January 20, 1988
TO: Mike Benoit, Utilities Engineer
FROM: Lawrence J. Warren, City Attorney
Re: Performance Bond - 1987 CBD Sanitary Sewer
Bolles Construction
Dear Mike:
I have reviewed t:e above captioned Performance Bond. The
Performance bond and payment bond together Satisfy the statute and
are equivalent to our performance bond.
J s
Lawrence J. Warren
LJW:nd
Encl.
cc: Ma
N8.17r 58
l
Y �
W Post Office Box 626 - 100 S 2nd Street • Renton, Washington 98057 • (206) 253-8678
CITY OF RENTON
Lawrence J. Warren, City Attorney
Daniel Kellogg -David M Dean-Mark E. Barber-lanetta L. Fontes-Theodore R. Parry
Assistant City Attorneys
r�
eD
January 6, 1988 Pt1" _:RKS D
uF RENTO
TO: Dick Houghton, Public Works Director
PROM: Lawrence J. Warren, City Attorney
RE: 1987 CBD Sanitary Sewer - Bolles Construction, Inc. - Bond
Dear Dick:
I cannot approve the performance bond with the language stricken.
We have utilised that bond form for many years without any
conflict between the bonding and the liability insurance.
Additionally, the deletion was not properly initialed so one could
not determine whether or not it had been elimina.ed from the bond
form. If the contractor wants to have its legal counsel or
bonding company submit a separate bond form that I will review,
then perhaps they can make the changes they beiieve necessary. I
do not want our longstanding and non-controversial bond form to be
tampered with in the manner that I have in this contract.
�C w
wrence Warren
LJW:nd
CC; Mayor
N8.17t22
1}
iI
Post office Box 626- 180 S 2nd Street - Renton, Washington 98057 - (206) 255-9678
at fax
• Y
f1
I
M E M O R A N D U M
i
DATE: January 5, 1988
TO: Lawrence Warren, City Attorney
FROM: Richard Houghton, Public Works Director
SUBJECT: 1987 CBD Sanitary Sewer
Bolles Construction Inc. — BOND
Enclosed is Bolles Construction response to your question regarding the
contract bond. Is this acceptable?
,B
i
1H.3.23.DRT:mf —'
Enclosures
tip..
q
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
Barbara Y. Shinpxh, Mayor Design/Utility Engineering
December 31, 1987
BOLLF.S CONSTRUCTION INC.
18844 N.E. 84th Street
Redmond, Washington 98052-3321
SUBJECT: 1987 CBD Sanitary Sewer
Ladies and Gentlemen:
The City Attorney has reviewed the above referenced contract as to legal
form. Two questions were raised:
f�
1. On the Bond to the City of Renton a line was stricker. (see enclosed
copy). The City requires a Bond be submitted complete as to our
approved form! or a letter to the City be provided explaining the
stricken lan?.iaae for approval by the City Attorney.
2. On the EEO forts (see enclosed copy), Part B needs to be completed.
Please complete the yellow copy enclosed, have Mr. Rollysor sign next
to his name, end return to me.
Thank you for your assistance in this matter. �y
Very truly yours,
Michael A. Benoit
Engineering Specialist
}
1H.14.MAB:mf
Enclosures
cc: R. Houghton
L. Warren
't
200 Mill Avenue South - Renton, Washington 98055 - (206)235-2631
i CITY OF RENTON
Lawrence J. Warren, City Attorney
Danirt Kellogg -David M. Dean-Mark E. Barber-Zanetta L. Ferries•Theodore R. Parry
Assistant City Attorneys
December 29, 1987
TO: Michael Benoit, Assistant Project Engineer
FROM: Lawrence J. Warren, City Attorney
RE: S-449, 1987 DID Sanitary Sewer Replacement
Dear Michael: '.
I have review=d the above-captioned contract and it is approved
as to legal form. However, the RED form , part has not been
completed. L�r6
Also, I would like to know why the bid bond was changed. The
language stricken does not add anything to the remaining
language. If there is a point to striking the language want
the contractor to tell me the point.
L&wren J. warren
LJW:nd
Encl.
cc: Dick Boughton �.4v
Mayor
N8.16=65
f
sac 301W
Post Office Box 626 • 100 S 2nd Street - Renton, Washington 98057 (206) 255-8678
a J
A
�;�;`��,,�� •..�i �,: - � ,�r *p a 4p — '�
S - 4449
PRECONSTRUCTION CONFERENCE
J
PROJECT: 1967 C-aO SEwcrc RE-HA4. DATE: /-L6• pt
ADDRESS/LOCATION: SN477ycfc .t..if cuy7-
LA acx 4v. S. -L REO..ep~ .f�•Lf. 4.�eT rU12
PROJECT / S- 441y PERMIT / WORK ORDER N 411a
THOSE IN ATTENDANCE
NAME COMPANY PHONE
L&p_ev Moi&& \c. 0 f LLES ALP,-p$G.lo ►
col Sc� /3oz S co."J.%,
����T//�..uie�✓ l��rr�uc'��ca.c �6d�- S�fLo
r (�]LUwr Lc� L iry a� itt�.Ji a .J — LA3.5 - /r
23S .2G�/
a s -oG��z—
L— `
Rim
Gary'o Tel*-!trn T.V. Inspection and Repair Report
NIOS 1NM 51.5KK1Xa NM FPIM
1'API tM-E.tM
JOB NO, CLIENT GATE
PIPE CtEANEOilV WEATHER INSPECTOR
LOCATION OF LINE
Ter
SECTION LENGTH DIRECTION MEASURED Lee^ro
F
OLE PIPE 51JO T•MI
1JIN1 REMARKS
Poolgr JOINT PEMARKS Fm1Y SEALED
SEALED
9 1
.I}
REMARKS
I
f� LINE CONOITION LEGEND
GMYININN I -B•O\M PAP
LKN LI -LNL Ir1111N\pn /
Wren Lf -LW EdOVKXOn
P -PKIUN NO.
1 PT -Pra\•uUnq T+O
I A - ROOq
U TlCHER N
Er �.
R .
I
F
"195 Tole-soon
T.V. Inspection and Repair Report
IT161 N..,A,
JOB NO. CLIENT DATE
PIPE CLEANED BY I WEATHER INSPECTOR
LOCATION OF LINE
i
in.
SECTION LENGTH - DIRECTION MEASURED
Loa�.q
MANHOLE NO. PIPE 512E JOINT LENGTH PIPE TYPE JOINT ivPE MANMOL�NO.
lV Ov�Y�on IMI
TrK.P
• Ti
Foo14 SE TINT REMARKS FonnPr SXRNTEALE REMARKS
r
IREMARKS
I
1
1
iLINE CONDITION LEGEND
CNPnNrw [
Lw V -LW InitlbHmn
. GN AN -LW E.IiI1rMM
MrMRIw P -PKI.n No:
Or -PraoWvq T.
R -Rwn
u -u„wsswNTECHNICIAN
L
Nary'•Tale-Scan
wlos IEUnSLSNI"' ulm T.V. Inapmilon and R/pair Report
It0F11N RN
J OI NO, CLIENT DATE
PIK CLEANED IY WEATHER INSPECTOR
LOCATION OF LINE
nP
SECTION LENGTH DIRECTION MEASURED °I
roF�ro
e
O PVF 512E NOMi LENGTN PIPE TYPE JDINT irPE MANDOLENO n
LV DnRtuon •wT
I
L ei
Tr R
Fpulp RJINT REMARKS FonIAT SEALED
REMARKS
SEALED
REMARKS
LINE CONDITION LEGEND
CrP.Rns 1 -&o.m Pw
LM LI -L.Y Inblvnbn
G•.0. LE -LIRA E.mlwnon
MMRob • -NawP No:
RT -wov.anq T.
R -Roolt
Y -V�RYYONTECHNICIAN
J
I
I
Darya TIe•ioan T.V. Impaction and Repair Report
IAEI]N awP
JOl NO, CLIENT DATE
MINE CLEANEO lM WEATN:R CTOR
LOCATION OF LINE
SECTION LENGTH DIRECTION MEASURED Too
ool�ro
M 11NNOlE NO PIPE LIE JOINT LENGTH NPF TVPF JOINT ME M�NNOLE NO. n
41 DnToo vMl
v vl
T�MlI
�1 Y
Pway SEALED REMARKS EYR11b SEALED REMARKS
I
I
REMARKS
LINECONDITION LEGEND
CMIMIMY I -MO\M RpE
LAN LE -LW InlilNllgn
j Ga LE -L«R F.Imglron /
i EMEWw ► -PKwn No. r
R RunM1
E ynvr!UM4
M VnpRNON
1 IA
�'JW �+ollMAAA
,R „�
1
F
r-W
"Is TNs-sose
M,US ,.„,:, ERLRN*w",N T.V. Inspection and Repair Report
aa,N.aer
JOE NO. CLIENT DATE
j ►IRCLIAMO sy WEATHER CTOR
i� LOCATION OF LINE —
1 mr
SECTION LENGTH DIRECTIONMEASURED
p
I MANHOLE No PIPE SIl[ gINT IENGTN PIPE IVPf JOINT rvpf MANHOLE NO lE• O�rcum IMi
YJDINT REMARKS •M.EEI JI11r12 4%REMARKS
EMNP SEALED SEALED
i
r
i
I
REMARKS
J
LINE CONDITION LEGEND
CEEUAIw f -M.wrn na
IK+E I f -LAM IRNIIruwn
ONE, Lf -Lw E•I�O.WO.
MW,EIE. ♦ -PRIUIR No.
PT -/r.11va q T.
A Roolx
� - YrM1in UIPM
L
Wry's TNoRtiwn
.EIJJS 4, SMIIN. T.V. Inspection and Repair Report
. VIA NIM
INS)2HwM
JOS NO. CLIENT DATE
PIPE CLEANED SY WEATHER INSPECTOR
LOCATION OF LINE
T..
SECTION LEK.TH DIRECTION MEASURED ! m
ANHOLE NO` PIPE 512E
M HINT LENGTH PIPE TYPf JOINT TYPE MANHE NO µr DnKuon ,pr
4 T
r / JaN7. NEMAP.%
FPRI.E. JOINT REMARKS FRP•T >F al
SEALED
r
j
I
I
I
i
RFMAA.l
I
LINE CONDITION LE 7FND '
.CNYAInw! I -W.w P,w
L. 11 -Lw tM1,11.1,
Ono LE -Lw F.rnanro� yµ
NO.
Pr -wmr„aro*R, iE21
A -RRpn
y -w,.rMer NNI IAN
J
Gary's Tole-Scan T.V. Inspection and Repair Report
ee10s INRe St Sena WGwrM
Imes awawe
JOB NO. CLIENT DATE
POPE CLEANED BY WEATHER INSPECTOR
LOCATION OF LINE
Tne
SECTION LENGTH DIRECTION MEASURED Look,
MANHOLE NO PIPE SI2F JOINT LENGTH PIPE TYPE JOINT TYPE MANHOLE NO, LEE OnPaeen IMT
I TINf�
FwJ,w JOINT REMARKS "-"W �� REMARKS
SFALED
I
REMARKS
LINE CONDITION LEGEND
CN.nerlwe E -MPer P,;w {I11
LI•y U -LAW,U'lliv lrOn
GIAs LE -LAM E•nnr.Ron
MY!MWI, I -PaNn N..
PT -INIruGnF TAP
R - Roou
A
s -eRM1Ke lnMn I
u -uwEMOR 1
� 1
Clary'•Tale-:can
tiros IN,nS, RM11.e N %In T.V. Inspection and Repair Report
(m,ZMa
Joe NO. CLIENT DATE
ARE ftfAN1D By WEATHER INSPECTOR
LOCATION Of LINE I '
SECTION LENGTH DIRECTION MEASURED Tnr
4ANH0 F NO PIPE 512E JOINT Look��q
=� LENGTH PIPE TYPE JOINT ,vPE MANHOLE NO. �F. D•Pceo� �M,
` ul
T•wN
R
F.,qk SEAILED REMARKS Fw,p. (DINT AEMARRS
Sk HIED
f '
1 r •��
1
1 '
t
REMARKS
I
LINE CONDITION LEGEND
lrok.Pip
L.IIP l/ -Lyk InldUtlron
LAM E.mnnwn
RWVkYw I -IK,WP No;
PT -Molrugnp Tp
! -Root,
i. S
U mm.
k.� J
r >.
1
F
jpsry's Tole-fcsn
",I I-1,St.BrPnw.YNWIEE T.V. inspection and Repair Report
(m)2"40, DATE
JOl NO, CLIENT
WEATHER INSPECTOR -
POPE
LOCATION OF LINE
Tnr
SECTION LENGTH DIRECTION MEASURED LooE ro
MANHOLE NO PIPE SIZE JOINT LENGTH PIPE TYPE JOINT TYPE MANHOLE NO.
. _ � - Ur Dna�m Iwr
Trove
101N REMARKS
Fooly JOINT REMARKS FPoW SLALED
SEALED
I
v.F 1
k
I
i
REMARKS
LINE CONDITION LEGEND
CIPPM. I -W.w PPP
L=_ LI -LW InhR:Elro�
(11,10 Lf -LAN E.Uuglq�
MGM
or -wotvJro Tw
R - Raab
i - Sm.ae Lwwa
� -�,.pKvae NNI AN
J
J
1
Gary's Tole-Seen
W WAA W T.V. Inspection and Repair Report
I m s`Clio at SunN. WIN`M
Itlll lMJ%l
JOB NO. CLIENT DATE
PIPE CLEANSO BY WEATHER INSPECTOR
LOCATION Of LINE
T,
SECTION LENGTH - DIRECTION MEASURED Loot
�N`ANHOLE NO. PIPE 512E JOINT LENGTN OIPE TYPE DIRECTION
ME MANHOLE.NO_ r a
1�/ ff llr D x IM`
1 t � I I 1 1
Tgyel
Forage J00SE•AILEDNT REMARKS Fenep S � REMARKS
r
I
1
REMARKS
LINE CONDITION LEGEND
CIPP`IP • -&..ee P..
LKII _ LI -L 1.6111 iron
G.Ane L! -Lw E.mv....
MMMNe • -PKlun No:
IT -hanuE�q TeP
A -Roon
S -krvre L.W.1
Y - ^PLLYWP TECHNICIAN
Imo. J
Y
a., Ji L?
F
Oary's Tel*-scan
w10S ImbS, s..„,.R "I" T.V. Inspection and Repair Report
iM,2"�
JOB NO. CLIENT DATE
PIPE CLEANED BY WEATHER INSPECTOR
LOCATION OF LINE
V in.
SECTION LENGTH DIRECTION MEASURED
lou^rp
MANHOIF NO. PIPE 512E JOINT LENGTH PIPE rPF JOINT ivpE MAMIOIE N0. ,
Ls..l
rt
RO ,w SE WILED NT REMARKS F.,,& SOILED REMARKS
I
1
REMARKS
LINE CONDITIDN LEGEND
CYMtlirlwF • -BIRLfn Pip
LMP V -LAIR Inb111.1iM
DIPE. LE -LNL E.LpgUOn
M.IMRy. P -PKI..N..
PT -Prolrud„N T q
R A.II
S -Snvcf lfbra
U -u�prupM NI N
t
J
•'l _ JAIJa
I
F
i
Aury's Tole-Scan
�.� 410S IMI„SI.SCKnIs.WA WIN T.V. Inspection and Repair Report
I�EI YM-Et3!
JOB NO. I CLIENT DATE
PIPE DLEANEe eN WEATHER INSPECTOR
LOCATION OF LINE -
SECTION LENGTH DIRECTION MEASURED ¢MANHOLE NO. PIPE 92E JOINT LENGTH Plvf TYPE !(RNT ivPE MANHOLE Ny. V/
,J U. OnTI, 1wr
I
r...I
f FOOIq NT SEALED REMARKS iOplgs- "ALSO REMARKS
1
I
I
REMARKS
LINE CONDITION LEGEND
CMY•liryy / -&ow P,w
Lxv LI -.LM Inl„M1tlgn
Gb L[ -LAK Ectnnmon
MPwMHa • -P¢run No.
Pr -wUVuCnN UR
A -Raor.
S -SPmo LiMgl
U -unOYHpe TECHNICIAN '
J
r _, V . ��
I
CITY OF RENTON
dl PUBLIC WORKS DEPARTMENT
Barbara Y.Shinrw h, Mayor Design/Utility Engineering
SUBJECT: Construction Contract CAGB O 7 7- S
Project Name: I C`r 87 C s t]
Prime Contractor: O t_�-CS C O ruS 1 . 1N r,
original Date:— Z
Rev: _ Date: 0� — � By: v/
Rev:Z Date: 4 �- �� By: /
Rev:3 Date: Ca f By
:
Rev: 4L Date 10- /j3 IW_ By: r 7-
1
:w
Rev:— Date: By;
Date Received Date Received
Prime Contractor S Subcontractors Intent to Pay Affidavit of
Prevailing Wages Wages Paid
Meet -ter rL LFACi4 aH d - 5- /O- /7--
— 4
I
SP oo.PRrvAIL/DRT:MD PRV. n/n:
�' _"
EL Vo
1 _�,..
Complete &.mail entire set
WITH APPROVAL FEE TO: Statement of
D-PosINTENT TO PAY
ESAC am of Irhora"no.FSAC Division-HC-0lO PREVAILING WAGES
925 Plum Sued INSERT CARBON PAPER ( Public Works Contract)
Olympia W. 98506-0631 (206)7534019 BEFORE COMPLETING
(Type or print clearly.-this IS your mailing label) O'BRY97n'Phase ! Sdrllja,[y Sew F
APPROVED FORMS TOBEREPURNEDTO: n%��- y[
WlIft ConstruCtion Inc. B'a."
L—�lalCmrinaCl awyllCdW..
18844 SE 84th St �'6ao wohper7omwf
King
Redmond Wash 98052 Iles Construction Inc.
Uo you ut�u�uu sutmnveciues?
Year ® No 0
COFnRACr AWARDING maim plwme number
PUBLIC AGENCY City of Renton (20fi) 235-2631
meO 200 Mill Ave S 1%%ton Wa"8053P
SEE INSTRUCTIONS ON REVERSE SIDE
1.CRAFT 2.ESnMAT6'D NO. 3.RATE OF 4.RATE OF HOURLY
fW WORKERS HOURLYPAY FRINGEBENEFITS
350-1280 Pipelayer g Caulker 1 15.69 3.43
57D-5615 loaders, Overhead under 6 yrds 1 18.04 4.21
570-5660 Scrapers 1 18.04 4.21
1 570-5775 Tractor, 60 HP 6 under 1 17.68 4.21
lD 72Brl9M Flatbed, Truck Stnglt Qiiitk, ju 1 15.50 3.:"71 —
IIII 350-1880 Topman Tailman 1 15.21 - : --; 3
570-9577 Foreman 1 18.54 4.21
i
i � s
1 hereby certify that the above information is correct and that all workers I employ on this Public Works Project will be paid no less
than the Prevailing Wage Rate as determined by the Industrial Slatimician o c Dc arlrcnt of rr and Industries.I understand
that contractors who violate Prevailing Wage Laws are Lopu more
subject to fmncs and/or debarment. , G
(complett dl 4 copies and have each notarized) � orpdm o i ire
STATE OF WASHINGTON Bolles NOstl ion Inc.
Cmmmy or __ 18844 fi,_E 84,
City
ly — _._Zi"'`.x`ont7s
Signed or akImW lrforc Inc cn_�4 I. /4E 1 nedmornd We 98052 -6fft oBL1 L09K
(Signoature
My ppinunenrc.,ov, J
A3 J ,L,I eiIreA ECSeT1W�
A CONTRACTORS. UISTRIdIIE APPROVED COP
By
Depamninent of
Labor&I{Cnd u�sri�es
FOLLOWS:rma. .enGI..L wnner- LVao
CrmP(Qe "FEN WPMIkr-Le 1, tsoL0VMrM ScINS M14eLVE-- TaIPLK71 - Ml wIIIIMM
-pADRUPI-MAW PNl;4*29 iyytni to py 4-87
!n
It Ly
� _1
M.\'Iti.'Yrr+^n.w NM„+s'wwfa.."N'olXrnr'Mlx. • ;.�.[�
RfCE-.�kp
Complete & mail entire see M!�R Statement of
WITH APPROVAL FEE TO: 1MF�B INTENT TO PAY 7567
DcpvMmt of Labor R bMustriu
ESAC Division-HC-710 PREVAILING WAGES
925 Plum Suca INSERT CARBON PAPER ( Public Works Contract)
Olympia,W. 98504-0631 (206)7534019 BEFORE COMPLETING
(Type w print clearly---this Is your mailing Inheh ContracUBPW No.
APPROVED FORMS TO BE RETURNED TO: Q77_Q7
vne 8idda drtr 'i7-im�missii'rrilal...._....
" %.A. Segale, Inc. �2-9-g1_ . =14--87 .___....
ZOWMy W1NNa Ismtpd
P. Q. Box.9BO5v __...... Kin
t�rmnantracla
Bolles Construction
�o Yau mluid io are�ubwmsmt �.
Yea Q No
CONIxACT AWARDING nmw petrrlam�6e
PUBLIC AGENCY _&ktY 2R�R.69P_......_____,�_
eibm city
200 Mill Ave. So. Renton RA 98055
SEE INSTRUMONS ON REVERSE SIDE
L CRAFT �2.ESTIMATED NO. 3.RATE OF 7 4.RATE OF HOURLY
OF WORKERS I HOURLY PAY 1 FRINGE BENEFITS
1 t
Screedstan 2 18.04 -- ! 4.21-
Roller Operator on Plant Mix 2 17.68- 4.21-
Paving Machine Operator 1 17.68 4.21-
Dump Trucks: 5 to G Inci. 12 Yels. 6 17.63- 3.71- i
Dtmtp Trucks% 16 thru 20 Yde. 4 17.74 - 3.71-
Rater Truck: 3000 Gals. R Over 1 17.74 - 3.71_
General Laborer 1 15.21 - 3.43-
Raker 2 15.69 - 3.43-
Flagger 2 10.78 - 3.43 -
I �
I hereby certify that the above information is corral and that all workers I employ on this public Works Project will be paid an less
than the Prevailing Wage Ralc as detemuncd by the Industrial Smtislician M the Ile atmcnt of labor and Industries.1 uncle staml
that contractors who violate Prevailing Wage Laws are u ours sgneurc
subject to lines ad/or debarment. a7Y,s(
(complete all 1 copla and have each notarized) YPr urp ompmy ame ����� �""
STATE OF WASHINGTON M. A. Ste ale, Inc.
'^ County of K.na p. 0. Box 88050 __
City --Zip
.. Ccouacmr Qeguuwon No. 1
e Sig"cd m[nesasd heforc me F Tukwila, WA 98188223-01-SE-GA-LM-A372NO I
1 1 ,w a of rmwry
7 My ayµ. '.au capiree 0-90 u
TO CONTRACRS, DISTRIBUTE APPROVED COPIES A PROVFsD Department of labor&Industtic<
AS FOLLOWS: mxmAo.Avaanmr,Acrxcv (
I 4nLI.N- nllRleale-La1, rMVLOVMexT cT 7/fLLr IILV[-- 111rL%11[-1.1M1 lmmrnt AcrsR
caNary WAUA eICAT[-suasbNlnAt'TN BY FEB_25 88 _
our
1`101.029.000 intcm to ryY
J
1
r ,.J
Complete & mail entire set Statement of
WITH APPROVAL FKR TO: INTENT TO PAY
Dgwm.md of Libor A lw1usuim PREVAILING WAGES
ESAC Divlshm HC 710
925 Plum Street INSERT CARBON PAPER (Public Works Contract)
Olympia,W. 98504-0631 (206)733-4019 BEFORE COMPLETING
(Type or print clearly...this le your mailing label) CmnxWi'W No.
APPROVED FORMS TO BE RETURNEDTO: Renton Sanitar 077-87 _
___.._.. .e... �__ _._,. .. _ yy _—
ttmtle 9kl Jue Hie �Oile wniiciawuJnl � -
Neriwether Leachmain ASSOC Inc. 12-14-88
11E00 N.E. llilth St. KingPrime xintriasur
-
WA 98011 Bolles COnst. Co.
allyrn ieddai b rue sWavnaicmn.
Y. Q No Q
CONTRACTAWAROINO rmne Pi'mK mmmhaT
PUBLIC AGFNCY Cityof_Renton
�� ...-..�. aq 5
Wash. up _.
200 Mill Ave. South Renton 98055
SEE INSTRUCTIONS ON REVERSE SIDE
1 CRAFT 2.ESTIMATED NO. 3,RATE OF 4.RATE OF HOURLY
OF WORKERS HOURLY PAY FRINGE BENEFIT'S
Professional Land Surveyor 1 15.03 2.49 —
Survey Party Chief 1 12.00 _ 2.20 ..
Survey Chainman 1 10.00- 1.52-
t
if
i
i
i
I hereby ctnify that the above information is cormet and that all makers,I emplm on this"ublic Works Pmjmt will he paid no Icss
than Ble Prevailing Wage Rate as determined by the industrial Slati 16', of t4 D and nt of ber and Industries.I understand
d6g cimm,stc•s who violme Prevailing Wage laws arc �' S. ur
suhjccl m rr,srmdrbrdcbammrd. M,a - _ Sec.-Treas.
(Complete all 4 copies and have eech nW.rlud) Tyl*or lamt Go P:6iyl mn
STATE OF WASHDIGfON Meriwether, Leachman ASSOCiateS, Inc.
Camry of [Cinq__ 11800 N.E. 160th St. *•_„
p Ca _.._. ., ._...._.3tue"21p z'einrwrslteaw`ruiin5d�.
3 �rJ �5 y
signnu.m,rsteJ lnrnrr me Bothell WA 98011
(Signadum of 'is,,p,lhli n s
'I MY eppninunmtespircx - APPROVED
CONTRACTORS, DISTRIBUTE APPROVED COPIES Dcpanmcm of tart or&Indrauies
AS FOLLOWS:rml<- oalalNAL Conn ACT.avaeolNr,acrrrcv
nerrN- W>lMr.nL al. rMrinVMINT STpC
alUr-� 1meLMan-MIM CANTIIMTA {
fANASV-WanYVrLMAn-:URVnnac'iM aigW inn'tl'1
FIU).071 lel0 intend m lwy 4.87
tli .. Y
M
... ,.�-+..ram.. _. �.....Y�n..._..� �.._.....:•,vwuwr.r.i.... .�..�M��
J
1 n
i
CumPle't & mail entire set
WIT[11
WITH APPROVAL ,FEEdui TO: Affidavit of
ESAC meal of labor A Indmr.ier PREVAILING WAGES PAID f
ESAC Uiviaion HC�710
9'.5 Plum Sueet INSERT CARBON TAPER (Public Works Contract) 1
OI i Wa. 9a301.06I1 206 75N019 BEFORE COMPLETING
(Type or print eleurly...tblx la your Conuacr/BPW No.
APPROVED FORMS TO BE RETURNED M. mailing Iabe)
2------ 077-87
rd ue Sue-. ` "�'ay canexn ar Bolles_Construction Inc. I j 12-14-87
_ 1 12-14-87
18814 SE 84th St �"^^tY rh`cra yr ort-
iper'm�" -
._. K i n9___......._.
mime ouneiiw— ,. .
Redmond Wa 98052 l
I Bolles Construction Inc.
PYue altar a wrmwuw 10 ro f3 ww^f Hurt vW fa erect flaw rar Wa-i stitemant ea r-Ii 61ed7or'�jwt'1'-"'
ware rar rtreirrd darsamm wdq at earrrr f n. Yea No
PUBLIC G AWARDING
PUBLIC AGENCY ...P one no --]Dive work compleiad ..
_ ..... ._.._ . (206.)235-2631
cnY _. awe up
ADD Mill Av c Renton Wa 98055
SEE INSTRUCTIONS ON REVERSE SIDE
I CRAFT APPRENTICES: Nrme,rtgismtion N, 3.RAT6 O �.RATE OF HOURLY _
nine of pog»silon a data of hi» HOURLypAyI FRINGE BENEFITS
Pipelayer�v6erhe.Ker 15.69 i 3.43 - -
serLoa s�rW1{ead under 6! yds 16.01 4.21
spetTractor, 60 h s qnder +0-04- �L
p�y 17.68 - 4.21Flatbe -
Topmand, Truck 7q'1Ca�! Ga-Thti 15.50, 3.71 - r
Foreman
Tallman I 15.21_ 3.43-
Ebreman 18.54- 4.21 ,
i
I hereby cenlfy mat we above infonnmion is mace,and that all workers-1 employed 1
p yW on this PubbC W01113 Pfmject were paid no leo that the actors:w Wage teP as ding rxd by the Indusvial Smlisdci:m of{ Dc mtmcm of Labor and bldluWM& I understand
3 Out midlorldeb who violate Prevailing Wnge laws are subject to iVpr f SI o
fines;vulbr debarment, Cjf
ComplrU this form;n Irlplleua and have uM no4drad
' STATE.OFWASHIN17TON -A „lies Cons ructi9D Inc....,..,,,-,.,_„_,i„-�_-
County or 1 18844. SE 84th SL_ ...
--j— t CnY SUM Zip Conuactu,i Rapatranon No. I
signed or LLmnd hfo»nw m ,. "' i 4 d Redmond Wa 98052 BILL*8 e264KF
($lanalmr of noury plNaaL:�Z/ I� I U
. . . —�? , w a•� [A-PPROVED ���
ely aPpomtment eapn �.. Department of LOcv lk Industries I•.?
CONTRACTORS. .'AIL AN APPROVED rp
CONTRACT AWARDING PUBLIC A ENCY OF700.007.Boo affidavit of wager 10
t{I
ai !
J
,a
Complete 4a mail entire set j;t I. '-It sf)f3a 7567
WITH APPROVAL FIEV TO: Affidavit of
Deferment of labor A Industries PREVAILING WAGES PAID I
ESAC se Street He-710 (Public Works Contract) I 925 Mum trat INSERT CARBON PAPER
OI na 206 7534019 O O
T1M 9 M learly...1Ma Is your mdlleg label) ContrinimPW \e.
APPROVED FORMS TO HE RENRNEDTO: ndBdto
ke
wt M. A. Segale, Inc. 12-9-87 1 12-14-87 khan
P. O. Box 88050 King
74me mnti+cior.-'—.
Seattle, WA 98188 Bolles Construction
ua smemenio imm�n�at�i ie t1r.____
Y x No
CONIIIACTAWARIHNG pl.no. "" -'
PUBLIC AGENCY City of Renton 4-19-888
Me work
ekly. _.._.�_._._.h.,_..__,.. _._—___
ary ._.,,_,,._...___- one up
200 Mill Ave. So. Renton WA 98055
SEE INSlRUC110NS ON REVERSE SIDE
1.CRAFT ;2.AIMRFI7fiCE5: Name,rcgistmiun a, J.NA7E OF i4.RAPE OF HOURLY
ststars of pmgreasitm d doe of bin HOURLY PAY FNINCB BENEFITS
l edtttan Rol 2 18.04 4.21-
Roller Operator on Plant Nix 2 17,68- 4.21-
Paving Machine Operator I 1 17.60- 4.21-
Dump Trucks, 5 to a Incl. 12 Yda. 6 17.63 - 3.71-
Dun Trucks: 16 thru 20 7da. ( 4 17.74- 3.71-
Water Truck, 3000 Gala. a Over 1 17.74- 3.71 -
General Laborer 1 15.21- 3.43-
Raker 2 kf 15.69- 3.43-
Falgger 1 2 ! 10.78_ 1.43-
1
i
I Ocr,by t ently that the alxave ndunnnUon is correct and that all workers 1 employed an this laubhe Works Projal were Ixtxl no toss
,:,an the Prevailing Wage Rate as determined by the Industrial Statistician of the Dcumm,m of Labor and Industries. 1 um erSoW
that contractors who violate P"ailing Wage Laws are subject ro C acnvi Stgrot�°j7
fines and/or debarment. /�/�f,(��f
t e nr pr, o,h�iay7Tso
Complete this harm In trlphatte and hove each notarized M. A. Segale, Inc.
i
STAI E OF W ASIBNCrION Adam
P. O. Bo•' 8G050
County of Kist]__-_ City State Zip Contrsbr'r Registration No. i
Signed m etested Mfort raw on April 21, 1908
Tukwil.i WA 48188 223-0l-SE-GA-6M-A372N0
I
t (Signeve nfwtey;rpyfiO' L & I Use Only
t APPROVED
hly appninvnent expirca 10-90 DetxRmaent of labor d Industries li Q)NfRA[TORS, MAIL AN APPROVED COPY TO THE APR 26 a88
CONIRACf AWARDING PUBLIC AGENCY By
F700 ON 000 affidavit of wages 4 87All rdwrW'" �
. .- ,........wwequa:.nnna+suet14r1ak
r �j
yy5�
le fi mail collie
WITH T -
{VI7'll APPROVAL FEE TO: � At'IideVit OI
liq.FSAC mentIN,i io 11 a Imlusw`r PREVAILING WAGES PAID
F.SAC Uivirion IIC710
975 Plan Street INSERT CARBON PAPER (Public Works Contract)
Olymni Wr. 9g501-0651 ]06 75JJ019 BEFORE COMPLETING
(1'yP. .r prinl rlenly...lYl. b yoar mdling LYd) Couuwl/BI'W No.
i�OVEDr III"S9pgEREfURNED70 Renton Sanitary 07_7_-_87
1(( Bid tiro t3us__._ _ �iaionvsi:wu —
Meriwether Leachman Assoc. , Inc. 12-14-87
fey 6oumy wMre.;;A pw-
11800 N.E. 160th St. Ring
Bothell wA 98011 B0110S COnst. Co,
PMae,X a.rM. eJ 1010 ro%J werkiogworRwg%ays for Proeexiwg frwl Ar �r i yiuirinrni o�lnmii Ylsd(y'lllis jirif--
dore the OrPmrmwtr rmivrd wi ,donumm,with tM ror.rcr Yn No
LIN'IRACI'AW/.RUINU 1Mrt plamia u:ie wot��pnpl:le�-�
PUBLIC AGENCY City ofu Renton^_ _ i 235-2500 3-8-88
dben.. -�.—_ 4._.._..._ ..._..
200 Mill Ave. South Renton e e lip
WA 98055
SEE INSTRUCTIONS ON REVERSE SIDE
1.CRAFT AITRENI'ICES: N.lue,wgntr.tion., ],RATEOF e.RAI E OF IIWRLY
sl.g.of isngreuion A dine of hu, IIOURLYPAY FRINGE BFNEnTS
Professional Land Surveyor 15.03 2.49
Survey Party Chief ' 12.00 2.20
Survey Cnainman 10.00 1.52
i
CITY OF RENTON
RECEIVED
OCT 171900
i
PURCHASING DEPT.
I
I hcrrhv renily Nat dte nhovC inlnmlalion is Correct and that till workers 1 en,liluyed on Nis Public Works liujecl were paid no less
th:m the Prevailing Wage Rate as tictern,ined by the Indusro I So isticina nit Dr al [mt lab r and Industries. 1 understand
that contnwtrrs who violate Prevailing Wage laws ore%object to e'onuwt y 'r , �
litres an dehe.mem, 1- t« Sec.-Treas.
Complets this form In"Whatl and h......h nohrlred T9pt or ..it ComMny Nwtw Phone.
Meriwether Leachman Assoc-al-es, Inc.
STAIEOFR'ASl11NGPUN AdAew
County ofEinc 11800 N.E. 160th St,
- ----- City Sup Zip Contr.rmi r RegimNon No.
Signed or stterted before me on _( / Bothell WA 98011 -
i �^
ISignrw u re or nory public ^�"�
[Appi.
ROVED 'My .ppoir m. t e.pv.s 3 �L ; Department of Labor d Industries
^ON7RACfORS,MAIL ►J,Z7 COIM1fY1 �(fA'�r4' 4inI CON RACp AWAq tNG PUBLIC AGENCY y ,� r J 1N V V
F/W U07.000 .ffid..it of IS UN 0 fi 1988 .iuirrar —
}gl
Mwwvw
�aPr+r J
.,s � ,r du
i
Stale of Washington
09panment of Revenue A%02 Rap. NO.t _
ht At dil Procedures s Administration
Olympia,Washington 98504 0090 Date:
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
FFom CITY OF RENTON DEPARTMENT USE ONLY
Department of Public Works Assigned To
200 Mill Avenue South
Renton, Washington 98055 ate Assigned
Notice is hereby given relative to the completion of contract or project described below.
Description of Contract
CAG 077-871S-449 - 1987 CBD Sanitary Sewer Replacement
Contractoes Name Telephone No,
Bolles Construction Inc, 868-0866
Contractor's Address
19844 N.E. 84th St.. Redmond, WA 980S2
Date Work Accepted Date Work Commenced Date Work Completed
August 8, 1989 July 1, 1988
Surely or Bonding Co.
McLeod Agency
Agent's Address
111 Park Lane, Kirkland, WA 98033
Contract Am. nl'. $1.25_�42.00 _ Amount Disbursed: $ 1 a7.26S.$,$__._.
Additions: J Y9.6.fi6_— Amount Retained: 6.656.99_
Sales Tax. to 784 21 Total. 141 022,89
Total .1141.922.89
By.
(Disbu.'sing OBcer)
Phone No_
The Disbursing Officer must complete and mail three Copies of this notice to the Department of Revenue.Olympia.
Washington 98504.Immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL
BE MADE FROM RETAINED FUND cold receipt of Department's cede icate,and then only in accordance with said
certificate.
FORM REV 01 1 j2 861
all
I For Use By City Clerk's Office Only
A.I. M
AGENDA ITEM
RENTON CITY COUNCIL MEETING
................................................. ................................—......
SUBMITTING
Dept./Div./Bd./Comm. Public WorkslUt'hly Enl1r. For Agenda Of Nyou
Nq Staff Contact
' Namc Agenda Status; ate
SUBJECT: C AG 077-87 1987 17,31) Sanitary Consent
<_ewer Rehabilitation 5QAS: Project N 9-449 Public Hearirg
BOLLES CONSTRUCTION Correspondence
Ordinance/Resolution
Old Business
Exhibits: (Legal Cescr., Maps, Ltc.)Attach New Business
A Final Pay Estimate 14 Study Session
Other
B.
C. Approval: 'F
Lega' Dept. Yes_ No_ N/A
COUNCIL ACTION RECOMMENDED: Approval of Finance Dept. Yes_ No N/A_
Final Pay Estimate request final acceptance Other Clearance
of project,begin 30-d y lien period.
KCAL IMPACT:
4.
Expenditure Required $ 143,92289 Amount $ Appropriation-
Budgeted Transfer Required S .
SUMMARY (Background information, prior action and effect of mplementntion) _
(Attach additional pages if necessary.)
This project was completed on July ,, 1988, and accepted by the Public Works Department
on July 15, 1988. The amount due the contractor is $3,917.90. It is recommended that
the City Council accept completion of the contract as of August 8, 1988. If, after thirty days no
liens or claims are filed against this project and proof of payment of tax liabilities have been
received, it is recommended the retained amount of $6,656.94 be paid to the bonding company.
The total construction cost for this project is $143,922.89. Original bid amount was S13S,819.00.
PARTIES 0! ^ECORD/INTERESTED CITIZENS TO BE CONTACTED:
1
)
1
I
a
.•. SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
L ��
' state of Washington
° * Department of Revenue AX-02 Rep. No.:
Auda Proosduros a Adinmistratwn
y i Olympia.Washington 96504-0090 Dcle
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT .
1 From. CITY OF RENTON DEPARTMENT USE ONLY
Department of Public Works Ass,3ned 10
200 Mill Avenue South
Renton, Washington 98055 D, ,Asssgned
w
Notice i5 hereby given relative to the completion r contract or protect described below.
Description of Contract
CAG 077-8715-449 - 1987 CRD Sanitary Sewer Replacement
Contractor's Name Telephone No.
Bolles Construction Inc. 868-0866
Contractor s Address
`a
( 18844 N.E. 84th St., Redmond, WA 90052
Dale Work Accepted Date Work Commenced Date Work Completed
August 8, 1988 Judy 1, 1988
i
! Surely or Bonding Co.
McLeod Agency
Agent'c Address
111 Park Lane, Kirkland, WA 98031
is
Contract Amount. $ 12S 642.00 Amount Disbursed. $ 1 37 L65,,9y�5—_
Aaditions. 7 496.66 Amount Retained _ 6y$6.9,+1,_
Sales Tax: 111 7e4„21 Total: _1.41922.89_—_—_
Total. $143,922_89
I
By
'r (Dsbursing Officer)
r
Phone No. __
i
The Disbursing Officer must complete and mail three copies Cr this notice to the Department of Revenue,Olympia,
Washington 98504,immediately after acceptance of the Work done under this contract. NO PAYMENTS SHALL ..
iSE MADE FROM RETAINED FUND unlit receipt of Department's certificate,and then only in accordance with said
f certificate.
i
i FORM REV 31 0020(2-86)
I
I
V
J
a, afala of waaMnpton
t t I XCISmant of DIVISION
5 EIIOIEE TA[ a1V1a�OM
AWIt No<aEurM{ P 9850
alYmpa, WOMnplon 9{SOa0a90
Certificate of Payment of State Excise
Taxes by Public Works Contractor JI1nJ,, tVC �III111'VVvlll�lll,
t
Contractor: I ill; r a 19$8
CITY OF RENTON
80LLES CONSTRUCTION INC.
PWC Efgtggj9 Dept.
16844 N.E. 04TH STREET
REDMOND WA 98052
We hereby certify that taxes, increases and penalties due or to become due from the above named
contractor under Chapter 180, Laws of 11115, as ame,ded, with respect to the following public works
contract:
CITY OF RENTON
CAU 07T-87/S-449 1987 CSD SANITARY SSMSR
together with all other taxes, increases and penalties due tram such contractor,have been paid in full
or that they are, in the Department's opinion, readily collectible without recourse to the state's lien on
t
the retained percentage.
This certificate is issued pursuant to the provisions of Chapter 60.28 Revised Code of Washington '+t
for the sole purpose of informing the slate, county or municipal officer charged with the duty of
di::bursing or authunTing the payment of public funds to said contractor that the Department of
Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for ex-
cise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax which may be later
r
determined to he due with respect to the above mentioned contract or other activities.
Date at Olympia, Washington, J'AlIM
STATE Or WASNINCTON
DEP/IRTM/EJNT OF REVENUE
SUN Mce"np o81a<r
ROUTING: While Cory—Di b minE Offim. Canary Cp -C.,.NV,
Pink Copr—File.GaW., COPY—�P iul hf,
FORM REV 11 pp:Y U�ISI
�t M
t�
STATE 01 W&WNCU N
DEPARTMENT OF LABOR AND INDUSTRIES
C '? &s*'W • Mn. Na,MnC�on 4AGN-dJnl
December 20, 1988
City of Renton
Department of Public Works
200 Mill Avenue S
Renton, WT 98095
Re: Account ID 273,655-00-1 ,
Bolles Construction, Inc.
Contract No. CAG 077-87/5-449
Gentlemen:
i
Please be advised that the Department of Labor and Industries does hereby
release the City of Renton from any further liability pursuant to RCW
51.12.050 and RCW 51.12.070 as would otherwise incur in connection with a
contract calling for the 1987 CBD sanitary sewer replacement project.
this certificate does not release Bolles Construction, Inc., from liability
for additional contributions which later may be determined to be due with
respect to the above mentioned contract or any other contracts said
contractor may have performed.
Very truly yours, i
i
Kaye Kjorlaug
Administrative Assistant
Contractor Compliance Unit
Phone: (206) 753-4398 �:
CCU1.KK:2cd.28
cc to
Bolles Construction, Inc. ', 1
18844 W 84th -Street
Redmond, YA. 98052
i
1
A �
CONSTRUCTION INSPECTION
DAILY DIARY
PROJECT:--- =-- - -
PROJECT NO.:-----_' ------.-._ -
INCLUSIVE DATES
FROM ----- - -...___.TO -- - ---- --
BOOK NO_ __
I
I
L_ _ I
_
•ITEM 4 PARTIAL CHECK LIST
• DESCRIPTION AND CONDITION OF MATERIALS AND EQUIPMEIJT DELIVERED.
q • DESCRIPTIONS OF ITEMS REJECTED AND REASONS THEREFORE.
.. • RESULTS OF INSPECTION TESTS WHICH ARE NOT RECORDED ON STANDARD
FORMS, SUCH AS WATER LEAKAGE TESTS, ELECTRICAL TESTS fp PIPE
COATINGS, SMOOTHNESS TESTS OF CONCRETE SLABS.
• ACCOUNT OF '.NORK ACCOMPLISHED DURING THE DAY INCLUDING LOCATION
AND QUANTITY.
• DESCRIPTION OF ANY DEVIATIONS FROM PLANS AND SPECIFICATIONS,
REASONS FOR, AND WHAT WAS SUBSTITUTED.
• RECORD O' SPECIFIC INSTRUCTIONS GIVEN TO THE CONTRACTOR.
• DETAILS OF DISCUSSIONS, OR CONTROVERSIES WITH ANYONE CONNECTED
WITH THE WORK SUCH AS THE CONTRACTOR OR HIS REPRESENTATIVES,
MATERIAL MEN, PROPERTY OWNERS, CITY, COUNTY, STATE, OR FEDERAL
GOVERNMENT PERSONNEL.
• LIST OF VISITORS TO THE PROJECT AND THEIR BUSINESS CONNECTION.
• DETAILS OF ANY PERSONAL OR PROPERTY DAMAGE THAT MAY HAVE
OCCURRED AS A RESULT OF THE CONTRACTOR'S NEGLIGENCE.
• NOTATIONS RELATIVE TO VISITS TO COUNCIL MEETINGS OR WITH OWNER
AND 41S REPRESENTATIVES, AND ANY INSTRUCTIONS RECEIVED FROM
OWNt a'$ REPRESENTATIVES.
• OBSERVATIONS OF CONDITION OF FOUNDATIONS AND OTHER ITEMS OF
i WORK WHICH WILLBE COVERED.
• REFERENCES TO IMPORTANT PHONE CALLS. (DETAILS OF ALL PHONE CALLS
SHOULD BE RECORDED ON TELEPHONE CONVERSATION PADS.)
*FOR OTHER INSTRUCTIONS, SEE THE CONSTRUCTION INSPECTION MANUAL.
� _J
N
DAILY INSPECTION DIARY
a
PROJECT TITLE:
oIOJECT NONIEI:
PROJECT NCR.
f N01NEENINO PERSONNEL:
TITLE NINE LOCAL PNONE LOCAL ADDRESS
Aos. Enir,
Insroctor
InsRoctar ,-
In o-p actor
IasPoctor
GRAIN PERSONNEL:
NINE TITLE OFFICE PRONE NONE PHONE .,.....
— I
I
OONTRACTRN PERSONNEL: j
NAME TITLE OFFICE PRONE NONE PRONE t
I
r
t
i
IOSOZI��IN1*�ItArANw ,.�--•^---
F
DAILY INSPECTION DIARY
REPORT 0
DAY: 1( /t . DATE: WORK PERIOD:__ a.m./V .m. Co a.m./P.m.
WEATHER: TEMP. MAX _°F MIN _'F PRECIPITATION:
WORE ACCOMPLISHED TODAY:
f
{
I
i
I
1 CONTRACTOR SIGNATURE - INSPECTOR SIGNATURE
1 DATE:
L
I
DAILY INSPECTION DIARY
REPORT d
DAY: / / /. DATE: % / // WORE PERIOD:_ a.m./P.m. to a.m./P.m.
WEATHER: TEMP. MAX _°F MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
I I
CONTRACTOE STGMATUEE I S E
DATE: —
L_ _J
1
I
DAILY INSPECTION DIARY
_ REPORT A
DAY: DATE: WORK PERIOD: / a.m./P•m. to a.m./P.m.
WEATHER: rI t TEMP. MAX _-F MIN =°F PRECIPITATION:
WORK ACCOMPLIOP TODAY:
M i'
leg, t41
_,.
/ [♦
i
rJ v
�I
CONTMCTOA SIGNATURE 19SVECTOR SIGNATME
DATE.: —
i
J
1
1
DAILY INSPECTION DIARY
REPORT h
DAY: '71, DATE: I• / WORK PERIOD:_ a.m./p.m. to a.m./p.m.
WEATHER: TEMP. MAX OF MIN OF PRECIPITATION:
WORK ACCOMPLISHED TODAY:
CONTRACTOR SIGNATURF. INSPECTOR SIGNATURE
DATE:
Yrr..
DAILY INSPECTION D►ARY
REPORT P
DAY: DATE: / /• . WORK PERIOD:_ a.m./p.m. ZO _ a.m./p.m.
WEATHER: TEMP. MAX _°F MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
4
CONTRACTOR SIGNATURE ,' INSPECTOR SIGNATURE
DATE:
— t
DAILY INSPECTION DIARY
REPORT M
DAY: Irii, .r DATE: WORK PERIOD: i a.m./p•m. to a.m./p.m.
WEATHER: /_. TEMP. MAX '/' *P MIN _°F PRECIPITATION: _
WORK ACCOMPLISHED TODAY: 1
LIC
ie
f t. .
�(!-. �/i 6✓ � LG cLC "Tlc Ke__ - la/r IN `Y.,r .'": — -%I[.n -_ /'� ['•n
['Y_[Gu� C'X. :✓_'./. Lir rF 61flr rr t/ 711:rY'urA llir
!(A6 r' /nLG•> .5.. FL cr.a.r :� //::.iFY'w:. r�tr .0 C. ..-n Ly.r `
A&r yL /LLTn L rlr!
I _
I
i
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
,
DATE:
L J
J
DAILY INSPECTION DIARY
REPORT k
DAY• - ,( ! � IAAT6� !_.1_ WORK PERIOD:','_ a.m./P•m. to _ t.m./p.m.
WEATHER• _ TEMP. MAX �_'F MIN 2_°F PRECIPITATION: I
WORK ACCOMPLISHED TODAY: I. I . .
i c < < • •'i — U l 1 -•rk - f
4 If
/. ! _
i
s.
I
i t
— I r
I
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE: _
J
. I
^cu
DAILY INSPECTION DIARY
REPORT N ..
DATE: WORK PERIOD: a.m./P.m. tO a.m./p.m.
DAY: ./ —
WEATHER: TEMP. SAX _'F MIN 'F PRECIPITATION:
WORE ACCOMPLISHED TODAY:,
1
1 A A _
L
L i
All Illy
AL
l"f I K F A At
Cry► . \ ' 1 x �-
1
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE. I
DATE%
DAILY INSPECTION DIARY
REPORT d
DAY: DATE: / / WORE PERIOD:_ a.m./P.m. to _ a.m./P.m. _
WEATHER: TEMP. MAX _'F MIN __'F PRECIPITATION:
WORE ACCOMFLISW¢D '[ODAY:
4/. j ti C✓ / /L � 'l /
'i
I _
CONTRACTOR SIGNATURE ~ INSP TOR SIGNATURF.
` DATE:
L J
DAILY INSFECHON DIARY
REPORT r
DAY: 1, i DATE: l;; l' .f WORK PERIOD:_ a.m./P.m. to
WEATHER: TEMP. MAX _°F MIN �!/ °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:71
a
i
I
CONTRACTOR SIGNATURE INSPECTOP SIGNATURE
DATE:
I
DAILY INSPECTION DIARY
REPORT d
DAY: _�,t / DATE: WORK PERIOD:_ a.m./P.m. to
HEATHER. TEMP. MAX._'F MIN _'F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
A-117/1 lie
u i it
i
E
i
i
i
i
E
i
CONTRACTOR SIGNATURE i I SPECTOR SIGNATURE
` DATE:
DAILY INSPECTION DIARY
• REPORT R �-
DAY: /iL "/. DATE: // /• WORK PFR10D: a.m./P.m. to _ a.m./P.m.
HEATHER: TEMP. HAIL y_°F HIN i°F PRECIPITATION: /.
WORK ACCOMPLISHED TODAY:
r `
J i -A0 It
M
, K t
ij
7 , 1.
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
A
DAILY INSPECTION DIARY
REPORT A
DAY: / DATE: , //( / WORK PERIOD:_ a.m./P.m. to _ a.m./P•M.
WEATHER: TEMP. MAX OF MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
/
�� � � III u• �,., ,..
' _a— /. 1 •� l i l . 1.'.
l
li r'L lrr
i
i
1
CONTRACTOR SIGNATURE — INSPECTOR SIGNATURE `
DATE: (iof
•� J
1
I
DAILY IVECTIQJ DIARY
REPORT N
DAY: DATE: WORK PERIOD:_ a.m./p.m. to a.m./p.m.
WEATHER: TEMP. 'L1Y °F MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
CO—TRACTOP ;,�MrURE INSPE6TOR SIGNATURE
DATE:
p
1
DAILY INSPECTION DIARY
REPORT B
DAY: DATE: /i / WORK PERIOD:_ a.m./p.m. to a.m./p.m.
WEATHER: TEMP. MAX 'F MIN v °F PRECIPITATION: _
WORK ACCOMPLISHED TODAY:
- '' L, ,
CONTRACTOR SIGNATURE [i NSPECTOR SIGNATURE -
DATE:
J
DAILY INSPECTION DIARY
REPORT N
DAY: i C ,'. DATE: - /' /, ; UnRK PERIOD: a.m./p,m. to _ a.m./p.m.
WRATHER: TEMP. MAX _°F MIN v •F PRECIPITATION: _
WORK ACCOMPLISHED TODAY:
IZIC L A 1, f V L1
'54i: T f3 E
A I Srn
I — Z 7 c, o - 17
' CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
d
DAILY 1NSPECTI DIARY
_ REPORT N
DAY; P45°1 DATE: /... . /i�_ WORE PERIOD: a.m./p.m. to a.m./p.m.
WEATHER: (_I TEMP. MM > >°F MIN �F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
�
o. hl. - 17E(-s. 1 LA lg� L_ ATr+M` e.t n.k k w - [+ A •G
10 'fO' - /Z " Pv,' - C_. (1 CL - L .,r ,1., Te - -
d /1
I"I'," IA —
X�—TY_FE T S.A Z(A Z..4 C� b
S=A I' A /ice-' ou-r :
py/ oa a 7 L3
i
.or XL.. .%«_ l /nr/
�• -&ISt7- jVC, co-A'OP//.<'ti. FTC /[/ '-F/ 1 /'77 /,yc
r/1711
rI✓ .t �'
I1!
p t
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
I)A'I'E:
L
J
DAILY INSPECTION DIARY
11 '' G C
DAY: K� C>. DATE: G 'Q e �WORK PERIOD:_ a.m./p.m. to _ a.m./p.m. REPORT M
WEATHER: 6)•C- . TEMP. MAX '.,`� 'F MIN c S °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
i-i iC k�/A/Cn I R ls. Ja/ _`w4;—i,- .- K_
SO i
/-/,,A J7. 7fi /'ne./) ii/' /l1�S . ! YL .
Now
i
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
i
DAILY INSPECTION DIARY
� - REPORT k
DAY: _ /4.. X. DATE: /; ./ %� WORK PERIOD:_ a.m./p.m. to _ a.m. ,.m.
WEATHER: , _ _ TEMP. MAX OF MIN OF PRECIPITATION:
WORK ACCOMPLISHED TODAY:
O•i f' f/ CcG1, 6
4r r7 - J AC-b.
F� fi c,r.ui v Sury✓of& %/t[✓ ' - r K 4! ti - � - --
`} �4
Ile V4 -
i
I
CONTRACTOR SIGNATURE low
/ ! INSPECTOR SIGNATURE
/ DATE:
1bw�
I
DAILY INSPECTION DIARY
i
DAY: 1 A DATE: WORK PERIOD: REPORT 0
_a.m./p,m. [o _ e,m./p,v,
WEATHER: TEMP. MAX
_°F MIN °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
i
rt
COMTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
DAILY INSPECTION DIARY
I�� REPORT 0
DAY: /C{• DAT' /.. Y .'_ 'WORK PERIOD:-- a.m./p.m. to a.m./P•m.
�TTTT f
WEATHER• i^ TEMP. MAK °F MIN `!U `F PRECIPITATION:
rt
WORK ACCOMPLISHED TODAY: ,
_ 4
4
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
7I
DATE: _—
L J
J
i
DAILY INSPECTION DIARY
+
DAY: %u'. . � DATE: j / / " WORK PERIOD:_ a.m./p.m. to a.m./p.m. REPORT
WEATHER: TEMP. MAX _'F MIN _'F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
SSf � �CTOR SIGHATURE INSPECTOR SIGNATURE
DATE:
J
h
DAILY INSPECTION DIARY `
. � .1 REPORT
DAY: i '. DATE: / c /. WORK PERIOD:_ _ a.m./p.m. to a.m./p.m.
WEATHER: TEMP. MAY _°F MIN °F PRECIPITATION:
WORK ACCOMPLISHED TODAY: s
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
1
DATE:
DAILY INSPECTION DIARY
3D REPORT N
DAY: I"c.3r _ DATE: 3 / /Y� WORE PERIOD: a.m./P•m. to _ a.m./P.m.
WEATHER: ( _ TEMP. MAX S_S 'F MIN Q�°F PRECIPITATION: _
WORK ACCOMPLISHED TODAY:
6 AcT/ /i FE'd
IC L04'�}
CONTRACTOR SIGNATURE INSPE�:OR SIGNATURE
i DATE!
L_
DAILY INSPECTION DIARY
- REPORT $
DAY: f�/t_._ DATE: 3 / /SP WORK PERIOD: a.m./p.m. co e.m./p.m.
WEATHER: O•L. TEMP. MAX SS •F MIN 4<70F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
M _ F
Z. C _
rAnnij/ A — M CE-.(lrO -t
GClti C7<--Gi 7. /r l"e"Ef' ny
I - -
E
i
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE: I
—J
•
DAILY INSPECIIDN DIARYu C
3� REPORT f
DAY: IL.1C_- DATE: 3 /� 196 WORK PERIOD:l a.m./P•m. to _ A.M./p.m.
WEATHER: U. TEMP. MAX `nn 'F MIN 1_5�F PRECIPITATION: Icy 6+
WORK ACCOMPLISHED TODAY:
,al,i — %/ •/ 1L. ant/ r/.A/s —h�dVIA,c�
lil-l7� J'Tl/JM /A/ L/.c/FS !'�i.r CC%7(//'.Q.(/7-
s%%/"6 Ur C L'Iil [ p i .yyA7ltic K. �l %/Lcir ��M.
n/'T •-1 ntu i CCtlOtc p•�— .�'OdD/�//i �z -
�/7 /i��ct/T FJ /F!' !� u " / r 7TJ /3 D�(/G •_
.v.T. :_ 1. ✓. L//IFS �/ fun.rr- o u �.L9 .
{
ONTRACTOR SIGNATURE I SPECTOR 3•GNATURE
DATE:
1
J
i
r-
DAILY INSPECTION DIARY a�Ct
REPORT 0
DAY: DATE: :5 /y lVe WORK PERIOD: J a.m./p.®. to _ a.m./P.®.
WEATHER: D. TEMP. MAX S7e' 'F MIN S/C °F PRECIPITATION: 3csz
WORK ACCOMPLISHED TODAY:
W/O- F��lst/E�C' —/ X1 5,w/A,,e, JWA J. .P .✓s nuE -- --
'Ta C.A oyA/n IAi ,Cccns ell ege ,a i V ---
nrlLcl'C(T -----
.[1S!'.EL' 'NOT •--a., CAL �Nnc.i NlyCn�i'_
3
CONTRACTOR iIGNATURF. INSPECTOR SIGNATURE
DATE:
I
DAILY INSPECTION DIARY Se'eie-E`
_ REPORT N
DAY: /,:JUG. DATE: 1/0 /9*' WORK PERIOD:_ a.m./P.m. to _ a.m./p.m.
WEATHER: TEMP. MAX _'F MIN _OF PRECIPITATION:
WORE ACCOMPLISHED TODAY:
C
;r
y
CONTRACTOR SIGNATURE / INSPECTOR SIGNATURE
DATE:
DAILY INnUION DIARY
J REPI.RT k
DAY: /F,fV _ DATE: 3 / ,P WORK PERIOD:/ 3 a.m./P.M. to a.m./P.m.
WL,THER: a,S _ TEMP. MAX j`_*F MIN -� S °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
- All i7GT/ Vi i
Vq
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
1
s
a
DAILY INSPECTION DIARY z uEK
t
R�^ REPORT b
DAY: /!/47 , DATE: /� WORK PERIOD: a.m./P.m. to — a.m./p.m.
HEATHER: L. o ram_ TEMP. MAX LO °F MIN SO °F PRECIPITATION: -.
WORK ACCOMPLISHED TODAY:
7- VIAE Lit v
4 P!' gtlf =/'< /t .TE[_T/Oc l5 0 rA-'F
.! 724/ /L F TU li•U DU SN/Q7ri:LK
�F^L.drn /�F.0 duS ni LA4• dK^F:.q 5
TVd c_ S.5
//7ET IU�Tf! /N�LKt3 �J IMi77�: -7 L</E•i AVEK
,QLeY /CEm ��yi D NF f,/a /E y�NA-7UL/ /3.�'Truf�d/ 7D 43i�J
/.Ir-le ., 3SEA
i --
og� Ale
i
i
i
1
CONTRACTOR SIGNATURC RSPECTOR SIGNATURE
DATE:
L
.r Y �
DAILY INSPECTION DIARYr
i.,
REPORT N
DAY: IlS . DATE: -' / S` fY WORK PERIOD:/ a.m./p.m. to a.m./p.m.
WEATHER: L/• - TEMP. MAX O 'P MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY: _
to R7 t
CONTRACTOR SIGNATIRE 4,—?Z7 INSPECTOR SIGNATURE C
DATE:
L
j
DAILY INSPECTION DIARY
REPORT
3t' N -
DAY: /�/ � DATE: S /I 9 WORK PERIOD:? a•m./p.m. to _ a.m./p•m.
7/
WEATHER: (4 TEMP. MAX G+A 'F MIN 4S 'F PRECIPITATION:
WORK ACCOMPLISHED TODAY: »
�OU[✓L> U
Ft/ `Y1..-/ 4/
CSSoiu RK'Ea's — sT.Lc L/ut _ Loy-
.si^/..7T ]! /3F TIC •c«-' 1 i • � T/4L/' ui+.,.
i
1 - _
r
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE: _
r
1
DAILY INSPECTION DIARY
!r REPORT N
DAY: /�,["/ DATE: /� �'/=� S WORK PERIOD: a.m./p.m. to a.m./p.m.
WEATHER: _/-- TEMP. MAX c_ 'F MIN _°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
7. al lgAJ (-• i Ii C7-ue rr "TUN' 1 TIL/I - r-•: < <
r
CONTRACTOR SIGNATURE NSPECTOR SIGNATURE
DATE:
T
DAILY INSPECTION DIARY
�,.i.o REPORT n
DAY: ei;AY. DATE: /�%/.?B WORE PERIOD: / y.m./P.m. tO _ _ a.m./P.m. _
WEATHER: n. C. . TEMP. MAX S,C' 'F MIN�F=°F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
T `r'
i
I
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
DAILY INSFECHON DIARY
3 KJ -
/) REPORT
DAY: �dL. DATE: /Z(:/51f WORK PERIOD: a.m./p.m. to a.m./p.m.
WEATHER: D. C_ , TEMP. MAX -Sn�_°F MIN 4?C, °F PRECIPITATION: S�
WORK ACCOMFLISHID�TODAY:
A.M. ,C/D W 1* 7-1 t/r 7-
[f..
lanialwh
- a
i
i
CONTRACTOR SIGNATURE I SPECTOR SIGNATURE
DATE:
L_-
S-449 1987 Si-all Sewer Replacement 2
i
I
DAILY INSPECTION DIARY Jt_k0".k
;r• REPORT ►
DAY: 1,(JF f,, DATE: /,''.r :1 WORK PERIOD: I_ a.m./p.m. to _ a.m./p.m.
WEATHER: 1� i_ TEXY. MAX 4J °F MIN i<_'F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
CONTRACTOR SICNATITRF: _ ' INSPECTOR a GNATPRF.
DATE:
I
DAILY INSPECTION MARY
_♦ REPORT r
DAY: //./tJf DATE% '+ /• '//w S WORK PERIOD:_ a.m./P•m. to _ •.a%•/R•m• ___
WEATHER: / TEMP. MAX f_�_°F MIN _e_°F PRECIPITATION:
WORK ACCOMPLISHED TODAY%
Q M 2 ft •.T✓ _.
II
Now M- 1
I
I
I ^
I
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
AN
_. _, .. . jr_._.�.`_ _. _ .�.�. .. ��� .Ply" ��� _.�''r►�.1. �.�
DAILY INSPECTION DIARY
T a DAY: _� �./. DATE: :� � S p'i°, WORK PERIOD: / a.-M./P.M. to _ a.m./p.m. REPORT B
WEATHER: TEMP. :1A7I 'F MIN ` •F PRECIPITATION:
.". _'� /,�
WORK ACCOMPLISHEQ TODAY:
RIMS—
CONTRACT, ' iIGNATURE SIGNATURE
DATItt
Yk
5w
rak'
DAILY INSPECTION DIARY
REPORT M
DAY: DATE: :'� ly'.W�_.'- WORK PERIOD: -e.a./P.n. to _ a.m./P.m.
WEATHER: TEMP. MAX S_� 'F HIN '1 'F PRECIPITATION:
WORK AL,O"LISH.ED/D TODAY:
A M .11c V
3 - _ tl - n i _ c%1 ee '
Ali)
/duC 3 3/ 41 0 C - - le"
(, [,)'r/C F A,&7 4' %Y' LAC✓3 d A,'
AL"- ^&,ZZ OFn //I7 I.F U/f�Tc dA"e l—'7 AaJ. -_—
cle
o AC7/ V// Y — IC"F LCN /iW/t 6"-
Pi. r
i
CONTRACTOR SIGNATORE INSPECTOR SIGNATME
,.._..GATE _. .._.
DAILY INSPECTION DIARY
Am REPORT B
DAY: n.!_ DATE: �% /y /.S;Y WORE PERIOD2: a.m./p.m. to _ a.m./p.m.
WEATHER: U- a.e TEMP. MAX 'F MIN ¢x-) `F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
c —
,C/@f'Af-� [Z-
L.' Ac . l z;; —
se
a `
FL/,�_7r4[e�" •. C>n[.L v S i/A!� ��,y: u [.�'•r �4r[' [:�-�'�r�er'
&A
S� IQt'SELf na'.'.1 7Z� Srr [r Lo.�!'S c�l�rc Vl�,�IB LL
-ywcV ueexE /ie5, f/J/S la.[PJs
1'EGf1CTL A! -F v '7G'4 FL-/c.•
i CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
_ L
J
I
DAILY INSPECTION DIARY
REPORT F
DAY: l�I,/. DATE: Q /// /�{ WORK PERIOD:/ a.m./p.m. to _ a.m./p.m.
WEATHER: e�A, TEMP. MAX / i 'F MIN T PRECIPITATION:
WORK ACCOMPLISHED TODAY:
M LE'F( / Ox/ f-� •' I f�F/I"/ ✓/A/4
I-A
I
CONTRACTOR SIGNATURE / INSPECTOR SIGNATIA F'
7ATE:
I •++ra
DAILY INSPECiIDN DIARY
REPORT N
DAY: 1t/E. DATE: / .' b.+ WORK PF.RIOD:L a.m./p.m. Co a.m.!p.m.
WEATHER: L' / TEMP. MAX %D °F MIN 4'5! •F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
-V i . Vim,
1
7 d /'
vc
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
S�
DAILY INSPECTION DIAR"
REPORT M
DAY: tom/ -L�e 1 DATE: 1S Ik WORK PERIOD:L a.m./P.m. to _ a.m./P.m.
WEATHER: ir• [i. TEMP. MAX S S °F MIN 417.• °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
J M - Mr-T a rr! o z ram.:-7- o✓sue_ r7z
' j r 7y 'T.{/F1rI !�C'1!• ✓b- r _ L.u7Tr !,�_,� %.�t-r . .. ..+,
Iz
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
l
DATE:
r
.� „'��-'� valaalYM_rr� arar..:':.. '! � E, �'�`=+f�f�a ► -'��aar'�. _ �i
i Y
(- 1
DAILY INSPECTION DIARY
f REPORT It
Ye %.!' _ DATE: �( /4/VA WORK PERIOD:_ a.m./P•m. to a.m./P.m.
WEATHER: TRIP. MAX MIN J_' °P PRECIPITATION:
WORK ACCOMPLISN;D TODAY:
r
CONTRACTOR SIGNATURE NSPEC OOR SIGNATURE
DATE: __.
DAILY INSPECTION DIARY
1�l REPORT N DAY: L.C% DATE: Q l/S /Ad WORK PERIOD: a.m./P.m. to
HEATHER: �J"i-. TEMP. MAX �o�•F MIN PRECIPITATION:
WORK ACCOMPLISH TODAY: —
/ �oi jr n
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
r _
1
•k_�raY.r, tt ..
DAILY INSPECTION DIARY
/ REPORT 1
DAY: �r7�.�1 ,_ DATE: 4-/(F�/RY�•NORR PERIOD:('"- a.m./p.m. [oa.m./p,m.
WEATHER;T>L.— TRIP. MAX \ L•P MIN CIS °F PRECIPITATION: -
WORK ACCOMPLISHED TODAY:
A/7. SEF6 4 LE n.i f.C'e l±. 4..G7. v zqt}i it/<�.•
�P I11Af C[. 'r" f' �— ./�1_ �rnr r c-n '" /. c•.re'..
'4 -7b/,',Yjj
f ' IrA 77L I —
n., •n . " .Sr.(�i�- Alan OAv�n
T
RL_ S r/y'G. ' 77/0 '72f -0 /:FFAY 7D i) ^L /'14-V
r
II '
I
� 1
I _
CONTRACTOR SIGNATURE. INSPECTOR SIGNATURF
DATE:
a�tYr„'MM r �A'+ '.� .�+9�'_1� 'a'i..s:.• ii.�e 'fir. �:,er�r �
DAILY INSPECTION DIARY
�
DAY: DATE: � /`� S'.� WORK PERIOD: �3•.m./p.m. to a.m,/p.m. REPORT I
WEATHER: t,w.. TEMP. MAX S S•F MIN dO °F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
ZE
CONTRACTOR SIGNATURE MSP iCNATURE
DATES
• 4
r °T MIN&' 1�
DAILY INSPECTION DIARY i 4 'I
REPORT
DAY: IL.l -_�1` DATE: 4- /<;^(.i.' WORK PERIODIC- a.m./p.m. Co a.m./p.m.
WEATHER: ZIL, ah, c__ TEMP. NO _Zj•F MIN Q °F PRECIPITATION:
WORK ACCOMPLISHEE/D TODAY:
dr/uC. - 4f- Z�•/n //e,
WA
:
%%L Li r ,.,Ind_ in AS,E I1�7L
44
/4 r,
CONTP\CTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
L
r ,�* ;
I
DAILY INSPECTION DIARY
i
REPORT 0
DAY: all DATE: j / I WORK PERIOD:_ a.m./P.m, to _ a.m./p.m.
WEATHER: < TEMP. MAX 'F MIN :/•.. 'F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
. ,,i r'
Tim -
i
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
J
rl _ ��... ..� . -- jai .ri' ._ ... ... "i....�""" .lam _i.al• ! .+Ill\ saga.
1
DAILY INSPECTION DIARY
REPORT N
DAY: I �� DATE: WORK PERIOD:_ a.m./p.m. to a.m./p.m.
WEATHER: TEMP. MAX °E MIN J °t PRECIPITATION:
WORK ACCOMPLISHED TODAY:
CONTRACTOR SIGNATURE INSPECTO^ SIGNATURE
DATE:
COST DATA AND_INVENTORY
FOR UTILITIES - CITY PROJECTS
S, iSF7 5�.�.. Sc�•=�. City Project Numbers: W-_
k'tA•cc. c...v S- ZI
Name of Project
As required for year end statistical data for annual reports, the following information is furnished
rcgardi:rg costs and inventory for utility inprovements installed for the above referenced project.
-I
WATER SYSTEM: ❑
ti
H
Length Size Type v
I_.F. OF 1. WATERMAIN
L.F. OF _ W'ATERMAIN
L.F. OF " WATERMAIN
L.F. OF _ WATERMAIN
_ EACH OF _ GATE VALVES tA EACH OF rATE VALVES o
EACH OF GALE VALVES K
SUBTOTAL E
EACH OF FIRE HYDRANT ASSEMBLIES $
(COST OF FIRE HYDRANTS MUST BE LISTED SEPARATELY).
TOTAL COST FOR WATER SYSTEM $
SANITARY SEWER SYSTEM:
Length Size Type
tauT L.F. OF SEWER MAIN
_ L.F. OF SEWER MAIN
L.F. OF " SEWER MAIN
�— EACH OF DIAM" Eli MANHOLES
TOTAL COST FOR SANITARY SEWER SYSTEM S
IO
STORM DRAINAGE SYSTEM: �
H
Length Size Type r
4
s tJG L.F. OF 5 r^i1L STORM LINE A
T L.F. OF STORM LINE
L.F. OF STORM LINE as
L.F. OF STORM LINE
r�
TOTAL COST FOR STORM DRAINAGE SYSTEM 3 _
ro
A
4
0
O
H
Submitted By: __ m
Project Engineer
Submittal Date: _
I •In lieu of listing all utility improvements installed, itemized pay cst`mates or spread sheets may be
attached hereto if applicoble costs and inventory are highlighted m,d totals are shown above on this form. JI
I
ST DATA AND INVENTORY
FOR UTILITIES - CITY PROJECTS
City Project Numbers: W- _
S_
Name of Project
As required for y.ar end statistical data for annual reports, the following information is furnished
regarding costs and inventory for utility inprovements installed for the above referenced project.
WATER SYSTEM: O
r
Length Size Type y
L.F. OF WATERMAIN
L.F. OF _ WATERMAIN
L.F. OF WATERMAIN
L.F. OF WATERMAIN
EACH OF GATE VALVES m
EACH OF GATE VALVES a
EACH OF GATE VALVES x
K
SUBTOTAL $
EACH OF FIRE HYDRANT ASSEMBLIES .f
(COST OF FIRE HYDRANTS MUST BE LISTED SEPARATELY),
TOTAL COST FOR WATER SYSTEM $
SANITARY SEWER SYSTEM:
Length Size Type
- 2aT L.F. OF 2,0- vcP _ SEWER MAIN W�
- 76(- _ L.F. OF C. yc- SEWER MAIN AbA'Y
- Jct _ L.F. OF 8 SEWER MAIN N
EACH OF t6" ?DIAMETER MANHOLES
TO'AL COST FOR SANITARY SEWER SYSTEM $
O
STORM DRAINAGE SYSTEM:
Lergth Size Type ..
r
N
_ L.F. OF STORM LINE
T— L.F. OF -"__ STORM LINE w
_ L.F. OF FTORM LINE 00
L.F. OF " STORM LINE
n
TOTAL COST FOR STORM DRAINAGE SYSTEM $ y
-- K
a
Q
ttv
Submitted By: _
Project Engineer
Submittal Date:
In lieu of listing all utility improvements installed, itemized pay estimates or spread sheets may be J attached hereto if applicable costs and inventory are highlighted and totals are shown above oa this form.
Dnlc: 03-Mar-88 Ci1.y or Rcn LGf1 4.41blir. Work:: Dcparl.nnnl,
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS DIRECTOR 1
1
CONTRACTOR: Bolles Construction
CONTRACT NO.CAG 077-87 ESTIMATE. NO. t
PROJECT: S-449 1987 CDD Sanitary Sewer Rchuhi.li Lul.ion j
I 9I
I' 1.=_=CONTRACTOR EARNINGS TRIS RSTIMATI•: f89,33A.91_____________________
2. SALES TAX !. 0.08 $7,236.13
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $96.571.04
I
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $0.00
5, tRARNINGS DUE CONTRACTOR THIS ESTIMATE $84.368.16
G, SUBTOTAL - CONTICACT014 PAYMENTS $84,868.16
I
1
I
7. 10'.1'AINAGE ON PREVIOUS EARNINGS $0.00
8. **RETAINAGE. ON EARNINGS TRIS ESTIMATE $4,466.75
9. SUBTOTAL - RETAINAGE .$4,466.75
i 10. SALES TAX PREVIOUSLY PAID $0.00
11. SALES TAX DUE TU IS ESTIMATE $7.231t•13
12. SUBTOTAL. - "ALES TAX f7,236.13
x (95% s LINE 1)
tx (RETAINAGE: 5%) GRAND 'TOTAL $96,571 04
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
I ACCT.Y x421/000/15.59G.38.65.28 $73,072.03
ACCT.1 x421/000/15.59G.30.65.62 f1.9,03Y..26 f I
$92, 104.29
RETAINED AMOUNT (Line 8) :
ACCT.0 x421/000/15.596.38.G5.28 $3,543.75
ACCT.R x421/000/15.596-.38.65.G2 $92:1.00 1 I
tA,A6G.75
TOTAL 'PILLS ESTIMATE: _-__-$96,571 .04
CIIAB'L'EIL I16, LAWS 010 1965
CITY 010 RENTON CERt.FICATION
Ma
CHARTER 116, LAWS OF 1066
CRY OF RENTON CERTIFICATION
p YM!1v.r <Y 00 r9.rar..a 4,I14 Ixvu.,a
R1WRY, r11Y T6 ltR'..A�.II IU,p U'!Il R::,R6'119. 1':•
O,i,mFu 1 V4 uT R'a, n m cm 1, 0 MAT 1 AM
N{IMptltl'J Yt1.�YMq 1!IUW CCRI:�•l'Yp^.Af.[J.M,
I
t
i � f
I r
Late: 0!16r'`JTi 'Ity of Renton .Iu IK Wout:'ueWrtaenl Page. I
kgact SAa9 0167 CM Cmltary 5der RetNbilltatlm Contract Nnit11: CA4 077-21
Contractor Bolles tmstructim E,tiute Au ff: :110vno Date: WCh a. 1908
!in Bus Description ' Quit Est. WIT Previous Prdvious this This Total TN31 l
M 1%. X Quantity Prll'e PNntitr Aaiun Ooantlty Albmt Qumtlty ~t
[heMle A
001. .65 SlmufO weele IEad 0 1.550. 0.00 0.00 5.00 '7W.00 5.00 77A.A
aB'Oiaeeter
001. .b5 Extra xyte NMI( 40' IVertizal It I40.00 0.00 0.00 1.00 0.00 0.00
005. .bS 0' Smitary Suer Pipe Linear Foot 1407 .A 0.00 G.W 1457.00 31054.00 1457.00 32054.00
AX. .6` 8'x4 tees Il:rear Fast is 11.00 0.00 0.00 18.00 797.00 -:0.00 792.00
A5. .65 6'Side Stier Pipe Ituear Foot IN t5.00 0.00 0.00 141.A 211S.00 ICED .115.00
-a
Ab. .b5 Canecttr.to Existing 1140 6 47S.00 0.00 0.00 A.OD :400.00 4.00 190).00
007. .0 8' Stora Stier Pone kinear Fool 115 111.00 090 0.00 0.00 0.0 0.00
000. .b5 bKA Run Karel 10, 'renn eackiilllim IS25 1.50 0.00 0.00 2W1.t2 9052.0/ 2W7.12 908:.04
009. .65 Tranct tounmtim 6raal Ilm 730 N.00 0.00 0.00 10+.:7 1460.06 10/.T LAbC.b
010. .0 CNOW':.NKI19 TOP IWA Ilm 550 12.W 4.00 0.01 11d. 1041.00 lb212 ;WA,A
D!t. 0 Aspull COmie:a Huss Ilm 520 SS.00 0.00 0.A C.A 0.00 0.00
011. .b5 1V lnspxtim Kw SA 1 00.00 0.00 0.00 0.00 0,00 0.00 �
OIL .65 Cmstrmtim Staking and A-Built Iku1P Sm 1 1.225.06 0.00 0.00 0.W 662.50 0.50 662.50
Notes
t
Y
Jk
Date: 2 Mar-Ao city of Action Ps�lt.Yorks De anent Page: 2
Pro3ut. ".-//9 1987 CGO:MituY Sewer R"ilitatim. Contract Meaner: CAG 077 87
Contractor Bolles Cumte Healer: I Closing D.atc: Mara A, 1M
Ito Bars Oeurhptfon 1 wit 131. mat Prmvlwi Previous This This Total Total
No. no. x Quanta Price Vamtaty Alwnt QMAtatY Awl Ormtity Amount
IT A4 total Sdrtnrla A WOO 857,81/.60 $57,814.60
Tx 9.1%Sales Tax $0,00 14,692.98 OIA.%
IT Total Sale A $0.00 162,897.58 862,897.5E
So"Ie B
001. .65 Extra MEN MmA02e Ka't l 250.00 0.00 0.00 1.00 MOO 1.00 050.00
H'Diameter
002. .65 07 Witty Saar Pipe Ilimar fool 270 22.00 0.00 O.W :0.00 5740.00 270.00 5980.00
1 003. .65 8*x6, lees ICam 8 11.00 0.00 O.00 0.00 0.00 OM
ON. .6S 6'SLY Seer Pile It isear out e0 15.00 0.00 0.00 0.00 0.00 0.00
005. .65 Connection to Existing #Each 1 500.00 0.00 0.00 1.00 500.00 1.00 SEEM
u06. .65 66'M Qm Gravel for Trench Bactl111Tm 115 4.50 0.00 O.W 31.10 5.31 81.18 365.31
I
1 007. .65 Trench focrhdation Gravel Ilm 75 11.00 0.00 C.00 0.00 Q.W 0.00
I
ON. .o5 Crushed Surfacing Too caarse 01m 50 12.50 0.00 0.00 0.00 UO 0.00
i
' 009, .65 Asphalt Concrete Class-B' Ilon 61 SS.W 0.00 0.00 0.00 O.d 0.00
010. '65 Tv TASDKt;m It arm f 150.00 0.00 0.00 0.00 0.00 E.00
011. .b' Construction Staking and As-Lilt IIUK Cum , CSoic0 0.1i) O.S. 0.50 12S.00 O.SO 125.00
Mates
a7k r
d
irC:afoul '2l[silo-' 40.2-0 4' Y °
5
Yr
9vxs
t
J7
low 0911
Vi 03-nar BB SAY of Benteu . 7u011f Nuks L,,i Mtl e
Pays: 3
l „
PrOjcct: SJEv 147 COD Saar +er 8dw
Corti. J:e CNstruetim Contract ePr Coil 077 0
;r
I Closing Date: VC11 e. 08B
lees Bars 'Description I wit Lt. Wit Dreilous Prwioos inn This iota: total •- +�BG. B0. n���
X pwntlt' DI tGe "tit, Ai 4unt11 01t O Pa471r1t f Ascent uNtatY + 4•.
TX 8.1:Sales To LO M k3C.21
f670.21
'1 total Sch"le C SO.00
$8.410.52 3S,410.52
S C Ma
001, . - Wild,5 WctlE Iron Dace::lass SZ KineN Toot 2% 2:.00 0.00 0.00 210.00 5280.0" "Ao.GC 5280.00
i
if Sub Total Schedule
p.aD 52:o.x� 52eo.ro
A
1X 8.3 Sales To 0 00 E27.60 E27.68
TT Total ScheNle C 0
5707.68 5107.6g
SCh i,lu 0 :tars;ever kWitim; r'�Q
001. .00 t2,store seaer P;pe Kirear foot I'S E0,00 0.00 0.00 319.00 i:40.01) 3iA.00 I1760.00
Di .60 CB Type : Kach 2 605.Do 0.00 0.00 E.00 ZAG'00 COO 2500.00
1`13. .60 Mali 48"e1CKch Itach 1 1:50.00 DA 0.00 1.00 1`50.00 1.00 114.00
M .0 Connect to t+t. ICach 650.00 0.00 0.00 3.0u 1350.00 3.00 1350.00
W5. .60 Besom'10 Oeplaze Klni foot Ns 12.D0 0.00 uOO
iori(ii 0.00 0.00 0.00
A 0 Psi of Replace Concrete AI IAture).uu I 10.00 ;,OD 0.00
0.00 0.00 0.00
007. .E0 ONk Fur.Gavel for IT IV6.00 0.00 p.DO
> Trench Wfill 0.00 OAO DA
^ 009. .60 Crushes Hoek 518'KNIS for I7M ., Ia.00 O.0C O.OD
r.•s Irma a.a:op Coarse 0.00 0.00 0.00
i
k*
Asphalt :Ji Die::B Ilar ti WAI 0.00 0 3I O.00 0.00
6e+
D.(Q
1�tlik,i'�
3:.
1
Date: 03-Ilar-88 City of gmton . to61ic 119r1.s Donartemt Pap: a
Project: 5169 1987 a Sanitary Stwi ReAa6ilitatim Cmtracl 0Aber: CAG 077-87
Contractor Bolles Construction Estimate In": I Closing Date: QatCh v, 1988
its Oars Oescrinlim I tail Est. Unit Previous Previous This Ibis Turf Total
W. Bo. k QAnttey Price Damtity Aeulnt Quantity AeAanl Quantity Aeomt
010. .60 Construction Staking me Kum Sua 1 12W.00 0.00 0.00 O.Y. 600.00 0.50 600.00
k-built
ST Sub fatal D 10.00 510,660.00 118,460.00
is 8.1%Ales lax 10.00 11,695.2u $1,495.26
Total WDO S19,955.26 319,955.16
Total All Smemles 00.00 396,571.04 S%,571.04
a
Aid
I
a
t
a
Date: 03-May-BB City of Renton Public Works Department Page: 1
T0; FINANCE DIRECTOR
FROM: PUBLIC WORKS DIRECTOR
CONTRACTOR: Solles Construction ESTIMATE NO. 2
CONTRACT NO.CAG 077-87
PROJECT: 5-449 1987 CBD Sanitary Sewer Rehabilitation
1. CONTRACTOR EARNINGS THIS ESTIMATE 329.758.73 =.....:...
2. S S TAX 0 0.OB $2,410.45
Z. TOTAL CONTRACT AMOUNT THIS ESTIMATE $32,169. 18
_________________________
4. EARNINGS PREVIOUSLY PAID CONTRACTOR fO4,O68.16
5. *EARNINGS DUE CONTRACTOR THIS ESTIMATE $28,27O.79 __--__---------
I1 6 SUBTOTAL - CONTRACTOR PAYMENTS f113,138.93
7, RETAINAGE ON PREVIOUS EARNINGS $4,466.75
B. •3*RETAINA5E ON EARNINGS THIS ESTIMATE $1,487.94 ----------------
9 SUBTOTAL - RETAINAGE $5,954.69
10. SALES TAX PREVIOUSLY PAID f7,236. 13
11. SALES TAX DUE THIS ESTIMATE $2,410.45 ________________
12. SUBTOTAL - SALES TAX 39,646_58
w (95% x LINE 1)(RETAINAGE: 5%) GRAND TOTAL = =3128,740.22E
r*
,
FINANCE DEPARTMENT ACTION:
1 PAYMENT TO CONTRACTOR (Lines 5 and 11),
ACCT.N *421/OOO/15.596.38.65.28 29,444.04 N 2
ACCT.N *421/OOO/15.596.38.65.6^< $1,237.20
f3O,681.24
RETAINED AMOUNT (Line 8), ;1,427.94
ACCT.0 *41-1/000/15.596.38.65.28 ;60.00 N 2
ACCT.0 *421/000/15.596.38.65.62 a
----- $1,467.94
..........
TOTAL THIS ESTIMATE: E$32,169.18
CHARTER 116, LAWS OF 1965 1 +.
CITY OF RENTON CERTIFICATION ��1 IE
I, THE UNDERSISNED DO NEREM CERTIFY 'JHDER FENALIi V
1111,11, THAT THE MATERIALS HAVE HIM FURSISMED, THE
SERVICES RENDERED ON THE LABOR PEIFOAMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JDST, DUE AND UNPAID
OBLIGATION A6AINS1 IHE CITY OF REWON, AND THAT 1 AM
AUTHORISED 10 ATAERTICAIE
ft_CERTIF1 i0 SAID CLAIM
SIGNED: ✓/Y'[. J cXL`/o—��, s'y�//Y/��F®�_
1
�4
I
"tK 03-%v-8S iaty to 6enlm. r'.,1i c Wks IRWte81t Pap: I � Y
FrOIKt: S-49 1957 In Silletmv Seew Fetiobtlltitim Cmtrrt haborl LAC 0--07
Eoolrirtm Eo11n imstructim Est I"is;ootw: :Closing Gtet April :9, 1965
It"9rs E"crkptim T mit Est. Unit Preyttu9 bt"i"s This This Total Tote;
M. MD. t f6untity frice Quality Awnl Watt:y Awl Wittily Aims
m...®...r,A..,....o..:::..r,..:-.e:.F--------.-,=-sr�:_.
Sthenle A
001. .65 StensirE 411%11 $Each 0 1.550.W 1.00 7750.00 0.00 S.W MIA)
10" illaeww
W2. .65 Ertri 0"tt MaMcle-ao' M+htel Ft mm 0.w 0.00 WW 0.00 0.0
x
Oil .65 V santtwy Sow Pipe 0.1mr Foot IW7 22.0 1151.00 MYA.W 000 1/57.106 Z51.00
WI. .65 Slab'Ten Ilinw Foot 16 H.W 1&W 792.00 3.W 132.0) 21.W 93.00
W& .65 6' 900 WW Ft" Wtear Fiat 154 15.0U 141.00 2115.00 SSW 0.00 19wW 2910.00
M. .65 im✓ectim to Existing 6Frh 6 9%.W 6.00 MOM 0.00 4.W i9W.W
M. .65 c, Stwa Saw ripe (Liner Fmt 115 12.0 LOD 0.W 0.00 0.W 0.00
0.d .65 bunk Fm 44.1 em Tmr h Ntyiillllm IN5 4.50 20074 9032.01 7B9.e6 I:90.66 i195.76 i053W92
Ni. .65 Trash Fun9itim 0rirei ilm 730 11.W 101.25 19WA6 15.t5 wS.10 119.% 20".16
UN. .b5 Irmo Surlrtnq Im iayse ATM Sw 1:.50 163.ir 2049.00 97.1i 12ILSO 261.W 367.50
i
0I1, .65 Asphiit Concrete Class°6' Tim `S-0 55:00 0.00 0.00 A7.`.;: I9u",.W M.50 19367.50
012. as N Imettim KW Coe 1 7880.00 O.W O.W I.t: 730.w 1.00 790.00 a
a.
'. 013, .65 Contractim Stikinq ns M-M It Ruep She 11,325.W 0.50 662.SD 0.w 0.50 662.%
Not"
�t
'eho
u
Wte: u;--NrP5 Eity m 41tm , hoi¢ 'acrrs iaearte"t page;2
Frmmtl SJ49 19W CX Wile,Sew FA d,11Ut,W Contract 6glapert CAB 0�7-87
Contractor holln Cmstructim istmale lus6r: 2 CI"tna Wet Or11 21,1968
It"Bars 0eun0tim 1 ]tent Est. drtt prerlitm knlms TAIL Ths TNaI Total
NO. ft 1 Cmnt1tv Frice Cuwnldv hwnt DWtl.v Nowt "tit, Awt
..a..m.m.m®..e.���.,..<�.Fen•...:_.........,:_�:,..,........s:aa.........��.:�.an.,��_=..a�6..�y
i
Sf 9A Total SchNule R t57,61/.60 tN,7w.9B 182,095.58
11 &It Sal"In 14,Q.% 11,9".7a t6,649.74
IT Iota] ScMWeA W'w.5B 126,247.74 W.74132
Schedule B a-A '
WI. .4 Extra Shallm Btnhole *Acn 1 W.W I.W BSAW 0.00 1.06 BLO
48' Waaew
002. .65 6' Smitry Sew AM Ki"r Foot NO 22.0) 270.0 SN0.00 2.W 44.00 212.00 0140
W. .65 B•n6' le" 1Er6 1 N,W 0.0 OAO 5.:0 DMO S.W 210.W
i
Wa. .65 6'Side Saw Ftpe KIw Faal 40 15.W O.W OAO 26.i0 Q.W 2B.W MOO
W5. .65 ganetlim to Fxlstinq 1Eun I
1 SWAMI, 1.00 SOAW v.W I.W SW.W
At- AS Rant Bm gravel ix Trench kact:ilietm US 4A 01.10 A5.31 0.00 81.16 36131
o,,. .65 Trench FmMatim Gravel Ilm 75 I4.W O.W VA O'k O.W 0.00
�uO. .as Rushb Srlxinq lop Cary lion W O.W O.W 7. v OM 7.10 80.75
iii. .65 Reteall CuncrNe Lim 'h' Ron 61 M.W O.W C.00 61.J 3355.W 61.W M.A '
OIA .65 1O I:rcpectim Kuap S" I 15AW O.W O.W 1.0 MOU I.W 150.W
0I. .a5 lma(rutt1M SUP, na Re-kilt Koep SA 1 *.W.W 0.50 12&W 0.W 0.50 MOU e
Notes
i
Sl Sup total schmile 6 17,70,1.31 14,277.75 112,AB.01
1
L
i
c
1 date: V,-Nrw Cat,or Rentm.Public WIS LWtwt Pellet 3
itofectt 5-49 1957 C60 Sanitary Sew Rlhalflitetim Contract aluawl C06 07-07 r
Contractor WIM Construction Estivte WrWrt 2 Closing Mr. April N, two r.
v
.tie Ere Eascrlptfm T IRtt Est, utlt Fr"km Pr"Im This This Total Total
Ne. M. I Wlntltl Price LV tlty Alcimt �LIty Asset wa.tll. a ANxuu
' one-z-xnu_a�szama+s=-�z-xxnu_aau>+Ru xaan_mnennanma.nu-uxraua_x_auxn
TI &II Sales Tax W'121 /3 49 N76.70
11 Total Sth@&Ie 0 00,410.52 e1,p21.26 $13,0 4.71
ii
Scheele C 4r
001. .15 0'Will lam Pipe Class 52 Kiw Fod Yip 22.w 240.0 5200.w 0.00 2W.00 52BO.00
.t.
ST So Total Scarsdale C Sro;.w 0.00 MOO
1s 6.Ix was To 627.60 aw 422.68
fi Total Schedule C
S707.66 0.00 -707.66 a
t 00
shedule 0-Store iIW AdUtIms
wI, ." 12-Store SSW hour twear foot 38 I0.00 319,w MAMA 0,00 119.00 12760.00
w2. .60 CB Tor I /Each 2 625.w 4.00 moo O.W 4.00 25W.00
r
w:. .0 Uftie aB' 4Catch IEath 1 12W.00 I.w 12WO V.w 1.00 A.w
1
I (W. .e0 CMKt to Eat. Kith S MOO 3.00 ISS0.w V.00 LOY I350.00
I
00S. .W Rapper and Apples, ILnaw Fad IQ 12.0 0.0) O.W 0.w 0.00 0.W
Concrete CA
f
li, .W piper,en/14Plese[matte Sal Kgwre Vied 1 IO.w 0100 p.W O.w 0.06 0.00
w7. .,6 Bad Am Gmel ono, pi 170 aW O.W 0.00 0.0 0.w 0.00
Trench Pactadl
wB. .6V Crush"sac,510' VMS.r ITm 35 14.00 0.00 0.4 0.00 0.00 0.0
.1{ Trench w Top verse
CJ9. .W Asphalt Cnrtrete Class R pins 20 60.00 0.0) 0.0) 20.0, I.UO,w 20.w .'w.W
i'
to 0
t
m Aentm.NEIL ftka Desartum Sage: s
k;t6e: CAfi C,AT
Cmtrattm Bolles innstrxttm Estimate SAW: :Elosmq Me: April '.9, Ism
Itm Frs Descr tptim 7 Nt ist. Lett F'"Ims Aaims Thls This Total total
uwtrtv bite ,Lml,ty Aecmt Want:-.v Awmt OWtdy AIDunl
01D, .w tmstmtim Stol i ad ilwp So I 1200.0 D.57 AM 0.00 0.51 600.0D
k-owll
ST Sub Thai D 116,40.00 11,200.0D 119,hho.60
It 6.1%Sales 7u 61,495.76 s97.20 11,592.41
w
IT Total D 119,415.21, 11,297,20 121,252.4 .r
t
total all SchRMtles 1%.571.01 m,169.16 6121,740.22
UM
x
Dotal 05-Jul-se City of Rbnton Public Nor k■ Dapartw,nt
Paper, j
1
TO, FINANCE DIRECTOR
FROMA PUBLIC WORKS DIRECTOR
a CONTRACTOR, Bolles CmatructiYx, �
CONTRACT NO.CAG 077-87 ESTIMATE NO. 3
PROJECT, 5-449 1987 CBD Sanitary S� RN,abilitation !
......................................................................... t
1. CONTRACTOR EARNINGS THIS ESTIMATE $10,420.69
2. SALES TAX a O.OS
a ..
3. TOTAL CONTRACT AMOUNT THIS ESTIMAT $844.08 ...............
$11,264.77s
E
_- _____________________—_______________________
4. EARNINGS PREVIOUSLY PAID CONTRACTOR
5. •EARNINGS DUC CONTRACTOR THIS ESTIMATE
6' f1fq�8g9.66
SUBTOTAL - CONTRACTOR PAYMENTS ----slzs- - --
,o3a.6i
7. RETAINAGE ON PREVIOUS EARNINGS
B. **RETAINAGE ON EARNINGS THIS ESTIMATE f3,954.69
9' SUBTOTAL - RETAINAGE $521.03 ______-_-__--__
$6,475.72
SO. SALES TAX PREVIOUSLY PAID
IT. SALES TAX DUE THIS ESTIMATE $9,646.58
12. SUBTOTAL f844.OB ----- _ -
• (95% x LINE 1) - BALES TAX $10,490.66
•• tRETAINAGE, 5X) ••......
GRAND TOTAL f140,004.99
..........................a ........................
FINANCE DEPARTMENT ACTION,
PAYMENT TO CONTRACTOR CLi... 5 and 11),
ACCT.Y 0421/000/15.596.38.65.20 $9,011.66
ACCT.0 •421/000/15.596-38.65.62 $1,732.08 N 3
RETAINED AMOUNT (Line 8),
ACCT.0 •421/000/15.596.38.65.28 6437.03
ACCT.0 0421/000/15.596.38.65.62
f84.n0 • 3
f521.03
TOTAL THIS ESTIMATE, �. ....e.
f 11,264.77
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATIEN
11 TIE NMKR616KD 00 NEREPY CERTIFY ENDER PENALTY OF
PERJURY, TNAT TIE MATERIALS HAVE PEEN FURNISHED, IRE
SERVICES RENDERED DA PE M 15 JUST,
As DFSCRIID ^ 1 \
MERE IN, AN TNAI THE LIMA IS A JUST, BX AMO IIiAID
OILISATION 0611161 THE CITY OF RENTON, AH THAT I AN
AOTIORISED TO AUTIF.NTICATE Alf CERTIFY IIISAID CLAIM
616ATD:
E
a
OaM 00JWi1 Cry W rtm.Wit tkb Iprtmk paps I
RsOetti S449 1911 m Srutr9 Spr b4l,lata0io HUH IYrrr tIi 017-07 7
CWrrtr blles Casatractim Estimate YWrs 3 Gay Id" July 1, IM
Ito ors OesysPtsm I Wt Est. Wt pnam RMor Iew this Total I" 1
MD. b. 1 brAsty Run bmatlty bgnt tlsoltity Amml Euantltr 4111E
SdreWe A
001. .65 Strur6 llnilnla lacA 11,20.00 5.00 Tr50.00 3.10 4A.00 0 12A00.00
08'D,antr
WL A5 Extra OpL 16shole-40' WWtLEal it 2 140.00 0.00 0.00 2.00 MAD LID BEAD
or- AS r Sn,tary Sow Pipe elamar Fact 1407 22.00 357.00 .ID1N.00 0.00 1457.00 054.00
006. AS 1'ae' Ices Y,ner Foot II 44.00 21.00 MOD 0.00 21.00 M." !•
005. .63 6' Lee Sur Pip fumar fact 154 MOO 196.00 29W.00 0.00 196W 2MOD
006. .W Cuwct,m to Ea,sl,sp KKh a M.00 6.W 1W.00 0.00 COD 1900.00 f
007. .65 r Rob Sow hPe Cigar Fact 115 12.00 0.00 0.00 100.00 I200.W IO0.00 1200.00
TOOL .65 Ink fin&awl for IrWr 40102m I= 4.50 2M.16 10730.92 MAI 115.94 2077.01 11116 86
I
009. .65 Irmo FurOatkm trawl elm 710 1600 109.44 2M.16 0.b 149,94 2099.IT,
Olt. .65 V06W 1r9atiy 1st Owu eim U IL50 LI.ID 3W.50 136.4 17CLOO .W7.11 0M-6
011. .65 Al"t masts Class'r elm 510 55.00 M50 19117,50 100 M50 19501.50
012. .65 TO lastmtam lust dr I 79D.OD 1.00 760.00 CA 1.00 7ID.00
OIL .65 EactMttio Stakine oe bisit 0.0 be I t,MOD 0.50 MLW 0.00 0.50 W.50 p
Notes
kip;
*Ad-w city of Wo.Wit Ole Irarttat 1 Y
�I
pmwt, 6-09 19I7 CID Saotry Snc AeAalaliletaan 7ntratl F,6" 06077-V
SOetralar Wln[uutratam
Eetietle Wt 3 tlosup Was Jely 1, IN ..
i
[to In wool/flan I wit Fat. Wt treraon Franca Ikil llaa total Total
10, IL I Loony Prim WYtaty, Amm fatal
r Anmt ia.ltty Amt
S7 SW Total Stow.A 0Q,011! II,651.91 ta0,7/7.4
It 611 Was lu I6,//9.71 t7a.e1 t7,750.8
1T Total ScWWe A Ifa,115.37
ro,s.7s ae,wa/7 _
SOWWO I ✓�
al. A5 Iatra Slut la ArMI• IEaa I 60.a LOD ISC.a -.
M•Dirt. O.a I.% MOO
OOL .65 I'Sarotar,Sans lye LLarr Sal 770 U.a M.a 90.00
0.00 nza ssw.a
ODS. .65 1•... Ten IIuA / 44.00 5.00 MOD
o.a s.a no.a
D%"45 A•Sid,1IM Pye Cw fat 10 15,,10 2LOO /20.a
0.00 28.00 /».a
00& .63 fuamct,w to Iatatim VI h 3 5a.00 1.00 5a.00
o.a 1.00 Sa.a
006 ,65 Ink Wm bawl fan inch Iackitllliee 115 4.50 CID 165.51
0.00 61.10 565,51
OF .65 franca fcrgatam bawl Ilan 75 I/.a uo 0.00
o.a o.a 0.00
Doe. A unrA Slriraoy To Corse ITan 50 12.50 7.10 IL 75 7.10 IL 75 14.00 177.50
al. ,u howt Omvet.Qr I. IIm U M.00 N.a SMOD
0.00 ai.a zmw
010. .65 N!myatam caa0 61a 1 I50.a I.a 150.a
0.a I.a ISO.a
011. .45 Qwmtaan StakaO am o-jott c+ml So 1 0 moo
250.00 0.5
Win 0.00 0.50 I400
11 DA total 6t01we 1 t11,O5B.0e
1�,15 IIi,IMBI
1
J
kill".4 city o1 Won.MIIt tkrh D*wtmt Pape: 3
Pre Vitt 6-09 1907 CO Smuts-, Swr p 111tetlm C*rwt A➢ar; q5 077-67 '
Ceetrrtor Owl"mmt"t'm (aline L;e1r: 3 Claiel iletel h10 1, IIW
Its lira Desirytim I out Est. out I'MM Prenas This This Total Taal
�' I Wwtitr Rim Lwtitl Aunt Ywtitt Aunt Ometit7 Amok
i
11 L33 Sala In $97610 S7.19 M1.119 f
rt Total 41nWe 1 113,0,4.7A as.w t13,130.10
r ,4
Stlei;le C
001. .65 r loll&Ira Pipe Class Si Lieer foot 250 M00 240.00 5M.00 0.00 240.00 S2113.00 jy
S1 M Total kiwe; S0.00 0.00 SK.00
IT Lll Sala Tu 127.61 0.00 477.60
Ti law SrAeale C 5707.e1 J.00 5701.A1
l�l s
Stadale 0-Store Senn 9Hitsas
001. .60 12'Start Sear Pipe 6laer Foot 38 10.00 319.00 12760.00 0.00 319.00 121A0.00
002. .60 la Type I Kmh 2 625.00 4.00 2500.00 0.0C 4.00 2500.00
001 .60 Aidwle IB'a/Otm 4A 1 170.00 1.00 1250.00 0.00 1.00 1250.00
OK .k Ponwl tout. IEmh 3 W.00 100 IN.00 zoJ 1s».oc
OIL .60 Mow ay A+Ire lacer Tat 143 12.00 0.0D 0.00 110.00 190.00 111:1.00 I0.00
Owete afi
101. .AO lave hot Wre couple W V*wo tr1 1 TOM 0.00 0.00 0.00 0.00 0.00
007. .60 laA M Orml Tar IT 200 L00 TOO 0.00 0.00 0.00 0.00
Tram l;tEf;ll
OIL .60 Crw1a kick Sw llaa it Ito A 14.00 0.00 0.00 0:J0 0.00 0.00
Tram r Top Ceres
op. .60 A*Wt ILsirets C11a 1 Ica 20 W.00 20.00 MCA 0.00 20.00 130.00
J
� _J
Date: M-AJ$ city of Was.Wit IMe kwtmt Aqw t
Phgwt: OdM 119/ Saltry Cbt Mrllitdla hart Nsfa: C16 077-V
Ostruta bila EmstmtIm Estimate NOW1 t ciatq Oeta My 1, low
Ita Ms Msny,t:a I 14t Est. but ltMoa hmm Dais This Total Taal
lb. Na t Ouet,t. Ik:u buetity, Amt iat:ty Moat 06muty Aaat
I
010. A Iastratsa s'lah,y ad Lm So 1 I3o0.Do 0.70 MOD aDo 0.50 im.00
Asiult
ITT laid,Tad D EIA,"O.00 EI,E00OD RI,SW.OD
tt B.Il Lla To 111,M2.16 /13e,00 $1,71i01
TT Tad D Q1,M.16 a,alsoe so,OeiDA
Taal ALL khwllss 013,lE0.22 t11,2b1.77 II40,004." -
f
4
e
i
I
Datie: 02-Rug-8e City of Renton Public Works Department Page:
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS DIRECTOR
CONTRACTOR: Bolles Construction
CONTRACT NO.CAG 077-87 ESTIMATE NO. 4 & Final
PROJECT: S-449 1987 CBD Sanitary Sewer Rehabilitation
1. CONTRACTOR EARNINGS THIS ESTIMATE S3,624.33
2 SALES TAX @ 0.08 $293.57
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $3,917.90
------------------------------------------------------------------------------
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $123,038.61
5. *EARNINGS DUE CONTRACTOR THIS ESTIMATE $3,443.11 ________________
6. SUBTOTAL - CONTRACTOR PAYMENTS $126,481.72
i
7. RETAINAGE ON PREVIOUS EARNINGS $6,475.72
8. *•RETAINAGE ON EARNINGS THIS ESTIMATE *181.22
9. SUBTOTAL - RETAINACE 36,656.94
10. SALES TAX PREVIOUSLY PAID 910,490.66
11. SALES TAX DUE THIS ESTIMATE S293.57 :
12. SUBTOTAL - SALES TAX S10,784.23
• (95% w LINE 1) =========...____
•• (RETAINAGE: 5%) GRAND TOTAL t143,922.89
FINANCE DEPARTMENT ACTION:
I PAYMENT TO CONTRACTOR (Lines 5 and ITT:
ACCT.N *41-1/000/15.596.38.65.62 3811.
ACCT.N *421/000/15.596.38.65.62 t2,924.77 T7 N 4 & Final
$3,736.68
RETAINED AMOUNT (Line 8):
ACCT.N *421/000/15.596.38.65.28 439.38
ACCT.N *421/000/15.596.38.65.62 $141.04 N 4 6 Final
---_----f181.22
=__ =. =TOTAL THIS ESTIMATEi $3.917.90
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
1, THE UNDERSIGNED OU HEREP CERTIN ODER RNALIY OF
FERJA9 , THAT THE MATERIALS HAVE BEEN FURNISHED, IHE
SERVICES RENDERED OR IHE LABOR PERFORMED AS DESCRIBED
HEREIN, AND iNAT INE CLAIM IS A JUST, WE AND UNPAID
CBUBAIIDN AGAINST INE CITY OF RENTON, AND THAT I AM
AUTHORISED TO %EMIT ATE AND CERTIFY 10 SAID CLAIM
Date: 0.'-hp-m City of f*tm.Public Yorks Department
FTn)at: S-449 1967 M Switary Sea. 8eha6ililatim Contract lumber: A 077-67
Contractor Bull"Construction Est I"to Mubm: 4 Cloning Dale: August 1, 19M
Its,Bars Description T Ind Est. Wit Preyias Pr"im: This This Total Total
Ib. No. I Quantity price Dantity Amount Quantity Aeoxt Quantdy Amount I'C
kheduls A
WI. .f3 Standard Wole IEach 6 1,550.W 8.00 12400.W 0.00 8.00 11400.00 �}
4B' Diameter
l
002. .65 Extra Depth Uftle-48' IVertical ft 2 140.00 2.W 28.0.00 0.00 2.Do 30.00
(n3. .`5 S.Smitry Serr Pipe It~ Faul IW7 22.00 1452.W 32054.00 0.00 149.00 054.00
004. .65 8%6' le" lone Fort IB 44.00 21.00 KIM 100 21.DD 924.00
005. .65 6' Atle Seer Pipe kinear Fml 154 15.00 196.00 940.00 0.00 196.00 2940.00
O:k .65 Dmnedimm to Existing Kuh 6 475.00 4.W 1900.00 0.00 4.00 1900.00
007. .65 8'Stars Sow Pipe kinmr Foot 115 12.00 100.00 M.00 0.00 100.00 MOM
00B. .bL Bank Rw,Friel for Trench Bacefellllm 15.1 4.5( 2471.08 11146.86 0.00 '477.08 11146.06
009. .65 Trm<h Fondalim Gael IT. 730 14.00 M.9/ 2099.16 0.00 149.94 20".16
010. .65 Gushed Surfacing lop Carle IT. 550 12.50 397.68 4973.50 0.00 397.80 4973.5)
011. .6� Asphalt Concrete Class 'S' ITm 520 S5.00 S57.50 19%7.50 0.00 352.50 11387.50
012. .65 TV frap"tton Lump Lac i MOO 1.00 18).00 0.00 1.90 1B0.00
013. .65 .4nslrudim Stating and As-Built kup So 1 1.....00 0.50 662.50 0.50 662.50 1.00 10.00
Win
I
' oz�q ea Cit1 ot 8mtm. Fdlic Wks Departunt Page: 2
Prowl: Si/9 1987 CM Smite,SH AMahl li;aUm Cmtrut RAN: ON 077-K
Contractor PollR Cmstractim Estieale%row: 1 Closing Pare: Aawst I, me
Itrn Bars Oescnptim I Unit Est. Wit Bevlous Preemas This this Total Local
IQ %. I This
Price Ooutity Amont Quantity Aroml Quantity Aeomt
ST Sit Total Sthedcle A f90,711.52 1662.SU "1,/10.02
TI 8,119IR lu 17,350.7, 153.66 $7,I04.21 4
i
IT Total Rhroule A 1W,098.07 $716.16 198,811.23
SchNale 8 �h r
001. .65 Extra Shallow Kuewle IEUA 1 850.00 IA B;O.W 0.001.00 MO
48'0iaeetw
002. .o5 8'Sanitary Sew Fipe Ilinw Fact 770 22.00 272.00 5984.00 0.00 272.0k) 5%4.00
W3, .65 Pik' Tees
IEuh 1 1/.00 5.00 220.W 0.00 5.00 220.00
e
09. .65 6'Side Sew Pipe k mar Fax 1s.W 2B.W /x.W a:.
0.W 2:.W Ax `0
Oy. .65 fmntttim to Eaistim IEach 2 SX.00 1.06 SW.W 0.00 1.00 V.00
A. Z TWA ikn Gawl !or Trwnh 6uk91tlTm 16 1 50 81.10 Z.31 40U 01.16 365.31
007. .65 Trench Fomdatim Gaeel Ilan 75 1/,00 0.00 0.00 O.W 0.00 0.00
OW. .4 Gusted Srrluing Top Cwrse 17. 50 12.50 11.20 117.50 0.00 14.20 177.50
009. .65 Acphall Cmcrete Class 'E' ITm 61 55.00 61.00 3395.00 0.00 61,00 .4.00
010. .65 TV Inspwtim 1Wep Sr 1 150.00 1,00 IT.00 O.W 1.00 150.00
011. .65 Cmstroctlm Slaking and %-%ilt ILwp Su I 2M.00 0.50 125.00 0.50 I^S.W 1.00250.W /
NAM
(11
1 + ,
ST Sr6 Total Schedule 6 112,146.81 LL.W 912,271.01 "�'
Date: U-04-88 City of BFnlm . Public Yorks E1partmt Paper 3
Project: S-149 1987 C50 Sanitary Seer oaslabilil.t,w Contract Now: CAG 077-87 F
Contractor Bolles Cmstructim Estuate KEW: 9 Closing Date: highest 1, 19M
Ito Bars Description 7 Quit Est. Wit Previous Proims This This Total Total
No. No. I Qumtaly Price Oowlity Asouot Quantity Aeounl Quantity Aamnt
TI 9.1%Sales Tax M.M s10.13 M9{.02
TT Total Schedule 6 113,130.70 1115.13 $13,26183
V`
Schedule
WI. .l5 9' Ductile Irm Pipe Class 52 Itmov Fool N 3.00 240.00 52W.00 D.DO 240.00 MOO
ST Sh Total Schedule C 52M.00 0.00 5280.00
TI 8.11 Sales Tax 127,60 0.00 427.60
TT Total Schedule C 5707.68 0.00 5707,6E
Schedule D-Store Sow AEdilims8
DOD. .60 12'Store Sevier Pipe Nanear Foot 325 60.00 $19.00 12760.00 0.00 319.00 12760.00
a
002. ,W EB Tve I IFach MOO 4.00 23DD.07 0.00 4,00 2%0.00
001. .60 OuNole 68'/Catch Koch x.i0 1.00 00.00 0.00 1.00 1250.00
006. .60 Cornett to Et. IEach 3 4W.W 3.00 13W.DO 0.00 3.DO 1350.00
OM. .60 RReove and Tepl.� llinear Fool 143 12.00 110.00 1680.00 100.50 2166.00 320.50 SB16.00
Concrete LW
OD6. ,W Bemve and Replace Cmnele la, 154uare yard 1 10.00 0.00 0.00 7.00 70,63 7.08 70.13
007. .60 Ewk Gam Gravel far I7 2m 6.00 u.00 0.00 0.00 0.00 0.00
lrmch Bactldl s
DOB. .60 Crushed Rock 5/0'Midas im Ikon Yi 11.W 0.00 0.W O.OD 0.00 0.00
lrmch and lop Cause
ON. A Wsphalt Concrete Class B ITor, ;p W,0) 20.W 1200.00 0.00 20.00 INO.00
a1
II_Y
J
Bate: 02-44-88 A,a ..4o, Niels DeputwL Page: s
Protect: S-449 IWI Ch-.ntol 61 pMkw at'm Cootrut NAbw: CA6077-07
Contractor Bolles CM%tMl,m '."vele M&u. 6 Closing Date: ppusl I, 1988
:tpa Bus Descriptim I IA11 lit. ttirl Previous Prevlws This This Total Total
No. W. I WntltY 6¢e C -nt:ty Amount Duntrty Amount kintit! Bonl
010. .60 Cmstmtim Slakipp nE Rose Sm 1 IND.00 0.50 600.00 0.50 6W.00 1.00 1200.w
As-wilt
51 Ai Total 0 121,340.00 t2,B36.B3 f24,176.83
TI B.IX Sale To 11,72&54 1229.78 f1,95B.32
TI total D Y13,ob&A A,066.61 f26,135.15