Perimeter Fence Adjustment;
Emeryency Power Connection 212 ,93
Fence irate Modification for Uisconnect 593 ,40
isc Modification u3 00
Subtotal: 2,159 32
,1% Sales Tax 174 90
jTotal: $2,334 22
Fr Fba
�TEt>>rcrannl. 75737 �gwolm WIN
POLY PAK (50 SETS) 7P777 ,�_
� 1T
USLIC WORKS DEPARTMENT " ��y -�
DESIGN/UTILITY E 4GINEERING 0 235-2631 0 ` $
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH,88055 9
0
P
1>f0 SEP�E�O�
TO: ., W�_f0 __-- //per� _ DATE: _ 1. NO.: _
ATTN: eN Sco Tl —
GENTLEMEN:
WE ANT SENDING YOU J� ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS:
❑ SHOP DRAWINGS o PRINTS ❑ RLPRDDUCIBLE PLANS o SPECIFICATIONS
❑ COPY OF LETTER o _
— ION AND
tF Y8 3
— /►1/ss 1� ;gib►„c
THESE ARE TRANSMITTED AS CHECKED BELOW:
a FOR APPROVAL o APPROVED AS SUBMITTED a RESUBMIT _ COPIES FOR APPROVAL
,Y< FOR YOUR USE a APPROVED AS NOTED a SUBMIT _ _ COPIES FOR DISTRIBUTION
o AS REQUESTED a RETURNED FOR CORRECTIONS o REIURN CORRECTED PttINTS
❑ FOR REVIEW AND COMMENT o _ o PRINTS RETURNED AFTER LOAN TO US
COPIES TO:
SIGNED
TITLE
IF ENCLOSURES fAE NOT AS NOTED, KMY NOTIFY US AT ONCE
DATE 4-9-87 CITY OF RENTON
REQUISITION P•0.No. 40483
DEPT. Public Works - Utilities
ACCT. 421/000/15.596.38.65.19 $ 2,334.22 VENDOR NO.
ACCT._ _ $ PHONE NO. 226-4457
VENDOR NAME AND ADDRESS VENDOR "RBU TTANCE" ADDRESS
R.W. Scott Construction Co. SAME
9840 Carr Road S.E.
Renton WA 98055
TY. DESCRIPTION IN DETAIL AMOUNT
Honey Creek Pump Statio,L Adjustments
Perimeter Fence Adjustment 1,290.00
Emergency Power Connection
Fence Gate Modification for Disconnect 593.40
liac Modification
-- 63.00
Subtotal
—_ 8.1% Sales Tax 717490--- _._. _ TOTAL
CONFIRMING
PURCIIASINC TO ORDER AUTI1. BY: K —
. - .1 7
HAMMOND, COLLIER $ WADE - LIVINGSTONE ASSOCIATES, INC.
CONSULTING [NGINCERS
4010 STONE WAY NORTH
6EATTLC, WANHINOTON 99103
TELEPHONE: 1206) 632-2664
April 9, 1987
City of Renton
Dept. of Public Works
200 Mill Avenue South
Renton, Washington 98055
Statement No. 31
Statement of Services - Honey Creek Sewer System JO11NO.
March 1987 Services.
Preject No. 29503.000: Finalize operations troubiEshooting improvements at Honey
Creek Pump Station and install "see through" chamber top. Comrlete work order
arrangements for land�,ceninc at Eastman property. Review ' nas , 1 Schedule C R D pay
summaries, prepare init,al spread sheet and start final amene d progress payment.
Memorandum on research for N.E. 27th slide.
TOTAL AMOUNT DUE: $ 2,837,05
RECEIVED
APR 13 WT
T'1GIrt!RmG nr.PT.
CITY V RtNTOR
I
ACTG-71
Ce f,aZ 61� 1 ec
,ti43 +y2T /5,.�►G•s>r•G6'. lq '� Z�3:'"'
FINANCIAL SUMMARY
._ HONECEk SEWER ENUINEERING ICES
For City of Renton, WA
by Haa►mond, Collier L Wade - lavingstone Associates, Inc,
Project No. 2850 and 'pub-phase designations Floaa ii" " 19 v2125,66 REb Letter btd. $4,253.87
rrziersiwil PrViOas Mi,ei kzw. ke{aV tti 11301166 v3'V684 kites 1b,144.)! Ht,v4).64
bav,lcef i6.. lavoiee +uisos 4zca aammts Lur*eai aazla+t 21 K IV,bb 14,5r3.V5 N5,61 a.P"
u e4s, 49, 511IN 8111164 b+ilee
N v7 12r8e . 116,3t
_ "_-_- '_—__ _"_ "_ ". ._ :5 v6�29 a3 h,A2b4.36 3a 68.6uv.se Bb
bA1Z lrsiw 1 V'9,28ir4 xse,,dte.c I'o .. {a,442.W 06,44—"
a ie,u+Si 64 i1 IN'53.W 116,94,W Front rootage Charge Li il+it 66 R68 Letter H.V.15 4476.75
Jl Ali'b4 ,V.V, 0 4td,I6h.W $45.265.w Eabibrc Nil two W
a IL.u484 01,483.4V i,f1,L88.uv
S VI.15,it', LIS.i6i.W {51,35i.W 14Rerettans warrant. rb i.-Iwiac REY bulb, 62,4w.94 $2,450.94
7 az.l3,bi lA"9S.W 454,15V.w 5ur.ey, floe 4~e"n ;9 t I1 8 {.,131.15 64,59v.19
f! w-141w, i1,85b.w t5e,vtn).W w t 23:br 42,31V.o5 16,9W.19
Fosev 5ujefr Prsien 6 &2n8` wrn +: v5 if I ,"'v IV,I"rv.36 AY,liv.36 al i ;.+ 12,b3i.U5 39,13i,24
i.ntxua b w4•26.Bo ,remaa:r. 4 5.. 4;,dL3.2f f+,et3.24 C E. 27t6 iro"Ir+g t4 L l:,i. RU Letter f5,L83.99 16161.44
:er,tcta 9 W;30•0 31 /16.32I.i6 $24,J4,41 6tw6t ry I ii, 1L.L3 66 1r,28b,16 N1,57L,'S
Noaitataq 14 4,17,9 0 ."0 322,SV5.V4 N6,449,44
FR,te I laru Ji Be II Ya.114/ib 0.A.,4v 155,919,66
Mize [ 7are 4978$6 12 W,11,b5 $6,365.v, /ai,L94.8;
0 Aw ILr 85 e15,2v5.13
Ca Atrsctlaa berv:me 15 I911045 W 14W. 125,„u SIMM,4; fl>,99b.91
Nritaruy ►has" S 14 14r24ei^ 04 f9,4".46 I2e,362.8:
is 16rw 14185 P 1426.,85 i, it 64,618..5 32i,d1.3i
f.tra East. Ib Ri,13186 at4. tS,1i3.d 15,773..E
%umt'3/4 19 4jit'5L86 titel ft,37 75 /5,151.0 a
19 4Lwr&. 4 :,rz3.63 Advised City of probable extra (Trca,i toe ing see vice; related to
23 43+046 11111,416 f30,9391• changed construction schedules:
2i if,.4ib4 11,898.t5 f3[,837.ba 05107/85 )
21 V5:1bba 61,323.t5 /3f,16v,N i15/17/85 )
23 w.124r, H,S1.59 135.7[.Sv U8/12/135 1 for respondence
24 V7,:21ea 1t,35e 44 !}:.W).M IQ/30/85 )
4 68.'2446 ti.102.av $AAK3,34 11/27/85 )
14 99aa+86 1,,319.ty
rallit (Wile ti V7:tL,&a FEe let 6-is,be $4, .4V /t
2.5
2b 09.2616c li,,.J:;..1 fi,6:'...: 1 certify that this financial summary accurately epresents
professional engineering services charges to the City of Renton
S43R. P.S. Ibesrtl*a. s it 89121+Ib5 Flo tit l6n::85 5t4. Ross 18.8ea.54 te,a�o, . Honey Creek Sewer Project as compiled from time records, expense
charges and subconsultant statements. All charges have been allocated to
46N lb 4 ,13r6e Ah Lett" 6tr, Si,4LI.W +r,:.;... pro3ect phases and tasks during the time period performed and in
Na"41 0 ei'25rb4 l2Rb,65 hit" sw.54 t.,tt,.;,; accordance with letters of agreement and an Ulorr lzation.
A 111,11166 "N.W 11,tN39.5h
2l $&16ib6 t(,95;.78 $5,519.R
u i4:161bb t472.J6 b3,319. 8 �7
23 $6,U4% f}52.4u {5,671.88 1/- 7
14 V71211" 13.654.39 $8,12b.1: /
25 Q12917m $1.I41.7v 6W.Wi,97
Ps-bun i 18 Vlii3i8a Ri,B lei'. 6),5VV $5,434.13 15,933.13
19 42i25,66 it�i7:10 $M3 e,3 fo,i77.i4
2f V311; 86 ML54 67,437.36
21 v41 IV-b6 SUL 70 0AW,W
22 45,161 bo Ff8 aura S'J6 151). v $511.?^ 16,V11.2°v
Strew En6snceneet !b Vi.11.:86 8E4 Lekty Ste. 6i,643.t3 3•,o13.1S i
iWese, at fib" 19 32125,86 12:24185 Rates 02,197.34 f3,84V.43
Hc+mmond, U01, 11..r c< Wadv i. lnc.
4010 Stone Way :,I.
8enattle, WH 9e31 :'S
Project: <BSI,:'.Vvv kweltont L1ty at-
i.onstructlrxx Monitoring I1 Apr it `V, 1981
i
" Rage number
�'itv w4 Kencorr
Fublic; Works wept.
2v0 It l l Ave. S.
kentorr WA 9Efv55
Frofwasiona, Services
L•sts• It jut s a Amount
±... it , 'it F xr� re�K
Frederick: u. kewn
Englnee:r inq - tiener`a1 S- 1`i-Si 17.uu 61.u0 1 ,Ob4.0v
S-3 c f i t y.50 62.00 1 .2u9.ua:,
f4%OoCiatW Fe'ryiaxNc?r
John L. Hendrun
Enginr,er inn - Genr^•ral .S... a bi 6. 00 Si .uu
Ll erical
kuxanna 1 . Frevonke
Cltr'ical _ uenctral S 31 9i uu 29.Ou _56.ov
Cynthia Rustsel1
Clerical - Uenerul 3- .51-•9; _ �1.5u 2q.00 ._._ 1Su 50
t''cr :ices Icatale r° .vv <,6)S. 5v :,b:.S. 50
Reimbursable Expwrrmets
uate Cost. Multaplictr Amount
i
Reinrbur eatrlet Lxpensa
AcrYlic Concepts a v4 -HJ la->tl. I 1. 1vv 118.91
M1 sceol 1 ar reaous 3 1;3,8J S.u19 1 . 1 uv S. 39
RO) Mbcu-seble F>tperrrse total 12 u
Mileage iMersorr.al L.ar r
Mi 1 eager S 1'S-&7 Al . <<; 1 .i,vu 51. 25
1411eagQ S .51 bt lv.ut. l .uuv iv.00
Ili leagca kPor scn,al t.ar r total 41. zh
Protc��:i : ''d.`.SV;v.VVi, k _...,.orr: Lr. Jr Ur e.<'dSVY3, � lnvoxce No. di}�
i,r.,.,=trucJion NnrutotI.uq J r,prIJ 4, 1vH7
t-'aue rsvAmber
Reimbursable Expetises
k-os,t I* I t pl ter Hmount
t.�co�Ur_u a.rblu t.ot.al1 163.2jb 161k.55
Current 04ar gesI t,as 05
Uutctar,dinq A/R
Locumrnt Vattr I ypo t4mot.tnt
844 3-seu -Si Invoice .t,S10.titU
total Receivablest 1,310.uu ..{, SJ V.uV
total Uu,a Ihis last': 9, 14i .u5
Hged Roceivaules
Lur-ront 31 6V days 61-9u days 91 11v days ialr days total
5, 14:.u5 VV uu .VC+ vV fir, 147.V15
Project Billing Summary
Pr inr Gutfent total
ProtettQiorral Ser-vJCVS 11 , S4 1,6i3.5V 14,k0S.d4
Reimbursable i_xpt;nsre3 d.h9 1tS.o5 392.:14
Consultant Expewaea 1' 1 .uu iu 121.00
l ot.alI II ,s8ri.4.).5 ,63/.VS 14, 711.u8
Iota! 13alanc:E inter S, 14i.V5
�,Q:S WSY{ARTwS YAr
lr".P.oP�tA .
C.O. h 7
CAG-022-85 --
CITY OF RENTON
PUBLIC WORKS DEPARTME14T
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT HONCY CRCEK SANITARY SEWER PUMP STATION & POWER, PHASE 1 , SCH. C 8 D
CONTRACTOR R.W. Scott Construction Co. , 9840 Carr Road SE. , Renton WA 98055 226-4457
SUMMARY OF PROPOSED CHANGE Adjustment - Corrections to C.0_h3 and h6 and added items.
C.O. h3 Adj. : $3.529.21 figure was transposed from correct $3,592.21 + $ 63.00
C.O. h6 Item 5: Perimeter fence included at $3,022.50 should be $4,312.50 + $ 1,290.00
Add receptacle plug for generator conversion + $ 212.92
Add additional fence gate for closer generat + $ 593.40
Access to power panel
SUBTOTAL — —�— $ 2,159.32
—_ _— WSST @ 8.1% 174.90
----- ------- TOTAL ----- -------- $ 2,334.22
All work, materials and measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the, type of construction involved,
�RIGIIIAL CONTFt/(CY` - CURRENT CO14 RAC7 ESTIP'JiTEti ' E7 HANGE� ESTIMATED CONTRACE
AMOUNT I AMOUNT I THIS ORDER TOTAL AFTER CHANGE
$2,334.22 $216,725.22
SIGNATURES: CONTRACTOR ,__-- —_ DATE _
PROJECT ENGINEER DATE `
APPROVED BY ` ` _—
DATE
kPOblii—c Wrrks Director
HAMMOND,COLDER III WADE LIVINGS, ASSOCIATES, INC. n 24MELro, O�
CONSULTING ENGINEERS LLLS IJ LS (lUW WL vJIS
4010 Stone Way North
Seattle,Washington 98103
O.R �O..y,N.'O
(206) 6322664 ',Z - p 7 G 5o;f
.TT[nT
,�'OfJf.Cr rCfSTXeY .
TO "`
Cis/ / /✓ .Su%�9C V eJ J e �6,CiIE'Ut' .
P[lrYGic_ J Anso �ir,dSE 1 .x 'v�dtu E, d
GENTLEMEN: — —WE ARE SENDING YOU I Z-Attaxhed i Under separate cover via —.---the following items:
Cl Shop drawings r] Prints ❑ Plans Ci Samples I Specifcatrons
L-1 Copy of letter ! Change order ,e7 /l.+ )40'
COPIES TE YID. o[scellTiON
THESF ARE. TRANSMITTED as checked belo.::
❑For review ❑No exceptions taken ❑Resubmit --copies for review
For your use ❑Exceptions as noted ❑Submit __._.copies for distribution
C As requested ❑Returned for corrections ❑Return_corrected prints
C For review and comment 0 —
REMARKS
COPY TO
SIGNED: Aeaee4Q4 sv
Ir.nflemr.[ �ry not .[ naf[tl, xm01) n011ly ya N aaN,
HAMMOND,COLLIER d WADE- LIVINGSTONE ASSOCIATES. INC.
CONSULTING ENGINEERS
1Y49•IOB6-43 YEARS OF PROFESSIONAL SERVICE
401 D STONE WAY NORTH
unnvn..Of PE SEA17LE.WASHINGTO� 961030090 CONSULTANTS
nnuc[I.VINGSTONE.PE TELEPHONE f20616322664 GEORGEn H...ONO It
n.ND.0 O H If"P.E O PC
rn[OCnICM C n[M1 I.SO 562 T TOT 1 W.SN 'IN,,I WIILIAM P COEu[n Of
.P
GENE ITNKCNEN.PE
NILS n,[LSTAO PC PO BOX 2967
HAnOLDE n.1NA1EPC 30:SOUTH MISSION STREET
DALE D ENwNE_PL& WENATCHEE.WASHINGTON 9BB01
KENNETH E.COONET6k PL4 TELEPHONE I5091662 1762
March 30, 1987
Mr, Robert E. Bergstrom, P.E.
Engineering Supervisor
Public Works Dept.
200 Mill Avenue South
Renton, Washington 98055
Re: Audit of Pay Estimates a1-9 for
I
R.W. Scott Honey Creek Construction
Contract #CAG022-85
Phase 1 Schedule C&D
Dear Bob:
Enclose: n a spread sheet illustrating a record of progress payments approved by
Renton Public Works Department for payment. We did not make a tally of actual
payments made to the contractor, but reviewed the approved final sheets from the
files you provided. We find:
1, lhat there are several adjustments on change orders that should be made.
2. The final quantity for Schedule D, Item 2, should be 623 rather than 673.
The extended $1D,591 amount is correct.
Perhaps the easiest way to clean up the detail is to prepare a Change Order N7 to
include adjusted items. A copy of a proposed change order is enclosed for your
review and consideration.
I also reviewed the spread sheets with Ron Scott and he is in agreement with the
changes noted.
Sincerely,
HAMMOND. COLLIER & WADE - LIVINGSTONE
ASSOCIATES, INC.
:ifZe. -
Frederick G. Kern, P.E.
Enclosures
W22-127 °lwlrtcsrwy ertt�o�EE..../e/r:��/ (tsars .?
f�rysr.e�� r. O. 411'7
nEPE.TD gEunE[ nP[IMTCN[E
• Qua 6 to 1"m rs FUMM mdws
ibgiEt: pair a+ i�slb. f of 2
,ugtiwf.t,ii F.M. 5ctxt wastrrct,os Lawn.
ra4r .
•
YlptsELlt Mere• rea aegaee uo itatiot aid tretrain Purse 1 .
• ic►ewle L - Foe itatiot wdMErG
FA, Eat. it No E51. s1 pAt OF. 13 PAT Eli. i4 pill Of. fq Pot 61. fa FA# Of. 1; No Est. to PAr�Estt.. 0 Fl*mL APRIL W1v •
• not id AN 95 Jai 15 wl Ib BLI 85 a w 85 FEb M ______ --
• slv ,1LI.df
«tGl:tl ALGN ALLM!I tAbtltl ALWM AL1A11 tiLt4Mt t L1M AEEA •
Ae. Ito KKkifilFtb !ill Kid mm"l mXk* filBifft AllbiMfl ,tNdNlt ---
NID!M!1 -i ---- l -----
-' i
-- _.
. 1 5ltgrerl is It .wv.w --N,15a.w fly ro it5.3w.W ►IS Ivi w ilS.Svtt w ii5,3w.w 115,3W.tnt i`S w•i.w 123,406.#k4 i23.#tbtr.vo
t Nitwit itrsee Li *6.wv.w iv.w f[J.vw.w W,vw.w $4.vw.w 1[S,vtw w fiS.virt.w f23,AitY.i14
3 Vail" fiptnd Ls {ll,wwe.w W.w W.w W.w W.w W.w 19,1N.w
fti.#Nt1.t6 Ill,wv.w ikl.wV.6v 1il.trov.ir.
4 Li tir.vw..w W.w W.w r'.w W.w sto.otio.w lu,bW.av ilb.wp.bb !}b.ovo.uv liB,a�.4e 11B.t1Gb.vi
• r is:t to Hl.r+rr.w W.w fv.vv w.w ii,l9§.vv w.bb.w sb.bW.vv fb.e0.t.w 1! .14v.w ►k3,w6.tr+ 113.66o.1v
o Erclgfrr Ls ii3.•.w.w W.w, W.w, W.w ii,bw.o4 "'Xi.w 1B.s42.w ltS,vw.w {fl.,»iv.w ►t3.v44.W t13.vW.ait
•
• v-1 Kaye brow Si rsei.i5 Fia1.35 iBe1.35
1 JaWarl Force La lao1.35 ibel.i5 sgti.SS {bei.15 foot.SS 4rei.35 {bni.l5 lu:t.s` •
• r[ Lux" •1riw ![ 1•,[S.•.a+ ►4.13v.w N,tSv.w 41,tSv.w N.15v.'N 44.2w,w 44.[5v.w {4.2%.w t1,t54.w.•
l LmpletN but treca;enable ►s i4,tSv.w •
• eastilt- bast grt so* to slide !fk.ebv.wr
t MoleIitO19eT it tif:lS ii ll,lin:.w ,it,prv.srot .l:,orv.w� +{1.oB+!.vat !ik,erv.wt <II,oBv.w• tik.bBp.vi, /1.tgr..44, i{I.biil.Vni �lo`.7t.wi
dtSv.vv+ ui54.4Y,
S lrciete Atp-FW let Li W15o.a: <ti5v.wr .{i5v.v+i, 1f t_'4•av� •l,Sv.wt +Ii}i.wr t115v.w- i-[,41v.W
4 b,/-ei/ paM ib {t,41v.w 41,4tv.w 11,4[v.�n i'.i[v.w f_,4.,.w it.+ar.W 1[,4tv.wi 1[.4h.w f[.4ib.ov IoeV.r. •
• 5 Fit oat hr rid-Mal Lfi isto.a.. itbv.W U".vt+ luuv.a, toay.w 1ew.W {aw.voN6fr.it
s FeeeiAIIRst,a tibtr a it &ta. rettatii t6 1t•uW.w Y't.wv.w 1[.wv.w it.vw.w tZ.vw.vi. s[,sitb.it!r 1[,wv.u4 ►2,t/a11.14 fi,vw.;r.
•
• b-S FLye Yuen SS - trce ac.:awt x•
For systside tart rsaabtiitaloR i3,S?i.Zi IS.Srt.Zt i3,S4[.[I 13.5--t[.11 {3,5402-1 {3.51i.[k f3,592.2i i3,5Cr.:'i i •
i Labr lb"14104 pwalt b loan Li 13,59t.t."
• pigs MI tlrrraad 4 Proitt �, ,y3 IS.t�.e3 i5,lt�.b3 /5.idX s5,1B5.B3 f5.IB5.53 ►5.185.55 15,!75.53
2 Wrtais LKIN101M lS: it b F Lb 15,1b`_.!t3
Fjstlrtt ibcigdiy 15: b E F Li fi.b1.r.vi s5.telo.+k 15.63ir.uB 15.d3v.ltb ►5,53u.•rd f5.i34.vu is.blo.vb fS,iSs.vd {S.B3o.u6
• 4 isrW EltiNegt /nc15'. ,St l5 f;33.� i33s.4B i31).4i0 IS.i;.46 /313.+6 1333.48 {SSS.eB 1333.48 {333.48 •
u+arbebl i Prs4,t •
• a fi 16,5or.5t ii ib,fSt.?4 to 68,756.ir to f6.+5a.+4 it M,SW.+' tr
wi tha►ge wde• N Lip 46,;5t.
t3,iN-.i1 ►3.Wi.14 13,B4;.i4 lS,b4i.24 •
r-5 Lbaw Ufder /S La fi.N:.ti
{S.t9u.bv its bb
v-t a"6ar;e t?rW Y. �b i5, tivAr
It,Ib,,jt •
• o-w j,taw yAer 4 t/rrrt"". ____ la lt.i5r.tt __..-- -. - ._. ____. ----------- ___ -------
---
___- __ ____r___._ .__ —_—_ -
-_..__ ___—____ _ .vo',w Sv.Svo.9B Nic.1V"r.'S *lS*,v44.vz •
icbtlite L SeAtetils a ir,lated, iS.ltl.15 64a.bbi.35 141.60/.95 ii.....i. #� .
ai 1354[.[1 Je6grt rA1M sn sKt,ak Pa• fe4tests cet�eci but r,atrr !rass/usN er. came or srr I3 eeetutea 1[ Sv llc.
• n Lbaye rdr anent sbfwld be ndted di fa,Svs ft. lei ii.i t.5i. 1F.la.wNlef wi AMr/td dried cbar4e erdaflw ! •ate: try :aeeade6 cantors cadet If tae:ated ia:w+Ec is cxrect. .
a!i crested Cba►4e or"r M "tee 14 lv:pia 6te nat enclWe sr;tral t-eras of NW
•
i
•
•
e
e
e
• 1MMt OF bit IILK 111111 YltME66 P tMEMi6
t0 tk: Lit, of keetac udti P„i.iJit Y..N. x641 wastractim, toepxiv •
• fipu.u6l,I: itoaw Lreo be%a4e Fuip :tat.ai .ie Fmcesito phdir I
r�,. t� 1. 1'pf E51.t7 Fuf WAS Pkt ESi.IY Fl" Ilu
• 4th+date b Yuav ititea:, Pr„ tbi.il pm, Eoi.1t Pu, Eb1.13 Fa, E61.N Pe. ESLR FED /6 IIINitSI 6b AN 86 _ _AK.__-------
SL 97
y„ 6� A* d5 JUL, N5 bEPI 85 uLi y✓ �a. n; ---- -- -------- ---__-_"
Wi l ,i.l1Mt ri..Ur; ,aLllM uk.E;M gl.Wh ..um ni:O AL all +cam e
e UfII Fklot INan6u ,ifdilNi iiNitW AM1M1 (NMMTMI vie •,iNdWl all 1MIOUM!____ - ___--__--__ - ------------------
ut{iMf �Gitl
40. Ili;l! tEStkIFII6ti - .
p NWUMi Nt, AMu+Sh 61f
_ ____ _ Y # '6 v� t14
- - -. - Ik4 N26.uv 2N
• i utilit, !reach - OE t4th p:e rt it.uv Sib "' 41.N6 526 66,942.0v 673 + tiv,541.vu 673 + {lu t.1.6; d[1 fib,S41.u�
? btiltt. Ireacit - 110110 Wei Lt iii.v 14.76 t24i.6v 24.ib !24'.x. 24.16 1247.0=
9 bogy"" fra. tLi 6+ tc Irenth iiM tYv.w 161 $1b2.uo 162 ftbt.uU 262 t162.vc e
e 8 Siacvt LF il.w 31 N4b.w 31 N46.W 31 N4d.v�
S e:L fa+cunt Replateeeat Sr lle.uu bu.4 i3W.v4 bu.4 13ui.w 66.4 6302.v�
c i'6L Pivemat keplacewat if $5,uv Stb iveu.5U 5t6 i42u.5u 545 Si'01.25 S4S i1,U41.25 545 i1,v41.t.: e
i-111C11 PiC iele+Nry 11rtN1t it ii•'S 5td 110,64.0 51a $15,254.uu 653 1141.417.u4 bS3 fIB.4E.vv 453 lit 411.°it
d 4-14cn ki4id .onduit if to.w
ieleoetr, type p Fail tw+ f." $1w.w a p4vU,vu 3 f4w.uu i 44uv.w 1165v.vu 3
3 '6bv.uv 3 f4w.v •
• iv 4elesetry Noe 6 hull Yea En tSvu.w S ft.b5u.vv 3 41.65U.cw 3 61.65u.UU S lt,dSU.tis,
f' Puaer i,pe N Nil hot 4+' iSSv.v' ui lN4.vv li ltvA.Uv 1; itu4.w; Il iLW.iio i7 i284.•i
It ?over Ivpe L Pell Got kill tt..w b i4tv.w a N2v.vu d N"LU.w: •
e 11 leper xr Laid Patch tali fru.w 1 N5v.vv i IISu.uu i i15J.v.
14 Nttl/tr Vied a1td Er 4 6tlfi En #i5v.u1 Iw. #t.vw.w iw•. t. 1u6. it,VW.w Ivvi /t,vw.vu lw. it.vuU.v:
is Misc. Mil koleers 4 Rest. La it.vw.w :5S 113,-13.vi 651 113.713.Uu b53 tIS,I1 S.a,
. kb 15 sV Loadactrr - ian 6 kesti /F t21.w Iw. i1 u,.w.UU 1uU. 41v.bw.wi luv. t1u.6uU.vn luu. ilc.".," e
t!<SU,i.w•
11 fit Nmte4 hl irans+orur Lb fiv.aw.w i ii.5w.vu t 11,5w,w I 11.50.w 1 ►1,56U.vs
IN uhM La i"'w'w i il,wv.w 1
Nreras fLvwi.iv 1 Il.uvv.v: '
. lY kestoratidb t t.lwaap Lb 11,wu.w __ + . ---Nl, ---- -- - ---- 1.b5 -- --------�< L ---- ----- N4, l.n.
ab
Scb"ute N babtotds iv.w iv.rt iv.w iv.w k'•-v " •
e fi-4 a
Wyedvle b WOWS S !, iu.55 Nb ba/.a5 ibi.avi. 5 ltb,4u).45 iN6,dai.45- _ - ---- . 64--- '--- --
v f13u 3v6 46
i13b W b •M +
• a. I;,tal Scheoet es 6 < i, ►5,i11.35 t40,bb1.35 ibi.ovi.45 fle,ivi.ir5 #6E,66:.15
t6b.b. it.333.v. f3,tNP..is S4,"5.I(, f4.433.4u io.+'t4.:fv
l6.3,S.ut l4,tS7.N ikU,v31.4b fu.vu
b. fetaiaa4e c5'. x a, ftUii,4M5.87 •
. 115b,511.{b ik8S,N11.34 iI4U.bU .aS
.. Ex+tags Fayaele Ws tit 1i-1, $4'V4.7b $44.SLB.ty .`d,5tt.bu f'S,vSe.fiS fPH.tSa.SS i13i,533.t3
i1S,515.7u f1S,714.b6 $16.451.81 f16.234.34 •
• e. aai.s lip -0.11 1 iu Nii.ui lS.i74.5r »,4d4.84 tb,u4.w ii,l6Z.i1 !11<tN.44 -_
fJ,tbY.bV $46,1ue.d5 !b3<51t.W fi4 2b5.v1 14k.41b.ai 1141,•46.11 i1-2,y33.-b
i2uu.7�u.NS {2vo,654.#b /21a.i'tS.i:
e. dbmt 6ae T6#e EstL"te 4c+d+ - - - $216,125.23 `
• -Naad total is+#) +
`•B.S+ t5v,44v.4t it.SYt.rr /63.i3i.vk l45.il5u.iro i144,b1v.ti1 /kiKi,376. b
•
• + tvpWaphicil errs, 6)S sWald be eta
e
•
•
•
•
U*, '-
CITY OF RENTON • DEPARTMENT OF ENGINEERING
MUNICIPAL BUILDING, 200 MILL AVE. SOUTtt, RENTON, WA. 9t3055a235.21531
Hone.I Creek - Phase I
PROJECT Schedule "C" and "0" PROGRESS PAYMENT ESTIMATE NO. .L1 (Amended Final)
ContrB:l No.. 022-85 Contractor_R• w• Stott Construct len ComVanv Closing Date April 1, 1987Sheet of
Ite< Est, PREVIOUS TOTAL Tt-IIS ESTIMATE TOTAL TO DATE
No. Description Unit I.Inii Price Qty, Qty Amount Qiy Amount Q1, Artpunt
i
Schedule C Pump station Break- •
down of Lump Sun Bid Provided
By Contractor Determined Reason-
able Distribution by Hammond,
Collier 6 wade-Livingstone
Associates, Inc, II
-1 Site work LS $17,000.00 1 1 $17,000.00 S17,000.00
-2 wet well Storage LS 23,000.00 l 23,000.00 23,000.00
-1 Vnives and Pipi"C LS 11 ,000.00 1 11.000,00 11,000.00
-4 Pumpu LS 18,000.00 1 18,000.00
18,000.00
-5 Electrical LS 13,000.00 1 13,000.00 13,000.00
-6 Enr?osure LS 13,000.00 1 13,000.00 13,000.
0-1 Change Order No. I
I Temporary Fence LS 861 .35 1 861.35 861.35
0-2 Change Order No. 2
l Completed but Unrecoverable
East Side Bank work Due to
Slide LS 4,250.00 1 4,250.00 4,250.00
2 Delete Ecology Blocks LS (1 ,680.00) 1 (1,680.00) (11680.00)
3 Delete Riprap Toe 1.S (150.00) 1 ( 150.00) ( 150.00)
4 Riprap Bank is 2,420.00 1 2,420.00 2,420.nO
5 P : Run For Riprap LS 660.00 1 660.00 660.00
6 Foundation Under 6' wet well LS 2,000.QO l 2,000,00 2,000.00
SUB-TOTAL SCHEDULE C
1-3 Change order No. 3
Force Account work For East
Side Bank and Rehlbilitation
I Labor, Including Payroll,
Taxes and 207. Overhead and
Profit LS 3.592.21 1 1 3,592.21 1 •;- 63.001 '.529.�
2 Haterials, Including 15X
Overhead and Profit LS 5.185.83 1 51185.83 1 5,185.83
3 Equipment, and 15% Overhead
and Profit LS 5,830.08 1 5,830.08 1 5,830.08
L Rental Equipment, lnclud;ng
152 Overhead and Profit LS 333.46 1 333.48 1 333.48
i
v-4 Change Order No. 4 LS I ..8,756,79 1 1 8,7$6.79 1 (-2,250.08) 1 6,506.71
0-5 Change Order No, 5
E"rnency Repair LS 3.847.24 3,847.24 3,847.24
U-6 Change Order No. 6
i Miscellaneous and Fencing LS 5.290.80 1 1 5,290.60 1 5,290.1&
0-7 Change Order No. LS + 63.00 1 1 + 63.00
+1,290.00 1 1 +1,290.00
+ 212.92 1 1 + 212.92
+ 593.40 1 1 + 593.40
S 2,159.32 5 2,159.32
*136,197.78 ( 153.76) 136,044.02
• Transposition Error in C.D. No. 3 (Co rected in C 0. No. )
• Change Order Anaunt of $6.506.7 is c rrect. $8, 56.79 al ount ol tained by inc rrecti
adding rather than subtracting redit originally
+ C.O. No. 7 includes corrections for C 0. No. 3 an C.0. N . 6 ani C.0, 1tems ihadver ently omitted
01, CITY OF RENTON • DEPARTMENT OF ENGINEERING
• • MUNICIPAL BUILDING, 200 MILL AVE. SOUTH, RENTON. WA. 98055. 235-2631
Honey Creek - Phase 1 10 (Amended Final)
PROJECT Schedule D .__ PROGRE_' S PAYMENT ESTIMATE NO._
3ontract No._'?2- 85 Contractor R. W. Scott Construction Company Closing Dntc��//t7 Sheet2 of,-,Z
Est PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
INo Description Unit Unit Price Qty Qty. Amount Qty. Amount Qty Amount
1 Utility Trench NE 24th Ave. LF S 2.00 1280 214 428.00 428.00
2 Ctility Trench Unimproved Area LF 17.00 580 "673 10,591.00 ^623 10,591.0
00
3 Bank Run Gravel Class "8 ' For 247.60
Trench TON 10.00 100 24.76 247.60
4 Saw Cut LF 1.00 2560 262 262.00 262.00
5 A-C POIT Repl , SY 16.00 250 31 496.00 496.00
6 P.C.C. PVMT Real . SF 5.00 10 60.40 302.00 302.00
7 1" PVC Telemetry Conduit LF 1.75 1900 595 1,041.25 1,041.25
8 4" Rigid Conduit LF 29.00 580 653 18,937.00 18,937.00
9 Telemetry Type "A" Pull Boxes EA 900.00 5
10 Telemetry Type "B" Pull Boxes EA 300.00 4 3 900.00 I 900.00
11 Power Type "C" Pull Boxes EA 550.00 4 3 1,650.00 1,650.00
12 Type F Bedding TON 12.00 220 17 204.00 204.0
13 Temo Cold Patch TON 70.00 10 6 420.00 420.00
14 Utility Vault w/exc. ' Backfill EA 150.00 4 1 150.00 150.00
15 His. Hill Holders S Restor, LS 2,000,30 1 10011 2,000.00 2,000.00
16 15 KV Conductor Furnish and
Install LF 2.1.00 580 653 13,713.00 13,713.00
17 Pad Mounted Oil Transformer LS 10,600.00 1 100% 10,600.00 10,600.00
18 Hydroseeding LS 1,500.00 1 1 1,500.00 1,500.00
l9 Restoration 6 Clean-up LS 1 ,000.00 1 1 1,000.00 1,000.00
64,441.85 64,441.85
Subtotal Schedule D
64,441.85 -0- 64,441.85
Subtotal Schedule C 136,197.78 (-,53.76) 135,044.02
a TOTAL Schedules D and C 200,639.63 (-153.76) 200,485.87
b Retainage 5% x (a) * N/A N/A N/A
c Credit Return Due From R.W. Scott o City of Renton
(a) - (b) this Estimate (-'.53.76)
d Sales Tax 8. 11 x (a) 16,251.81 (- 12.45) 16,239.36
e Credit Uue This Estimate (c + d) 216,891.44 -166.21 216,725.23
f GRAND TOTAL (a + d)
" 673 is typographical error actural quantity is
623,$10,591.00 is correct.
i
��je�
DATE_ 3-26-87 CITY OF RENTON P.O.No. 40455
REQUISITION
DEPT. Public Works/Utility
ACCT. 421/OCO/15.596.38.65.19 $ 2,046.33 VENDOR NO.
ACCT. $ PHONE NO. 255-5726
VENDOR NAME AND ADDRESS VENDOR "REMITTANCE" ADDRESS
Edlund 6 Associates SiI T'IV
15 - South Grady Way, Suite 409
Renton WA 98055
QTY. DESCRIPTION IN DETAIL M1Ul1N'I'
L.S . Honey Creek Sewer easement landscaping repair
Honey Creek Park Plat Cul-de-Sac
In accordance with letter from Edlund a Associates
dated March 6th, 1987.
Subtotal 1 ,893.00
8. 1% Sales Tax 153.33
Total 2,046.33
CONFIRMING
PURCHASING TO ORDER AU'FII. BY: H
EDLUNDASSOCIATS
f INC
Landscape Development
March 6 , 1987
Mr. Frederick G. Kern, P.E.
Hammond, Collier 6 Wade-
Livingstone Associates, Inc.
4010 Stone Way North
Seattle, WA 98103-8090
Re: Honey Creek Sewer Improvement 2850 P3
Eastman Residence Landscaping Restoration
Dear Fred:
I have reviewed your letter of 23 February 1987 , and have visited
the site. My proposal for landscaping restoration is illustrated
on the attached Landscape Plan dated 3/5/87 and outlined as
follows:
1. Lawn: Add 4" topsoil, rotovate , finish
3raae and lay sod in area so identified
on drawing (780 s . f. ) $ 822 .00
2. Planting: Install (18) Pyramidal Cedar
r 3 . , 3 ft. on centers 323. 00
3. Bark Mulch: 211 depth under planting
(2 Od sq. 17t. ) 108 .00
4. Crushed Gravel : 1" depth between hedge
anU cu - e-sac (2P8 s. f. ) 165. 00
5. Mobilization, administration, design 475.00
(� �Q (� $1,893. 00
RE � L� I� V LS D Sales Tax 153. 33
MAR - n 1987 $2 ,046 . 33
►rQMMOND, COLLIER & WADE
"TINE ASSOCIATES. INC
1— _15 South Grady Way Suite 409 Renton,WA 98055 (206)255.5726 (206)363.1225
Mr. Frederick G. Kern, P.E. March 6 , 1987
Seattle, WA Page Two
I will review the drawing with Mrs. Eastman, and assuming it is
acceptable to her, yourself and the City we can proceed upon City
of Renton authorization.
Please call if you have questions.
Sincerely,
Gerry 41xund
Landscape Architect
GE/jr
Encl.
iI
I
I
I
HAMMOND.COLLIER at WADE —LIVINGSTONE ASSOCIATES. INC,
CONSULTING ENGINEERS
1943 1986—43 YEARS OF PROFESSIONAL SERVICE
4010 STONE WAY NORTH
LARRVN WADE PE SEATTLE,WASHING'ON 98103-8090 CONSULTANTS
BRUCE LIVINGSTONE PC TELLPHONE (205)6J2 2664 GEORGE R HAMMOND.PE
RANDALL D HERRALA PE 1 1300-562'7707(WASH.ONLI) WILLIAMP COLLIER PE
FAMERICR G NENN PE
GCNE OFFENBECHER.PE
NELSRIELSTAD PE PO BOX 2967 --�.
HAROLD E RAYNARD PE 302 SOUTH MISSION STREET 1
1
DALE D CIAMPL PLR WENATCHEE,WASHINGTON 98801 RECEIVED I
•ENNETNL EDINGTON PLS TELEPHONE MOW 662-1752
March 23, 1987 '
MAR 2 4 5987
MINEER!II!G YPT. I
Mr. Robert E. Bergstrom CITY OFRENTON
Engineering Supervisor -----
City of Renton
200 Miil Avenue South
Renton, Washington 98055
Re: N.E. 27th Slumping
Dear Bob:
I briefly discussed several ideas you and I chatted about with Ralph Boirum. (See
memo note to Ralph). The general conclusions were:
1. Tight quarters to rehandle matellal made the fabric option very expensive.
2. Loose fill , even if a post-tensioning system is used, would require a wall to
contain material .
Lewis County personnel I met in Pullman last week mentioned they had used light-
weight bottom ash to fill a road slump void. The material they used was very
pervious and worked well .
Ralph said they had used the same material in correcting slides at Perkins Lane,
and gave me the name of the hauler.
Costs are higher now because the hauler isn't able to haul sludge from Metro and
backhaul bottom ash.
I 've enclosed a copy of a memo discussing detail with Dan O'Neill .
Sincerely,
HAMMOND, COLLIER & WADE - UVINGSTONE
ASSOCIATES, INC.
Fj r�. Kern, P.E.
Enclosures
W22-103
RERLVIO USEATTLL ❑WENArcNEE
HAMMOND. COLLIER 6 WADE — LIVINGSTONE ASSOCIATES. INC..
CONS.JLTING ENGINEERS
CONVERSATION RECORD � 2
i)
Phone ❑In Person
Talked with , h�� Date: Time;— —
// i
Of (T NAe; J_ Phone No. 7S`< j72 Z
Re: - �� Job N-, ---
N' Placed Call ❑Party Called
SUMMARY OF CONVERSATION: w��� � GlsL Zyt/�IeP� / ivc.
,Gs-L �iZZI GwQ/ a '`
;,,tu.�'•,/�-cam .c;��,-.�i,�ceC 2G�.G .G+
�k w
920
ACTION OR FOLLOW-UP: /500 'r(YARD pa S•!
,c
iC', p,v S,+ /i> /NyGAGE /VT• ABadT ZOPcF. So _ SGf�ef ,c /5
-C Y. �•.ac s�aCe( ca.y( ,vl.L�..� /.V f�A�t .
ey
Routing:_ Signed:
Return to for filing.
6-i3 $ 7
o� 114 7
�O
Y \
�T ♦
ell-
��
—7� �V /�
/ / �/
�E%�. �Lc�t/T ,:-ECG GG<O`t�G_ / —z-r�.�ie2�- ,� '�
�o-���-�E ��o-- �� .�Pad � ,,�.c_.
��
,4_c�.r�c .��.
emu.-�-.-�._ _�fc-� Q_��� �� ,�-r�- u�-e. c.�_,�.._
��t..s-z�-�_ ,-
��
21
3-2047
AV
.�
)1A.0 -
HAMMOND. COLLIER & WADE - LIVINOSTONF ASSOCIATES, INC.
CONSULTING ENGINEERS
4010 STONE WAY NORTH
•[.LTT LE, Wk9HINUTON 90103
TELEPHONE: I7061 3]-96[4
March 23, 1987
RECEIVER
City of Renton MAR 2 4 148T
Dept. of Public Works E9r,11101NS nrPT.
200 Mill Avenue South Illy a� P[non
Renton, Washington 98055
Statement No. 30
Statement of Services - Honey Creek Sewer System •toe NO.
February 1987 Services.
Project No. 28503.000: Operations troubleshooting improvements at Honey Creek Pump
Station. Initiate work order for landscaping at Eastman property.
$ 2,310.00
Project No. 86151.000; Slumping study N.E. 27th. Services of geotechnical
subconsultant, Shannon & Wilson.
$ 6,288.76
Sub-Total : CE_8,598.76
Outstanding Accounts Receivable, Billing Statement No. 29, February 17, 1987.
Project 28EO3.000 $ 2,131.25
Project 86151.000 6,283;119
TOTAL AMOUNT DUE: $17,014.00
ACTG-71
cKjal PAy4i
Hammond, Lollier La Wade-L lnc.
40iV btone Way 14.
t*oattle, WA �F11u3
Projects ekI5US.VOV Rentorrj l.ity of ,185(W,5) invoice No. 8414
Lonstruction Monitorinq 71 March 20, lYai
Paqe number 1
I
City of Renton
Public Works Dept.
200 Mill Ave. S.
Renton WA 98055
Professional Services
---------I------------- Urte Hours Rate Amount
Senior Engineer
Frederick U. kern
Engineerinq -- Ueneral 2-15-87 11.5U 62.00 1 ,333.00
-28-8i 14.50 61.Uv 899.0U
Clerical
Roxanna 1 . Fresonke
Clerical - Ueneral Y-18-83 <.VQ 29.UO 58.00
^ `
Services iotalt ---311.U0 2,2YO.00 2,290.00
Reimbursable Expenses
Uate Lost Multiplier Amount
Mileage (r+e.-sonal Lar )
1•li l eage 2--15-&-/ 1v.00 1 .wu 20.00
llileage (Personal Lar ) total 10.00
Reimbursable totaiz 20.UU 20.00
Lurrent Lhargesi 1,a IQ.OV^
Outstandinq AM
---------------
Document
__- Document Date lype Amount
79 ::-i/-EI/ Invoice 1, 141 .s5
igtal Receival:lvsr 2, 141 .2b 2, 131. 15
lots! Uue Ihis laski 4,441.25
.. 33
F'V711
o,)Oct a 2a5u3.u0(J kentoni Gity of cm5uF3) Invoice No. 844 f
Lonstruction Monitorinq i! March 20, 11?87
F•age number
Aged Receivables
Current Sl--bu days tot-Yu days Y1-izu days 1� 1+ days Total
4,441.25 uv 0u .UC! Vu 4,441 . 25
Project Billinq tiummary
Pr i or Lur r wit 1 of a l
Pro+esslon.tl �iervtces Y,r:4v.34 :, :vu.vu 11 ,5.Su..5
Reimbursable Expenses eua.b9 1uU.vu Z;+y,bY
Consultant Expenses 1:,�1.0v .vv 1<l .vv
lotala 9,510.4m 2,Slu.uu 11 ,880.03
-------------------.-_-_...__..___.__....__ _---_._.___________...__.--
{ lotal Balance lluel- 4,441 .25
aaacas aa�-oc
f
a
I
9
Hammond, Co11 xer & Wade-l. Inc.
4Viu Stone Way N.
Seattle, Wk 981uS
Protects 8615L.uuv Lit.y of kant.un Invoice No, W45
Honey Creuk 5lumprxnq Study March 20, 1987
f'age number 1
City of Renton
Public Works Dept.
2UV M1II Ave. a.
Renton WA 9BUS8
----------------------------- __-- •---
Consultant Expenses
------------------- Date Gout Multiplier Amount
Gonsultant
Shannon & Wilson -28-87 b, 717.i�5 1. IUQ 6. 88.76
Gonsultant total 6,.'88. 76
Consultants totals 6,L8f}, i6' 6.288. 76
Current Char gear - 6.2dC1.76-
Uutst.andinq A/H
Document Date Type Amount
78V 2-17-87 Invoice 6,183.Y9
Total Receivables 6.28N.99 6,283.99
total We This Tasks 12,372.75�
Aged Receivables
Current 51-6U days 61-9U days 91 -11V days I;el+ days Total
12,572. 76 UV .UO .VQ QV I24b e. 75
Project 13i 11 x .ti Summary
Prior Current total
Professional Servicras 6':.S9. Yu .klV 6,239.YU
Reimbursable Expetines 44.vY ov 44.09
Consultant Expenne'; .+"+. 6,288. . 6 6,28Td. 76
lot ale 6,28 S. YY 6,28b. , 6
i
I
i
• F 1NANL IAL SLWfARY • • •
• y EFy, SEWER ENSINEEkING SEkV_GES
For City of Renton. WA Inc.
u Collier- L Wade - Livingstone kssociatas. Flood Dx+4e 19 J2r 25lB6 RFk Letter WA. N.LS>.
By Nateeard , 66,r9v.i7 li l,u13.61
Protect No. 285(a and .aub-Phase Deal gnat iaans AeBatr 20 J3717.M u3,wrkb Hates !l5,ele.W
rre•tons Sr2L87 Ker. 21 W,IJ,kb N.57SA5
krwetn oral 4699.b5 616,31b.52
Ser.tces ter. Is.olce "thwizee „earls Cutest Alert 24 oi,i24e
Ao. bate vathar:zattua Arent killed itiliee talked 25 W)29)ib SL,28l.3e 116.6W.Ik
r
utevw4 _ ------------------------
______ _____— ____—_____O_-___- _ b,e4L.W l47u.75
1 v9728r81 peeneertt lS6.Yw f,,b{L.w front Faataae ,.6u{e 17 IL11,66 REb Letter H7u.15
Wnc vest's 61 ,IY,2B3.W 616,915.uv 6ahiml dap lu,io:6e
t lnrv5!b{ f16.2A6.uv 135'eb.vv
3 11r1u,W 'b:W'94 6S,uBl.uv IA'All.w) IL.458.94
4 IGW,i6 avetatt"s gallant, tk IGIu,66 kill wth. 6[.458.94
113,669.vv I51,SS,.uU i[.131.25 f4,59u.k9
5 v1,15,85 t54 15v.ui, Sur-ey, fla. reamresen 29 2,1i[ki
i nb ILBS 12'793.w 36 idd.117 112.31v.W b.4uv.19
11 u'6,N,65 ii^.W 656.uW.W
b v1,14,k5 seen It v3:vb k3 lls:rlu 11,1N.36 19,I;v.3e a6.LB3.99 Ie.LB3.44
Carr Sups. wblyn A. E. Lith Si ueotM 19 Gl„8] iEi utter
k OP10,k5 nenMenl t6.><,v 67.823.24 17,61J.14 61dr
W In tl
1.1J,6i 6c b,2kb.N 1J45i[.75
Eaxtrec tr on 6t6 ul.16
Sar.ttes 4 u1,N,k5 IS , N6,e14.a6
iv OS,lbva u3 ..-b5 l22,Sb5.W
Peana 19,a9,i.4u iSS,Yt9.k6
Phase I !Kn h654 11 v6,14185 b,365.v1 Na296,ki
Phase 2 Ion, 045e 12 u71l:45 615,[•f.l! I77.Suv.iw
IS u6,12,95
c Hv,4Stl.47
Wnstrticne• iarnut IS u9,IYlkS .aeonexrt ItS,c,v
t4,411.4U
netts/IV U lwill'k5 N tease ; {6,62b.15 ►u,Ll t.l[
N iMtl ivrl!5 I% 11[2e,4 lm It-bS
iS.ii1.[b r
faun West to vLi3+M Sib I3,;;S.tk rr Advised City of probable extra reun6 taxing set o, _es eel atsd to
19 4G 15.is 624,9t3.65 ka'as $1.1;'.15 151151.43
NeslteriM IW.ut1 b Changed construction schedules:
14 v[:tS,16 1i64. / 7/85 L
tv u3:I; 6e 75 iW.434./1 05 OS/17/BS )
6i'V96-15 {SL,k37.eb Lorr"Pondertce
Lt vi,to 66 /34,16v.91 118/12/85 )
L2 u5,ter Il,lt3.614/347/BS 1
23 Ve:IGka f1,56i.59 135d".50 11/27/85 )
24 v:,12:64 61,356.84 63:,WLN
35 Vol 29,is 61,WL.vv Ub.Sk3.N
26 U4;nrki
f1.119.W Ilu,ii[.34
142,.w f4R.uu
E3btett eaptM L4 wi,xti 6 RE6 let 6,1b:66 t,e1 W 1 Clril f y that this ring sair ices
csummary ges o the
L1 t e0en 9
25 6k,26,W Uw.w professlonai er,glneer ertg set �tces charges to the Lt ty of Renton
<D Wr1i,b fl,vly.[1 li,tlt3.4 Horsey Lreek Sewer FFroJect as compiled iron time records, expense
/6.itc.5V charges and subconsul tart statemsints. All charges have been at located to
bup. i,5. lisittM, ad 14 OO'Nl85 fkb to 1u,G,kS Ste. hates 15,826.5u pro Sect phases and tasks during the time period perforwed and ut
W uk,I3,k6 fFk Letter Stl. i1,vLLW 11,4/t.u, acce•r dance with letters of agreement and authorazatton.
D i A µb4,5y /2.410.5v
llassai 19 bG 25.is IG Lv,85 iatet
a oil this bir.trl $5.W7.28
21 J4,lvrktl 61,95i.ik
22 W1646 {47L.0i i5,5t4.26
IlSY ti, 6SAi4ip
23 WAL6e fh6t standi ng invoices as of V'r 23:8/:
i< d7,4L86 63.u5f.39 W.R6.27 Stateeent No. L9, dated lit, 1/CIS/
66029,i6 N.31I.h {lv.WiAi
it v1.Mik kEk utter 6"5W 65.933.13 IS.r13.1S
«tbvr as b,l il.76
19 US, be II,P 54
,kS �'
a u3,I, W ftu'.N V'USI.iv
21 v4,IV,to $461.N fi,Suv.Jv
22 U5,16,86 REb wit 519,96 6511.40 $511.1J {k,vli.[u
Streae u6ancer+t I8 91.1'.,i6 kfl Letter Std. b1,64 61.N4.1S3.13 t;,BW.f3
inside at Elko. 19 ll,25;k6 12[24ikS Rates 11,191.5�
RECEIVED
HAMMOND,COLLIER IN WADE -LIVINGSTONE ASSOCIATES. INC. MAR 1 8 1987
CONSULTING ENGINEERS
19431986-43 YEARS OF PROFESSIONAL SERVICE ENGI"ECRING DE".
4010 STONE WAY NORTH CITY 9F RENTON
LARRYA WADE.PE SEATTLE.WASHINGTON 96103,80910 CONSULTANTS
RRUCE IVINGSTONE R. TELEPHONE (206)632 2644 GECWL f N HAMMOND BE
RANDALL 0 HtM ILA PC I SM 552 7707(WASH O WILLIAM P COLLIER.PE
FNEDERWR G KERN AS
GENE OFFENKCHER.PC
NETS RJL,STAD.PE PO 00 2967
RAYNARD.RE. 302 SOUTH MISSION STREET
DALE O ERDAHL.R L R WENATCHEE.WASHINGTON 96801
KENNETHL RANGTON PLC TELEPHONE(S09)$621762
March 17, 1987
Mr, Robert E. Bergstrom, P.E.
Engineering Supervisor
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Re: Eastman Landscaping
Honey Creek Project
Dear Bob:
I 've reviewed Edlund Associates proposal dated March 6, 1987. The original
proposal is enclosed; all amounts look reasonable.
As we discussed, I understand you will issue Edlund Associates a purchase order
and advise Mrs. Eastman that banktop fencing-paving will be considered separately.
Sincerely,
HAMMOND, COLLIER & WADE - LIVINGSTONE
ASSOCIATES, INC.
J' +_e_ E
Frederick G. Kern, P.E.
FGK/rtf
Enclosure
W22-57
REKYTO ❑SCATTLE ❑WENATCHEE
I ;
ti
-lit UN
H,1. L! '9 'r4
t� •r•t•ri •s��xa '.,
in i
Y7 71 a3N'.'tW.
�` •fin+x1�� 1.o�x� -
iiiiiiij
or , + + .L ..+c3+ +
1
rn
r• .N b ILSIX� M 3lrnotosl�J I
a 1 03a�0i .�► I ��
� • N � � noes ,� ���reh ►ts�a� �- � `'
• CA -
s
I Y 1
HIVWA131 O-L 1
r �
y 4
ANDREA BEATTY RM6.ER
Dre"or i
STATE OE WASNINGTON
DEPARTMENT OF ECOLOGY
hlad >t<V p ,i I • «E'npm, Ll'ashmgton 4H5(4-8711 • 1?051 459,6= `_-
March 16, 1987 RECEIVED
MAR 17
198T
ENGINEERING DEPT.
Mr. Rupert Bergstrom CITY OE REY;ON
➢epartment of Public Works
200 Mill Avenue South
Renton, WA 99055
Dear Mr. Bergstom:
Subject: City of Renton - WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved eligible for grant participation:
Kennydale Sewer: Phase III
King Construction Company
Change Order $1 Subtotal $54,402.51
Tax (8. 1%) =�06_60
$58,809.11
The following item is not considered grant eligible:
Item F Revised Overlay Cost Subtotal $15,675.00
Tax (8. 1%) 1,269.68
$16,944.68
(There is not sufficient justification or explanation for this
change. ]
Therefore eligible costs are limited to $41,864.43 including tax.
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
Approval of this changr should not be construed as an approval for addi-
tional grant funds.
Mr. Robert Bergstron,
March 16, 1987
Page 2
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
Margaret S. hill
Contract Officer
Grants Administration Section
Water Quality Program
Enclosure
cc: Fred Kern, HCW-1.
S. K. Chung, Ecology
Grant File
Page 1 of 2
t
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
CONTRACT CIWIGE ORDER AGREEMENT
CONTRACT Honey Creek Sewer Replacement, Phase III
4734 SW 312th Place CAG-062-85
CONTRACTOR King Construction Company, Fedgral W&X WA 9U(73 Phone• 838-7019.. _
SUMMARY OF PROPOSED CHANGE
Add Misc. Utility Work on Project
A. Added Force Account Sewer Serv'lce Relocation $ 679.01
B. Added Force Account Sewer Service Relocation 824.65
. C. Added Force Account Sewer Service Relocation 400.81
D. Changed Condition MH F 405 & N 28th St. L.S. 3,450.00
E. Change Materials from PVC Pipe to DI_ ,u L.S. 41928.04.
F. Overlay Revised Cost 380 Tons at $4i .25/Tan 15,675.DO
G. Manhole Adjustment 4 each at $200 _ 400.00
_ H. Adjust Existing Fire Hydrant Lateriai r ., L. � 2,153.26
1. Grade Adjustment _ ! L.S.Q. 1 ,600.00
J. Storm Drainage Revision in 28th Place - Force Account 2,O1g.97
K. Added Sewer Servicg Relocation - Fgrce &Quot IA 4.73 '
L, Added Sewer Service Relucation Force Account ,321,94__r,�
• M. Added Extra Support for Storm Sewer L.S. =,235,01 ►""� '
N. Added Ductile Iron Sewer Tee's and Pipe 645' L.F. at $S/LF 3,24!1.00
ntinued n Pa e 2
All work, materials and measurements to be in accordance with the provysionl of the
St:ndard Specifications and Special Provisions for the type of construction involved.
ORIGTAA1 CD Cr I C(IR PIr TRACT ISTI61Afi1�'C11hN� tiN�t
AMOUNT AMOUNT TNIS ORDER TOTAL AFIER CHANGL
SIGNATURES: CONTR4GTpR y DAIS
PROJECT ENCI NEE R C2� .,[ ad?r.�I sl�la DA1 L �
APPROVED BY - DATE 2 - S JG
1ruhTic ilorcTs Oire'torT� —
Page 2 of 2
CITY OF RENT011
PUBLIC, WURKS UEPARIMENT
CONTRACT wilhIlGE ORDER AGREEMENT
CONTRACT _ Heney C ek SewerRcptacenent, Phase III
4734 SW 312th Place CAG-0624
CONTRACTOR King COnstrilcti0f7 Company, Federal Way WA 98073 Phone. 838-7819
SUMMARY OF PROPOSED CHANCa
Continued from Page l : —
15 Tees at $550 each 8,250.00
Subtotal $54 402.51 I'9'
—_ 8.1% Sales Tax 4,406.60 Zu4j. 07
FOTAL $58,804.11
C0N,,TRUCTION MG
SECTION
All we, k, materials end measurements fo be in accordance with the provisions of the
Standard Speciffcat'•ens and SpEcial provisions for 13m- typt: of construction involved.
MRIKA'I*-TORT U--"�l1I NT cUNTTiA � gsfi7!A U0 NFTZNA 1tT_ . _1T` MILD'
AMOUNT AMOUNT THIS ORDER TOIAL AFTER CNANGF
5370,200.86 $370,204 86 S5t3,809.11 ' $429.013.99
SIGNATURES: CONTRACTOR DATC
PROJECT ENGINEEr "'� . -_ VAT L
APPROVED 8Y k 1. DATE .✓ i' fta
e ub11c Wor s rectos
r ..
4 e
w
ANDREA BEAM RNKER ;
,t
r
O rw1w
STATE C* W.4SHNGTON
DEPARTMENT OF ECOLOGY
Mad Stop PV-1I • 0)ynyw, WjOwWton 5195(.4.8711 • (,Yfi1 454,6"
March 13, 1987
RECEIVED
Mr. Robert Bergstrom
MAR 1 7 1987
Department of Public Works E9LINEERING UFPT
200 Mill Avenue South CITY OF RENTON
Renton, WA 98055
Dear Mr. Bergstroa:
Subject: City of Renton - WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
Kennydale Sewer, Phase III
King Construction Company
Change Order #2 Subtotal $863.09
Tax (8.1%) 69.91
$933.00
[This change order has not been signed ty all parties. ]
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, an have o copy available for our representative's
use during field inspections.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
�/
Margaret S. Hill
Contract Officer
Grants Administration Section
Water Quality Program
Enclos, e
cc: Fred Kern, HC.W-L
S. K. Chung, Ecology
Grant File
AA)REA BEAM RINIKER
Elirp"l
STATE OF W.ASHINGiGN
DEPARTMENT Of ECOLOGY
Mail 9%, PV-1 t • Olympia. 'Washington 98.504-8711 • (206) 4596M)
March i3, 1987
Mr. Robert Bergstrom
Department of Public Works
200 Mill Avenue South
Reaton, WA 98055
Dear Mr. Bergstrom:
Subject: City of Rentor. - WFG 85-063
On behalf of the Department of Eco'ogy, E-lift following change order has
been revi.ewe ' and is hereby approved, but. is not eligible for grant
participation:
Kenaydale Se Phase III
King Coasttuctron Company
Change Order #2 Subtotal $863 09
Tax (8.1%) 69.91
$933.00
[This change order has not been signed by all parties.]
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, -"necifications,
or contract document, and have a copy available for our represeutative's
use during field inspections.
I£ you have any questions, please coutrct me at (206) 4S9-6102.
Sincerely,
1',rgaret S, llill
Contract Officer
Grants Administration Section
Water Quality Program
Enclosure
cc: rred Kern, HCW-L
S. K. Chung, Eco".ngv
Grant File
4910.3
0
A,11R R i
f
ANDRE, BE ArY u4KER
STATE Of WASHINGTON
DEPARTMENT OF ECOLOGY
Mad Nqo PV-11 • 01y,,fw, Wdi&Wlcm 985W-8711 • (206) 4596"
March 13, 1987
j RECEIVED
Mr. Rob,^rt Bergstrom M A R 1 7 198T
Department of Public Works
200 Mill Avenue South U9GtNEERING DEFT.
Renton, WA 98D55 CITY OF RENTDN
Dear Mr. Bergstrom:
Subject: City of Renton, WFG 85-063
On behalf of the Department of Ecology, the followipg change order has
been reviewed and is hereby approved eligible for grant participation:
Portable Electric Generator, Phase TV
Puget Constructors, Inc.
Change Order io. 1 Suutotal $1,685.60
Tax (8. 1%) 136.53
$1,822.13
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use durin, field inspections.
Approval of this change should not be construed as an approval for
additional grant funds.
If you have an, _uns lease contact p m at (206) 459-610. .
Sincerely,
Margaret Hill
Contract Officer
Grants Administration Section
Water Quality Program
MH: 1 '
Enclosure
cc: Fred Kern, HCW-L
S.K. Chung, Ecology
Grant File
CITY Or RENTON
PUBLIC WORKS DEPARTMENT
CONTRACT CIIANGE ORDER AGREEMENT
CONTRACT Portable Electric Generator CAG-071-85
CONTRACTOR Puget Constr• ctors, Inc. 1235 East 4th Avenue, Olympia, WA 98501 754-9671
SUMMARY OF PROPOSED C"ANGE
NI Increase 2" conduit between pump house and generator garage per NEC requirements.
Lump Sum E 253.59
/2 Increase garage floor concrete slab per City Building Dept. requirements
Lump Sum S 1,212,20
TOTAL 1,465.79
15%, Overhead Pr fit 219.87
TOTAL $ 1,685.60
8.1% Sales Tax 136 53
P N O V b 1 ,822. 13
P
[SAT E
SECTION
GE
All work, materials ano measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
G`INAL CONTWr.� - `�URh�F(fi`c�N`TR4Cf— �sTl� b1J[T cJ171N�1 -E iIFA�fEu c�NlfsA�T�
AMOUNT I AMOUNT THIS ORDER TOTAL AFTER CHAiiGE
$71,129.80 JI $71,12980 + $1,822. 13 $12,g51.93
SIGNATURES: CONTRACT DATE
PROJECT ENGINEER r DATE n,4 fi°"M65'-
APPROVED BY , _ , . l (r DATE /(-A 1 ;/
�u c orks D rf ecto—ri—
t,
� !A
4 Li
yy l
WMFA REATT\ RINR,ER
S Y
EAretpr
STATE Gf WASHINGTO N
DEPARTMENT OF ECOLOGY
Mail Stop PV•i r • ()iy"". Washirgron 98504.8711 • 1206) 159{,0M
March 13, 1987
Mr. Robert Bergstrom RECEIVED
Department of Public Works
200 Hill Avenue South M A R i t 1987
Renton, WA 98055
Dear Mr. Bergstrom: ENGINEERING DE/T.
CITY OF RCNTON
Subject: City of Renton, WFG 85-063 - -
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
May Creek, Phase 1I
R. L. Alia Company
Change Order No. G Subtotal 30,023.70
Tax (8.1%) 2 431.92
Total 32,455. 2
[Outside the scope of the grant]
There is a mistake in the amount listed for material on the change
order. The amount should read $6,951.17 not $9,651.17.
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
Margaret Hill
Contract Officer
Grants Administration Section
Water Quality Program
Enclosure
cc: Fred Kern, HCb-L
S. K. Chung, hcolugy
Grant file
Inc
r... �q-_• C.U. I 6
E I B L4 CITY OF REIJT4.J
F GRANT PARTICIPATION PUBLIC WORKS DEPAR71'E141
RACT CIIA14GE ORDER AGREEMENT
CONTRACT Roney Creek Phase 11 Sanitary Sewer h terc 1ri,or CAG 040-55
CONTRACTOR R. L. Aiia, 9215 Martin Luther King Way S. , Seattle, WA 98118 (722 4900
SUMKARY OF PROPOSED CHANGE Emergency Flood Re air - u» -r channel
FINAL REPAIR �I
ORCE ACCOUNT: _ lppp!
Labor 15,623,42
20% Overhead and Markup _1,124,68 Y
TOTAL LABOR
$6,748. 10
Equipment _~ $9,219.01_. ....__._
TOTAL EQUIPMENT
Material S9,fi51. 3.7
15% Overhead and Markup 1042.68 y
TOTAL MATERIAL T^ $7,993,f15
Mf scei I aneous
� f5,271.95
15% Overhead and Mi rkup 790,74
WAL MISCELLANEOU 1;6,067.74
CONSTRUCTION MGM '
TOTAL __ $30.023.70
DEPARTMENT OF ECOLOGY 8 f% �zTrs ?ax'�` 431,9c^ z
c,
GRAND TOTAL. $32 455.62
All work, materials and measurements to be in accordance riilh the provisions ut the
Standard Specifications and Special Provisions Tor the type of construction involved.
OIEli;ffillE cal In cf- �U71A FTr�U�iI11Acf— �7PU1iFU�i€�i11At E"anPAirD-wNTRA
AMIIUNT AMOUNT THIS ORDER TOTAL AFTER MARGE
S53E,853.2p I 5610,520.87 .430,023,70 w/o tax $640,544.1.0
SIGNATURES, CONTRACTOR / ,/v
HATE d 1'r'
PROJECT ENGINEER DATE1 E! �
APPROVED BY DATE
wWfoft,� Wo r
c r s 0 rectoiT
I
OWj sANDWA BEAM RMNkER
STATE OF WASI-HNGTON
DEPARTMENT OF ECOLOGY
- Alan Rep PV-I I • ( 6,apia. WashvWton 9hi(4-8-11 • (2% 4596OOO
March 13, 1987
RECEIVED
Mr, Robert Bergstrom
Department of Public Works M A R 1 7 1,987
200 Mill Avenue South
Renton, WA 98055 VGNEERING OFPT.
'!1 r P'9TON
Dear Mr. Bergstrom:
Subject: City of Renton, WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
May Creek, Phase II
R. L. Alia Company
Change Order No. 5 Subtotal 10,748.76
Tax (8. 1%) 870.65
Total 11,619.41
[Outside the scope of the grant]
A copy has been stamped with our approval and is being returned to you.
Please incorprrate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
(-
Margaret Hill
Contract Officer
Grints Administration Section
Water Quality Program
Enclosure
cc- Fred Kern, HCW-L
S. K. Chung, Ecology
Grant File
5
R GRA,\fl PAFiT QPATIM CITY OF RENTON
PUBLIC WORKS DEPARTMENT ? w•
~A CONTRACT CHANGE ORDER AGREEMENT yi
;CONTPLAC Horcvl creek Benitsry (�1} I•,
CONTRACTOR x.l. JUia
SUMMJ.RY-PROPOSED CHANGE puzce �t r
201 Ovczhead asd Markupsuwrwm
-
495.85 1
�f paxttt ,
• _ 39 780.10
lacteriel
20584.24
•` .; 1SS Owsrhaad And Markap
388.24
2.976.48
miaaellaeeoac - -
07G.96
is* Overhead and Markup
54
— - - --- S1G,748.76
8.10 Sake va= /.
QRM TO' "
CON5TRU,TION MGMP. 811.619.41
DEPARTMENT OF ECOLOGY
All work; materials and measurements to he in Accordance ttith the provisions , the
. Stan, erd Specifications one Special Provisions for the typt- Of const,�"-f',-f, Involved.
" AMOUNT r 'if1fFD11l�f�€f fifTFDt1C�t`i�t
MOUNT .THIS ORDEh TOTAL AI-l'CR CHANGE
$536r853.20 it�599r771.1A
;1Or748,96 a/o {atz 8610,521.07
SIGNATURES: TOR DATE L'�.� y�j�b
f �- --._ _
l+ PROJECT ENGINEER _ UAIE
x5
APPROVED BY DATE' �Z
,1, Yub c War s rector
AA
Uri,
M
yys G
ANDREA BEATTY RMIER 4 ,
IAnrtor � �,.
STATE OE WASHNGTPN
DEPARTMENT Of ECOLOGY
Alad Srop VV-II • Olynrpra. Wdsh#Wt(;n 98504.871l • (2CW 4594"
March 13, 1987
RECEIVED
Mr. Robert Bergstrom MAR 17 1987
Department of Public Works
200 Mill Avenue South ;NGNEERMG DEPT.
Renton, WA 98055 11'up P'NTON
Dear Mr. Bergstrom:
Subject: City of Renton, WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
May Cceek, Phase I1
R. L. Alia Company
Change Order No. 4 Sul otal 8,297.62
Tax (8. 1%) 672.11
Total 8,969.73
(Outside the scope of the grant)
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
Margaret S. Hill
Contract Officer
Grants Administration Section
Water Quality Program
MSH:lt
Enclosure
cc: Fred Kern, HCW-L
S. K. Chung, Ecology
Grant File
C.O. N 4
` CITY OF RENTON
OR> ANT PAFMCIPATIONY PUBLIC WORKS DEPARTMENT
NTRACT CHANGE ORDER AGREEMENT
CONTRACT t . (
_ Roney Creek Phase 11 sanitary eewr Iaterceptor CRC 040-85
CONTRACTOR RL, Ali,,, 9215 Martin Luther Ring May R., wattle TTk 98118 (721-4900) '!j
SUWARY OF PROPOSED CHANGE de ,F
rgency Plood RsPeiv for January 17.. 1986
i
Labor
42,285.11
__ 2aT M*hid artd ltrrRuo ��
SUBTOTAL
is$ Overhead and Markup - 7
--- - --- -- — — 147,34
SUBT ?RL -
! .859.94
T Other/Ri.scalianeous
15t Overhead and Mcckup
Q l 4E 43•1,6N �
II ` '`'
Discount per 2/28/86 Lettea
TOTAL
i'. .+...-�.. ./
'y
8,1a Wag raw ---�-t
DATE
4RIETIQ rOTAL J n ; MT^-.- -- •,
SECTION $6,969.73 -�
Ci -.fLOLthAY.
All work, uteriais and measuremEnts e
Standard Speciffcations and Special Provisions for the type aft cunhe stluctionsinvolved.
AMDu URA�`NT'i;6riT�AC'f�ifitFiA11 'p� �►iAA "ISTTFTAMi-TZiN RAM
WIJNT THIS ORDER TOTAL AF1Lp CHANGE.
'. : : $53rr,853.20 i591,474.44 ' 48,247.62 W/o Ear
t�549,'(7Y.11
SIGNATURES: CONTRACTOR
PROJECT ENGINEER
'APPROVED BT. T—"—
AAIMDA i L
orT OTrector
s
ANDREA NEATTV MAUR
rxreitar
STATE OE WASHINGTON
DEPARTMENT OF ECOLOGY
Add -St(Y) PV-11 • O0WAIa, WJSNn9t0n 98St+td1711 • i2%1 459.60W
March 13, 1987
RECEIVED
M A R 1 7 1987
Mr. Robert Bergstrom
Department of Public Works ENGINEERING XPT.
200 Mill Avenue South CRY uF RENTON
Renton, WA 98055
Dear Mr. Bergstrom:
Subject: City of Renton WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
May Creek, Phase Il
R. L. Alia Company
Change Order No. 3 Subtotal 37,333.03
Tax (8.1%) 3,040.18
40,573.21
[Outside the scope of the grant]
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
If you have any questic ,ase contact me at (206) 459-6102.
Sincerely,
1 G.l..i'�
Margaret S. Hill
Contract Officer.
Grants Administration Section
Water Quality Program
Enclosure
cc: Fred Kern, HCW-L
S. K. Chung, Ecology
Grant bile
C.O. _
NOPKEU
GIB h.t CITY OF RENTON
FOR GRANT, PARTICIPATION PUBLIC WORKS DEPARTMENT
.� NTRACT CIIANGE ORDER AGREEPW:NT
CONTRACT honer-creek Phose 11 Sanitary Sower Intorcaptor CAC 040-85
CONTRACTOR R.G. Alla, 9215 Martin Luther It1na way S" Seattle MA 98118 1722-49001
SUMMARY OF PROPOSED CHANGE Eawrgencysawar RaL,al�r at suueet Nuntp station_ ^
DOM LItR . SYSTezm PROM DAMAGS 10 SANUARY 1.-7, 1956 STORM AT US 7th ST, AND
GARRINOTON Ays. Nl:. PORCH ACCOUNT.
ratxrr F1Ar3'10.35 ��
20S Overhead and Markup 2 {G{.07
♦:US70TA4 ----+'Y 13,027.76
. . P,qufpment _»
Materials --`� 2,006.78
r.51 Overhead and Markup
SUSTOTA.. - — 3.32e.80
Other - - {,950.{6
r.51 Overhead and Markup 7
5.693.03
TOTAL ..��
#37,533.03
9.10 sales Tax
'l� - -~
s.ac.le
GRAND TDTA4 W1
CONSTRUCTION MGMT: $40.573.21
Ali work, materials and measurement P8V T8CC(ffrda9R1%(t the provisions of the
Standard Specificatior . and Special Lm th. f construction involved.
WTUMCUNTOU-1
CURkTNT CON' T -I- ffEl7afi I�Ff f �IfAt� "--�sT7)�WN"Cb�ll'I r
AMOUNT AMOUNT ! THIS ORDER I IOIAI AFTER CIIWE
5536,H53.20 I ^.557,911.16 I $37,5.3.03 w/o tax 1 k591,474.49
SIGNATURES: CONTRACTOR C l _ .. K"- >AIE
PROJECT ENGINEER ,� �� �r� DALE
APPROVED BY c.. It
Zc -V! �� UAl'E
Ch� r c
r
AMMA aFO" RNKF9
(�rr�to
tit ATF (W WASHNGT(1N
DEPARTMENT OF ECOLOGY
8W Nqo PV-11 • (AMP-1 11v.hi(WI( wrs(N-871( a (^ 459a0Q9
March 13, 1987
RECEtV
Mr. Robert Bergstrom
Department of Public Works M A R 17 9W
200 Mill Aver South
Renton, WA 96055 014GINEERING DER.
Cltt OF RENIDN
Dear Mr. Bergstrom:
` Subject: City of Renton WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved, but is not eligible for grant
participation:
May Creek, Phase II
R. L. Alia Company
Change Ordtr No. 2 Subtotal 15,856.72
-11 284.39
1) 14-1.11
[Outside the scope of the grant]
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
Margaret S. Hill
Contract Ufficer
Grants Administration Section
Water Quality Program
MSH:lt
Enclosr-e
cc: Fred Kern, HCW-L
S. K. Chung, Ecology
Grant File
C.U. 6_
,♦` , x� [. CITi OF REIITO14
TIClr f�Tl PUBLIC WORKS DEPARTMENT
(ACT MANGE ORDER AGRMIE111i '
CONTRAST _ Uonay crack Phase 1l Sanitary Sever Int••rceptor CAC 040-85 i
CONTRACTOR R.L. Ali&, 9215 Martin Luther King Nay S., Seattle WA 98118 (722-4900)
SUMARY OF PROPOSED CHANGE emergency Blood Repair For. January 17, 1986 /
STORM - PORCB ACCOUNT
Labor ¢ 3,228.19
20% Overhead and Markup 645.64
- SUBTOTAL "—
Ma Ce r.i.a 2. 5,671.68 ._.- -•-,_.
Is% Overhead and Karkup 050_071 ---
� � SIIR'xO'FAL -- 6,!i22.43
11iscellaneous R 2,247.21
150 Overhea and Markup 337.00
SUBTOTAL
0
Discount per 2/18iB6e Letter
" 15,854.72-
0.11 Soler Tax / "ATE 2 .39 •
7- "
CRANK TOTAL $ECRON - V17.141.11
All work, materials and measurements to be rovisioos of the
Standard Specifications and Special Provisions for the type of construction involved.
Tiatt;tllAt c�rrt Aa Ul knff- (MCT ESTAW PIMUAN —`FSTIATWCONTRAM
AMOJHT MIOUNT THIS ORDER TOTAL An'ER CHANGE
$536,853.2U $53R,084.74 $15,856.72 w/o tar $553,941.46
11
SIGNATURES: CONTRACTOR ' �. ;� /% ` DATE t. y/Jt,
PROJECT ENC-INEER �r
` l�y�' �'� ti� � DATE
APPROVED BY 1
l DATE
ub��iC,Yor cT`t liirmKttcr)
!p`
N OKA BEATTY WWLR
Dwww .f
STATE OF WASMNGT(M
DEPARTMENT OF ECOLOGY
Mad Nop P✓-11 • (-*fW a. Washington 9004$71 1 • )205) 459,6W)
March 13, 1987
Mr. Robert Bergstrom I RECEIVED
Department of P blic Works
200 Mill Avenue South 7 19$7
Renton, WA 98055
Dear Mr. Bergstrom:
Subject: City of Renton, WFG 85-063
')n behalf of she Department of Ecology, the following change order has
been reviewed and is hereby approved:
Portable Electric Generator, Phase IV
Puget Constructors, Inc.
Change Order No. 2 Subtotal $864.70
Tax (8.1%) 70.04
$993 77
There appears to be an error ii this change order and that total costs
should be $934.74.
Therefore eligible cf- ts are limited to $934.74.
A copy has been stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for our representative's
use during field inspections
Approval of this change should not be construed as an approval for addi-
tionai grant funds.
If you have any questions, please contact me at (206) 459-6102.
/Sincerely,
Margaret Hill
Contract Officer
Grants Administrat.ior Section
Water Quality Program
Enclosure
cc: Fred Kern, HCW-L
S.K. Chung, Ecology
1 Grant File
1 .ram.
CITY Of f rUOil
PUBLIC WORKS UEPAItIh;.1f1
CUNMACT CIIAIIGL URULR AGRLLMLNT
CUNTWiCT Portable Electric Generatcr CAf 071-85
CUMRACTrilit Puyet Constructors, ---1235 East 4th St. , Olympia WA 98501
SUMMARY OF PROPOSED CIIANGE
l ,` Place crushed rock top course gravel surfacing on turn around
Lump Sum $ 200.00
2. Provide Electrical Conduit for Telemetry Lump Swn
1 664.70
Subtotal 964.70
8.1% Sale Tax 78.14
TOTAL 1 ,042.84
All arork, materials and measurements to be in ac,, rdance with Lice Standard Specifications and Specia' Provisions for the type of con n of te
sLructiosinvolved.
Oki WHACC61I7kAL-1—i—CUkkEftf'CUf IMLI Uri MATU .'C[TU NGE H IRAT[! -Lufi-RAc
AMOUNT I AMOUNT MIS ORDER .
, TOTAL AFTIit MANGE
1 1'.9.80 $72,9 93 $1 ,042.84 ; $74 ,072.91
SIGIIAIURES: CUUMAC1(}It� � r
UAiF.
i'12GJCC( E11GfilEER W UATE & /g
APPRUYEU BY �,� /r-f-"�
° UATE
(Nu611C Works U1i�ector)
March 10, 1987
3:33 N.E. 17th Fi
Renton. WA 98056
Edlurd Associates Inc.
400 i'vergreen Bldg.
Renton, WA. .98056
bear Ns. Edlund ,
Thank you for sending the well draam-up landscape plan
for the completion of our front yard. After reviewing
what wr had planned we are in agreement with the plans
that you have drawn up for the yard.
I shared with Bob Bergstrom sometime ago by telephone
telling him of some of the problems along the road and
bank with truc? s and neighbors dumping junk et,; over
the side, just recently, tires and a 5U gal. barrel.
Yr. Fred Fern and his men spent a lot of time pulling
the junk up to the top of the bank and cleaning up the
bank and trucking it away. The kids use the retainer
wall for access to the creek, lugging their bikes over
the side. The boards used as a retainer wall are slai,ted
downward which doesn 't give the bank as much support. 'ils n
use them as steps.
Mr. Bergstrom talked of a possible fence from Point A
to Point B on the drawing which is enclosed, hop ni g
ellmina e this problem. I think a fence with a sign "KI)
TRFSPASSING" would be helpful.
As for the crushed rock next to the cul-de-sac, BLACK-
SOP would be much better. The crushed rocks will soon
be filled in with blackberris, grass and weeds etc. and
it wild be harder to take care of. The kids in the neigh
hood squeal aroun, the corner and shoot the :rocks all over
the law».
We would appreciate your considering the fence and black-
top as a possib2c solution to thie problem.
Sincerely,
l.��tct�u�z 7l7. �yrirt�r.�
Wauneta M. Eastman
TO RLMAM ' ' t
ExlsTir+n 4UNIMIL
To ROMAN . .
�• ..rQ 1y1�i11tY��i��y�
4 NEVIt TAR - I
•� �` YGrbO�t. �r
� a`JAS6 co.US'TINCar
u _
Ic
f +. } �- t ` t '♦ e
cK�ot nR;vps.
IF
OtxI9r M.W.
Ar lyl
• �� H. E. I'I Tw Pl.AiuG
�x15"r�Na A9p►+st.T
B
.�� IS �=
m
0
i
i
a
Wauneta F.. rastmen
3533 NE 17th r1
Renton, WA 98056 ar 13
'S
Renton pity Hall
200 Fill S.
Renton,
ATTN: Bob Bergstrm WA 98055
Engineering DePt.
1iTA rf r
Y '^9
AN[NIEA LiL ATTY RMIAER
D,Ktor
iA
STK E Or W ASHINGTINJ
DEPARTMENT OF ECOLOGY
Add Stop P%1-II • 01YrJW VVashtrWion 98504-8, 11 • 12W 459-&M
March 6, 1987
LOVED
Mr. Robert. Bergstrom
Department of Public Works I WAtt :i 1 1987
200 Mill Avenue South
Renton, WA 98055 XINEERING DEFT.
C(TY OF RENTON
Dear Mr. Bergstrom:
Subject: Cif of Renton, WFG 85-063
On behalf of the Department of Ecology, the following change order has
been reviewed and is hereby approved eligible for grant participation:
May Creek Phase lI
R. L. Apia Company
Change ()rder No. I Subtotal 1,231.54
Sales Tax (8. 1%) 99.75
Total 1,331.29
No Time Extension
The following item is not considered grant eligible:
Item 7 $5,440.00 Increase
[Wider road% . y patch is larger than approved pavement width]
Therefore eligible costs are limited to:
Subtotal (-4,208.46)
Tax (8.1%) (-340.89)
Total (-$4,549.35) Dedu,-t
A copy has beer. stamped with our approval and is being returned to you.
Please incorporate this change in the appropriate plans, specifications,
or contract document, and have a copy available for ,or representative's
use during field inspections.
i
Mr. Rober� Bergstrom
March 6, 1987
Page 2
Approval of this change should not be construed as an approval for addi-
tional grant funds.
If you have any questions, please contact me at (206) 459-6102.
Sincerely,
Margaret S. Hill
Contract Officer
Grants Administration Section
Water Quality Program
Enclosure
cc: Fred Kern, HCWL
S. K. Chung, Ecology
Grant File
i
Ali
I,
J
CITY OF RENTON i
PUBLIC WORKS DEPARTMCHT
CONTRACT CHARGE ORDER AGREEMCNT
CONTRACT Honey Creel: Sanitary Sewers Phase 1I. 5-296, CAG 040-85
CONTRACTOR R.L. Alia, Company, 9215 Martin Luther King Jr. Nay So. , Seattle NA 98118
SUMMARY OF PROPOSED CHANGE
i . Add extra anchors for CHP storm drain L.S. Additive. > 450.00
_ 2. Remove existing pipe and provide new 12" connection at new
Honey Creek Pump Station, L.S. Additive. 228.60 W�
3. Approve uridoe detail aiYd plan ch6oge, ito rtce (-hagke. .0-
4. Reduce access road rock surfacing from 12" thick to G" thick. _
L.S. Deductive. C" 7,OOO.DO
5. Add additional clean- of slope from HE 170 St. to _
creek sewer alignment. L.S. Additive. _ - + 450.00M /
6. Add trace wire. L.S. Additive. + 100.00
7. Add wider ruadway patch on Union Ave, NE.
��-� 11i
136 sq, yds. 8 $40rpgr5g, 5,440.00 \ 1,8. add traffic loottIlAuMe andUnion Ave. Nl.6dditivE. ?� T Subtotal 1,231.64 _
— -&4 Sa3as.3aw
DAIE' r
-bial with Tax >j1,331.t9 � J'�r
SECTION
All work matt aid qWitvw*s to bt ciur•1rt .rdalxe with the provisions of the
Standard Specitfcations nd Special Provisions fdr the type of construction involvad.
MHA . Cr O CT `�IIWEN I�sTIMATt 0t`AANg 1WfiCG Nflt �1 l
AMOUNT AMOUNT THIS ORDER TOTAL AF1ER CI1ANGf�
$536,853.20 F536,853.2 $1.231.54 w/o, tax $538,084.74
SIGNATURi CONTRACTOR.--,,- DATE
PROJECT ENGINEER ,��w_r� GAT E /=
APPROVED 8` �e.Z7�N _ _ DATE S i1�►
ub c War s A raGtpr�
I P
HAMMOND. COLLIER&WADE -LIVINGSTONE ASSOCIATES, INC.
CONSULT ING ENGINLERS
1943'1966—43 TEARS OF PROFESSIONAL SERVICE
4010 STONE WAY NORTH
LARRYR WADE PE SEATTLE.WASHINGTON 99103.0090 CONSULTANTS
ewCE LIVNGSTONE.PE TELEPHONE 1206)632 2664 cr ORCER NANMON1 PE
RANDALL D NCRRALA RE 4BOlY}62 TTOT(WASH 01i'I N'LLUAW A COLLIER PE
rREDLIKCR 6 K_RN.RE
GENE Wr4NNCNER•E
NELSKJELSTAD.RE PO BOX 2967
NAROLDE PATNARD.PE 302 SOUTH MISVON STREET
DALE D ERDANL,PLE WENATCHEE.WASHINGTON 99801 RECEIVED
KENNEYNL EDwcTON PLS TELEPHONE 15 1662 1762
February 23, 1987 FEB 2 3 1987
I ENGINEERING DEFT.
CITY OF RENtON
Mr. Patrick Leuner
Edlund Associates, Inc.
15 South Grady, Suite 409
Renton, Washington 98055
Re: Honey Creek Sewer Improvement 2850 P3
Eastman Residence Landscaping Restoration
Dear Fdtrick
Enclosed are a reduced record construction drawing of sewer improvements in the
vicinity of 3533 N.E. 17th Place, Renton, Washington, and a sketch prepared by
Mrs. Eastman.
BACKGROUND
Removal of an established hedge was necessary in the front of Mr. Eastman's home
to permit sewer installation. The hedge ( I believe) shielded the front windows
from some direct auto lights and provided modest privacy.
The actual construction work has teen completed for nearly a year, and we had
inadvertently overlooked some restoration of Mrs. Eastman's property.
PROPOSAL
Using the record construction drawing and Mrs. Eastman's sketch, will you prepare
an accurate sketch illustrating proposed improvements and associated costs for
same. It would prolably be best for you to mee . Mrs. Eastman after preparing the
sketch to see that the planting arrangement is to her satisfaction.
Mrs. Eastman mentioned a guard rail may be desirable; but, Bob 3ergstom must keep
improvement costs within an amount the City is obligated to restore. If you see
improvements that might correct any apparent oeficiencies other than landscaping,
please note and detail them (as to extent) on your sketch.
"PLITO ❑SEATTLE ❑WE— CNEE
Mrs. Patrick Leuner
February 23, 1987
Page Two
Please send me your sketch and proposal , including additional cost for any
features beyond basic landscaping improvements. I will make Z recommendation on
your proposal and route the detail to the City. The City will issue you a
purchase order directly, if they find the proposal reasonable.
Please call me should you wish to discuss items or want me to ,iake a site
inspection with you.
Thank you for your assistance.
Sincerely,
HAMMOND, COLLIER & WADE - LIVINGSTONE
ASSOCIATES, INC.
�L
Frederick G. Kern, P.E,
cc: Mrs. Wauneta Eastman
1r . Robert Bergstrom, City of Renton
FGK/cgr
W21-151
HAMMOND. COLLIER & WADE — LIVINrISTONE ASSOCIATES. INC. III
CONSULTING ENI. EAs
♦Olo !TONE W.v No. .M
■KAT LE. W^XHINGTON 91103
TELEPHONE: (2001 $32.%&64
February 17, 1987
City of Renton
Dept. of Public 4orks
200 Mill Avenue South
kenton, Washington 98055
Statement No. 29
Statement of Services - Honey Creek Sewer System JOB NO.
i
December, 1986 - January, '987
Project No. 28503.000 - Warranty and Operations - Verbal Authorization
Instructions by R. E. Bergstrom.
Fee: Time and expense at standard hourly rate.
Fork Description: Provide assistance in obtaining pump system warranty sarvice and
operational improvements.
Amount Due: S 2,13:.25
Project No. 86151 - Slumping Study N.E. 27th - Authorization R.E. Bergstrom Letter
of 12/23/86.
Fee: Time and expense at standard rates in conformance with 12j17/86 proposal .
Supplemental emergency work authorized 12/30/86.
WC Option: Cimpleted field reconnaissance, soils borings, survey cross
sl ketches and preliminary analysis of repair options. Met with Bob
BI in 12/30/66, P.M. , to discuss findings. Additional report decumentition
wt detail authorized on 12/30/86. Met with Jack Crumley to Discuss findings,
subs, .Lrd final report.
Note: Statements from Snannon to be transmitted with separate future billing.
Amount Due: S 6,283.99
REWYED
Acrc 1 FES 18 1"7
MAEERINc err.
� / ,y �,rr of REW-ON
aC ra,z Pf wwr r*-? d iL #2&s Y1,s.Sir I -ad 4 C. �g L , 03
Correspondence S--296, 2
r
Hammond, Collier Y Wade-L Inc.
4010 stone Way N.
Seattle, WA 98103
Projects 28503.000 Renton} Lity of i2854)P3) Invoice No. 779
Construction Monitorinq 71 February 17, 1967
Page number 1
City of Renton
Public Works Dept.
Zoo Mi11 Ave. S.
Renton Wk 9b1J55
----------------------------------------------------------------------------------
Professional Services
Uate Hours Rate Amount
Senior Engineer
Frederick: G. Kerr.
Enq-neerino - General 12-13-86 17.00 62.00 1 ,054.00
12-31-86 2.5o 62.00 155.00
1-31-87 13.00 62.00 906.00
r;sslatant PrgleCt. Surveyor
Michael la. k01vulr
Survey - genetal 12-15-86 .50 47.00 18.50
Clerical
Roxanna I . Fresonke
Clerical - General 1.:- 15-86 2.00 29.00 58. 00
Services Totals -35. 00 d,091.50 2,091 .50
------------
Reimbursable r .r:�nses
___.-_-______-.._ . ___-___ Date Cost Multiplier Amount
Reimbursable E::pense
Film 1-31-81 Ie.50 l. iUQ 13. 015
Reimbursable Expense total I . 75
heprographICs
Unly Repro 1-29-87 4.31 l. loo 4. 75
Reprographics total 4. 75
Mileage rPer-sonal Carl
Mileage 12-15-8e 10.00 I.o00 10.00
leage L-:$1-87 11.25 1.0U0 11.25
mileage rPersonal Car) total 21. 25
Projecto 28503.000 Renton; City of taB;uF .r Invoice No. 179
Construction Monitorinq it February 17, 19BI
Page number
-------------------------------------------
Reimbursable Expenses
----•------------------ Uate Cost NultIpI &or Hmount
Reimbursable totala 39. )b 39.75
1-urrent Chargesa 2, 131.25
Aged Receivables
Current 31-60 days 61-90 days 91-120 days 121+ days Total
;�, 1 _1 . 25 .0U .00 .00 O0 2, 131.25
Pr o iect Billing Summ, r'y
Prior Current Total
Frofesai onal Services 7, 148.84 2,091.50 9,240.34
Reimbursable E>penses 168.94 39. 75 208. b9
COn9Ultant Expenses 121.00 .00 121.00
Total1 7,438. 78 , 131.25 9,570.03
Iotat-Balance Dust 2, 131. -25
mam3amzammz
Hammond, Collier & Wade-L Inc.
4u1!) Stone Way N.
Seattle. WA 98lvS
F'roaecti dbi5i .1r0V City of Renton invoice No. 78u
Honey Creek Siumpr'ing "Study February 17, 1987
Page number 1
City at Renton
Public Works Uept.
200 M111 Ave. S.
Renton WA 98u55
-- -' ------- ----------------------------------------------------------
Fro+essional Services
---------------------- Date Hours Rate Amount
Senior Engineer
Eugene R. Ut+enbecher
Engineerinq - General 1-15-67 1.Ou 66.uu 66. Gv
Freder 1ck G. kern
Enoineerinq - beneral 3.5U 62.00 217.U0
12-S1-8b 25.00 62.00 1 ,426.00
1-15-87 39.50 6a.00 2,449. 00
1-51-8/ 1.OU 6.`..00 62.00
Associate Engineer
John D. Hendron
Enqineerinq - Uenerel 12-31-86 12.00 37.00 444.00
Project Surveyor
Kenneth L. E(lingto..
Survev - General 12-31-8b 21 . 80 51 .4.)u i , 111.8U
51 .!lu 132.60
Ura+tsman
Denise P. Holcomb
Drafting - Ueneral 1-15-87 7. uu S:. uu e5�.Ou
Clerical
Roxanna 1 . Fresonke
Lierica! - beneral 1 -15-81 a.50 29.W 72. 50
-
Services lotalr 11S.9u 6,239.90 6,2S9.90
Project) 66151.000 City of Renton 1n•,oice No. lav {
Honey Creek Slumprinq Study February 17 , 198i
Page number 2
-•---------------------
Re.lmburaable E>:pensee
-- ------------ Date lost Multiplier Amount
Reprographics
Univ. Repro. 1-Ob-87 13.2i 1 . 1VV 14.60
Univ. Repro. I-13-B7 8.6.5 1 . iuO 9.49
Reprographics total 24.09
Mileage kFersonal Car)
III Ieaoe 12-31-86 ]O.UO 1.000 10.00
Mileage 1-15-87 10.00 1.000 LO.00
Mileage (Personal Car) total 20.00
Reimbursable total i 44.09 44.('.)9
------------
Current Charges. 6,28:3.99
------------
Aged Receivables
Current 31 -6J nays �1-90 days 91-120 days 121+ days total
6,283.99 .00 .00 oV 6,287..99
Pr'OjeCt Billing Summary
Prior Current Total
Professional Services .00 6,239.90 6,239.90
Reimbursable t>:pense.s .UO 44.V9 44.09
� otal : .00 6,283. 99 6,283.99
it
I,
FINANCIAL SLRftgRY 0
HMEV CR•EEK SEWER ENGINEERIW SERVICES
For City of Renton, WA
By Hammond, Collier i Wade - Livingstone Associates, Inc.
Project No. 2850 and Sub-phase designations Flood Baaage 19 02125/06 RED Letter Bid. $4,25I.07 64,253.07
hM"staaal Pr-ioas 21171V Auw. Repair 20 03/17/96 03/06/86 Rats r6,790.77 111,043.84
Bervices lay. Isso¢e hutlerized Asount, rArr"t AeAwt 21 04/10/66 $4,573.D5 115,616.89
category me. Bate hthorzzatim Aawnt Billed Billie Billed 24 07/22786 r699.63 116,SI6.52
25 09/29/86 $2.294.36 $18,600.66
Banc ksign I DD/2BItA Awdideit $56.000 4.642.00 f6,642.%
2 10105/84 11 $16,29.00 1161925.00 Front Footage Eharqe 27 11111/86 RED Letter 0470.75 r470.75
I 11/1041 06/10/84 /I0.280.00 1151205.0 Exhibit map 10/0e/86
4 12/04/64 r3,OB1.00 138,209.00
5 01/15,85 $13,069.00 151,357.06 Operation! 8arranty 21 12/10/B6 RES Auth. $2.458.94 12,45B.94
7 02713725 $2,793.00 154,1%.00 Survey. Floe eeasureaeh 29 2/17187 12.13:.25
tt 06/14/85 f1,B54.W 156.M.W
power Supply B"ige 6 Ol/22/r,,, Aeon 12 03 05/05 $10,000 ",176.36 P,M,36 B. E. 27th ;luapinq 29 2117187 PEE Letter 16,26..99
Study 12123/86
:aastrection D 0312b/65 Aaendaent 177,500 $7,123.,4 17,023.24
Services 9 04/30/B5 13 $16.321.16 $24,144.42
isaitorinq 10 03/17/85 03/24/85 $22,505.04 146,649.46
Phase I Iwu 7154 11 04/14/85 19,280.40 135,929.86
Phase 2 lhra 09/15a L2 07).7185 s6,14`.,01 W,294.87
13 02IL2185 $15,205.N 177.500.0
Coistrach" Iervic" 15 09/20/85 laendaeit 125.670 110,950.97 z.lk 958.P7
Aaitorisg toast 3 A 30/24/85 N $1,423.9L' 620,382.o7
4f Thr, 10185 17 11/2b/85 16/14/25 16,828.4E 127.211.32
Extr4 Coast. 1/ a$,I3L00 Bid. 13,773.26 G,773.21 Advised Cat-,, of probable extra monitoring services related to
hasitorsag 19 25166 Rat" i1,377.75 15,151.03 changed construction seheaui,�.
19 02/25160 $24,M.63 030,074.66 05/07/85 >
10 11,171" SM.75 130,931.41 35/1 7/85 )
21 04/10/06 r1,198.25 f32,B37." 0, /12/B5 ) Correspondence
22 O tI61Be $1,323.25 934,160.91 10/30/85 )
23 06/1216 $1,561.59 135,72-,,50 - 11/27/85 )
24 07/22/86 r1,35B.14 /31,0d1.34
25 0/29/Bb $1,302.00 638,303.34 r
26 0912a/8, 12,30.00 f4:,702.34
Exhibit taping 24 07/22/96 PEE let a/1446 $477.00 $477.06 I certify that this financial summary accurately represents
25 08/291DI 13".04 17/3.00 profe, -i orzal engineering sarvi ces charges to the City of Renton
26 0912646 /I,Of0.22 SI'm:2 Hrx v Creak Sewer Project as compiled from tine records, expense
cnary_- and subconsultant statements. All charges have been allocated to
S"4,. P.S. A"icing, W 14 09/24;85 RED Let 10/17/05 Std. Rates r8,526.50 18,02e.50 project phases and tasks during the time period performed and in
C 4 m to 01/13/66 REI Letter Bt1. R,921.06 f1,421.00 accordance with letters of agreeaent and authorization,
taaual 19 02/29/86 12/20/B5 Rates 1489.50 12,410.56 '
20 MiNl8e r675.00 $3,009.50 ?. /P•d/
21 04/10/86 f1,957.78 15,047.28
22 05116/86 r472.00 $5,519,28
23 %)12186 $152.66 B5,e71.88
24 07i22/B6 $3,054.39 11,726,27
2`. 06/29/96 $1,121.711 r10,047.97
As-0r.is to O(113/66 RED Letter 17,500 r5,933.13 r, 733.13
19 G2129/D6 11127/05 SM.0 fo.771.76
70 03/17/B6 129.34 17,037.30
G4/10/6e 062.70 r7,SW.0G
ze 05/16/26 REB Auth 319/% ;!11.20 1511.20 4,611.2v
Strew Enhaece"at 11 01/13/66 RED Letter Sid. h,69'.13 01,03.13
Biqa at Elboa It 02/2NBh 12%20715 Rat" f2,197.3o 13,040.43
HAMMOND, COLLIER a WADE• LIVINGS. _NE ASSOCIATES, INC, LETTER
��
CONSULTING ENGINEERS LSLS Uu /JUI1V lMJ U IJ l_;
4010 Stone Way North
Seattle,Washington 99103
OAT[ O JOa MO
I2081-632-2664 Z'/d'O 09—ZJY4
1TT[N
TO
/�� Zoo 1e>'cLl aac -
i ,
GENTLEMEN: J/
WE ARE SENDING YOU Attached Under separate cover via. _the following items:
❑ Shop drawings ❑ Prints f__: Plans L; Samples Cl Specifications
❑ Copy of letter ❑ Chan/e order ❑ _
COPIES OATE
NO. OESCRI►TION
I
THESE ARE TRANSMITTED as checkad Ih
❑Fn, evlew ❑No exceptions taken ❑Resubmit__copies for review
❑For your use ❑Exceptions as noted ❑Submit copies for distribution
0 As requested ❑Returned for corrections ❑Return __corrected prints
❑For review and comment
REMARKS
COPY TO_� _
_ — SIGNED:
It eYCI9[vr1[ It* not as notvd, kindly notify Y[ at OMI.
HAMMOND.COLLIER&WADE - LIVINGSTONE ASSOCIATES, INC.
CONSULTING ENGINEERS
1943 1960— 43 YEARS OF PROFESSIONAL SERVICE
4010 STONE WAY NORTH
ueFrM wADE PE SEATTLE WASHINGTON 98 103BOB0 CONSULTANTS
SANOA L D KE%9wt PE TEI EPH(NdE 1206/632 2664 GEOPGE P HAMIPCAI0 PE
'REM D wtnAAu vt
I BOO 56$-7 7071W ASH ONLY) 'MILUIMI COLLKII PE
(R[D(RIC1t G N[11w PC
GEwE OirE.WCwER.It
KLSPALSTAD PE PO BOX 2967
-"MOLD E MArNAPD.PC 302 SOUTH MISSION STREET
DALE D CREuwL PLS WENATCHEE.WASHINGTON 90801
MENNETNL FpMlTON PLS
TELEPHONE (50916621T62
MEMORANDUM
TO: R. W. Stott Construction Company
j H. D. Fowler, Erick Merklinghause
Yeomans Pump Company, Jim Girsh
0:ve', _ip Service, Dave hcIver
Arrow Electric, Jim 8agne
Superior Custom Controls, Bill Jordan
City of Renton, Gary Morrisun
` FROM: Fred Ketn, HCW-L
A
DATE: February 17, 1987
RE: Honey Creek Pump Station, Yeomans P. 0. #S0262358
j Follow-Up on 1/29/87 Menlo and 2/4/87 Report
PURPOSE: Continue troubleshooting unresolved pump system problems. Obtain
confirmation on sizing of vacuum system piping from pump manufacturer per original
submittal request.
Background: Pump station is designed to operate infrequently and principally
during wet weather overflow periuds. Thus, the pump cycle period may be quite
lung and variable (not predictable). Changes were made on a delay relay recom-
mended by Dakota personnel on 213187. The delay unit was tried for short interval
setting less than 30 seconds. The observation was that the pumps run for some
short period before the vacuum float drops. Thus, the delay relay does not appear
to solve "cutout" problems unless the timer is set for long time intervals (long
time delay is considered risky in the event air accumulates in the impeller case
and the vacuum demand is overridden by the delay relay). To eliminate apparent
float drop, ball valves were installed to allow partial closing of the 2" vacuum
line (refer to 2/4187 report). On 2/11/87, prior to completing additional testing
of new improvements, an emergency condition occurred and the Honey Creek Station
came on line. (A partial history of pump difficulties is documented as Attachment
A for backgl and information) .
IK YL.10 ❑HIIL IL( UMtwATC M[l
Memorandum
Pane Two
The hour meter recor.'s by the City indicate that Pump d2 ran for about four hours
and Pump M1 nearest the P.S. door ran about 2 hours on 2/11/87. Pump N1 was hot
to the touch in the seal area when City personnel checked the station. Seal
failure due to loss of prime was suspected. Fred Kern arrived to look at the
situation on Wednesday afternoon on 2;11/87. Dave McIver and Erick M. were
contacted prior to this and Fred and Dave made arrangements to meet at the pump
station on Friday, 2/13/87.
Dave M. , Erick M. , and Fred K. met Friday, 2/13/87, to review the situation. Dave
did not believe the seals were damaged. Fred advised Dave to obtain set of seals
for spares. The problem of why loss of prime occurred 1;r what actually did occur
was not immediately evident. Some vacuum teaks are probable. The seal filter
suction in the same manifold as the vacuum ejection system does not seem good and
will be changed. (The seal filters were recently installed wher, the water main
was taken out of service).
Additional Work: The vacuum priming system piping is, apparently, not balanced
for the specs is Yeoman Pump application and some vacuum piping improvements are
needed.
o Clow Yeoman's factory is requested to continent on prime system pipe si: as
it relates to pump suction discharge characteristic.,. (Refer to original
submittal notes enclosed).
o The present position of the small pressure side vacuum line or chamber
introduces water level turbulence that probably affects the float. We
helieve the positioning inlet of the small vacuum line is located to reduce
grease build-up on the float. But relocation, if effective, would be pre-
ferable to modest additional cleaning maintenance.
o Several sketches of alternates are illustrated which may be appropriate. The
pump manufacturer's counsel on these alternates is requested.
o Use of a delay is now limited to about 25 seconds should this relay be kept
or can pump damage occur in this short interval? The pump manufacturer's
counsel on this delay and length of time pump can run dry comments would be
appreciated.
Following consultation with the factory, we will proceed to make changes to
eliminate problems.
u City should relocate seal lubrication inlet off the vacuum-port manifold just
as a precaution and to eliminate any question that seal lubrication system is
creating vacuum leak difficulty.
Enclosures
u Attachment A History of Difficulties
o Original submittal letters and response re - vacuum system, March 1985
o January 29, 1987 meow
o February 3, 1987 memo
u Sketch February 17, 1987
ATTACHMENT A
HISTORY OF DIFFICULTIES WITH HONEY CREEK PUMPS AND PRIMING SYSTEM
0 Initial pump start-up, tests were conducted March 20, 1986.
Pump M1 checked out at the rated head - delivery. Initially, the shaft did
not turn easily znd some screw adjustment of the intermediate spacer was
made. The support units between the motors and pump were determined to have
been incorrectly assembled at the factory. Longer support units were ordered
from the factory. Pump M2 was not tested because the shaft could not be made
to spin freely.
o The pump motors also arrived with horizontal baseplates and eyebolts were
added �n the motor rase to permit vertical lifting.
o On May 2nd with pump assemblies repeir d, testing was again inade. High yield
and low discharge indicated a leak to pressure line may have occurred.
(Subsequently, contractor discovered leak. Yield-discharge did match pump
curve detail ). Need for a differential type vacuum float switch was
determined to be necessary at this time. Fred Stevens arranged to have Jim
8agne install the differential s,. Itch.
o Another start.-up was scheduled for May 29th and my notes show that seal
replacement wcs necessary after this start-up.
o On 6/10/86, Dave McIver replaced the seals in Pump M2) unit furthest from the
door and panel .
0 7/1/86: Final start-up testing of the system was made. Pump motor cut
in-out occurred and Fred Stevens promised to adjust the tether on the vacuum
float to eliminate cycling. System acceptance was recommended by HCW-L
letter from FGK on 7/3/86.
0 8/13/86: City contacted Dave's Pump Service for some adjustments and to
check Pump #I vibration. No review by HCW-L was made at this time.
0 10/20/86: Gary Morrison advised rred Kern that a seal had failed on Unit #1.
Unit #2 mechanical seals and bearings were replaced between 10/23/86 and
10/31/86. The failure was attributed to a bandaid plugging the impeller
vacuum port line at a tee. Fred Kern and Fred Stevens met with Gary M. in an
attempt to improve several features. (During the several preceding months
period, pumps were operated infrequently). Features discussed:
I) Reduce small line fouling of the impeller, port line.
2) Increase vacuum chamber size to allow longer difterential float to
have greater travel and less sensitivity to chamber water level .
Fred Stevens designed the features and discussed installation with Dave
McIver in addition to installing solenoid vacuum system check valves were
requested by the City and installed.
ATTACHMENT A (Continued)
HISTORY OF DIFFICULTIES WITH HONEY CREEK
PUMPS AND PRIMING SYSTEM
During installation, the unit was tested and the rapid on-off was still a
problem unless the 2-inch port was b, passed. Refer to memo of 1/29/87
regarding background on same.
o Loss of prime and suspected seal de,mage February 11, 1987 report (see 2/17/87
memo` ,
W21-123
I,
A. a..p
C. prlm'41 ckal".p Raiw....bk too
r�
Motor 'R.'pl� Saar...! 1. Y..a... pomp`
IPL
...
. J
(. tiSu .v/lna-�l.G�i� ti 2� (a•,y{� .�, (L�a C[.w •s�r�
%AC" PRIME DETAIL
N AMMOND.COLLIER ar WADE—LIVINGSTONE ASSOCIATE INC. C�
CONSULTING ENGINEERS
1 p43.1 Pao--41 YEARS Or PROFESSIONAL SERVICE
Wa+1af A wV,gNp ra 40 t0 ST(WE WAY HOR1 H
r ra SEATTLG WASHINGTON SS 103 OOAap.a IRCrM n•
twa n aww1A_rL 6ANIT w TYat ra 7[L[IT10N[ 1}Oa16]72aaA r,
AEAw(n.t a«.o. •�a1N.oaTala rl t
1 600-1142.77071WAM. Oklrj
aaaa.Wy o•aAAA,w ra
N1aa .a xaaw.ra
4.armAl�„q ra •O pox 4067
MAwrt,arAa ra ]Oi SOUTH M19SION 67REET
WENAX11[C WASH.NGTON 98601
YtLCPHONt 121061 aann 7aa
March 25, 19A6
R. Scott Construction Company
2840 Carr Road
Renton, WA 98055
Re: pump Submittals
Gentlemen:
In regard to the pump submittals, to speed up the approval process we
have discussed several items Lirect)y with M.D. Fowler. We have given
them necessary information to obtain approval.
lonfirming our discussion with Rowland Martin of N D. Fowler here are
our directions.
1 ) There is sufficient room in the fiber glass enclosure to
provide a pump with flexible coupling connection to the
motor. The unit should be furnished with the flexible
connection rather than the close (Oupled unit noted in
the submittal data.
2) The suction elbow is to be eliminated and the inlet
fitted with a vertical suction pipe.
3) The sizes and locations Of the vacuum priming pumping
connections to the body of the Clow pump and suction
connection piece should be approved in writing by the
Clow factory design engineer as suitable for intended
Pump operations. Clow factory personnel should refer to it
the specific design plan when preparing a response.
4) We have also asked H.D. Fowler to provide continent on
vertical suction connection piece size.
•A O wY.� p wtwrcw
R. Scott Construction Company
March 25, 1985
Page 2
Resubmittal for approval is not required, however, we will appreciate
new ,ata for our file as well as receip� of the letter referenced in 3
above. I
Sincerely,
Frederick G. Kern, P.E.
FGK:jkg
CC: Rowland Martin, H.D. Fowler
Bob Bergstrom, City of Renton
W7-71
RECFIVFQ t.:,
H. D. FOWLER COMPANY
April 15, 1985 taAAo s E 30TH STREET
POST OFFICE Box leo
BELLEVUE. WASH. 08009
Hammond. Collier b Wade - L.igingstone PHONE (toa) 746 6400
4010 Stoneway, North
Seattle, Washington OR103
Attention: Mr. Fred Kern
Reference: Honey Creek
Dear Mr. Kern:
This letter is sent in response to your March 2`1th, 1985 letter discussing
Pump approval.
1) Clow series 6260. Model 4312, Flexible coupled pump will be supplied.
Five (5) copies of dimensional data arc being sent to R.W. Scott, one
(1) copy to Hammond. Collier 6 Wade - Livingstone.
2) Suction elbow is eliminated.
3) Clow has no preference on the location of the vacuum priming system con-
nections. Clow does include 1/2" NPT tapping for case vacuum connection.
The H. D. Fowler Company recommends, for ease of plumbing, to put a 2"
saddle on to the 4" C.I. "suction stinger" spool. The connection could
be made above or below the floor a_ R. W. Scott's preference.
4) i;,e choice on "suction stinger" size is between 4" and o". ,rote first
that the 6" pipe would have a friction loss of 2.02' per 100' and a
velocity of 5.67 ft./s at 500 G.P.M. , while 4" pipe has a loss of 16.4'
per 100' and a velocity of 12.8 ft./s. For ease of plumbing, 4" is
recommended. The head loss in 4" pipe is still comfortably small and
we do not believe the velocity will be too great.
We hope this will answer your questions satisfactorily. Should additional
questions arise, please call.
Yours very truly,
H. F. FOWLER COMPANY, ,IINNC.
Rowland J. Martin
Pump Division
RJM:cc
enclosure PUMPS
SEWERAGE
WATERWORKS
cc: R. W. Scott TURF IRRIGATION
;o. dam
yA�
i J
1 2.40
•C 1 1 �\ � 11 i i ��; II +1 .1 PPAG6tl71�Y1�1��'�'
3iA I.
XZ&AOA ,, _k E[cG.. r E
4LTt�,AJArE aLTER,> TE L
PuH�Hft . Co�I.'+Fs�/�s +�dt�/Es7EG o� P,coPoSG'Q
DRAWN 8Y' J
SCALE oA/E HAMMOND, COLLIER & WADE- LIVINGSTONE
ASSOCIATES, INC.
CHECKED BY' DA(E L_17 -�6CONSULTING ENGINEERS
APPROVED BVFl.NO
.OHO ...1 . w Ma RI �.wwaW M,O. I10.1 aPN..
HAMMOND,CuLLIER&WADE - LIVINGSTONC ASSOCIATES, INC.
CONSULTING ENGINEERS
1943 1966-43 YEARS OF PROFESSIONAL SERVICE
4010 STONE WAY NORTH
LARRYR WADE.RE SLATTLF.WASHINGrON961036090 CONSUI'ANTS
6RUCE LIVINGSTONP RE TELEPHONE (206)632.2664 GEORGE R NAMMOND.PE
RANDALL O NERVALA RE 1-900 562-7707(WASH ONLO WILLIANP COLDER RE
rREDERYCN G At.RE
GENE O FEN6ECHEN It
NELS RJELSTAD It PO BOX 2967
MAROLDE RAYNARO It 302 SOUTH MISSION STREET
DALE D ERDARIL.RI S WENATCHEE.WASHINGTON 98801
RENNETM L EOINGTLIN PL S TELEPHgNE (509)662 1762
MEMORANDUM
TO: R. W. Scott Construction Co. , Tom Kivley
H. D. Fowler Co. , Erick Merklinghaus
Arrow Electric, Jim Bagne
Dave's Pump Service, Dave McIver
Superior Custom Control , Bill Jordan
Dakota Pump Inc. , Jon Wilgers
City of Renton, Gary Morrison
FROM: Fred Kern 1ItileG`^� -
DATE: January 29, 1987
RE: Honey Creek Pump Station
Background:
The vacuum system has been a source of problems and after discussions again with
the vacuum system manufacturer, Dakota Pump, Erick Merklinghaus believes the
problem is the lack of a time delay relay (a relay we don't have). This delay
relay is not the same as the vacuum chamber float differential switch.
The Dakota Company often supplies panels with the vacuum system and these panels
have time delay relays. In our situation, Dakota did not supply the panel . A
recent Metro pump start-up using "Clow" pumps had similar problems that were
traced to the relay, which had been set for too short a delay period.
Sketches:
Rough sketches of the existing vacuum system and proposed modifications are
attached. Note that:
1 . The original shall vacuum line factory design off the impeller has been
increased with a bell increaser to reduce fouling.
2. The original Dakota chamber has been upsized to 8-inch to reduce the chamber
water level fluctuation.
3. A seal unit water supply is tapped into the volute discharge vacuum port.
REnT To ❑SEATTLE ❑WFNATCNEE
Memorandum
January 29, 1987
Page Two
Procedures for Corrections:
Plumbing: Dave McIver has installed a new larger PVC tloat chamber and we need to
change plumbing again. Dave will complete the piping changes. Erick Merklinghaus
will review the proposed sketches with the Dakota factory and advise Dave and Fred
Kern of any suggestions they have.
Electrical : Jim Bagne is familiar with the electrical work and can best determine
how to install the new time delay relay in the Superior Custom control panel . Jim
will check with Erick Merklinghaus and determine the proper type of delay relay
switch. Copies of record construction electrical drawings, diagrams are also
attached.
Schedule: I believe it will be most efficient to have Jim and Dave doing the
sm—�T—retrofit work concurrently. We need to budget about 4 hours to comfortably
make the changes and test the pump controls. I ' ll arrange to be at the project at
the same time too on Tuesday, February 3, 1987. The building and gate will be
open at 8:00 a.m.
Follow-UP: After all the work on retrofit is complete, we wish to have Jim and
Dave—available to discuss the improvement with City staff. Dave or Tom Kivley
should make arrangements to come back in a week's time to double check the vacuum
plumbing for leaks and fix any leaks.
Thank you for your assistance.
Enclosure
W21-43
TEMPORARY PUMP SEAL uOX WATER SUPPLY AND FILTER (NOT SHOWN) IS CONNECTED HERE
UNTIL DOMESTIC SEAL SUPPLY WATERMA:N CAN BE REACTIVATED.
G1/2" R 2" BELL INCREASER ADDED TO MINIMIZE PLUGGING OF VACUUM LINE.
2" �NWITH PLUG TO ALLOW EASY ACCESS AND CLEANOUT.
4 ) LARGER VACUUM CHAMBER ADDED (SEE DETAIL FOR CONSTRUCTION).
NOTE 2" CONNECTION TO PUMP SUCTION WAS ELIMINATED AND CHAMBER IS NOW PRESSURIZED
WHEN PUMP IS ON (CHANGE BACK TO ORIGINAL PROPOSED).
yAct 4
r
/ JGCL fo✓E2
AV`
red
1
r
- 1 '
J
� 1 �
� V
.1
r 1
1 ,
� 1
T'Odi
DRAWN av FDA
11 HAMMOND, COLLIER & WADE - LIVINGSTONE
---- - -- _. ASSOC;ATE S, INC.
CNECKED aY 1APP%VED aY No - COrv5U�71NG ENGINEERS
= vF'^ � vo.. � ...., w...re.o. no• ,loci • »..
1 K
• jy
1
3 � 1
1
l� I� r .
zi
F l..o or— Cow d.
I c� G�e.cwrI&L
t Floor I '
�1G.3 160 7
I
i
-
�- 8 ` )
CO .v N♦
'Dn;
F
r •
,
DAKOTA REQUESTED TO ADDRESS THESE QUE;TIONS:
O1 SHOULL 2" HORIZONTAL PIPE OFF PUMP DISCHARGE BE CONNECTED WITH TEE TO PUMP
SUCTION VACUUM CONNECTION?
(OR SHOULD 2" HORIZONTAL PIPE BE PLUMBED DIRECTLY INTO VACUUM CHAMBER? IF YES,
PROVIDE RECOMMENDATION ON VERTICAL CONNECTION LOCATION, AND SIZE FOR SANE.
7 4 '
ff/Hp• /
� nl �
A Gr. il4e axf 1Y J 7�H
Mo & /i/G A 7-70AIS ,
uRAvey� SCALE' '/ HAMMONQ COLLIER 3c WADE- LIVINGSTONE
CHECKED !Y: DATE' /q ASSOCIATES, INC.
A►►IIOV O BY! ftND. �p if _ CONSULTING ENGINEERS
ww s,aw rrr • eanru �erueree rw. pw, u•-er•
MItZ Isar-pa.+
WIRING SCHEDULE
OarttMC7♦ ; .T[r a[tcrrT.a. utt • ralu
ri.raawp Ilece.n�ittr..e_...+ �[ �. w� � rr+..�r.••ruI laterm/,aw.yrrer.a; t;♦/ybylxq.
s♦ ---ir'a�• �r Q j/J'� .•Enw•crarww .�.;as.aW; t•.J/Y6 4 PtA
If'l..'�aa..1M++�N.L{G+b / i /� \ - 1T••.arDa av(cM,...ap. IIarA.r.apfaj Y.s/f•Ift
a•aT�c
� pa1.S.CI,ra[[a agar
A _. , y J1{ ® MOn4+rwr o+T1ar a+s'w•mi ac sq w ae.o.'+ KMi.10
4 { h!/ // V' 1 ltpiaiDlRL.tGITMMitr I v2•A/b I Ib4.
• _ '---'—'� A 1 jyJ ��;//�� �` _ r I A.nrr rlMR.1fN. A.r r{I4•. 2lli { Il lii.
r Y Ia//�• f �.. r I bts 11 a�ells GWgYr W.
. �R1a.EF• xa o A//.`. �'y;• � �!- rx+a rx cwd+.o .•n.... le no.+wo rwaVIN .4L 1V.cE»Hd..
,rA1101- a+• ! 1� tc• //i/i t : / "�v I•nTc/a : •o.. .ao.�..ca �u.sc a•.cas.
t�Cp �'r a %� �r ,,,,� FLAG NOTES
�--� -" ya wr-nsv.,d
_ .I0/IOE
ir..rl. • C.C. TD r e¢ ' Tm PXA b.+,C,.k+tjr q,p�aE�-r.E..Me rJl. LRwc
erlsf' TEi.R,t4c - M W I r CZ. IAftc .
(_ _ _-- r•'�' �.`� , P1bOCG ,• CG.F L I'MMp IF FU ]Ou-G� (AT &% IGtl•BCWD
rMr•Il'IY Co•c./T IWY. rilDr/IDG rl/fL Cum rY118G•<GS TO pt
cm os•tcc.•TaY srA.sv.DD 61O..1AL t•Yu.eeras.
�rl IdfATgN.TIb f.C[-
/ !rsaow,t4av20
I
AN
• •z 1
tom- E t
I .�..e._ zu,
r 1 ��era� o.� � Tj,{� f [w.r w oso--{'��vl { �<laswc.'r rt•<c. �
1 amne.mM•rt.n «..o lam— ^` � c+.�set ?�•.ICe-: wr.,G `.al�O+ws C12•ec.
1 1TdT' ca..annn.. I
� x�a• {/2G 1•rN +/iG 2 a/'C 14. � _}-� SEW rr.ce. NtG.J
AowwT Trrw'o+rrta �,��
ONE LINE DIAGRAM SERVICE POWER PANEL
SECTION
RECORD CONSTRUCTION DRAWING ,„
n�..p..r. yV�p..�p✓M� Yi(4.p...1 1
CITY OF NENTON
•••n.....•v� •HONEY CREEK "
c[ `wmi..n Ir ELECTRICAL
1.•rup.e ca[ucwr•[•oc-cmwsro..c t aWl..mm[a v.D.•a[Y. [n
.IffOLul[f.wC /yy�r� 7q wy�ynp u c..lyf c.
...,_� aorwnr• rs=w �.%}!-" ��•^�� [w.T10-+,VLo[Df � .ro.[o ( .
ew.d J0/aw�.nwvr
usr cr e+4Y1-eWls
il-TY<OO- rtr gevwrriw
L � E+rs�+•leas !
Iowr. ��Te'wshnl � � owc-1'rli4/a.rM:4IwrI-.<. j
1C1S I�eMwrllt OTIM�li/mw.6 i
0S- 1) of _ �� o��• I I.c.00caRea:nR�Nc.
T c't +i YG� 1 eL.I CL� ITI TY4YIr110. OMh
3 Orl
Q !, eeIEO 1 �Muw ww-esT•Als-r+�
_'� I..a 7 E'i�"e" wlr AITDYiNCeI
w..la,ilc. i elr ) er aIwK TI.`ae.waE
o
{ 1 .YYTL NINM M16Bd M• 4 FIE C1THL IaM
pV/a 1✓+qY ern PI�e4eaa•4alEl�a lww-v+
I erR� era �-� eTEo wE Imw�. p waw-Na1Mwl�wwEwllwrel,
rOM! !RM 1 Ou► YQ- I��MIY.P�I��� �������Y�.
/ flblE Ma DwerY Ra eOf YIV DMA.
i
W L�1� /�- era,.I.K.ef 4 I w.Y Ip./.IR rvreCw:b I
-8'.=.tL ll4RmE ��� iL '/_� 3014•M'�Y.r ❑ ^ rnl�m
n-w rul 1!4Y �� ' re. Tay..�.I LJ ewe I IN�'IMRAn 6.eY
>T Gll/ Y
ws wwwL nlnwaL s+-+..w I, [� i our.a:w
I T„Q
Q<s.aw m -...eeK.e,e-✓�r.-e unww.s
yx.,a.K.s.s <erxo s<s re
•IW ana i
' u4u.w..m.n ea.✓ac++nd rw�ir i
-ems vn,d e.•nen m.uuv I
I wl.Il K! I 1
�x
1.a>a eMR 1
1 rim
.W
1� e'wR v.G R'Y� LMM1 KS
1
{ '•--'w'ncwn
- M--. 9rOr�iYrb NwY
.IIECOIb GOMSTRUCTIOM DMWpIM - I,
� � TYS4�1°'^-""E'o•• rybea : �/ CITY Or R E N T O N
--MONEY CREEK
ELECTRICAL
1�1L�
N-YYP9 Cf]ELKR�WwOE'l1='hGSTON[
go'
SSOC�wTEi erC 4�h.-I J� rE,�e�pY y�ylpy, _�
tl�r tr
• _ LI T OF MATERIALS -
Y(70V J¢ GO NZ ITEM qTY DESCRIPTLON NIFC-R
4 VACUUM MPULAP5 2 2 I7RCUIT ERRS. AA TED 13YIt791R GE
L P CJP.I 0� _ _ L� C83 / C/RCU/T NpR LS A TED 11AWSIL GE
m L CR 2 j/ _ — _ 3 INTEGRAL uAYD/ TEFRIS , GE
R I 29f L C- - - s2 Al LC 1 OAD CENTER /ZOr 1.
03 LR4 P TR/LNSFORI1fR t1U 110 3KCA T_.5;G/3 ACME
J 1 32
POKER tt N Z STARTERS Qf 3_ I" JLAA fUR AAi
BLOCK I J3 ' -
1 , 4 AJI CIr,IACT IL. 9-"7rr ENL Full11
1 t ! - n
r -iC�3 ISA 9� 9} -9-� CB!/OM }' - -p� GB2 rllA - ISR3 NOA Z NANO Off AUTO 1
P�, �f( �(1�o- _ Xt L ILOY SIPALZZWJN I•
f AM ` ( SY 3r ALT / ALTERNATOR 120 Y 41Ab10AF - Fill
cr Ir cl r - 2N0 PUMP ON N
0-/OdA� ,CT 0-/iM Cl I TCl,1 2 BLOWER rhIl 12.1v CM8-A/L
'- t2 i wI NTN IS jL l C' c Cl ve-.l- - INS. In• 2 +L-:0,
yL10r 1 M[I 1- n.0 1 ° ISR v N v:R - /- SIR i-id ALE
AlL AIG✓sl HIGH WATER ALAFM r
3'KYA Tl /T T (�}- o - f S _ ', Z244.7 OEM ,
TAAYSFORA! - ?< 3d O� 31 GRS Grp f!/R4A5
IlOY / /LICE SA./LN SISAivAL rva
AllOAO LCt1 ^I
=ENTER TAI l T/M(Gff AI F['AI 110V SA929 F-/AT 3. DAY TON
LC 34 Yr 1 ENCLOSPRE All A98H361 a OFFMAN
A Al I N9 r/P Mc �P ZSkS s:sa W Ol MUSSELL
20) 20) LO 15) 1S - I-OW WATER ALARM DI I RMI CONy00{ 120Y
M TERM1NAl BLOCA BRAT
MON
�— PF LR L vl V3 ♦ ICR6 M
}l9({ R R I I CONTROL I'll /70 Y. All ar PL 5 D
1} y1 _ - _ __-- N I POWER SLOCR IY133TD MARATHON
/SjI /3� ZOl 75i 10i IS - ;_ LIC.k .- - -x -- LIGN pFu !LOWER
N P8. 1 y y DI RM 2 A/N'LTLfS 0-/:4A SO-2S03y0C5PN Gf
.a. o- - .C•
9 yy P 0r.: R SALE TLI `7 TM 2 RVNN;Mi 'Mf OUI l21YAL •1ftl1L1AQAAL GE
1 [R7 TD I TI&R➢OTE00A Ee . CONTROL PC /IDY/OA A3I41IBI4BP pilyp
-/ 1vETfZw- BIOWER W
W. W. &ONfR SW.�r vv y LR� �� _I?II__ I N S LOY qA AJ/YEG148P' E/ .
T TCZ 3 yl X PUMP
C CRB R NLGN 7TrP ,g43 52/ABAf-JIBAI F,URNAS
CRII TR£RMOSTAr ---PANEL NEATER r� y TNfRAG�TJ'ECTOR 1 p,G1 ! At 52TA2•JZW.A--+ FURNhS
k a i y 7 Ij_fYE- BYPASS ® , RU :,,q :TFI-- i oG ---.-� NAME y 1 L-
T �,.9 PUMP Z I�— PLATES
W —bR PR I l.•. I _ l N16N Tf AP
3 "I RCL, ; - I tom'' S/ 1 - CS/ -PLUMP Al
o .. CRY OAr f Ff iAr /P / /00 A.
- • t CL A a `CKd JOL. A/ SyIELD CLJ :� 'v 2 - L87 Py"100 A. hl2
at wh t /Y CPI MSRI'/"t't at N 3 - CS J LEND CENO
MCI IFYYYLE TO PUMP A/ IY PUMP Of
-/:J 4 - CONTROL PU
x I{ MS RI r SEAL T33 "SJ
CK
c u T 1,1 I )R` Falt nf/ (� S — CONTROL PVAl -
,LT ALTERNATOR SW _ --iJ.j..l , ® T - VACUUM P11M7 I
CP3 S eNs L I M MSR2 TO POM�ML y N' rB t-, a 1t - VACUUM ➢UMPRZ 'I
h - 1
PUMP 2 FM AM (0 Qr) SPMRE - :t
Y MSR2 64 7 SEAL U� _( (A) — SECY:4' fX:. Aim
I
HEYEDIOTPASS —� FA/LURE -ir. _ CONTROL 1
8 ® LRS POL AL ARTfST�T>f BELL CID v 00
t-lNTf[LXIf TO y ----
LIT I — DRY WELL BLINt
^ PRNM,4✓ MLI O ° _-1---{ LRL Sf LRI ____ N 7— TEL IF Li PJNCR
Phillip S T"F" S Lk< Oo IS F11nT /7 •Fr _ R6 I B.S — RECEPTLCAL
�9-R£YED TAMTylASS �I{ N-L -- Z R - -ROOM NEATER
sill TO ALLOW /L _` CRY JO! - CK9 SltCNC - SPARE
SIMULTANEOUS PIMP 111 C82 S' CRIB -- - WCT vil 8l1
OPERATION MC2 M N/ -
110
aTHESE ITEMS ST L� m—TtRRY LLGRT♦SELL 2Sr —LIGHTS
ON SERVICE PANEL 'I )L CRJ i3 ____�1 Al _ /E - -y.Y /T - ALARM BELL SILENCE P.
` -8 L110N WA/EI ALI1Rb Id -THERMAL RESET
NTK IS _ 12 i3 R3 -- N r--A---f-? i 9 - LOW WATEL ALARM
FU ISRI ] ISR2 ` 1T_ i -1 1 V T T Po - PUMPa Il TENI. 4JM£ 2 ,,,••o W YYU
�J RSA !1 - PUMP Z R�:N TEMP.-
�I �' p ti a' �k% t ,4• �t•« II - PUMP MI STILL FAILURE ... 9-J•63 - s A
ill
ALL STOP 2 f9T PUMP ON T ly t t� Q?Q� + ���• •a� Is - 'PnMP 07 SEAL �AaYRE NGNfiCLREE Tit AL Sd�'fF./ONw:•. 4?
f%< O R� J• 4J G2 IY- ALTf RKl S✓J. j
® ® �J.O /S- ONE PUr➢ LOCNOIIr SCHEMWAI D/A. PARTS 4L -1 PF tY7N
D L N N W LY Lf 41 47 At r 7� 7172 - RA BYPASS LAYOUT ♦ NAME PLATE SCALLNILE -
I L.
AAA
t
HAMMOND.COLLIER Q WADE — LIVINGSTONE ASSOCIATES. INC.
CONSULTING ENGINEERS
1943 1986—43 YEARS OF PROFESSIONAL SERVICE
4010 STONE WAY NORTH
LAPPIA*AM It SEATTLE.WASHINGTON 961036090 CONSULTANTS
RAUCt uv1N %n Pt TELEPHONE 1206i 632 2664 GtO t A HAwwOND of
NANO&LI O HIMHLA.Pt 1 600 962 7707(WASH ON1.1 WLLUAw A COLLRA PI
tNtulw K O KENN PI
4INE OIIINNCHUI PI
NtLREntBTAD Pt PO 60A 2967
HAAOLDI RAINAAD It 302 SOUTH MISSION STREET
DALE D EADAIK.IL• WENATCHEE WASHINGTON 98001
AENNIT.I TD1A TON IL TELEPHONE (609)662 1762
MEMORANDUM
TO: Mr. Gary Morrison RECEIVED
FROM: Fred Kern ���
DATE: February 4, 1987 I FEB 3 1987
RE: Field Report on Hone Creek Pump Station EN 1YOFR DEP►.
p Y p I L'11'Of NENEdI
VACUUM PRIMING SYSTEM L
o Tire vacuum priming system 2" suction pipe connection was installed on
February 3. 1987.
o A time delay relay was installea with variable time control dialing.
This system will prevent the rapid on-off vacuum float valve flutter.
The relay is presently set for about 28 seconds. (Setting the delay for
a greater time interval may be reasonable after, we complete some trial
tests. During trial tests it would be easiest to continuously divert
the Sunset P.S. flow/down the Honey Creek Interceptor.
o Bill Chiller (Arrow Electric) put an ampmeter meter on the fluat valve
relay to see when the flutter, started t0 occur. To try and eliminate
the flutter we installed 2" ball valves on each of the 2" vacuum chamber
piping systems. When the ball valve is partially closed the float
switch flutter is modulated.
o I pinched the ball valve down until we eliminated the vacuum chamber
float flutter; and, these valves should be left in this position until a
longer period of testing next week can be arranged. We ran out of test
water about the time we got the 2" ball valves set at a good openin;.
o I will call you early next week su we can set up a good time to do some
further checkout of the new improvements.
o The ball c lve could be shut for a short time to pressurize and soap
test connections for leakage.
C(9►Co/�i Ficc
G �'A A9C
.KITS 00KATT1E LIRENATCHtt
.T/ZA^a r►�;
d')A40/—
FIELD STUDY MEMORANDUM
February 4, 1987
Page Two
o It may still be reasonable to install a heftier vacuum chamber top
flange that does not flex under pressure. Then, if the ball valve is
accidentally or purposely shut off, the flange strength would not be a
concern.
cc: Bob Bergstrom ✓
FGK/cgr
W21-79
PHONE CALL
FOR DOTE iMF
----- -- /-_3V ' -
� _
M
TELEPHONED
pp _ ___..—.—__,.. _
RETURNED
PHONE _ _ YOUR CALL
nw[ rsx MFIEF F1tr�ry�ypM
2 PLEASE CALL
ME GE.j,L,LSQ --
WILL CALL AGAIN
CAM YOU
TO
2' WANTS TO SEE
YOU
SK'NED
I • '♦i V I II
i
WMA RIATIV MAUR >
I&n Im
�I All Id \VAtI WX.I1 NJ
IPAK i MI:N I OF ECOLOGY
A6d Strp PV 11 • f 1h II pm I Alln?Wl.yr 40M FI R'II • U011 4S"N0 e
January 26, 1987
RECEIVED
Robert Bergotrom JAN 2 7 1987
Department of Public Works
200 Mill Avenue South EKIWERNODEpT•
Renton, Washington 98055 CRY 0f kENf011
Dear Mr. Bergstrom:
Cityof Renton NFU 95-063
While reviewing your final progress paynent request and supporting
documentation I discovered that the following change orders are
missing from my files:
a) Change orders 1 through 6 for Phase II Gam' C FFS `q U wZ.
b) Change orders 1 and 2 for Phase III G
c) Change order^. 1 and 2 for Phase IV
If you want these change orders reviewed for grant eligibility, please
submit them for review by February 10, 1987. If they are not
submitted I will have to consider them ineligible for grant
participation.
If you have any questions please call me at 459-6102.
Sincerely,
,�-
Margaret S. Hill
Contract Officer
Water Quality Program
MSH:smr
Ix: Frel Kern, Hammond Collier Wade-Livingstone
a. K. Chung, Ecology/TRTS
Grant File
4�\
• CITY OF RENTUN •
PUBLIC WORKS UEPARTMENT
CONTRACT CIIANGE ORDER AGREEMENT
• CONTRACT honey Creek Sanitary Sewers Phase 11 , S-296, CAG 040-85
CONTRACTOR R.L. Aliq Company, 9215 Marlin Luther Kir gJr. Way So. , Seattle WA 98118
SUMMARY OF PROPOSED CHANGE
1. Add extra anchors for CMP storm drain L.S. Additive. f 450.00
2. Remove existing pipe and provide new 12" connection at new
How Creek Pump Station, L.S.Additive. 228.60
3. Apyrove bridge detail and plan change, no price change. 0-
4. Reduce access road ruck surfacing from 12" thick to 6" thick.
L.S. Ueductive. 7.000.00
5. Add additional clean-up of slope from NE 17th St. to
creek sewer alignment. L.S. Additive. { 450.00
6. Add trace wire. L.S. Additive. + 100.00
7. Add wider roadway patch r Union Ave. NE.
136 sq. yds. @ $40/per sq. yd. Additive. 5,440.00
B. Add traffic loop replacement at Sunset and Union Ave. NE.
L.S. Additive. 1,562.94
Subtotal $1,231.54
_ A 14 Caloc Tay �_—_99.75
Iota] with Tax $1,331.29
All work, materials and measurements to be in accordance with the provisions of the
Standard Specifications and Special Prov1>ions for the type of construction involved.
DR191HAL7T WIT M(T; cURKIJTZuifiRACCT— > STIHATE D TIET EiIANCE -t�T PAT I euNTRAcr
AMOUNT I AMOUNT THIS ORDER I TOTAL AFTER CHANGE
$536,853.20 i E536,853.2 f $1,231.54 w/o tax $538.084.74
SIGNATURES: CONTRACTORSTIAI DATE
PROJECT ENGINEER S>y�Q�yfh _ DATEJotiIS"'41'70C
DATE
APPROVED BY - , ��.—•-_-- ---___--
�1 Vublic Works Dlrector•�
� ciTr of RENiOII
PUBLIC WORKS DEPARTI4ENT
CONTRACT CIIANGE ORDER AGRWiENf
CONTRACT money Creek Phase it Sanitary Serer interceptor CAG 040-85
CONTRACTOR R.L. Alin, 9215 Martin Luther Ring Nay S., Seattle MA 98119 (722-4900)
SUMMARY OF PROPOSED CHANGE rmer9ency Flood Repair For January 17, 1986
SVm - roRCB ACCOUNT
Lahor s 3,228.19
200 Overhead and Markup 64 .64
SUBTOTAL $ 3,873.83
Equipment 3,991.15
Material
5,671.68
151 Overhead and Markup 850.75
SUBTOTAL 6.522.43
Miscellaneous 2,247.21
i
15% Overhead and Markup 337.00
SUBTOTAL 2,584.29
Discount per 2/18/96 Letter - 1.114.98
TOTAL 15,856.72
8.1% Sales Tax 1,284i39
I
GRAND TOTAL $17,1A1.11
All work, materials and measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
uRNINAL ONTTAACT—' CUR REtfr cuiifRAC 51iNAi 6 'IT LIIANbE —LMMITEU CUNi72AC
AMOUNT AMOUNT THIS ORDER TOTAL, AFTER CHANGE
$536,953.20 $538,084.74 I $15,856.72 w/o tax iII $553,941.46
SIGNATURES: CUNTRACTOR i DATE
PROJECT ENGINEER a, _ DATE
APPROVED BY DATE
(Public Nnrks Dlrector) '-
• • C.O. M 3 ——
CITY OF RENT014
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT money Crack Phase 11 Sanitary sever Interceptor CAG 04o-65
CONTRACTOR R.L. Alias 9215 Martin-Luther Rin! May s., Seattle NA 90t18 (722-4900)
SUMMARY OF PROPWO CHANGE Emergency Sewer Repair at sunsot Puwp station i
UONNSTRRAM SYSTi. MOM DAMAGE IN JANUARY 17, 1986 STORM AT NR 7th ST. AND
NARk1NGTON AVE. NE. FORCE ACCOUNT.
Labor _ -�i ` $12,320.35 ----
201 Overhead and Markup 2,464.07
SUBTOTA' 13,827.78 $14,784.42
Equipment
Materials 2,806.78
l5/ Overhead and Markup 421.02 �—
SUBTOTAL 3.228.80
Other 4,950.46
1r,% Overhead and Markup 742.57 -�`—
SUBTOTAL --_ i- _
5,693.03
TOTAL ---
_'_ $37.533.03
8.11 Sales Tax 3,040.18
GRAND TOTAL '------ --'—`J -
$40,573.21
All work, materials and measurements to to in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
MTGINAi. CONTRACT �URRfNT C�I1Tf CT TSfiF�TED NET CIIANGE EST 11 TED COFIfAAC
AMOUNT I AMOUNT I THIS ORDER TOTAL AFTER CIIANGE
$536,853.20 — $553.941.46 $37,533.03 w/o tax $591.474.49
SIGNATURES: CONTRACTOR ` _ - ---- DATE
PROJECT ENGINEER _ DATE _
APPROVED BY ^-` DATE _
-jPub'lic Norlis D�rectorr '-
C.D. r 4
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE URULR A6REEME141
CONTRACT Roney Creek Phase 11 sanitary never Interceptor CAG 040-85
CONTRACTOR R.L. Alia, 9215 Mnrtin huthpr xinq way S., Seattle MA 90118 (72.2-49001
SUMMARY OF PROPOSED CHANGE _ Himergency Flood Repair for January 17. 1986
srPn`. PGRce Acclxlmr
lsabor $2,285.11
_20t ogerhead and markup 457.02
SUBTOTAL
$2.742.13
Rquipsent 3.554.05
Material _ 1,615.60
151 Overhead and Markup 242.74
SUBTOTAL
1.857.94
other/miscellaneous _ 300.59
15% Overhead and markup 57.09
SUBTOTAL `
437.68
Discount per 2/28/86 Letter
- -15 1�9g
TOTAL ~- -
_ 8.297.62
8.11 sales Tax
-- 672.11
GRAND TOTAL $8,969.73
All work, materials and measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
OkIi;INAt_cbN�kAr=1'-"_ CuitRE`lf`f cOtffiRA�T' �_�fit�Ul'f€D NE�` �1tA'N� --�TIMATi:ti ChiifRA
AMOUNT I AMOUNT THIS ORDER
TOTAL AFTER CHANGE
1--$536,853.20 I $591,474.49 $8,297.62 w/o_tax
--- —� _ $599,772.11
SIGNATURES: CONTRACTOR __ i— _ ` DATE _ —
PROJECT ENGINEER _ _y _ DATE
APPROVED BY _- -- OATE
CITY OF RENTON DEPARTMENT OF ENGINEERING
MUNICIPAL BUILDING, 200 MILL AVE. SOUTH, RENTON, WA. 98055 9 235-2631
Money Creek - Phase It
PROJECT Sanitary Sever Interceptor PROGRESS PAYMENT ESTIMATE NO. 8 -- f(nsl
Contract No. 040-85 Contractor, R.L. Alta Company Closing Drta 7,31,86 31vsc1 of 1
Iter, PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
No. D_eacnption Unit Unit Price Qt
Qty Oly. Amount Qt y. Amount Qty. AngwH
1 Mobtlixattnn LS 47.357.00 1 IOOS 47.357.00 --
2 Clexrfng And Grubbing LS 31,SUO.vo 1 IODi 3?,SDO.OU 100% 47.357.00
1 Timber Salvage Lf 1.W 1,000 1009 32,500,00
4 Access Hoed 1432- 1,432.00 1412 1,432.00
CHPLF 27.07 3.760 3760 82,983.20 5 19" Culverts LS 4,Svo.uo 1 100% 4,500.00 100% R4,500.00
b 18" PIP Cv.vert LS 8,700.00 1 1001 8,700.00 100% 4,500.00
7 Crushed Rcza SF 1.00 5301 1,590.00
R Temporary r•crn BY 650 530 1,590.00 530 ),590.00
f Asphalt Concrete Pavement 3.00 650 295 885.00 295 885.00
BY 15.00 630 53D 7.950.00 530 71950.00
t0 Porlond Cement Conetete BY 30.00 10
It Bankrun Cr•vel TON 1.00 1,000 1028 5,404.00 17 Sinpa Reciting 1828 5,494.00
CY 20.00 1.500 1418.9 28,378.DO 1418.9 28,378.00
13 Beading (Type it) LF 3.00 Soo 435 1,305.00 435 1,305.00
14 leading (Type 111) LF 0.30 5,100 4918 2,459.00 435 1,305.00
15 Scour12.' S protection Sock LF 12.60 1.800 1430 18,018.00 1430 18,018.00
16A I2" Sower ripe LF 30.00 300 329 91870.00
166 6" Swer LF 30.00 307 329 9,870.00
17A Overilov Structure 1S4 4,620.00 154 41620.00
LS 2,500.00 I loot 2,SO0.00 toot 2,500 �0
to Interceptor Cut In LS 1,000.00 1 100% 100000 100% 1,000.00
If
18 M,x. x". ) LS , .1,150.00 1 100% 11250.00 100% 1,250.00
M.M, Type 1-48'•+0 eVAI.ou0.0o 4 6 6,000.00 6 6.000.00
Existing M.N. Depth yr 100.00 22 13.) 1,330.00 1J.J 1,330.00
1 6" Drop Connection Yt 70.00 10 8.1 567.00 8.1 567.00
Y 12" Gun Ewer Pfpa LS 14.20 5,100 4988 70,829.60 4988 T0,829.6D
+)A 12" Clnnout G 2,v00.00 15 12 24,000.00 12 70,829.60
236 S" Cleanout
26 12" Cleanout Apron G $75.00 - 3 3 2,625.00 3 ?.625 00
P
25 EA 11 6 . 3,824.00 8 3,824.00
Service Tees G 350.00 9 10 3,500.00
26 6" or 8" Serv. Lateral* 10 5,500.00
27 Television Monitorin Lf 50,00 350 491 24.550.00 491 24,550.D0
t LF 0.20 5,100 4988 997AO 4988 997.60
e Spevning Gravel TOM 15.00 !.000 925 13,875.00 925 1J.815.00
]0 1 cablon* CY 100.00 450 373 37,300.00 373 37,300.00
Subdraf" LF 6.00 1.000 187S )),250.00 1875 11,250.00
11 30" Hatizoutal well Point G 100.00 40 4 400,00 4 4GO.oD
,
32 horizontal well Point Extension LF 2.Do 600 25 5000 25 50.00
)) 12" Culvert LT 60.00 300 260 10.400.00 260 10,00.00
74 Bridge Structure G 4.000.00 1 3 12,OD0.00 3 12,000.00
35 or
ldge Extra Span LF 100.00 20
76A 4' Chain Link fence G 1.000.00 2
360 Chem Link Fence Le 5,000.00 1
)7 Spring Head Drain
U` 400•00 6 2 800.00 2 830.00
39 4' Willow starts EA1.13 In,000 600 690.00 600 690.00
19 Iinishing and Cleanup LF 2.00 5,410 5471 10,942.00 5471 10,942.00
Change Orders fl 1001 ),23).54 100% 11231.54
Change Order 62 100% 15,856.72 100% 15,856.72
Chei.ge Order 13 909 33.533.03 10% 41000 100% 37,533.03
Change Order f4 100% 8,297.62 -0-
Change Order is toot IO,T48.76 -p_ _p_ toot 8.29)_16.6
`Change Order 06 )Do
1001 30,023,70 % `--iD;'i7.
(n) subtotal 568,319.07 34.023.70
602,/02.71
b) Retainget 31 x (a) 28.416.95 1.701.19 30.120.14
0 Earnings Payable this tatimate-
CITY OF REnon
PUBLIC WORKS UCPARFMENI
CUNTIIACT CIIANGE VRUER AGRLEMENI
CONTRACT Money Creek Phase If Sanitary Sewer Interceptor CAG 040-85_
CONTRACTOR R. L. Alia, 9215 Martin Luther King Way S., Seattle, WA 98118 (722�4900)
SOMMRRV OF PROPOSED CHANGE _ Emerjency Flood Repair ` upper channel
FINAL REPAIR_
FORCE ACCOUNT: —
Labor $5,623.42
20% Overhead and Markup 1,124.68
TOTAL LABOR $6,748. 10
Equipment $9,219.01
TOTAL EQUIPMENT _ $9,219.01
Material — $9,651. 17
15% Overhead and Markup 1,042.68
TOTAL MATERIAL $7,993.85
Miscellaneous $5,271.95
15% Overhead and Markup 790.74
TOTAL MISCELLANEOUS $6,062.74
TOTAL $30,023.70
8. 1% Sales Tax 2,431.92
---- GRAND 101AL j32,455.62
All work, materials and mnasvrements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
iiiiIWIN' - ESTInnil:u fits CHANGE - _BiI1ATED C611TRACT"
AMOUNT I AMUUNf IIIIS UIIULR TUTAL AFTLR CIIANGE
$536,853.20 $610,520.81 . � $30,023.70 w/o tax I $64C,544.57
SIGNATURES: CONTRACTOR (� yJ _ UAIE el s ?X,
PROJECT ENGINEER ? „ UAIE
APPROVED BY ' . J �.//it r , �E • ., t J77 7 -
_---� ----- f.�4. �= ------ UAIE AIL—
(idE�iic NorT<s Ulrectoi� -' /
' Page 1 of 2
CITY Or Rr.mof, •
RLIC WURKS HF.PARTMINT
LUHIRACT LIIARGE URULR AGRLDILIll
CONTRACT —Hone
Y Creek Sewer Replacement, Phase 111
CUNiR/1CTUli King Construction Comrarr 4734 SW 317th Place CN;-06?-A
------ I Y, r arlUA LJVd Y-lYLL YlftllL 1.11Sr11C,�,ij1'7_ ,r"
SUMiARY OF PROPUSEU CHANGE
Add NisC. Utility Work an Pro'et ct
A• Added Force Account Sewer_ Service Relocation r
$ 679.01
U. Added Force Account Sever Service Relucation
— — ---- 824.65 9 7,4.(pf
C. Added force ACCOnnL Sewer Service Relocation y
40U.81 gw•91
_1)• Ch• rye Conaition Mli t 405 h H r^.OLh St. v
L.S. 3,450.0U 3IS6Q�
F. nanye Materials from PVC Pipe to DI
- - - - L.S. 9.928.04 9978•U'+
F• :vcvlay Revised Cost 380 Ions at S41.Z5/Ton 15,675.00
r►�i.S
G. Manhole Ad,justruent 4 each at $200
800.00 &)og
If. Adjust Existing Fire Hydrant taterial
--- L.S. 2,153.26 ZiS;.ZG
1 . Grade Adjustment
L.S. 1 ,600.00 K 16oc>
J. Storm Drain,.ge Revision in 28th Place - f A x
_ force ccount 2,019.97 ZU194J
K. Added Sewer Service Relocation - fore Ac&ourr v
1 Fi24.73 I9,1.y•73
L. Adde(l Sewe • Service Relocation - Force Accormt
1 ,321 .94 � /3z/,4q,
M. Added Extra Support for Storm Sevier
L.S. Z235.01
H. Added Ouctile iron Sewer lee's and Pipe 645' L.r. at $5/Lr q Jy,7.''22r n0 37 1v•�
All work, materials and measurements to be in accordance withutiLerrprovisioilseuf the
Standard Specifications and Special Pruvisions for the type of constluctioo involved.
Oft iGiUAi. C )I(TRtAL-T-_ '-CUNIiL11Fiu111RAC -`---ESTIAff t U-11€T'LHANUi----LsriKA-i0i ciiiiiiiilcl
AMOUNT I AiNIUNT iIIIS ORUER TOTAL AFTER CHANGE
S1GNAlURES: k-011TRl1CTOR UAiE
PROJECT ENGINEER i /
DATE
APPRUVEU BY �N- JATE 7 - y 1 L
Ziiubllc Worlcs Ulrec`tor��
. Page 2 or 2
• ley or RENr011
PUBLIC WORKS 1)[PARTMIJ11
IllWT CHANGE URUER AGHLEMENr
0 U prq
!r Replacement, Phase III N
679 • U 10 + 4734 .SW 312th Place CAG-OG2-85�—
B24 • 650 + in Company, rederal Way WA 98071 Phone- 838-7819
400 . 310p ' -
:t 9 Bo1'o - Ou) +
2 153 . 261) +
_ 1 019 • 00U + 15 Tees at f55U each 8,250.00 `d'
2 019 . 970 �'2T0
1 82 • 7 30 +
1 321 . 940 Subtotal $54.402.51
+
_ 2 2 35 • 0 1 �; + 8.1% Sales Tax 4 406.60
3 24U • 00 —_. —
0 250 . 001) + TOTAL 558,809.11 34,17.
38 727 • 421)
OV� o1�N�
work,, materials and measurements to be in accordance with the provisions of the
ndard Specifications and Special Provisions for On type of construction involved.
FINAL-fOlITRUT-1- CURREIII CoiffAAcT—__EST IfIATIUlI T'L t1
IlANGL -ESTIMATED i'ONTRA
AMUUNr I ANUUNT 1111S URUER TUTAL ArT6 CHANGE
E370,204.88 E370,2.04,88 I $59mr?.1) I t429.1113.9 9
TUBES: GUNTMCTUR DATE
ECT k'iGINEERC C , . .. DATE
OVEU UY DATE
c _� { •f�>
�Fublic we ki wictor�i` - ,
CITY Of RENTOH
PUBLIC WORKS DEPARTMENT
CONIRACT CHANGE ORDER AGREEMENT
CONTRACT Honey Creek Sewer Replacement, Phase !]1 , CAG-062 ,1S
CONTRACTOR King Construction Company 4734 S.W. 312th Place
fed ral Way.WA 98073 fc9
SUMMARY OF PROPOSED CHANGE Add Force Account Work
Install Type E Curb on N.E. 28th St. Cul-de-Sac
East of 1-405 Lump Sun $863.09
8.1% Sales Tax 69,91
Total $933.00
All work, materials and measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
Zffi�IIdALTNTIIA�T- -i1JR>i€tfT NfRA�T--€sfIF1ATFu NET�iIANu€— ES MAT€U CuNTkA
AMOUNT I AMOUNT THIS ORDER TOTAL AFTER CHANGE
$370,204.88 IJ $429,013.99 I $933.00
E479,946.99
SIGNATURES: CONTRACTOR _ � •
DATEQ�.
PROJECT ENGINEFR,r ¢01w GATE
APPROVED BY DATE
r(�ubF�c�Siork`s f7 rector
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER AGREEMEN
CONTRACT Portable Elec, Ic Generator , Phase IV
CAG-071-85 _
CONTRACTOR _Puget Constructors i�c 1235 East 4th Avenue, Olympia, WA 98501 75a-9671
SUMMARY OF PROPOSED CHANGE
01 Increase 2" conduit between pump house and generator garage per NEr. requirements.
Lump Sum $ 253.59
02 Increase garage floor concrete s;ab per City Building Dept. requirements
Lump Sum $ 1,212.20
TOW 1,465.79
15% Overhead Profit 219.87
TOTAL $ 1,685.60
8. 1% Sales Tax 136, 53
$ 1,822.13
All work, materials end measurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
�If1�IAAL—�bATTL T TTMMMUTU T WTMT€U N T TTIA ry
AMOUNT I AMOUNT THIS ORDER TOTAL AFTER CHANGE
$11,129.80 $71,129.80 $1,822. 13 $12,951.93
SIGNATURES: ~'
CONTRACT DATE IA65
PROJECT ENGINEER t( )) r N+ DATE *"H T-
i
APPROVED BY DATE io i z
c Nor s D rector —
CITY or RLIIIOiI •-
PUBLIC WORKS ULI'ARfIU:NI
LOWRACT CIIA14GE ORDER AW'EFfflll
C014TRACT Portable Electric Generator CAG-071-85, Phase IV
CONTRACTOR P_ uyConstructors, 1235 East 4th St., Olyripia WA 98501
SUMl'KRY OF PROPOSED CIIANGE
1. Place 2" crushed rock top course gravel surfacing on turn around
----------------
Lump Sum E 200.00
2. Provide Electrical Conduit for Telemetry Lump Sum 664.70
_ Subtotal 964.70
i8.1% Sale Tax 78.14
TOTAL 1 ,042.84
All wark, materials and n!nasurements to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
uktclttAt-ci)NTWIT- -�URiiEIlTi;uNif+hci— EsTI1tATEu-1iEfi�iiAfti;E— EST)HATEi�ciiiiTRAl7
APIUUIII AFIUUNT 11115 URULR TUTAL AFTER CIIANGE
E71 .129.8U �E72,9�' .93 E1 ,042.84 I
E74,072.91
SIGI)AIUBES: CU1)TR/1tT0 DATE 2
PROJLCT ENGINEER
DATEg���g'6
APPROVED BY y
/C fr'1. DATE 4-
�iliu�flc Works'Uirector�` - --