Loading...
HomeMy WebLinkAboutWWP2701432(1) Miscellaneous Out of Order Filing; Honey Creek S--296 Sewer Phase I I ,► V �� r clF ;y PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 MAL 0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055 9,0 ,o O�4rFO SEPSE�'0�P BARBARA Y. SHINPOCH MAYOR June 5, 1985 Washington State Dept. of Ecology Mail Stop PV-11 Olympia, WA 98504-8711 Attention: Ms Rosemary Walrod Subject: Honey Creek Sewer - Phase II Dear Rosemary: Thank you nor your letter of Ma; 30th, 1985. As requested, I have attached: 1. Low Bidder 's Proposal form and bond copies 2. Proof of Advertising 3. Addendum notations are attached Our Consultant, HCWL Enginers, has responded to Chris Hayne's letter of April 22nd. I have attached a copy of the HCWL letter. On the issue of emergency power, as directed by Ed O'Brian, we are purchasing our own portable standby power unit. The plans and specifications are being prepared right now, and I have attached a copy of out Purchase Order for this work. The bid documents will be completed within three weeks and I wit' submit them • rou AS soon as possible for review and approval. This should complete all the DOE reN ew comments on Phase II award. Please notify me as soon as possible so we may award and execute the contracts. Time is eery important, our Fisheries Permit shut-off date this fall must he accommodated, so we need to start work as sown as possible. In your letter you have noted your concerns about the Honey Creek Pump Station Emergency Power Unit's use, We will commit to make the power units highest priority for use at the Honey Creek Sewage Pump Station. To implement this priority ranking, we will: Dept. of Ecology -2_ 1. Label the Generator with this priority on a sign or painted letters. 2. We will include this priority in the O 5 M manual for the pump station. 3. we will include this priority in the water system emergency plan now in preparation. 4. we will include this priority in a letter report to the city Fire Department. The City Fire Department provides all of City's emergency planning and response and has the ultimate responsibility for all emergency work. I feel these planning activities will meet your needs. Please give us the Phase II Award recommendation as soon possible. Very truly yours, Robert E. Bergstrom, P.E. Engineering Supervisor .jft Attachments CITY OF RENTON "29C� Lawrence J. Warren, City Attorney Daniel Kellogg + gg -Mark E. Barber - David M. Dean - Zanetta L. Fontes - Robert L. Sewell - Mary deVuono, Assistant City Attorneys October 5, 1988 Malcolm J. Bell, Esq. Attorney at Law 148 S .W. 153rd Street, Suite C Seattle, Washington 98166 Re: City of Renton Condemnation - Shane Money Creek Sewer Line Dear Mr. Bell: By letter dated December 29, 1987 , I inquired why you had not re- noted this case for trial as you had promised to do. Nearly a year has passed without the case being noted. Therefore, I have note the case myself. You will find enclosed a copy of the note. Do you inceud to try this case? If so, I would like to take the deposition of your expert, Ono Millard, and the deposition of your client. Could you please contact me abouc available dates? Ver t my urs, a� Z?�� --- awrence arren LJW:as. Encl. cc: Mayor Dick Houghton A8.3/22 :-23. XAIY-1 ,a. " �e �-r� Cam•+�- ,� 7?0, a. Post Office Box 626 100 S 2nd Street - Renton, Washington 98057 (206) 255-8678 ztt a % _ ENDING OF FILE FILE TITLE 5 - Z96 �loney