HomeMy WebLinkAboutWWP2700352(11) KAID-27-0352 DP= AVE NE SAN. SAS LID #337 - Change OrdErs 1
BEGINNING OF
FILE
FILE TITLE WWFA-olqo-035Z
I)NYTDN AVE NE JIL
SAWITAKI 5FWep-`o4Now
833T
C 4A N6e ORDEK
R
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 94-38 LID 337 Dayton Ave NE Sanitary Sewers CA#1
CONTRACTOR: GARY MERLINO CONSTRUCTION Co.
SUMMARY OF PROPOSED CHANGE.
Because of unexpected sandy soil conditions between stations 2+55&4+55 on Dayton Ave. NE and
between stations 2+50&4+50 on NE 22nd St it was not feasible M me Lain the minimum trench width
specified in the contract in the contract. This change order,therefore revises the trench limits for paving
as follows:
Deylon Ave NE (Ste 2+55 to 4+55) From 8'n.aximum to 12'maximum
NE 22nd St (2+50 to 4+50) From 8'maximum to 7'maximum
This will add an additinnal 155 Square Yards of asphalt patch to the original estimate.
ITEM Additional Oaantitl.a Under rhla Change Order UNIT EST. UNIT ESTIMATED
QUANT PRICE 'MOUNT
009 Trench?atching SY 155 $1350 2,09250
Sales Tax 111 ,59
Total 2,264 09
i
ORKUNAL CONTRACT CURRENT CONTRA CT ESTIMATEDNET CHANGE ESTWATEO CONTRACT
AMOUNT AMOUNT THIS ORDER TOTALAfrERC11ANGE
ite{,rM.N — _ 1011,7114.48 I =,SN.af tff,0ff.47
( ram /L� Data. x6�ZJ
Protect�nglnmr.. r cy_ 2 - _ Date: _S'-2 3-^e
Approved By: - •+ :LV'h Date: C•- 5.a¢..
aAw..ar.em o�
6YUR!)�1fa1a
•',.y r
1
4 V'L.
4
F
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT. CAG 94-38 LID 337 Dayton Ave NE Sanitary Sewers C.O.#2
CONTRACTOR: GARY MERLINO CONSTRUCTION Co.
SUMMARY OF PROPOSED CHANGE'.
Provide compacted top course surfacing to eliminate the drop,between the shoulder and the asphalt,
created by the thickened asphalt edge of the overlay.
This work has beer,done on a time and materials basis to completion.
ITEM Additional Quantities Under This Change Order UNIT EST. UNIT ESTIMATED
QUANT PRICE AMOUNT
+ 017 Change Order C 2 i.s 1 $1,997 59 $1,997.59
Sales Tax 16380
Total 2.16139
i
ORIGINAL CONTRACT CURRENT CONBACi ESTIMATED NET CHANGE E6TIMATED CONTRACT
AMOUNT AMOUNT TH190RDER TOTAL AFTER CHANGE
ft%,791N 109.065.57 I 2,161.39 f111,916.%
SIGNATURES: /7
Contractor aK Dates -Z3
Project Engineer. _� a Date:
— f
Approved By: I� nv�� / (�-� Date:
..sew.wrvl
c lcNcoaorvA.a
l _