PROJECT I+oney Creek - Phase I _ PROGRESS PAYMENT ESTIMATE NO _
ontract No._ '�I � Contractor R.L. Alta Company _- Closing Date 4% 12 O .__ Sh,.j_oi_
PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
No Descrip Lon Unit Umt P.,ce Qty Qty Amount Qty Amount Qty. An rtt
Schedule A' Force Main
Mobilization L.S. 20,000.00 0 0 64% $ 12.800.00
2 r'mnon Excavation L.S. 2,000.D0 1 0 0 IOJ% 2,000.00
3 Crushed Rock TON 9.25 450 0 0 $40.9 4,078.33
4 Asphalt Cuncrete Pavement TON 37.00 900 0 0 0 0.00 f
5 Monument EA 300.00 3 0 0 0 0.00
6 Curb 6 Gutter Reston. LF 8.00 50 0 0 0 0.00
7 Sidewalk Restor. SY 10.00 8 0 0 0 0.00
8 Temporary Cold Patch SY 3.00 15G 0 0 345 1,035.00
9 Bedding Material TON 0.50 650 0 0 40 20.00
10 Bank Run Gravel TON IAA 2000 0 0 225 225.D0
6" Side Sewer LF 20.00 80 0 0 51 1,020.00
10" PVC Gravity Sewer LF 14.08 250 0 0 247 3,47i.76
1.3 4" Trench Drain LF 6.00 85 0 0 11) 60.00
14 12" C14P Culvert LF 32.00 s0 0 0 30 360.00
15 Type III - 48 Manhole EA 1,D00.00 1 0 0 1 1.000.00
16 Side Sewer Tee's EA 20.00 4 0 0 3 60.00
17 Trench Drain w/Blocking EA IOO.00 5 0 0 1 100.00
18 Conn. to Existing Manhole L.S. 300.00 1 0 0 1 300.00
19 Fittings for Force main 1 1 . 1.50 800 0 0 462 693.00
20 8" PVC C900 Force main LF 9.15 2220 0 0 2159 19,754.85
21 Force Main Clean Out EA 900.00 4 0 0 4 3,600.00
22 Finish and Cleanup LS I 100.00 1 0 0 0% - 0.00
Change Orders 0 I 0 0 O.Au
Subtotal Schedule "A" I I I If 50,583.94
i
Schedule '8' Water Main
I Crushed Surfacing TON 9.25 150 0 0 182 $ 1,683.50
2 Temporary Cold Patch SY 3.00 75 0 0 85 25x.00
3 4" PVC Trench Drain LF 6.00 60 ! 0 25 I50.00
4 Bedding Material TON 0.50 105 0 0 15 7.50
5 Bank Run Gravel TON 1.00 1000 0 0 154 154.00
6 Trench Drain w/Blocking EA 100.00 3 0 0 I 100.00
7 Fittings for Water Main LBS 1.50 1200
0 0 749 1,123.50
• 8" D.I. Water Main LF 17.58 1280 I 0 0 1270 22,326.60
9 8" Gate Valve EA 385.00 1 0 0 1 385.00
10 Fire Hydrant Assembly EA 900.00 4 0 0 4 3.600.00
Change Orders 0 0 0 0.00
Subtotal Schedule "B" S 29,785.10
GRAND TOTAL S 80,369.04
0
CITY OF RENTON 9 DEPARTMENT OF ENGISP Y
• • MUNICIPAL BUILDING. 200 MILL AVE. SOUTH, RENTON. WA. 98055. 235-2631
PROJECT Honey Creek - Phase I PROGRESS PAVMEN- ESTIMATE NO. 2
o�tract No - Contracto• P. L. Alia Company Closing Date 57/85 Sheet=of 1
Est PREVIOUS TOTAL THIS EST-MATE TOTAL TO DATE
1I0 Oaacr'pt�on Unrt Unit P.,�e Qty Qty Amount Qty, Amount Qty.I Amount
. Schedule 'A' force Maio
Mobilization L.S. 20,000.00 1 64. S 12.800.00 36: $ 7,200.00 100% S 20.000.00
Common Excavation L.S. 2,000.00 1 100% 2,000.00 0% 0.00 100% 2,000.00
3 Crushed Rock TON 9.25 450 440.9 4,078.33 47.3 437.52 488.2 4,5I5.85
Asphalt Concrete Pavement TON 37.00 930 0 0.00 610.6 29.992.20 810.6 29,992.20
5 Monument EA. 300.DO 3 0 0.00 0 0.00 0 0.00
5 Curb 6 Gutter Restor. LF 8.00 50 0.00 19 I52.00 19 152.00
0
7 Sidewalk Restor. SY 10.00 8 0 0.301 10 100.00 10 100.00
8 Temporary Cold Patch SY 3.00 150 345 1,035.00 0 0.00 3.45 1,035.00
3 Bedding Material TON O.iO 650 40 20.00 0 0.00 40 20.00
'S Bank Run Gravel TON 1.00 2000 225 225.00 0 0.00 225 225.00
.l 6" Side Sewer LF 20.00 80 51 1,020.00, 0 0.00 51 1.020.00
. 10" PVC Gravity Sewer LF 14.08 25C 247 3,477.76 0 0.00 247 3,477.76
.3 4" Trench Drain LF 6.00 85 10 60.00 0 0.DO 10 60.DO
C . 12" CMP Culvert LF 12.00 50 30 360.DO 0 0,00 30 360.00
Type III - 48 Manhole EA 1.000.00 1 1 I 1,000.00 0 I 0.00 1 1,000.00
Side Sewer Tee's EA 20.00 4 3 f 60,00 0 0.00 3 60.00
Trench Drain w/Blocking EA 100.00 5 1 i 100.00 0 0.00 1 100.00
I
Conn. to Exlsting Manhole L.S. 300.00 1 1 I 300.00 0 J 0.00 1 300.00
3 Fittings for Force .amain LBS. i.50 800 462 693.30 0 ! 0.00 462 693.DO
8" PVC C900 Force main LF 9.15 2220 2159 19.754.85 0 I 0.00 7159 19,754.85
Force Main Clean Out EA 900.00 4 4 3,609,001 0 0.00 4 3,600.00
Finish and Cleanup LS 100.00 1 0 0,00 loc` 100.00 100% 100.00
Change Orders 0 _ 0.00 0 0,00 0.00
Subtotal Schedule 'A' S 50.583.94 S 3. ,981.72 $ 88,565.66
Schedule 'B' Water Main
i Crushed Surfacing TON 9.25 150 182 S 1,683.50 0 S 0.00 182 S 1,683.50
2 Temporary Cold Patch SY 3.00 75 i 85 255.00 0 C.00 85 255-00
3 4" PVC Trench Drain LF 6.00 60 25 I 150.00� 0 0.00 25 iSO.DO
4 Bedding Material TON 0.50 105 15 I 7.501 0 O.DO 15 7.50
5 Rank Run Gravel TON 1.00 10D1 154 154.00 • 0 0.00 154 154,00
6 Trench Drain w/Blocking EA I 100.00 3 I i 100.00 00.00 1 100.00
7 Fittings for Water Main LBS 1,50 1200 - 747 1,123.50 0 0.00 749 1,123.50
8 8" D.I. Water Main LF 17.58 1280 ( 1270 j 22,326.60 3 0,00 1210 22,326,60
8" Gate Valvue EA 385.00 1 I 385.00 0 0.00 1 385.00
0 Fire Hydrant Assembly EA 900,30 4 4 3,600.90 0 0.0 4 3,COO.00
Change Orders 0 0 0 _ _ 0.00
Subtotal Schedule "9" S 29,t85.10 $ 0.00 S 29,78;.10
GRAND TOTAL I S 80,369.04 S 37.981.72 $ II8.350-76
I
- H4aY 7, 19ropy
DATE:
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS DIRECTOR
SUBJECT: PROGRESS PAYMENT
CONTRACTOR: R. L. Alia C--Many ESTIMATE NO. 2
CONTRACT NO. 321 - 85 PROJECT: Ht"y Creek - .➢tease I
Sr_hedule 'A" b 'B" _
•
1. CONTRACTOA EAR%I%GS THIS ESTIMATE S 37,981.72
2. SALES TAX P 8.1% (1) 3,053.73
3. TOTAL CONTRACT AMOUNT THIS ESTIMAT9 S 41,035.45
4. EAWIINGS PREVIOUSLY PAID CONTRACTOR S
S. -EARNINGS DUE CONTRACTOR THIS ESTIMATE S 36.U82.63
6. SUBTOTAL - CONTRACTOR PAYMENTS f 112.431.22
7. RETAINAGE ON PREVIOUS EARNINGS S 4,018.45 _
4. •- RETAINAGE ON EARNINGS THIS ESTIMATE 1,899.09
• 4. SUBTOTAL - RETAINAGE f 5-917.S4
10. SALES TAX PREVIOUSLY PAID S 6.461.67
it. SALES TAX DUE THIS ESTIMATE 3.153.73
12. SUBTOTAL - SALES TAX S 9,SI5.40
•(95% x Line 1) GRAND TOTAL S 127,866.16
*'i1ETAIMAGE: 5%
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCT. I 421/000/G15.596.38.65.19 $ 39136.36
ACCT. I _ S /_
ACCT. I j I
ACCT. I $ /!
ACCT, F ---- f I—
yETAINED AMOUNT (Line B):
ACCT. I 421/000/015.596,38.65.19 $ i,"9,09 I
ACCT. P S /
ACCT. I f
ACCT. I S I_
ACTT. i S I
CHARTER 116. LAWS OF 1965 TOTAL THIS ESTIMATE $ 41,035.45
CITY OF RENTON CERTIFICATION
MuwCY Iww�c.4 wl./4vCa.s Y 4WPwID
rrt rw ..0 .r ar�. u• v ro u+.o
u*rraCO a u1fU.4*�:.D all.r D YO UYt
Washington State Sales Tax is applied on the following apportionment basis:
20X Project within `.'irlg County P 7.8X Rate
80E Protect within City of Renton B 8.1. Rate
Effect:. .righted TaA Rate = 8.641.
J CITY OF RENTON • DEPARTMENT OF ENGINEERING
• • MUNICIPAL BUILCING. 200 MILL AVE SOUTH. RENTON, WA 90055. 235-2831
rF7vrc'��C ;
PROJECT Honey Creek - Phase I PROGRESS PAYMENT ESTIMATE NO =_
ontract No. '2i"65 Contractor R. L. Alia Company _ Closing Date 5/7/85 _ Shoot_of 1
Est PREVIOUS TOTALI THIS ESTIMATE TOTAL TO DATE
Y0 Daac"PLan Uml Unit Pr,ce
OtY. Qty. Amount Oty Anwur+t Qty, Amount
Schedule 'A' Force Ma -:
•1 Mobilization L.S. 20,000.00 1 64% S 12,800.00j 36. S 7,2OC.00 IODY $ 20.000.00
2 Coweon Excavation L.S. 2,000.00 1 t00% 2,000.00 OS "0 100% 2.ODD.00
3 Crushed Rock TON 9.25 450 440,9 4,078,33 47.3 437.52 488.2 4.515.85
4 Asphalt Concrete Pavement TON 37.00 900 0 0.00 810.6 29,992.20 810.6 29,992.20
', Manument EA. 300.00 3 0 0.00 0 0.00 o 0.00
6 Curb 6 Gutter Restor. LF 8.00 50 0 0.00 19 152.00 19 152.00
7 Sidewalk Restor. Sy I0.00 8 0 0.Do 10 100.00 10 100.00
3 Temporary Cold Patch SY 3.00 I50 345 1,035.00 0 0.00 345 1,035.00
i Bedding Material TON 0.50 650 40 20.001 0 0.00 40 20.00
Banx Run Gravel TON 1.DO 2000 225 225.00 0 0.Do 225 225.00
i 6" Side Sew, LF 20.00 80 51 1,020.00 D 0.00 51 1,020.00
10" PVC Gr, .y Sewer LF 14.08 250 247 3,477.76 0 0.00 247 3,477.76
_3 4" Trench Drain LF 6.00 85 10 60.00 0 O.GO to 60.90
A 12" CHIP Culvert LF 12.00 5D 30 360.00 D j 0,00 30 360.00
5 Type Ill - 48 Manhole EA 1,000.00 I I 1,000.00 0 I 0.00 1 1.000.00
16 Side Sewer Tee's EA 20.00 4 3 60.00 0 0.00 3 60.00
;T Trench Drain w/Blocking EA 100.00 5 1 100.00 0 0.00 1 100.00
i8 Conn. to Existing Manhole L.S. 300.00 1 1 300.00 0 0.00 1 300.00
13 Fittings for Force twin LBS. 1.50 800 462 693.00 0 0.00 462 693.00
20 S' PVC C900 Force main LF 9.15 2220 2159 19,754.85 0 3.00 159 I x,754-85
21 Force Main Clean Out EA 900.00 4 4 3,609.00 0 0.00 4 3,600.00
22 Finish and Cleanup LS 100.00 1 0 0,00 100% 100.00 130% 100.00
Change Order; 0 0.00 0 _ 0.00 0.OQ
Subtotal Schedule "a" $ 50,583.94 i S 37,981.72 f 88,565.6E
Schedule 'B' water Main
Crushed Surfacing TON 9.25 150 182 S 1,683.501 0 $ 0.00 18_ S 1,683.50
Temporary Cold Patch I Sy 3.00 75 85 255.00i 3 0.00 85 25S.00
s 4" PVC Trench Drain ! LF 6.00 60 25 15n.00 0.00 25 150.00
Bedding Material TON 0.50 105 15 7.50�, 0.00 15 7.50
Bank Run Gravel TON 1.00 1000 154 154.00 D 0.00 154 154.00
S Trench Drain w/Blocking EA 100.00 3 1 100.001 1 0.00 1 100.00
Fittings for Water Main LBS 1.50 1200 747 1,123.50' - 0.00 749 1.123.50
8" D.I. Water Main LF 17.58 1280 1270 22,31-1 q 0.0^ 1270 22,326.60
6" Gate Valvue EA 385.00 1 1 385.Do 0.00 1 385.00
Fire Hydrant Asseebly EA 900.00 4 4 3,600.00 n 0.00 4 3.600.00
Change Orders 0 0 D 0,00
Subtotal Schedule "B' S 29,785.10I S 0.00 S 29.785.13
GRAND TOTAL I S 90,359.041 S 37,981.72 S 118.350.76
I
l '
I
i
i I
DATE: June 12, 1985
TO: FINANCE DIRECTOR
FROM' PUa LIC WORKS DIRECTOR C! ,
j SUBJECT: PROGRESS PAYMENT d Y,
COMRILACT0R: R.L. Alia Coxw ESTIMATE NO. 3
CONTRACT NO. 321-85 _ PROJECT: Honey Creek Phase I
. cfhPd,.1e A A B
1. CONTRACTOR EARNINGS THIS ESTIMATE i 2,10O.OU
2. SALES TAX a 8.1t (I) 168,84
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S 2,268.84
4. EARNINGS PREVIOUSLY PAID CONTRACTOR f 11T 433.72
S. -EARNINGS DUE CONTRACTOR THIS ESTIMATE j 1,995.00
6. SUBTOTAL - CONTRACTOR PAYMENTS f 114,428.22
T. RETAINAGE ON PREVIOUS EARNINGS S '-,917.54
a. •• RETAINAGE ON EARNINGS THIS EM14ATE 105.00
• 9. SUBTOTAL - RETAINAGE f 6.022.51
10. SALES TAX PREVIOUSLY PAID f 9,515.40
11, SALES TAX DUE THIS ESTIMATE 168.84
12. •(95S x Line i) SUBTOTAL - SALES TAX j 9,684.24••RETAI RAGE: --
GRAND TOTAL f tiD 115.00
::
'IhANCE DEPARTMENT ACTION:
=AYNNT TO CONTRACTOR (Lines 5 and 11):
ACCT. / 421/000/015 596 38 65 19 `.IE3.84
ACCT, / f I
ACCT.
ACCT.
ACCT.
^.STAINED AN01W (Line 8):
ACCT. / 421/000l015.596.38 65 19
ACCT. / f 105.00
ACCT. / — f I_—
ACCT. I f /
--- i-
ACCT. / f —
' I
CHARTER 116, LAWS OF Igor, TOTAL THIS ESTIMATE f 2,25F,.84
CITY OF RENTON CERTIFICATION
�l wrr M WlatyM,uM ua� �,i. R[MwMpM aaxawM C!11�I,lo 14a�ppwp 4 bra •�,A���nT 4i!OYi�,y
• Y�ai i W G.W
(1) Washington State Sales Tax is applied on the following apportioment basis:
2M Project within King County @ 7.8' Rate
110X Project within City of Renton @ 8.1 Rate
Effective wrighted Tax Rate = 8.04:
COPY
Da'r4:
TO: IINANCE UIRECIOR
FROM; PUBLIC MORXS DIRECTOR
SUBJECT: PROGRESS PAYMENT
CONTRACTOR
I" ESTIMATE N0, .,
CONTRACT N0. �1_H; PROJECT-
I. CONTRACTOR EARNINGS THIS ESTIMATE
6 ,, „v,]4
SALES TAX / 8.It --
47.
} TOTAL CONTRACT AMCINT THIS ESTIMATE = 71.1.11
�. FARNlACS PRtYIOUSLY PAID CONTRACI'OA
5. *EARNINGS DUE C
ONTRACTOR 11115 ESTIMATE
e. SUBTOTAL
• CONTRACT'Cq PAYlIENTg
7• RF.TAINACE ON PREVIOUS EARNINGS
B. " RETAINAGE ON EARNINGS THIS ESTIMATE
SUBTOTAL - RETAINAGE•:U. SALES TAX PREVIOUSLY PAID --------
11. SALES TAX DUE THIS ESTIMATE
'(951 x line 1) SUBTOTAL SALES TAX
••RETAINAGE: 51 GRAND TOTAL 1 - ,-'��—•-•—'--
FINANCE DEPARTMENT ACTION: --�.•.Yr
PAYMENT TO CONTRACTOR (lines 5 and 111
ACCT. /
ACCT. / ,,i„ $
ACCT.
ACCT. / /
ACCT. / $
DETAINED A►DUNT (Ll.e 8): /--
ACCT. / ---
ACCT. / f
ACCT. / $ /—
ACCT. /--
ACCT.
CMAMTER IIB. LAWS OF 1905 TOTAL THIS ESTIMATE S /CITY OF RENTON CERTIFICATION —�1 R� 1►Y�yj�o W 4MY�gxery���IYJ7 0/
�MYt 1y�
Rft Oacm ".
W,p Wr 'w�Ai YlT i MO ryny
•
CITY OF RENTON • DEPARTMENT Or f- N),W, Re
"CA MUNICIPAL BUILDING. 200 MILL AVE SOUTH RENTON. Vn- 9PO55e235- 2631
PROJECT - PROGRESS PAVMENT ESTIMATE NO
_o• tract No Contractor 4
Uos:ng Date_ 71' - _ Shee._ot_
"I Est PRE PIOUS TOTAL THIS E571MATE TOTAL TO 06n►TE
Delw.ptron Unit Unit P,,ce Otv 7 RE I AntOO a A,..o,„q
�er� Qtp Awsowat
Sccedu:e '4' Force Mo!-
i I
Mobilization LS f 24,000.90 I ` hu•5 I .;`r,.K � :
10.U0 M. o., blot s 20,0t10.1.
Coaaeoth Excavation LS 2,000. ! t��.: ,ow.00 0 ".to, I'Krt 2,600.u=,
3 Crushed Rock 1`04 9.25 45"s •`A-: i .,515_K5 1.,2 { fi1.35 5e•�. 5,647,,.
4 asphalt Concrete Pavearent 701f 37.00 99j - . .--� 29,992.2u�
5 Monvaent EA 330.00 3 ( 2,too.(*) o r,,rx 2,Iner,r.
5 Curb A Gutter Restor. LF 8.00 50 to LSLQn 0 j u.00 ti i51.`c:
Sidewalk ReStOr, $Y WOO B In 100-00 0 111�I 0.00 Sn
3 '.eaporary Cold Patch Sy 3.40 152 345 I,n 35.M 0 0.00 345
Bedding Material TOW 0. 650 40 20,n+r 54.e i 27.4074,4 3T.4
Bank Run Gravel TON I. 2000 225 225.00 0 1!' :.,o0 225 22S.ra1
6' Side Sew_r LF 20. 80 51 1,020.00 O I O,IKI ;. I,o20.a.
19' PVC Gravity Serer r LF 14. 250 Z•.7 3,477.76 0 ! o.l00 247 I04T7.7::
.: 4' Trench Drain Ib 60,1K. O a,c+I LF 6. 85 1,r 60.rwr
:. 12" CMP Culvert LF 12. Y60.IM1 IY ;l,fwt 9r- }g0�py
'lY III - 48 Mannole EA 1,000_ 1 1 1.€Rq.60 a ti.rwr I I,rKw.:q
'de
Serer Tee's !
EA 20. 4 i + rp,00 0 i v.all I
Trench Drain r1810cking EA 100. 5 , loc.uo e h o,ai 1 100.00
.3 Corm. To Existing Manhole LS 300. 1 300,a! o o,tho 1 300,00
3 Fittings for Force Main LBS. 1. BOO ' 2 a93_ 0 O.cwr 49I,0U
8' PVC C900 Force Main LF 9.1 2224 .•.`, io,754,E 0 n.tiu 2159 19.754.A5
1 F,,rce Main Clean Out EA 900.�O.a,,!tt 4 +`' i,ttr9. o I 6.00- a 3,600.00
Finish and Cleanup ! LS r 100.Oy 1 i 0. �lOE/L 0.00 Iou" loo,00
Change Orders •=i 1!{ f t! o. I"ot r Sop.Orr `Ont ,00.00
Sub-iota! Scnedule R i j �p,....c,n; s e50.75 ; a7.is•..•,i
Scnedule 'B' Water Main
1 i
i
1 Crushed Surfacing TON 9.25� ISO 1.2 1,"3. 0 0.00 In, 1,643.50
! Te-%*rary Cold Patch Sy 3.001 75 255.01 .r b.Vj &5 # 255.,*,
3 4" PiC Trench :.rain LF 6.CO 60 ._ . 150. a 0. 25 1S0.4io
Bedding Material TON 0.5G 106 [5 7.5f 0 0.00 t5 7.56
Bank Run Gravel TOW 1.30 ID00 15•,,ra. o,00 I5-: ISa.nn
Trench Drain ri Blccking EA 100.00 3 - leK,.. a o.om i Itgl,iM
Fittings for Water Main LBS 1.50 1200
747 Ia123,50 0 0, 7a9 1,123.SR
E" D.1. alter Main Lf 17.58 2280 12 i= ! 22,514,60 n 4. 1270 22,724.60
8" Gate valve EA 385.00 I 1 11 Ssi.oO 0 o. 1 36S.00
Fire Hydrant Assembly EA 900,00 4 - 4I 3,600,0" 0 0. 4 s,6w.o0
Cninge Orders i ( O.uo rt d, 0.00
Sub-Total Schedule B S 29,705.1. s r. s 29,7a5.10
GRA.YD TOTA1. S1.'.•,aA..7r, n5r!,75 5121.:o9.51
I . r
t � .
1
I
I
i
c � CITY OF RENTON • UEPAWMENT OF ENGINEERING;
e �• MUNICIPAL BUILDING. 200 MILL AVE SOUTH. RENTON, WA 98055. 235-2631
-rI N'fv PROJECT how:r - N.. 1 PROGRESS PAYMENT ESTIMATE NO ^
::Ontreei No. Contractor 1. I . Alin (."-1 �I Clots...g bale 7717x% Shret_of_
It Est EVIOUS TOTAL TMS ESTIMATE TOTAL TO DATE
NO Description Un,t Unit Price QtY Qly A.nount Qty AmovN Qfy. Amount
5cnedule 'A' Force Main --
I Mobilization LS S 20,000.00 1 pot'.' s 711,Uh0,t10 (2 i o,d) 1002 f ZO,mM).00
2 Caalon Excavation LS 2,00!I.00 1 Inn'- z,1w., M1 a 9.ra1 Imrt I,m1u,•w�
', Crushed Rock TOM 9.25 450 4RA,> 4.i15.A5 V..2 131.35 N,2.4 4,647.20
3 Asphalt Concrete Pavement TOM 37.00 900 f.Ie,1. To,991,20 n n,rMe 10.6 29,992,2u
5 Munulent EA 300. 3 7 2,11M1.W 0 O,W 7 2,)W.lrrr
6 Curb 6 Gutter Restor. LF 8.00 50 110 152.00 0 O,0111 19 15z,00
7 Sidewalk Restor. Sy 10.00 8 .,+ 1W,W n o,W it, 100.00
8 Temporary Cold Patch Sy 3. 1SA vr, 1,015.tm 0 0.00 Y.5 1,035.coo
9 Bedding Material FOR 0.. 650 ,u 2o,W V..P 27.49t .x 47,40
i'i Bank Run Gravel row 1. 7!l0U _ , 225,r1n o o.W 125 225.W
6' Side Serer LF 20. BO 51 1,02o,tw o 0.00 51 1'020.01)
12 10' PVC Gravity Sewer LF 14. 250 <',7 3,477.16 n O.tM) 247 3r477,7f•
!3 a- french Drain LF 6. 85 I" ".uu 0 O,W lu 60,00
14 11' CMP Culvert LF 12. 50 if, 340,W 0 11.W 3n 360.00
15 Fyro Ill - 48 Manhole EA 1,000. 1 1 1,000.00 0 0.00 1 1,Oml.W
16 Side Sewer Tee's EA 20. 4 3 ! 691.00 0 0,00 1 60.00
17 Trench Drain w/Blocking EA TOO, 5 1 I 100.00 to 0.00 1 100.00
18 Conn. To Existing Manhole LS 300. 1 1 31mj.txl of 0.00 1 309.00
49 Fittings for Force Main LBS. 1. 800 462 693.00 a 0.00 K2 693,00
20 8' PVC C900 Force Main LF 9.1 2220 2159 I 19.754.N a u.p) Z159 19,754.85
,11 Force Main Clean Out EA 900. 4 II f,taD.tM 0 0.00 4 3,6Lr1.00
:12 Finish and Cleanup I LS 100. 1 100% f 10O.001 of 41.cm lmt. IW.too
Charge urders GI of
) n.1Mi Im WW,: 5uu.1Ml Tool S ,
Sub-total ,chedule A f 30,665,6f s 658,75 f 91,314,41
Schedule 'B' Hater Main
1 Crushed Surfacing TOM 9.25 150 11R2 1,683.5f �f 0,W let 1'"1.50
' Temporary Cold Patch Sy 3.00 75 85 z55. n n, 85 255.00
3 4" PVC Trench Drain LF 6.00 60 25 150.01 0 0.01 25 150.00
4 Bedding Material TON 0.50 105 15 7.51 0 0.011 15 7.50
5 Bank Run Gravei ( loom I-OU 1000 154 IV1.1R 9 0.01 154 154.00
6 Trench Drain to Blocking EA 100.00 3 1 1101.m 11 0.01 1 100.00
Fittings for Water Main LOS L 50 1200 71,7 10 113.50 0 0.01 749 1,123.50
8" D.I. Water Main LF 17.58 1280 1271, :2,326.60 to (f.W 1270 22,326.60
9 8" Gate valve CA 315.00 1 1 185.00 to o,,ro 1 3R5.00
10 Fire Hydrant Assembly EA 900.00 4 3,64141.00 3,6011.0c)
Change Orders n 0.1wI a n,1w O.W
Sub-Total Schedule 8 S 29,795.111 S 29,711115.10
GRAND TOTAL S121J,15u,76 f 1,511.75 $121,109.51
{a total Schedules 'A" 8 "8" 120,450.76 658.75 121,109.51
(b etainatte: 51 x (a) 6,022.54 32.94 6,055.48
(c) Earnings Payable This Estimate (a) - (bl 114,428.22 625.81 115.054A3
(d) Sales Tax 8.1% x (a) 9,756.51 53.36 9.B09.87
(e) Mount Due This Estimate (c) + (d) 124,184.73 679.17 124.863.9
(f) Grand Total (a) + (d) 130,207.27 712.11 130,919.
HAMMOND.COLLIER&WADE- LIVINGSTONE ASSOCIATES,INC, EI (�T�qp1•�(� qT.Iy�/�Iy� �l� �p /�
CONSULTING LTING ENGINEERS Lti1Lr ll'U[EM ®(C u INWWSKO 11 ULL
Wla STIN!WIN INEE 1T� Il(!VWW�1UvU ll �f(�
Seats,We r"neron de10,T
IPLl1 0.L.tM1
To J �� N/It/lA
.G� ..6riAl� ��/6/IT •ri.
GENTLEMEN
WE ARE SENDING YGU Attached ❑ Under agenb corn vu _ -_
SKOR drawmp Rnnis _.Ipe Io1loWin` dM+
❑ Rena. _] 3HaPlaa
. . Capy of 4tta; C Change Omer l'!�/i+ rl if w r, �' SOecINNigAe
camas
-- aecearroR
THESE ARE TRANSMITTED as IKnkaa boo.
❑For rev+ew ❑No e.ct,atrone taken
❑Ptsupm't cvOlea for review
Cl for your use ❑Excevpons as noted
- O$unm❑ males for dminpU60n
❑As requested p Returned for
Corrections ❑Re+wn cc.reeled m
❑For lBY+BW and COTTBnt Pr Ie
REMARK$ .^ -
. ,./
� s
cow TO r&d At".rXif"
51911E0:�<L 'k'""
/yAJ�' Epp yi�M
wM •rYM1Ri• I<.eYfr lv rx<
WIl y.yy,. YY•� �YY•Yl
NE- 27111.gVN11
II
L C 1 �� I Z Y'<rl TUl yyr•. 4
Wirt RiaRap�ry,{
4 I
PLAN
auu r•ro . I
• t
T_
9-1
- - _ _
;pl• Y� I
� � -. . - ... �i�' _ ..-_.-_—. . _.-.._ - _.._______ ...___ i nw+•.u�wnmw saw r T� �.
_- lIO 1. ..♦
.�....1•'4IwI M
I _\
5�
-"--' - - ---- nc — /IECOROCONSTRUCTION ORAWING!
.wa. ., ..... Or OlkTOk
� O�•.. . N�NET R . .e..•
PRESSURE SEWER A WATER YAM.
_. �u..o,o r4\.T+•••Y{-\w+Yc++owc r ■a — _ 9TA.19 OlAOTOFTOOf►NO,ECT 1
WOCYI•.�YC A R• { Y�wJra_S� - 1�
\. is
.� twy otn.ww
I�• . •ri
♦ ter` �•�
r e �
•^ � - `���.^ `�/ m. n.1n cr—_ate.m�,ar� ^� /(�_ ��e �: A
t. is
IIiO
A�• ,�Y . 1 s s E �.
CONSTRUCT DR�W�NG
1 b.v.l RtCORD CO 5
___ - I �A..•�i MONEY co ••• ••
- } - -- -
g swPE sEwER A wnM NAM'
_ _ � � e _ .....wryp Co.aN.•rA ar.'n.YrOy� w.e.Y< w. A, y p-y. a ••� •
n[-..rte xC
tyt' k,t•
.� •1 .
Z BQAItD OF PUBLIC WOPJM • REN71ON,WABHINOTON
g MUNICIe4I 9Un DING • 7M MRLL AVENUE SOUTH IRE NTCWI.rpSHINk,TDN 9111055 • 235 2569
0
P
rFo SEPIt
November 12. 1985
Bob Bergstrom
Engineerino Supervisor
Public Works Department
City of Renton
SUBJECT: Request for Variance Undergroundinq Ordinance, Honey
Creek Sever Project, N.E. 24th St. from Edmonds Ave. N.E.
east to cul-de-sac
Dear Bob:
The Board of Public Works reviewed the subject request at the Novem-
ber 5th meeting and made the determination to grant said variance on
the condition that the portion on Edmonds Ave. N.E. be undergrounded
and the rest of the system to go overhead (N.E, 24th) and to remain
overhead until such a time as the neighborhood goes underground.
If you have any questions, please do not hesitate to ask.
Very truly yours,
�,/i 4{ _J��
Richard C. HoughtorO
Chairman
PMP
• SPEED LETTER •
TG: DATE:
ityw i' PROJECT:—---
SWJECT• it a� ^rr
r
..t
pne j —�
R.L. LIA NY
1 9215 M.l. King Way Why South
SEATTLE.WASHINGTON9611S
Conh Lic. No RL-AL-1"2620
(206)7224900
TO city cx- /IEA.rAY DATE 9".10 +ls
SURACI //—O-f CA-eAC /;'00J.-
/PE'rir/NA6�.
7)ew
n /car or
F:-O EV14-4rn i l eol of �4f
/6 Ctxrir.�.f�r of
-� ,WAfr r -jFP� �kcistr Tamers c /4ty �.lr?t Awe,
+/
TWIJ SwalO ENsAcf A,-7� �r y%rfi
'7A1!" /PE"TA+.�uOE C.M/ OE /r!`LEA�JFO
lij
SCP 2 b 194 ��y
• ai.r a warrrw
r •
o.a..aaasi a M•wa - '
aaciM tAa A alY1a
ales P.aaMraa a M.H.
Darr wasAsyr+aaaaaow
Boo 149 ITR
Certificate of Payment of Slate Excise
Tax" by Public %%orko Contractor
Contractor:
i
R L ALIA CONSTRUCTION CO PWC 65089
U213 IMPIRI NAY S.
SBATTLE NA Veit@
(g1U.IP1>fl r.SUIU[CT TO MOVE aUDhe
We hereby certify thst taxes, increases and penalties due or to become due from the above nam..i
47011110r44710r under Chapter 180, Laws of 1935. as amended, with rc.pevt to the following public works
contract.
CITY UP RFNTON
RCNTUN/NONBY CRthK. PNASF 1 SCHEDULE AaB
together with all other taxes, increases and penalties due from such contractor, have been paid in full
ur that they are, In the Department's upmtuni. resrhly collectible without recourse to the state's ben tin
the retained percentage.
This certificate is issued pursuant to the provisions of Chapter 60,28 Revised Code of Washington
for It purpose of Irifortnmg the state, county or municipal officer charged with the duty of
dtsbut'smg or Author," the payment of public funds to mid contractor that the Department Of
Revenue hereby releases the state's lien wt the retained percentage provided by this Chapter for ex.
else taxes due from said comtractor.
This certificate dues not mleax said colon it for from Lability for additional tax which nay be later
determined to be due with respect to the above mentioned contract or other activities
Date at Olympia. W"bInStcm, JL C C P 18 1985
STATL or WASHINGTON
DUP"TMINT or RLVLNUI
JO LYS4 @ICRER, AUDITOR
Clwtiraiae Oeav
RWTINti Waae('Dry laaMrtunr teaii,t..urt (qn ♦wa.wtu.
Nast IOV M 011111 taw Ptak Can Fir c.w.tas i or, SPsert his
CONTRACTOR/SUBCONTRA
MONTHLY MANPOWER UTILIZATION REPORT fjtl REPORTING PER100
Month. 4,y,y Year; )5
To be submitted to the City'■ Project Goals and Timetables as comaitted
anone•r dwirg the lot week of tot lowing I-
, in ConVactor'a AffirYtive
nth while Contract is in progress. Prime ly Action Plan
03ntract0r is responsible for obteinin,, nN
All Su4con.t actorr or per City's Plan 9.1 l
To: (0r W Ierattft of awtrws Amer mr From left• ate IwNrft at amsessw) —_
rY A ee,•n k. L. At.yA 40AA"
Zoo .FY,. A,# S. 7.�,T .►t a k..* is/Ay S
.arwmi o.As 9A-Sr ir+-*rt[, r..a fe/4"
This report a »qu ro y •aecut ve r er b, Section 703. Failure—to report Can
result in sanctions which include suspension, tenination, cancellations or debarment of
.onrrsct.
t. 7. — •. R 1. m.
elno. total total
Voris Mour• of IMPloywant 000 foots tel city number "bar
�r 01
C leeet o• • -A of wlrorlt rn
CORPWV 0 Howe (1,D.1 Trade }1Ca• Total
ot• slack Nis• ndlan heVtr v a9r. Asian/ 41 'otel ea to 4Dy.
t iun• ntc e- D r' eo
LL Da talon I s u:�n ass
n G YU
• TL
t/ Iuf
tAg
e
Iv
A T
2 i 2
euf�
oq t
Ap
Tr
ADy \
Tr
Tr
Tr
t
� oi4 lw 7 r/
mt Ms.
sNne' ...XGUIVO signature • Mt• S neo a a orw N er
t tl etude area Code)
tom,.-,. . �L���. 1�re•.sMy d'" .iI F.S pp11
l 7ZZ-1j9w
L
rvmales, ••Mirwritiae c Mon-sinoritirs)?-R em0 (Subedttal Requirents i Clty'$ Cwala/Tlsrtables) Poe - of
Ak
CONTRACTOR/SUICONTRACTOR fJMOP
MONTHLY MANPOWER UTILIZATION R Month: YeaEPORT AFPORTINI: PER Yea r: Ys
To be subaa tted to the City's Pro)oct Goals and Timetables as comilted
Engineer durtny the let week of following to Contractor's Atfir"tive
month while tuntract is in programs. prim ,N Action Plan t
Detractor is rasi+ stble for obtalninq and
19bmatei114 mil Su&MnIrIctor Rawrts. or per City's Plan 9.1 t
to (ear W ise61se at tw.
*r as ti w+a+/�1 s aav s+N.1 FTOC like sae losses"to assaesesr)
200 vrt n. Iva f, R c A..a1 4wr,eaw'y
seem .✓ �
s, " I Trost' a✓I a1 PJ/!~ r.
a report is require y recut ve r or I IZ46, Section .101. F&ijuva to report can
result in sanctions wh ut Include stepansion, termination, cancellations or debarment of
contract.
elt Total total
York Noun cr teploysMt (gee footrwUl Tit,t, number luffibsr
Clout a. w/h at of of
seta- er. Asian/ ,olkl total mtMrlt aepby
comaaiq'a Yoee (1.D.1 Trade tionr rota 1, aek panic iMlan hetm r.- urn re.loy- sae
Than, .ur
I.
♦SC 34.
sw.
11
tm1w4C 46
M
Ap
Mwrl
- r Ao
Tr
it
Tr
(
"7-e94C saor /11o.re r !eo 1
Dreary e • a. M ureoffll N e I%t T.16phona er
' (Inoluse area Coasl
Zeu� 722.1/y x
11/77 (+Nal•a a Pamu160, "Wroritlea a Non-mirwritiap /
No ISutwAttal Nequirements 6 rity's rv+nl+•Tlmrtableal Pap of /
• •u»os•aa►uao ur,t,T,o
�� n ///�,//� teY�ewiNT ei Nra�
Q/, . // is(] C ) �/�a/� COMOIIiTs MY,MO
` �N ���a��M{af
OSISfGKNFRAL
Pi CONTRACTORS ((//fir
aaU [w PIR[w,Av OOUTN
a 4TTl[.WAONINOTON 90''a 4
�i0 a la 7 ♦►00
June 12, 1905
City of Renton
200 Mill Ave South
Menton, WA gill
Re: Money Creek Phese I, Schadu le[ A 6 B
Dear Bob,
(lprn our walkthrough of tha Money Creek Phase 1 project, the
fullowinq deficiencies were noted:
1) Seal asphalt cold joint
2) Seal all casting patches
3 Seed till area
A) Tackweld clesnout lids
5) Locate and raise existing water velve
As of silt/ll these Items are completed and this project Is
finalized,
Thank you,
R L Alla Co-Tlany
Richard L Alls,
President
CONTRACTOe1 LIC[NOt NUMO[n RtA40•742eP
AIL
CONTRACTOR/SUICONTRA R I
REPORTING PERIOD
KONYMLY MANPOWER UTILIZATION REPORT Month: /J7/W Year: J
Is, be submitted to the City's Project Coals and Timetables as eomdtted
Engineer during the let week of following ��+ in Contractor's Affirmative
month while contract is in progress. Prim N Action Plan \
mntiautor is raalwnsible for obtaining aM
;1 1 All !,uticontractor Flowlts, or per City's Plan 9.1 \
ro: tar w letetIa of cow leap AlsaeY Iqt_I From: laar w faa tam of esweaeal
Cory or eYeYra 9 1 . d., /ftwf 40A 104
Ave t ^FY
it'eevvo�. cJe YPoSS' f rvo21C .ef t. K• ,✓y f
.lrarsrt(, wAe PJ.#N�
Thin report is require requir*3 by Fxecutive Order 11246, Section 20.1. Failware to report can
result in sanctions which include suspension, termination, cancellations or Jebarment of
contrsct
sine_ retal .tal
Mark Noure of Employment (gee footrote) rity nusber .uetr.
of t
C lemsl e. . • e tot of alrortt 6epkry- l
item_ a Nte. en me isN �041 total
CoayaMy•a MYe 11,D. Trr Ue done Tote Bieck pu,lt ndlsn Peefne .- tiP1oY' sea
IeLnJ ele wT eea
r
F e
TIIL y
Z
T
d tr.aiF :/
'Ca 1
T
-A,A
_ oRiwt t
Ap
lip
C.
T
T
Ti
TL
Ti
Tr
� + a
77 Date a nsa • a eM Number
!-8S I tnaluae Area Code)
72r- ADO
11/77 NNaln i Pemr.lea, eatlltgritiss k Not+-unorit tea)
Tan Ie,JomittAl W,introventf A Ntv'u n.+l+yTlemtableal Paso / of /
ORIGINAL DATtI
REVISION 1 DATE.
TOI Accounts Peyable
FROM: Public NotAA
SU SJ SCT: construction Contract GO t"J_,,
pro)Oct Haw,a
A
trice cone ractett HL
DATA RWRIVED GAT! wjk0®_
PRIM CoarreAr`RM a SUDC""RACTORS I Ilfrw T TO PAT A•/IDAVIT OP
PAEVAII.IM NAOR9 MAaM PAID
signed , -
lro�eet Uginow .
ccf ►to)ect rite
Form: ]/IR/sT
MAIa T'(I: a •
INu1�Si pt Al were nll,� AFF'IES AI
OF
I.Ph"nrxt nt Iabu [ Ind,+.rl,. WAGES PAID
f mphn nl%th &attdxrd. 1h+idor! (IN Pl'pl.l(' IMMIKi (UNIPACT
I n•m•nl ldadldslnlhm Naddine
ut+mpis, a( "4414 PAYW NI RCCFIYFII
121M, 't 141111
e lmtroct Number ..-. -_ !df f I � ' ..•,.
IRue "III N.,, Dodo
(smtract A .; p 1'uhh, ol Dale I""Ael Awarded
1-17�A5 _•,1.
lt
-J_.-.ity of Renton
war_-- Yale N,xk (lenpletcd
Address liwnN in Nhkh No•k 14rionn\rl
—'_ - Prime (omraetor R. L. Ali& Conplh
lekphone Number _
Na. a Stalenrnt of intent I11rJ
I of the protect. Yes
In compliance with R('W 39.12.040 1, the undcntgord, bemp a duty anlho,ved representative of
III-Lin- ARphalt t)RVirlp Co., 111o., P.O. I1624 0279, Soattle, ;IA 0111111111
do berths cernty that the following rates of houry wage and hourly fringe benefits have been paid tc the laborers,
workmen and mechanic% enlpfoytd bs me upon the project described able and that no laborer. workman nr
mechanic has been ptdd less than the "prevailing rate of wage" as determined by the Industrial Slatiolvain ul the
l kparunew of 1 aba and Industries
I nt below each classification of Lthlr cmplo%td b, wu up,nt the project described ibtoc and the rate of bound pal
and houth fringe benefits paid to each classification
PI F(st N011-
If aPPIrra rr,hxa•h,o•n •niplurrd on Ibis prole,l, pro,ids Ili,,addNionol infarmauon: ionic, regisfrahun number and
stage of prl.prr,.lon.
I W.
xn• n1 Xu.d Ilmrb
I1innl. V., Irin,r R 111, PM
LAfio r-�rn
1'k-rq ,Of,
Paving 1 �.Iits
lwvinfr I ao'+Ine Operator 17.'0 i1.114
Res)I ,r Or,^riitrir 17.41 `•
SererO Opt!rrktor 17.79
.Jhnnl^r i.)C1V;tt• i0 yyep ).71'In
Pruok C Trailer n•lvrr 16 to 70 yl•� 17.• 'I
r'1M. vlA,l ,a,InnMNI aMfl\ p. .p(a{'a It!-Linn A.-.
Mate 1'avinr. Oa,, Ina.
Sulvcriheol 1 rid ,worn to before file ts .9p10MAa
this -lot da% of
1q1� tat I.thus
t aflfl\,,f111!\11y1 1\'C1kd111,In 11M n.at MW I odor!r" iv In1f111\nnn
�NMIW
la!M MP\+Ilm, .ore rryplvpMnl+M RI a Iv `MO.,Iv1 Mex kUnlyp
sMnn flrAl. . ,Anr
y a.oMMn- INI1C51'p1A1 SI UI\11111\
OF P(RI%IbylJ(lF' LABOR % ,II Iw1 NIN1U
1 +t• /¢�
INSTRIit'110N5� f �ll�.=i `4/.
oste
1. pursuant 141 RCN W 121h"t agNcs of this hunt must be completed b, (he contractor and each of his sub,
ctN rrulira
I. R+Inpktx this form in triplicate and have it notarised
i. Wtbmit aft tams for apphwal to, Flnphymenl Standards Division,I"Irlment of 1 abir and Induutie,,General
Admmturathm hinkhnp, (Nsmry'a, W ithogion 9N5(N
A. Mail an appmed ety+f It, the Contract Awarding Public Agenc,
CONTRACTORS ARk RRRPC/NSII"F IOR OMAININ(i AND 1'11ING AIIIOAYII'S of the StIR-
CONTRACTORS.TW la rllOakp111q bw pod pa)menLs"A not lawfully be made until such affdavtix an fild.
t l M' ,M..,.1•e,w
CONTRACTOR/StIVONTRACTOR
MONTHLY MANPOWER UTILIZATION REPORT REPORTING PERIOD
. • Month: Lv'iC`;a. Year: .�S
tb a sulwitted to the City'. prollct ��
ergltiaar during tM let weak of follovi Goals and Tlnetablls as C itt.d
onth while contract !s in pr n4 �" in Contractor's Affinativ!
Untrat-tor is r!s Dora.!. prime Action Plan
WnriEl! for oEtrinlny ant t
' n all or per City
Plan 9.1 t
To: IN�e W Lwllw.f cabal
aern► uel,i
t r A4 r r:.. I'roe. ARM us Imsebw at sw t"Awl
3.
h.Hm e,This ropott a requ rs >• recut ve r or
ert an a ur. to report can
result to sanctions rhlch Include suspension. tensination cancellations or deHanent of
Font tact.
1 t,
y s.
Mork Hours of ar to •ant Ia Total
t
. rootnot.l r1tY a0ar .bar
CLuia w/h of of or
fto.- Nlo- er. A.1an elnortt as
tonpany'k Au. (f.D.1 `nd. Tot. black °tal total ,w PloY
t took panic r.d l.n hetflr Fe_ Ploy- ...
t.Lnl .air w'n eer
r 9Z
Tz
aAn
T
AD
W�
M.Pk r
Av
AD
Ti
na urr kn t
Tr
onpary r 101. 'e
Da. 3knrn • ephoM A r
/.. 't.. . (tnelwle area to"I
712 .yro"
li •' (•Mahe a £male,. ••Mincritiea i Non-minorltieel
1`uMal tt al Rw Pureemnts t City'. f,Mls TlaMtahles! Page / Of 1
SUPPLY COMPANY
e00U S W e0Ule wfeu! - i6eL ee)e5a, of avFet nN UalGUw 1h^.OS
NOTICE OF DELIMT O! NA't'4jMS
and rf•., of
Sea[tw lu`A g&�iS— . n Renton,
Ave.
Rentoon,, WA 98055
The undanigaed is delivering materiels mW svpplieg to be used f
connection with cam truction on property at
which property la daaeri fI follows
Runt on
From 1)..v'1'- 1'1h f N F 27 ! VQl 1
in the County of _ RI„g , State of ua
These materials and supplies ware ordered for me
\1 I,i This notice is furnished for by — Rick
Your
y
complitace with the laws of the State of plot relating
gild !n
Construction Liens and to advise you that a~lien yy beclaimed for all
such mgterial and supplies delivered after a data whieb is ten days
before this notice 1s settled. Payment by you to the Contractor order'ltgt
there materials and supplies does not remove the right of the undersigned
as the person furnishing the materials and supplies to claim a lien
against the property desciibed herein unless the undersigned is in fact
paid. No further notice of this or any subsequent delivery of materials
end supplies to you is necessary. P19"a feel free to contact us for any
Information you require concerning this notice.
Dated this —�tl,doy of '..,rch 19 85
Certified Nog. ❑l6i-I All, SY Mark Ward
P363-1, Renton �!'ufgvr
Hinds Supply Company
6000 S. 1 . Rocken Avenue
Beaverton, OR 9700.
�QfC1aGt�! mcf(.e4lY AM1� �ddli(/ildsl
r
4 L P • W�10 ,
• e u,rl
City of Renton aRMiil •'I
200 Mill Avenue
Renton, NA 98055 ,wN.nar
CERTIFIED
MAIL
P 363 153 620
Ifi( Nl,al�.ap�Il'AYlfli r_Y(iil�'y,Y'I
lm,:'i 114U,4 is 4'sY1lA
Parker,Smithh Fcck,Irx:.
torch 22, 1985
Mr. Bob Bergstrom
City of Renton
Municipal Building
200 Mill Avenue S.
Renton, NVn 98055
Re R. L. Alia Cti
PuN/Boney Creek Sewage Pr'ojer.t
With respect to the abov4 we are pleased to enclose the following.
Original Policy Certificate of Insurance _ XXXIM _
Copy of Policy -. Endorsement
Loss Payable Clause _._. __. Mortgagee Clause
Invoice a Fort ___—---. . Credit Memo .._.__ For$
Check n __._For$ —_.. Renewal Certificate
This Is issued in connection with
Honey Creek Savage Rate Station att: Force Main
ROvised Certificate of Insurance to inflect inereasgi Ulbrella lim'_t.
We trust you Will find the enclosurelsl to be In order
Very truly yours,
PARKER.SMITH FEEK. INC
Y
thY Q'CS)
SWdW A&COUnt A&Ainlstrabor
R. L. Alia axlpany
9215 Martin Luther Kim Jr., Way South
Seattle, Washington 98118
.'rA1 YnV IUBwtrn lr•u[r[_. + {xi.Irom
t;F• '11 xN,i L''1l)IK
hrker,Smith&Fcck,Inc.
March ], 1"S
Mr. Bob Bergstrom
City of Renton
Mmicipal Building
200 Mill Amum S.
Renton, NA 98055
Re: R. L. Alia CUnpany
Honey Creek Sewage Pump Project
Dear Mr. Bergstrom:
This letter is in response to a request from R. L. 41ia Company to provide you
with some additicmal infcumation in connection with our Certificate of Insurance
Prepared in connection with the above project.
Detailed below is a brief description of coverage and limits presently written:
operations Liability $500,000 each occurrence
Bodily Injury only $500,000 aggregate
Operations Liability • $100,000 each occurrence
Property Damage only $100,000 aggregate
" Provided by Lloyd's of Lore= Broad Form Property Damage
Automobile liability $500,000 mmbi.ned Single Limit
Bodily Injury s Property Damage
U lu,lla LiabiliL. '* $5,000,000 each occurrence
$5,000,000 aggregate
"• Eccess liability ridimi over the primary limits shown above
+ITk limit structuring of the current insurance program for R. L. Alia have been
in Place foi several years and have been sufficient on projects considerably
larger than the project in question here. fiis Honey Creek project at approximately
$127,000 represents a small to madiun project for R. L. Ali.;
41e trust you will find this information helpful to you. I ,ou should have any
questions, we wleome your call.
Sincerely,
PAP , SM21N A M, INC.
Kathy r
Senior Accoww t Administrator
R a V I S 9 D
CERTIFICATE OF INSURANCE
CERTIFICATE 15WED 70u CITY i)P RDRIW
S.
S 200 14 Nal1l Auvar S,11 9s11
MO
' Ilenben. 96O55
NAME OF INSUNEO: A. L. µTA COMPANY
9215 Martin Luther king a,., Nay South
Seattle, Wallington 98118
lilts Is to certify that the insurance indicated hereunder has Dean issued a Is
In ful nd l force ano offact a of the effective data(%) Irbicated on this Certificate.
This Certificate of Insurance does not In any toy rind, extend, alter or vary th.
c0v0149e afforded by the policy or policies referred to herein, nor dal It confer
any coverage to the Certificate Holder, except as my be speclflcally Stated at the
butt na of this Certificate, It Is fls,ply A synopsis px %watery cal the actual
Insurance contracts.
COVERAGES PROVIDED . COMPREHENSIVE- LIMITS
1. Bodily Injury Liability - $ 500,01 Each Occurrence
Other Than Auto S 500,0ou. Aggregate
2. Property Damage Liability - Other S 100.000, Each Occurrence
Thin Auto S 100.000. Aggregate
Broad Tom Property Damage
3. Co"InM Single Limits Bodily Injury S 500,000. Each Occurrence
Ano Property Dsa9e Liability -
Autatublle
A, liabrella Excess Liability riding over f6.1100,000 Each Occurrence
and above prlmary halts of BOdl1Y se.000,000,, Aggregate
Injury am Property OAma9e Liability
1 lmits shown above.
NAME OF INSURANCE COMPANY POLICY EXPIRATION
NUMBER DATE DATE
I. CONSOLIDATED AMERICAN
INSURANCE COMPANY CAP 10OU42 10-01-414 10.01-85
2. UNDERWRITERS AT LLOYD'S
(µFXAN1ER HMEN INS. SERVICES) 30299 10-01-84 10-01•HS
3. CONSOLIDATED AMERICAN
INSURANCE CO"MV CAP 180042 10.01•94 10.O1.85
A. U40ERWKITERS AT LLOYD'S
(ALEXANDER ININDEN INS, SERVICES) ISX904267 10.01-84 10-01-85
Description of Its, location, or project to which this certificate applies:
Barr Project Phase 1 - S296 - Nomy CYsN Satatgs pLW Sntim am M,,ce Maln
S h xiule A: Flores, Main arts a..ity Soviet,
Sell+hula U, luny Main
It sa a9ceatl that that City of Political le In ILKINd u W Mdauoital Inatira7, but only
r.tic reopw.< in "Ability arlaLg at of OPMMUcaat performd for stint Iratired by oc
on behalf of Me MPsi liattsred. It to further mareto j asu aReed task, the Ly,,W n
of mn thaws,dir Enthused hutoelaer Welu rot E,=Meee the Blain of COVerago afrod MMS br, this popliicy_.
Of
Ct
aunts o/ inswrance that l% i beegi rani to then above eo owdc lglderaof wthls certificate.1
sor
Date of [SSW: March 28, 1985 PARKER, SMITH A FEEK, INC.
ALEXAND HONDEh - RANCE SERVICES
By. t R S i /�'�//lJ/'IfA✓n 1�,y^��_+J1
lraH n 1 1 y—
rohn ,as—
7aa
CERTIFICATE OF INSURANCE
CERTIFILArL ISSUED TO clw OF R12M
Iardcipal MuMlis,
2OU Mill Avenues S.
Iaotan, sWt(ngtvmh 9g058
NAM[ Of INSURED. A. L. ALIA COMANY
9215 Martin Luther Ring Jr„ may South
Seattle, Nashingtnn 90116
This is to certify that the Insurance indicated hervander Ms been issued and Is
in full foKA and eff"t is of the effective data(%) Indicated on this Certificate.
This Certificate of InsuraN"does not in any My WM- eatand, alter or vary the
coverage afford" by the POIICy or policies Warr" to herein, nor does it canter
any coverage to the CerthflCate Holder, eac"t as may be specifically slated A the
bottom of th's Certificate. It Is slepl
insurance contracts, y a synoSynopsis or smeawry of end actual
COVERAGES PROVIDED - CONMEKRSIV[a LIMITS
1. Bodily injury Liability - S 500,000. Each Occurrence
Other than Auto $ 500.000. Aggregate
2. Property Damage Liability - Other S ID0,000. EaU Occurrence
Than Auto S 100.000. Aggregate
Broad Font Property Damage
). Cambhned Single Limits Bodily Injury 1 500.000. Each Occurrence
And Property Dam," Liability - j
Automobile
A. Umbrella Faces, Liability riding over 16.DOO.D00. Each Occurrence
end above primary limits of Bodily $6,000.000. Aggregate
Injury and Property Damage Liability
I INits shown above.
NAME OF INSURANCI cUMPAMY EFFECTIVE LIPIRATION
POLICY NL 6LR DATE DATE
1. CONSOLIDATED AMERICA%
INSURANCE COMPANY LAP 180042 10-01.94 10-01-85
2. UNDERWRITERS AT LLOYD'S
(ALEAANDER NDIIDEN INS. SERVICES) )U299 10-01.86 10.01-85
). CONSOLIDATED AKRICAN
INSURANCE COMPANY CAP 180062 10-01-94 10-01-85
C. UNDERWRITERS At LLOYD'S
(ALEXANDER MOM INS. SERVICES) IS1904267 I0-01.84 10-01-85
Description of itw, location, or project to which this certificate applies:
sa6aar Srojmet Pthaee 1 - 6296 - shmaV CraN soup[ pump Stanon and rpry Mills
Schedule A: Miriam Vain Md n'uvity soar
Srjwl". H� Wetor Maus
It in aepa" tMt the City of Boston sm drcluld am an AMiucvai Lnw r , but ordy
nth Compact; to liability ariaing out of oparauoro ;varforaw [or HNhch InHural by be
on bualf of the NNad InmaCad. It u further uniam4twa and grptl that tlu• iFoloaim
of one than ohm Induced homed= shAli rot lncrmoee rla I11d4 of cimaeragm affottW
by thla policy.
mays written notice of nonrer"al, CanCellation or reduction In
amounts o ns ur amp shall be given to the above nee" holder of this certificate.
note of Issov: maaeh 2a. 19R PAWN. SMITH B FEER, INC.
ALEAANI LHOWDEN (DSIWANCE SERVICES
By
in 1-/--nIs a ea
naa
Of RF,
pJ ,,,} ° PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235 2631
>� MUNICIPALSUILOING lee MILL4VE.s0. RENTON.RASN.IRIOM
P
rEo statLwd"
BARBARA Y. SHINPOCH
MAYOR
March 14, 1985
Alia Construction Co. Inc.
9215 Martin Luther King Way So.
Seattle, WA 98118
Subject: Honey Creek Sewer Project - Phase I
Gentlemen:
In review of your insurance certificates for the Honey Creek
Project, you have inadequate coverage. As pro -ided in the old
documents, you must have insurance limits as shown on the
attached specifications, Sp - 12 and Sp - 13.
Please update your insurance coverage and return Lo me as soon
as possible. This certification is the only item left to be
cleared for contract signing.
Thanks:
Very truly yours,
Robert E. Bergstrom, P.E.
Engineering SIQervisor
:jft
ALtachments
C1 of Renton Engineering Department
235-2631 •
PRECONSTRUCTiON CONFERENCE
DATE: Wednesday, March 6, 1985
TIME: 2:30 p.m.
PLACE: 4th Floor C.,,ference Room
DEVELOPER / CONTRACTOR OR SUBCONTRACTOR / NAME OF PROJECT
Name: R.L. Alia Construction - Schedule A A B R.M. Scott - Schedule C A D
Phone: 722-4900 226-4462
Project: Honey Creek Sewer pump Station A Force Main
Proj. a: S-296
r
NAME OF APPOINTED INSPECTOR
HCWL Engineers
Please check departments to be notified and specify person to attend.
x Engineering Dept.
M Fire Dept.
x Police Dept.
x Street Dept.
x Traffic Dept. _
x Utilities Dept. _
x Water Shop
Other
Additional outside departments you may wish to notify.
Department of Transportation
x Pacific N.W. Bell Company
h Puget Sound power a Light Company
x
_` Group W Cable TV Company
r Washington Natural Gas Company
x Other King Co. Public Works 255-?531 (Renton Hlohlands Office)
PRECONSTRUCTIDN CONFERENCE
PRO,;FCT: DATE:
ADDRESS/LOCATION:
PROJECT 0 _ PERMIT / _ WORK ORDER 0 _
r r r r r a r r r r w r a a r r r r r r r r r r a r r w r r a a a r r r r r r r
THOSE IN ATTENDANCE
NAME COMPANY PHONE
t
i, d
m C�rur_ Iq e 1 -A6 Alz
t u -z
�c_t1sT�
17ruc�seL��i,+�slaae. Ncw-�. r�iz-zc.v¢
1riCED lriif A+ f�A.YNewyCA[Kti4WN DF:'6/YiAhiJM(/C F^32 " 24Gq -
1
Jio
ai
t
__ ___. ___. ° ._. t 1,�s.,_,,,�L_��.,Qkr.:i?�.d��la5t►�h �^►�'' ���. � � ._ _. _..--
Y� .. N
a
K�
_ ... _7., %ski...
�I
i
let 4
II
/ 1
ads-+
u
// 4i n L.
4
a '
erg. .
L
) ) r
Mail Tu • •NtslemeM of
INIII STRIAL ATATIRTIVIAN INTENT TO PAY
neeprlmrnt p( I-ro, R lAduatrls, PAYMENI RECEIVED PREVAILING WAGER
EMplxymrnt NntndpM. M,iAIaW
General Adinlri.t,tlion RuRdhtR APR ')4 19®5 (Public Work, Conlrort)
I Olympia. NA RASn1 19091 711.1./0114 l M[ Centrati Number-15 2 ra
4_
Q M'"M FI
Date Bid 11'as I)M t' 21��' _T_,PL 1',mtrsrl Awanbnt 1'uMlr Agrnry Dane !'thrall Awarded _J ���' !__._._...�
(`,tint, in N'hch W,vk I'eHtumFd 1Sif1�__
Addr„e .�_._ _. L,"Iwn Within C�pmty,Rentoh llonn Cre
----------_.-- . Prime Contractor R•_L• Al In !2pmMny
PI"IM—•--- -----. -- ConttMor'n RNainlrntion 1'ertifirale No,M. r�.F 51 '
Ib You Inlernd '1'n Cpe &Ihonusrulri' Y" L. No C
In rnmpinntr wnh RCN' xi 12litn 1, Ihr und"'-Owd, hill"N a duly axthonred mpt"nnbtne of
f1 1In laphRlt Fav1nR Co.. jr,!_ c.0, Box 6P2791_3@Att_1rL '!q )P1gR
,AMxa .
do breath,V rertify that the fldlewing 'al" of '..tlrly wage and hmirly fringe henefts will he paid it, all
IaIuVrr". nrkmrn and merhanica rrep -.0 ray me upeo the pupil.ae-rks pmi"t described III and that
it,,Iaboter,w,uklllan nr r erhalllr will hr i'lid I"a than the•'pMVnlhog rate if%age-8,determined 11% the
Imbl.tnal Stale,111-14n td the Department !.•hilt and Imhatrl".
PLEASE: NOTE If Apprentice. arc it, he u,ed the, milt he rrgigcred with the State Apprennrr,hili
('munch or the, "I'M he pant prevnlling pnunmman wagr,.
I*Aef "TIMAIM MOM"M RAT,M RATE of Hitt AIA
M MtMaaa, Ra/la4T PAT "INfR al"N,rl"
LnhorArr
Rakers
1",ulna t-itchin 0por. 2 19,44
Roller oper, 1 17.41 4.1P
3crnart 0per, jr2 17,41
'('ruck R Trailer )river 16 to 2 e a 17.79 ••
0 yd. 17.49-
New Atlt,h Addnonitit Shrrl, x, N"Ird '11 Lne ARhA t t'8Yi v'O.A„_1nc•._.
Idv Alt, , /_ __Secretary
Suhmerihed and sworn to brG.re me ITtl.r
1 F., 1.a 1 I'.. Oal,
this -Al"_-. dsy of .��.-�,><..!".�s,,. . .
14 �• ' AI'1'HOVF.II
p Drnrtmenl of Labor • Industrir.
`T lndualrial Nl alialiri��o
_..__
Aw. WAMi in
s.A/v IAe 3rar. •./ W'a.Al,wl^n
m.6Y IA WFWAe1w1 Inc _ .. IInU _....
BEFORE FINAL SRTFLEMENT can Iw made ran ariy puohc wvuks prujecl,the prime comrnrWr and each
cold every anhnmlr"tier count ,uhmit (lum 1.1 71MI.7 "Adfidavil of Wages Paid"tit the l4rtlTr charged with
the disu ittement of public fund.. EACH AFFIDAVIT OF WAIFS PAID) MAST HE CF.RTIFIFIII fill'
THE INDITS7'NIA(. STATISTICIAN ,.,) '11) SD THE DF:1'AH'I'MF:N'1' OF LABOR AND INDII�IRIF:R
BF:FI11tF: IT IS SIIBMI'ITF:D '1'O SAID I1F'F'1('RR,
1'R(N7RF:SS PAYMENTS: Kill+ voucher claim Nubmitted to an owner by a ronlraAor Ilir payment on a
pmie•t estimate shall.late that prevailing Wag"have ICY"laid In aebrdarem with the prefll"i.tairlitent
or .tatementa of intent In p ov pervading Wit" ,m file with tilt public agtncy.
COMPLETE AND MAIL ENTIRE SVI' FOlt APPROVAL 11):
FIT01"Vment StAmdArdn 1 hWa„m. Department of Laluir and Indusiri".
Central Administration Building, Olympia, Wr Ahington 9AN14
1'IINTRACT11118, 1114TRIRhTV APPROV911 Wf ATRMRNTP AN FI11.I049,
u•INK I In'1, IIRI01NAL 1.ONTRAI'T AWARIIINI: A011M v
t-RF;RN rtl',I tll'PLIVAT0 INIRISMIAI.VfyTiNf N•IAN ikilnitd by 0.1wrlrvnnn
�MLt�F IVN•ti TRI114.107ATt PRtMR CONTRMTtM
11'RIAA/w ItMYIIBIAl111tIPL1t•ATR apm11MA1. M
ORIGINAL DATE,
REVISION DATE,
TO: Accounts Payable
PROM: Public No,Aa
SUBJECT: CU„etructi0o Coet.4Wt Cia I w I' 111 5 1^
Project RA , /'(tIPJq 1 "i�t/( N L
-J, yy' cifb
Prue Coetrectorl �L� y�l:.. (IM tfl�t'i(l✓,
PATE R1Ct1VtD WiT1[ RECIIVmp
PRINB CONTRACTOR tOeCDelr*AlTO118 11172" TO PAT R"IDAVIT OF
FMAILING MAGRE MGM PAID
project 11"i"aet,.
cc, Protect ri:e
Pure:
OPPAR'I'MEN'r m,I.AIIIIH A OUSTRIFS • NtNlemunl of
(iMPI.OVMEN'1'r'IANIIARI)S1 1SION 09IN'PF.N'rTO 1'A)'
Olythple,WA9a8U4 1'14F:VAILING 1VA(,ES
(Publir Work*Cunlrecl)
PAYMENT
11 RECEJJIVEU
41) It9O5 Awan6ng Aaem'v City rr Renton l:kl_,I_
North,,Nuhr, s 296
nomPlkWA IMte 0oilmet Awanlai 1/14/85 1✓1�I( � I�I��1
Kin 1,..,:,,.....,.. . ,..1
County inWha•h Work 14r4rcmelt 9 ••
Inraunn Within Comil, Renton
STAT R OF WASHINn'r(IN ( Prime CnntrActor R L Alia Company
0,441111 aJ .King , IM You Intend lb Ilse Nultcunt...to,.' Yes 19 No❑
In compliance with RCW 39.12,040 1, the undersigned, being a duly Authorized representative of
R L Alia Company 9215 MM L King May South Seattle, MA 98118
11'm,IrNliv nrwarnrlarlMl IMAnee
do hereby rerlify that the following rnb•s of hourly wage and hourly fringe benefits will be paid to
All IRhorers, workmen and mecha lira employed by me upon the public works project described
above and that if,, I,thurer, workmml or mechanic will be puld JeAs than the "prevailing rate fif
wage" RR determined by the Industrial Statistician of the IN'parttnent Or labor alld hidaatrieN.
PLEASE NO'I'Fi If apprentir•es fire to he "Net] they must be reµistemi with the Slide Apprentice
ship Council fir they must he paid prevailing journeyman wages.
('RArr HA'IF 11, NAIK OF NooNI.Y
Utilities Contract HOURLY PAY FRINaR RRNRFina
Superintendent 1 j 21.13 $ 4.18
Pipelayer I 15.44 3.45
Laborer 1 14.96 3.45
Truck Driver (5-12 1 17.49 3.66
Beckhoe Operator 41D L11e C.Ct� 1 16.425 4.18
Oiler 1 14.46 4.18
Foremen (Teamster) 1 18.11 3.66
No ..n' Allach Additional Nhrotx an Nroded
d lo M L AI la
���__ 1 nY Nana
Subscribed avorn if) before Are --Rrh r �{ 114 . //f1,Or«r Mot,
this 29th day of ......Eq#ruary Fit,La I u«ostr
I,) 85 APPHOY U
/ 00parUrNim of IAbor♦Industries
Ir)al statist(e1�1
S1n+n /'xAtyy ra ens far tAr Wb� YparnMux. 'rt'.
mud,aaor a'a.Amarnn. H I� , IM4
BEFORE FINAL SE17I.EMEN7'can he made on tiny public works project the prime contrm•lor
and each and every subcontractor must submit form L1 7(07 "Affidavit or Wnge@ Paid" to the
officer charged with the disbursement of public fund@. EACH AFFIDAVIT OF WACES PAli)
MUST' BE CER'1'11'Ik1) ill' 111F. INDUSTRIAL,STATISTICIAN OF THE DEPAR`rMENT OF
I.AROR ANO INDUS'rRIES REFORE I'r IS SUBMI71700 TO SAID OFFICER.
PRO(i1lkSS PAVMF.N'r5- Each voucher claim submitted to an owner by a conlracturfor payment
on n project estimate shall state that prevailing wages have been paid in arrordnnrP with the prr
riled statement or statements of intent to pay prevailing wages on file with the public agency.
COMPLETE AND MAII, ENTIRE SF:7' FOR APPROVAI.7'O,
Employment Standards Ilivision, Ikepartinent a(IAbor and Industries,
General Administration Building,Olympia, Washington 4.8504
Ivw I RAV IIINN, PINI'RINUT'K ALPROVIKI)III A MMKN1N AS FOLLOWS:
J uA y r, '11 UNIOINAI A%ANIIINa MIFNPY
nh el I'1111 I11111CRAIF PNIMFIIINTRAMIN
IYI1�uW rul'11 INiP1:11'AI'R .NnIN VNi'NAt"IN
UFNI )PYI VIIAMI IPLIVATR-INIII INTRII'AI.ATATIR1111 AN 111 Iuif dhr IIpaof ml
Unit" beft"Pia e0 'G?'
•Il' • AF-F&T OF
;SIN1AL CI AIMII IAN
ratio" of labor a Industries �� WAGES PAID
ewplsywra Slaahrds INuciop ON PCINLII' WORKS I ONINACI
General Adnrlahlratfen Nuilline
IRyeela, WA n+w PAYMENT RECEIVED
1111617S14119 8 296
Contract Number —...
Unto Hod Was Due 12-21-84
('untract Awarding Public Agency Date Contract Awarded _ 1-17-eS I 1
OLy tt ?40k%n 5-243
l>•N Work Controlled __.
Address — County in Which Work Prtlermed
Prime Contractor As Le uL Otn1MP
lelephont Number ___.__- --- Was A Sislensent of Intent Filed Ar
For this Project? van No (.
In compliance with RCW 39,12.040 I, the undersigned, hemµ a duly authorized representative of
R1wLlne AspMlt Av1n11 Ot.a Ins., P.O. Ma 68M, a>MtUras VA !oleo
do hereby certify that the following raise of hourly wage and hourly fringe benefits have been paid to the laborers,
workmen and mechanics employed by nor upon the pro)cct dnttibed rMnc and hal no laborer, workmen or
mechanic has been paid less than the "prevailing tale of wage" as determined by the Industrial Statistician of the
Iepannvent of Labor and Industries.
Lim below eat classification Of labor employed by you upon the project described above and the tole OI hourly Ivy
slnl hourly fringe benefits paid to tech classification
PLFASF. NIITF'.
11 apprrnlice,hsty been tropbry ed ton Ibis projrct, pmsld, Ihiv sddttional Information; now,reghtralWn number and
stage of progression.
I Yah al a.. nl Il.wlr
IwpM R. ,,Nei Rr•rnt. hN
Laborers 14.96 3043
lotakfirs kla7in MaGhLne 1S.4t'
dI Operator 17.4i 4,10
hiller Operator 17.e1
screed Operator 17.79
Wheeler Driver 10 de 17, 1.66
Sgvek A Trailer I)Xer 16 to 20 yde 17, r
�k910
)(e
Not Arlark Additional shop... N.w.e Nlwirlake AeplMlt AvLk� 00.s I9aa
Subscribed and station to before me Nyr:!-, ,.rt,t,.• 7 .'
r �fs.t Over
Ihle .�-..4 day of :f_f�Y-.__.
o
14 i(7 kill toe ab
I A its amq tMl..wedge w tM ap t W .ail tote is"bass
Amu r"
m tM m.aate wN.,enn,awan W at'W lice lien cites WYIw1
t Nip �tdW av rM. ateN wuA,gxn,ro.Mry INDINIR1AL SIATISTRIAN
1 ARl'MKN ' IlR LANUN AND INWkf(R169
INSTRUCTIONS: III
0 m.`
1 Pursuant to RCW 39.12.040 copes of this form mutt be completed by the amuactoe and each of hat sub-
prrracltrs
I Ctml*tt this (min in Irfplicale and he" it notarlaed
I. Submit all forms for APprovRI to, Flnployment Slamlards Division,Department of I shot and Industries,tienetol
MlnunintolNn Ruihfing, IHympla, Waslr1md m 911504
e Sled or appcwed copy to the Contract Awarding Iluh6c Agenos
CON IRAC-IONS ARF RF.SPCNNSIBLF FOR 001AININ(i AND 111IN(1 AFIIDAVITS Of the SUH.
CYNNINACIORS 'This is required bylaw and paym mot an not lawfully be made until such offWaviu use filed
I ti.. into..." Iwlu u..l -ow,
MAIL TO • • Statement of
INDUSTRIAL STATISTICIAN DEWED INTENT I'D PAY
Department of labor & Industries Z
Fnoptnrment Ntandarde Div l..ea PA�N'EN PREVAILING WAGES
General Administration Building
t (Public Works Contract)
Olympia, WA 9S504 Will,
(206) 753-400
Contract Number—
Date Bid Wait Due 12/21/84
('ontract Awarding Public Agency Date Contract Awarded 1114/35
- Clty of Renton County in Which Work Performed_
Address 200 NiII Ave. `o. Location Within County City of Renton
Renton,WA 98055 Prima Contractor LW-Scott Construction Co.
Pho a 235-2631 Contractor's RegiMtion Certificate No. RW-SC-OC 229HU _
Do You Intend To Use Subcontracton, Yee F1 No 11
In compliance with RCW 39.12.040 1, the undersigned, being a duly authorized representative of
R.W.Scott Construction Co._200_Carr Road Rentoa.WA_ 98055
M.alwebr a 9oh,v,n.,g1 tAditrwl ---
do hereby, certify that the following rates of houcIV wage and hourly fringe benefits will be paid to all
laborers,workmen and mechanics employer)by me upon the public work%project described above and t het
no laborer,workman or mechanic will be paid less than the"prevailing rate of wage"as determined by the
Industrial Statistician of the Department Of tahor and Industries. '
PLEASE NOTE: If apprentices are to be rued they mast be registered with the State Apprenticeshiu
Council or they :rust be paid prevailing journeyman wages.
CRAFT UTILITY CONTRACT ESTIMATED RATE RATE Of RATE OF IIV
Or WORAW HOURLY PAY FRINGE a1L'RLY
NEN:TI
410 Backhoe,690 Backhoe,450 Dozer 3 16.92 4.16
Truck Driver [5yd - 12yd] 2 17.38 3.64
Laborer 2 13.80 3.43
Pipelayer 2 I4.28 3.43
Nora: Attach Additional Sheets ss Needed. R•W.c'M y _Go.
Subscribed and sworn to before ale mOW
this ___1.9 .__. day of tkrth___�, F., 1. a 1 1'.. 0.1,
19 M— APPROVED
i ) Department of Labor & Industries
-1- fa4 --s __ Industrial Statistician
Notary Public, zvw Wa.Aleroa.rcnd
iy
Ry _ Dal _�2
BEFORE:F1NAL.;F TLEMENT can be mvde on any public works pruje,-!,the prime contractor and each
and every suhroWraclor must submit form 1.1;DID-7`IAfdaiit of Nagle Peid"t11 the officer Charged with
the disbursement of public funds. EACH AFFIDAVIT OF WAGfti PAID MUST HE CERTIFIED BY
THE INDIISPRIAL STATISTICIAN OF THE. DEPARTMENT OF LABOR AND INDUSTRIES BE-
FORE 1'r IS SUBMITTED 71) SAID OFFICER.
PROGRESS PAYMENTS: Each voucher claim submitled to do owner by a contractor for payment on a
project estimate shall state that prevailing wages have been (mid in accordance with the Trebled statement
or statements of intent to PAY prevailing wages ,H file with the public age,ley.
COMPLETE AND MAID. ENTICE SF:I' FOR APPROVAL 'TO:
Ernplovaleot Standards Division, Department of labor and Industries,
General Adminislrnlion Building, OlYmpia. Washington 98504
CONTRACTfIRR DISTRIBUTE APPROVED RTATEMRNTR AN FOLLOWS:
IFINE VorYI ORIGINAL CONTRACT- AWARDING A(;FNt'V
(GREEN COPY) DUPLICATE INDUSTRIAL RTATI1MCIAN IRetai,sd br Ileprlm.
(BLUR COPY) TRIPI..TCATE PRIME(T)NaIA(TDN
(YELIA.Y VOPY)QUADRUPUCATE-SURCONTRACKM
LI]n,r Imrm e.Pp slits n%A1r �.l
ENDING
OFM FILE
FILE TITLE �.
96
PI ot ;e l 5 � �, �dN ►� s Af B
�. L . Al ; o, Cvhstr (� ctian
Gurtc. SRoh04eAce