TO: CITY OF RENTON FROM: Shohen Limited Partnership
UTILITIES DIVISION 1420 Made Ave. S.W.
200 MILL AVE. SO.
RENTON WA 98055 Renton, WA 98055
ATTENTION: ARLENE HAICHT DATE: October 30, 1985
COST DATA AS') INVENTORS'
SUBJECT: Shohen Limited Partnership CITY PROJECT NU(BERS: '+-
1420 Maple Avenue S.W S-
NAME OF PROJECT
Dear Ms. lsiRht: ppp^
Per your request, the following infor Lion is furnished concerning costs for
Improvements installed for the obcve referenced project.
WATER SYSTEM:
Length Size I•pe
20 L.F. OF 6 L524S WATERMAIN
L.F. OF " WATERMAIN
U.F. OF " WATERMAIN
_ L.F. OF WATERMAIN
EACH OF FIRE HYDRANT ASSEMBLIES
EACH OF " GATE VALVES
EACH OF GATE VALVES
EACH OF GATE VALVES 1
Other: con..rete vault with 0," detector check valve
16 T FOR WATER SYSTEM S_8y344
1TARY SEWER SYSTEM:
Length Size Type
253 L.F. OF 8 PVC SEWER MAIN
_. 175 L.F. OF 6 PVC SEWER MAIN
_ L.F. OF SEWER MAIN
One (1) EACH OF _ 4$ DIAMETER M,,NHOLE^ (Type
r:
SEWER 'YSTEM S 10,405 —
STORM DRAINAGE SYSTEM:
Length
_- 8 L.F. OF 8 CP STORM LINE
�— L.F. OF �_ —C1� STORM LINE
L.F. OF STORM LINE
L.F. OF — STORM LINE
other: 2 each curb inlets wit.`. castin 5
2 eac�i type - rate basins w t castings
TOTAL COST FOR STORM DRAINAGE' SYSTEM A 3,790
STREET IMPROVEMENTS: (Including Curb, Gutter, Sidewalk)
290'-6" curb and gutter, 11E7 S.F. sidewalk, 3 each driveway
TOTAL COST FOR STREET IMPROVEMENTS S 5,652
ILLUMINAT. N
1 each street light
TOTAL COST FOR ILI.141NATICN
$ 2,750
Very truly yours,
SIGN 1
Rich Hendrickson