June 5, 1985
Washington State Dept. of Ecology
Mail Stop PV-11
Olympia, WA 98504-8711
Attention: Ms Rosemary Walrod
Subject: Honey Creek Sewer - Phase II
Dear Rosemary:
Thank you nor your letter of Ma; 30th, 1985. As requested, I have
attached:
1. Low Bidder 's Proposal form and bond copies
2. Proof of Advertising
3. Addendum notations are attached
Our Consultant, HCWL Enginers, has responded to Chris Hayne's letter
of April 22nd. I have attached a copy of the HCWL letter.
On the issue of emergency power, as directed by Ed O'Brian, we are
purchasing our own portable standby power unit. The plans and
specifications are being prepared right now, and I have attached
a copy of out Purchase Order for this work. The bid documents will
be completed within three weeks and I wit' submit them • rou AS
soon as possible for review and approval.
This should complete all the DOE reN ew comments on Phase II award.
Please notify me as soon as possible so we may award and execute
the contracts. Time is eery important, our Fisheries Permit shut-off
date this fall must he accommodated, so we need to start work as
sown as possible.
In your letter you have noted your concerns about the Honey Creek
Pump Station Emergency Power Unit's use, We will commit to make
the power units highest priority for use at the Honey Creek Sewage
Pump Station. To implement this priority ranking, we will:
Dept. of Ecology -2_
1. Label the Generator with this priority on a sign or painted
letters.
2. We will include this priority in the O 5 M manual for the pump
station.
3. we will include this priority in the water system emergency
plan now in preparation.
4. we will include this priority in a letter report to the city
Fire Department. The City Fire Department provides all of
City's emergency planning and response and has the ultimate
responsibility for all emergency work.
I feel these planning activities will meet your needs.
Please give us the Phase II Award recommendation as soon possible.
Very truly yours,
Robert E. Bergstrom, P.E.
Engineering Supervisor
.jft
Attachments
CITY OF RENTON "29C�
Lawrence J. Warren, City Attorney
Daniel Kellogg
+ gg -Mark E. Barber - David M. Dean - Zanetta L. Fontes -
Robert L. Sewell - Mary deVuono, Assistant City Attorneys
October 5, 1988
Malcolm J. Bell, Esq.
Attorney at Law
148 S .W. 153rd Street, Suite C
Seattle, Washington 98166
Re: City of Renton Condemnation - Shane
Money Creek Sewer Line
Dear Mr. Bell:
By letter dated December 29, 1987 , I inquired why you had not re-
noted this case for trial as you had promised to do. Nearly a
year has passed without the case being noted. Therefore, I have
note the case myself. You will find enclosed a copy of the note.
Do you inceud to try this case? If so, I would like to take the
deposition of your expert, Ono Millard, and the deposition of your
client. Could you please contact me abouc available dates?
Ver t my urs,
a� Z?�� ---
awrence arren
LJW:as.
Encl.
cc: Mayor
Dick Houghton
A8.3/22 :-23.
XAIY-1
,a. " �e �-r� Cam•+�- ,� 7?0, a.
Post Office Box 626 100 S 2nd Street - Renton, Washington 98057 (206) 255-8678
ztt
a % _
ENDING
OF FILE
FILE TITLE
5 - Z96
�loney