regulations of the City of Renton and any other governmental authority having jurisdiction thereover. It is ar further agreed and stipulated that all of said labor, materials, to appliances , machines, tools, equipment and services shall be furnished L 2of7 Contracts Other Than Federal-Aid FHWA and the construction installation performed and completed to the satisfaction and the approval of the City's Public Works Director as being in such conformity with the plans, specifications and all require- IL L.. ments of or arising under the Contract. i 2) The aforesaid Contract, entered into by the acceptance of the Contractor's bid and signing of this agreement, consists of the following documents, all of which are component parts of said Contract and as fully a part I thereof as if herein se* out in full , and if not attached, as if hereto attached. a) This Agreement b) Instruction to Bidders c) Bid Proposal d) Specifications e) Maps b Plans 1� f) Bid V g) Advertisement for Bids it h) Special Provisions, if any i ) Technical Specifications, if any i M 3. If the Contractor refuses or fails to prosecute the work or any part thereof, with such diligence as will insure its completion within the time specified in this Contract, or any eAtension in writing thereof, w or fails to complete said work with such time, or if the Contractor w shall be adjudged a bankrupt, or if he should make a general assignment for the benefit of his creditors, or if a receiver shall be appointed on account of the Contractor' s insolvency, or if he or any of his 10 Rev. 4/83 M CContracts Other Than Federal-Aid FHWA 3 of 7 subcontractors should violate any of the provisions of this Contract, the City may then serve written notice upon him and his surety of its intention to terminate the Contract, and unless withir ten (10) days r after the serving of such notice, such violation or nrn-compliance of r any provision of the Contract shall cease and satisfactory arrrngement for the correction thereof be made, this Contract, shall , upon the expiration of said ten (10) day period, cease and terminate in every 6 respect. In the event of any ;uch termination, the City shall immediately serve written notice thereof upon the surety and the Contractor and the surety shall have the right to take over and perform the Contract, provided, however, that if the wrety within fifteen (15) days after the serving upon it of such notice of termination doe, no: perform the Contract or does not commence performance thereof within thirty (30) } days from the date of serving such notice, the City itself may take over the work under the Contract and prosecute the same to completion by Contract or by any other method it may deem advisable, for the t4 account and at the expense of the Contractor, altd his surety shall be liable to the City for any excess cost _r other damages occasioned the City thereby. In sucy event, the City, if it so elects, may, without liability for so doing, take possession of and utilize in completing said Contract such materials, machinery, appliances, equipment, plants 1, and other properties belonging to the Contractor as may be on site of f the project and useful therein. 4) The foregoing provisions are in addition to and not in limitation of ■ any other rights or remedies available to V,e City. L r Contracts Other Than Federal-Aid FHWA 4 of 7 5) Contractor agrees and covenants to hold and save the City, its officers, ` agents, representatives and employees harmless and to promptly indemnify r sam,> from and against any and all claims, actions, damages, liability of every type and nature including all costs and legal expenses incurred by reason of any work arising under or in connection witq the Contract to be performed hereunder, including loss of life, personal injury and/or damage to property arising from or out of any occurrence, omi,,sion or activity upon, on or about the premises worked upon or in any way relating to this Contra�t. This hold harmless and indemnification provision shall likewise apply for or on account of any patented or un- patented invention, process, article or appliance manufactured for use in the performance of the Contract, including its use by the City, unless otherwise specifically provided for in this Contract. In the event the City shall , without fault on its part, be may, ..arty to any litigation commenced by or against Contractor, then Contractor shall proceed and hold the City harmless and he shall pay all costs, expenses and reasonable attorney's fees incurred or paid by the City 4! in connection with such litigation. Furthermore. Contractor agrees to pay all costs, expenses and reasonable attorney's fees that may be i incurred or paid by City in the enforcement of any of the covenants, Vr provisions and agreements hereunder. i 6) Any notice from one party to the other party under the Lontract shall be in writing and shall be dated and signed by the party giving such notice or by its duly authorized representative of such party. Any such M i . Contracts Other Than Fedrr,?-,•',;4p FKh 5 of 7 III notice as heretofore spe_Ifit, 'hall br glv ily personal delivery thereof or by depositing same in the United States mail , postage prepaid, 1.6 certified or registered mail . 7) The Contractor shall commence performance of the Contract no later than 10 calendar days after Contract final execution, and shall complete the full performance of the Cont act not later than 90 working days from the date of commencement. For each and every working day of delay after the established day of completion, it is hereby stipulated and agreed that the damages to the City occasioned by said delay will be the sum of In accordance with the standard specifications. 6 as liquidated damages (and not as a Penalty) for each such day, which shall be paid by the Contractor to the City. k L ` 8) Neither the final certificate of payriient nor any provision in the w» Contract nor partial or entire use of any installation provided for by this Contract shall relieve the Contractor of liability in respect to L any warranties or responsit)ility for faulty mate^ials or workmanship. The Contractor shall be under the duty to remedy any defects in the r r work and pay for any damage to other work resulting therefrom which �. shall appear within the period of one (1 ) year from the date of final acceptance of the work, unless a longer period is specified. the City w. will give notice of observed defects as heretofcre specified with I IN reasonable promptness aater discovery thereof, end Contractor shall be t r , W h" 6of7 r Contracts Other Than Federal-Aid FHWA t obligated to take immediate steps to correct and remedy any suet defect, M fault or breach at the sule cost and expense of Contractor. ps is 9) T'ie Contractor and each subcontractor, if a i, shall .ubmit to the CCity SLIch schedules of quantities and costs, progress schedules, Day- rolls, reports, estimates, records and miscellaneous data pertaining to the Cortract as may be requested by the City from time to time. C10) The Contractor shall furnish a surety bond or bonds as security for the C faithful performance of the Contract, including the payment of all persons and firms performing labor on the construction project under t+ this Contract or furnishing materials in connectic,i with this Contract; said bond to be in the full amount of the Contract price as -Necified i ,* in Paragraph 11 . The surety or sureties on such bond or bonds must be r duly licensed as a surety in the State of Washington. L 11 ) The ' ..� ' >nount of this Contra(* is the sum of Seventy-One Thousand, One hundred and twenty-nine dollars and eighty cents, wn; h includes Washington i State Sales Tax. Payment; will be made to Contractor as specified in the f i b "Special Provisions" of this Contract. L L L i i Rev. 4/83 r. Contracts Other than Federal-Aid FHWA 7 of 7 IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk and the Contractor has hereunto set his hand and seal the day and year first above-written. CONTRACTOR CITY OF RENTON �G' �ayor reside/ ner;Uwner Mayor ATTEST- Secretary �w City C erk 4 d/t:a Firm Name Inditi dual Partnership Corporation d Corporation �+ State off`incorporation Attention: If business is a CORPORATION, name of the corporation should be listed in full and coth President and Secretary must sign th^ ronty -t, OR if one .. signature is permitted by corporation by-laws , a cnpy of one by-laws shall be furnished to the city and made a part of the contract docurr:nt. If business is a PARTNERSHIP, full name of each partner should be listed followed by d/b/a (doing business as) and firm or trade name; any une partner may sign the contract. If business is an 114DIVIDUAL PRO7r'RIETORSNIP, the name of the owner shoulc appear followed by d/b/a and name of the company. w r t CONTPACTGR/SUBCONTRAC'luR MONTHLY MANPOWER UT1112ATI0N REPORT V :. J�, REPORTING PERIOD . ♦i �} . Month: Year: To be submitted to the City's Project Goals and Timetables as committed Engineer during the l:;t week of following t'N�L1� in Contractor's Affirmative month while contract is in progress. Prime Action Plan $ Contractor is responsible for obtaining and submitting all Subcontractor Reports, or per City's Flan 9.1 % To: (Nave and location of Compliance Agency Dept.) From: (Name and location of contractor) This report is required by Executive order 11246, Section 203.Failure to report can result in sanctions which include suspensior, termination, cancellations or debarment of contract. i mine- Total .otal Mc rk Hours of Employment (see footnote) city number number of of Claeei a• . • c. • . + e. "A of r. inor St fmpby• flea- Hie- Amer. AeranTe l total Cor..p ary' e Naxe (I.D. ) :rode Lion; Total Black radian oacVl Employ- eee panic Ie7ande w.M e,e C =A #= Tr C A Tr A Tr C. A — Tr C A I A T C r All Tr AD Tr Tr '/. Cccpaay Cffl cia l'a si angnature , e c . Date 5lg nec y. Telephone Lumber (Inelude Area Code) Rev. 11/77 (*Males 6 Females, "Minorities 6 Non-minorities) 7/60 (Submittal Requirements 6 City's Goals/Timetables) Page — of ` INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CI1Y OF RENTON The Employment Utilization Report is to be completed by each subject contractor (both prime and subcontractors) and signed by a responsible official of the company. The reports are to be filed on the day required, each month, during the term of the contract, and they shall include the total work-hours worked on the project for each employee level in each designated trade for the entire reporting period. The prime contractor shall submit a report for its work force and shall collect and submit reports for each subcontractor's work force to the Compliance Agency that is funding their construction project. Reporting Period . . . . . . . . . . . Self-explanatory Compliance Agency . . . . . . . . . . City of Renton (administering department) Contractor . . . . . . . . . . . . . . Any contractor who has a oualifying construction contract with the City of Renton. 1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a qualifying contract. 2. Trade . . . . . . . . . . . . . . Only those crafts covered under applicable EEO bid conditions. 3. Work-hours of Employment . . . . . The total number of hours worked by all employees in each classificatiou; the total number of hoars worked by each *minority group in each classification and the total work-hours for all women. Classification . . . . . . . . . . The level of accomplishment or status of the worker in the trade. (C - Craftworker - ' Qualified, Ap - Apprentice, Tr - Trainee) . 4. Percent of minority work- hours of total work-hours . . . . The percentage of total minority work-hours worked of all work-hours worked. (The sum of columns b, c, d and a divided by column a.) 5. Total Number of Minority Employees . . . . . . . . . . . . Number of minority employees working in contractor' s aggregate work force during reporting period. 6. Total Number of Employees . . . . Number of all emplovees working in contractor's aggregate work force during reporting period. M * Minority is defined as including Blacks, Hispanics, American Indians and Asian and Pacific Islanders - both men and women. M II to f r REQUIREMENTS FOR THE PREVENTION OF ENVIRONMENTAL POLUMON ANDURAL RESOURCES i In accordance with the provisions of Chapter 62 , Laws of 1973 , 4 H.B. 621 , the Contractor shall secure any permits or licenses required by, and comply `ully with all provisions of the follow- ing laws , ordinances , and resolutions : 'q r �+ King County Ordinance No. 1527 requires Building and Land Deve opml— ent Divisior. an Hy raulics Division review of gradin; and filling permits and unclassified use permits in flood L hazard areas. Resolution No. 36230 establishes storm drain design standards to be incorporated into project design stand- ards to be incorporated into project design by Engineering Services . Reivew by H. draulics Division. King county Ordinance No . 800, No. 90G No. 1006 and Resolution o• o. o. an o. 1 contained in ing County o e liitles an 10 are provisions or disposi- tion of refuse and litter in a licensed disposal s?te and pro- vide penalties for failure to comply. Review by Division of Slid Waste . Puget Sound Air Pollution Control A&ency Regulation I : A regu- lation to contro the emission fir contaminants from all sources within the jurisdiction of the Puget Sound Air Pollution Control Agency (King , Pierce , Snohomish, and Kitsap Counties) in r` accordance with the Washington Clean Air Act , R.C.W. 70. 94 . i�. WASHINGTON STATE DEPARTMENT OF ECOLOGY t' ti. W.A.C. 18- 02 : Requires operators of stationary sources of air 'E_onta ' to maintain records of emissions , periodically re port to the State information concerning these emissions from his operations , and to make such information available to the M public. See Puget Sound Pollution Control Agency Regulation I . R. C.W. 90 . 48 : Enacted to maintain the highest possible standards to ensure t e purity of all water of the State consistent with public health and public enjoyment thereof, the propagation and protecting of wildlife , birds , gams , fish, and other aouatic life, and the industrial development of the State , and to that end require the use of all known available and reasonable methods by industries and others to prevent and control the pollution of the waters of the State of Washington . It is unlawful to throw, r. drain , run or otherwise discharge into any of the water of this State any organic or inorganic matter that shall cause or tend to cause pollution of such waters . The law also provides for w civil penalties of $5 , 000/day for each violation. R. C.W. 70. 95 : Establishes Lniform statewide program for handling solid wastes which w.11 prevent land, air and water pollution. a' Makes it ur.law`ul to dump or deposit solid wastes onto or under the surface of the ground or into the waters of this State except to at a solid waste disposal site for which there is a valid permit . A WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES R.C.W. 76. 04 . 370 : Provides for abatement of additional fire baz . ar (lands upon which there is forest debris) and extreme fire hazard (areas of additional fire hazard near building , roads , campgrounds , and school grounds) . The owner and/or person respons- ible is fully liable in the event a fire starts or spreads on property on which an extreme fire hazard exists. R.C.W. 76. 04. 010: Defines terms relating to the suppression or a a—tement--o-fest fires or forest fire conditions . R. C .W. 70. 94 . 660: Provides for issuance of burning permits cor a aging or prevention of forest fire hazards , instruction or silvicultural operations . R.0 W. 76. 04. 310: Stipulates that everycne clearing land or c eeaarirg righ—t -`of-way shall pile and burn or dispose of by other satisfactory means , all forest debris cut thereon , as rapidly as the clearing or cutting progresses , or at such other times as the department may specify , and in compliance with the law requiring burning permits . R.C.IV. 78 . 44 : Laws governing surface mining (including sand , gravel , stone , and earth from borrow pits) which provide fer fees and permits , plan or operation , reclamation plan , bonding , and inspection of operations . W.A.C. 332-18 : Delineates all requirements for surface mined an rec anation. W.A.C. 332-24 : Codifies requirements of R.C.W. 76. 04 pertaining to an clearing and burning; . U . S. ARMY CORPS OF ENGINEERS Section 1 of the River and Harbor Act of June 13 , 1902 : Author- izes ecretary o Army an ores o ngineers to issue permits to any persons or corporation desiring to improve any navigable river at their own expense and risk upon approval of the plans and specifications . Section 404 of the Federal Water Pollution Control Act PL92-500 T69tat . 816 : Aut orizes t e ecretary� ti�Army, acting tt 6ug the Corps of Engineers , to issue permits for the discharge of dredged or fill material into the navigable wat, . s at specified disposal sites . Permits may be denied if it is d• , ermined that : uch discharge will have adverse effects on municin�! water supplies , Shell fish beds and fishery areas and wildlife or recreational areas . MISCELLANEOUS FEDERAL LEGISLATION Section 13 of the River and Harbor Act approved March 3 , 1899 : Novi es t at isc arge o refuse without a permit into na iv gcble waters is prohibited. Violation is punishable by fine. Any citi- zen may file a complaint with the U. S . Attorney and share a por- tion of the fine . - 2- PERMITS REQUIRED FOR THE PROJECT ARE AS FOLLOWS: KING COUNTY BUILDING AND LAND DEVELOPMENT DIVISION Kin Count Resolution No . 25789 requires an unclassified use permit or tIling , quarrying including borrow pits and associ- ated activities such as asphalt plants , rock crushers) and refuse disposal sites and provides for land reclamation subse- quent to these activities . A copy is available at the Department of Public Works or Building and Land Development Division. Shoreline Mara ement Act 1971 rpluires a permit for construction On Late s ore Ines . Perrnit acquired by Public Works and reviewed by Building and Land Development Division. Kin County Ord'_nance No. 14gg r quires permit for grading , land fi s , graveTpits—dumping , quarrying, and mining operations except on County right-of-way. Review by Building and Land Develop- ment Division. WASHINGTON STATE DEPARTMENT OF FISHERIES AND GAME ' C- ha�ter 112 , Laws of 1949: Requires hydraulics permit on certain �• projects. King ounty Department of Public Works will obtain. ) WASHINGTON STATE DEPARTMcNT OF ECOLOGY_ 1 W.A.C. 173- 220: Requiras a National Pollutant Discharge Elimination SystcmTRPM79T permit before discharge of po .utants from a point source into the navigable waters of the State of Washington. W.A.C. 372- 24 : Permit to discharge commercial or industrial waste waters 1r.to tale surface or ground water (such as gravel washing , �. pit operations , or any operation which results in a discharge which contains turbidity. ) r .. W.A.C. 508- 12-100 : Requires permit to use surface water . W.A.C. 508- 12-190 : Requires that changes to permits for water use e reviewed y t e Department of Ecology whenever it is desired to change the purpose of use , the place of use , the point of withdrawal and/or the civersion of water. W.A.C. 508-12-220: Requires permit to use ground water. W.A. C. 508- 12- 260: Requires permit to construct reservoir for w water storage . W.A.C. 508-12- 280 : Requires permit to construct storage dam. r r W.A.C. $08-60 : Requires permit to construct in Stace flood control zone. King County Public Works secures one for design. ` Contra-tor secures one for his operation (false work design, etc . ) . ` - 3- PERMITS REQUIRED FOR THE PROJECT - Continued WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES R.C.W. 76 . 04 . 150 : Requires burning permit for all fires except or small outdoor fires for recreational purposes or yard debris disposal . Also the Department of Natural Resources reserves the right to restrict burning under the provisions of R.C.W. 76 . 04 . 150, 76. 04 . 170 , 76. 04 . 180, and 70 . 94 due to exteme fire weather or to prevent restriction of visibility and excessive air pollution . .I.C.W, 76. 08 . 030 : Cutting permit required before cutting merchant- s e tim We Fr. R. C.W. 76. 08. 275 : Operating permit required before operating power equipment in dead or down timber . R.C.W. 78. 44 . 080 : Requires permit for any surface mining opera- tion inc u�sand, gravel , stone . .,nd earth from borrow pits) . UNITED STATES ARMY CORPS OF ENf'NriRS Section 10 of River and Harbor of Marc)— �1899 : Requires permit or construction (other t;wi, F_ra ec ,ee l S. Coast Guard administered permits) on aav :yabie . . ;ers ( King County Department of Public Works will obtain) . FIRE PROTECTION DISTRICT R. C.W. 52 . 28 . 010, SZ . Z8 , JZ0 , 11. 28 , 030 , SZ . 3 . 040 , 52 . 28 , 050 : Provides aut ir_ or, requirements of, an penalties ori—Tailure to secure a fire permit for building an open fire within a fire protection district. UNITED STATES COAST GUARD Section 9 of River and Harbor Act of March 3 1899 (;Pneral Bride Act o Marc 23 , 1 0 an enerai Bri ge Act o 19 6 as amende3� August s equires a permiL�or construction or ri ge on navigable waters (King County Department of Public Works will obtain) . King County Department of Public Works will comply with pertinent sections of the following laws while securing the afore- mentioned permit : Section 4(f) of Department of Transportation Act , National Environmental Policy Act of 1969, Water Quality Improvement Act of 1970. PUGET SOUND AIR POLLUTION CONTROL AGENCY Section 9. 02 (d) (Z) (iii) of Regulation I : Request for verifica- tion o popu atioa 3ensity. Contractor should be sure his-opera- tions are in compliance with Regulation I , particularly Section 9. 02 (outdoor fires) , Section 9 . 04 (particulate matter- -dust) , and Section ) , IS (preventing particulate matter from becoming airbirne) . -4- lir PERMITS REQUIRED FOR THE PROJECT - Continued ENVIRONMENTAL PROTECTION AGENCY r. Title 40, Chapter Ic , Part 61 : Requires that the Environmental Prciection gency a note ie 5 days prior to the demolition of any structure containing asbestos material (excluding residential r structures having fewer than 5 dwelling units) . �+ Thy above requirements will be applicable only where called for on the various road projects. Copies of these permits , ordinances , laws , and resolutions are available for inspection at the Office of the Director of Public Works , 900 king County Administration Building , Seattle, Washington, 98104 . It shall be the responsibility of the Con- tractor to familiarize himself with all requirements therein. All costs resulting therefrom shall be included in the Bid Prices and no additional compensation shall be made. t, All permits w4.11 be available at construction site . 1 L -5- � HMY-R32320-AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07, 1565 OCCUPATION: CEMENT MASCNS LOCATION: CLALLAM• GRAYS tARBOR. JEFFERSON• KING ( THAT PORTICN SOUTH OF AN EAST-wEST LINE ON 190TH ST. S.W. WHERE IT STARTS AT THE PUf.ET SCU40 ANU EXTENCS EAST TC THE COUNTY LINE) . KITSAP• LEWIC. MASON• PACIFIC (THAT PCRTION NORTH OF WAHKIAKUM COUNTY NORTHERN BOUNDARY EXTENDEC WEST TC THE PACIFIC OCEAN) , PIERCE AND THURSTON CCUNTIES. FRINGE BENEFITS HEALTF A40 WELFARE 1. 60 $/HR. STATE PENSICN 1.75 $/HR. STATE TOTAL HOURLY BENEFITS 3.45 f/HI%. FEDERAL TRAINING FUND . 10 $/HR. STATE ba WAGE RATES t OCCUPATIJtJ CCCUPATION STATE FEDERAL (, CODE DESCRIPTION RATE RATE F , GROUP 1 6 6 090-C260 APPLICATIGN OF SEALING CCMPCUNO IT.86 17.86 090-CC15 CEMENT MASCN - BUILCING GENERAL 17.86 17.86 090-0210 CCNCRETE PAVING 17.86 17.86 w 090-C240 CLRB AND GLTTER 17.86 17.86 090-0230 CURING CCNCRETE 17.86 17.86 090-C220 PATCHING CCNCRETE 17.d6 17.86 090-0250 SIDEWALKS 17.86 17.86 GROUP 2 090-C330 APPLICATION OF UNDERLAYIMENT 18.11 18.11 090-0350 CCMPOSITION MASTIC 19.11 18.11 090-C291 CCNCRETE SAW ( SELF FCWERED ) 18.11 18.11 090-C360 EPCXY 18.11 18.11 090-0310 FINISH CCLCRED CONCRETE 18.11 18.11 090-OC75 GRINDER* HAND PCWERED 18.11 18.11 090-C370 GLNITE NCZZLEMAN 18.11 18.11 090-0273 PLASTIC 18.11 18.11 090-C29a POWER TCCLS !GRINDERS AND ALL OTHERS) 15.11 19.11 090-C300 SANOBLASTING ARCHITECTUAL FINISH 18.11 18.11 �- 09C-C323 TLNNEL WCRKERS 18.11 18.11 i w PAGE 1 f r HWY-R3232C-AA PREVAILING MINIMUM HOURLY WAGE RATES JUNE 37, 1985 OCCUPATION: CEMENT PASCNS LOCATIONx CLALLA09 GRAYS FAR80R. JEFFERSCN, KING ( THAT PORTICN SOUTH OF AN EAST-WEST LINE ON 190TH ST. S.N. WHERE IT STARTS AT THE PUGET SCUNO ANC EXTENCS EAST TC THE CCUNTY LINE) , KITSAP, LEWIS. MASONt PACIFIC ( THAT PCRTICN NORTF OF WAHKIAKUM COUNTY NORTHERN BOUNDARY EXTENDED WEST TO THE PACIFIC CCEANI • PIERCE AND TPURSTON CCUNTIES. WAGE RATES .- OCCUPATION OCCUPATION STATE FEDERAL iu CCOF OESCRIPTION RATE RATE GROUP 3 1 L 090-0140 TRCWEL MACF-INE ON CCLCREO SLAGS. 18.36 18.11 CCMPOSITION OR KALMAN FLCCRS YY F i 3 .r v ) w PAGE 2 L HWY-R32320-AA PREVAILING MINIMUM 13URLY WAGE RATES JUNE 07, 1985 OCCUPATION: CEMENT MASCNS LOCATION: KING CCLNTY ( 1HAT PCRTION NCRTH CF A STRAIGhT LINE ON 190TH SIREET SW WHERE IT STARTS AT THE PUGET SCUND AND EXTENDS EAST TC THE CCUNT7 LINE1 . FRINGE BENEFITS HEALTH AND WELFARE 1.6C S/HR, STATE PENSILN 1. 75 S/HR. STATE TOTAL HOURLY EENEFITS 3.GO $/HR. FEDERAL TRAINING FUND .10 f/HR. STATE WAGE RATES OCCUPATION OCCUPATION STATE FEDERAL L+ CCOE DESCRIPTION RATE RATE GROUP 1 090-0260 APPLICATION OF SEALING CCMPCUND 17.8b 16:95 090-OC15 CEMENT FASON - 8UILCING GENERAL 17.86 16.95 090-0210 CCNCRETE PAVING 17.86 16.95 J90-C240 CLRS AND CLTTER 17.8b 16.95 090-023G CURING CCNCRETE 17.86 16.95 090-0220 PATCHING CCNCRETE 17.96 16.95 090-C250 SIDEeALKS 17.86 16.95 GROUP 2 ti 090-C333 APPLICATION CF UNOERLAYMENT 18.11 17.20 090-C350 CCMPOSITION 144STIC 18.11 17.20 OSO-C280 CCNCRETE SAW ( SELF FCWEREOI 18. 11 17.20 090-C360 EPDXY 16.11 17.20 090-0310 FINISH CCLCRED CCNCRETF 18. 11 17.20 090-CC75 GRINDER , HAND PCWERED 18.11 17.20 090-0370 GLNITE NCL2LEMAN 18.11 17.20 090-0270 ELASTIC 18.11 17.20 090-C290 PGWER TCCLS (GRINDE: S AND ALL CTHERS) 18.11 17.20 090-C30J SANDBLASTING ARCHITECTUAL FINISH I8.11 17.20 090-0320 TLNNEL WCRKERS 18.11 17.; GROUP 3 C190-C340 TRCMEL MACH: hE ON CCLCRED SLABS, 18.36 11.20 LCMPOSITION OR KALMAN FLCCRS 1. Wa PACE 3 HWY-R32320-AA PREVAT' IM'i MINIMUM HOURLY WAGE RATES JUNE 07, 1985 OCCUPATION: CEMENT rASCSS LOCATION: KING. CCUNTV IIH1T PORTION NCRTF CF A STRAIGHT LINE ON 190TH STREET SW WHERE IT STARTS AT TFE PUGET SOUND AND EXTENDS EAST TC THE COUNTY LINE) * OTHER 09O-9C93 STATE : FCREMAN - f 1.25 PER HOUR ABCVE THE HIGHEST PAID JOURNEYMAN UNDER HIS SUPERVISION 090-9C91 CVERTIME: THE FIRST 2 FOURS IN EXCESS OF 8 i" HCURS PER CAY* MCNOAY THROUGH FPIDAY. AND THE LA FIRST 10 HCURS ON SATURDAY SHALL BE PAID AT CAE AND CUE-HALF TIMES THE REGULAR RATE. ALL CTFER OVERTIME HCURS AND SUNDAYS AND HOLIDAYS SHALL 8E PAID AT DOLBLE THE REGULAR RATE . I �nr }V w PAGE 4 HMY—R32320—AA PREVAILING MINIMUP HOURLY WAGE RATES JUNE 07. 1985 OCCUPATION: FLECTRICIANS LOCATION * CLALLAP. JEFFER5CN* KING ANC KITSAP CCLNTIES. FRINGE BENEFITS HEALTF AND MELFARE .985 f/H2. STATE NEBF 3.00 2 STATE PENSION 3.00 3 FEDERAL PENSICN ICCAL 2.30 $/HR. STATE TOTAL HOURLY BENEFITS 3.385 s/HR. FEDERAL TRAINING FUND .LO $/HR. STATE WAGE RATES {s OCCUPATION OCCUPATION STATE FEDERAL CCCF DESCRIPTION RATE RATE 17C—CC10 CABLE SPLICER 19.38 19.38 4 17C—CC30 CCNSTRUCTICN STOCKMAN 8.81 -- 170—OC40 ELECTRICIAN 17.62 17.62 { 170-OCSO FCREMAN 19.38 -- 1. 170—OCEO GENERAL FOREMAN 21.14 -- 4. I Of. PALE 7 Ar r 4MY-it32320-AA PREVAILING MINIMUM HOURLY WAGE RATES JUNE 07, 1985 OCCUPATION: ELECTRICIANS - LINE CChSTRUCTION LOCATION% SIATEWICE FRINGE BENEFITS APPRENTICESHIP .50 1 STATE HEALTH AND WELFARE 1.00 $/HR. STATE NEBF 3.00 1 STATE PENSICN - JCURNEYMAN AND ABOVE 2.00 S/HR. STATE PENSICN - GROUPS 1. 2 ANC 3 3.50 1 FEDERAL PENSICN - GROUPS 4. 5 AND 6 3.50 1 FEDERAL PENSICN - ALL OTHERS 1.30 $/HR, STATE TOTAL HOURLY BENEFITS - 3.25 $/HR FEDERAL GROUPS 1 TC 3 TOTAL HOURLY BENEFITS - 2.25 $/HR. FEDERAL k GROUPS 4 TO 6 VACA71CN . 10 $/HR. STATE v WAGE RATES OCCUPATION CCCUPATION STATE FEDERAL CGOE DESCRIPTION RATE RATE 191-CC10 APPRENTICE LINEMAN: 1ST 6 MCNTHS 10.81 -- 190-OC20 APPRENTICE LINEMAN: 2ND 6 MCNTHS 11.T1 -- L90-CC30 APPRENTICE LINEMAN: 3RG 6 ► ZNTHS 12,. 79 -- 190-OC43 APPRENTICE LINEMAN: 4TH 6 MONTHS la.%9 -- 19C-CC50 APPRENTICE LINEMAN: 5TH 6 MCNTHS 15.31 -- 190-OC60 APPRENTICE LINEMAN: t;TH 6 MONTHS 16.03 -- 190-CC70 APPRENTICE LINEMAN: 7TH 6 MCNTHS 16.75 190-0350 CABLE SPLICER FOREMAN 21.23 -- 190-0?60 LINE CRE► FOREMAN 19.30 -- 190-0230 PCLE SPRAYER LEARNER: 1ST 6 MCNTHS 15.43 -- 190-C240 PCLE SPRAYER LEARNER: 2ND 6 MCNTHS 16.17 -- 190-0253 PCLE SPRAYER LEARNED: 3RD 6 MONTHS 16.71 -- 190-C370 TREE TRIMMER FGREMAh 18.67 -- 190-0300 TREE TRIMMER TRAINEE: 1ST 6 MCNTHS 14.63 -- 190-0310 TREE TRIMMER TRAINEE: 2ND 6 MCNTHS 14.90 -- 19C-C220 TREE TRIMMER TRAINEE: 3R0 6 MCNTHS 15.13 -- 190-0?30 TREE TRIMMER TRAINEE: 4TH 6 MONTHS 15.37 -- GROUP 1 190-C113 CABLE SPLICER 19.93 20.03 190-C220 PCLE SPRAYER LEACMAh 19.43 20.03 I f PAGE B HWY-R32320-AA PREV':� ING MINIMUM HOURLY WAGE RATES JUNE 07, 1985 OCCUPATION: ELECTRICIANS - LINE CCK37RUCTION LOCATION: STATEWIGE WAGE RATES OCCUPATION CCCLP .ON STATE FEDERAL CCOE DESCRIPTION RATE RATE GROUP 2 190-0160 HEAVY LINE EQUIPMENT MAN 18.01 18.11 190-0200 LINEMAN 18.01 18.11 190-0210 PCLE SPRAYER 18.01 18.11 190-0340 WELDER, CERTIFIED 19.01 18.11 GROUP 3 h 190-0270 TREE TRIMMER 16.25 16.35 Lo GROUP 4 j 190-0190 LINE EQUIPMENT MAN 15.51 15.61 GROUP 5 190-0140 HEAD GRCLKOMAN 13.56 13.66 190-C150 HEAD GRC0CMAN - CHIPPER 13.56 13,66 L90-0170 JACKHAMMERMAN 13.56 13.66 190-C260 PCbDERMAN 13.56 13.66 GROUP 6 190-0130 GRCUNCMAN, I-CLEGIGGER 12. 74 12.84 190-0290 TRES TRIMMER HELPER 12.74 12.84 OTHFR 190-9190 FECEI.4L ZCNE DIFFERENTIAL (ACO TO EASE RATE) : ZCNE 1 - 0.00 "0-3 MILE RADIUS FRCM GEC- GRAPIC CENTER OF SEATTLE, TACOMA, PCRTLANC, MECFCRC" ZCNE 2 - 2.40 03-20 MILE RADIUS FROM SEATTLE , TACOMA , PORTLANC. MEDFCRO, AND C-20 V M PAGE 9 f HWY-R32320-AA PREVAILING MINIMLM HOURLY WAGE RATES JUKE OT. 1985 OCCUPATION: ELECTRICIANS - LINE CCASTRUCTION LOCATIUN: STATEWIDE OTHER 190-9191 MILE RADIUS FRCM THE BASE POINTS" ZCNE 3 - 3.15 "2C-35 MILE RADIUS FRCM BASE PCINT CENTER" ZCKE 4 - 3 .90 "35-5C MILE RADIUS FRu.i BASE PCINT CENTER" ZONE 5 - 5 .15 "OVER 50 MILE RADIUS FRCM BASE PCINT CENTER" iw 190-5192 BASE POINTS: BELLINGHAM. ELLENSBLRG. EPHRATA. EVERETI• KENNEUICK. LCNGVIEW, CLYMPIA. SPCKANE, WALLA WALLA, WENATCHEE. LAKEVIEW, PENDLETON# WILBUR• VAKTMA9 ASTCRIA. BAKER. BENDr BURNS• CORVALLIS, THE CALLES, ELGEAE. KALAMATH FALLS RCSEBURG, UMATILLA, CCEUR D*ALENE . KELLOGG. 190-9193 LEWISTOh. CROFINC. SAKCPCINT. SALF_M . �r 60 f` L r L 60 ! , V L PAGE 10 L HMY-R32920-AA PREVAILING MINIMUM HOURLs WAGE RATES JUNE OTv 1985 OCCUPATION: LABORERS LOCATION: CLALLAM, GRAYS FARBOR. ISLAND. JEFFERSCN. KING. KITSAP, LEWIS, RASON, PACIFIC INCRTH OF WAFKIAKUM COUNTY NORTHERN BOUNDARY . . EXTENDEC DUE 4EST TO THE PACIFIC CCEANI, PIERCE. SKAGiT. SNOHJMISH• THURSTCN AND MHATCCM CCUNTIES . FRINGF BENEFITS HEAL7F ;NO WELFARE 1. 75 $/HR. STATE PENSICN 1. 55 S/HR. STATE TOTAL HOJRLY BENEfiTS 3.43 $/HR. FECER41. TRAINING FUND . 13 S/HR. STATE WAGE RATES OCCUPATION CCCUPATION CODE DESCRIPTION SRATE FEDERAL GROUP 1 35C-2100 WINDOW CLEANER 8.46 e.46 GROUP 2 350-OC90 BATCF WEIGFMAN 1C.78 1C.78 350-0460 CRUSHER FEEDER 10.78 10.78 350-1260 PILOT CAR 1C.78 10. 78 350-IE70 TCCLRrlGM MAN (AT JCB SITE $ 10.78 1.0.78 tsROUP 3 350-CC80 BALLAST FEGULATUk MACFINE 14.96 14.96 350-0240 CARPENTER TENDER 14.96 14.96 350-C270 CEMENT FINISHER TENCER 14.96 14.96 350-C_10 CFIP?ER 14.96 14.96 350-C350 CLEAN-LF LABORER 14.96 14.96 350- 390 CCNCRETE FORM STRIPPER 14.96 14.96 350-C470 CLRING CCNCRETE 14.96 14.96 3SO-0520 DEMOLITICN , WRECKING AND MOVING (INCL. 14.96 14.96 CF 'RED MATERIALS) 350-C710 E AY TECHNICIAN 14.96 14.96 350-C810 GAilON BASKET BUILDER 14.96 14.96 350-CE23 GENERAL LABORER 14.96 14.96 350-CE60 GRINDERS 14.96 14.96 350-1370 PCT TENDER 14.96 14.96 r V PAGE 11 I I IWY-R3232C-AA PREVAILING MINIMLM HOURLY hAGE RATES JUNE 079 1995 OCCUPATION: LABORERS OCATION: CLALLAM. CRAYS HARBOR. ISLAND, JEFFERSCN. KING. KITSAP, LEwIS, MASON* PACIFIC (NCRTH OF WAHKIAKUM CCUNTY NORTHERN BOUNDARY FRTENDEC DUE 1,EST TO THE PACIFIC CCEANI. PIERCE, SKAGIT. SNOHOMISH, THLRETON AND %HATCCM CCUNTIES. WASE RATES OCCUPAIJON CCCUPATION STATE FEDERA, CCCE DESCRIPTION PATE RATE GROUP 3 C 350-13SO PCtiDERMAN HELPER 14.96 14.96 350-1765 STAKE HOPPER 14.96 14.96 350-1E80 TCFMAN - TAILMAN 14.96 14.96 350-1S43 TUGGER OPERATOR 14.96 14.96 f , 350-2033 VIBRATING SCREEC ( AIR, GAS Ok ELECTRIC ) 14.96 14.96 6r GROUP 4 r 350-CCSO ASPHALT FAKER 15.44 25.44 350-0250 CEMFNT OLMPER - PAVING 15.44 15.44 35G-C420 CCNCRETE SAk OPERATOR 15.44 15.44 r• 350-CESO DRILLER - 1.AGUN AND AIR TRACK CPERA70A 15.44 15.44 ti. 350-C723 FALLER AND BUCKER - CHAIN SAM 15.44 15.44 350-Cf4l GRADE CHECKER AND TRANSIT MAN 15.44 15.44 350-CS53 HIGH SCALER 15.44 15.44 - 350-OS65 HCO CARRIER 15.44 15.44 350-CS83 JACKHAMMER 15.44 15.44 350-1090 MA\hCLE BUILOER 15.44 15.44 350-1145 MCTAk MI)ER 15.44 15.44 350-1200 NCZZLEMAN (CONCRETE PUMP. GREEN CUTTER WHEN 15.44 15.44 USING COMBINATION I OF F1GH PRESSURE AIR AND WATEP CN CrNCRETf ANC FCCK AN. S CBL45T. _. GUNN'. TE, SHCTCRETE) RATER BLASTER 350-1256 PAVEMENT BREAKER 15.44 15.44 350-1315 PIPE RELINER ( NCT INSERT TYPE) 15.44 15.44 350-1280 PIPELAYEF ANC CAULKER 15.44 15.44 ` 350-1465 RAILROAD SPIKE PULLER (POWERI 15.44 15.44 350-1753 SPREADER ( CCNCRETEI 15.44 15.44 350-1753 SPREADER - CLARY POWER OR SIMILAR TYPES 5 1 .44 15.44 350-1840 TAMPER IMUITIPLE AND SELF PROPELLED) 15.44 15.44 350-IE20 TAMPER AND SIMILAR ELECTRIC, AIR AND GAS 15.44 15.44 OPERATED TOOLS 4 r PAGF 12 i I , HWY-R32320-AA PREVAILING MINIMLM CURLY WAGE RATES JUNE 070 1585 OCCUPATION: LABORERS LOCATION: CLALLAM, GRAYS FAkBCR9 ISLAnD. JEFFFRSCN• K1NG9 KITSAP9 LEWIS* MASON. PACIFIC (NCRTH OF WAHKIAKUM CCUNTY NORTHERN BOUNDARY r. EXTENOEC DUE HEST TO THE PACIFIC CCEANI, PIERCE► SKAGIT. SNOHOMISHr THLPSTON AND IMHATCCN LCUNTIES. WAGE RATES OCCUPATION UCCUPATION STATE FEDERAL CODE DESCRIPTION RATE RATE GROUP 4 350-1E65 TIMBERMAA - SEWER (LAGGER, SFCRER, 6 CRIBBER► 15.44 15.44 350-1SCS lk9CK LINER (POWER ) 15.44 15.44 35C-2COO VIBRATOR I5.44 15.44 350-2CS) WELL-POINT MAN 15.44 15.44 CGROUP 5 350-C200 CAISSON PORKER 15.80 15.80 350-1110 MINER 15.80 15.80 350-1380 PCWUERMAN 15.80 15.80 350-1500 RE-TIMBEFAAN 15r83 15.80 - OTHER 350-SCIO STATE: EFFECTIVE 12/1/84 DELETE THE CLASSIFI- CATION OF CLEANING LABCRER FROM CROUP 1 ANC ACC IT TC GROUP 3. 350-9155 STATE : CVERTIME : ALL MCRK PERFCRMEO IN EXCESS f_F 8 HOURS IN ANY LNE DAY CR IN EXCESS OF 40 hCLRS IN ANY CNE WEEK. MCNDAY THROUGH SATURDAY , SHALL BE PAIL) AT CNE AND CNE-HALF TIMES TEE EMPLOYEES REGULAR RATE. 350-5356 STATE: C�ERTIME : ALL WCRK PERFCPMED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWC TIMES 'TFf EMPLOYEES REGULAR RITE. _ wCRKING FOREMAN: 50 CENTS PER FOUR ABOVE ThE HIGHEST CLASSIFICATICN SLPERVISED i r 1r PAGE 13 F HWY-R12320-AA PREVAILING MINIMUM HOURLY WAGE RATES JUNE 079 1985 OCCUPATION: LABORERS LOCATION: CLALLAM. GRAYS (ARBOR. ISLAAC, JEFFERSON. KING. KITSAP. LEWIS, MASON, PACIFIC (NCRTH OF WAHKIAKUM COUNTY NORTHERN BOUNDARY EXTENCED DUE WES1 TO THE PACIFIC GCEAN ), PIERCE, SKAGIT, SNCHOMISH. THURSTCN ANO WHATCCM CCUNTIES . OTHE.' 350-9370 FECERAL : : 85t OF THE BASE RATE PLUS FULL FRINGE BENEFITS MAY BE PAID CN THE FOL- LOWING KINDS OF PRCJECTS: 11 MARINE TYPE PRCJECTS ( CCCKS. WHARFS, ANC SIMILAR ) WHICH HAVE A TGTAL VALUE LESS THAN S150.000.00. 21 PRCJECTS INVOLVING WCRK CN NGN-MARINE I 35C-9371 STRICTURES (BUILCINGS CR BRIDGES) WHICH HAVE A TOTAL VALUE OF $195009000.00 (EXCLUDING MECHANICAL, ELECTRICAL. AND �- UTILITIES) . 31 NCN-MARINE PROJECTS WHERE NO BUILDING IS ' INCLUDED WHICH HAVE A '%#.4•L7!E LESS THAN $1 .000.000.00 (SLRFACING 6 PAVING IN- 35C-S450 FEDERAL : : CN PROJECTS: It WHICH INVOLVE WCRK CN STRICTURES SUCH AS BUILDINGS. BRICGES. CR DOCKS WHICH HAVE A TCTAL VALUE CF LESS THAN $19500.000.00 ( EXCLUDING ELECTRICAL . MECHANICAL• AND UTILITIESI , OR ; 21 WHERE NC BUILDING IS INVOLVED WHICH HAVE 350-5451 A TCTAL VALUE CF LESS THAN SI.000.000.00 ( INCLLOING SURFACING AND PAVING, EXCLUD- ING UTILITIES) . RECUCEC RATES AS INDICATED MAY BE PAID: GROUP 1 $8.46/HR . GROUP 2 SIC.78/HR . GROUP 3 S12.69/HR. 350-S452 GROUP 4 GROUP 5 UTILITIES ARE CEFIkFO AS, SANITARY AND STORM SEWAGE , AND FACILITIES FOR T:1E DELIV- ERY OF WATER , ELECTRICITY. GAS. ANC CCM- Mii:JICATICNS. 4 PAGE 14 V I HNY--R32320-AA PREVAILING HINIML14 HOURLY WAGE RATES JUKE 07. 1985 OCCUPATION: PAINTERS LOCATION: ISLAND. KING. KITSAP. LEWIS• MASCN, PIERCES SKAGIT9 S' CHOMISH, THURSTCN. ONO WHATCCM CCUNTIES. FRINGE EENEFITS APPRENTICESHIP .06 S/HR. STATE MEALTF AND WELFARE AND DENTAL 1.70 S/HR. STATE PFNSICN .96 S/HR. STATE TOTAL HOURLY EENEFI7S 2.72 S/HR. FECERAL v WAGE RATES OCCUPATION CCCL'PATION STATE FEDERAL CODE DESCRIPTION RATE RATE 450-CC30 BRIDGE 17.14 -- F* 450-CCRO BRUSH, JCURt 'YMAN 16.74 -- tin 450-C153 INDUSTRIAL . TINTER 17.14 1T.14 450-0170 PAINTER 1E.74 450-C180 PAPER HANGER 16.74 __ 450-0220 ROLLER 1o.74 450-C250 SANDBLAST PC'-TENDER 17.14 -- r 450-0280 STEAM CLEANING 17.14 -- 45C-C290 STEEL 17.14 -- -• 450-0300 STEEPLES 17.49 -- 450-C370 TCWERS 17.49 --_ 450-0380 TOXIC MATEFIAL 17.14 -- OTHER 450-7CIO STATE: FCREMAN - .75 $/HR. CVER THE hIGHEST PAID JOURNEYMAN CN ThE JOB. 450-7C20 STATE:GFNERAL FOREMA? - 1 .00 S/HR . CVER THE HIGHEST PAID ON THE JCB. 450-SSOO STATE: INDUSTRIAL PAINTER INCLUDES: STEAM CLEANER. PCWER WASH ICVER 2000 PSII , BRIDGE. EPCXY. TCXIC SPRAY* SANDBLAST (PCT TENDER - BRUSH RATE) . STEEL. TANK, SUSPENDED SCAFFOLD- ING, PIPES . INDUSTRIAL WCRK IN INDUSTRIAL PLANTS. I ` PAGE 25 ! r HMY-R32320-AA PREVAILING MINIMUM 11OURLY WAGE RATES JUNE 079 1585 OCCUPATION: PAINTERS LOCATION: ISLAND. KING. KITSAP, LEIS. MASCN. PIERCE. SKAGIT, SNGHONISH, T!•URSTCN. ANG WhATCCM COGNTIES. OTHER 450-SSIO STATE: CVERTIML - THE FIRST 2 HOURS IN EXCESS Or 8 HOURS PER DAY, MCNDAY THFCUGH FRIDAY, k, SHALL 8E PAID AT ONE AND CNE-HALF TIMES THE REGULAR RATE OF PAY. ALL CTHER OVERT14E HOURS r^ AND ALL fOLRS %ORKEC ON SATURDAYSt SUNDAYS ANC HOLICAVS SHALL EE PAID AT OCUBLE THE REGULAR PATE OF PAY. i� y Y r V rr U/ 1� M PAGE 26 '-HWY—R32320—AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07o 1985 OCCUPATION: PLUMEERS AKE PIPEFITTERS LOCATION: CLALLAR. JEFFERSON ANC KING COUNTIES. FRINGE BFNEFITS DENTAL .al S/HR. STATE HEALTP AND WELFARE 1 .26; $/HR. STATE PENSICN 2.30 %/HR. STA7E TOTAL HOURLY BENEFITS 6.82 3/HR. rEnERAL TRAINING FLNO . 16 $/HR. STATE VACATICN 2.75 $/HR. STATE WAGE RATES OCCUPA7104 OCCUPATION STATE FEDERAL j w CODE DESCRIPTION RATE RATE 530—CCIJ FCREMAN 2C.93 -- 530—CC20 GENERAL FOREMAN 21.89 -- 530—CC30 PLLMBER ANC PIPEFITTER 19.00 19.00 530-0G50 WELDERS i9.00 -- w PAGE 27 i r City Plans Spec's & Permits S-- 2+ HW Y—R3232C—AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07, 1585 OCCLIPATION: SHEETMETAL 4QPKERS LDCATIUN : ISLAND. KING ANC SNCHCMISH CCLNTIES . FRINGE BENEFITS HEALTH AND WELFARE 1 . ?5 $/HR. STATE 3.00 i FEDERAL PENSION 1 . 80 S/HR. STATE SASMI 3.CO 4 STATE TOTAL HOURLY BENEFITS 3.C7 S/HR. FEDERAL TRAINING FUND . 16 $/HR. STATE WAGE RAZES DCCUPATIJV CCCCPATION STATE FEDERAL CCOE DESC.RIPTIGN RATE RATE f" 63C—OC1J F(RE4AN 22.70 63C—CC31 JCLRNEYMAN 21 .00 2C.71 630—OC40 MATERIAL MAN 14. JO -- OTHER 630—St3) STATE: CbERTIME — All HOURS IMCRKED IN EXCESS CF B HOURS PER DAY CA 40 HOURS PER MEEK, 4ON— W DAY THRCLGH FRIDAY . ANC ALL HCURS MORKEC ON SATURDAYS. SUNOAVS AND HCLIOAYS SHALL BE P41C AT DOUBLE THE REGULAR RATE OF PAY. I , I L i. f f YA PAGE 29 HWY—R32320—AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07. 1985 OCCUPATIONS TEAMSTERS LOCATION CLALLAP* GRAYS HARBOR, ISLAND, JEFFERSCN9 KING• KITSAPs KITTITASr LEWIS . MASON, PACIFIC INCRTH OF TI-E WAHKIAKUY COUN71' NORTHERN ECU.NDARV EXTENCEO DUE WEST TO THE PACIFIC OCEAN) , PIERCE. SKAGIT, SNOHOMISH♦ THLRSTCN, WHATCCM, YAKIMA AND THOSE PARTS OF THE FCLLOWIAG COUNTIES LYING WEST OF THE 120TH MERIDIAN: CHELAN AND CCUGLAS COUNTIES. FRINGE BENEFITS HEALTf AND WELFARE 1.89 f/HR. STATE PENS)CN 1. 75 t/HR. STATE TOTAL HOURLY BENEFITS 3.64 f/HR. FEDERAL ,. TRAINING FUND .00 FEDERAL WAGE RATES OCCL'PATIOY CCCLPATION STATE FEDERAL �. CCOE DESCRIPTION RATE RATE GROUP 1 730—C690 LEVERHAN AND LCACERS AT BUNKERS AND 17.06 17.06 BATCH PLANTS 730-1200 SMAMPER 17.06 17.06 730-1810 WAREHUUSEMAN AND CHECKERS 17.06 17.06 GROUP 2 730-1303 TEAM CRI �EP 17.11 17.11 GROUP 3 730—C11J BLLL LIF1S• OR SIMILAR ECUIPMENT USED 1N 17.16 17.16 LCADING CR UNLOACING TRUCKS. TRANSPCRTING MATERIALS EN JGB SIIES:WARENCUSING 730—C140 BUS OR EMPLCYEEHAUL 17.16 17.16 r i PAGE 29 L HWY-R32320-AA PREVAILING MINIMUM HOURLY WAGE RATES JUNE 07, 1585 OCCUPATION: TEAMSTERS LOCATION: CLALLAM. GRAYS hAROCR, ISLAND. JEFFERSCN, KING• KITSAP, KITTITAS, LEWIS, MASON. PACIFIC INCR7l- CF THE WAHKIAKUM COUNTY NORTHERN ECUNOARY EXTENDED DUE WEST TO THE PACIFIC CCEANI. PIERCE. SKAGIT. SNUHCMISH, ThLRSTCN, wHATCCM, VAKIMA AND THOSE PARTS CF THE FCLLOWIKG CCLNTIES LYING WEST CF TfE 120TH MERIDIAN: CHELAN ANC OCUGLAS COUNTIES. WAGE RATES OCCUPATION CCCLPATION STATE FEDERAL CCDE DESCRIPTION RATE RATE GROUP 3 730-C200 DUMPSTER$, AND SIMILAR ECUIPMENT:TOURNO- 17.16 17.16 RCCKERS. TCURNOWA,ON. TOURNCTRAILER, CAT OW SERIES, TERRA CCERA, LETCURNEAU, WESTINGrOUSE ATHEY WAGON. EUCLID, TWO AND FCUR-WHEELEC PCMER TRACTOR WTF TRAILER ANC SIMILAR TOP- LCADED EQUIPMENT TRANSPORTING MATERIAL AND PERFORMING WORK IN TEAMSTER JURISDICTION:DUMP TRUCKS. $ICE. END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR LCMBINATILNS TO-ERECF:LP TC AND INCLUDING 5 YARDS 730-C460 FL0,ERTY SPREADER 17.16 17.16 730-Ct1O FUEL TRUCK , GREASE TRUCK. GREASER. BATTERY 17.16 17.16 SERVICE MAN AND/CR TIRE SERVICE MAN 730-1100 SCISSORS TRUCK 17.16 17.16 730-1350 TRACTCR, SMALL RUBBER-TIRED (WHEN USED WITHIN 17.16 17.16 TEAMSTER JLRISDICTICNI 730-175J VACUUM TRUCK 17.16 17.16 730-2C00 WATER WACON AND TANK TRUCK: UP TC 1600 17.16 17. 16 GALLONS 730-2200 WINCH TRLCK: SINGLE REAR AXLE 17. 16 17.16 730-2220 WRECKER • TCW TRUCK ANC SIMILAR EQUIPMENT 17.16 17. 16 GROUP 4 730-0500 FLATBED TRLCK, DUAL REAR AXLE 17.27 17.27 GROUP 5 730-CCBO BUGGYMCBILE AND SIMILAR 17.33 17.33 I We PAGE 30 HMY—R32320—AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07. 1985 OCCUPATION: TEAMSTERS LOCATION: CLALLAM, GRAYS I-ARBOR, ISLAND. JEFFERSON9 KING* KITSAPo KITTITAS• LEWIS. MASON. PACIFIC ( NCRTH CF THE MAHKIAKUM COUNTY NORTHERN BCUNOARY EXTEKEED DUE WEST TO THE PACIFIC OCEAN) , PIERCE- SKAGIT. SKOH_)MISH. THLRSTCN. moHAICCMv YAKIMA AND THOSE PARTS CF THE FCLLOWING COUNTIES LYING WEST CF THE 120TH MERIDIAN: CHELAN ..NO CCUSLAS COUNTIES, WAGE RATES OCCUPATION CCCUPATION STATE FEDERAL CCDE DESCRIPTION RATE RATE GROUP 5 730—C670 HYSTER CFERATORS (HAULING BULK LOOSE 17.33 17.33 AGGREGATFSI 730—I190 STRADDLE CARRIER IRCSS, HYSTER AND SIMILAR) 17.33 17.13 730-2010 WATER WA ON AND TANK TRUCK: 16CO GALLCNS 17.33 17.33 TC 3000 CALLCNS GRUUP 6 730-1503 TRANSIT—MIX. () TO AND INCLUDING 4.5 YOS. 17.37 17.37 GROUP 7 730—C210 OLMPSTEPS. AND SIMILAF ECUIPMENT:TOURNO— 17.3d 17.38 RCCKERS. TCURNOWAGOh, TOURNOTRAILER . CAT DW SERIES, TERRA CCERA, LETCURNEAU. WESTINGrOUSE ATrEY WAGON, EUCLID, TKC AND FOUR—WHEELEC PCWER TRAC7CR MTh TRAILER AND SIMILAR TOP- - LCAOED ECUIPMENT TRANSPORTING MATEAIAL AND PERFCRMINI: WORK IN TEAMSTER JURISDICTION:OUMP TRUCKS, SICE. END AND BOTTOM DUMP, INCLUDING SEMI—TRLCKS AND TRAINS OR CGMBIhATICNS TfEREOF:CVER 5 YARDS TC AND INCL. 12 YARDS 73C—C410 EAPLOSIVE TRUCK (FIELD MIX) AND SIMILAR 17.38 17.38 _ EQUIPMENT T30-0710 LCWBEO AhO HEAVY DUTY TRAILER: UNDER 50 17.38 17.38 TCAS GRCSS 730—CS10 CIL DISIFIBLTGR CRIVER (RCAOI 17.38 17.39 730-114) SLURRY TRUCK URIVER 17.3d 17.38 73C-1160 SAC—GO AND SIMILAR EQUIPMENT 17.38 17.38 730-2210 WINCH TRLCK: DUAL REAR AXLE 17.38 17.38 r r PAGE 31 1� HWY-R32320-AA PREVAILING MINIMUM HGLRLY WAGE RATES JUNE 07, 1985 OCCUPATION: TEAMSTERS LOCATION: CLALLAM, GRAYS HARBOR, ISLAND. JEFFERSON, KING* KITSAP, KITTITAS* LEWI`„ MASON. PACIFIC INCRTH CF THE WAHKIAKUN COUNTY NORTHERN BCUNJARV EXTENDED DUE WEST TO THE PACIFIC CCEANI , PIERCE. SKAGIT, SNOHOMISH, THLRSTCN, WHATCOM, YAKIMA AND THOSE PARTS OF THE FCLLOWING COUNTIES LYING WEST OF THE 120TH MERIDIAN: CHELAN AND OCUGLAS COUNTIES. WAGE RATES OCCUPA710N CCCLPATION STATE FEDERAL CCDE DESCRIPTION RATE RATE GROUP 8 730-C220 OLMPSTERS, AND SIMILAR EOUIPMENT:TCURNO- 17.44 17.44 RCCKERS, TCURNOWAGON* TOURNOTRAILER * CAT DW SERIES, TERRA CCBRA* LFTCURNEAU. WESTINGHOUSE Alltf WAGON, EUCLID, TWO AND FOUR-1,HEELEC PCWER TRACTCR WTH TP4ILER AND SIMILAR TOP- LCADED ECUIFMENT TRANSPORTING MAT;KIAL AND PERFORMING WORK IN TEAMSTER JURISOICTION:OUMP TRUCKS* S10E* END ANC BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR COMBINATICNS THEREGF :CVER 12 YARCS TO AND INCL. 16 YARDS GROUP 9 730-CIOJ 8LLK CEMENT TANKER 17.49 17.49 730-C230 OLMPSTERS * AND SIMILAR ECUIPMENT:TOURNO- 17.49 17.49 RCCKERS . TCURNCWAGON* TOURNCTRAILER, CAT OW SERIES, TERRA CCBRA, LETCURNEAJ, WESTINGHOUSE ATHEY WAGCN, EUCLID* TWO AND FOUR-Wi+EELEC POWER TRACTCR WTH TRAILER AND SIMILAR TOP- LCADED ECUIPMENT TRANSPORTING MATERIAL AND PERFORMING WORK IN TEAMSTER JURISOICTICN:DUMP TRUCKS, SICE, ENC AND 8071CM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR CCMBINATICNS TFEREOF:CVER 16 YARCS TO AND INCL. 20 YARDS 730-2015 WATER WAGCN AND TANK TRUCK: CVER 3000 GALLCNS 17.49 17.49 GROUP 1C I W. PAGE 32 1 in HWY-R32320-AA PREVAILING MINIMLM HOURLY WAGE RATES JUKE 07. 1985 OCCUPATION: TEAMSTERS LOCATION: CLALLaM, GRAYS HARBOR* ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, LEWIS, MASON, PACIFIC ( NCRTH CF THE WAHKIAKUM COUNTY NORTHERN BCUYDARV EXTENCEO DUE 'WEST TO THE PACIFIC OCEAN)► PIERCE, SKAGIT, SNCHOMISH, THLRSTCN, WHATCCM, YAKIMA AND THOSE PARTS OF THE FCLLOWING CGUNTIES LYING WEST CF THE 120TH MERIDIAN: CHELAN AND DCUGLAS COUNTIES. WAGE RATES OCCUPATION OCCUPATION STATE FEDERAL CCOE DESCRIPTICN RATE RATE GROUP 1C 730-C12J BLLL LIF1S . OR SIMILARY ECUIPMENT USED IN 11.51 17.51 -• LCADING CR UNLOACING TRUCKS. TRANSPCRTING MATERIALS CN JC3 S17ES:CTHER THAN WAREHOUSING GROUP 11 730-1510 TRANSIT-MIX USED EXCLLSIVELY IN HEAVY 17.5 • 17.54 CCNSTR. (EVER 4 YDS. TG AND INCL. 6 YOS. 1 GROUP 12 730-CC10 A-FRAME CR HYDRALIFT TRUCKS GR SIMILAR 17.64 17.64 j ECUIPMENT WHEN A-FRAME OF HYDRALIFT OR SIMILAR EOLIPAENT IS IN USE GROUP 13 4 730-G240 OLMPSTERS, AND SIMILAR ECUIPMENT:TOURNO- 17.66 17.66 RCCKERS, TCURNOWAGON, TOURNOTRAILER, CAT DW SERIES, TERRA CCBRA , LETCURNEAU, WESTINGHOUSE AlHEY WAGGN, EUCLID* TWO AND FOUR-WHEELED PCWER TRACTCR WTti TRAILER AND SIMILAR TOP- LCADEU ECUIPMENT TRANSPORTING MATERIAL AND PERFCRMING WCRK IN TEAMSTER JURISOICTION:OUMP TRUCKS, SIDE, IC ANC BOTTOM DUMP, INCLUDING SEMI-TRLiCKS AUD TRAINS OR CCMBINATICNS THEREOF:CVER 20 YARCS TO AND INCL. 30 YARDS 730-C720 LCWBED AND HEAVY DUTY TRAILER: OVER 50 TCNS 17.66 17.66 GRCSS TO AND INCLUDING 100 TONS GROSS r f I PAGE 33 HWY-R32320-AA PREVAILING MINIVGM HOURLY WAGE RATES JUNE J7* 1985 OCCUPATION: TEAMSTERS LOCATION: CLALLAP* GRAYS HARBOR . ISLAAG. JEFFERSCN, KING, KITSAP. KITTITAS* LEWIS* MASON* PACIFIC (NCRTH OF THE WAHKIAKUM COUNTY NORTHERN BCUNDAFV EXTENCEC DUE WEST TO THE PACIFIC OCEAN) , PIERCE, SKAGIT, SNOHOMISH. THLRSTCN. WHATCGM, YAKIMA AND THOSE PARTS GF TfE FCLLCWiNG COUNTIES LYING WEST CF THE 120TH MERIDIAN: CHELAN AND DCU%�LAS COUNTIES. WAGE R47ES OCCUPATION CCCUPATION STATE FEDERAL CODE DESCRIPTION RATE RATE I GROUP 14 730-1525 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 0.70 17.70 CCNSTR- :CVER 6 YCS. TC AND INCL- 8 YJS. 730-0253 DUMPSTEPS. AND SIMILAR ECUIPMENT:TDLRNO- 17.82 17. 82 RCCKERS, TCURNOWAGON, TOURNCTRAILER. CAT D'W SERIES* TERRA CCBRA. LETCURNEAU♦ WESTINGHOUSE A7FEY WAGCS, EUCLID, TWC AND FCUR-WHEELEC PCWER TRACTCR WTF TRAILER 'ND SIMILAR TOP- LCADED ECUIPMENT TRANSPORT&NG MATERIAL AND PFRFCRMING WCRK IN TEAMSTER JURISCICTION:DUMP TRICKS, SICE. ENE ARC SOTTGM OLMP* INCLUCING SEMI-TRUCKS AND TRAINS CR COMBINATIONS THEREGF :CVER 30 YOS. TC AND INCL. 40 YDS. 730-C73O LCWBED AND HEAVY DUTY TRAILER: CVER 100 17.82 17.82 TCNS GROSS GROUP it 730-1530 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 17.86 17.86 CCNSTR. :CVER 8 YCS. TC AND INCL. 10 YDS. � I I w PAGE 34 lr HolY—R32320—AA PREVAILING MINIMLM HOURLY WAGE RATES JUKE 07, 1965 OCCUPATION: TEAMSTERS LOCATION: CLALLAF, GRAYS HARBOR, ISLANC, JEFFERSON. KING, KITSAP, KITTITAS, LEWIS, MASON, PACIFIC INCRTH CF THE WAHKIAKUM COUNTY NORTHERN 8CUND ARY EATENCEC DUE WEST TO THE, PACIFIC OCEAN) , PIERCE. SKAGIT, SKOHOMISH, THLRSTCN, eHATCCP, YAKIMA AND THOSE PARTS GF THE FCLLuWING COUNTIES LYING WEST OF THE 120TH MERIJIAN: CHELAN AND OCUGLAS COUNTIES. WAGE RATES OCCUPATION OCCUPA"iION STATE FECERAL CODE DESCRIPTION RATE RATE GROUP 17 730—C260 OLMPSTER ' . AND SIMILAF EGUIPMEN7:TOURNO— 17.99 17.98 ROCKERS , fCURNOWAGON, TOURNOTRAILER , CAT DW SERIES. TERRA CCERA, LETCLRNEAU, WESTINGHUUSE !,. ATHEY WAGON, EUCLID, TWO AND FCUR—WHEELED PC''mER TRACTCR WTh TRAILER ANC SIMILAR TOP— LOADED ECUIPM£NT TRANSPORTING MATERIAL A';D PEFFORMING WGRK IN TEAMSTER JURISCICTION:DU-,F TRUCKS, $ICE, END ANC BOTTOM DUMP, 1NCLUCING SEMI—TRUCKS AND TRAINS OR COMBINATICNS THEREOF :CVER 40 YARCS TO AND INCL . 55 YARDS GROUP If [. .., 730—I .rJ .T AANSI7—MIX USED EXCLUSIVELY IN HEAVY 1H.03 18.03 CLNSTR. :CVER 10 YOS. TO AND INCL. 12 YDS. GROUP 19 T30-1553 TRA14SIT—MIX USED EXCLUSIVELY IN HEAVY 18.19 18.19 CCNSTR. :CVER l2 YOS. TO AND INCL. 16 YDS . ~ GROUP 2C 730-1`.6J TRANSIT—MIX USED EXCLLSIVELY IN HEAVY 18.35 18.35 CCNSTR. :CVER 16 YOS. TO AND INCL. 20 YDS. GROUP it 730-1570 TRANSIT—MIX USED EXCLLSIVELY IN HEAVY 18.51 18. 51 CCKSTR. :CVER 20 YOS. d r. I v PAGE 35 HWY-R3232C-AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07, 1S85 OCCUPATICN: TEAMSTERS LOCATION: CLALLAM, GRAYS HARBGR, ISLAND. JEFFERSCN, KING, KITSAP, KITTITAS, LEWIS, MASON, PACIFIC (NCRTH OF THE WAHKIAKUM COUNTY NORTHERN bCU.YDARY EXTENDED DUE WEST TO THE PACIFIC CCEAN), PIERCE. SKAGIT, SNOHCMISH, THLRSTCN. WHATCCM, YAKIMA AND THOSE PARTS CF THE FtLLOWING CCLNTIES LYING WEST CF THE 120TH MERIDIAN: CHELAN AND DCUGLAS COUNTIES. WAGi RATES 9CCUPA7ION CCCLPATION STkTE FEDERAL CCOE DESCRIPTICN RATE RATE GROUP 22 730-C400 ESCORT CPIVER 17406 12.00 Y30-1C20 PILOT CAR 17.06 12.00 GROUP 23 730-C490 FLATBED TRLCK, SINGLE REAR AXLE -- 15.25 730-1CIJ PI':K-UP TRUCK -- 15.25 GROUP 24 - 73J-CEIJ .MECHANIC HELPER 16.91 -- GPJUP 25 730-C800 MECHANIC 17.50 -- OTHER 130-5371 STRLCTUPES (BUILDINGS CR BRIDGES) WHICH HAVE A TOTAL VALUE CF f1,5CC,000.00 - ( EXCLLOING MECHANICAL, ELECTRICAL, AND UTILITIFS ) . 31 NON-MARINE PROJECTS WHERE NO BUILDING IS INCLUDED WHICH HAVE A VALUE LESS THAN S1 .000,CJ0.00 (SURFACING G PAVING IN- 730-5372 CLLCED. BUT UTILITIES EXCLUDEDI. UTILITIES ARE DEFINED AS: SANITARY & STURM '- SEWAGE , AND FACILITIES FOR THE DELIVERY OF WATER. ELECTRICITY. GAS , AND CCMMUNICATIONS s. L PAGE 36 f V HMY—R32320—AA PREVAILING MINIMLM HOURLY WAGE RATES JUNE 07, 1985 OCCUPATION: TEAMSTERS LOCATION: CLALLAP, GRAYS HARBOR, ISLAND. JEFFERSCN, KING, KITSAP, KITTITAS, LEWIS, MASON, PACIFIC INCRTH CF THE WAHKIAKUM COUNTY NCRTHEPN BCUNUARY EXTENCED DUE WEST TO THE PACIFIC GCEANl , PIERCE. SKAGIT, SNOHOMISH, THLRSTCN, WHATCOM, YAKIMA AND THOSE PARTS CF THE FCLLLWING COLNTIES . PING WEST CF THE 120TH MERIDIAN: CHELAN AND CCU3LAS ('.CUNTIES. OTHER 730—SI35 STATE: FCR CCCUPATICN 730-0260 IN GROUP 17 ACO .15 1/!-R . FOR EACH 10 YARD INCREMENT OVER 55 YARDS 73C-9736 STATE: O�ERTIME—ALL WORK PERFCRMED IN EXCESS CF 8 HOURS PER DAY OR 40 HOURS PER aEEK, MON— DAY THRCLGH FRIOAY, A6C ALL WCRK PF.RFCRMEO CN SATURDAYS SHALL BE PAID AT ONE AND CNE— HALF TINES THE REGULAR RATE OF PAY .ALL WCRK PLR— �. FCRMED CN SUNDAYS AND HOLIDAYS SHALL BE PAID DOUBLE THE REGULAR RATE OF PAY. ti. c� M PAGE 37 4 . 1. r 1. �II SPECIAL PROVISIONS i I ` I L L L L L CITY OF RENTON APWA STANDARD SPECIFIr,ATIONS THE STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTP' ION PREPARED BY THE WASHINGTON STATE CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION, 1981 EDITION, SHALL BE HEREINAFTER REFERRED TO AS THE "STANDARD SPECIFICATIONS" AND SAID SPECIFICATIONS TOGETHER WITH THE LAWS OF THE STATE OF WASHINGTON AND THE ORDINANCES AND CHARTER OF THE CITY OF RENTON, SO FAR AS APPLICABLE, ARE HEREBY INCLUDED IN THESE SPECIFICATIONS AS THOUGH QUOTED IN THEIR ENTIRETY AND SHALL APPLY EXCEPT AS AMENDED OR SUPERSEDED By THE SPECIAL AND TECHNICAL PROVISIONS HEREIN. A COPY LF THESE STANDARDS SPECIFICATIONS IS ON FILE IN THE OFFICE OF THE PUBLIC WORKS DIRECTOR, MUNICIPAL BUILDING, RENTON, WASHINGTON 98055, WHERE THEY MAY BE EXAMINED AND CONSULTED BY ANY INTERESTED PARTY. WHEREVER REFERENCE IS MADE IN THE STANDARD SPECIFICATIONS TO THE OWNER, SUCH REFERENCE SHALL BE CONSTRUED TO MEAN THE CITY OF RENTON, AND WHERE REFERENCE IS MADE TO THE ENGINEER, SUCH REFERENCE SHALL BE CONSTRUED TO MEAN THE DIRECTOR OF PUBLIC WORKS, "ITY OF RENTON, OR HIS DULY AUTHDRIZEJ REPRESENTATIVE. NOTE: THE SPECIAL AND TECHNICAL PROVISIONS HEREINAFTER CONTAINED SHALL BE IN AUDITION TO OR SHALL SUPERSEDE PROVISIONS OF THE STANDARD SPECIFICATIONS IN CONFLICT HEREWITH. HEADINGS HEADINGS TO PARTS, SECTIONS, FORMS, ARTICLES, AMU SUBARTICLES ARE INSERTED FOR CONVENIENCE OR REFERENCE ONLY AND SHALL NOT AFFECT THE INTERPRETATIGN OF THE CONTRACT DOCUMENTS. SPECIAL AND TECHNICAL PROVISIONS STRUCTURE THE SPECIFICATIONS NOTED HEREIN ARE IN ADDITION TO, OR IN LIEU OF , DIVISION i, II, III AND IV OF THE STANDARD SPECIFICATIONS. WHERE SECTIONS ARE MARKED "REPLACEMENT SECTION" OR "PARTIAL REPLACEMENT SECTION," THE SPECIFICATIONS HEREIN ARE TO REPLACE, OR PARTIALLY REPLACE, THE STANDARD SPECIFICATIONS NOTED. WHERE SECTIONS ARE MARKED, "ADDITIONAL SECTION," THE SPECIFICATIONS HEREIN ARE TO BE AN ADDITION TO THE STANDARD SPECIF?CATIONS NOTED, WHERE SECTIONS ARE MARKED "SUPPLEMENTAL SECTION," THE SPECIFICATIONS HEREIN ARE TO BE A SUPPLEMENT TO THE STANDARD SPECIFICATIONS. Revised 1/94 SPECIAL PROVISIONS INDEX SECTION PAGE SECTION 1 SP 1 SPECIAL PRrVISIONS SP 1 STANDARD SPECIFICATIONS SP 1 ACT OF GOD SP 2 SHOP DRAWINGS SP 2 OR EQUAL SP 2 APPROVAL. SP 2 SECTION 2 SP 2 PUBLIC OPENINGS OF BIDS SP 2 SECTION 3 SP 2 CONSIDERATION OF B.'OS SP 2 SECTION 4 SP 2 PROCEDURE AND PROTEST BY THE CONTRACTOR SP 2 USE OF MATERIALS FOUND ON THE PROJECT SP 3 WASTE SITES SP 4 HOURS OF WORT( ;,r 4 CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS SP 4 SECTION 5 SP 4 SUBMITTALS SP 4 CONSTRUCTION STAKING SP 5 FINAL ACCEPTANCE SP 6 METHOD OF SERVICE OF NOTICE S? 6 ERRORS AND OMISSION` SF' 6 .SECTION 7 SP 6 SANITAT N SP 6 LOAD LIMITS SP 6 EMPLOYMENT OF STATE RESIDENTS SP 7 WAuE5 SP 7 SUELONTRACTING SP 9 RECORDS AND REPORTS SP 9 CONTRACTOR'S RESPONSIBILITY FOR WORK SP 10 RESPOONSIBILITY FOR DAMAGE SP 11 PROTECTION AND RESTORATION OF PROPERTY SF' 11 RESTORATION OF STRUCTURES ANO SURFACES SP 11 UTILITIES AND SIMILAR FACILITIES SP 13 Revised 3/89 PUBLIC LIABILITY ANG PROPERTY DAMAGE SP 13 GENERAL SAFETY REQUIREMENTS SP 13 FLAGMEN, BARRICADES, AND SIGNS SP 14 DUST CONTROL SP 15 RIGHTS OF WAY SP 15 EMPLOYMENT OPENINGS SP 15 SECTION 8 SP 15 PROGRESS SCHEDULE SP 15 PRE-CONSTRUCTION CONFERENCE SP 16 NOTICE TO PROCEED SP 16 TIME OF COMPLETION SP 16 LIQUIDATED DAMAGES SP 17 OVERTIME WOW, BY OWNER EMPLOYEES SP 17 CONTRACTOR'S PLANT AND EQUIPMENT SP 17 r ATTENTION TO WORK SP 18 SECTION 9 SP 18 L MEASUREMENT OF QUANTITIES SP 18 SCOPE OF PAYMENT SP 19 r OWNER'S RIGHT TO WITHHOLD CERTAIN AMOUNTS SP 19 L Revised 3/84 r r SECTION 1 111.39A SPECIAL PROVISIONS (ADDITIONAL SECTION ALL PROVISIONS OF THE APWA STANDARD SPECIFICATIONS RELATING TO AND PROVIDING FOR THE METHOD OF MEASUREMENT AND PAYMENT FOR WORK PERFORMED ARE DELETED AND VOID. THE MEASUP"MENT AND PAYMENT SECTION SET FORTH IN THESE DOCUMENTS EHALL BE THE BASIS FOR AYMENT OF ALL WORK PERFORMED UNDER THIS CONTRACT. 1-1.398 STANDARD SPECIFICATIONS (ADDITIONAL SECTION) OTHER CERTAIN REFERENCED STANDARDS, AS USED IN THIS SPECIFICATION, ARE FROM THE LATEST EDITIONS OF: AWWA AMERICAN WATER40RKS ASSOCIATION ANSI AMERICAN NATIONAL STANDARDS ASA AMERICAN STANDARDS ASSOCIATIGN ASTM A4ERICAN SOCIETY FOR TESTING AND MATERIALS 1-1.50 ACT OF GOD (REPLACEMENT SECTION "ACT OF GOD" MEANS AN EARTHQUAKE, FLOOD, CYCLONE, OR OTHER CATACLYSMIC PHENOMENON OF NATURE. A RAIN, WINDSTORM, HIGH WATER OR OTHER NATURAL. PHENOMENON OF UNUSUAL INTENSITY FOR THE SPECIFIC LOCALITY OF THE WORK, WHICH MIGHT REASONABLY HAVE BEEN ANTICIPATED FROM HISTORICAL RECORDS OF THE GENERAL LOCALITY OF THE WORK, SHALL NCI BE CONSTRUED AS AN ACT OF GOD. 1-1.51 SHOP DRAWINGS (REPLACEMENT SECTION) THE TERM "SHOP DRAWINGS" SHALL REFER TO THE PICTORIAL DESCRIPTION OF THE DETAILS OF PROPOSED MATERIALS, EQUIPMENT, METHODS OF INSTALLATION, OR OTHER CONSIR')'CTION PREPARED BY THE CONTRACTOR, A SUBCONTRACTOR, OR A MANUFACTURER AND SUBMITTED FOR THE APPROVAL OF THE OWNER. 1-1.52 OR EQUAL (REPLACEMENT SECTION) WHERE THE TERM "OR EQUAL- IS USED HEREIN, THE OWNER, OR THE OWNER ON RECOtR&NDATION OF THE ENGINEER, SHALL BE THE SOLE JUDGE OF THE QUA_1TY AND SUITABILITY OF THE PROP050 SUBSTITUTION. SP 1 Revised 3/84 .. 1-1.53 APPROVAL (REPLACEMENT SECTION) THE TERM "APPROVAL" OR "APPROVED" SHALL MEAN APPROVAL GIVEN BY OR GIVEN PROPERLY ON THE BEHALF OF THE OWNER. SECTION 2: 6I0 PROCEDURES AND CONDITIONS 2--' .12 PUBLIC OPENINGS OF BIDS (REPLACEMENT SECTION) SEALED BIDS WILL BE RECEIVED BY THE CITY OF RENTON, WASHINGTON, BY FILING WITH THE CITY CLERK, MUNICIPAL. BUILDING, RENTON, WASHINGTON, AS PER CALL FOR BIDS AND WILL BE OPENED AND PUBLICLY READ ALOUD. SECTION 3 3-1.01 CONSIDERATION OF BIDS (ADDITIONAL SECTION) AWARDING OF CONTRACT WILL BE BASED ON TOTAL SUM OF ALL SCHEDULES OF PRICES. NO PARTIAL BIDS WILL BE ACCEPTED. SECTION 4 4-1.05 PROCEDURE AND PROTEST BY THE CONTRACTOR (REPLACEMENT SECTION) ANY QUESTIONS ARISING BETWEEN THE INSPECTOR AND THE CONTRACTOR OR HIS SUPERINTENDENT OR FOREMAN AS TO THE MEANING AND INTENT OF ANY PART OF THE PLANS AND SPECIFICATIONS OR ANY CONTRACT DOCUMENT, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE PUBLIC WORKS DIRECTOR OR HIS REPRESENTATIVES FOR INTERKETAIION AN ADJUSTMENT, IF WARRANTED. FAILURE ON THE PART OF 1HE PUBLIC WORKS DIRECTOR OR HIS REPRESENTATIVE TO DISCOVER AND CONDEMN OR REJECT IMPROPER, DEFECTIVE OR INFERIOR WORK OR MATERIALS, SHALL NOT BE CONSTRUED AS AN ACCEPTANCE OF ANY SUCH WORK OR MATERIALS, OR THE PART OF THE IMPROVEMENT IN WHICH THE SAME MAY HAVE BEEN USED. 10 PREVENT DISPUTES AND LITIGATION, IT IS FURTHER AGREED BY THE PARTIES HERETO THAT THE PUBLIC WORKS DIRECTOR OR HIS REPRESENTATIVE SHALL DETERMINE THE QUANTITY AND QUALITY OF THE SEVERAL KINDS OF WORK EMBRACED IN THESE IMPROVEMENTS. HE SHALL DECIDE ALL QUESTIONS RELATIVE TO THE EXECUTION OF THE WORK AND THE INTERPRETATION OF THE PLANS AND SPECIFICATIONS. r SP 2 Revised 3/84 IN THE EVENT THE CONTPACTOR IS OF THE OPINION HE WILL BE DAMAGED BY SUCH INTERPRE(ATION, HE SHALL, WITHIN 3 DAYS, NOTIFY THE ENGINEER AND THE CITY CLERK IN WRITING OF THE ANTICIPATED NATURE AND AMOUNT OF THE DAMAGE OR DAMAGES. TIME IS OF THE ESSENCE IN THE GIVING OF SUCH NOTICE. IN THE EVENT AN AGREEMENT CANNOT THEN BE REACHED WITHIN 3 DAYS, THE CITY AND THE CONTRACTOR WILL EACH APPOINT N ARBITRATOR AND THE TWO SHALL SELECT A THIRD WITHIN 30 DAYS THEREAFTER. THE FINDINGS AND DECISION OF THE BOARD OF ARBITRATORS SHALL BE FINAL AND BINDING ON THE PARTIES, UNLESS THE AGGRIEVED PARTY, WITHIN 10 DAYS, CHALLENGES THE FINDINGS AND DECISION BY SERVING AND FILING A PETITION FOR REVIEW BY THE SUPERIOR COURT OF KING COUNTY, WASHINGTON. THE GROUNDS FOR THE PETITION FOR REVIEW ARE LIMITED TO SHOWING THAT THE FINDINGS AND DECISION: 1. ARE NOT RESPONSIVE TO THE QUESTIONS SUBMITTED; 2. IS CONTRARY TO THE TERMS OF THE CONTRACT OR ANY COMPONENT THEREOF; 3. IS ARBITRARY AND/OR IS NOT BASED UPON THE APPLICABLE FACTS AND THE LAW CONTROLLING THE ISSUES SUBMITTED TO ARBITRATION. THE BOARD OF ARBITRATORS SHALL SUPPORT ITS DECISION BY SETTING FORTH IN WRITING THEIR FINDINGS AND CONCLUSIONS BASED ON THE EVIDENCE ADDUCED AT ANY SUCH HEARING. THE ARBITRATION SHALL BE CONDUCTED IN ACCORDANCE WITH THE STATUTES OF THE STATE OF WASHINGTON AND COURT DECISIONS GOVERNING SUCH PROCEDURE. THL COSTS OF SUCH ARBITRATION SHALL BE BORNE EQUALLY BY THE CITY AND THE CONTRACTOR UNLESS IT IS THE BOARD'S MAJORITY OPINION THAT THE CONTRACTOR'S FILING OF THE PROTEST OR ACTION IS CAPRICIOUS OR WITHOUT REASONABLE FOUNDATION. IN THE LATTER CASE, ALL COSTS SHALL BE BORNE BY THE CONT""'TOR, THE VENUE OF ANY SUIT SHALL BE IN KING COUNTY, WASHINGiON, AND IF THE CONTRACTOR IS A NON-RESIDENT OF THE STATE OF WASHINGTON, HE SHALL DESIGNATE AN AGENT, UPON WHOM PROCESS MAY BE SERVED, BEFORE COMMENCING WORK UNDER THIS CONTRACT. 4-1.10 USE OF MATERIALS FOUND ON THE PROJECT (REPLACEMENT SECTION) ALL SALVAGE MATERIAL AS NOTED ON THE PLANS AND TAKEN FROM ANY OF THE DISCARDED FACILITIES SHALL, AT THE ENGINEER'S DISCRETION, BE CAREFULLY SALAVAGED AND DELIVERED TO THE CITY SHOPS. ALL SALVAGED WATER MAINS, FIRE HYDRANTS, VALVES AND APPURTENANCES, CATCH BASINS, AND STORM AND SANITA Y MANHOLE COVERS SHALL BE SALVAGED AND DELIVERED TO THE CITY SHOPS. ANY COST INCURRED IN SALVAGING AND DELIVERI4G SUCH ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND NO COMPENSATION WILL BE MADE. SP 3 Revised 3/84 4-1.12 WASTE SITES (ADDITIONAL SECTION) ALL MATERIALS DESIGNATED BY THE ENGINEER TO BE WASTED SHALL BE HAULED, DUMPED, AND SPREAD AT THE LOCATIONS SELECTED BY THE CONTRACTOR. THE CONTRACTOR SHALL HAVE THE RESPONSIBILITY OF OBTAINING HIS OWN WASTE SITE. ALL WORK INCLUDED IN THIS SECTION SHALL BE CONSIDERED TO BE INCIDENTAL TO OTHER ITEMS OF WORK. AND NO FURTHER COMPENSATION WILL BE MADE . THE ROUTE TAKEN TO THE WASTE SITE SHALL BE MAINTAINED SOLELY BY THE CONTRACTOR IN A MANNER AS DESCRIBED BELOW: THE CONTRACTOR SHALL BE PREPARED TO USE WATER TRUCKS, POWER SWEEPERS, AND RELATED EQUIPMENT AS DEEMED NECESSARY BY THE CITY PUBLIC WORKS DIRECTOR TO ALLEVIATE THE PROBLEM OF LOST SPOILS ALONG THE ROUTE. PROMPT RESTORATION OF THE ROUTE IS MANDATORY. 4-1.13 HOURS OF WORK (REPLACEMENT SECTION) THE WORKING HOURS FOR THIS PROJECT WILL BE LIMITED TO WEEKDAYS DURING THE L PERIOD FROM 8:00 A.M. TO 5:00 P.M. THE HOURS OF WORK MAY BE CHANGED AT THE DISCRETION OF THE ENGINEER WHEN IT IS IN THE INTEREST OF THE PUBLIC OR THE CONTRACTOR DUE TO REASONS OF SAFETY, HEALTH, OR WELFARE. 4-1.14 CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS THE CONTRACTOR WILL BE SUPPLIED BY THE OWNER WITH 5 SETS OF PLANS AND SPECIFICATIONS. AT LEAST ONE COMPLETE SET OF CONTRACT DOCUMENTS, INCLUDING ONE FULL SIZE SET OF DRAWINGS, SHALL BE KEPT AT THE. SITE OF CONSTRUCTION IN GOOD CONDITION AND AT ALL TIMES AVAILABLE TO THE OWNER AND THE ENGINEER ADDITIONAL COPIES OF THE CONTRACT DOCUMENTS, IF REQUIRED, WILL BC FURNISHED I THE OWNER AT NET COST OF REPRODUCTION. SECTION 5 5-1.03 SUBMITTALS (REPLACEMENT SECTION) THE CONTRACTOR SHALL FURNISH ALL DRAWINGS, SPECIFICATIONS, DESCRIPTIVE DATA, CERTIFICATES, SAMPLES, TESTS, METHOD, SCHEDULES, AND MANUFACTURER'S INSTRUCTIONS AS REQUIRED TO DEMONSTRATE FULLY THAT THE MATERIALS AND EQUIPMENT TO BE FURNISHED AND THE METHOD OF WORK COMPLY WITH THE PROVISIONS AND INTENT OF THE SPECIFICATIONS AND DRAWINGS. IF THE INFORMATION SHOWS ANY DEVIATION FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR SHALL, BY A STATEMENT IN WRITING ACCOMPANYING THE INFORMATION, ADVISE THE ENGINEER OF THE DEVIATION AND STATE THE REASONS THEREFORE. SP 4 Revised 3/84 W r 5-1.05 CONSTRUCTION STAKING (REPLACEMENT SECTION) THE ENGINEER SHALL HAVE THE RIGHT 70 MAKE REASONABLE CHANGES IN THE GRADES AS THEY ARE SHOWN ON THE DRAWINGS. GRADES WILL BE ESTABLISHED IN THE FORM OF OFFSET STAKES AT DISTANCES NOT GREATER THAN 50 FEET, SET IN ADVANCE OF THE WORK. WHENEVER WORK 15 IN PROGRESS, THE CONTRACTOR SHALL HAVE IN HIS EMPLOYMENT A WORKER COMPETENT TO SET A BATTER BOARD OR OTHER CONSTRUCTION GUIDE FROM THE LINE AND GRADE STAKES GIVEN BY THE ENGINEER. SUCH EMPLOYEFF SHALL HAVE THE DUTY AND RESPONSIBILITY OF PLACING AND MAINTAINING S, :H CONSTRUCTION GUIDES. A BATTER BOARD SET WITH AN ENGINEER'S LEVEL SHALL BE USED FOR A,L LINES SET ON A GRADE Oc 0.50 PERCENT OR LESS, AT LEAST THREc BATTER BOARDS SHIL� REMAIN IN P ACE DURING PIPE LAYING OPERATIONS. IF, THROUGH THE CONTRACTOR'S NEGLIGENCE, ANY STwES SHALL BE DESTR]YED AND REQUIRE RESETTING, A SUM SHALL BE DEDUCTED FROM THE CONTRACTOR'S FINAL PAYMENT EQUIVALENT TO THE EXTRA COST IN ENGINEERING REQUIRED FOR SUCH REPLACEMENT. THE LASER METHOD OF ESTABLISHING GRADE MAY BE USED PROVIDING: 1. REQUESTS FOR USE, EQUIPMENT, AND METHOD OF OPERATION ARE SUBMITTED FOR CITY REVIEW AND APPROVAL AT LEAST FIVE DAYS PRIOR TO USE. 2. GRADES ARE CHECKED AT LEAST ONCE EVERY 50 FEET AND AT LEAST 3 TIMES DAILY BY CONVENTIONAL METHODS. 3. PROPER ANCHORING OF PIPE IS PERFORMED IN LOCATICN� WHERE A BOX IS BEING USED FOR EXCAVATION. THE CONTRACTOR SHALL ARRANGE HIS WORK TO ALLOW A REASONABLE TIME FOR THE SETTING OF STAKES FOR THE NEXT PHASE OF HIS OPERATION TO PREVENT WORK DELAYS WHILE WAITING FOR CONSTRUCTION GUIDES. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DETAILED DIMENSIONS AND TRANSFERRING ELEVATIONS OR MEASUREMENTS MEASURED r-ROM SUCH STAKES AND MARKS. DELAYS BY REASON OF LACK OF STAKES OR A TIME REQUEST FOR SURVEY LESS THAN 3 DAYS ARE DEEMED A RISK TO THE CONTRACTOR AND SHALL NOT BE THE BASIS FOR CLAIMS FOR ADDITIONAL COMPENSATION OR CONSTRUCTION TIME. ALL COSTS FOR THE CONTRACTOR'S SURVEYING SHALL BE CONSIDERED INCIDENTAL TO OTHER BIC ITEMS IN THE PROPOSAL, AND NO FURTHER COMPENSATION WILL BE MADE, UNLESS A BID ITEM FOR SURVEYING IS SPECIFICALLY LISTED IN THE SCHEDULE OF PRICES. SP 5 Revised 3/84 5-1.12 FINAL ACCEPTANCE (REPLACEMENT SECTION) THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF THE COMPLETION OF THE WORK WHEREUPON THE ENGINEEP WILL PROMPTLY, BY PERSONAL INSPECTION, SATISFY HIMSELF AS TO THE ACTUAL COMPLETij4 OF THE WORK IN ACCORDANCE WITH THE TERMS OF THE CONTRACT, AND SHALL THEREUPON RECOMMEND TO THE OWNER THAT TOE WORK IS ACCEPTABLE. FINAL DETERMINATION OF THE ACCEPTABILITY OF TH; WORK SHALL 8E MADE BY THE OWNER. 5-1.15 METHOD OF SERV;CE OF NOTICE (REPLACEMENT SECTION) WRITTEN NOTICE SHALL BE DEEMED TO HAVE BEEN DULY SERVED IF DELIVERED IN PERSON TO THE INDIVIDUAL, OR TO A PARTNER OF THE FIRM, OR TO AN OFFICER OF THE CORPORATION OR OWNER OR TO AN EXECUTIVE OFFICIAL IF THE OWNER I5 A GOVERNMENTAL BODY, OR IF SENT BY RtGISTERED UNITED STATES MAIL TO THE BUSINESS DRESS SHOWN IN THE CONTRACT DOCUMENTS. 5-1.17 ERRORS AND OMISSIONS (REPLACEMENT SECTION) IF THE CONTRACTOR, IN THE COURSE O� HIS WORK, BECOMES AWARE OF ANY ERRORS OR OMISSIONS IN THE CONTRACT DOCUMENTS OR IN THE LAYOUT AS GIVEN BY SURVEY POINTS AND INSTRUCTIONS, OR IF HE BECOMES AWARE OF ANY DISCREPANCY BETWEEN THE CONTRACT DOCUMENTS AND THE PHYSICAL CONDITIONS OF THE LOCALITY, HE SHALL IMMEDIATELY INFORM THE ENGINEER. THE ENGINEER, IF HE DEEMS IT NECESSARY, r SHALL RECTIFY THE MATTER AND ADVISE THE CONTRACTOR ACCORDINGLY. ANY WORK DONE AFTER SUCH DISCOVERY, UNTIL AUTHORIZED, WILL BE DONE AT THE CONTRACTOR'S RISK, �s SECTION 7 a. 7-1.04 SANITATION (ADDITIONAL SECTION) ALL EXPENSES INCURRED IN SUPPLYING ACCESS, PARKING, AND SANITATION FACILITIES SHALL BE CONSIDERED INCIDENTIAL TO THE PROJECT AND NO COMPENSATION SHALL BE `^ Mar /-1.07 LOAD LIMITS (REPLACEMENT SECTION) ALL MOTOR VEHICLES OF THE CONTRACTOR, SUBCONTRACTORS, AND SUPPLIERS SHALL STRICTLY ADHERE TO CH. 46.44 OF THE MOTOR VEHICLE LAWS OF THE STATE OF WASHINGTON (1467 EDITION AND AMENDMENTS THEREOF) IN REGARD TO SIZE, WEIGHT , AND LOADS OF MOTOR VEHICLES. w PAYMENT WILL NOT BE MADE FOR ANY MATERIAL THAT IS DELIVERED IN EXCESS OF THE LEGAL WEIGHT FOR WHICH THE VEHICLE IS LICENSED. re SP 6 Revised 3/84 r ANY VIOLATION OF THESE REGULATIONS SHALL BE REPORTED TO THE AFFECTED LAW ENFORCEMENT AGEN' . THE CONTRACTOR IS TO FURNISH TO THE PUBLIC WORKS DIRECTOR A LISTING OF ALL HAUL VEHICLES USED ON THIS PROJECT, LISTING THE VEHICLE NUMBER, LICENSE NUMBER, TARE WEIGHT, AND LICENSED LOAD LIMITS. 7-1.08 EMPLOYMENT OF STATE RESIDENTS (REPLACEMENT SECTION THE SECTION ON EMPLOYMENT OF STATE RESIDENTS IS DELETED IN ITS ENTIRETY. 7-1.09 WAGES (REPLACEMENT SECTION) THIS CONTRACT IS SUBJECT TO CHAPTER 39.12 RCW, AND AMENDMENTS AND ADDITIONS THERETO RELATING TO MINIMUM WAGES. ON FEDERAL AID PROJECTS, FEDERAL WAGE LAWS AND REGULATIONS ARE ALSO APPLICABLE. HOURLY MINIMUM RATES OF WAGES AND FRINGE BENEFITS ARE SHOWN IN THE CONTRACT. WHEN FEDERAL WAGE RATES AND FRINGE BENEFITS ARE LISTED, THEY ARE IN ACCORDANCE WITH THE UNITED STATES DEPARTMENT OF LABOR DECISION NUMBER WA 83-5110. TF.. CONTRACTOR, ANY SUBCONTRACTOR, OR OTHER PERSON DOING THE WORK OR ANY PART OF IT SHALL NOT PAY ANY WORKMEN, LABORERS, OR MECHANICS LESS THAN THE REQUIRED HOURLY MINIMUM RATES OF WAGES SHOWN 1N THE CONTRACT. WAGES 1N EXCESS OF SUCH HOURLY RATES MAY BE PAID. IN ADDITION TO THE WAGE RATE DESIGNATEn, THE EMPLOYEER SHALL CONTRIBUTE FOR EACH COMPENSABLE HOUR THE FRINGE BENEFITS LISTED. IT IS SPECIFICALLY UNDERSTOOD AND AGREED THAT THE WAGE RATES AND FRINGE BENEFITS FOR THIS CONTRACT ARE SUBJECT TO CHANGES, THAT THE BIDDER ACCEPTS FULL RESPONSIBILITY AND ASSUMES THE RISK OF ANY INCREASED LABOR COST BY REASON OF PAYING HIGHER RATES THAN THOSE SHOWN IN THE CONTRACT. THE CITY DOES NOT WA*iRANT OR REPRESENT THAI LABOR CAN BE PROCURED FOR THE MINIMUM RATES SET FORTH OR AS CHANGED. IT IS THE CONTRACTOR'S i%ESPONSIBILIIY TO ASCERTAIN THE WAGES ABOVE SUCH MINIMUM AS HE WILL HAVE TO PAY. 7HE CONTRACTOP SHALL POST, IN A LOCATION ACCEPTABLE TO THE CITY AND INDUSTRIES, A COPY OF THE APPROVED "STATEMENT OF INTENT TO PAY PREVAILING WAG`," A COPY OF THE PREVAILING WAGE RATES FOR THE PROJECT UPON WHICH THE CONTRACTOR HAS INDICATED THE APPROXIMATE NUMBER OF WORKERS IN EACH CLASSIFICATION; AND THE ADDRESS AND TELEPHONE NUMBER OF THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES WHERE A COMPLAINT OR INQUIRY CONCERNING PREVAILING WAGES MAY BE MADE. ON PROJECTS GOVERNED BY WAGE RATES DETERMINED BY THE STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES AND BY THE U.S. SECRETARY OF LABOR, IF THERE 15 A DIFFERENCE BETWEEN THE TWO IN THE PREVAILING RATE OF WAGE FOR A SIMILAR CLASSIFICATIONi OF LABOR, THE CONTRACTOR SHALL PAY NOT LESS THAN THE WAGE WHICH IS THE HIGHER OF THE TWO, SP 7 Revised 3/84 IF THE CONTRACTOR MAKES USE OF APPRENTICES ON PROJECTS GOVERNED BY WAGE kATES DETERMINED BY THE STATE DEPARTMENT OF LABOR AND INDUSTRIES, HE SH'rLL F44 SENT TO THE ENGINEER WRITTEN EVIDENCE OF REGISTRATION OF SUCH EMPLOYEES PROGRAM APPROVED BY THE STATE APPRENTICESHIP COUNCIL AND ThE PERK PROGRESSION FOR EACH SUCH APPRENTICE EMPLOYEE. IF THE CONTRACTOR MAKES USE OF APPRENTICES ON PROJECTS GOVERNED BY WAGE RATES DETERMINED BY THE U.S. SECRETARY OF LABOR, HE SHALL PRESENT TO THE ENGINEER WRITTEN EVIDENCE OF REGISTRATION OF SUCH EMPLOYEES IN A PROGRAM OF A STATE APPRENTICESHIP AND TRAINING AGENCY APPROVED AND RECOGNIZED BY THE U.S. BUREAU OF APPRENTICESHIP AND TRAINING. IN THE ABSENCE OF SUCH A STATE AGENCY, THE CONTRACTOR SHALL SUBMIT EVIDENCE OF APPROVAL AND REGISTRATION BY THE U.S. BUREAU OF APPRENTICESHIP AND TRAINING. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER WRITTEN EVIDENCE OF THE ESTABLISHED APPRENTICE JOURNEYMAN RATIOS AND WAGE RATES IN THE PROJECT AREA, WHICH WILL BE THE BASIS FOR ESTABLISHING SUCH RATIOS AND RATES FOR THE PROJECT UNDER THE APPLICABLE CONTRACT PROVISIONS. IF ANY DISPUTE ARISES AS TO WHAT ARE THE PREVAILING RATES OF WAGES FOR WORE OF A SIMILAR NATURE TO THAT CONTEMPLATED UNDER THE CONTRACT AND SUCH DISPUTE CANNOT BE ADJUSTED BY THE PARTIES OF INTEREST, INCLUDING LABOR AND MANAGEMENT REPRESENTATIVES, THE MATTER SHALL BE REFERRED TO THE DIRECTOR OF THE DEPARTMENT OF LABOR AND INDUSTRIES OF THE STATE OF WASHINGTON (OR TO THE UNITED STATES SECRETARY OF LABOR WHEN PREVAILING WAGES ESTABLISHED BY THAT OFFICE ARE INVOLVED), AND HIS DECISION THEREIN SHALL BE FINAL, CONCLUSIVE AND BINDING ON ALL PARTIES INVOLVED IN THE DISPUTE. IF THE CONTRACTOR MAKES USE OF A LABOR CLASSIFICATION NOT LISTED IN THE SPECIAL PROVISIONS, THE CONTRACTOR SHALL REQUEST THE DETERMINATION OF THE APPROPRIATE WAGE RATE FOR THE CLASSIFICATION AND FOR THE AREA IN WHICH WORK IS PERFORMED, FROM THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTIRES. ON FEDERAL-AID PROJECTS THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL FURNISH WEEKLY PAYROLL STATEMENTS TO THE ENGINEER. IF WEEKLY STATEMENTS ARE NOT UTILIZED THE CONTRACTOR SHALL FURNISH A CERTIFICATION, PRIOR TO EACH PROGRESS ESTIMATE PAYMENT, CONFIRMING THAT PREVAILING WAGE RATES HAVE BEEN PAID. IF THE CONTRACTOR UTILIZES THE OCCUPATION CODE WHEN SUBMITTING PAYROLLS AND WAGE AFFIDAVITS, AND MORE THAN ONE JURISDICTIONAL AREA IS INVOLVED IN THE PROJECT, THE JURISDICTIONAL AREA INVOLVED SHALL BE SHOWN IMMEDIATELY FOLLOWING THE OCCUPATION CODE NUMBER, I.E. : 10-OD10 YAK.E. THE CONTRACTOR'S RECORDS PERTAINING TO WAGES PAID AND PAYROLLS SHALL 8E OPEN TO INSPECTION OR AUDIT BY REPRESENTATIVES OF THE CITY DURING THE LIFE OF THE CONTRACT AND FOR A PERIOD OF NOT LESS THAN THREE (3) YEARS AFTER THE DATE OF ACCEPTANCE THEREOF, AND THE CONTRACTOR SHALL RETAIN SUCH RECORDS FOR THAT PERIOD. WHERE SUCH RECORDS PERTAINING TO WAGES PAID AND PAYRULLS FOR THE CONTRACT ARE MAINTAINED BY SUBCONTRACTORS OR AGENTS OF THE CONTRACTOR, THE CONTRACTOR EXPRESSLY GUARANTEES THAT THE RECORDS OF SUCH SUBCONTRACTORS DR AGENTS SHALL BE OPEN TO INSPECTION AND AUDIT BY REPRESENTATIVES OF THE CITY ON THE SAME TERMS AND CONDITIONS AS THE RECORDS OF THE CONTRACTOR. IF AN AUDIT IS TO BE COMMENCED MORE THAN SIXTY (60) DAYS AFTER THE ACCEPTANCE DATE OF THE CONTRACT, THE CONTRACTOR WILL BE GIVEN A REASONABLE NOTICE OF THE TIME WHEN SUCH AUDIT IS TO BEGIN. ^R SP B Reviser 3/6w M BEFORE PAYMENT IS MADE BY THE CITY OF ANY SUMS DUE UNDER THIS CONTRACT, THE CITY MUST RECEIVE FROM THE CONTRACTOR AND EACH SUBCONTRACTOR A COPY OF "STATEMENT OF INTENT TO PAY PREVAILING WAGES" (FORM L & I NUMBER 700-29 WASHINGTON STATE DEPARTMENT OF LABOR AND INDUSTRIES). UPON COMPLETION OF THIS CONTRACT, THE CITY MUST RECEIVE FROM THE CONTRACTOR AND EACH SUBCONTRACTOR A COPY OF "AFFIDAVIT OF WAGES PAID" (FORM L & I NUMBER 700-7 STATE DEPARTMENT OF LABOR AND INDUSTRIES) CERTIFYING THAT ALL PREVAILING WAGE REQUIREMENTS HAVE BEEN SATISFIED. IN ADDITION, THE CITY MUST RECEIVE FROM THE PRIME CONTRACTOR A COPY OF "RELEASE FOR THE PROTECTION OF PROPERTY OWNERS AND GENERAL CONTRACTOR" (FORM L & I NUMBER 206083 THE STATE DEPARTMENT OF LABOR AND INDUSTRIES). THESE AFFIDAVITS WILL BE REQUIRED BEFORE ANY FUNDS RETAINED, ACCORDING TO THE PROVISIONS OF ROW 60.28.D1D ARE RELEASED TO THE CONTRACTOR. FORMS MAY BE OBTAINED FROM THE DEPARTMENT OF LABOR AND INDUSTRIES. A FEE OF $12.00 PER EACH "STATEMENT OF INTENT TO PAY PREVAILING WAGES" AND "AFFIDAVIT OF WAGES PAID" IS REQUIRED TO ACCOMPANY EACH FORM SUBMITTED TO THE DEPARTMENT OF LABOR AND INDUSTRIES. THE CONTRACTOR IS RESPONSIBLE FOR PAYMENT OF THESE FEES AND SHALL MAKE ALL APPLICATIONS_DIRECTLY TO THE DEPARTMENT OF LABOR .AND INDUSTRIES. THESE FEES SHALL BE INCIDENTAL TO ALL THE BID ITEMS OF THIS CONTRACT. IN ADDITION, THE PRIME CONTRACTOR SHALL SUBMIT TO THE WASHINLTON STATE DEPARTMENT OF LABOR AND INDUSTRIES A "REQUEST FOR RELEASE" FORM PROVIDED BY THE DEPARTMENT OF LABOR AND INDUSTRIES. THESE AFFIDAVITS WILL BE REQUIRED BEFORE ANY FUNDS RETAINED ACCORDING TO THE PROVISION OF ROW 60.28.010 ARE RELEASED TO THE CONTRACTOR. 7-1.11I SUBCONTRACTING (ADDITIONAL SECTION) BEFORE PAYMENT OF THE FINAL ESTIMATE, THE CONTRACTOR SHALL SUBMIT AFFIDAVIT OF AMOUNTS PAID TO MINORITY BUSINESS ENTERPRISE AND/OR WOMEN BUSINESS ENTERPRISE PARTICIPANTS ON THE FORM PROVIDED BY THE CITY; CERTIFYING THE AMOUNT PA10 TO MINORITY BUSINESS ENTERPRISE AND/OR WOMEN BUSINESS ENTERPRISE PARTICIPANTS. 7-1.11J RECORDS AND REPORTS (REPLACEMENT SECTION) THE CONTRACTOR WILL BE REQUIRED TO COMPLETE AND SUBMIT THE FOLLOWING DOCUMENTS BEFORE PROGRESS AND/OR FINAL PAYMENTS TO THE CONTRACTOR WILL BE APPROVED BY THE PUBLIC WORKS DIRECTOR: 1. EACH MONTH - DEPARTMENT OF LABOR STANDARD FORM 257 2. EACH JULY - STATE HIGHWAY FORM PR-1391 THE OWNER WILL FURNISH THESE FORMS TO THE PRIME CONTRACTOR DURING THE PRECONSTRUCTION MEETING. SP 9 Revised 3/84 AN EQUAL EMPLOYMENT OPPORTUNITY REPORT CERTIFICATE SHALL BE EXECUTED BY THE BIDDER WITH HIS 610 PPOPOSAL ON THIS PROJECT AND WHICH COMES WITHIN THE PROVISIONS OF THE EQUAL EMPLOYMENT OPPORTUNITY REGULATIONS OF THE SECRETARY OF LABOR AS REVISED MAY 21, 1968. THE FORM OF CERTIFICATE WILL BE FURNISHED TO THE CONTRACTOR WITH THE PROPOSAL, STATING AS TO WHETHER HE, HIS FIRM, ASSOCIATION, CO-PARTNERSHIP, OR CORPORATION HAS PARTICIPATED IN ANY PREVIOUS CONTRACTS OR SUBCONTRACTS SUBJECT TO THE EQUAL OPPORTUNITY CLAUSE A-9 IF 50, WHETHER OR NOT HE HAS SUBMITTED ALL REPORTS DUE UNDER APPLICABLE FILING REQUIREMENTS. FAILURE ON THE PART OF THE BIDDER TO FURNISH THE REQUIRED CERTIFICATE WILL BE DUE CAUSE FOR REJECTION OF THE BID. IF A CONTRACTOR TO WHOM AN AWARD IS ABOUT TO BE MADE, EXCEPT FOR LACK OF AN EQUAL EMPLOYMENT OPPORTUNITY REPORT CERTIFICATE, REFUSES OR FAILS TO PROMPTLY EXECUTE AND FURNISH THE REQUIRED CERTIFICATE WITHIN 10 DAYS AFTER NOTICE BY THE DIRECTOR OF PUBLIC WORKS THAT SAFE IS LACKING FROM HIS PROPOSAL. lHE PROPOSAL GUARANTEE, IN FORM OF BOND, LHECK, OR CASH WHICH ACCOMPANIED THE BID, WILL BE FORFEITED TO THE CITY. WHENEVER A CONTRACTOR REQUESTS PERMISSION TO SUBLET A PART OF ANY CONTRACT AND SUCH CONTRACT COMES WITHIN THE PROVISIONS OF THE EQUAL OPPORTUNITY REGULATIONS OF THE SECRETARY OF LABOR, REVISED MAY 21, 1968, HE SHALL OBTAIN THIS CERTIFICATION FROM HIS PROPOSED SUBCONTRACTOR AND FORWARD IT TOGFTHER WITH SUCH REQUEST, NO SUBCONTRACT WILL BE APPROVED BEFORE RECEIPT OF SUCH CERTIFICATION FROM THE SUBCONTRACTOR. FOR THIS PURPOSE, CERTIFICATION FORMS MAY BE OBTAINED FROM THE PROJECT ENGINEER ASSIGNED TO THIS PROJECT . 7-1.13 CUNTRACTOR'S RESPONSIBILITY FOR WORK (REPLACEMENT SECTION THE WORK SHALL BE UNDER THE CONTRACTOR'S RESPONSIBLE CARE AND CHARGE. THE CONTRACTOR SHALL BEAR ALL LOSS AND DAMAGE WHATSOEVER AND FRCM WHATSOEVER CLAUSE, EXCEPT THAT CAUSED SOLELY BY THE ACT OF THE OWNER WHICH MAY OCCUR ON OR TO THE WORK DURING THE FULFILLMENT OF THE CONTRACT, IF ANY SUCH LOSS OR DAMAGE OCCURS, THE CONTRACTOR SHALL IMMEDIATELY MAKE GOOD ANY SUCH LOSS OR DAMAGE, AND IN THE EVENT OF THE CONTRACTOR REFUSING OR NEGLECTING TO DO S0, THE OWNER, MAY ITSELF OR BY THE EMPLOYMENT OF SOME OTHER PERSON MAKE GOOD ANY SUCH LOSS OR DAMAGE, AND THE CG:T AND EXPENSE OF SO DOING SHALL BE CHARGED TO THE CONTRACTOR. THE CONTRACTOR ALONE SHALT_ AT ALL TIMES BE RESPONSIBLE FOR THE SAFETY OF HIS AND HIS SUBCONTRACTOR'S EMPLOYEES, AND FOR HIS AND HIS SUBCONTRACTOR'S PLANT AND EQUIPMENT AND THE METHOD OF PROSECUTING THE WORK. DURING UNFAVORABLE WEATHER AND OTHEF CONDITIONS, THE CONTRACTOR SHALL PURSUE -- ONLY SUCH PORTIONS OF THE WORK AS SHALL NOT BE DAMAGED THEREBY. SP 10 Revised 3/84 w r NO PORTION OF THE WORK WHOSE SATISFACTORY QUALITY OR EFFICIENCY WILL BE AFFECTED BY UNFAVORABLE CONDITIONS SHALL BE CONSTRUCTED WHILE THESE CONDITIONS EXIST, UNLESS BY SPECIAL MEANS OR PRLCAUTIONS ACCEPTABLE TO THE ENGINEER, THE CONTRACTOR SHALL isL ABLE TO OVERCOME THEM. 7-1.14 RESPONSIBILITY FOR DAMAGE (ADDITIONAL SECTION) THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING DUST AND MUD WITHIN THE PROJECT LIMITS AND ON ANY STREET WHICH IS UTILIZED Ey 'CIS EQUIPMENT FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL BE PREPARED TO USE WATERING TRUCKS, POWER SWEEPERS, ANP JTHER PIECES OF EQUIPMENT AS DEEMED NECESSARY BY THE ENGINEER, 10 AVOID CREATING A NJISANCE. rXIST AND MUD CONTROL SHALL BE CONSIDERED AS INCIDENTAL TO THE PROJECT, AND NO -COMPENSATION WILL BE MADE FOR THIS SECTION. COMPUa IN1S OF DUST, MOO, OR UNSAFE PRACTICES AND/OR PROPERTY DAMAGE TO PRIVATE OWNERS IP WILL BE TRANSMITTED TO THE CONTRACTOR AND PROMPT ACIION IN CORRECIIN; WILL BE REQUIRED. WRITTEN NOTICE OF CORRECTION OF COMPLAINT ITEMS WILL BE CALLED FOR SHOULD REPETITIVE COMPLAINTS BE RECEIVED BY THE CITY. 7-1.16 PRJTECTION AND RESTORATION OF PROPERTY (REPLACEMENT SECTION' THE OWNER WILL OBTAIN ALL EASEMENTS AND FRANCHISES REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL LIMIT HIS OPERATION TG THE AREAS OBTAINED AND SHALL NOT TRESPASS ON PRIVATE PROPERTY. THE OWNER MAY PROVIDE CERTAIN LANDS, AS INDICATED IN CONNECTION WITH THE WORK UNDER THE CONTRACT TOGETHER WI1H THE RIGHT OF ACCESS TO SUCH LANDS. THE CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE PREMISES WITH HIS EQUIPMENT OR MATERIAL`_ iE CONTRACTOR SHALL PROVIDE, WITH NO LIABILITY TO THE OWNER, ANY ADDITIONAL LAND AND ACCESS THFRLTO NOT SHOWN OR DESCRIBED THAT MAY Et REQUIRED FOR TEMPORARY CONSTRUL, i,V FACILITIES OR STORAGE OF MATERIALS. HE SHALL CONSTRUCT ALL ACCESS ROADS, DETOUR ROADS, OR GTHER TEMPORARY WORK AS REQUIRED BY HIS OPERATIONS. THE CONTRACTOR SHALL CONFINE HIS EQUIPMENT, STORAGE OF MATERIAL, AND OPERATION OF HIS WORKERS TO THOSE AREAS SHOWN AND DESCRIBED ANO SUCH ADDITIONAL AREAS AS HE MAY PROVIDE. RESTORATION OF STRUCTURES AND SURFACES A. GENERAL. ALL CONSTRUCTION WORK UNDER THIS CONTRAC" ON EASEMENTS, RIGHT-OF-WAY, OVER PRIVATE PROPERTY UR FRANCHISE, SHALL 4E CONFINED TO THE LIMITS OF SUCH EASEMENTS, RIGHT-OF-WAY OR FRANCHISE. ALL WORK SHALL BE ACCOMPLISHED SO AS TO CAUSE THE LEAST AMOUNT OF DISTURBANCE AND A MINIMUM AMOUNT OF DAMAGE. THE CONTRACTOR SHALL SCHEDULE HIS WORK SO THAT TRENCHES ALtOSS EASEMENTS SHALL NDf BE LEPT OPEN DURING WEE,,ENDS OR HOLIDAYS AND TRENCHES SHALL NOT BE OPEN FOR MORE THAN 4P HOURS. SP 11 Revised 3/84 B. STRUCTURES. THE CONTRACTOR SHALL REMOVE SUCH EXISTING STRUCTURES AS MAY BE NECESSARY FOR THE PERFORMANCE OF 1HE WORK AND, IF REQUIRED, SHALL REBUILD THE STRUCTUPES THUS REMOVED IN AS GOOD A CONDITION AS FOUND WITH MINIMUM REQUIREMENTS AS HEREIN SPECIFIED. HE SHALT. ALSO REPAIR ALL EXISTING STRUCTURES WHICH MAY BE DAMAGED AS A RESULT OF THE WORK UNDER THIS CONTRACT. C. EASEMENTS - CULTIVATED AREAS AND OTHER. SURFACE IMPROVEMENTS. ALL CULTIVATED AREAS, EITHER AGRICULTURAL OR LAWNS, AND OTHER SURFACE IMPROVEMENTS WHICH ARE DAMAGED BY ACTIONS OF THE CONTRACTOR SHALL BE RESTORED AS NEARLY AS FOSSIBL` TO THEIR ORIGINAL CONDITION. PRIOR TO EXCAVATION ON AN EASEMENT OR PRIVATE RIGHI-OF-WAY, THE CONTRACTOR SHALL STRIP TOP SOIL FROM THE TRENCH OR CONSTRU. 11ON AREA AND STOCKPILE IT IN SUCH A MANNER THAT IT MAY BE REPLACED BY HIM, UPON COMPLETION OF CONSTRUCTION. ORNAMENTAL TREES AND SHRUBBERY SHALL BE CAREFULLY REMOVED WITH THE EARTH SURROUNDING THEIR ROOTS WRAPPED IN BURLAP AND REPLANTED IN THEIR ORIGINAL POSITIONS WITHIN 48 HOURS. ALL SHRUBBERY OR TREES DESTROYED OR DAMAGED, SHALL BE REPLACED BY Ti.- CONTRACTOR WITH MATERIAL OF EQUAL QUALITY AT NO ADDITIONAL COST TO THE OWNER. IN THE EVENT THAT IT 15 NECESSARY TO TRENCH THRO'IGH ANY LAWN AREA, THE SOD SHALL BE CAREFULLY CUT AND ROLLED AND REPLACED AFTER THE TRENCHES HAVE BEEN BACKFILLED. THE [AWN AREA SHALL BE CLEANED BY SWEEPING OR OTHER MEANS, OF ALL EARTH AND DEBRIS. THE CONTRACTOR SHALL USE RUBBER WHEEL EQUIPMENT SIMILAR TO THE SM. ._ TRACTOR-1 f'E BACKHOES USED BY SIDE SEWER CONTRACTORS FOR ALL WORK, INCLUDING EXCAVATION AND BACKFILL, ON EASEMENTS OR RIGHTS-OF-WIY WHICH HAVE LAWN AREAS. ALL FENCES, MARKERS, MAIL BOXES, OR OTHER TEMPORARY OBSTACLES SHALL BE REMOVED BY THE CONTRACTOR AND IMMEDIATELY REPLACED AFTER TRENCH IS BACKFILLED IN THEIR ORIGINAL POSITION. THE CONTRACTOR SHALL NOTIFY THE OWNER ANC PROPERTY OWNER AT LEAST 24 HOURS IN ADVANCE OF ANY WORK DONL ON EASEMENTS OR RIGHTS-OF-WAY. ALL CONSTRUCTION WORK UNDER THE CONTRACT ON EASEMENTS, RIGHT-OF-WAY OR FRANCHESE SHALL BE CONFINED 10 THE LIMITS OF SUCH EASEMENTS, RIGHT-OF-WAY OR FRANCHISE. ALL WORK SHALL BE ACCOMPLISHED SO AS TO CAUSE THE LEAST AMOUNT OF DISTURBANCE i`ND A MINIMUM AMOUNT OF DAMAGE. THE CONTRACTOR SHALL SCHEDULE HIS WORK SO THAT TRENCHES ACROSS EASEMENTS SHALL NOf BE LEFT OPEN DURING WEEKENDS OR HOLIDAYS, AND TRENCHES SHALL NOT BE LEFT OPEN FOR MORE THAN 48 HOURS. DAMAGE TO EXISTING STRUCTURES OUTSIDE OF EASEMENT AREAS THAT MAY RESULT FROM DEWATERING AND/OR OTHER CONSTRUCTION ACTIVITY UNDER THIS CONTRACT SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR BETTER. THE ORIGINAL CONDITION SHALL BE ESTABLISHcD BY PHOTOGRAPHS TAKEN AND/DR INSPECTION MADE PRIOR TO CONSTRUCTION. ALL SUCH WORK SHALL BE DONE TO THE SATISFACTION OF THE PROPERTY OWNERS AND THE OWNER AT THE EXPENSE OF THE CONTRACTOR. D. STREETS. THE CONTRACTOR WILL ASSUME ALL RESPONSIBILITY OF RESTORATION OF THE SURFACE uF ALL STREETS (TRAVELLED WAYS) USED BY HIM IF DAMAGED. IN THE EVENT THE CONTRACTOR DOES NOT HAVE LABOR OR MATERIAL IMMEDIATFLY AVAILABLE TO MAIL NECESSARY REPAIRS, THE CONTRACTOR SHALL SO INFORM THE OWN: �t. THE OWNER WILL (MAKE THE NECESSARY REPAIRS AND THE COST OF SUCH REPAIRS SHALL BE PAID BY THE CONTRACTOR. SP 12 Revisea 3/84 Ri 7-.'..17 UTILITIES AND SIMILAR FACILITIES (ADDITIONAL SECTION)) LOCATION AND DIMENSIONS SHOWN ON THE PLANS FOR EXISTING UNDERGROUND FACILIIIES ARE IN ACCORDANCE WITH THE BEST AVAILABLE INFORMATION WITHOUT UNCOVERING AND MEASURING. THE OWNER DOES NOT GUARANTEE THE SIZE AND LOCATION OF EXISTING FACILITIES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL PUBLIC AND PRIVATE COFPANIES HAVING UTILITIES AND/OR FACILITIES IN THE VICINITY OF THE CONSTRUCTION AREA. )HE CONTRACTOR IS WARNED THAT CITY OF RENTON WATER, STORM DRAINAGE, SANITARY SEWERS, STREET LIGHTS, AND TRAFFIC CONTROL UNDERGROUND UTILITIES ARE NOT A PART OF THE "ONE CALL" SYSTEM AND MUST BE CONTACTED SEPARATELY AS PRESENTED IN THE TECHNICAL SPECIFICATIONS. IF, IN THE PROSECUTION Gf THE WORK, IT BECOMES NECESSARY TO INTERRUPT EXISTING SURFACE DRAINAGE, SEWERS, UNDERDRAINS, CONDUIT, UTILITIES, SIMILAR UNDERGROUND STRUCTURES, OR PARTS THEREOF, THE CONTRACTOR SHALL BE ^ESPONSIBLE FOR, AND SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT AND PROVIDE TEMPORARY SERVICES FOR SAME. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, REPAIR ALL DAMAGE TO SUCH FACILITIES OR STRUCTURES DUE TO THIS CONSTRUCTION OPERATION TO THE SATISFACTION OF THE CITY; EXCEPT FOR CITY OWNED FACILITIES WHICH WILL BE REPAIRED BY THE UTILITY DEPARTMENT AT CONTRACTOR'S EXPENSE, OR BY THE CONTRACTOR AS DIRECTED BY THE CITY. 7-1.18 PUBLIC LIABILITY AND PROPERTY DAMAGE CREPLACEMENT SECTION) THE MINIMUM POLICY LIMITS OF SUCH INSURANCE SHALL BE AS FOLLOWS: THE AMOUNT OF COVERAGE SHALL BE NOT LESS THAN A SINGLE LIMIT OF $500,000 FOR BODILY INJURY INCLUDING DEATIA AND PROPERTY DAMAGE PER OCCURENCE. TN ADDITION, AN UMBRELLA INSURANCE COVERAGE OF NOT LESS THAN S5,0D' ,000 SHALL BE PROVIDED, WITH THE OWNER AND ENGINEER THE NAMED INSUREDS. THIS LIMIT SHALL APPLY TO COMPREHENSIVE GENERAL LIABILITY INSURANCE AND VEHICLE LIABILITY INSURANCE. THE CONTRACTOR SHALL FURNISH THE CITY WITH SATISFACTORY PROOF OF WRIAGE LF THE INSURANCE REQUIRED. 7-1.23A GENERAL SAFETY REQUIREMENTS (ADDITIONAL SECTION) THE CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS ALONG THE CONSTRUCTION AREA, BY MAIL, PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY ALL LOCAL POLICE, TRANSIT, AND FIRE DEPARTMENTS BY MAIL PRIOR TO CONSTRUCTION. NAMES AND ADDRESSES WILL BE FURNISHED BY THE OWNER. (HE CONTRACTOR SHALL FURTHER NOTIFY EACH OCCUPANCY IN PERSON A MINIMUM OF THREE DAYS PRIOR TO CONSTRUCTION IN FRONT OF EACH PROPERTY. SP 13 Revised 3/84 77=1.23C FLAGMEN, BARRICADES. AND SIGNS (REPLACEMENT SECTION) FLAGMEN, BARRICADES, SIGNS AND TRAFFIC CONTROL FURNISHrO OR PROVIDED SHALL CONFORM TO THE STANDARDS ESTABLISHED IN THE LATEST ADOPTED EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES," PUBLISHED BY THE U.S. DEPARTMENT OF TRANSPORTATION. COPIES MAY BE PURCHASED FROM THE SUPERINTENDENT OF DOCUMENTS, U.S. GOVERNMENT PRINTING OFFICE, WASHINGTON D.C. 20402. THE CONTRACTOR SHALL IMPLEMENT THE TRAFFIC CONTROL PLAN(S) APPEARING IN THE CONTRACT PLANS, AS APPLICABLE. IF THE CONTRACTOR'S PLAN OF OPERATIONS IS IN CONFLICT WITH THE CONTRACT TRAFFIC CONTROL PLAN, HE MAY PROPOSE MODIFICATION OF THE TRAFFIC CONTROL PLAN BY SHOWING THE NECESSARY CONSTRUCTION SIGNS AND BARRICADES REQUIRED FOR THE PROJECT, AND SUBMIT IT TO THE ENGINEER FOR APPROVAL AT LEAST TEN DAYS IN � . ADVANCE OF THS TIME THE SIGNS AND BARRICADES HILL BE REQUIRED. r THE STRIPING OF NO PASSING ZONES THAT ARE TO BE OBLITERATED IN EXCESS OF 150 w FEET BY PAVING OPERATIONS SHALL BE REPLACED BY "DO NOT PASS" AND "PASS WITH CARE" SIGNS. THE SIGNS SHALL BE LOCATED NOT LESS THAN 2 FEET OUTSIDE THE USABLE SHOULDER NOR LESS THAN 7 FEET ABOVE THE EDGE OF PAVEMENT. UNLESS OTHERWISE SPECIFIED IN THE SPECIAL PROVISIONS, THE CONTRACTOR SHALL PROVIDE POSTS AND BE MAINTAINED BY THE CONTRACTOR UNTIL CONSTRUCTION OPERATIONS ARE COMPLETE. WHEN THE PROJECT INCLUDES STRIPING BY THE CONTRACTOR, THE SIGNS AND POSTS SHALL BE REMOVED BY HIM WHEN THE NO PASSING ZONES ARE RE-ESTABLISHED BY STRIPING. THE SIGNS SHALL BE RETURNED TO THE CITY AND THE POSTS WILL BECOME THE PROPERTY OF THE CONTRACTOR FOR HIS DISPOSAL. WHEN THE CONTRACTOR IS NOT RESPONSIBLE FOR THE STRIPING, THE POSTS AND SIGNS WILL BECOME THE PROPERTY OF THE CITY AND WILL BE REMOVED BY CITY FORCES WHEN THE NO PASSING ZONES ARE RE ESTABLISHED BY STRIPING. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE PROVIDE ALL SIGNS, BARRICADES, GUARDS, FLAGMEN, AND EQUIPMENT, CONSTRUCTION WARNINGS, AND NIGHT LIGHTS IN ORDER TO PROTECT THE PUBLIC AT ALL TIMES FROM INJURY AS A RESULT OF HIS OPERATIONS. IF THE CONTRACTOR SHOULD FAIL TO MAINTAIN SUFFICIENT LIGHTS AND BARRICADES, IN THE OPINION OF THE ENGINEER, THE CITY SHALL HAVE THE RIGHT TO PROVIDE THESE LIGHTS AND BARRICADES AND DECOCT SUCH COSTS FROM PAYMENTS DUE THE CONTRACTOR. WORK SHALL BE RESTRUCTURED, THE ORDER OF WORK MODIFIED, THE HOURS OF WORK MODIFIED OR THE WORK HALTED ALTOGETHER AT THE ENGINEER'S DISCRETION WHEN THE ENGINEER FINDS SUCH A COURSE OR COURSES OF ACTION NECESSARY TO PROTECT THE PUBLIC OR THE CONTRACTOR'S SAFETY, HEALTH, AND WELFARE. ALL SIGNS F'MOVED SHALL BE SALVAGED AND DELIVERED TO THE CITY YARD. TRAFFIC MOVEMENT SHALL. BE HEREIN DEFINED AS APPLYING TO BOTH VEHICULAR AND PEDESTRIAN TRAFFIC. DURING ALL PHASES OF CONSTRUCTION, TRAFFIC MOVEMENT SHALL BE MAINTAINED AS NEAR AS POSSIBLE. REASONABLE ACCESS SHALL BE MAINTAINED AT ALL TIMES TO ADJACENT PROPERTIES OUTSIDE OF THE RIGHT-OF-WAY LINE. ALL ROADS WILL BE OPEN TO TRAFFIC DURING PEAK TRAFFIC PERIODS, 6:30 TO 8:30 A.M. AND 3:30 TO 5:00 P.M. SP 14 Revised 3/84 a NO WORK SHALL BE DONE ON OR ADJACENT THE ROADWAY UNTIL ALL NECESSARY SIGNS AND TRAFFIC CONTROL DEVISES ARE IN PLACE. THE COST OF FURNISHING AND PLACING ALL CONSTRUCTION AND IDENTIFICATION SIGNS SHALL BE INCIDENTAL TO THE PROJECT AND NO COMPENSATION WILL BE MADE. 7-1.23E DUST CONTROL (ADDITIONAL SECTIril THE CONTRACTOR SHALL PROVIDE A MINIMUM 1,500 GALLON CAPACITY WATER TRUCK WITH A PRESSURE SPRAY SYSTEM DESIGNED FOR STREET CLEANING. THE STREETS SHALL BE CLEANED OF DUST AND DEBRIS AT THE END OF EACH WORKING DAY, IN ADDITION, THE CONTRACTOR SHALL PROVIDE SPRINKLING, AS NECESSARY, TO ALLEVIATE OUST NUISANCE OR AS DIRECTED BY THE CITY. 7-1.24 RIGHTS OF WAY (ADDITIONAL SECTION) THE CI1Y SHALL OBTAIN ALL EASEMENTS AND ACCESS PERMISSION NECESSARY TO THE CONSTRUCTION GF ALL IMPROVEMENTS LOCATED ON PRIVATE PROPERTY AND PAY ALL COS' S OF THE SAME. COPIES OF ALL EASEMENTS AND ACCESS PERMISSION WILL BE PROVIDED TO THE CONTRACTOP. THE CONTRACTOR SHALL PERFORM ALL WOW ON PRIVATE PROPERTY IN STRICT COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE EASEMENTS AND RIGHT-OF-ACCESS DOCUMENTS. 7-1.28 EMPLOYMENT OPENINGS (REPLACEMENT SECTION) ENTIRE SECTION OF STANDARD SPECIFICATICNS ON EMPLOYMENT OPENINGS IS DELETED. `CCTION 8 8-1.03 PROGRESS SCHEDULE (REPLACEMENT SECTION IMMEDIATELY AFTER EXECUTION AND DELIVERY OF THE CONTRACT AND BEFORE THE FIRST PARTIAL PAYMENT IS MADE, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, AN ESTIMATED CONSTRUCTION PROGRESS SCHEDULE IN FORM SATISFACTORY TO THE ENGINEER, SHOWING THE PROPOSED DATES OF COMMENCEMENT AND COMPLETION OF EACH OF THE VARIOUS PAY ITEMS OF WORK REQUIRED UNDER THE CONTRACT DOCUMENTS AND THE ANTICIPATED AMOUNT OF EACH MONTHLY PAYMENT 1HAT WILL BECOME DUE TO THE CONTRACTOR IN ACCORDANCE WITH THE PROGRESS SCHEDULE. THE CONTRACTOR SHALL ALSO FURNISH PERIODIC ITEMIZED ESTIMATES OF WORK DONE FOR THE PURPOSE OF MAKING PARTIAL PAYMENTS THEREON. THE COSTS EMPLOYED IN MAKING UP ANY OF THESE SCHEDULES WILL BE USED ONLY FOR DETERMINING THE BASIS OF PARTIAL PAYMENTS AND WILL NOT BE CONSIDERED AS FIXING A BASIS FOR ADDITIONS TO OR DEDUCTIONS FROM THE CONTRACT. SP 15 Revised 3/84 SHOULD IT BECOME EVIDENT AT ANY TIME DURING CONSTRUCTION THAT OPERATIONS WILL OR MAY FALL BEHIND THE SCHEDULE OF THIS FIRST PROGRAM, THE CONTRACTOR SHALL, UPON REQUEST, PROMPTLY SUBMIT REVISED SCHEDULES IN THE SAME FORM AS SPECIFIED HEREIN, SETTING OUT OPERATIONS, METHODS, AND EQUIPMENT, ADDED LABOR FORCES OR WORKING SHIFTS, NIGHT WORK, ETC. , BY WHICH TIME LOSS WILL BE MADE UP, AND CONFER WITH THE ENGINEER UNTIL AN APPROVED MODIFICATION OF THE ORIGINAL SCHEDULE HAS BEEN SECURED. FURTHER, IF AT ANY TIME A PORTION OF THE ACCEPTED SCHEDULE 15 FOUND TO CONFLICT WITH THE CONTRACT PROVISIONS, IT SHALL, UPON REQUEST BE REVISED BY THE CONTRACTOR AND THE WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE CONTRACT PROVISIONS. r� w PAYMENTS OF ANY FURTHER ESTIMATES TO THE CONTRACTOR AFTER SUCK REQUEST IS MADE AND UNTIL AN APPROVED MODIFIED SCHEDULE HAS BEEN PROVIDED BY THE CONTRACTOR MAY BE WITHHELD. EXECUTION OF THE WORK ACCORDING TO THE ACCEPTED SCHEDULE OF CONSTRUCTION OR APPROVED MODIFICATIONS THEREOF, 1S HEREBY MADE AN OBLIGATION OF THE CONTRACT. r �+ PRE-CONSTRUCTION CONFERENCE (ADDITIONAL SECTION) r' PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR, ENGINEER, ALL y SUBCONTRACTOR, UTILITY DEPARTMENT, TELEPHONE COMPANY, AND OTHER INTERESTED DEPARTMENTS SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE, WITH TIME, PLACE, AND DATE TO BE DETERMINED AFTER AWARD OF THE CONTRACT. SUBSEQUcNTLY, A REPRESENTATIVE OF THE CONTRACTOR WILL ATTEND A WEEKLY CONFERENCE TO REVIEW PROGRESS AND DISCUSS ANY PROBLEMS THAT MAY BE INCURRED. THE TIME, PLACE, AND DATE TO BE ESTABLISHED AT THE PRE-CONSTRUCTION CONFERENCE. 8-1.04 NOTICE TO PROCEED AND PROSECUTION OF WORK (ADDITIONAL SECTION) THE CONTRACTOR SHALL NOTIFY THE CITY OF RENT: . AT LEAST 48 HOURS PRIOR TO COMMENCING WORK. THE SAME NOTIFICATIONS SHALL BE PROVIDED TO THE POLICE AND FIRE AUTHORITIES AND THE SCHOOL DISTRICT WHEN WORKING WITHIN A ROADWAY RIGHT-OF-WAY. THE CONTRACTOR SHALL ALSO NOTIFY PROPERTY OhNERS ADJACENT TO THE CONSTRUCTION AREA, INDICATING THE DURATION AND PROPOSED TIME OF ACCESS CLOSURE TO THEIR PROPERTY. 8-1.05 TIME OF COMPLETION (ADDITIONAL SECTION) THE CONTRACTOR IS EXPECTED TO DILIGENTLY PROSECUTE THE WORK TO COMPLETION IN ALL PARTS AND REQUIREMENTS. THE PROJECT SHALL BE COMPLETED WITHIN THE TIME NOTED IN THE CALL FOR BIDS. ew SP 16 Revised 3/84 rr PROVIDED, HOWEVER, THAT THE CITY COUNCIL SMALL HAVE THE RIGHT UPON REQUEST OF THE PUBLIC WORKS DEPARTMENT, CITY OF RENTON, WASHINGTON, TO EXTEND THE TIME OF COMPLETION OF SAID WORK. NO EXTENSION SHALL BE VALID UNLESS THE SAME BE IN WRITING AND ACCOMPANIED BY THE WRITTEN CONSENT TO SUCH EXTENSION BY THE SURETY ON THE BOND OF THE CONTRACTOR. TIME LOST IN REPLACING IMP'kOPER WORK OR MATERIAL SHALL NOT FURNISH ANY GROUNDS TO THE CONTRACTOR FOR CLAIMING AN EXTENSION OF TIME FOR THE COMPLETION OF THE WORK, AND SHALL NOT RELEASE THE CONTRACTOR FROM DAMAGES OR LIABILITIES FOR FAILURE TO COMPLETE THE WORK WITHIN THE TIME REQUIRED. RECOGNIZED HOLIDAYS SHALL BE AS FOLLOWS: NEW YEAR'S DAY, LINCOL.N'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4, LABOR DAY, VETERANS DAY, THANKSGIVING AND THE DAY FOLLOWING, AND CHRISTMAS EVE AND CHRISTMAS DAY. THE DAY BEFURE CHRISTMAS SHALL BE A HOLIDAY FOR CITY EMPLOYEES WHEN CHRISTMAS DAY OCCURS ON A TUESDAY OR FRIDAY. THE DAY AFTER CHRISTMAS SHALL BE A HOLIDAY FOR CITY EMPLOYEES WHEN CHRISTMAS DAY OCCURS ON A MONDAY, WEDNESDAY, OR THURSDAY. WHEN CHRISTMAS DAY OCCURS ON A SATURDAY, THE TWO PROCEEDING WORKING DAYS SHALL BE OBSERVED AS HOLIDAYS. WHEN CHRISTMAO DAY OCCURS ON A SUNDAY, THE TWO WORKING DAYS FOLLOWING SHALL BE OBSERVED AS HOLIDAYS. ALL REFERENCES TO RECOGNIZED HOLIDAYS IN THE STANDARD SPECIFICATIONS ARE DELETED AND VOID. 8-1.09 LIQUIDATED DAMAGES (ADDITIONAL SECTION) THE LIQUIDATED DAMAGES DO NOT INCLUDE, AND ARE IN ADDITION TO, DAMAGES FROM COSTS FOR INSPECTION, SUPERVISION, LEGAL EXPENSE, AND COURT COSTS INCURRED BEYOND CONTRACT COMPLETION DATE. THE COST OF ADDITIONAL INSPECTION AND SUPERVISION SHALL BE AN AMOUNT EQUAL TO ACTUAL SALARY COST PLUS 100 PERCENT FOR OVERHEAD. 8-1.11 OVERTIME WORK BY OWNER EMPLOYEES (REPLACEMENT SECTION) WHEN THE CONTRACTOR PERFORMS CONSTRUCTION WORK OVER THE ACCEPTED 8 HOURS PER DAY OR 40 HOURS PER WEEK, OR ON ANY CITY HOLIDAY, AND THE WORK REQUIRES INSPECTION, THEN THE CONTRACTOR SHALL REIMBURSE THE CITY AT THE RATE OF $50 PER HOUR. THE CITY SHALL HAVE THE SOLE AUTHORITY IN DETERMINING THE NECESSITY OF HAVING THE OVERTIME INSF ._CTION, AND SHALL NOTIFY THE CONTRACTOR OF INTENT AND SAID COSTS WILL BE DEDUCTED FROM MONIES DUE THE CONTRACTOR ON EACH MONTHLY ESTIMATE. 8-1.12 CONTRACTOR'S PLANT AND EQUIPMENT (REPLACEMENT SECTION) THE CONTRACTOR ALONE SHALL AT ALL TIMES BE RESPONSIBLE FOR THE AO_QUACY, EFFICIENCY, AND SUFFICIENCY OF HIS AND HIS SUBCONTRACTOR'S PLANT AND EQUIPMENT. THE OWNER SHALL HAVE THE RIGHT TO MAKE USE OF THE CONTRACTOR'S PLANT AND EQUIPMENT IN THE PERFORMANCE OF ANY WORK ON THE SITE OF THE WORK. SP 17 Revised 3/84 THE USE OF SUCH PLANT AND EQUIPMENT SHALL. BE CONSIDERED AS EXTRA WORK AND PAID FOR ACCORDINGLY. NEITHER THE OWNER NOR THE ENGINEER ASSUME ANY RESPONSIBILITY, AT ANY TIME, FOR THE SECURITY OF THE SITE FROM THE TIME CONTRACTOR'S OPERATIONS HAVE COMMENCED UNTIL FINAL ACCEPTANCE OF THE WORK BY THE ENGINEER AND THE OWNER. THE CONTRACTOR SHALL EMPLOY SUCH MEASURES AS ADDITIONAL FENCING, BARRICADES, AND i WATCHMAN SERVICE, AS HE DEEMS NECESSARY FOR THE PUBLIC SAFETY AND FOR THE PROTECTION OF THE SITE AND HIS PLANT AND EQUIPMENT. THE OWNER WILL BE PROVIDED KEYS FOR ALL FENCED, SECURED AREA. B-1.13 ATTENTION TO WORK (REPLACEMENT SECTION) THE CONTRACTOR SHALL GIVE HIS PERSONAL ATTENTION TO AND SHALL SUPERVISE THE WORK TO THE END THAT IT SHALL BE PROSECURED FAITHFULLY, AND WHEN HE IS NOT PERSONALLY PRESENT ON THE WORK, HE SHALL AT ALL REASONABLE TIMES TO REPRESENTED BY A COMPETENT SUPERINTENDENT WHO SHALL HAVE FULL AUTHORITY TL, EXECUTE THE SAME, AND TO SUPPLY MATERIALS, TOOLS, AND LABOR WITHOUT DELAY, AND WHG SHALL BE THE LEGAL REPRESENTATIVE OF THE CONTRACTOR. 7HE CONTRACTOR SHALL BE LIABLE FOR THE FAITHFUL OBSERVANCE OF ANY INSTRUCTIONS DELIVERED TO HIM OR 1.. TO HIS AUTHORIZED REPRESENTATIVE. r SECTION 9 9-1.01 MEASUREMENT OF QUANTITIES (ADDITIONAL SECTION) ALL DELIVERY TICKETS THAT ARE REQUIRED FOR THE PURPOSE OF CALCULATING QUANTITIES FOR PAYMENT. MP1ST FiE RECEIVED BY THE ENGINEER AT THE 7IHE OF DELIVERY. NO PAYMENT WILL BE MADE ON TICKETS TURNED IN AFTER DATE OF DELIVERY OF MATERIAL. A. BY TRUCK PAYMENT WILL NOT BE MADE FOR DELIVERY TICKETS WHICH DO NOT SHOW TYPE OF MATERIAL, GROSS WEIGHT, TARE WEIGHT, TRUCK NUMBER, DATE, AND INSPECTOR'S INITIALS. SCALE CERTIFICATION SHALL BE SUBMITTED AS EARLY IN THE PROJECT AS POSSIBLE. EACH WEIGHT STATION SHALL MAINTAIN A RECORD OF THE TRUCK NUMBER, TIME, DATE, ANO WEIGHT OF ALL TRUCKS PROVIDING MATERIAL TO THE PROJECT . THE WEIGHT LIST SHALL BE MAINTAINED IN DUPLICATE WITH ONE SIGNED COPY TRANSMITTED DAILY TO THE CITY BY THE SCALE ATTENDANT. IN ISOLATED CASES ►- WHERE SCALE WFIGHT IS NOT AVAILABLE, THE INSPECTOR SHALL MEASURE THE TRUCK VOLUME AND CERTIFY AS TO ITS FULL LOAD DELIVERY. ! r SP 18 Revised 3/84 V 8. BY OTHER MEANS METHOD FOR MEASUREMENT AND PAYMENT FOR MATERIAL BROUGHT TO THE SITE BY ANY OTHER MEANS WILL BE DETERMINED BY CONTRACTOR/OWNER AGREEMENT BEFORE AWARD OF THE CONTRACT. 9-1.03 SCOPE OF PAYMENT (ADDITIONAL SECTION) ALL COSTS AND EXPENSES FOR ITEMS OF WORK, EQUIPMENT , OR MATERIALS, INCLUDING INSTALLATIONS, NOT IDENTIFIED AS BID ITEMS IN THESE SPECIFICATIONS SHALL BE INCIDENTAL TO THE PROJECT. NO SEPARATE PAYMENT OF ANY KIND WILL BE MADE FOR THESE INCIDENTAL ITEMS. 9-1.09B OWNER'S RIGHT TO WITHHOLD CERTAIN AMOUNTS (ADDITIONAL SECTION) PARTIAL PAYMENTS ON ESTIMATES MAY BE WITHHELD UNTIL A WORK PROGRESS SCHEDULE, AS DESCRIBED IN SECTION 6, HAS BEEN RECEIVED AND APPROVED. IN THE EVENT THAT ANY MATERIX OR WORKMANSHIP DOES NOT MEET THE REQUIREMENTS OR SPECIFICATIONS, THE CITY rAY HAVE THE OPTION TO ACCEPT SUCH MATERIAL OR WORKMANSHIP IF THE DIRECTOR OF PUBLIC "KS DEEMS SUCH ACCEPTANCE TO BE IN THE BEST INTEREST OF THE CITY, PROVIDED THE CITY MAY NEGOTIATE PAYMENT OF A LOITER LNIT PRICE FOR SAID MATERIAL OR WORKMANSHIP. SP 19 Revised 3/B4 r. c c TECHNICAL PROVISIONS C i V M I r L CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, 1985 i r 1.0 GENERAL � r r 1SCOPE OF WORK lr THIS SECTION COVERS THE WORK NECESSARY TO PROVIDE ONE PORTABLE, TRAILER MOUNTED EMERGENCY ENGINE GENERATOR SET COMPLETE. THE EMERGENCY ENGINE GENERATOR (E-G) SET SHALL BE FOR USE BY THE CITY OF RFNTON'S PUBLIC WORKS L DEPARTMFNT AT TWO SITES: THE HIGHLANDS WATER BOOSTER PUMP STATION, AND THE HONEY CREEK SEWAGE LIFT STATION. THE E-G SET WILL NORMALLY BE LOCATED (STORED) AT THE HIGHLANDS PUMP STATION SITE, WHERE THE UNIT WILL BE CONNECTED TO THE PUMP STATION' S ELECTRICAL SERVICE THROUGH A NEW AUTOMATIC TRANSFER SWITCH PROVIDED THIS CONTRACT. IN ADDITION, AN ALARM AND CONTROL CIRCUIT CONNECTION, AND A 120 VAC POWER r. CONNECTION WILL BE PROVIDED THIS CONTRACT FOR AUTOMATIC OPERATION OF THE UNIT DURING POWER FAILURE CONDITIONS TO OPERATE ALL THREE BOOSTER PUMPS IN THE STATION. THE CONNECTIONS WILL BE OF THE PLU"-IN TYPE THAT CAN BE EASILY REMOVED FOR E-G SET RELOCATION. IN ADDITION 10 THE ELECTRICAL WORK REQUIREC TO ACCOMMODATE THE E-G SET, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE IMPROVEMENTS AND A NEW GARAGE FACILITY TO ACCOMMOD.1- "'E NEW EQUIPMENT AS SHOWN ON THE PLANS. DURING PERIODS OF E:TENDED POWER FAILURE AT THE HONEY CREEK LIFT SiAlION, THE E-G SET WILL BE TOWED BY CITY-OWNED UTILITY VEHICLES TO THE LIFT STATION AND CONNECTED TO THE EXISTING POWER RECEPTABLE AND MANUAL TRANSFER SWITCH AT THIS SITE. OPERATION OF THE E-G SET AT THIS SITE WILL BE MANUALLY CONTROLLED, AND THE CONTROL AND ALARM RECEPTABLE ON THE UNIT WILL NOT BE CONNECTED. 2. EXISTING SYSTEM THE FOLLOWING INFORMATION IS PROVIDED FOR THE CONTRACTOR'S USE IN SIZING THE E-G SET, AND SELECTING NECESSARY COMPONENTS AND ACCESSORIES. HIGHLANDS PUMP STATION BASE LOAD - 5 KVA TRANSFORMER 480-120/240 IPH3W `- 10 KVA TRANSFORMER 480-120/240 1PH3W SERVICE - 400 AMP 3 POLE FUSIBLE 5'ITCH M 1-1 Is CITY OF RENTON GENERAL ENGINE GENERATOR SET JOLY, 1985 PUMP 1 r' Z PUMP 3 HORSEPOWER 50 25 25 NEMA CODE C C C MOTOR MODEL NO. 404 UP 324 UP 324 UP VOLTAGE 440 440 440 MANUFACTURER US US US SERIAL NO. 1200905 1192925 1211237 III SPEED 1800 RPM 1800 RPM 1800 RPM HI-VOLT AMPS 73.5 31 31 POWER RECEPTACLE - RUSSELL AND STOLL MODEL NO. 2504 FRABX CONTROL RECEPTACLE - RUSSELL AND STOLL MODEL NO. SKWR 12XG HONEY CRECK LIFT STATION BASE LOAD - 3 KVA 4BO VOLTS 1 FH PUMP 1 PUMP 2 HORSEPOWER 40 40 NEMA CODE F F SPEED 1800 RPM 1800 RPM POWER RECEPTACLE - RUSSFLL AND STOLL MODEL NO, 2'04 FRABX 3. CONTRACTOR'S DUTIES THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, MATERIALS AND EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, FUEL, AND OTHER FACILITIES AND SERVICES AS NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THIS WORK. ALL REQUIRED NOTICES SHALL BE GIVEN BY THE CONTRACTOR. THE CONTRACTOR SHALL COMPLY WI1H ALL CODES, ORDINANCES, RULES, REGULATIONS, ORDERS, AND OTHER LEGAL REQUIREMENTS OF PURL IC AUTHORITIES WHICH BEAR ON THE PERFORMANCE OF THIS WORK. 1-2 `r CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, 1985 4. PRECONSTRUCTT9N REQUIREMENTS 1. PERMITS AND LICENSES THE OWNER. SHALL SECURE AND PAY FOR THE FOLLOWING PERMITS: 1. GENERAL BUILDING PERMITS r THE OWNER SHALL PAY THE FEE PRESCRIBED FOR ALL PERMANENT PERMITS. LICENSES, AND EASEMENTS. THE CONTRACTOR SHALL ACQUIRE AND PAY FOR ALL SPECIALTY PERMITS, SUCH AS Er_ECTRICAL PERMITS, PLUMBING PERMITS, TRANSPORTATION PERMITS, BURNING PERMITS, WAGE AND HOUR REGULATIONS PERMITS, AND ALL OTHER PERMITS OF A TEMPORARY NATURE � • RELATING TO THE CONSTRUCTION OF THIS PROJECT. I ' A COPY OF THE OWNER ACQUIRED PERMITS WILL BE AVAILABLE AT THE 6, CITY'S OFFICE FOR EXAMINATION BY BIDDERS. THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF THESE PERMITS AND ALL OTHER PERMITS ISSUED FOR THIS PROJECT. IN THE EVENT THE OWNFR-OBTAINED PERMITS ARE NOT AVAILABLE FOR INSPECTION PRIOR TO BID OPENING, ALL BIDDERS SHALL BE HELD ' RESPONSIBLE FOR THOSE PROVISIONS OF THE PERMITS THAT ARE AVAILABLE TO THE BIDDERS AT THE TIME OF BID OPENING. ADDITIONAL PROVISIONS OR REQUIREMENTS OF THESE PERMITS THAT ARE DETERMINED AFTER BIO OPENING WILL BE NEGOTIATED BY THE OWNER AND THE SUCCESSFL_ ADDER. t. 2. EASEMENTS THE CONTRACTOR SHALL MEET AND FULFILL ALL COVENANTS AND STIPULATIONS OF EACH EASEMENT OBTAINED BY THE OWNER FOR THIS PROJECT. COPIES OF ALL EASEMENTS AND SPECIAL COVENANTS ARE ON FILE IN THE OFFICE OF THE OWNER _ IN A SEPARATE VOLUME, WHICH VOLUME IS INCORPORATED IN THIS CONTRACT BY THIS REFERENCE AS IF SET FORTH .4EREIN IN FULL. 3. PRECONSTRIICTION CONFERENCE THE OWNER SHALL SCHEDULE A PRE-CONSTRUCTION CONFERENCE NOT MORE THAN 5 DAYS AFTER THE NOTICE TO PROCEED IS ISSUED. PRESENT AT THE MEETING TO REPRESENT THE CONTRACTOR SHALL BE AT LEAST THE OFFICIAL IN CHARGL OF THE PROJECT, THE PROJECT SUPERINTENDENT, A REPRESENTATIVE WITH F AUTHORITY TO SPEAK FOR EACH OF hIS PRINCIPAL SUBCONTRACTORS AND OTHER REPRESENTATIVES AS HE MAY DEEM EXPEDIENT. THE OWNER AND HIS REPRESENTATIVES SHALL BE PRESENT AS REQUIRED. 1-3 L CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY. 1985 4. CONSTRUCTION SCHEDULE THE CONTRACTOR SHALL PREPARE AND SUBMIT WITH THE CONSTRUCTION SCHEDULE, AS OUTLINED IN SECTION E.1.03 OF THE SPECIAL PROVISIONS AND A SEPARATE SCHEDULE LISTING DATES FOR SUBMISSION AND DATES THAT REVIEWED SHOP DRAWINGS, PROJECT DATA, AND SAMPLES WILL BE NEEDED. WITH THE EXCEPTION OF COLOR SCHEDULES, SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS SOON AS DETAILS ARE RECEIVED AND REVIEWED BY THE ENGINEER REGARDLESS OF ABOVE SCHEDULE OF NEED. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR LATE REVIEWS IF SUBMITTALS ARE UNNECESSARILY DELAYED BECAUSE OF HEAVY WORKLOADS DUE TO I RGE NUMBERS OF SUBMITTALS ARRIVING NEARLY j SIMULTANEOUSLY. TO FACILITATE COORDINATED COLOR SELECTION, COLOR SAMPLES FOR ALL ITEMS FOR WHICH COLORS ARE TO BE SELECTED SHALL BE SUBMITTED AT THE SAME TIME. 5. SUBMITTALS AND SHOP DRAUINGS SHOP DRAWINGS, DATA, AND SAMPLES SHALL BE SUBMITTED SHOWING THE LOCATION OF EACH ITEM BY DRAWING NUMBER AND PARAGRAPH OF THE SPECIFICATIONS SHALL BE SHOWN ON THE FORM OF THE PRODUCT OR MATERIAL BEING SUBMITTED, THE CONTRACTOR SHALL REVIEW AND STAMP WITH HIS APPROVAL AND SUBMIT WITH SUCH PROMPTNESS AS TO CAUSE NO DELAY IN HIS WORK OR THAT OF AN" OTHER CONTRACTOR, THE REQUIRED NUMBER OF COPIES OF ALL SHOP DRAWINGS, SCHEDULES, DATA, AND SAMPLES REQUIRED FOR THE WORK OF THE VARIOUS TRADE DETERMINED NECESSARY BY THE ENGINEER, REQUIRED IN THE GENERAL CC DITIONS, AND DESCRIBED ELSEWHERE IN THE PROJECT. SHOP DRAWINGS SHALL ESTABLISH THE ACTUAL DETAIL OF ALL MANUFACTURED OR FABRICATED ITEMS. (HEY SHALL BE DRAWN TO SCALE AND BE COMPLETELY DIMENSIONED. SHEET SIZES OF SHOP DRAWINGS SHALL BE IN MULTIPLES OF 8-1/2 INCHES BY 11 INCHES, NOT TO EXCEED 22 INCHES BY 34 INCHES, UNLESS APPROVED BY THE ENGINEER. ON EACH DRAWING, THERE SHALL BE PROVIDED A CLEAR SPACE FOR THE ENGINEER'S AND/OR OWNER'S REVIEW AND APPROVAL STAMPS AND COMMENTS. SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER IN THE FORM OF A REPRODUCIBLE TRANSPARENCY, ALONG WITH ONE BLACK LINE OR BLUE LINE PRINT. TWO COPIES OF MANUFACTURER'S LITERATURE, BROCHURES, CATALOG CUTS, AND OTHER PERTINENT PRINTED MATTER OR DATA SHALL BE SUBMITTED IN ADDITION TO THE NUMBER OF COPIES THE CONTRACTOR WISHES RETURNED TO HIM. THE ENGINEER SHALL REVIEW THE SHOP DRAWINGS WITH REASONABLE PROMPTNESS AND WILL AFFIX HIS DRAWING REVIEW STAMP WITH NOTATIONS AS REQUIRED. WHEN SHOP DRAWINGS AND/OR OTHER SUBMITTALS ARE REQUIRED TO BE REVISED OR CORRECTED AND RESUBMITTED, THE CONTRACTOR SHALL MAKE SUCH REVISIONS AND/OR CORRECTIONS AND RE-SUBMIT THE DRAWINGS OR OTHER MATERIALS IN THE SAME MANNER AS SPECIFIED ABOVE. THE CONTRACTOR SHALL OBTAIN AND PROVIDE SUCH NUMBER OF PRINTS OF COPICS OF DRAWINGS AS IS REQUIRED FOR HIS FIELD DISTRIBUTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEARLY NOTE ON THE SHOP DRAWINGS AND IN WRITING SPECIFICALLY CALL TO THE ENGINEER'S ATTENTION ANY CHANGES THAT VARY FROM THE CONTRACT DRAWINGS AND SPECIFICATIONS. REVIEW OF THE SHOP M 1-4 r CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, 1985 DRAWINGS BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR OF FULL RESPONSIBILITY AND AT HIS OWN COST AND EXPENSE TO COMPLY WITH THE CONTRACT DOCUMENTS UNLESS THE CHANGES ARE CLEARLY NOTED AND IN WRITING CALLED TO THE ENGINEER'S ATTENTION AS ABOVE PROVIDED, IN WHICH EVENT SUBSEQUENT ACCEPTANCE BY THE ENGINEER IN WRITING SHALL BE AUTHORITY FOR THE CHANGE OR CHANGES PROPOSE^ IN THE SHOP DRAWINGS. IF CORRECTIONS ARE REQUIRED, THE CONTRACTOR SHALL MAKE THE CORRECTIONS REQUIRED BY THE ENGINEER AND FILE WITH HIM THE SAME NUMBER OF CORRECTED COPIES AS INDICATED ABOVE. THE CONTRACTOR SHALL DIRECT SPECIFIC ATTENTION IN WRITING OR ON RE-SUBMITTING SHOP DRAWINGS TO REVISIONS OTHER THAN THE CORRECTIONS REQUIRED ON THE PREVIOUS SUBMISSION. THE ENGINEER WILL RETURN TO THE CONTRACTOR COPIES OF DRAWINGS IN THE SAME MANNER AND NUMBER AS BEFORE. SHOP DRAWINGS SHALL GIVE COMPLETE INFORMATION NECESSARY FOR THE FABRICATION ANI INSTALLATION OF ALL COMPONENT PARTS OF THE EQUIPMENT, STRUCTURE, FACILITY, ETC. IN THE CASE OF STRUCTURAL DRAWINGS, THEY SHALL INCLUDE THE LOCATION, TYPE, AND EXTENT OF ALL WALL PIPING CUTOUTS, EMBEDDED INSERTS. CONDUIT, AND PIPING. MANUFACTURER'S STANDARD DETAILS, CATALOGS, ADVERTISING LITERATURE, ETC., SHALL NOT ` NECESSARILY CONSTITUTE ALL OF THE SHOP DRAWINGS REQUIRED FOR ANY UNIT OR FACILITY. ADDITIONAL SHOP DETAILS DESIGNED FOR THIS PARTICULAR PROJECT SHALL BE FURNISHED WHEN REQUIRED BY THE ENGINEER. SHOP DRAWINGS OF THE ELECTRICAL EQUIPMENT SHALL INCLUDE COMPLETE DIAGRAMS OF ELECT^ICAL CIRCUITRY. THE ENGINEER'S REVIEW AND PLACEMENT OF THE SHOP DRAWING STAMP ON ANY SHOP DRAWING IS UNDERSTOOD TO BE AN ACCEPTANCE OF THE CHARACTER OF THE DETAILS AND NOT A CHECK OF ANY DIMENSION OR QUANTITY AND WILL NOT RELIEVE THE CONTRACTOR FOR ERRORS OF ANY SORT IN SHOP DRAWINGS DATA OR SCHEDULES, WHETHER OR NOT SUCH ERRORS ARE FOUND BY THE ENGINEER IN HIS REVIEW OF SUCH DETAILS. THE ENGINEER'S REVIEW OF AND PLACEMENT OF SHOP DRAWINGS REVIEW STAMP ON ANY SHOP DRAWING WILL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR CONSEQUENCES DUE TO DEVIATIONS FROM THE CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS CALLED ATTENTION TO SUCH DEVIATIONS IN WRITING BY A LETTER ACCOMPANYING THE DRAWINGS AT THE TIME OF SUBMISSION AND THE ENGINEER ACCEPTS SUCH DEVIATIONS IN WRITING. NO CHANGES WILL BE MADE IN ANY DRAWING AFTER IT HAS BEEN REVIEWED EXCEPT BY THE CONSENT OR DIRECTION OF THE ENGINEER IN WRITING. 6. CONTRACTOR RESPONSIBILITY BY APPROVING AND SUBMITTING SHOP DRAWINGS AND SAMPLES, THE CONTRACTOR THEREBY REPRESENTS THAT HE HAS DETERMINED AND VERIFIED ALL FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS, AND SIMILAR DATA, OR WILL DO SO AND THAT HE HAS CHECKED AND COORDINATED EACH SHOP DRAWING WITH THE REQUIREMENTS OF THE WORK AND OF THE CONTRACT DOCUMENTS. i , r 1 1-5 r CITY OF RENTON GENERAL ENGINE GENERATOR SET JULV, 1985 7. SUBSTITUTIONS AS SOON AS POSSIBLE, BUT NOT MORE THAN 30 DAYS AFTER THE DATE OF THE CONTRACT, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER THREE COPIES OF COMPLETE LISTS OF ALL PRODUCTS WHICH ARE PROPOSED FOR INSTALLATION AS SUBSTITUTIONS OR PRODUCT OPTIONS. EACH LIST SHALL BE TABULATED IN ACCORDANCE WITH SPECIFICATION SECTIONS. FOR PRODUCTS SPECIFIED ONLY BY REFERENCE STANDARDS, THE CONTRACTOR SHALL SELECT ANY PRODUCTS WHICH EITHER MEETS OR EXCEED SUCH STANDARDS, BY ANY MANUFACTURER. FOR PRODUCTS SPECIFIED BY NAMING TWO OR MORE PRODUCTS, BUT INDICATING THE OPTION OF SELECTING EQUIVALENT PRODUCTS BY STATINS "OR EQUAL" AFTER SPECIFIED PRODUCT, THE CONTRACTOR SHALL SUBMIT A REQUEST +S REQUIRED FOR SUBSTITUTION FOR ANY PRODUCT NOT SPECIFICALLY NAMED. DURING THE BIDDING, THE ENGINEER SHALL CONSIDER WRITTEN REQUESTS FROM PRODUCT SUPPLIERS OR PRIME BIDDERS FOR SUBSTITUTIONS, RECEIVED IN ACCORDANCE WITH THE PRE-SUBMITTAL SPECIFICATION CONTAINED HEREIN. REQUESTS RECEIVED AFTER THE TIME SPECIFIED WILL NOT BE CONSIDERED. ALL SUCH REQUESTS MUST BE ACCOMPANIED BY DRAWINGS AND SPECIFICATIONS IN SUFFICIENT DETAIL TO ALLOW THE ENGINEER TO DETENMINE WHETHER OR NOT THE SUBSTITUTE PROPOSED IS EQUAL TO THAT SPECIFIED. ALL SUCH REQUESTS SHALL INCLUDE A LISTING OF ANY SIGNIFICANT VARIATIONS IN MATERIAL OR METHODS FROM THOSE SPECIFIED. IF THERE ARE NO VARIATIONS, A STATEMENT TO THAT FACT SHALL BE INCLUDED IN THE REQUEST FOR APPROVAL. THE DETERMINATION AS TO WHETHER OR NOT PROPOSED SUBSTITUTE EQUALS THAT SPECIFIED SHALL REST SOLELY WITH THE ENGINEER. APPROVAL OF ALTERNATES AND/OR EQUAL MINOR PRODUCTS WILL BE ONLY BY ADDENDUM. THE BIDDER SHALL INCLUDE, IN HIS PROPOSAL, ALL COSTS FOR MODIFICATIONS REQUIRED TO ADOPT THE SUBSTITUTE. WITHIN 30 DAYS AFTER THE DATE OF THE CONTRACT, THE ENGINEER SHALL CONSIDER FORMAL REQUESTS FROM THE CONTRACTOR FOR SUBSTITUTION OF PRODUCTS IN PLACE OF THOSE SPECIFIED. THE CONTRACTOR SHALL SUBMIT TWO COPIES OF THE REQUEST FOR SUBSTITUTION. DATA TO BE COMPLETED SHALL INCLUDE THE NECESSARY CHANGE OF CONSTRUCTION METHODS INCLUDING A DETAILED DESCRIPTION OF THE PROPOSED METHOD AND THE RELATED DRAWINGS ILLUSTRATING SUCH METHODS. AN ITEMIZED COMPARISON OF THE PROPOSED SUBSTITUTION WITH PRODUCT OR METHOD SPECIFIED SHALL BE PROVIDED. IN MAKING SIC`+ A REQUEST FOR SUBSTITUTION, THE CONTRACTOR REPRESENTS THAT HE HAS PERSONALLY INVESTIGATED THE PROPOSED PRODUCT OR METHOD AND HAS DETERMINED THAT IT IS EQUAL OR SUPERIOR TO, IN ALL RESPECTS, THE PRODUCT SPECIFIED. HE WILL PROVIDE THE SAME GUARANTEE FOR SUBSTITUTION AS FOR THE PRODUCT OR METHOD SPECIFIED. HE WILL ALSO COORDINATE INSTALLATION OF ACCEPTED SUBSTITUTIONS INTO THE WORK MAKING SUCH r 1-6 I CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY. 1985 CHANGES AS MAY BE REQUIRED FOR THE WORK TO BE COMPLETE IN ALL RESPECTS. HE WAIVES ALL CLAIMS FOR ADDITIONAL COSTS RELATED TO SUBSTITUTIONS WHICH CONSEQUENTLY BECOMES APPARENT. COST DATA IS COMPLETE AND SHALL INCLUDE ALL RELATED COSTS UNDER THIS CONTRACT INCLUDING ALL ENGINEERING RE-DESIGN COSTS. 8. STAKING THE ENGINEER SHALL STAKE OUT THE LOCATIONS OF MAJOR FACILITIES SHOWN ON T4E DRAWINGS AND ESTABLISH BENCH MARKS AT LOCATIONS TO BE DESIGNATED BY THE CONTRACTOR. THE CONTRACTOR SHALL PROTECT AND PRESERVE IN THEIR ORIGINAL CONDITIONS ALL STAKES, POINTS, OR MARKS SET FOR THE WORK BY THE ENGINEER. IF SUCH STAKES AND MARKINGS ARE DESTROYED OR DEFACED BY i , THE CONTRACTOR'S OPERATION BEFORE THEIR USE IS ENDED, THE FULL COST OF REPLACING THEM WILL BE AT THE CONTRACTOR'S EXPENSE BY DEDUCTION FROM ANY MONEY DUE HIM. THE CONTRACTOR SHALL PROVIDE SUFFICIENT AND SAFE FACILITIES TO ENABLE THE ENGINEER TO SET THE CONTROL POINTS, TOGETHER WITH SUCH TOOLS AND MATERIALS AND RENDER SUCH COMPETENT ASSISTANCE AS MAY BE REASONABLY AND CUSTOMARILY REQUIRED. WORKING OPERATIONS SHALL BE SUSPENDED AT DIFFERENT POINTS FOR SUCH BRIEF AND REASONABLE TIME AS MAY BE REQUIRED FOR GIVING OF LINES AND GRADES, TAKING MEASUREMENTS AND MAKING INSPECTIONS. SUCH DELAYS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED. 4� 5. COMMENCEMENT OF WORK 4 1. POLLUTION CONTROL THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS OF FEDERAL, STATE, AND LOCAL STATUTES AND REGULATIONS DEALING WITH POLLUTION. iN ADDI"ION, TIE CONTRACTOR SHALL PROVIDE AND MAINTAIN, IN A NEAT AND SANITARY CONDITION, SUCH ACCOMMODATIONS FOR THE USE OF HIS EMPLOYEES AND ENGINEERS AS PAY BE NECESSARY TO COMPLY WITH THE REQUIREMENTS AND REGULATIONS OF THE AGENCIES OR ORGANIZATIONS HAVING JURISDICTION OVER !.ANITARY AND HEALTH CONDITIONS AND OF OTHER BODIES OR OFFICES HAVING JURISDICTION THEREOVER. HE SHALL PERMIT NO PUBLIC NUISANCES. Ili FEDERAL, STATE, AND LOCAL STATUTES AND REGULATIONS DEALING WITH THE PREVENTION OF ENVIRONMENTAL POLLUTION AND THE PRESERVATION OF PUBLIC NATURAL RESOURCES THAT MAY AFFECT OR MAY BE AFFECTED BY THE PROJECT ARE ON FILE AT THE OFFICE OF THE OWNER. THESE PROVISIONS ARE NOT EXCLUSIVE AND THE CONTRACTOR MUST FAMILIARIZE HIMSELF WITH ALL SUCH STATUTES, ORDINANCES, AND REGULATIONS THAT APPLY TO THIS CONTRACT. IF THE CONTRACT MUST UNDERTAKE ADDITIONAL WORK DUE TO THE ENACTMENT OF NEW OR AMENDMENT OF EXISTING STATUTES, ORDINANCES, RULES, OR REGULATIONS DEALING WITH THE PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION �. OF NATURAL RESOURCES THAT MAY AFFECT OR MAY BF AFFECTED BY THE PROJECT WHICH ENACTMENT OF AMENDMENT OCCURS AFTER THE "MISSION OF HIS BID FOR THIS CONTRACT, SUCH ADDITIONAL WOP , AS MUST dF UNDERTAKEN SHALL NOT tir INVALIDATE THE CONTRACT AND THE CJNTRACTOR SHALL PROCEED TO PERFORM SUCH ADDITIONAL WORK. L 1-7 CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, 1985 2. USE OF PREMISES THE CONTRACTOR SHALL CONFINE HIS APPARATUS, STORAGE OF MATERIALS, AND CONSTRUCTION OPERATIONS TO SUCH LIMITS AS MAY BE DIRECTED BY THE OWNER AND SHALL NOT UNREASONABLY ENCUMBER THE PREMISES WITH HIS MATERIALS. 3. CARE OF EXISTING FACILITIES THE CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT EXISTING SIDEWALKS, CURBS, PAVEMENTS, UTILITIES, ADJOINING PROPERTY, AND STRUCTURES. TO AVOID DAMAGE THERETO, HE SHALL, AT HIS OWN EXPENSE, COMPLETELY REPAIR ANY DAMAGE CAUSED BY HIS OPERATION. ACCESS FOR FIRE-FIGHTING EQUIPMENT SHALL BE MAINTAINED AT ALL TIMES. 4. REMOVAL OF ALL DEBRIS, CLEANING, ETC. THE CONTRACTOR SHALL, AT ALL TIMES, KEEP THE CONSTRUCTION AREA CLEAN AND ORDERLY AND, UPON COMPLETION OF THE WORK, SHALL LEAVE ALL BUILDINGS BROOM CLEAN AND ALL PARTS OF THE WORK CLEAN AND FREE OF RUBBISH AND EXCESS MATERIAL OF ANY KIND. ALL WINDOWS, DOORS, HARDWARE, WOODWORK, FIXTURES, EQUIPMENT, WALLS, AND FLOORS SHALL BE LEFT CLEAN AND FREE OF STAINS, PAINT OR ROOFING SPLASHES, OR OTHER MARS OR DEFECTS. UPON COMPLETION, THE SITE OF ALL WORK OR EQUIPMENT AND MATERIAL STORAGE AREAS SHALL Bc RESTORE ' TO THEIR ORIGINAL CONDITION. ALL MISCELLANEOUS DEBRIS, ROCKS, ETC. , RESULTING FROM THE WORK. SHALL BE REMOVED AND DISPOSED OF IN A MANNER. SATISFACTORY TO THE OWNER. THE SITE, THROUGH THE PROGRESS OF CONSTRUCTION, SHALL BE KEPT AS CLEAN AS POSSIBLE AND IN A NEAT CONDITION• 5. COMMENCEMENT OF WORK ON PUBLIC AND PRIVATE RIGHT-OF-MAY WORK SHALL NOT BE. STARTED ON ANY PUBLIC OR PRIVATE RIGHT-OF-WAY UNTIL CLEARANCE IS GIVEN TO THE CONTRACTOR BY ,HE ENGINEER. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH ANY SPECIAL REQUIREMENTS OF ANY PERMIT FOR THE PROJECT ACQUIRED BY THE OWNER. THE ENGINEER SHALL, AT ALL TIMES, HAVE ACCESS TO ALL PARTS OF THE WORK AND TO THE SHOPS WHEREIN THE WORK IS IN PREPARATION FOR THE P,:'POSE OF INSPECTION AND THE CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN PROPER FACILITIES AND PROVIDE SAFE ACCESS FOR SUCH INSPECTIG" b. TEMPORARY FACILITIES THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND LOCATION OF ALL FIELD OFFICES, ALL NECESSARY WATER FOR CONSTRUCTION-RELATED FIRE PROTECTION, ALL NECESSARY GATES AND BARRICADES, FENCES, HANDRAILS, GUARD RAILS, AND SECURITIES REQUIRED BY THIS CONTRACT, OR BY LAWS AND REGULATIONS. SANITARY FACILITIES ADEQUATE FOR ALL WORKERS SHALL COMPLY WITH ALI. CODES AND REGULATIONS AND THERE SHALL BE SHELTERS AND DRY CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY. 1985 FACILITIES FOR THE WORKMEN AS REQUIRED. THE CONTRACTOR SHALL INSURE THAT ALL GUARDS, MARKS, SHIELDS, PROTECTIVE CLOTHING, RAIN GEAR, AND OTHER EQUIPMENT REQUIRED BY LAW. ORDINANCE, LABOR CONTRACTS, OSHA REGULATIONS, AND OTHER REGULATIONS FOR TH;: MAINTENANCE OF HEALTH AND SAFETY BE SUPPLIED. FIRST AID KITS AND EQUIPMENT AS REQUIRED BY LAW SHALL ALSO BE SUPPLIED. AT THE CLOSE OF THIS CONTRACT, THE CONTRACTOR SHALL PAY ALL UTILITY BILLS THAT ARE OUTSTANDiNG, REMOVE ALL TEMPORARY ELECTRICAL, SANITARY, GAS. TELEPHONE, WATER FACILITIES, AN ANY OTHER TEMPORARY SERVICE - EQUIPMENT THAT MAY REMAIN. IN ADDITION, HE SHALL ARRANGE FOR THE TRANSFER OF ELECTRICAL AND WATER ACCOUNTS TO THE OWNER'S NAME. I v 7. TEMPORARY UTILITIES THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AN AUEQUATE TEMPORARY ELECTRICAL SYSTEM. THIS SYSTEM SHALL BE ARRANGED BY AND ALL COSTS PAID BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE .ARRANGEMENTS FOR AND PROVIDE ALL NECESSARY FACILITIES FOR THE NECESSARY WATER SUPPLY FOR HIS CONSTRUCTION AT HIS r OWN EXPENSE UNLESS OTHERWISE PROVIDED. i o. TESTING AND FACILITY STARTUP 1. FACTORY TEST THE E-G UNIT SHALL BE TESTED AT THE MANUFACTURER 'S PLANT BEFORE SHIPMENT, THE TEST SHALL CONSIST OF A STEADY LOAD RUN OF AT LEAST 60 MINUTES DURATION AT 100 PERCENT FULL RATED LOAD. COMPLETE TEST REPORTS SHALL BE MADE WHICH SHALL SHOW THE ENGINE FUEL CONSUMPTION AND KW OUTPUT. TEST RESULTS SHALL BE REVIEWED BY THE OWNER PRIOP TO SHIPMENT. THE OWNER AND/OR ITS REPRESENTATIVE SHALL DE GIVEN THE OPPORTUNITY TO WITNESS THE TESTS BY THE MANUFACTURER. 2. FIELD TEST UPON COMPLETION OF THE UNIT INSTALLATION, RUNNING TESTS SHALL BE CARRIED OUT. THE ENGINE SHALL BE OPERATED FOR A PERIOD OF NOT LESS THAN TWO HOURS, IN WHICH FIVE STARTS OF THE E-G SET SHALL BE MADE AND POWER SUPPLIED TO THE MOTORS AND PUMPS. THE TEST SHALL DEMONSTRATE THE ABILITY OF THE E-G SET TO CARRY THE SPECIFIED LOADS. UPON COMPLETION OF THE TESTS, FINAL ADJUSTMENTS SHALL BE MADE TO THE EQUIPMENT BY A QUALIFIED REPRESENTATIVE OF THE ENGINE MANUFACTURER. FUEL AND OIL FILTERS SHALL BE REPLACED, BELT DRIVE TENSIONS CHECKED, AND THE PROPER OPERATION OF ALL EQUIPMENT DEMONSTRATED TO THE OWNER'S REPRESENTATIVE. THE OWNER'S REPRESENTATIVE SHALL BE INSTRUCTED IN THE MAINTENANCE AND OPERATION OF THE EQUIPMENT. 1-9 e. Ir CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, ERAS 3. CONTRACTOR'S RESPONSIBILITY ALL TESTING, STARTUP, AND OPERATION SHALL NOT BE CAUSE FOR CLAIMS FOR DELAY BY THE CONTRACTOR AND ALL EXPENSES ACCRUING THEREFROM SHALL BE DEEMED TO BE INCIDENTAL TO THIS CONTRACT. THE CONTRACTOR SHALL MAKE ARRANGEMENT FOR ALL MATERIALS, SUPPLIES, AND LABOR NECESSARY TO EFFICIENTLY COMPLETE THE TESTING, STARTUP, AND OPERATION. ALL POWER AND UTILITY BILLS SHALL BE PAID BY THE CONTRACTOR UP TO AND INCLUDING THE DAY OF FINAL ACCEPTANCE OF THE CONTRACT BY THE nW NER. IF NOT PAID, THESE CHARGES SHALL BE TREATED AS CLAIMS AGAINST THE CONTRACTG:. IF THE OWNER CHOOSES TO COMMENCE OPERATIONS PRIOR TO THE FINAL ACCEPTANCE, THE OWNER WILL ASSUME PAYMENT OF ALL POWER AND UTILITY CHARGES EFFECTIVE THE DAY THAT OPERATION IS ASSUMED BY THE OWNER AND NOTICE IS GIVEN IN WRITING. 4. STARTUP STARTUP SHALL CONSIST OF TESTING A SIMULATFI) OPERATION, ALL OPERATIONAL EQUIPMENT, AND CONTRULS. THE ItRPDSE (W 'Hi SE TESTS SHALL BE TO CHECK THAT ALL EQUIPMENT ►ILL FUNCTION UNDER OPERATING CONDITIONS, THAT ALL INTERLOCKING CON', JLS :ID SE 0r'tCFS 4RE PROPERLY SET AND THAT THE FACILITY WILL FUNCTION 'S AN OPER.,iI UNIT. CHECKS FOR LEAKAGE OF TANKS, PIPING, VALVE'. , AND OTHER HYDRAULIC ~ SYSTEMS AND STRUCTURES SHALL EE MADE. FACTORY REPRESENTATIVES OF ALL MAJOR UNITS SHALL BE PRESENT FOR THE STARTUP PHASE. THE TEST SHALL CONTINUE UNTIL IT IS DEMONSTRATED THAT ALL FUNCTIONS OF CONTROLS AND MACHINERY ARE CORRECTED. STARTUP SHALL NOT BEGIN UNTIL ALL TESTS REQUIRED BY THESE SPECIFICATIONS HAVE BEEN COMPLETED AND APPROVED BY THE ENGINEER. S. OPERATION OPERATION OF THE FACILITY SHALL BE IMMEDIATELY STARTED AFTER COMPLETION OF TESTING AND STARTUP AND AFTER SATISFACTORY REPAIRS AND ADJUSTMENTS ` HAVE BEEN MADE. 6. INSTRUCTION PERIODS AFTER SUBSTANTIAL COMPLETION OF THE WORK, AND 20 DAYS AFTER THE 0 AND M MANUALS HAVE BEEN DELIVERED TO THE OWNER, AND AFTER ALL TESTS AND FINAL INSPECTION OF 1HE WORK BY THE AUTHORITY HAVING JURISDICTION; THE CONTRACTOR SHALL DEMONSTRATE THE ELECTRICAL SYSTEMS AND INSTRUCT THE OWNER'S DESIGNATED OPERATING AND MAINTENANCE PERSONNEL IN THE OPERATION AND MAINTENANCE OF THE VARIOUS ELECTRICAL SYSTEMS. THE CONTRACTOR 1-10 CITY OF PENTON GENERAL ENGINE GENERATOR SET JULY. 1985 SHALL ARRANGE SCHEDULED INSTRUCTION PERIODS WITH THE OWNER . THE CONTRACTOR'S REPRESENTATIVES SHALL BE SUPERINTENDENTS OR FOREMEN KKDWLEDGEA.BLE IN EACH SYSTEM AND SUPPLI-IRS REPRESENTATIVES WHEN SO SPECIFIED. THE INSTRUCTION PERIOD FOR THIS ENGINE-GENERATOR SET SHALL BE ONE DAY. 7. FINAL ACCEPTANCE REQUEST THE CONTRACTOR SHALL SUBMIT TO THE CITY WITH A COPY TO THE ENGINEER, A r JOB COMPLETION FORM (FORM ATTACHED IN THIS SECIION) PROPERLY FI'.LEO OUT �- PRIOR TO THE TIME FINAL ACCEPTANCE OF THE ELECTRICAL WORK IS REQUESTED. AT THIS TIME ALSO SUBMIT COPIES OF FINAL INSPECTION CERTIFICATES. ACCEPTANCE OF THE UNIT WILL BE IN WRITING BY THE CITY OF RENTON. 7. OPERATION AND MAINTENANCE MANUALS PRIOR TO THE RECEIPT OF PAYMENT FOR MORE THAN 50 PERCENT OF THE WORK, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER FIVE SETS OF ACCEPTABLE MANUFACTURERS' OPERATING AND MAINTENANCE INSTRUCTIONS COVERING EACH PIECE. OF MECHANICAL AND ELECTRICAL EQUIPMENT, OR EQUIPMENT ASSEMBLY, FURNISHED UNDER HIS CONTRACT. EACH SET OF INSTRUCTIONS SHALL BE BOUND INTO MULTIPLE VOLUMES; EACH VOLUME TO BE COMPLETE WITH AN INDEX AND BOUND IN A SUITABLE HARD-COVER BINDER. BINDERS SHALL BE SIMILAR AND EQUAL TO NATIONAL 98-381 . MANUALS SHALL BE ASSEMBLED AND INDEXED SO THAT FORMATION ON EACH PIECE OF EQUIPMENT CAN BE READILY FOUND. THE OPERATING AND MAINTENANCE INSTRUCTIONS SHALL INCLUDE, AS A MINIMUM, THE FOLLOWING DATA FOR EACH ITEM OF MECHANICAL AND ELECTRICAL EQUIPMENT: I . COMPLETE AS-BUILT ELEMENTARY WIRING AND ONE LINE DIAGRAMS. 2. RECOMMENDED SPARE PARTS. 3. COMPLETE PARTS LIST, BY GENERIC TITLE AND IL_NTIFICATION NUMBER, COMPLETE WITH EXPLODED VIEWS OF EACH ASSEMBLY. 4. LUBRICATION SCHEDULE INCLUDING THE APPLICABLE LUBRICANT DESIGNATION AVAILABLE FROM THE STANDARD OIL COMPANY OF CALIFORNIA. 5. RECOP PREVENTIVE MAINTEIANCE PROCEDURES AND SCHEDULES. 6. DISASSL . -Y AND RE-ASSEMBLY INSTRUCTIONS. 7. NAME, LOCATION , AND TELEPHONE NUMBER OF THE NEAREST SUPPLIER AND SPARE PARTS WAREHOUSE. 8. RECOMMENDED TROUBLE-SHOOTING AND STARTUP PROCEDURES. 9. RECOMMENDED STEP-BY-STEP OPERATING PROCEDURES. 1-11 r CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY. 1985 10. ALL MANUFACTURERS' WARRANTIES. 11 . EQUIPMENT SPECIFICATIONS AND GUARANTEED PERFORMANCE DATA. GENERAL MANUALS WHICH DESCRIBE SEVERAL ITEMS NOT IN THE CONTRACT WILL NOT BE ACCEPTED UNLESS ALL REFERENCES TO IRRELEVANT EQUIPMENT IS NEATLY ERADICATED OR BLOCKED OUT. 8. GUARANTEES AND WARRANTIES THE CONTRACTOR SHALL SECURE AND DELIVER TO THE ENGINEER ALL EQUIPMENT WARRANTIES OTHER WARRANTIES AND GUARANTEES AS MAY BE REQUIRED FOR EQUIPMENT OR PROCESSES REQUIRED UNDER ALL SECTIONS OF THIS CONTRACT. SUCH DELIVERY SHALL BE DONE AT ONE TIME COVERING ALL MAJOR AND MIN1R EQUIPMENT WARRANTIES. ALL EQUIPMENT PROVIDED UNDER THIS CONTRACT SHALL BE WARRANTED AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP FOR A MINIMUM PERIOD OF ONE YEPR AFTER DATE OF ORIGINAL OPERATION. "ORIGINAL OPERATION" SHALL BE DEFINED AS THE DATE THAT THE MANUFACTURER'S REPRESENTATIVE APPROVES THE FIELD TESTING OF EACH UNIT, AND THE OWNER ACCEPTS THE ' V1T PND ITS INSTALLATION. 9. DELIVERY THE CITY WILL ACCEPT DELIVERY OF THE UNIT AT THE HIGHLANDS PUMP STATI(N SITE, 3410 N.E. 12TH STREET, RENTON, WASHINGTON. II I 1-12 I CITY OF RENTON GENERAL ENGINE GENERATOR SET JULY, 1985 JOB COMPLETION FORM PROJECT NAME: PROJECT LOCATION: DATE: A. ELECTRICAL INSPECTOR'S FINAL ACCEPTANCE (COPY OF CERTIFICATE ATTACHED): NAME AGENCY DATE B. THE FOLLOWING SYSTEM HAS BEEN DEMONSTRATED TO OWNER'S REPRESENTATIVE: GENEkATOR SYSTEM OWNER'S REPRESENTATIVE DATE C. RECORD DRAWINGS ATTACHED. TRANSMITTED PREVIOUSLY TO: DATE D. 0 AND M MANUALS ATTACHED. TRANSMITTEL PREVIOUSLY TO: E. TEST REPORTS ATTACHED. DATE TRANSMITTED PREVIOUSLY TO: DATE F. THE WORK IS COMPLETE IN ACCORDANCE WITH CONTRACT DOCUMENTS AND AUTHORIZED CHANGES EXCEPT FOR AND THE EN6I4-EER 'S REPRESENTATIVE IS REQUESTED TO MEET WITH THE SUPERVISOR OF ELECTRICAL WORK AT ON CONTRA- CT RTS RAP: SIGNATLFR- DATE w M CITY OF RENTON SITEWORK ENGINE GENERATOR SET JULY, 1985 2.0 SITEWOPX 1. EARTWORK 1. GENERAL THIS SECTION DESCRIBES THE GENERAL REQUIREMENTS FOR ALL TYPES OF EARTHWORK AND IS APPLICABLE TO ALL EARTHWORK AS REQUIRED ON THIS PROJECT. CLASSIFICATION All EXCAVATION IN THIS PROJECT IS CONSI`)EKED UNCLASSIFIED. THE TERMS "EARTHWORK" OR "EXCAVATION" INCLUDE ALL MATERIALS EXCAVATED OR REMOVED, "EGARDLESS OF MATERIAL CHARACTERISTICS, THE CONTRACTOR SHALL MAKE HIS OWN ESTIMATE OF THE KIND AND EXTENT OF THE EXCAVATION. 3. SITE GRADING PERFORM ALL EARTHWORK TO THE LINES AND GRADES AS SHOWN AND/OR ESTABLISHED BY THE ENGINEER, WITH PROPER ALLOWANCE FOR Si1RFACING SHOWN. SHAPE, TRIM, AND FINISH SLOPES OF CHANNELS TO CONFORM WITH THE LINES, GRADES, AND CROSS SECTIONS AS SHOWN OR APPROVED. MAKE SLOPES FkEE OF ALL L ,POSED ROOTS AND STONES EXCEEDING 3-INCH DIAMETER WHICH AkE LOOSE AND LIABLE TO FALL. ROUND TOPS OF BANKS TO CIRCULAR CURVES, IN GENERAi , NOT LESS THAN A 6-FOOT RADIUS. ROUNDED SURFACES SHALL BE NEATLY AND SMOOTHLY TRIMMED. FINISHED SITZ GRADING SHALL BE APPROVED w BY THE ENGINEER. 4. STRUCTURAL 'EXCAVATION ,- STRUCTURAL EXCAVATION SHALL INCLUDE CLEARING AND GRUBBING BEYOND THE EXCAVATION CATCH POINT. CLEARING SHALL CONFORM TO APWA SECTION 12-1,03 AND GRUBBING TO APWA SECYION 12-2.04. STRUCTURAL EXCAVATION SHALL INCLUDE THE REMOVAL OF ANY AND ALL FORMATIONS ENCOUNTERED AND THE REMOVAL AND DISPOSAL OF ALL DEBRIS, INCLUDING SUBMERGED OR BURIED TIMBER. THE CONTRACTOR SHP' L EXCAVATE TO THE DEPTH NECESSARY TO COMPLETE THE WORK AS SHOWN ON THE DRAWINGS. 2-1 CITY OF RENTON SITEWORK ' ENGINE GENERATOR SET JULY. 1985 1. SHORING WHERE SHORING, SHEET PILING SHEETING, BRACING, LAGGING, OR OTHER SUPPORTS ARE NECESSARY TO PREVENT CAVE-INS OR DAMAGE TO EXISTING STRUCTURES, IT SHALL BE THE RESPONSIBILITY nF THE CONTRACTOR TO ` DESIGN, FURNISH, PLACE, MAINTAIN, AND REMOVE SUCH SUPPORTS IN ACCORDANCE WITH APPLICABLE ORDINANCES AND SAFETY REQUIREMENTS. TKE DESIGN, PLANNING, INSTALLATION AND REMOVAL OF ALL SHEETING, SHORING, SHEET PILING, LAGGING, AND BRACING SHALL BE ACCOMPLISHED IN SUCH A MANNER AS TO MAINTAIN THE UNDISTURBED STATE OF THE SOIL BELOW AND ADJACENT TO THE EXCAVATION. 1 . 2. DISPOSAL OF EXCAVATED MATERIAL IT IS ANTICIPATED THAT THE MAJORITY OF THE EXCAVATED MATERIAL WILL 1.. BE SUITABLE FOR USE IN FILL AND BACKFILL. UNSUITABLE EXCAVATED MATERIAL SHALL BE DISPOSED OF OFF-SITE. SUITABLE EXCESS EXCAVATION SHALL BE DISPOSED OF BY THE CONTRACTOR. 3. STOCKPILING OF EXCAVATED MATERIAL � > PEP.MISSIBLE AREAS FOR STOCKPILING OF SUITABLE EXCAVATED MATERIALS FOR LATER RE-USE SMALL BE DESIGNATED BY THE ENGINEER. S. BACKFILL FOR STRUCTURAL EXCAVATION WHEN FILL IS PLACED ADJACENT TO WALLS, FOOTINGS, ETC., HEAVY EQUIPMENT FOR SPREADING, AND COMPACTING SHALL NOT BE OPERATED CLOSER TO ANY WALL THAN A DISTANCE EQUAL TO THE HEIGHT OF THE BACKFILL ABOVE THE TOP OF THE FOOTING. FILL ADJACENT TO WALL SHALL BE COMPACTED TO 35 PERCENT OF A MAXIMUM DENSITY AS DETERMINED BY ASTM D-1557 WITH A SMALL VIBRATORY OR HAND COMPACTOR. 6. STRUCTURAL FILL ALL FILL UNDER STRUCTURES AND PAVED AREAS SHALL BE STRUCTURAL FILL. STRUCTURAL FILL SHALL BEAR IN A FIRM BASE ANL : CONSTRUCTED IN UNIFORM LAYERS NOT EXCEEDING 9 INCHES IN LOOSE THICKNESS WITH EACH LIFT TO BE COMPACTED TO 95 PERCENT OF ITS MAXIMUM DENSITY AS DETEFMINED BY ASTM D-1557. 7. GENERAL FILL ALL FII L THAT IS NOT BACKFILL FOP, STRUCTURAL EXCAVATION OR STRUCTURAL FILL IS GENERAL FILL. GENERAL FILL S4AL' BE WELL COMPACTED BY REPEATED �r COVE"AGES OF THE B.AULING AND SPREADING EQUIPMENT AND SHALL BE FINAL GRADED AS SHOWN ON THE GRADING PLANS. L 2-2 CITY OF RENTgN SITEWORK ENGINE GENE J OR SET JULY, 1985 8. GRAVEL UNDER SLABS AND FOOT?MGS r. USHED SURFACING TOP COURSE WILL BE PLACED AND WELL COMPACTED UNDER CEMENT CONCRETE SLABS, FOOTINGS, PAVEMENT AND WALKS, WHERE SHOWN ON THE DRAWINGS, AND SHALL CONFORM TO WSDH STANDARD N0. 9-03.9(3) . 2, PAVING AMD SURFACING 1 , Gk4EL BASE AGGREGATE AGGREGATE FOR GRAVEL BASE, CLASS 6, SHALL CONFORM WI'H SECTION 9-03.10 OF THE WSDH STANDARD SPECIFICATIONS. i 2. CRUSHED SURFACING TOP COURSE AGGREGATE AGGREGATE FOR CRUSHED SURFACING TOP COURSE SHALL CONFORM WITH SECTION 9-03.9(3 ) OF THE WSDH STANDARD SPECIFICATIONS. 3. CEMENT CONCRETE PAVEMENT, SIDEWALKS, AND CURBS CEMENT CONCRETE PAVEMENT, SIDEWALKS, AND CURB SHALL. BE "LASS B CONCRETE (3,300 PSI ) PER THE CONCRETE SECTION OF THESE SPECIFICATIONS. CONSTRUCTION SHALL COMPLY WITH SECTION: 39 OF THE APWA STANDARD SPECIFI '.ATIONS. fURBS SHALL COMPLY WITH SECTION 40 OF THE APWA STANDARD SPECIFICAT'3iJS. 4. ASPHALT CONCRETE PAVEMENT PROVIDE A MINIMUM THICKNESS OF 2-INCHES OF ASPHALT CCNCRFTE PAVEMENT, CLASS B, IN CONFORMANCE WITH WSDOT AND APWA STANDARD SPECIFICATIONS SECTION 5-04. THE EDGES OF EXISTING ABUTTING PAVEMENT SHALL BE SAWCUT TO PRODUCE A CLEAN, STRAIL,HT INTERSECTION BETWEEN THE NEW AND THE EXISTING PAVEMENT. FINISHED GRADES SHALL CAUSE SURFACE WATER RUNOFF AWAY FROM ALL STRUCTURES AND INTO THE STORMdAIER SYSTEM. 2-3 CITY OF RENTON CONCRETE ENGINE GENERATOR SET UU!Y. 1985 3.0 r„ CONCRETE V r 1. TOLERANCES L VARIATIONS FROM PLUMB, SPECIFIED GRADE, CONSPICUOUS LINES, AND WALLS, SHALL. BE +/- 1 /4 INCH IN ANY 10 FOOT LENGTH, NOT TO EXCEED +/- 1 INCH OVERALL. VARIATIONS FROM DIMENSION SHALL NOT EXCEED PLUS 2 INCHcS, MINUS 1/2 INCH. 2 SUBMITTALS SUBMIT IN ACCORDANCE WITH SECTION 1 OF THESE SPECIFICATIONS AND AS FOLLOWS: INDICATE BAR SIZES, DIMENSIONS, QUANTITIES, LOCATIONS, SPACING, BENDING DiAGRAMS, AND WELDED WIRE FABRIC ( INCLUDING SUPPORTS. SPACERS, AND r RELATED ACCESSORIES) AS REQUIRED FOR THE FABRICATION A' PLACEMENT OF L ALL CONCRETE REINFORCEMENT. PROVIDE MANUFACTURER'S CERTIFICATION THA'. MATERIALS MEET THESE SPECIFICATION REQUIREMENTS, :NCLUDING MATERIAL CONTENT PER CUBIC YAR^ FOR EACH CLASS OF CONCRETE FURNISHED. TH;S SHALL INCLUDE DRY WEIGHT OF CEMENT, SATURATED SURFACE, DRY WEIGHTS OF FINE AND COARSE AGGREGATES, WEIGHT OF WATER PLUS QUANTITIES, TYPES, AND BRAND NAMFS of ADMIXTURES. DO NOT PROCEED WI1H CONCRETE CONSTRICTION WITHOUT PRIOR APPROVAL OF ALL CONCRETE MIXES. 3. TESTING THE OWNER WILL PROVIDE AND PAY ALL COSTS OF CONCRETE TESTING. THE CONTRACTOR SHALL GIVE THE OWNER 48 HOUR NOTICE PRIOR TO CONCRETE PLACEMENT FOR TESTING COORDINATION. - THE CONTRACTOR SHALL PROVIDE ALL ASSISTANCE AND COOPERATION NECESSARY TO THE TESTING PERSONNEL TO OBTAIN ADEQUATE CONCRETE TESTS. THE CONTRACTOR WILL HAVE ACCESS 1" ALL TESTING RESULTS AS SOON AS THEY ARE AVAILABLE. 4. GNICRETE MATERIALS r 1. CEMENT SHAi PONFV " TO AS1M C 150, TYPE II . w 2. WATER SHALL BE 1 AND FREE FROM OIL, ACID, ALKALI , ORGANIC MATTER, OR OT -R L -�TERIOUS SUBSTANCES. i 3-1 r CITY OF RENTON CONCRETE ENGINE GENERATOR SET JULY, 19Q.5 3. CONCRETE AGGREGATES SHALL CONFORM TO ASTM C 33, OR TO THE APPLICABLE SPECIFICATIONS OF THE WASHINGTON STATE HISHWAY DEPARTMENT FOR BRIDGE CONSTRUCTION. FINE AGGREGATE, WHEN TESTED IN ACCORDANCE WITH ASTM C 87, SHALL DEVELOP A COMPRESSIVE STRENGTH AT 7 A"'D 28 DAYS OF NOT LESS THEN Br 'ERCENT OF THAT DEVELOPED BY THE STANDARD MORTAR SPECIFIED IN AST 87 AS THE BASIS OF " 4PAPISON. 4. CONCRETE SHALL ATTAIN A 28-DAY STRENGTH OF f'c = 3,000 PSI AND MIX SHALL CONTAIN NOT LESS THAT SIX SACKS OF CEMENT PER CUBIC YARD NOR MORE THAN SIX GALLONS OF WATER PER SACK OF CEMENT. THE MINIMUM AMOUNTS OF CEMENT ANG MAXIMUM "MOUNTS OF WATER MAY BE CHANGED IF A CONCRETE DESIGN MIX IS SUBMITTED TO THE STRUCTURAL ENGINEER IWO WEEKS PRIOR TO PLACING ANY CONCRETE. THE CONCRETE DESIGN MIX SHALL INCLUDE THE AMOUNT OF CEMENT, FINE AND COARSE AGGREGATE, WATER AND ADMIXTURES AS WEIL AS THE WATER CEMENT RATIO, SLUMP, CONCRETE YIELD AND SUBSTAINING STRCNGTH DATA IN ACCORDANCE WITH UBC 260, (c) . THE USE OF A DESIGN MIX REQUIRES BATCH PLANT INSPECTION. ALL CONCRETE EXPOSED TO WEATHER SHALL BE AIR-ENTRAINED WITH AN AIR-ENTRAINING AGENT CONFORMING TO UBC STANDARD 26-9. THE AMOUNT SHALL BE 4% + 1% BY VOLUME. LOCAL MATERIALS FOk CONCRETE SHALL BE USED INSOFAR AS PRACTICABLE AND CAPABLE OF MEETING THE SPECIFICATIONS. THE PROPORTIONS ,AND GENERAL DESIGN OF THE CONCPETE MIXTURE AND THE CEMENT GIVEN IN TABLE 1 HEREINAFTER ARE SUITABLE FOR THE USE OF MATEF e AVAILABLE IN THE VICINITY AND ARE BASED UPON THE USE OF LOCAL AGGREGAIL, OTHER SOURCES OF MATERIALS MAY BE USED. THIS STATEMENT DOES NOT RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS AS TO QUALITY, EVEN THOUGH SOME LOCAL MATERIALS MAY NOT MEET THESE STANDARDS. 5. CONCRETE FORP,� 1. DESIGN DESIGN OF THE CONCRETE FORMS SHALL BE SUFFICIENTLY TIGHT TO PREVENT LEAKAGE OF MORTAR AND SHALL BE PROPERLY BRACED OR TIED TOGETHER SO AS TO MAINTAIN THE DESIRED PM TION AND SHAPE UNTIL REMOVED. 2. CONSTRUCTION FORM CONSTRUCTION FOR SURFACES THAT WILL BE COVERED WITH RACKF10 MAY BE OF STEEL, PLYWOOD, OR DRESSED MATCHED LUMBER. C^NSTRUCT FOR a TO THE SHAP , LINES, GRADES, AND DIMENSIONS OF THE CONCRETE CALLED FOR ON THE PLANS. 3-2 CITY OF RENTON CONCRETE ENGINE GENERATOR SET JULY, 1985 3. OILING r' UNLESS OTHERWISE DIRECTED, THE CONTACT SURFACES OF FORMS SHALL BE h COATED WITH A COLORLESS, NON STAINING MINERAL OIL FREE FROM KEROSENE, OR OTHER APPROVED SUITABLE MATERIAL, TO PERMIT SATISFACTORY REMOVAL OF FORMS. WHERE OIL OR SIMILAR MATERIAL IS USED, IT SHALL BE APPLIED L PRIOR TO INSTALLATION, IF POSSIBLE, AND BEFORE REINFORCEMENT IS PLACED. r- 4. REMOVAL DO NOT START THE REMOVAL OF FORMS UNTIL THE CONCRETE HAS ATTAINED THE NECESSARY STkENGTH TO SUPPORT ITS OWN WEIGHT, AND THE CONSTRUCTION LIVE LOADS, AND HAS SUFFICIENT STRENGTH TO PREVENT CRACKING OR CHIPPING WHEN THE FORMS ARE REMOVED. THE CONTRACTOR SH^1.L BE RESPONSIBLE FOR ALL DAMAGE RESULTING FPOM PREMATURE REMOVAL OF FORMS. DO NOT PLACE BACKFILL AGAINST WALLS BELOW GRADE UNTIL iE CONCRETE HAS ObIAINED A COMPRESSIVE STRENGTH EQUAL TO 2/3 OF THE SPECIFIED 28-DAY COMPRESSIVE CSTPrNGTH, EXCEPT AS OTHERWISE DIRECTED BY THE OWNER. 5. DE-MATERING r° DO NOT AILOW WATER TO FLOW THROUGH AREAS WHERE FORMS ARE TO BE PLACED. DURING FORM CONSTRUCTION AND PRIOR TO PLACEMENT OF CONCRETE, KEEP ,. FOOTINGS AND FLOOR SLAB AREAS FREE OF WATER. DIVERT ANY FL^" OF WATER, I INTO THE EXCAVATION THROUGH PROPER SIDE DRAINS TO A SUMP AND REMOVE BY PUMPING OR OTHER ACCEPTABLE METHODS. 6. REINFORCING STEEL REINFORCING STEEL SHALL CONFORM TO ASTM A615-81a, GRADE 60, fy = 60,000 PSI. EXCEPTIONS: COLUMN 'TIES, BFAM STIRRUPS, BARS TO BE FIELD BENT, BARS TO BE WELDED AND ANY OTHER BARS SPECIFICALLY SO NOTED ON THE DRAWINGS SHALL BE GRADE 40, fy = 40.000 PSI. REINFORCING STEEL SHALL BE DETAILED (INCLUDING HOOKS AND BENDS) IN ACCORDANCE WITH ACI 335-74 AND 313-77. LAP ALL CONTINUOUS REINFORCEMFNT 30 BAR DIAMETERS OR 2'-0" MINIMUM. PROVIDE CORNER BARS AT ALL WALL INTERSECTIONS. LAP SORNEP BARS 30 BAR DIAMETERS OR 2 '-0" MINIMUM. LAP ADJACENT MATS OF WELDED WIRE FABRIC ONE FULL WIRE-SPACING AT SIDES AND ENDS. NO BAPS PARTIALLY EMBEDDED IN HARDENED CONCRETE LL BE FIELD BENT UNLESS SPECIFICALLY SO DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER. CONCRETE PROTECTION (COVER) FOR REINFORCING STEEL SHALL BE THREE (3) INCHES FOR THE FOUNDATION. I r TIE WIRE SHALL BE BLACK ANNEALE7 WIRE, 16-1/2 GAUGE OR HEAVIER . 3-3 6 L CITY OF RENTON CONCRETE ENGINE GENERATOR SET JULY, 1985 BAR SUPPORTS SHALL CONFORM TO "BAR SUPPORT SPECIFICATION" . CRSI MANUAL OF STANFnRD PRACTICE, MSP-1-80. PROVIDE CLASS 1 , PLASTIC PROTECTED BAR SUPPORTS. USE PRE-CAST CONCRETC BLOCKS TO SUPPORT BARS OFF GROUND. REINFORCING SHALL BE KEPT FREE 0 RUST AND LOOSE SCALE AT TIME OF DELIVERY. BARS WITH KINKS, IMPROPER BENDS, OR REDUCED CROSS SECTION OUE TO ANY CAUSE WILL NOT BE USED. 7. CAST IN PLACE CONCRETE CONCRFTC MIX PROPORTIG,.S USED SHALL BE DESIGNED TO MEET THE FOLLOWING REC ` gEMENTS: TABLE 1 MIN. COMPRESS''iE FIELD STRENGTH AT 28 DAYS 3,000 PSI III CEMENT FACTOR (SACKS OF CEMENT/CU. YO. - MIN.) NOT LESS THAN 6 SACKS WATER REDUCING AGENT ADDED PER SACK OF AS RECOMMENDED BY MFR CEMENT (LBS.) MAX. WATER PER 94 I.B. SACK OF CEMENT (GALS` NOT MORE THAN 6 GALS. FINE AGGREGATE, % TOTAL BY WEIGHT (RANGE) 35-45 SLUMP RANGE (INCHES) 2-4 MAX. SIZE COARSE AGGREGATE (INCHES) 7/8 ENTRAINED AIR (PERCENT BY VOLUME) (RANGE) 4% +/- 1% NOTE: CONCRETE CYLINDERS MAY BE TAKEN TO VERIFY SLUMP AND REINFORCING MATERIAL AS DETERMINED BY THE O 'NFR. IN ORDFR TO OBTAIN PROPER WORKABILITY AND ; SMOGTH, DENSE, HOMOGENEOUS PLASTIC MIXTURE, FREE FROM SEGREGATION, THE PERCENTAGE OF FINE AGGREGATE MAY BE VARIED DURING THE PROGRESS OF THE WORK. CONCRETE TRANS' TED IN A TRUCK MIXER SHALL BE DISCHARGED AT THE JOB WITHIN 1-1/2 HOURS AF t THE CEMENT HAS BEEN ADDED TO THE WATER OR THE AGGREGATES. 1. CURING MATERIALS WATERPROOF SHEET MATERIALS CONFORMING TO ASTM C171 OR LIQUID MEMBRANING-FORMING COMPOUNDS CONFORMING TO ASTM C309. 3-4 I CITY OF RENTON CONCRETE ENGINE GENERATOR SET JULY, 1985 2. BONDING AGENT P FURNISH PRODUCTS BY RECOGNIZED MANUFACTURERS SUCH AS LARSEN "WELD-CRETE", SONNEBORN "SONOBOND" OR APPROVED. i ir 4 3. COLD WEATHER '- PLACE NO CONCRETE WIT N AIR TEMPERATURE IS BELOW 40 DEGREES WITHOUT TAKING ADEQUATE PRECAUTIONS TO FROTLCT THE WORK. r 2. CONTRACTOR SHALL PROVIDE ADEQUATE EQUIPMENT FOR HEATING 1 MATERIALS AND PROTECTING CONCRETE DURING FREEZING 02 NEAR �- FREEZING WEATHER. A.LI_ MATERIALS, REINFORCEMENT, FORMS, AND GROUND IN CONTACT WITH CONCRETE SHALL BE FREE FROM FROST AT TIME OF PLACEMENT . HEAT MIXING WATER AS REQUIRED. USE NO L MATERIALS CONTAINING ICE. .� 3. APPROVED DETAILED RECOMMENDATIONS FOR COLD 'WEATHER CONCRETINS ARE CONTAINED IN "RECOMMENDEC PRACTICE FOR COLD WEATHER CONCRETING" , ACI 305. 4. HOT WEATHER 1. PLACE NO CONCRETE WHEN AIR TEMPERATURE EXCEEDS 85 DEGREFS OR WHCN THE COMBINATION OF HIGH TEMPERATURE, LOW HUMIDITY, AND WIND VELOCITY IS DEEMED TO BE DETRIMENTAL TO CONCRETE OPERATIONS UNLESS ADEOIJATE PRECAUTIONS ARE TAKEN TO PROTECT THE WORK. 2. ALL ING^EDIENTS SHALL BE COOLED PRIOR TO MIXING. FLAKE ICE OR CRUSHED ICE OF A SIZE THAT WILL MELT COMPLETELY DURING MIXING MAY BE SUBSTITUTED FOR ALL OR PART OF THE WATER. COOL FORMS AND REINFORCING PRIOR TO PLACING CONCRETE. 3. APPP 40 DETAILED RECOMMENDATIONS FOR HOT WEATHER CONCRETE ARE CONTAINED IN "RECOMMENDED PRACTICE FOR HOT VEATHER CONCRETING" ACI 305. 5. OTHER ADVERSE WEATHER CONDITIONS 00 NOT PLACE CONCRETE DURING RAIN, SLEET, OR SNOW UNTIL ADEQUATE PROTECTION I-- PROVIDED. b. CONSOLIDATION 1 . All CONCRETE SHALL BE CONSOLIDATED BY VIBRATION WHICH MAY BE SUPPLEMENTED BY HAND SPADING, RODDING, FORKING, OR TAMPING. CONCRETE SHALL BE THOROUGHLY WORKED AROUND T4E REINFORCEMENT, L 3-5 i CITY OF RFNTON CONCRETE ENGINE GENERATOR SET JULY, 1985 AROUND EMBEDDF:) ITEMS, AND INTO CORNERS OF FORMS TO ELIMINATE ALL AIR OR STONE POCKETS WHICH MAY CAUSE HONEYCOMBING, PITTING, OR PLANES OF WEAKNESS. 2. INTERNAL VIBRATORS SHALL HAVE A MINIMUM FREQUENCY OF 8,000 VIBRATIONS PER MINUTE AND SUFFICIENT AMPLITUDE TO CONSOLIDATE THE CONCRETE EFFECTIVELY. VIBRATORS SHALL BE OPERATED BY EXPERIENCED WORKMEN. 3. INTERNAL VIBRATORS SHALL BE INSERTED AND WITHDRAWN AT POINTS APPROXIMATELY 18 INCHES APART IN EACH DIRECTION. AT EACH INSERTION, THE DURATION SHALL BE SUFFICIENT TO CONSOLIDATE THE CONCRETE BUT NOT SUFFICIENT TO CAUSE SEGREGATION, GENERALLY BETWEEN 5 AND 15 SECONDS. DO NOT USE VIBRATORS TO TRANSPORT CONCRETE WITHIN THE FORMS. 4. SLABS SHALL BE CONSOLIDATED BY UTILIZING VIBRATING SCREEDS, ROLLER PIPE SCREEDS, INTERNAL VIBRATORS, OR OTHER METHODS AS APPROVED. 5. CONTRACTOR SHALL HAVE A SPARE VIBRATOR AVAILABLE AT THE JOB SITE DURING ALL CONCRETE PLACING OPERATIONS. 7. BODING CONCRETE 1. AT CONSTRUCTION JOINTS: THOROUGHLY CLEAN SURFACE OF "_STING CONCRETE TO REMOVE ALL LAITANCE. APPLY APPROVED BOND'NG AGENT TO EXISTING CONCRETE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIOYS, OR ROUGHEN THE EXISTING CONCRETE SURFACE IN SUCH A MANNER AS TO EXPOSE THE AGGREGATE UNIFORMLY BUT NOT LEAVE LAITIAIVCE, LOOSENED AGGREGATE PARTICLES, OR DAMAGED CONCRETE AT THE SURFACE. DAMPEN JJINT AND COAT WITH GROUT MIXTURE IN ACCORDANCE WITH ACE 301 , SECTION 8.5. PRIOR TO PLACING FRESH CONCRETE. 2. AT PATCHES, REPAIRS, AND OTHER AREAS REQUIRING BONDP4G OF NEW TO EXISTING CONCRETE: APPLY APPROVED BONDING AGENT TC EXISTING CONCRETE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 8. PLACING OF CONCRETE SHALL BE AS FOLLOWS: 1. BEFORE BEGINNING PLACEMENT OF CONCRETE, REMOVE HARDENED CONCRETE AND FOREIGN MATERIALS FROM THE INNER SURFACE OF THE r MIXING AND CONVEYING EQUIPMENT. BEFORC DEPOSITING CONCRETE, REMOVE DEBRIS FROM THE SPACE TO PE OCCUPIED BY THE CONCRETE. REINFORCEMENT SHALL BE SECURED IN POSITION AND ACCEPTABLE TO THE CITY BEFORE THE CONCRETE IS PLACED. 3-6 r CITY OF RENTON CONCRETE ' ENGINE GENERATOR SET JULY, 1985 r 2. HANDLE CONCRETE FROM THE MIXER, READY -MIXED TRUCK, OR FROM THE TRANSPORTING VEHICLE TO THE PLACE OF FINAL DEPOSIT AS RAPIDLY AS PRACTICABLE BY METHODS WHICH PREVENT THE SEPARATION OR I.OSS OF THE INGREDIENTS. TINDER NO CIRCUMSTANCES SHALL CONCRETE THAT HAS PARTIALLY HARDENED BE DEPOSITED IN THE WORK. 3. WORK CONCRETE INTO PLACE IN CORNERS AND AROUND REINFORCING, DURING AND IMMEDIATELY AFTER DEPOSITING, AND COMPACT BY FA MECHANICAL VIBRATION. L• 4. DEPOSIT CONCRETE CONTINUOUSLY OR IN LAYERS OF SUCH THICKNESS THAT NO CONCRETE WILL BE DEPOSITED ON CONCRE E WHICH HAS HARDENED SUFFICIENTLY TO CAUSE THE FORMATION OF SEAMS AND PLANES OF WEAKNESS WITHIN THE SECTION. IF A SFCTION CANNOT BE PLACED CONTINUOUSLY, CONSTRUCTION JOINTS MAY BE LOCATED AT POINTS AS PROVIDED FOR IN THE PLANS OR AS APPROVED BY THE r , OWNER. 8_E14BEDDED ITEMS r ALL EMBEDDED ITEMS SHALL BE POSITIONED ACCUFSTELY AND SUPPORTED AGAINST DISPLACEMENT. VOIDS IN SLEEVES INSERTS, ANCHO; SLOTS, ETC., SHALL BE L FILLED TEMPORARILY WITH READILY REMOVABLE MATERIAL:; TO PREVENT THE ENTRY OF CONCRETE INTO THE VOIDS. t' 9. VAPOR BARRIER 1. PROVIDE APPROVED BARRIER MATERIAL OVER SUBGR.4DE AT ALL INTERIOR SLABS ON GRADE. 2. INSTALL VAPOR BARRIER IN LARGEST PRACTICABLE SIZES. LAP EDGE JOINTS 6 INCHES MINIMUM AND SEAL CONTINUOUSLY. FIT AROUND SERVICE OPENINGS, PIPING, AND SEAL. PROTECT FROM EXCESSIVE D%MAGE AND REPAIR PUNCTURES AND TEARS PRIOR TO PLACING CONCRETE. 10. NON-SHRINK GROUT 1. MIX AND PLACE GROUT MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. PROTECT ADJACENT FINISHED SURFACES FROM DEF4CEMENT. 2. PROVIDE FOR EOUIPME�" BASES, SLEEVES, DRILLED-IN REBAR AND ELSEWHERE AS SHOWN ON THE DRAWINGS. 3-7 to W CITY OF RENTON CONCRETE ENGINE GENERATOR SET JULY, 1965 11. CONCRETE FINISHES 1. GENERAL DO NOT PLACE fONCRETE WHICH REQUIRES FINISHING UNTIL THE MATERIALS, TOOLS, AND LABOR NECESSARY FOR FINISHING THE WET CONCRETE ARE ON THE JOB AND ACCEPTABLE TO THE 06NER. ALL HORIZONTAL SURFACES SHALL BE STEEL TROWELED, UNLESS OTHERWISE SPECIFIED. 2. PATCHING DEFECTS IN ALL CONCRETE SURFACES SHALL BE CUT OUT AND PATCHED AS SPECIFIED HEREIN. AFTER REMOVAL OF '. _ FORMS ALL IMPERFECTIONS, ROCK POCKETS, HOLES FROM FORM TIES, AN) OTHER DEFECTS SHALL BE CHIPPED OUT TO SOLID CONCRETE. THE SURFACE OF THE CAVITY TO BE PATCHED SHALL BE THOROUGHLY WET BEFORE THE PATCHING MIXTURE 15 APPLIED. WHERE THE PULL-OUT TYPE TIES ARE USED, THE HOLES SHALL BE FILLED AS RECOMMENDED BY THE MANUFACTURER OF Ti;E TIES AND AS APPROVED. THE CONCRETE SHALL BE FINISHED AS FOLLOWS: SCHEDULE OF CONCRETE FINISHES AREA TYPE OF FINISH FLOOR SLAB MONOLITHIC 3. MONOLITHIC FINISH FINISH BY SCREEDING ANO FLOATING WITH STRAIGHT EDGES TO BRING THE ` SURFACES TO THE REQUIKEO FINISH ELEVATION S'lOWN ON THE PLANS. WHILE THE CONCRETE iS STILL GREEN, BUT SUFFICIENTLY HARDENED TO BEAR A MAN' ; WEIGHT WITHOUT DEEP IMPRINT, IT S,IALL BE FLOATED TO A TRUE, EVEN PLAN' WITH NO COARSE AGGREGATE VISIBLE. SUFFICIENT PRESSURE SHALL BE USED ON THE FLOATS fO BRING MOISTURE TO THE SURFACE. AFTER SURFACE MOISTURE HAS DISAPPEARED, THE CONCRETE SHALL PE HAND TROWELED TO PRODUCE A SMOOTH, IMPERVIOUS SURFACE, FREE FROM TROWEL MARKS. AN ADDITIONAL TROWELING SHALL BE GIVEN TO THE SURFACE FOR 1HE PURPOSE OF BURNISHING. THE FINAL TROWELING SHALL PRODUCE A RINGING SOUND FROM THE TROWEL. DRY CEMENT OR ADDITIONAL WATER SHALL NOT BE USED IN TROWELING. M 3-8 CITY OF RRTON r ENGINE GENE, ;h SET JULY, 1985 i r 4.0 NOT USED THIS SPECIFICATION wr» I r �I r I I I t t i j� 1M � I II II CITY OF RENTON METAL FABRICATED BUILDING ENGINE GENERATOR SET JULY, 1985 5.0 METAL FABRICATED BUILDIna 1. GENERAL THE SCOPE OF WORK FOR THIS SECTION CONSISTS OF THE DESIGN, MATERIALS, AND FABRICATION OF A PREFABRICATED METAL BUILDING SYSTEM COMPLETE WITH ALL j APPURTENANCES INCLUDING DOORS, AND OPENINGS FOR COOLING AND EXHAUST SYSTEMS. THE BUILDING SHALL BE OF WEATHERTIGHT CONSTRUCTION, EASILY ERECTED, AND SUITABLE FOR ITS INTENDED USE. THE METAL FABRICATED BUILDING 9RL ff A SU DDSM VMBIMSSK SNI1UEK OtAAOB)M AAOIISSALff MMp"UBDUMAOAL COSTS RESULTING FROM MODIFICATIONS TO THE DESIGN PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MATERIALS FURNISHED SHALL INCLUDE THE STRUCTURAL FRAMING, ROOF PANELS, WALL PANELS, BRACING, FASTENERS, SEALANTS, AND ALL COMPONENTS FOR THE C METAL BUILDING PROPER. ALL MATERIALS WILL BE NEW, UNUSED AND FABRICATED IN A WORKMANLIKE MANNER. THE CONTRACTORS 810 SHALL BE RESPONSIBLE FOR SUBMITTING DETAILED SHOP DRAWINGS FOR THE STRUCTURAL DESIGN OF THE BUILDING. SUBMISSION AND APPROVAL SHALL BE IN ACCORDANCE WITH SECTION 1 OF THESE TECHNICAL SPECIFICATIONS. THE SHOP DRAWINGS SHALL SHOW ALL PERTINENT FEATURES, '10ING: DOORS, VENTILATOR OPENINGS, ROOF AND WALL PANEL DESIGN, FLASHING w TM DETAILS AND FRAMING DETAILS. )ESIGN THE BUILDING DESIGN SHALL COMPLY WITH STATE AND NATIONAL UNIFORM BUILDING CODES FOR METAL BUILDINGS. THE BUILDING SHALL BE DESIGNED IN ACCORDANCE WITH THE APPLICABLE FROVISIOWz OF THE AISC "SPECIFICATIONS FOR THE DESIGN, FABRICATION AND ERECTION OF jrEEL BUILDINGS". AtL COLD FORMED LIGHT GAGE STEEL MEMBERS SHALL BE DESIGNED IN ACCORDANCE WITH THE AISI "SPECIFICATIONS FOR THE DESIGN OF LIGHT GAGE COLD FORMED STRUCTURAL STEEL MEMBERS". ALL DESIGN LOADS SHALL MEET OR EXCEED UBC AND CITY OF RENTON REQUIREMENTS. 5-1 City Plans Spec's & Permits r CITY OF RENTON METAL FABRICATED BUILDING I ENGINE GENERATOR SET JULY, 1985 3. MATERIALS f" ALL STEEL PLATE AND SHEETING USED IN THE FABRICATION OF THE BUILDING STRUCTURAL MEMBERS SHALL BE OF STRUCTURAL QUALITY, ASTM A-570, GRADL 50, WITH A MINIMUM YIELD POINT OF 50,000 PSI . STEEL USED FOR ROOF AND WAL! r.. PANELS SHALL BE ASTM A-446 GRADE A OR D AS REQUIRED BY THE DESIGN WITH A G90 GALVANIZED COATING, MATERIALS SHALL HAVE A MINIMUM YIELD POINT OF 33,000 AND 50,000 PSI RESPECTIVELY. ALL STEEL SHAPES AND MILL ROLL CHANNELS ETC. SHALL CONFORM TO ASTM A-16. 4. ROOF AND MALL PANELS r ROOF AND WALL PANELS SHALL BE RIBBED WITH AN OVERLAPPING DESIGN TO INSURE A WATERTIGHT SEAL. PANELS SHALL BE OF A SINGLE LENGTH WHERE FEASIBLE. IF ENDLAPS ARE REQU?RED, THEY SHALL OCCUR AT A P'JRLIN OR GIRT AND SHALL HAVE A MINIMUM OVERLAP OF B INCHES. ALL PANELS SHALL BE FORMED IN A CONTINUOUS ROLLING MILL TO INSURE CLOSE DIMENSIONAL TOLERANCES AND QUALITY CONTROL. C INSTALLATION OF ROOF AND WALL PANELS SHALL RE IN STRICT ACCORDANCE WITH THE BUILDING MANUFACTURER'S INSTRUCTIONS. PROVISIONS FOR REINFORCING WALL PANELS AROUND LOUVERS AND EXHAUST PENETRATION SHALL BE MADE BY CONTRACTOR. DESIGN DETAILS OF REINFORCING SHALL BE SUBMITTED WITH PRE-BID SUBMITTALS IN ACCORDANCE WITH SECTION i OF THESE TECHNICAL SPECIFICATICNS. ROOF AND WALL PPNE'_ COATINGS SHALL RE MANUFACTURER'S STANDARD. SELECTION OF COLOR SHALL BE MADE BY THE CITY FOLLOWING BID AWARD. COLOR SELECTION SHEET SHALL BE SUBMITTED WITH PRE-BID SUBMITTALS IN ACCORDANCE WITH SECTION 1 OF THESE TECHNICAL SPECIFICATIONS. 5. FLASHING AND TRIM ALL GUTTERS, TRIM AND FLASHINGS SHALL BE FABRICATED FROM 26 GAGE GALVANIZED SHEET METAL. TRIM SHALL BE EQUAL TO SOULE INDUSTRIES, CASCADE TRIM SYSTEM. TRIM AND FLASHING SHALL RE FORMED AND LAPPED TO PROVIDE A COMPLETE WEATHERTIGHT INSTALLATION. FINISH AS SPECIFIED FOR ROOF AND WALL PANELS. 6. DOORS STEEL ROLLING SERVICE DOOR SHALL BE ATLAS DOOR CORPORATION OR APPROVED EQUAL. CURTAINS SHALL RE INTERLOCKING SLATS COLD ROLL FORMED FROM GALVANIZED STEEL. ALTERNATE SLATS SHALL BE FITT,7D WITH MALLEABLE IRON ENDLOCKS TO ACT AS A WEARING SURFACE IN GUIDES AND TO MAINTAIN SLAT ALIGNMENT. SLAT DESIGN, SLAT PROJECTION INTO GUIDES AND WIND LOCK USED SHALL SATISFY A 20 r 5-2 L r CITY OF RENTON METAL FABRICATED RUILDINt, ENGINE C---NERATOR SET JULY. 1985 PSF WINDLOAD CONDITION. STEEL SLAT THICKNESS SHALL BE NO. 22 US GAUGE. STEEL SLATS SHALL BE GALVANIZED WITH A ZINC COATING IN ACCORDANCE WITH ASTM A. 525-80. EACH CURTAIN SHALL BE REINFORCED WITH A BOTTOM BAR CONSISTING OF TWO STEEL ANGLES. SPRING COUNTERBALANCE SHALL BE HOUSED IN A STEEL PIPE OF DIAMETER AND WALL THICKNESS TO RESTRICT MAXIMUM DEFLECTION TO 0.36 INCHES. SPRINGS SHALL BE HELICAL TORSION TYPE DESIGNED TO INCLUDE AN OVERLOAD FACTOR OF 25 PERCENT, GREASE PACKED, ADJUSTABLE FROM OUTSIDE END OF BRACKET PLATE, AND SHALL BE FURNISHED WITH SEALED BALL BEARINGS. LOCKING SHALL CONSIST OF SLIDE BOLTS SUITABLE FOR CITY'S STANDARD PADLOCK AND KEY. DOORS SHALL BF "ALL WEATHER" , FULLY WEATHERSTRIPPED AT SILL. HOOD AND AT GUIDES. I � 5-3 r. CITY OF RENTON ENGINE GENERATOR SET JULY. 1985 6.0 W f� r NOT USED THIS SPECIFICATION `1^V YYI I C C C C r r C CITY OF RENTON THERMAL/MOISTURE PROTECTION ENGINE GENERATOR SET JULY, 1985 7.0 THERMAL AND MOISTURE PROTECTION 1_CAULKING THE PUkPOSE OF THIS SELTION IS TO PROVIDE A STRUCTURE WHICH IS COMPLETELY WEATHER-TIGHT. THE CONTRACTOR SHALL CAULK ALL JOINTS AND SPACES NECESSARY, WHETHER SHOWN ON THE DRAWINGS OR NOT, TO CONFORM TO THIS REQUIREMENT. AREAS TO BE CAULKED INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING; DOOR FRAMES, INTAKE LOUVER FRAMES, VENTILATOR FRAMES, PIPE PENETRATIONS IN WALLS AND FLOORS, ETC. EXTERIOR AND INTERIOR BUILDING WALLS AND FLOOR SEALANT SHALL BE GENERAL ELECTRIC SILICONE 1300 DOW-CORNING OR EQUAL. COLOR SHALL BE NATURAL, NEUTRAL, OR CON"RETE GRAY AS NOTED. APPLY CAULKING IN STRICT ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. 1HE CONTRACTOR SHALL ASSURE THAT ALL SURFACES TO BE SEALED SHALL BE CLEAN OF OUST, OIL, DIRT, FORM RELEASING OR CONCRETE CURING AGENTS, AND WATER. ALL CONCRETE SHALL BE CURED FOR 28 DAYS PRIOR TO THE APPLICATION OF SEALANT AND CAULKING. WHERE NECESSARY TO PROVIDE A >JITABLE BACKSTOP AND BOND BREAKER, TIGHTLY PACK WITH POLYETHYLENE FOAM. ROPE THE SACK OF GROOVES LEAVING A MINIMUM DEPTH OF 1/4 INCH FOR SEALANT. PRIME CONCRETE SURFACES AS RECOMMENDED BY THE MANUFACTURER. APPLY CAULKING WITH GUN USING NOZZLE OF CORRECT SIZE FOR JOINT, FORCED INTO GROOVES WITH SUFFICIENT PRESSURE TO EXPEL ALL AIR AND COMPLETELY FILL GROOVE. FINISH CURED-CAULKING UNIFORM AND FLUSH WITH ADJOINING SURFACES. SEAL AROUND ENTIRE PERIMETER OF OPENINGS. DO NOT APPLY SEALANT TO WET OR FROST SURFACE. APPLY SILICON SEALANT AT TEMPERATURES ABOVE 45 DEGREES FAHRENHEIT. CLEAN ALL ADJOINING SURFACES OF EXCESS SEALANT, SMEARS, OR MARKING DUE TO APPLICATION AND LEAVE JOINTS WITH NEAT, UNIFORMLY FILLED SURFACES. 2. FLOOR VAPOR BARRIER CONCRETE FLOOR SHALL BE POURED OVER A POLYETHYLENE FILM (WHITE OR CLEAR) . ` THE FILM SHALL BE AT LEAST 10 MILS THICK AND SHALL BE UNIFORM IN APPEARANCE AND FREE FROM DEFECTS. FURNISH IN AS LARGE SHEETS AS POSSIBLE TO REDUCE THE NUMBER OF JOINTS TO A MINIMUM. OVERLAP ALL JOINTS A MINIMUM OF 12 INCHES. 7-1 r CITY OF RENTON ENGINE GENERATOR SET JUEY, 1985 8.0 NOT USED THIS SPECIFICATION C C C C L a Y CITY OF RENTON FINISHES ENGINE GENERATOR SET JULY, 1985 9.0 FINISHES 1. SCOPE THE CONTRACTOR SMALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR TO COAT ALL ITEMS IN ACCORDANCE WITH THESE SPECIFICATIONS. FINISHES SHALL BE DONE AT SUCH TIMES AS THE CONTRACTOR A0 CITY MAY AGREE UPON IN ORDER THAT OUST FREE AND NEAT WORK BE OBTAINED. COATING SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND IN A MANNER SATISFACTORY TO THE CITY. ALL PHASES OF THE WORK SHALL BE AVAILABLE TO OBSERVATION BY THE CITY. II ALL SAFETY PRECAUTIONS STATED IN THE MANUFACTURER' S PRINTED INSTRUCTIONS SHALL DE CAREFULLY OBSERVED. ADEQUATE VENTILATION AND LIGHTING SHALL BE PROVIDED AT ALL TIMES. 2. SUBMITTALS THE CONTRACTOR SHALL SUBMIT, PRIOR TO BEGINNING OF ANY PAINTING OR COATING, A LIST OF COATINGS AND MANUFACTURERS HE INTENDS TO USE FOR REVIEW BY THE CITY . THE APPLICATION EACH COATING IS INTEVDED FOR, ANY SURFACE PREPARATION, NUMBER OF COATS, METHOD OF APPLICATION, AND COATING THICKNESS SHALL BE INCLUDED. THIS INFORMATION SHALL BE SUBMITTED IN ACCORDANCE WITH THE REQUIREMENTS REGARDING SHOP DRAWINGS INCLUDED HEREIN. 3. SURFACE PREPARATION ALL SURFACES SHALL BE PREPARED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER OF THE COATING TO BE APPLIED TO THE SURFACE. IN ADDITION, ALL SURFACES SHALL BE SMOOTH, CLEAN, AND DRY PRIOk TO ANY COATING UNLESS SPECIFICALLY DIRECTED BY THE COATING MANUFACTURER. NO PAINTING SHALL BE DONE BEFORE THE PREPARED SURFACES ARE APPROVED BY THE CITY, 4. COATING QUALITY THE. PAINT AND PAINT PRODUCTS OF TNEMEC COMPANY OF KANSAS CITY, MISSOURI , MENTIONED IN THESE SPECIFICATIONS ARE INTENDED AS A STANDARD OF QUALITY. 9-1 W CITY OF RENTON FINISHES ENGINE GENERATOR SET JULY, 198S S. SUBSTITUTIONS SUBSTITUTIONS CF THE COATINGS OF OTHER MANUFACTURERS SHALL BE CONSIDERED ONLY IF EQUIVALENT SiSTEMS OF COATINGS CAN BE PROVIDED, AND ONLY IF A RECORD OF SATISFACTORY EXPERIENCE WITH THE SYSTEM IN EQUIVALENT APPLICATIONS IS AVAILABLE. A SUBSTITUTE COATING SYSTEM IS CONSIDERED TG BE AN EQUIVALENT SYSTEM WHEN IT IS PROVED TO THE SATISFACTION OF THE CITY THAT THEY ARE EQUIVALENT IN COMPOSITION, DURABILITY, USEFULNESS, AND CONVENIENCE FOR THE PURPOSE INTENDED. SUBSTITUTIONS WILL BE CONSIDERED PROVIDED THE FOLLOWING MINIMUM CONDITIONS ARE MFT- 1. THE PROPOSED PFTNT SYSTEM SHALL HAVE A DRY FILM THICKNESS EQUAL TO OR GREATER THAN THAT OF THE SPECIFIED SYSTEM. °. THE PROPOSED PAINT SYSTEM SHALL EMPLOY AN EQUAL OF GREATER NUMBER OF SEPARATE COATS. THE' PROPOSY.I PAINT clSTEM SHALL EMPLOY PRIMERS COMPATIBLE WITH THE TYPE OF PAINT SELCCTF 4. ALL REQUESTS FOR SUBSTITUTION SHALL CARRY FULL DESCRIPTIVE LITERATURE AND DIRECTIONS FOR APPLICATIONS, ALONG WITH COMPLETE INFORMATIDN ON GENERIC TYPE, NON-VOLATILE CONTENT BY VOLUME AND 1 LIST OF SIMILAR PROJECTS W ZE THE COATINGS HAVE BEEN APPLIED TO SIMILAR EXPOSURES. 5. IF THE ABOVE MENTIONED DATA APPEARS TO BE IN ORDER, THE CONTRACTOR SHALL PROVIDE. CERTIFIED LABORATORY DATA SHEETS SHOWING THE RESULTS OF COMPLETE SPECTROGRAPHIC, AND DURABILITY TFSTS PERFORMED ON THE PROPOSED SUESTITUTE. TESTS SHALL BE PERFORMED BY AN INDEPENDENT TESTING LABORATORY APPROVED BY THE CITY AND ALL COSTS INCURRED IN THE TESTING PROGRAM SHALL BE CHARGED TO THE CONTRACTOR. 6. IN ANY CASE, THE CITY SHALL BE THE SOLE AND FINAL JUDGE OF THE ACCEPTABILITV OF ANY PROPOSED SUBSTITUTION. ALL MATERIALS SHAD_ BE BROUGHT TO THE JOSSTTE IN THE ORIGINAL SEALED AND LABELED CONTAINERS OF THE PAINT MANUFACTURER AND SHALL BE SUBJICT TO INSPECTION BY THE CITY. THE CONTRACTOR SHALL PROVIDE, IN ADDITION, ONE UNBROKEN GALLON CONTAINER OF EACH TYPE AND COLOR OF PAINT AND EACH TYPE OF SOLVENT AND THINNER USED. PAINT SUPPLIES SHALL BE STORED AS APPROVED BY THE CITY. COLORS, WHERE NOT SPECIFIED, SHALL BE AS SELECTED BY THE CITY. THE CONTRACTOR SHALL SUBMIT TO THE CITY, IMMEDIATELY UPON COMPLETION OF THE JOB, CERTIFICATION FROM THE MANUFACTURER INDICATING THAT THE QUANTITY OF EACH COATING PURCHASED WAS SUFFICIENT TO PROPERLY COAT ALL SURFACES. SUCH ., CERTIFICATION SHALL MAKE REFERENCE TO SQUARE FOOTAGE FIGURES PROVIDED TO THE MANUFACTURER BY THE CONTRACTOR. 9-2 1r CITY OF RENTON FINISHES ENGINE GENERATOR SET JULY, 1985 6. COLOR THE OWNER WILL DEVELOP A DETAILED COLOR SCHEDULE AFTER AWARD OF CONTRACT. 7. MATERIALS 1. iNTERIOR CONCRETE FLOOR DO NOT COAT. 2. STEEL (EXTERIOR) - E-G HOUSING, LOUVERS, ETC. SURFACE PREPARATION SP6 (COMMERCIAL BLAST) ONE COAT HI-BUILD EPDXOLTNE 4 TO 6 MIL OFT ONE COAT E� ''RA SHIELD 1.5 TO 2.5 IL DFT 3. STEEL (INTERIOR) - GUIDE RAILS, ETC. SURFACE PREPARATION SP6 (COMMERCID_ BLAST) ONE COAT EPDXOLINE PRIMER 3 TO 5 MIL OFT ONE COAT HI-BUILD EPDXOLINE 4 TO 6 MIL OFT 4. METAL BUILDING MANUFACTURER'S STANDARD COATING - COLOR TO BE SELECTED BY OWNER AFTER CONTRACT AWARD. 8. INSPFCTIOM INSPECT ALL SURFACE PREPARATION PRIOR TO APPLICATION OF ANf COATING. TAE PICTORIAL SURFACE PREPARATION STANDARDS FOR PAINTING STEEL SURFACES (VIS-1 ) BY THE STEEL STRUCTURES PAINTING COUNCIL (SSPC) SHALL BE USED AS A VISUAL STANDARD FOR INSPECTION OF SURFACE PREPARATION OF METAL SURFACES. EACH COAT SHALL BE INSPECTED PRIOR TO APPLICATION OF THE NEXT COAT. AREAS FOUND TO CONTAIN RUNS, OVERSPRAY. ROUGHNESS, OR OTHER SIGNS OF IMPROPER APPLICATION SHALL BE REPAIRED OR RECOATED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. THE COMPLETED COATING SHALL PRODUCE A MINIMUM DRY FILM THICKNESS IN ACCORDANCE WITV THE SPECIFICATIONS AS DETERMINED BY THE MICROTEST THICKNESS GAUGE OR COMPARABLE INSTRUMENT. IN AREAS WHERE THIS THICKNESS IS NOT DEVELOPED, SUFFICIENT ADDITIONAL COATS SHALL BE APPLIED TO PRODUCE IT. 9-3 CITY OF RENTON FINISHES ENGINE GENERATOR SET JULY, 1985 THE COMPLETED COATING ON M'TAL SURFACES SHALL BE INSPECTED BY THE CONTRACTOR IN THE PRESENCE GI THE CIT" FOR PINHOLES AND HOLIDAYS WITH A TINKER AND RASOR OR OTHER LOW VOLTAGE ('UNDER 100 VOLTS) HOLIDAY DETECTOR. AREAS FOUND TO CONTAIN PINHOLES SHALL BE REPAIRED OR RECOATED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. THE COMPLETED COATING SHALL BE INSPECTED FOR RUNS, OVERSPRAY, AND ROUGHNESS, AND ANY AREAS FOUND TO SHOW THESE OR OTHER SIGNS OF IMPROPER APPLICATION SHALL BE REPAIRED OR RECOATED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. w 9. COMPATIBILITY OF COATINGS 1 . THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPATIBILITY OF ALL PAINT r PRODUCTS. L 2. TEST COATINGS APPLIED TO AN EXISTING SURFACE COATING BY PATCH TEST TO DETERMINE SUITABILITY. 3, ALLOW SC"FICIENT TIME TO DEMONSTRATE COMPATIBILITY. t" L 10. INSPECTION AND CERTIFICAT13N OF SHOP SURFACE PREPARATION r 1 . IMMEDIATELY PRIG^ TO APPLICATION OF PRIME COATS HAVE ALL SURFACES TO RECEIVE PAINT INSPECTED BY CITY-APPROVED QUALITY CONTROL AGENT. 2. REBLAST DR PROVIDE ADDITIONAL PREPARATION DIRECTED CY AGENT IF REQUIRED TO MEET SPECIFIED SURFACE PREPARATION SPECIFICATION. 3. SUBMIT TO CITY CERTIFICATION OF CONFORMANCE OF FINISH SURFACE PREPARATION TO STANDARDS REFERENCED: 1. CERTIFICATION BY QUALITY CONTROL AGENT 2. INCLUDE DATE OF SURFACE PREPARATION AND SSPC STANDARD ACHIEVED 3. PRIMER-APPLICATION: TYPE AND MANUFACTURER FROM LABELED CONTAINERS USED FOR PRIME COAT WORK 4. RECORDED DRY FILM THICKNESS 11, INSPECTION PRIOR TO APPLICATION OF FIELD PRIMER AND FINISH COATINGS 1 . CLEAN ALL SURFACES IMMEDIATELY PRIOR TO COATING. 2. INSPECT ALL SURFACES FOR CONFORMANCE TO SPECIFIED PREPARATION STANDARDS. L 9-4 r is CITY OF RENTON FINISHES ENGINE GENERATOR SET JUL'„ 1985 3. REQUEST AND OBTAIN CITY INSPECTION FOR EACH COATING SURFACE PREPARATION PRIOR TO COATING APPLICATION. 12. PAINT SMOOTHNESS, COVER, AND SHEET TOLERANCE 1. FINISH COATIN' JRFACE SMOOTHNESS EQUAL TO BASE SURFACE PREPARATION SMOOTHNESS. 2. UNIFORM LUSTER WITH EVEN APPEARANCE FREE OF LAP MARKS. 13. PAINT APPLICATION CONDITIONS 1. CLEAN, DRY ENVIRONMENT AND AT TEMPERATURES RECOMMENDED IN MANUFACTURER'S PREPRINTED INSTRUCTIONS. 2. SURFACE TEMPERATURE: MINIMUM OF 5 DEGREES FAHRENHEIT ABOVE WET BULB TEMPERATURE. 3 MAXIMUM HUMIDITY: 85 PERCENT. 4. SHIELD FROM HOi SUN WITH APPROPRIATE HCUSING WHEN APPLYING PAINTS. 5. DO NOT APPLY COATINGS IN AREAS WHERE DUST IS BEING GENERATED. 6. DO NOT APPLY IN FOG, SNOW , RAIN, OR TO WET OR DAMP SURFACES. 14. APPLICATION 1 . APPLY COATING AT SPECIFIED RATES AND CONSISTENCY PER SELECTED MANUFACTURER'S SPECIFIC APPLICATION INSTRUCTIONS. 2. BUILDUP IN MULTIPLE OR SINGLE FINISH COATS AS SPFCIFIED. 3. THIN ONLY WITH THINNERS SPECIFICALLY FORMULATED FOR USE BY APPROVED MANUFACTURER. 4. TINT PRIMER, SECOND COAT, AND FINISH COAT DIFFERENT SHADES TO VERIFY COVERAGE. 15.. RECO_AT DRY T:IE 4 PERMIT ADEQUATE CURE-DRYING INTERVAL BETWEEN MULTIPLE COATS AS DETERMINED BY MANUFACTURER'S RECOMMENDED DRYING TIME AT SPECIFIED CURE CONDITIONS. r. 9-5 w R CITY OF RENTON ENGINE GENERATOR SET JULY, 1985 10.0 r � r NOT USED THIS SPECIFICATION N C V Ir L t r L ■ CITY OF RENTON EQUIPMENT ENG14E GENERATOR SET JULY, 1985 11 .0 EQUIPMENT 1. DIESEL ENGINE 1. GENERAL THE GENERAL DESIGil OF THE ENGINE GENERATOR FURNISHED SHALL BE THE MANUFACTURER'S STANDARD, EXCEPT WHERE IT DIFFERS FROM THE REQUIREMENTS OF THESE SPECIFICATIONS. THE DIESEL ENGINE IS TO BE INSTALLED AT AN ELEVATION OF 400 FEET ABOVE SEA LEVEL AND SHALL MEET ALL PERFORMANCE REQUIREMENTS SPECIFIED HEREIN WHEN INSTALLED AT THAT ALTITUDE. THE ENGINE SHALL, AS A MINIMUM, BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SPECIFICATION AND MAY BE THE MANUFACTURER'S STANDARD COMMERCIAL PRODUCT WITH ADDED FEATURES NEEDED TO COMPLY WITH THESE REQUIREMENTS. ADDITIONAL OR BETTER FEATURES WHICH ARE NOT SPECIFICALLY PROHIBITED BY THIS SPECIFICATION, BUT WHICH ARE A PART OF THE MANUFACTURER' S STANDARD COMMERCIAL PRODUCTS, SHALL BE INCLUDED IN THE ENGINE GENERATOR BEING FURNISHcD. A STANDARD COMMERCIAL PRODUCT IS A PRODUCT WHICH HAS SEEN OR WILL BE SOLD ON THE COMMERCIAL MARKET THROUGH ADVERTISEMENTS OR MANUFACTURER'S CATALOGUES, OR BROCHURES, AND REPRESENTS THE LATEST PRODUCTION MODEL. EXPOSED PARTS WHICH ARE SUBJECI TO HIGH-OPERATING TEMPERATURES OR WHICH ARE ENERGIZED ELECTRICALLY, AND MOVING PARTS WHICH ARE OF SUCH NATURE OR SO LOCATED AS TO BE A HAZARD TO OPERATING PERSONNEL, SHALL BE INSULATED, ENCLOSED, OR GUARDED. -4FETY DEVICES AND SAFETY MEASURES SHALL NOT IMPAIR THE PROPER FUNCTION OF ANY PART OF THE SET. PARTS WHICH REQUIRE ADJUSTMENT OR SERVICING (NOT REPAIR OR ^EPLACEMENT) TO PERMIT OPERATION Of THE SETS, SHALL BE ARRANGED TO PROVIDE OPTIMUM EASE OF SERVICING. ADJUSTMENT, REPAIR, AND REPLACEMENT OF PARTS, ASSEMBLIES, AND ACCESSORIES SHALL BE POSSIBLE WITH MINIMUM DRAINAGE AND MINIMUM DISTURBANCE OF THE SET. MAINTENANCE SHALL BE POSSIBLE BY THE USE OF COMMON TOOLS. 2. RATING RATING OF THE DIESEL ENGINE-GENERATOR SET SHALL BE BASED ON OPERATION OF THE SET WHEN EQUIPPED WITH ALL NECESSARY OPERATING ACCESSORIES SUCH AS RADIATOR, FAN, AIR CLEANERS, LUBRICATING OIL PUMP, FUEL INJECTION PUMP, JACKET WATER PUMP, GOVERNOR, CHARGING GENERATOR. THE ENGINE-GENERATOR SHALL BE A FOUR-CYCLE DIESEL TYPE WITH A MINIMUM POWER OUTPUT OF 125 KT.!OWATTS AT A SPEED NOT EXCEEDING 1,800 PPM. RATINGS SHALL BE ESTABLISHED USING SAE J1349 STANDARD CONDITIONS, 11-1 h CITE OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 3. ELECTRIC STARTING SYSTEM THE ENGINE SHALL BE EQUIPPED WITH AN ELECTRIC STARIING SYSTEM OF SUFFICIENT CAPACITY TO CRANK THE ENGINE AT A SPEED WHICH WILL ALLOW FOR FULL DIESEL STAP.T OF THE ENGINE. THE STARTING PINION SHALL BE SO ARRANGED AS TO DISENGAGE AUTOMATICALLY WHEN THE DIESEL ENGINE STARTS. STORAGE BATTERIES WITH RACK SHALL BE FURNISHCD HAVIN"u SUFFICIENT CAPACITY FOR CRANKING THE ENGINE -OR AT LEAST 30 SECONDS AT FIRING SPEED IN THE AMBIENT TEMPERATURES SPECIFIED, AND WITH CAPACITY FOR STARTING THE DIESEL ENGINE A MINIMUM OF THREE TIMES, INCLUDING OPERATION OF THE 12 VOLT LIGHTING SYSTEM. II A CURRENT LIM`.TING VOLTAGE COMPENSATED BATTERY CHARGER SHALL BE FURNISHED TO AUTOMATICALLY RECHARGE THE BATTERIES. THE CHARGER SHALL INCLUDE OVERLOAD PROTECTION, SILICON DIODE FULL WAVE RECTIFIERS, VOLTAGE SURGE SUPPRESSERS, D.C. AMMETER AND FUSED AC INPUT. THE CHARGER SHALL OPERATE ON 120 VOLTS, SINGLE PHASE, 60 HERTZ, AC. WITH AN AMPERE OUTPUT NOT LESS THAN FIVE AMPERES. THE CHARGER SMALL BE DISCONNECTED FROM THE BATTERY SET DURING THE CRANKING CYCLE OR SHALL BE CAPABLE OF WITHSTANDING STARTING CURRENT VOLTAGE DROP. INCLUDE A TIMER SWITCH TO PROVIDE AN EQUALIZING CHARGE TO THE BATTERIES. PROVIDE AN ALARM CONTACT FOR ANNUNCIATION OF BATTERY CHARGER LOSS O� ' ITPUT. THE BATTERIES SHALL BE MOUSED IN AN ACID-RESISTANT BOX. WHICH SHALL BE MOUNTED ON THE ENGINE FRAME ADJACENT TO THE ENGINE. LOCATION OF THE BATTERY HOUSING SHALL NOT INTERFERE WITH MAINTENANCE AND INSPECTION OF THE ENGINE. THE BATTERY CHARGER SHALL HAVE AN ENCLOSURE MOUNTED 120 VAC RECEPTACLE FOR LINE CHARGING WHEN THE ENGINE GENERATOR SET IS STORED. THE RECEPTACLE SHALL BE LABELED, "120 VAC". 4 . COOLING SYSTEM THE COOLING SYSTEM SHALL CONSIST OF A FRAME-MOUNTED RADIATOR WITH ENGINE WATER PUMP, FAN ASSEMBLY, AND FAN GUARD. RADIATOR CAPACITY SHALL BE ADEQUATE USING ENGINE FAN COOLING TO MAINTAIN SAFE OPERATION AT AN AMBIENT TEMPERATURE OF 105 DEGREES FAHRENHEIT. AN ENGINE THERMOSTAT SHALL BE PROVIDED TO REGULATE ENGINE WATER TEMPERATURE AS RECOMMENC-D BY THE MANUFACTURER. INCLUDED IN THE COOLING LOOP SHALL BE A HIGH-COOLANT TEMPERATURE DEVICE TO SHUT DOWN THE ENGINE THROUGH THE ENGINE CONTROL PANEL WHEN THE ENGINE TEMPERATURE IS EXCESSIVE, COOLING SYSTEM WATER HEATERS SUITABLE FOR OPERATION ON A 120-VOLT, 60-HZ CU?'tENT SHALL BE PROVIDED TO MAINTAIN ENGINE WATER TEMPERATURE AT 120 DEGREES FAHRENHEIT AT AN AMBIENT TEMPERATURE OF 50 DEGREES 11-2 a� CITY OF RENTON EQUIPMENT ENGINE GENERATOR SFT JULY, 1985 FAHRENHEIT. THE HEATERS SHALL BE THERMOSTATICALLY CONTROLLED KIM JACKET HEATERS Ok APPROVED EQUAL. THE ENGINE COOLING SYSTEM SHALL BE FILLED WITH A MIXTURE OF WATER., ANTI-FREEZE, AND CORROSION INHIBITOR TO PROVIDE FREEZING PROTECTION AT AN AMBIENT TEMPERATURE OF -10 DEGREES FAHRENHEIT. THE ENGINE HEATERS SHALL BE WIRED TO THE CONTROL RECEPTACLE FOR LINE CONNECTION WHEN THE ENGINE GENERATOR SET IS STORED. 5. AIR CLEANERS THE ENGINE SHALL BE PROVIDED WITH ONE OR MORE DRY TYPE AIR CLEANERS OF SUFFICIENT CAPACITY TO EFFECTIVELY PROTECT THE WORKING 0 KING PARTS OF THE ENGINE FROM DUST , GRIT, AND ASH. 6. GOVERNOR SYSTEM ENGINE SPEED SHALL BE CONTROLLED BY EITHER A HYDRAULIC OR MECHANICAL GOVERNOR PROVIDING NOT MORE THAN 5% REGULATION. THE THROTTLE SHALL BE FITTED WITH AN AUTOMATIC SOFT START UNIT WHICH WILL THROTTLE THE ENGINE FROM AN IDLE AT START TO FULL RPM WITHIN AN ADJUSTNBLE PERIOD OF TIME (0-I MINUTE) . UNIT SHALL OPERATE ON CLOSURE OF CNGINE START CONTACTS. A COOL DOWN PERIOD OF 3-10 MINUTES SHALL BE PROVIDED WITH THE ENGINE AUTOMATICALLY RETURNING TO IDLE FOR COOL DOWN. AN OVFRSPEED TkIP SHALL ALSO BE PROVIDED. 7. LUBRICATION THE ENGINE SHALL HAVE A GEAR-TYPE LUBRICATING OIL PUMP FOR SUPPLYING OIL UNDER PRESSURE TO MAIN BEARINGS, CRANK PIN BEARINGS, PISTONS, PISTON PINS, TIMING GEARS, CAMSHAFT BEARINGS, AND VALVE ROCKER MECHANISM. AN EFFECTIVE LUBRICATING OIL FILTER SHALL BE PROVIDED AND SO LOCATED AND CONNECTED THAT LUBRICATING OIL IS CONTINUOUSLY FILTERED AND CLEANED. FILTERS SHALL BE ACCESSIBLE, EASILY REMOVED AND CLEANED AND SHALL BE EQUIPPED WITH A SPRING-LOADED BY-PASS VALVE AS AN INSURANCE AGAINST STOPPAGE OF LUBRICATING OIL CIRCULATION IN EVENT THE FILTERS BECOME CLOGGED. THE ENGINE SHALL HAVE A SUITABLE LUBRICATING OIL COOLER , EITHER + AIR-COOLED OR WATER-COOLED, AND PROVISION FOR DRAINING THE OIL BY PIPING OR OTHER MEANS TO THE OUTSIDE OF THL ENGINE BASE. THE ENGINE LUBRICATING SYSTEM SHALL BE EQUIPPED WITH A D°VICE TO SHUT DOWN THE ENGINE THROUGii THE ENGINE CONTROL PANEL ON LOW OIL PRESSURE. w 11-3 � I CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 B. EXHAUST SYSTEM THE MUFFLER SHALL BE RATED FOR CRITICAL SILENCING, AND SHALL BE - FURNISHED WITH THE ENGINE. IT SHALL BE OF SUFFICIENT SIZE TO ENSURE AGAINST LOSS OF POWER DUE TO EXCESSIVE BACK PRESSURE. ALL EXHAUST PIPING SHALL BE STAINLESS STEEL. CONSTRUCT AS SHOWN ON 1HE PLANS FOR QUICK DISCONNECT AT THE HIGHLANDS PUMP STATION. 9. FUEL SYSTEM r L. THE ENGINE SHALL OPERATE ON A COMMERCIAL GRADE OF DISTILLED NO. 2 DOMESTIC. BURNER OIL. DIESEL ENGINES REQUIRING A PREMIUM FUEL WILL NOT r BE CONSIDERED. L INJECTION PUMPS AND INJECTION VALVES SHALL BE 4, TYPE NOT REQUIRING ADJUSTMENT IN SERVICE, AND SHALL BE CAPABLE OF QUICK REPLACEMENT BY ORDINARY MECHANICS WITHOUT SPECIAL DIESEL EXPERIENCE. FUE'_ INJECTION PUMPS SHALL BE POSITIVE ACTION. CONSTANT-STROKE PUMPS, r ACTUATED BY A CAM DRIVEN GEARS FROM THE ENGINE CAMSHAFT. V FUEL LINES BETWEEN INJECTION PUMPS AND VALVES SHALL BE OF HEAVY SEAMLESS TUBING, AND, TO ELIMINATE IRREGULARITY OF FUEL INJECTION, SHALL BE OF THE SAME LENGTH FOR ALL CYLINDERS. THE FUEL SYSTEM SHALL BE EQUIPPED WITH A RACOR TYPE FUEL FILTER HAVING REPLACEABLE ELEMENTS WHICH MAY BE EASILY REMOVED FROM THEIR HOUSING FOR REPLACEMENT WITHOUT BREAKING ANY FUEL LINE CONNECTIONS, OR DISTURBING THE FUEL PUMPS OR ANY OTHER PART OF THE ENGINE. ALL FUEL FILTERS SHALL BE CONVENIENTLY LOCATED IN ONE ACCESSIBLE HOUSING, AHEAD OF THE INJECTION PUMPS SO THAT THE FUEL WILL HAVE BEEN THOROUGHLY FILTERED BEFORE IT REACHES THE PUMP. NO SCREEN OR FILTER REQUIRING CLEANING OR REPLACEMENT WILL BE USEO IN THE INJECTION PUMP OR INJECTION VALVE ASSEMBLIES. PROVIDE WITH A FUEL FEED LINE SOLENOID THAT STOPS FUEL FLOW WHEN THE ENGINE IS CALLED TO STOP. PROVIDE WITH AN INTEGRAL 125 GALLON FUEL TANK MOUNTED BETWEEN THE STRUCTURAL STEEL SKIDS FOR ENGINE FUEL SUPPLY. THE TANK SHALL BE ESPECIALLY CONSTRUCTED FOR MOUNTING IN THIS LOCATION AND SHALL BE DESIGNED TO WITHSTAND THE LOADS TRANSMITTED BY THE ENGINE AND DURING INSTALLATION AND TRANSPORT. PROVIDE WITH A FUEL LEVEL GAUGE, LOW LFVEL ALARM ANNUNCIATION DRAIN, LOCKABLE FILL PIPE, AND A VENT THAT 15 PIPED OUTSIDE THE ENCLOSURE. THE TANK SHALL BE SLOPED TO THE ENGINE PICK-UP TUBE 5% MIN. THE FUEL FEED LINE SHALL BE VALVED Al THE ENGINE, BUT THE FUEL RETURN LINE SHALL NOT BE VALVED. THE RETURN LINE SHALL BE MOUNTED IN THE TOP OF THE TANK TO PREVENT FUEL SIPHON INTO THE ENGINE. ALL FUEL LINES SHALL HAVE FLEXIBLE SECTIONS BETWEEN THE TANK AND THE ENGINE TO ABSORB I VIBRATION. L 11-4 t : V CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 THE FUEL STORAGE SYSTEM SHALL BE INSTALLED ACCORDING TO THE DIESEL ENGINE MANUFACTURER'S RECOMMENDATIONS AND SHALL CONFORM TO THE NATIONAL FIRE PROTECTION CODE AND UNIFORM BUILDING CODE. DELIVER THE UNIT WITH A FULL FUEL TANK. 10. FINISHES THE DIESEL ENGINE SET ENCLOSURE AND ACCESSORIES SHALL BE PRIMED AND PAINTED IN CONFORMITY WITH THE MANUFACTURER'S STANDARD PRACTICE. MANUFACTURER SHALL SHIP WITH THE UNIT ONE QUART OF TOUCH-UP PAINT FOR EACH OF THE FINISHES. 11. TORSIONAL VIBRATION THE COMPLETE ENGINE GENERATOR SET SHALL BE SO DESIGNED, CONSTRUCTED, AND INSTALLED AS TO BE FREE FROM OBJECTIONABLE VIBRATION IN ANY MODE. FREEDOM FROM TORSIONAL VIBRATION SHALL BE DEMONSTRATED DURING THE FACTORY TEST PERFORMED ON THE SET PROVIDED, AND PROOF OF TORSIONAL ACCEPTABILITY SHALL BE PROVIDED BY THE MANUFACTURER, 12. SPECIAL TOOLS A SET OF SPECIALTY TOOLS NECESSARY FOR ROUTINE MAINTENANCE OF THE EQUIPMENT, IF REQUIRED, SHALL BE FURNISHED. TOOLS SHALL BE LOCATED IN A UNIT MOUNTED, LOCKABLE TOOL CHEST. 13, SPARE PARTS THE FOLLOWING SPARE PARTS SHALL BE FURNISHED: THREE (3) SETS OF FUEL FILTER ELEMENTS AND GASKETS THREE (3) LUBRICATING OIL FILTER ELEMENTS AND GASKETS ONE (1) AIR CLEANEk FILTER ELEMENT TWO (2) COMPLETE SETS OF V-BELTS, INCLUDING FAN AND ALTERNATOR DRIVE BELTS ALL SPARE PARTS SHALL BE LOCATED IN A UNIT MOUNTED, LOCKABLE STORAGE CHEST, 11-5 a« r CITY OF RENTON EQUIPMENT ENGINE GEN'RATOI, SET JULY. 1985 2, CONTROL PANEL i. THE ENGINE CONTROL PANEL SHALL RE MOUNTED INSIDE THE WEATHERPROOF ENCLOSURE, AND SHALL BE ACCESSIBLE BY OPENING A HINGED, LOCKABLE PANEL ON THE EXTERIOR OF THE ENCLOSURE . THE CONTROL PANEL SHALL INCLUDE THE �- FOLLOWING: " 1. OIL PRESSURE GAUGE (PSI) L 2. COOLANT TEMPERATURE. GAUGE (°F) 3. FUEL TANK LEVEL GAUGE (E TO F) �. 4. TACHOMETER (RPM) -- 5. OPERATING HOURMETER (MRS) 6. HOA SELECTOR SWITCH (M-O-A) 7. FREQUENCY METER (HERTZ) B. VOLT METER (0-60OV) 9. AMMETER (0-400A) C THE REMOTE START CONTACTS FROM THE AUTOMAYIC TRANSFER SWITCH AT THE HIGHLANDS PUMP STATION SHALL BE CONNECTED TO THE PLUG-IN RECEPTACLE THA1 ALSO CONTAINS THE COMMON ALARM CONTACTS, THE RECEPTACLE SHALL BE LABELED, "REMOTE CONTROL AND 120 VOLT POWER" . �-- 3. ALARM SYSTEM 1.. A FAILURE ALARM SYSTEM SHALL BE PROVIDED THAT WILL OPEkATE A CONTROL PANEL MOUNTED INDICATING LIGHT, A UNIT MOUNTED AUDIBLE ALARM, AND A SINGIF (COMMON) ONTACT FOR REMOTE ALARM ANNUNCIATION. ANY ALARM CONDITI. . WILL SHUT DOWN THE ENGINE. 1. OVER CRANK 2. OVER SPEED 3. HIGH COOLANT TEMPERATURE 4. LOW OIL PRESSURE 5. LOW FUEL 6. ENGINE FAIL TO START 7. OVER VOLTAGE IN ADDITION TO THE ABOVE ALARMS THAT SHUT DOWN THE ENGINE, PROVIDE A BATTERY CHARGER FAULT ALARM AND A SECOND LOW FUEL ALARM THAT ACTIVATES A "LOW FUEL WARNING" ALARM ON THE ALARM PANEL, AND THE COMMON ALARM, BUT DOES NOT SHUT DOWN THE ENGINE. THE "LOW FUEL WARNING" ALARM WILL BE ACTIVATED WHEN 30 GALLONS OF FUEL RFtt11N IN THE TANK. ALL ALARMS SHALL BE COMMONED TO A SINGLE FAULT CONTACT FOR REMOTE ALARM ANNUNCIATION, y� THE ALARM PANEL SHALL HAVE A RESET PUSH BUTTON FOR ACKNOWLEDGING THE ALARM CONDITIONS, AND LATCHING INDICATING LIGHTS FOR EACH ALARM POINT TO DISPLAY L TO OPERATING PERSONNEL THE REASON FOR THE ENGINE SHUTDOWN. THE LIGHTS v SHALL BE LABELED AS SHOWN ABOVE. PROVIDE A LAMP TEST PUSHBUTTON. } i. 11-6 1 r CITY OF RENTON EQUIDMENT ENGINE GENERATOR SET JULY. 1985 PROVIDE AN INTERIOR ENCLOSURE MOUNTED RECEPTACLE THAT WILL ACCEPT A PLUG FOR TRANSMITTING THE COMMON ALARM TO THE AUTOMATIC CONTROL SYSTEM AT THE HIGHLANDS PUMP STATION. THE RECEPTACLE SHALL BE LABELED, "REMOTE CONTROL AND 120 VOLT POWER" . 4_._ GENERATOR 1. ALTERNATOR THE GENERATOR SHALL BE A REVOLVING FIELD, 4-POLE BRUSHLESS CONNECTION TO THE ALTERNATOR. THE GENERATOR ROTOR SHALL HAVE BEEN DYNAMICALLY BALANCED AND ALIGNED WITH THE ENGINE, AND CONNECTED TO THE ENGINE USING A FLEXIBLE DISC COUPLING. THE GENERATOR SHALL MEET THE FOLLOWING REQUIREMENTS: STANDBY RATING 156 KVA 125 KW VOLTAGE 480 VOLTS PHASE 3-PHASE FREQUENCY 60-HZ INSULATION CLASS F THE ALLOWABLE TEMPERATURE RISE IN THE GENERATOR SHALL NOT EXCEED 105 DEGREES CENTIGRADE OVER 40 DEGREES CENTIGRADE AMBIENT TEMPERATURE. THE GENERATOR SHALL HA!JE A THREE-PHASE, FULL WAVE RECTIFIED EXCITER AND BE SUITABLE FOR STARTING ONE 60-HORSEPOWER MOTOR AND TWO 40-HORSEPOWER MOTORS WHILE MEETING A HEATING AND LIGHTING LOAD OF 15 KW. THE OUTPUT WAVE FORM DEVIATION SHALL BE LESS THAN 0.6 LINE TO LINE AND LESS THAN 0.6 LINE TO NEUTRAL, PER NEMA MG1-22.42. THE TELEPHONE INFLUENCE FACTOR SHALL BE LESS THAN 50 PER NEMA MG1-22.43. 2. VOLTAGG REGULATOR THE ENGINE-GENERATOR UNIT SHALL HAVE A STEADY STATE VOLTAGE REGULATOR. TRANSIENT VOLTAGE DIP SHALL NOT EXCEED 25 PEP'ENT OF RATED VOLTAGE WITH A SUDDEN APPLICATION OF RATED LOAD, RECG.-RY TO RATED STEADY STATE I CONDITIONS SHALL OCCUR WITHIN TWO SECONDS FOLLOWING THE LOAD CHARGE. THE GENERATOR SHALL RE SUPPLIED WITH A VOLTAGE LEVEL CONTROL TO PROVIDE AN ADJUSTABLE OUTPUT VOLTAGE OF PLUS OR MINUS 5 PERCENT. THE VOLTAGE CONTROL DEVICE SHALL BE MOUNTED ON THE ENGINE CONTROL PANEL. 11-T CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 3. SWITCHGEAR THE GENERATOR SWITCHGEAR SHALL INCLUDE AN EXCITER CIRCU?T BREAKER WITH MANUAL RESET, POWER ANU CONTROL TRANSFORMER, PRIMARY BREAKER, TRANSFORMER, FOUR CIRCUIT DISTR1BUTiON PANELS, AND A LINE CIRCUIT BREAKER WITH MANUAL RESET. THE BREAKERS SHALL BE MOUNTED IN THE ENGINF CONTROL PANEL. GENERATOR INSTRUMENTATION SHALL INCLUDE A PANEL-TYPE AMMETER WITH PHASE SELECTOP SWITCH, A PANEL-TYPE VOLTMETER WITH SELECTOR SWITCH, AND FREQLFNCY METER MOUNTED ON THE ENGINE CONTROL PANEL. r- ` 5. TRANSFER SWITCH t THE TRANSFER SWITCH SHALL BE A STANDARD PRODUCT, APPROVED FOR THE PURPOSE, IN CONFORMITY WITH UL STANDARD 1008, AND SHALL CONTAIN ALL THE LOGICS FOR AUTOMATIC OPERATION, INCLUDING A SEVEN F.AY TIMER SWITCH FOR ONCE-A-WEEK EXERCISING OF THE SET. TRANSFER AND RETRANSFER TO NORMAL SOURCE SHALL BE AUTOMATIC. AUTOMATIC TRANSFER SWITCHES SHALL BE ELECTRICALLY OPERATED, ME!.HANICALLY HELD AND SUPPLIED WITH POSITIVE MECHANICAL INTERLOCKING. THE MAIN CONTACTS SHALL PE EQUIPPED WITH A SAFE MANUAL OVERRIDE CAPABILITY. UL 1008 LISTED MEETING TABLES 21 .1, 23.1, 23.2. MANUFACTURER: ASCO, ONAN, RUSSELF' TPIC, KOHLER., WESTINGHOUSE. TRANSFER SWITCH SHALL HAVE VOLTAGE, AMPERAGE AND AMPERE WITHSTAND RATINGS AS SHOWN ON THE DkAWINGS. TRANSFER SWITCHES USED Tr1 TRANSFER FROM NORMAL TO EMERGENCY POWER SHALL BE APPROVED FOR EMERGENCY SEkv10E, FULL CONTINUOUS AMPERE RATED (NO DERATING) WITH MAKE RATING AT 20 TIMES AND BREAK RATING AT SIX TIMES FULL LOAD CURRENT RATING. PROVIDE FOUR POLE DEVICES FOR SWITCHING OF NEUTRAL IN ADDITION TO PHASE CONDUCTORS WHEN GENERATOR NEUTRAL IS GROUNDED AT THE GENERATOR, OR AS SHOWN ON THE DRAWINGS. THE TRANSFER SWITCH SHALL HAVE A MINIMUM CONTINUOUS RATING EXCEEDING THAT OF THE SERVICE WHICH IS 300 AMPS AT 480 VOLTS, 60 HERTZ. THE TRANSFER SWITCH SHALL HAVE THE FOLLOWING STANDARD AND/OR ACCESSO0 EQUIPMENT: 1. MINIMUM RUN TIMER, 10 MINUTES SUBSEQUENT TL EACH START. 2. TRANSFER. ADJUSTABLE RIDE THROUGH FEATURr OF APPROXIMATELY 0-10 SECONDS FOR START OF ENGINE GENERATOR AND TRANSFER ON MOMENTARY LOSS OF NORMAL SOURCE. SET AT ONE SECOND. INCLUDES TWO AUXILIARY CONTACTS, 1 N.O. AND 1 N.C. FOR USE FOR ENGINE START SIGNAL. 3. RETRANSFER. ADJUSTABLE TIME DELAY (WITH EMERGENCY FAILURE BY-PASS) OF 0-30 MINUTES FOR RETRANSFER TO NORMAL. SET AT 15 MINUTES. 11-8 CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 4. GENERATOR CONDITION. VM TAGE AND FREQUENCY SENSITIVE LOCKOUT RELAY. PREVENTS TRANSFER JNTIL VOLTAGE AND FREQUENCY OF GENERATOR HAVE REACHED PRESET I,ATING. SET AT 95 PERCENT. 5. "TIME DELAY NEUTRAL". PRUVIDF TIME DELAY WITH TRANSFER SWITCH IN NEUTRAL POSITION AND LOAD DISCONNECTED FROM EITHER SOURCE, ADJUSTABLE .2-` SECONDS, TO PREVENT TRANSFER BETWCEN SOURCES WHEN SOURCES ARE SIGNIFICANTLY OUT OF PHASE. SET PER ENGINEER' S INSTRUCTIONS. 6. PHASE REVERSAL RELAY, SENSING RELAY TO PREVENT TRANSFER TO NEW SOURCE WHEN PHASES ARE REVERSED FORM DESIGNED PHASING. 7. EXERCISER CLOCK. SHALT _-ET THE PAY , TIME AND DURATION OF THE GENERATOR EXERCISE PER;91' AND INCLUDE A WITH/WITHOUT LOAD SELECTOR SWITCH. B. SIGNALS. TWO PILOT LIGHTS FOR INDICATING TRANSFER POSITION. WHITE - NORMAL, YELLOW - LAERGENCY AT TRANSFER SWITCH. AUXILIARY CONTACTS FOR REMOTE PILOT LIGHTS. 9. TWO AUXILIARY SETS OF CONTACTS TO BE CLOSED IN NORMAL POSITION AND OPEN IN EMERGENCY POSITION. 10. ''AUTO-OFF-TEST" SWITCH IN COVER. (TEST SWITCH TO SIMULATE POWER FAILURE.) 11. FULL THREE PHASE VOLTAGE FAILURE WITH ADJUSTABLE DROPOUT AND PICKUP AT 85 PERCENT DROPOUT, 92 PERCENT PICKUP, ALL THE ABOVE REQUIREMENTS SHALL BE EITHER STANDARD, OR STANDARD OPTIONS WITH THE TRANSFER SWITCH MANUFACTURER. THE TRANSFER SWITCH SHALL BE PROVIDED IN A NEMA 3R ENCLOSURE FOR "REMOTE" MOUNTING FROM THE ENGINE GENERATOR SET. ALL INTERWIRING TO THE SET AS WELL AS OTHER EXTERNAL WIRING FOR CONTROLS SHALL BE WIRED TO TERMINAL BLOCKS. 6. TRAILER AND ENCLOSURE 1. GENERAL THE ENGINE GENERATOR UNIT SHALL BE FACTORY ASSEMBLED AND ALIGNED ON A STRUCTURAL STEEL FRAME AND TRAILER. THE ASSEMBLY SHALL BE CONSTRUCTED SO AS TO ENSURE PROPER ALIGNMENT OF ALL ROTATING PARTS, AND TO PREVENT VIBRATION BUILD-UP. THE ENCLOSURE SHALL COMPLETEL" ENCLOSE ALL ENGINE GENERATOR COMPONENTS AND APPURTENANCES AND SHALL BE DESIGNED FOR EXTERIOR STORAGE AND OPERATION. THE TRAILER SHALL COMPLY WITH ALL WSOOT REQUIREMENTS. Mr 11-9 30 CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 1985 2. RATING THE TRAILER SHALL BE RATED FOR 7,000 POUNDS GROSS CAPACITY MINIMUM. 3. FRAME r. THE FRAME SHALL BE ALL WELDED, ALL STEEL ANGLE AND CHANNEL CONSTRUCTION WITH A SOLID HEAVY GAUGE BED PLATE. THE PLATE SHALL BE DRILLED TO ACCEPT THE OIL DRAIN HOSE FROM THE OIL PAN OF THE ENGINE. THE FRAME "^ SHALL HAVE A V-TYPE TONGUE WITH A 2-112 INCH LUNNETTE EYE TOWING RING, L, AND TANDEM AXLES THAT ARE MOUNTED TO THE FRAME WITH ELLIPTICAL SPRINGS II � AND SHOCK ABSORBERS. 4. WHEELS AND TIRES ( THE TRAILER SHALL RE EQUIPPED WITH TANDEM AXLES, EACH USING STEEL WHEELS AND 8.00 X 14.5 , 12 PLY TIRES. PROVIDE THE UNIT WITH ONE INTEGRALLY MOUNTED SPARE TIRE AND WHEEL ASSEMBLY. AXLES SHALL BE INDUSTRIAL QUALITY TYPE WITH DOUBLE ROW, TAPERED ROLLER BEARINGS (MOTOR HOME AXLES WILL NOT BE ACCEPTED) . S. CONNECTOR e THE CONNECTOR SHALL BE AS REQUIRED TO CONNECT TO EXISTING CITY VEHICLES. 6. WEATHERPROOF ENCLOSURE THE WEATHERPROOF ENCLOSURE SHALL BE OF 14 GAUGE FORMED STEEL, ESPECIALLY CONSTRUCTED FOR THE ENGINE AND TRAILER COMBINATION PROVIDED. THE ENCLOSURE SHALL BE EQUIPPED WITH FIXED OPEN AIR INTAKE AND EXHAUST LOUVERS FOR OPERATION AT RATED CAPACITY WITH ALL OF THE DOORS CLOSED. THE LOUVERS SHALL BE BAFFLED TO PREVENT RAIN FROM ENTERING THE ENCLOSURE AT HIGHWAY SPEEDS. ALL DOORS AND LOUVERS SHALL BE PIANO HINGED AND HAVE KEY LOCKING LATCHES, THE DOORS COVERING THE CONTROL AND ALARM PANEL SHALL BE GASKETED TO PROVIDE A NEMA 12 RATING FOR THE ENCLOSURE CONTAINING THE ALARM AND CONTROL EQUIPMENT. ALL ENGINE GENERATOR COMPONENTS SHALL BE EASILY ACCESSIBLE FOR INSPECTION OR SERVICE WITH THE DOORS REMOVED. THE MUFFLER SHALL BE EXTERIOR MOUNTED. FUEL FILLER CAP AND VENT SHALL BE EXTERIOR MOUNTED. 7. LICENSE t DELIVER THE TRAILER WITH A CURRENT WASHINGTON STATE VEHICLE LICENSE, REGISTERED IN THE CITY'S NAME. 1 11-10 CITY OF RENTON EQUIPMENT ENGINE GENERATOR SET JULY, 19"15 8, FINISHES THE TRAILER SHALL RE FINISHED WITH TWO COATS OF ENAMEL OVER A PRIMED BASF, COLOR TO MATCH THE ENGINE GENERATOR SET. 9. ACCESSORIES f'JRNISH WITH THE FOLLOWING ACCESSORIES: FRON" RETRACTABLE DEADSTAND (WITH SWIVEL WHEEL) LICENSE PLATE HOLDER FENDERS BUMPER) HUB CAPS TWO SAFETY CHAINS WITH GRAB HOOKS ICC EQUIPMENT (12 VOLT ELECTRIC BRAKES - ONE AXLE ONLY, SIDE AND REAR REFLECTORS, STOP,IURN/TAIL/LICENSE LIGHTS) CABLE STORAGE CABINET WITH LOCKING COVEk TO STORE 25 FEET OF CABLE WITH THE PLUG ASSEMBLY SPARE WHEEL, TIRE AND CknRIER DOUBLE REAR LOAD LEVELING JACKS UNIT MOUNTED FLOOD LIGHT (SWITCHED) ENCLOSURE CONTROL PANEL LIGHT (SWITCHED) ACCESSORIES SHALL BE THE MANUFACTURER'S STAN"�RD, SUBJECT TO APPROVAL OF THE CITY. M' 11-11 b CITY OF RENTON METAL FABRICATED BUILDINC ENGINE GENERATOR SET JULY, 1985 5.0 r „ METAL FABRICATED BUILDING r 1. GENERAL THE SCOPE OF WORK FOR THIS SECTION CONSISTS OF THE DESIGN, MATERIALS, AND FABRICATION OF A PREFABRICATED METAL BUILDING SYSTEM COMPLETE WITH ALL APPURTENANCES INCLUDING DOORS, AND OPENINGS FOR COOLING AND EXHAUST SYSTEMS. THE BUILDING SHALL BE OF WEATHERTIGHT CONSTRUCTION, EAS?LY ERECTED, AND SUITABLE FOR ITS INTENDED USE. THE METAL FABRICATED BUILDING SHALL BE A SOULE INDUSTRIES, TACHTE BUILDING SYSTEMS, STAk BUILDING, OR APPROVED EQUAL. APPROVALS SHALL BE OBTAINED PRIOR TO BID OPENING AND ALL COSTS RESULTING FROM MODIFICATIONS TO THE DESIGN PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MATERIALS FURNISHED SHALL INCLUDE THE STRUCTURAL FRAMING, ROOF PANELS, WAIL PANELS, BRACING, FASTENERS, SEALANTS, AND ALL COMPONENTS FOP THE METAL BUILDING PROPER. ALL MATERIALS WILL BE NEW, UNUSED AND FABRICATED IN A WORKMANLIKE MANNER. THE CONTRACTORS BID SHALL BE RESPONSIBLE FOR SUBMITTING DETAILED SHOP DRAWINGS FOR "HE STRUCTURAL DESIGN OF THE BUILDING. SUBMISSION AND +» APPROVAL SHALL BE IN ACCORDANCE WITH SECTION 1 OF THESE TECHNICAL SPECIFICATIONS. THE SHOP DRAW:NGS SHALL ShOW ALL PERTINENT FEATURES, INCLUDING: DOORS, VENTILATOR OPENINGS, ROOF AND WALL PANEL DESIGN, FLASHING AND TRIM DETAILS AND FRAMING DETAILS. 2. DESIGN THE BUILDING DESIGN SHALL COMPLY 'WITH STATE AND NATIONAL UNIFORM BUILDING CODES FOR METAL BUILDINGS. THE BUILDING SHALL BE DESIGNED IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE AISC "SPECIFICATIONS -OR THE DESIGN, FABRICATION AND ERECTION OF STEEL BUILDINGS". ALL COLD FORMED LIGHT GAGE STEEL MEMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ThF AISI "SPECIFICATIONS FOR THE DESIGN OF LIGHT GAGE COLD FORMED STRUCTURAL STEEL MEMBERS" . ALL *" DESIGN LOADS SHALL MEET OR EXCEED UBC AND CITY OF RENTON REQUIREMENTS. r 5-1 • CITY OF RENTON ENGINE GENERATOR SET JULY, 1985 12.0 NOT USED THIS SPECIFICATION . II r ti i y li r G1 r ' r� I M 7 CITY OF RENTON ENGINE GENERATOR SET JULY, 1985 13.0 NOT USED T4IS SPEC.FICATION fi r III I a.. r I ,. L CITY OF RENTON ENGINE GENERATOR SET JULY, 1985 14.0 NOT USED Th:S SPECIFICATION I a a I 4 III � r r i CITY OF RENTON r ENGINE GENERATOR SET JULY, 1985 4 r 1. 15.0 r r NOT USED THIS SPECIFICATION i i i L CITY OF RENTON ELECTRICAL ENGINE GENERATOR SET JULY, 1485 16.0 ELECTRICAL 1. SCOPE MATERIAL AND EQUIPMENT DESCRIBED IN THE FOLLOWING SHALL BE USED ON THIS PROJECT. ITEMS NOT COVERED SHALL BE PURPOSE MADE FOR THEIR PARTICULAR APPLICATION. 2. LOCAL CONDITION THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORK, AS WELL AS THE LOCAL CONDITION UNDER WHICH THE WORK IS TO BE PERFORMED. TO THE EXTENT POSSIBLE, HE SHALL ASCERTAIN ALL FACTORS WHICH WILL AFFECT HIS OPERATION AND SUCCESSFUL COMPLETION OF THE wORK WITHIN THE SPECIFIED TIME, 3. PERMITS AND INSPECTIONS ALL PERMITS, LICENSES, FEES, INSPECTIONS, APPROVALS, AND OTHER ARRANGEMENTS NECESSARY TO PFRFORM THE ELECTRICAL WORK SHALL BE OBTAINED BY THE CONTRAC'fCR. ALL COST OF SUCH ARRANGEMENTS SHALL BE INCLUDED IN THE BID. 4. MINOR DEVIATIONS ELECTRICAL PLANS ARE DIAGRAMMATIC IN NATURE AND LOCATION OF DEVICES, FIXTURES, AND EQUIPMENT IS APPROXIMATE UNLESS DIMENSIONED. ON THE BASIS OF THIS, THE RIGHT IS RESERVED TO PROVIDE FOR MINOR ADJUSTMENTS AND DEVIATIONS FROM THE APPARENT LOCATIONS SHOWN ON THE DRAWING WITHOUT ANY EXTRA COST, PROVIDING THIS IS DONE PRIOR TO ROUGH-IN. DEVIATIONS FPOM THE FLANS AND/OR SPECIFICATIONS REQUIRED BY CODE SHALL ALSO BE DONE, SUBSEQUENT TO THE ARCHITECT'S APPROVAL, WITHOUT ANY EXTRA COST TO THE OWNER. 5. TEMPORARY LIGHT ANO POWER ADEQUATE SERVICES FOR TEMPORARY LIGHT AND POWER MUST BE PROVIDED. THE CONTRACTOR MUST VERIFY THE NEED IN TERMS OF CAPACITY AND CHARACTERISTICS (RATING, SINGLE, OR THREE-PHASE) AS REQUIRED FOR THE CONSTRUCTION, AND INCLUDE THE COST OF FURNISHING BOTH THE INSTALLATION AND THE POWER USAGE IN HIS BID. 16-1 w / I CITY JF RENTON ELECTRICAL CENGINE GENERATOR SET JULY. 1985 • 6. SHOP DRAWINGS C THE CONTRACTOR SHALL SUBMIT FOR APPROVAL SHOP DRAWINGS, CATALOG CUTS, DIAGRAMMATIC DRAWINGS, AND ELEMENTARY CONTROL DIAGRAMS FOR EQUIPMENT AND FOR "SYSTEMS" AS THEY RELATE TO THIS PROJECT, SPECIFICALLY FOR THE FOLLOWING ITEMS AND IF REQUESTED BY THE ENGINEER, FOR ANY ADDITIONAL ITEM OR ITEMS DEEMED NECESSARY: 1 . SERVICE ENTRANCE EQUIPMENT 2. PANELBOARDS 3. SAFETY SWITCHES 4. MOTOR STARTING EQUIPMENT AND CONTROLS 5. CONTACTORS AND RELAYS C6. LIGHTING FIXTURES 7. WIRING DEVICES 7. DISCONNECTS DISCONNECTS OF PROPER RATING SHALL BE PROVIDED IN ALL CASES WHERE SHOWN AND ADDITIONAL DISCONNECTS SHALL BE PROVIDED IF REQUIRED BY CODE. ENCLOSURES r+ SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED. r 8. OVERCURRENT DEVICES OVERCURRENT DEVICES, BEING FUSED DISCONNECTS OR MOLDED CASE CIRCUIT BREAKERS, SHALL BE AS SHOWN ON THE PLANS. A SPARE SET OF FUSES SHALL BE PROVIDED IN A!_L CASES WHERE FUSIBLE SWITCHES ARE EMPLOYED. DEVICES SHALL �. HAVE RATINGS AS SHOWN, EXCEPT WHERE CHANGES IN REQUIREMENT MAKES IT NECESSARY TO PROVIDE RATINGS BETTER SUITED FOR THE LOAD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING THE RATINGS OF MOTOR OVERLOAD ELEMENTS .. FOR PROPER SIZE. 9. CONDUIT AND FITTINGS r RIGID OR INTERMEDIATE GALVANIZED CONDUIT SHALL BE USED THROUGHOUT, EXCEPT IN AREAS WHERE OTHER MATERIAL MAY BE USED AS INDICATED BELOW: r 1 . EMT MAY BE USED INSIDE THE BUILDING APOVE GRADE AND WHERE NOT SUBJECTED TO PHYSICAL DAMAGE AND CORROSIV ATMOSPHERE. 2. FLEXIBLE CONDUIT SHALL BE USED FOR FINAL CONNECTION TO MOTORS AND VIBRATING EQUIPMENT. JACKETED FLEX WITH THREADED FITTINGS SHALL BE USED OUTSIDE AND IN WET AND CORROSIVE ATMOSPHERE. M 16-2 CITY OF RENTON ELECTRICAL ENGINE GENERATOR SET JULY, 1985 3. PVC SCHEDULE 40 CONDUIT MAY BE USED OUTSIDE IN CONTACT WITH EARTH, PROVIDING AN EXTRA GROUNDING CONDUCTOR OF PROPER SIZE IS ADDED. HOWEVER, RIGID CONDUIT SHALL RE STUBBED OUT FROM BUILDING AND OTHER STRUCTURES TO A MINIMUM OF 5 FEET. 4. RIGID GALVANI7ED CONDUIT INSTALLED IN EARTH SHALL BE COATED WITH BITUMINOUS ASPHALT SUBSEQUENT TO ASSEMB+.Y. 5. ALUMINUM CONDUIT SHALL NOT BE USED ON THIS PROJECT. 6. USE THREADED FITTINGS FOR ALL RIGID AND INTERMEDIATE CONDUIT. USE THREADED DRIVE ON, CONCRETE TIGHT FITTINGS FOR EMT. 10. OUTLET AND JUNCTION BOXES USE CAST BOXES WITH THREADED HUBS FOR ALL RIGID ANU INTERMEDIATE CONDUIT. USE PRESSED STEEL BOXES FOR EMT. ALL BOXES SHALL BE OF PROPER SIZE TO ACCOMMODATE DEVICES, CONNECTORS, AND NUMBER OF WIRES PRESENT IN THE BOX. 11. WIRE AND CABLES ONLY COPPER WIRES SHALL BE USED. NO. B AWG AND LARGER CONDUCTORS SHALL HAVE TRW COVERING. NO. 10 AWG AND SMALLER SIZES SHALL HAVE THHN COVERING. USE NO LESS THAN NO. 12 WIRING FOR ANY CIRCUIT, EXCEPT THAT NO. 14 MAY BE USED FOR CONTROL WIRING. 12. WIRING DEVICES SPECIFICATION GRADE DEVICES SHALL BE USED THROUGHOUT THE PROJECT. SPECIAL DEVICES SHALL BE FURNISHED WHERE THE EQUIPMENT REQUIRES OTHER 1HAN STANDARD DEVICES. , 13. GROUNDING SERVICE AND EQUIPMENT GROUNDING SHALL BE PER ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE. THE CONTRACTOR SHALL VERIFY THAT A LOW RESISTANCE GROUND PATH IS PROVIDED FOR ALL CIRCUITS SO THAT AN ACCIDENTAL CONTACT TO GROUND OF ANY LIVE CONDUCTOR WILL INSTANTLY TRIP THE CIRCUIT. 14. SERVICE ENTRANCE EQUIPMENT SERVICE ENTRANCE EQUIPMENT SHALL IN EVERY RESPECT AND AS A MINIMUM COMPLY WITH ARTICLE 230 OF THE NATIONAL ELECTRICAL CODE. IT SHALL, TO THE EXTENT POSSIBLE, BE A STANDARD DESIGN OF A NATIONALLY RECOGNIZED MANUFACTURER AND BE VERIFIED BY THE MANUFACTURER AS SUITABLE FOR SERVICE ENTRANCE EQUIPMENT. 16-3 p CITY OF RENTON ELECTRICAL ENGINE GENERATOR SET JULY, 1985 1.5. BRANCH CIRCUIT PANELROARD THE BRANCH CIRCUIT PANELROARD SHALL HAVE RATING, NUMBER, AND TYPES OF DEVICES AS SHOWN ON THE PLANS. THE PANELBOARD SHALL BE OF CURRENT MANUFACTURE, SHALL BE UL APPRCVED, AND SO LABELED. 16. DRY TYPE TRANSFORMER THE DRY TYPE TRANSFORMER SHALL RE A STANDARD , CATALOGUED ITEM BY A NATIONALLY RECOGNIZED MANUFACTURER OF SUCH EQUIPMENT. ENCLOSURE, TERMINAL COMPARTMENT , PROTECTIVE PAINTING, ETC . , SHALL BE COMPATIBLE WITH THE ENVIRONMENT IN WHICH IT IS LOCATED. RATINGS SHALL BE AS SHOWN ON THE j PLANS. FURNISH UNIT WITH STANDARD TAPS. �I 17. LIGHTING FIXTURES THE FIXTURES SHALL. BE A STANDARD, CATALOGUED ITEM GENERAL DESCRIPTION AS CALLED FOR ON THE PLANS. ALL FIXTURES SHALL BE UL. APPROVED AND SO LABELED. PROVIDE SUITABLE SUPPORTS AND MOUNTINGS. 16. GENERAL WORKMANSHIP INSTALLATION OF THE VARIOUS COMPONENTS OF THE ELECTRICAL WORK SHALL FE PERFORMED BY CRAFTSMEN EXPERIENCED IN COMMERCIAL AND INDUSTRIAL ELECTRICAL INSTALLATIONS. CRAFTSMANSHIP AND METHODS OF INSTALLATION SHALL BE IN CONFORMITY WITH NECA "STANDARDS OF INSTALLATIONS", WHICH IS HEREBY MADE PART OF THESE SPECIFICATIONS. 19. CUTTING, PATCHING AND PIERCING 1. OBTAIN WRITTEN PERMISS'ON OF THE ENGINEER BEFORE CUTTING OR PIERCING STRUCTURAL MEM!< 'S. 2. USE CRAFTSMEN SKILLFD IN THEIR RESPECTIVE TRADES FAR rOTTING, FITTING, REPAIRING, PATCHING OF PLASTER, AND FINISHING OF MATERIALS, INCLUDING CARPENTRY WORK, METAL WORK, OR CONCRETE WORK REQUIRED FOR THIS WORK. DO NOT WEAKEN WALLS, PARTITIONS, OR FLOORS WITH CUTTING. HOLES REQUIRED TO BE CUT IN FLOORS MUST BE DRILLED WITHOUT EXCESSIVE BREAKING OUT AROUND THE HOLES. 3, SLEEVES THROUGH FLOORS AND WALLS TO BE STEEL PIPE, FLUSH WITH WALLS, CEILINGS OR FINISHED FLOORS, SIZED TO ACCOMMODATE THE RACEWAY. , 4. USE CARE IN PIERCING AND WATERPROOFING. AFTER PIERCING AND, THE WATERPROOFING HAS BEEN SET IN PLACE, SEAL OPENING, AND MAKE ABSOLUTELY WATERTIGHT. �- 16-4 I CITY OF RENTON ELECTRICAL ENGINE GENERATOR SET JULY, 1985 20. WEATHER PROTECTION SEAL EQUIPMENT OR COMPONENTS EXPOSED TO WEATHER AND MAKE WATERTIGHT AND INSECT-PROOF. PROTECT EQUIPMENT OUTLETS AND CONDUIT OPENINGS WITH TEMPORARY PLUGS OR CAPS AT ALL TIMES THAT WORK IS NOT 1N PROGRESS. 21. IDENTIFICATION OF EQUIPMENT PROVIDE A NAME TAG FOR EACH PIECE OF EQUIPMENT AND FOR EACH CIRCUIT AND/OR CONTROL DEVICE ASSOCIATED WITH THE EQUIPMENT. NAME PLATES SHALL BE PHENOLIC ENGRAVED AND SHALL CLEARLY IDENTIFY THE ASSOCIATED COMPONENT. COLOR SHALL BE BLACK BACKGROUND WITH WHITE LETTERS. TAGS SHALL BE SECURELY ATTACHED. 22. ACCESS TO EQUIPMENT LOCATE STARTERS, SWITCHES, PULLBOXES, AND SIMILAR ITEMS TO PR(`VIDE BEST POSSIBLE ACCESS FOR OPERATION, MAINTENANCE, AND REPAIR. i 23. PROTECTIVE FINISHES 1 . PREPARE ALL EXPOSED FITTINGS, BOXES, SUPPORTS, PANELBOAF )S, ETC., FOR PAINTING BY REMOVING ALL OIL, GREASE, AND DIRT. 2. TAKE CARE NOT TO SCRA7..H OR DEFACE FACTORY FINISH ON ELECTRICAL APPARATUS AND DEVICES. 3. EXPOSED CONDUIT INSTALLED SUBSEQUENT TO ROOM FINISH SHALL BE PAINTED TO MATCH. 4. PROVIDE HOT-DIP GALVANIZED COMPONENTS FOR FERROUS MATERIAL': EXPOSED TO THE WEATHER. 5. PROVIDE BITUMINOUS ASPHALTI: COATING FOR ALL FERROUS CONDUIT INSTALLED DIRECTLY IN EARTH. AP!'-Y TWO (2 ) COATS AFTER COMPLETELY ASSEMBLED. 6. CONDUIT WITH FACTORY-APPLIED PROTECTIVE COATING MAY BE CONSIDERED IN LIEU OF ASPHALT, PROVIDING SUITABLE TOUCH-UP MATERIALS .ARE USED w FOR FINAL SEALING OF COUPLINGS AND INJURIES TO THE FACTORY-APPLIEO COAT. w 24. TESTING 1. TEST ALL CIRCUITS FOR CONTINUITY, FREEDOM FROM GROUND, AND PROPER OPERATION DURING PROGRESS OF WORK. 16-5 Is CITY OF RENTON ELECTRICAL ENGINF GENERATOR SET JULY, 1985 2. TEST ALL SYSTEMS AS THEY ARE COMPLETED AS PER REQUIREMENTS. 3. CONDUCT SPECIAL TESTS AS REQUIRED FOR SERVICE AND/OR SYSTEM GROUND. 4. TEST PUMP MOTOR TO VERIFY THAT AN OVERLOAD CONDIIIGN DOES NOT EXIST. 2F , CLEAN-UP AND C"ISSIONING 1 . THROUGHOUT THE WORK, THE CONTRACTOR SHALL KEEP THE WORK AREA REASONABLY NEAT AND ORDERLY BY PERIODIC CLEAN-UPS AS REQUIRED. 2. AS PART OF THE 14STALLATION BECOMES READY FOR USE, THE SEGMENTS SHALL ?E COMMISSIONED AND JSED FOR CONVENIENCE DURING CONSTRUCTION. 26. FINAL TEST 1 . FINAL TEST SHALL BE CONDUCTED IN TH, PRESENCE OF THE OWNER AND/OR HIS AUTHORIZED REPRESENTATIVE. 2. PRIOR TO THE TEST, THE CONTRACTOR SHALL HAVE SATISFIED HIMSELF THAT THE PROJECT AREA IS PROPERLY CLEANED UP, ALL PATCHING AND PAINTING DEEMED NECESSARY PROPERLY DONE, AND ALL SYSTEMS, EQUIPMENT, AND CONTROLS ARE FUNCTIONING AS INTENDED. 3. THE CONTRACTOR SHALL R'ON All TESTS AND FURNISH ALL TESTING INSTRUMENTS REQUIRED TO DEMGNSTRATE SATISFACTORY OPERATION OF SYSTEMS, EQUIPMENT, AND CONTROLS. 27. CORRECTIONS 1. AFIER THE CONCLUSION OF THE FINAL TEST, THE CONTRACTOR WILL RECEIVE A WRITTEN NOTICE REQUIRING REPLACEMENT, ADJLSTMENT, OR REPAIR OF l SYSTEMS, EQUIPMENT, AND CONTROLS WHICH DO NCT MEET THE SPECIFIED REQUIREMENTS. 2. INSPECTION AND RETESTING AS NECESSARY WILL BE REQUIRED SUBSEQUENT TO THE CONTRACTOR'S NOTIFICATION THAT THE REQUESTED CORRECTIONS HAVE BEEN MADE. 28. WARRANTY UNLESS OTHERWISE STATED, THE WARRANTY STARTS ON THE DATE WRITTEN NOTICE IS GIVEN THAT THE PROJECT IS COMPLETE AND ALL REQUIRED CORRECTIONS HAVE BEEN MADE. 16-6 r CITY OF RENTON ENGINE GENERATOR SET JULY, 1985 17.0 NOT USED THIS SPErIFICATION f m � r r k' 1 r 101 CITY OF RENTON MEASUREMENT AND PAYMENT ENGINE GENERATOR SET JULY, 1985 18.0 MEASUREMENT AND PAYMENT I. SCOPE OF WORT( r IT IS THE INTENTION OF THESE SPECIFICATIONS THAT THE PERFORMANCE OF ALL WORK UNDER THE BID FOR EACH ITEM SHALL RESULT IN THE COMPLETE CONSTRUCTION, L IN PROPER OPERATING CONDITION, OF THE IMPROVEMENTS IDENTIFIED IN THESE I WRITTEN SPECIFICATIONS AND THE ACCOMPANYING CONTRACT DOCUMENTS. LL WORK AND MATERIAL NOT SPECIFICALLY LISTED IN THE PROPOSAL BUT REQUIRED ACCORDING TO THE CONTRACT PLANS, SPECIFICATIONS, AND GENERAL PRACTICE SHALL BE INCLUDED IN THE CONIRACTOR'S BID PRICE. 2. CID ITEM NO. 1 LTHE LUMP SUM PRICE SHOWN SHALL COVER THE COMPLETE COST OF PROVIDING THE TRAILER MOUNTED ENGINE-GENERATOR SET COMPLETE AS DETAILED ON THE PLANS AND IN THE SPECIFICATIONS. PAYMENT SHALL BE LUMP SUM. FOR UNIFORMITY, ALL BIDDERS SHALL SUBMiT PRICES BASED ON A CATERPILLAR BRAND ENGINE-GENERATOR SET, BIDDERS SHALL ALSO BE REQUIRED TO SUBMIT ALTERNATE ADD OR DEDUCT PRICES FOR THE ENGINE-GENERATOR SETS LISTED IN THE SCHEDULE OF PRICES IN THE SPACES PROVIDED. 3. CID ITEM NO. 2 THE LUMP SUM PRICE SHOWN SHALL COVER THE COMPLETE COST OF PROVIDING ALL ELECTRICAL WORK SHOWN ON THE PLANS AND SPECIFICATIONS, EXCLUSIVE OF THAT REQUIRED TO OPERATE THE ENGINE-GENERATOR SET AS A STAND ALONE ITEM. (THIS WORK WILL BE INCLUDED IN 810 ITEM NO. 1 .) PAYMENT SHALL BE LUMP SUM. 4. CID ITEM MO. 3 L THE LUMP SUM PRICE SHOWN SHALL COVER THE COMPLETE COST OF THE PRE- FABRICATED METAL BUILDING AND SITE IMPROVEMENTS NECESSARY AT THE HIGHLANDS PUMP STATION AS SHOWN ON THE PLANS AND IN THE SPECIFICATIONS. WORK 114CLUDES EXCAVATION, CLEARING, CONCRETE SLAB, BUILDING WITH ACCESSORIES, CRUSHED ROCK SURFACING, AND ASPHALT PAVING. PAYMENT SHALL BE LUMP SUM. �, 18-I ENDNG FILE TI,rLE OF FILE 40 r in