HomeMy WebLinkAboutWWP2700374(11) -.` KennydaleInterceptor-Change Order.s
BEGINNING
FILE TITLE Sw374
` 1 •
4
0 ''n
CITY OF RENTON
Department of Planning/Building/Public Works
Lyon Gattmann, Administrator
Earl Clymer, Mayor
September 20, 1"0
King Construction Co., Inc.
13313-1/2 - gth St. East
Sumner,WA 99390
Attention: Brad Holt
Subject N'ect Keonydale Interceptor Clwnge order No. I
l Brad,
Attached for your signature are two originals for Change Order No. I. Please sign and
return both of them to me at your earliest convenience.
if you have any questions, please call me at 277-6206.
Very truly yours,
MI-lC.,e e—M—%�? -.
Michael A. Benoit
Wastewater Utility
KING-COt/MAB.If
Attachments
2W Mill Avenue South• Renton,Washington 98055•(206)235.2631
L— J
r
1
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG x0u3-90 West Kennydale Interceptor C.O.><I
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
Change Order for the extra work regarding the addition of manhole 2A and 10 Lf. of 8' Ductile Iron
Pipe (stubbed to the east), as shown on the attached drawing. The charge for this extra work :S
$3,2'L38.
jTEM OUANTIT\' _UNIT_ DESCRIPTION AMOUNT
23 1 Lump Sum Change Order No. I S3,129.00
State Sales Tax 253.45
Total: $3,392.45
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHwNCE ESTIMATED CONTRA'
AMOUNT AMOUNT THIS ORDER TOTAL AFTER CR C
{ir{,9TLT1 iiLa,9T1 TI {a,aaT.1i � {T6T,]OT tG
SIGNATURE$
Contractor: _ Date:
Project Engineer: :11L-�x--/ /+_� Date'
- ---
Approved By: Date'
J
V
'• $UWECT_L rJSL`•'ti[.Q/1.{ .�Sa2. __t1/��r�Q�_Q= Q� S�_�C�_ _________
8"D•I, sEw
E)(rEvD TO-
i
MH Z
MH ZA
PLAN
F 0+00 6+00
e• D. r r rwe.0 .f 0.0a14 B" QL. SEW4`C Q
Z30
2Z5 �
ZZO p
`MH 2 T�2�NCN MN 2A (54/} love
PLUGr 6+ Z3.5
2i5 4 f 89.8 ZE: Z/9.70 /N
ZE= 2/9, co ovr
GROJrJD 225. 0 -
PRE�r
• . s' v
t
,C / q 1M0 NO.-%- OF-�
-Alf ____ PRO IE:TNOSCAZZO�JZY�-CY_E_Rvo�oe�— oAras:0_9-o
o '� 45KT JD T - GON57'
Eq_scmmq r
- -'
_--K-yCK-�_ � K_�,_�K---•C +F- X-X X
_ (2 µ/
_ FENCE
Ni%i 2 A AM (rn B.s fierco
PLAN Tatouw7)
G +00 7+00
S=�.oo fq �" O.L. S�WEK S• 0, 0044
i
RNCN MN 2A (54A14OKv TYPES /+ � � 7t /9. 9 (BEro2!
�LUCr 6f 23.S R�GOCA7i0N)
ZE= 2/9.70 /N
IF= .0 cur
�,ROJND• 225. O
2 O' N
t� J
� _ 1
CRY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG +043-90 West Kennydale Interceptor C.O.01
CONTRACTOR: King Construction Company. Inc.
SUMMARY OF PROPOSED CHANGE:
Change Order for the extra work regarding the addition of manhole 2.A and 10 l.f. of 8' Ductile Iron
Pipe(stubbed to the east), as shown on the attached drawing. The charge for this extra work is
53,121,39.
ITEM QUANTITY UNIT DESCRIPTION AMOUNT
23 1 Lump Sum Change Order No. 1 $3.129.00
State Sales Tax 253.45
Total: S3,382.45
ORIGINAL^INTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CON'ITAC
AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANG
5a5a.9T4,74 $253924.74 $3,3824s $257MT.12
lam.
SIGNATURES
Contractor. — Date:
Protect Engineer: .oN�h ___ Date:
q_/S-So
Approved By: Date:
krubriv o. rweorl
K
y
As
E�rEaD 70 !�
_. . ri
�S, 4-ND P�cJG
'-_ K- X- X-X-
MH 2A
PLRN
- zo'
F 5+00 6+00
Z3S
D.r S�rweK �v S—a.cc14 8" D.E. sow6e @
i33.7'
9r. ¢
Z30 .
ZZS
Zzo
`MH 2 ra�Ncw MN 2A (5k4ccow
2r5 �f �LUCr 94 Z3.5
ZS 2r9.7o /N
ZE= 2r9. 4o cur
�Ro LMD• 225 0 r
P2oFrL CS
r° s' v
D
a
I
WW1
Awl
9
f7[_a! Ltd Kda€—Z-'-_--------------- I.OIECTrO-Lot 7o'7ZQZ,-V EAR _Owst_ CAr[31J_YD
gxTENG TO it /
OD X S' /j ND PI_U(r b — GON ST"
- EfR..annaN r
- -- - _Q o-w
_FENCE
MI! 2A M/l3 (To 9345
PLAN R�LOU7 QO)
6+00 7+00
J d•o049 g" QL. S�wee_ @ S• o. 00¢¢ "
_y
1
0 \
7Q NGN MN 2A (5k.4440w TYPE A � `MH3
OLUCr 6423.5 �7t/J. 9 (SErORG
A'ELOGATiON
Z5 Z/9.70 /A/
ZE= 2/9, bo cvr
GROJND• 225. 0 r
S' V
4
p
I
CR1' OF RENTON
Public works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 0043-90 West Kennydale interceptor C.O.01
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
Change Order for the extra work regarding the addition of manhole 2.A and 10 1.f. of 8" Ductile Iron
Pipe (stubbed to the east), as shown on the attached drawing. The charge for this extra work is
$3,221.38.
ITEM oUANTITY UNIT DESCRIPTION AN:OUNT
23 1 Lump Sum Change Order No. 1 $3,129.00
State Sales Tax 253.45
Total: $3,382.45
ORIGINAL CONTRICT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRA
AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANG
32SS.924.18 8158,991.FI 85,587 e5 $357 30T.a9
SIGNATURES: /�-- �� p
Contractor 1�2. —C 2 Date: S'A 40
Project Engineer '�4 Date
Approved By. Date: NL
w � J
Nsuuscr_�re`S €N4(Y.2Q1� 2 _--------------
'
SEW
E7(TEND 701
0 _ o I S' A-ND PL vG
K— K— K—K— K—K_—
----
MH ZA
PLAN
5+00 6+00
Z3S 8. o.r. scwce @ s•O•oo14 9" aL. Scwmc
i33.7'
Z3O
ZZ5
ZZO
`MH 2 ra�NCN MN 2A (sw,44to
PLUCr 64 23.5
2�s 4f Ag•8 - IE= 2/9.�o iN
IE= 2/9. 60 ccJT
G�OJND• Z-ZS. 0 =
�;� PROFILE
J' V
t7777--
4f�y
16
a S"aRS'At
Y y,
µ
-� eIr
r
wre
SLPaC—QFtNd��-� -_--------------- rno�ecTNo tEfi22o7ZQZ_!v_E_R�vws�— S1J_t0
x �"D•S. SEv� � C3I � /
E7(TEnID TO � �--
o X ems' AwD PwG -CONS7"
8a � <
t--•K- —X-- K—_-Y—K x_'.0 k_ _ x_)c
FENCE
MH 2A MN3 (7- es iicLD
PLAN eeLOCAMO)
6+00 7+00
s-p.00yq g• D.E. ScweC C� s• o. 0044
I
D
PQENGN MN 2A (5%:AGGOw .TYPE \-MH3
OG UCr� 64 23.5 '7t /9. 9 (BEFORas
A'BG O GATE ON
Z6* 2/9.70 /N
IE= 2i9. 60 cur
GRoc)N.D� 225. 0 r
PRoF��!
I
I
"$ y- CITY OF RENTON
BOARD OF PUBLIC WORKS
Earl Clymer, Mayor
May 10, 1991
King Construction Co.. Inc.
13313-1,2 8th St, East
Sumner, WA 98390
Attention: Brad Holt
SUBJECT: EXTENSION OF CONTRACT
3rad,
In response to your request, we agree and hereby extend our contract an additional 75
(seven)-live) calendar days. The date of completion cf all work is therefore May 31, 1991.
We expect that you will be in touch with us to determine the viability of completing the
restoration. Please execute the enclosed Change Order and return it to us.
If you have any questions, please call me at 277-6206.
Very truly yours.
Michael A. Benoit
Wastewater Utility
%VM E%TNIMAB:e
Rv.6.11 Vnnona.Sturm Ws4rlWnuwcer uo0ry
200 Mill Avenue South - Renton, Washington 98055 - (206)235-2569
Facslmll.(206)215-2513
t P
lire_
I
CITY OF RENTON
Public Works IXpartment ;.
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 043 90 WEST KENNYDALE INTERCEPTOR C.O.M 3
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
In consideration of this project being 9596 complete and the fact that a significant portion is too
wet to make restoration, as per contract specifications, viable at this time, we are extending the
original contract by 202 calendar days. The new Date of Completion is therefore May 31,
1991
.`here are no financial considerations involved with this Change Order.
ORMINAL GVNIAAR CURRENT CO.
FSTAI ATEO NET MANGE ESTPSATED CONTRACr
AMOUNr r=O CO.z.ER ='1 AMA CHANGE
31$).9$llA SIS9,66]Q Sn- $251.90JAI
CIGNATIIRE&
Cuntrarlor: —— Dale:
Pml,vt Engtnrnr —..__—.—__ Date:
Appm,,d Its _____ Date:
n,Ar.vas r>ra..
i _ a. � ..dam- •.�lY`�� ,,. �_ ,< _J�� �. _�®�._ r�
r �
1
1
V'aE•1?2 1 v KI NGC,-x
KING CONSTRUCTION CO., INC.
13313 N -81h STREET EAST • SUMNER,WASHINGTON 98Yx1 (206)8;8.7819 863-0935
September 14, 1990
City of Renton
Public Forks Department
200 Mill Avenue South , �../
Renton, WA 98055
Attention: :,ichael Benoit I r IIENTON
"i necnne Dept.
Project: West Kennydale Interceptor 5-374
Gentlemen:
i I have computed the pricing for the extra work regarding the addition
of M H 2A, per our telephone conversation and the drawing faxed by you on
September 12, 1990.
As we have no unit price for manholes, I have based my pricing on labor,
equipment and material estimates with the appropriate markups. For the
10 If of d. i. pipe, trench excavation and backfill, and imported crushed
rock backf ill, I have used unit prices. For additional tr inch safety system, 1
I prorated the Lump Sum.
The following prices are derived as noted above:
(1) Manhole No. 2A Lump Sum $1,775.00
(2) Trench excavation and backfill
imported crushed rock backfill 570.00
(3) 8" ductile iron sewer pipe
installed in trench 190.00
(4) Trench safety system 145.00
I Total $2,980.00
To the above total add 5% mark-up
for bonding, insurance and B 5 0 taxes.
If the above pricing meets with your approval, please prepare a Change
;F .. Order in the amount of $3,129.00 to provide compensation to King Construction.
Co. Inc.
I
Sincerel
y
,
�I'Yrr
Brad Holt
^`' cc:file
j
7,.
�lhm1 4fw\ 1J&
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG #043-90 West Kennydale Interceptor C.O.u2
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
Change order for the extra work regarding the addition of a side sewer at approximately Station
5 .00. The work involved in this change order is excavation, tapping the main, shoring, and sod
restoration. (The side sewer itself is covered under Item a22.)
ITEM QUANTITY 17M DESCRIPTION AMOUNT
25 1 Lump Sum Change Order e2 S2,362.50
State Sales Tax S 193.73
Total: $2,556.23
All work, materials and measurement to be in accordance with the provisions of the Standard
Specifications and Special Provisions for the type of construction involved.
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT
AMOUNT AMOUNT THIS ORDER TCTAL AFTER CHANCE
220,924.r. $257,307.19 S2.S5633 11259,863 42
SIGNATURES,
y�"G
Contractor Date: /J - J 3 4 J
Project Engineer: Date: /
Approved Ev.y Date:
90-41WM AE.p.
I
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAO 043-90 WEST KENNYDALE INTERCEPTOR C.O.a 4
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
Change order for the extra work due to the changed condition discovered at STA 0 + 05. The !
changed condition was an unmarked 5' x 5' concrete duct bank. The proximity of this duct to
the manhole and the depth of the trench at that location required supporting of the duct and
tunneling to the manhole. This change order is for one day additional work calculated using
force account methods as detailed in the attached exhibit.
ITEM QUANTITY UNIT 12ESCRIPTION AMOUNT
27 I Lump Sum Change Order N4 $3.232.39
Stare Sales Tax S 265.06
Total $3,197.44
All wort,materials and measurement to be in wwrdwn a with the pmvimoos of the Standard Specifications and Special
Provisions for the type of eonstrucDoo involved.
MIGINALCON7RALT CURRENT CUNIRACT ECTatATED Nh CHANGE FSMATED CON ACr
A 10u T AMOUtrr T Vr OEDFA TOTAL AFTER CHANGE
W3 924 A 1239,1163 A2 $3,497.N $263"60.86
SIGNATURES.
Contractor. -
_._ Date: /b'/.'u/s/
Pmjmt Engineer: *4-4.0:1< /Lf
Date: iG //v/9t
Approved By: 4 Date:
CM N4,M4f
Mai
J
i
I
FORCE ACCOUNT WORK RECORD
Ito Oa .n pwtl EI om 0l .0, Wp•* G, E.d
S*p OV Oolh nprnbtlra .hp GIo...I
KING CONSTRUCTION COI, INC PROJECT NO. u
PROJECT .
KI-NG-CC'209 YN OWNER Cr.-1 .�- Uk••�+o^
13313`G B1h Street EPsI PA PVCORD NO. /
Sumner,Washington 911390 DATE
(206)838_7819•(200)W3403E
( Pr
DESCRIPTION OF WORK
i 1 1
IFws%1n
lam•,
Q I W p En.r'vMln
W 6 6 p c 1" j COS TOTAL TOTAL
Z S i uei pEfCRIPT10N JQUAMITYJ uR COST TOM REM ODET
t E he .J6T` ?11 =
2 - d A. :?63e 1iU'r
\•Y .15 .2 V3.
0 c., c. I•r rat S4 k-7
8 /vo/'-r is oa i
7
e m1 ; t0
y Hr 4 b 39Y'=
10 ar r. J.. .2Sw 2u3..
/uT
12 4.::� - A-v.o r ram /ou••
u- rTG
10 1...i..' u• g�� F Iv 3`-"' 3Y7a.
1161 1 1 �.. N e.•a fn� n 8 6s 7'a 56 (•
17 75 74 s
18
19
20
21
22
7
q
30 76
tlfwRLTR s�H'Y . 32--3 3Y
r
1M'7RIIRCRS PEP. .
rtaF1 -
u.iERS REP -
RRl[l
ALL FORCE ACCOUNT CLAIM UMT PE VERIFIED BY TNn MECOMD.
I J
I
F
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 043-90 WEST KENNYDALE INTERCEPTOR C.O.r 4
CONTRACTOR: King Construction Company, Inc.
SUMMARY OF PROPOSED CHANGE:
Chenge order for the extra work due to the changed condition discovered at STA 0 + 05. The
changed condition was sr.unmarked 5' x 5' concrete duct bank. The proximity of this duct to
the manhole and the depth of the trench at that location required supporting of the duct and
tunneling to the manhole. This change order is for one day additional work calculated using
force account methods as detailed in the attached exhibit.
ITEM QUANTITY UNIT DESCRIPTION AMOUNT
27 I Lump Sum Change Order N4 $3,232.38
State Sales Tax $ 265.06
TOW $3.497.44
All work.mmenals and measurement to be m accordance with the provisions of the Standard Sr. ificahans and Special
Provisions for the type of construction involved.
olulotL C'ONIRACr CURREM CO MRAClf MMATED NET CHANGE ESTIMATED C`01 A4T
AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE
583.924.74 1 S259,163A2 $3,497.44 $261,11.146
SIGNATURES:
Contractor: Date.
Protect Enginmr _ _ _ Date:
Approved By: Dne:
COC.M.ILNf
C
t
F't CITY OF RENTON
P-R.Y Planning/Building/Public Works Department
Earl Clymer, Mayor _ _ Lynn Guttma,Admfntatntur
May 23, 1991
King Construction Co.. Inc.
13313-1f2 - 8th St. East
Sumner, WA 98390
Attention: Sharon Holt
SUBJECT: WEST KENNVDALE INTERCEPTOR, CHANGE ORDER N0. 3
Sharon,
Attached is the second v, ginal of a Order No. 3 for your signature and your files.
Very truly yours.
Michael A. Benoit
Wastewater Utility
'NKI-0O3NA6:11
ArtecMnem
cu aeMNl 1.Peraone.51orm WelerhVealewerer S.Pervaor
200 Mill Avenue South - Renton, Washington 98055
L
J
e �vi. � ` i All,
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
^.AG 043-90 WEST KENNYDALE INTERCEPTOR
C.O.# 3
CC'+'R..- ''-' King Construction Company, Inc.
SL„, •%._,r y ^F FROPOSED CHANGE:
in consideration of this project being 95% Complete and the fact that a significant portion is too
wet to make restoration, as per contract specifications,viable at this time, we are extending the
original contract by 202 calendar days. The new Dave of Completion ,s therefore May 31,
1991,
There are no financial considerations involved with this Change Crder.
— kIGINAL CONTRACT CURRENT CONiRACr FSTPIATED N.
CHANGETE�ATEO
CONTRACTA}IUUNT AAU)UNT THIf ORDER TOTAL AFTFR CHANGEf159,3e3 Al
S251.2414 $239,13 12 i u
'Dtlir.. Y_4•J.M.�
D.te:
i�
I
�_ J
1 -A
-
N
e,R"D.I. SEWER
EXTEND 70 1�
O
- K- K- x-
1
MY
MN 2A
� ' PLRN
{I 5+00 G+oo
735
g• o•r. SBwE.e @� s•o•oogq _ B" aI. SCW" C'
i33.7'
Z30
ZZ5
Z20 -- -- — O
�MH -Z neENc� MN 2A (51Mllow
PLUC= 64 23.5
� z�s 4fe9.8
ZE= 2/9.70 /N
IE= 2/9. bo oc�r
�goJ."ID• 2 25. 0 s
/` r, V
Cv
SNEETNO.—
.."iLIC_QF --___--__. PROJECTNO.` 'YZZ�`SL�._Bv E.RVOa.O/r_ DATElfI_[Y
s"Q1. ssw TTO !�
°o x xs' pl-ore 10 O // CONS77
/ EgsnncVr
—. x
k o-w
FENCE
MN 2A MR (To eE fi6t.D 1
PLAN REaau�ao) a
6+00 7400
s-0.00 4q g" a I. Se WIC @ s• o. 0044
i
if
3
�atCN � MN 2A (54A440V/ TYPE 7t 9 9 (5EFORC-
PL.u6T 6423.6
�Csc ocaTK dN)
IB- 219.70 /A/
IE- Zi9. 60 ous
6ROJe4D• 225. 0 r
P12
�� _ v