Loading...
HomeMy WebLinkAboutWWP2700352(11) KAID-27-0352 DP= AVE NE SAN. SAS LID #337 - Change OrdErs 1 BEGINNING OF FILE FILE TITLE WWFA-olqo-035Z I)NYTDN AVE NE JIL SAWITAKI 5FWep-`o4Now 833T C 4A N6e ORDEK R CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 94-38 LID 337 Dayton Ave NE Sanitary Sewers CA#1 CONTRACTOR: GARY MERLINO CONSTRUCTION Co. SUMMARY OF PROPOSED CHANGE. Because of unexpected sandy soil conditions between stations 2+55&4+55 on Dayton Ave. NE and between stations 2+50&4+50 on NE 22nd St it was not feasible M me Lain the minimum trench width specified in the contract in the contract. This change order,therefore revises the trench limits for paving as follows: Deylon Ave NE (Ste 2+55 to 4+55) From 8'n.aximum to 12'maximum NE 22nd St (2+50 to 4+50) From 8'maximum to 7'maximum This will add an additinnal 155 Square Yards of asphalt patch to the original estimate. ITEM Additional Oaantitl.a Under rhla Change Order UNIT EST. UNIT ESTIMATED QUANT PRICE 'MOUNT 009 Trench?atching SY 155 $1350 2,09250 Sales Tax 111 ,59 Total 2,264 09 i ORKUNAL CONTRACT CURRENT CONTRA CT ESTIMATEDNET CHANGE ESTWATEO CONTRACT AMOUNT AMOUNT THIS ORDER TOTALAfrERC11ANGE ite{,rM.N — _ 1011,7114.48 I =,SN.af tff,0ff.47 ( ram /L� Data. x6�ZJ Protect�nglnmr.. r cy_ 2 - _ Date: _S'-2 3-^e Approved By: - •+ :LV'h Date: C•- 5.a¢.. aAw..ar.em o� 6YUR!)�1fa1a •',.y r 1 4 V'L. 4 F CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT. CAG 94-38 LID 337 Dayton Ave NE Sanitary Sewers C.O.#2 CONTRACTOR: GARY MERLINO CONSTRUCTION Co. SUMMARY OF PROPOSED CHANGE'. Provide compacted top course surfacing to eliminate the drop,between the shoulder and the asphalt, created by the thickened asphalt edge of the overlay. This work has beer,done on a time and materials basis to completion. ITEM Additional Quantities Under This Change Order UNIT EST. UNIT ESTIMATED QUANT PRICE AMOUNT + 017 Change Order C 2 i.s 1 $1,997 59 $1,997.59 Sales Tax 16380 Total 2.16139 i ORIGINAL CONTRACT CURRENT CONBACi ESTIMATED NET CHANGE E6TIMATED CONTRACT AMOUNT AMOUNT TH190RDER TOTAL AFTER CHANGE ft%,791N 109.065.57 I 2,161.39 f111,916.% SIGNATURES: /7 Contractor aK Dates -Z3 Project Engineer. _� a Date: — f Approved By: I� nv�� / (�-� Date: ..sew.wrvl c lcNcoaorvA.a l _