CONSTRUCTION FIELD SERVICES
M Q=EANCY INSPECTION REPORT
DATE: SEPTEMBER 11, 1991
TO:AIRUILD09-ZIM
TEMS
LL PARSONS
(—)-WATER - ABDOU
EVIEW - GREGG 7,IMMERMAN
UCTION $VCS - PHELPS/BURGY/KOKKO
PORTATION SVCS - CLINT MORGANCAPE/ZONING - BOB ARTHUR ii,Y Of RLWON
ING FINAL - KEN BINDARA ! 14,' erflt'F Dept.
[ ] FIRE PREVENTION
FROM:—CONSTRUCTION FIELD SERVICES- KEN BINDA1tA x6173
Ic
}
SUBJECT: 2001 LIND AV 5W _—PERMIT NO. : B-36258 (WOl871351
STONEHENGE II (VY"IS) TYPE BUSINESS: OFFICE BUILUZNG
The suDject project is nearing completion. Please investigate your area of
responsibility and indicate;A
P your acceptance or non-acceptance.
Please return this form by }i �� T1 M8�,gffg4"14 In order that a
permanent Certificate of Occupancy may be issue " omments are
received by the above date, the permanent certificate will be issued.
1
TO: CONS T UCTION FIELD SERVICES DATE
FROM: DnL(zz
This project is approved by this department subject to the following
corrections: (Note: see copy of 90 day requirements attached)
NON-LIFE SAFETY ITEMS LIFE SAFETY ITEMS '
-J'
Do YOU HAVE ANY OBJECTION TO ISSUANCE OF A PERMANENT CERTIFICATE OF
OCCUPANCY? (IF YOU HAVE LISTED ANY LIFE SAFETY ITEMS, MARK "YES".)
YES [ ] NO
Authorized signature '
- 1
CONSTRUCTION FIELD SERVICES
FINALOCCUPANCY INSPECTION REPORT
I
DATE: JULY 25, 1991
A TO: UTILIPY SYSTEMS
[ ] STORM - RANDALL PARSONS 5
.[ ] SEWER - DAVE CHRISTENSEN
[ ] WATER - ABDOUL GAFOUR ,
[ ] PLAN REVIEW - GREGG ZIMMERMAN
[ ] CONSTRUCTION SVCS - MARV BURLY/RICK KOKKOIUL
[ ] TRANSPORTATION SVCS - CLINT MORGAN
( ] LANDSCAUdMEING -- BOB ARTHUR
( ] BUILDING FINAL - RANDY MARTIN CITY OF RENTON
[ ] FIRE PREVENTION Engineering Dept.
FROM:—CONSTRUCTION FIELD SERVICES- RANDY MARTIN x6171
SUBJECT: SOUTHGATE II/STONEHENGE/VYZ_U PERMIT NO.: B=16502 (W9/e7135)
2001 LIND AV SW TYPE BUSINESS: OFFICE BUILDING
The subject project is nearing completion. Please investigate your area of
responsibility and indicate below either your acceptance or non-acceptance.
Please return this form by THURSDAY, AUGUST 1. 1991 in order that a
permanent Certificate of Occupancy may be issued. If no comments are
received by the above date, the permanent certificate will be issued.
TO: CONSTRUCTION FIELD SERVICES
FROM:JC]l3 ���' IJCfL,Iy�/
This project is approved by this department subject to the following
corrections: (Note: see copy of 90 day requirements attached)
- NON-LIFE SAFETY ITEM$ LI,pE SAFETY ITEMS
DU YOU HAVE ANY OBJECTION TO ISSUANCE OF A PERMANENT CERTIFICATE OF
OCCUPANCY? (IF YOU HAVE LISTED ANY LIFE SAFETY ITEMS, MARK "YES".)
.,tea
YES [ ] NO
Authorized Signature
' O:• nl ocr
r
{ZJC r
y4'
} � i
K" .
�a ^
1 '
CONSTRUCTION FIELD SERVICES
PRE—OCCUPANCY INSPECTION REPORT s
DATE: MAY 31, 1991
TO: UTILITY SYSTEMS
[ ] STORM - RANDALL PARSONS
[ ] SEWER - DAVE CHRISTENSEN
[ J WAFER - ABDOUL GAFOUR
[ I PLAN REVIEW - GREGG ZIMMERMAN
[ j CONSTRUCTION SVCS - MARV BURGY
[ j TWSPORTATION SVCS - CLINT MORGAN
( ] LANDSCAPE/ZONING - BOB ARTHUR
[ ] BUILDING FINAL - RANDY MARTIN
[ j FIRE PREVENTION
FROM:—CONSTRUCTION FIELD SERVICES - RANDY MARTIN x6171
SUBJECT: SOUTHGATE OFFICE PLAZA PERMIT NO: B-16258 (WOY87135)
2001 LIND AV SW TYPE BUSINESS: OFFICE BUILDING B-2
The subject project is nearing completion. Please investigate your area of _
responsibility and indicate below eit..er your acceptance or corrections.
Please return by NNE 7. 1991 in order that a Certificate of Occupancy may •k
be issued. If no comments are received by the above date, the Certificate
will be issued.
TO: CONS T UCTION FIELD SERVICES - 3RD FLOOR DATE_ �✓� �_
FROM: itJ11�TTc� lL 17� '
This project is approved by this department subject to the following
corrections:
NON-LIFE SAF$TY ITEMS LIFE SAFETY ITEMS `
_ J'
ido
DO YOU HAVE ANY OBJECTION TO ISSUANCE OF TEMPORARY CERTIFICATE OF
OCCUPANCY? (IF YOU HAVE LISTED ANY LIFE SAFETY ITEMS, MARK 'YES'-.)
[ j YES >.-I NO
i
ainexc
Author zed Sed qn� M�C-
I
SANITARY SEWER SYSTEM LOW PRESSURE AIR TEST
PROJECT tt-ul" C N"L 6-a I.L
DATE I P
LOCATION LENGTHI K C RESULT
1
F
DAILY INSPECTION DIARY
DAY:jtb� - PERIOD: •` 3o REPORT i
2_' n DATE: � /� /.� WORK 7 e.o.{►:n. to�__M.!p.e.
WEATHER:F4'-7 CLrl TEMP. MAX 6() OF NI*:I_'F PRECIPITATION:
WORK ACCOMPLISHED TODAY:
y=
IXMFI Eu sTrnr,
�1.V. A.InCxs-) OFF ASStMBL
_ bs1 S.W• Z 7TMI 5 E .�. $u I�� `JIC.E_ " oNl Z41 F u
'7�aILtC TEE 1D I " V. S 4vIQxL'
Inc act
5•D,i_ UEEr> 'ClIC FZ.7A1-Tl JC, I:t 4'�F'Efu i
r 1 4 f
Yvr„v vur.l �Gc wA5 Ca1JG1 �YIES e-P• 1—; f1E6 ti�t:E.l
b r l E �AOev 1 AL IC E^ T}+.Y.t'.AI T r % btu EL77e-c.
1�ir-r rla� e��,F-n -rtl.1<1• `(t�' �" .TcT TIA - ST l f-lc
�.I•, A _�,,'S 'yT1 fi 1FA� JTE +\w1y 00 iiE�-T
tr Pc�jco,c. s,n,�l�— n�(Z nil l nD Y
n n
A
�(.�...-, -tt lc pc..w i.� � Ir If • T7 r G Fi+�^M` T�•F 'i'l�r r'f�? /�Y F'. r` x
9!L(. ^
f r nor--n -n f.. r^. 1 \ •� i -ter�, \
CONTRACTOR SIGNATURE INSPECTOR SIGNATURE
DATE:
t
r
J
J
7 I Adiff
sA-068-90
,ED FOR RECORD AT REQUESI"I
rICE OF THE CITY CLERK
q_NTON MUNICIPAL BLDG.
200 MILL AYE.SO.
RENTON,WA 98055 SFSYf,R PARTICIPATION AGREEMENT
THIS AGREFD'lF n is made by and between the City of Renton (the
"city.) and Storehenge II Lv ited Partnership,Office ash'ngYoPlaza limited
partnership lfomerly known as Southgate ship) (the "owner").
Partnership, a Washington limited partner
RECITALS
WHEREAS, CW is the caner of certain real Property located in
the t forth m Exhi)"it A attachedte of w the
and
egal description of which
is etFenton incorporated by reference
herein; and
WHEREAS, the City, at sate future date may wish to extend a sewer
main west from Lind Avenue S.W along S.W. 19th Street to connect with
Metro's trutu line at oaksd—le Ave. S.W. i
NOW THEREFORE, rr IS AGREED AS FOLLOWS:
1. owner agrees to participate in the cost of said sewer line.
Lt
(( 2. owner's participation shall not exceed Fifty percent (508) of the
cost of installing an S" sewer lire along Owner's property
cofr ontage.
O3. This Agm-mant shall terminate ten years from the date written
CT) below.
4. This Agreement shall be a covenant running with the land and shall
be filed and recorded in the records of King County, Washington,
in the. Department of Records and Elections and shall be binding t
upon and inure to the benefit of owner and its heirs, successors
and assign/s/(�.r��`
DATED this '! Y of October, 1990.
OWNER:
STONEEER4GE II LITED PARTNERSHIP,
MI a 04-'08 41345 B
a Washington limited Partrersh'P
RECFEE ^c.00n
BY: VYZ Com1PANY, a Washington corporation RECD cF 8.00 a:**lO.OQ I
'I as ing General Partner CPSH�L
IL D. VYZIS, President �p
m
/ � m
sy c
—X 0
x
to
J
1
i
Ar
r. ,
i
STArEOF WASHINGTON I
1
COUNTY OF KING r
' On this 'A- day of October, 199b, before me, a Notary Public in and for the State of
Washington, personally appeared BASIL D. VYZIS, the President of Vyzis Company, to me known to be
the corporation that is the Managing General Partner of Stonehenge II Limited Partnership, a Washington
limited partnership, the partnership that executed the foregoing instrument, and acknowledged said
instrument to be the free and voluntary act and deed of said partnership, .or the uses and purposes
I therein mentioned, and on oath stated that he is authorized to execute the said instrument on behalf of t
1 the partnership. �It
I
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and
year first above written.
1 PUBLIC in and for tat,
i Washington, residing at 9
My commission expires:
� a
d
O.t
co
i c
0
rn
i
;I
1
I
I
J.
N))
Sewer PartkipatioNStonehenge II
AII
d +�
EXHIBIT "A"
LEGAL AL QFSCRPT QN
This Exhibit a a continuation of that certain LID Participation Air, sment aided October 1990, for
real property in King County, Washington, and by this reference shall become a part of that Agreemeet.
Local Description: STONEHENGE 11
i
1 That portion of the Southwest quarter of the Soutnwest quarter of Section 19, Township 23 North. -�
Rang 5 East, W.M. m King County, Washington, descnbed as follows:
Commencing at the Northwest comer of said Southwest quarter of the Southwest quarter also being the
inlersection of the West line of said suhdivision and the centerline of S.W. 19th Street;
Thence, South 00'471W West along said West line a distance of 30.00 feet to a point ON the Southerly
margin of said S.W. 191h Street;
i
Thence, South 89'48'50' Ezst along said Southerly margin a distance of 211.72 feet to the point of
beginning of the herein descnbed parcel of land;
Thence, continuing South 89'48'50' East along said Southerly margin a dislance of 707.88 feet to a
point on a curve to the right, the center of which bears South 0*11.10- WasL having a radius of 55.00
feet;
[r
Thence. Southeasterly along the arc of said curve through a central angle of 91'09'04', an arc length
M of 87.50 feet to a point on the Westerly margin of Lind Avenue S.W.;
O
� Thence, South 01'20'14' West along said Westerly margin a distance of 563.31 feet;
O ro
CT) which
North 8979'a2" West a pittance of 385.19 lee' ro a point on a curve to the left. the center of
which bears South 73'27'04" West, having a radius of 140.00 feet:
Thence, Northwesterly, Westerly and Southwesterly along said curve through a central acgle of
117'09'31', an arc length of 286.27 feet;
r
Thence North 43'42'27'West a distance of 196.64 feet;
Thence North 00'20'18" East a distance of 416.00 feet to the point of beginning.
y
3
LID ParticipationfStonshenge 11 _
{
4
i
'F
S.W. 19TH ST. '
.. S 99'ae 5p E :.p16.p1
211.12' 'pLB9 Y0,
f A-50 0
SOUTHGATE OFFICE PLAZA P
PHASES
W
e1° AREA:4a2.25i+SO,FT.
0
�I} 9.92 . ACRES
e _
I
n
0
e au d
'n h �a
\�� I u
a
m �SOUTHGATE OFFIC�E,_ 1`-`\ S.W. 21ST ST.
Co PLAZA 11 s e9_as ar El
. 'A0'.
ae-' w
PHASE= !.
m I „;r SOUTHGATE OFFICE PLAZA F^ a
AREAL 415.512 . so.FT. 2'r PHASE L
C
9.57+ACRES $
I AREA:410,332 +$O.FT, = �
9.42.+ACRES a
wl
a, it I
f �
of
I�
I W1
I
^I l
Ir
r
- 1.003.4r�- A av 52 p2' w -
i
i (Y�
i _ C
y
1
' il
t
CITY OF RENTON
Office of the City Attorney
Earl Clymer, Mayor _ Lawrence 1. Warren
!1 cm OF FWNTON
NOV -9 1990
November 7, 1990
' DEVE10A1EM SEA�a=t:
ON16gN
TO: Gregg Zimmerman, Supervisor, Plan Review
FROM: Lawrence J. Warren, City Attorney
RE: Southgate Office Plaza I1 - Sewer Participation
Agreement
Dear Gregg:
1 The agreement, as forwarded to me, is approved as to legal form.
Howeier. I'm not sure that Dave Christensen's amendment to
Condition 2 clarifies the language unless we are dealing with
actual costs as opposed to estimated costs.
' Lawrence J. Warren
LJW:as.
cc: Mayor Clymer
A8.62:59.
i
i
f
iI
i
i
z
i
Post Office Box 626-100 S 2nd Street-Renton,Washington 98057-(206)255-9678
4
AVOW ' . '
r
SEWER PARTICIPATION AGREII+ NT
THIS AGRF.FTgNf is made by and between the City of Pentonlimited
"City"1 and Storehenge II Limited Partnership. a washingtun
partnership It.mnerly known as Southgate Office Plaza II Limited
�` Partnership, a Washington limited partnership) (the "Owner").
iwTTALS
U MMASv Owmar is the owner of certain real Property located in •'
Z
the City of Pnntsn, State of Washington, the legal description of which
is set forth on Exhibit A attached hereto and incorporated by refen-erce
0 herein; and „4
U
WHEFZ%S, the City, at sate future date may wish to extend a sewer
main west from Lind Avenue S.W along S.W. 19th Street to connect with
nL metro's trunk lire at Oeksdale Ave. S.W. r-
F
O NOW TkaEREFOiff', TT IS AGRg17 AS FOLLOWS:
�1 1. Owner agrees to participate in the cost of said sewer 1ine.
2. Owrer's participation shall not excee i Fifty Percent (SOd1 of the
1 cost of installing an 8" sewer line along Owners Property
frontage. s
3. This Agrenennt shall terminate tc.� years from the date written
below.
4. This Agreement shall be a covenant runnnuig with the land and shall
be filed and recorded in the records of Ring County, Washington,
in the cepan-arent of Peoords and Elections and shalt be boding
upon and inure to the benefit of C're and its heirs, successors
and assigns (I
DATED this _ y of October, 1990.
-WNEP:
III Lmit8d p p
BY: COMPANY, a W n rgtm corporation
T _ing General Partner
IL D. VyZIS, President
CITY OF PENTON
BY
,i
STATE OF WASHINGTON )
1
COUNTY OF KING )
On this 'z- day of October, 1990. before me, a Notary Public in and for the State of
Washlogtor, personally appeared BASIL D. VY21S, the President of Vyxis Company, to me known to be
the corporation that is the Managing General Partner of Stonehenge II Limited Partnership. a Washington C
limited partnership, the partnership Rat executed the foregoing instrument, and acknowledged said
instrument to be the free and voluntary act and deed of said partnership, for the uses aid purposes
therein mentioned, and on oath stated that he is authorized to exac is the said instrument on behaif of '1
i the partnership.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my olllcial seal the day and
year first above written.
0.1 PUBLIC in and fort tat —
Washington, residing at
My commission expires: 9
k
I
I
f
Sewer ParticipatioNSionehenge II
EXHIBIT 'A•
I FGAL DESCRIPTION
This Exhibit is a continuation of :hat certain LD Participation Agrwment dated October 1990. for
real property in King County, Washington, and by this reference $hail become a pan of that Agreement
hal De<_cnenon: STONEHENGE
That portion of the Southwest quarter of the Southwest quarter of Section 19. Township 23 Nonh. `
Rang 5 East. W.M. in King County, Wasmngtw,asscnhsa as follows:
Commencing at the Northwest comer of said Southwest quarter of the Southwest quarter also being the
mtarsecoon of the West line o1 said subdivision and the centerline of S.W. 19m Street:
Thence. South 00•4;38'West along said West line a distance of 30.00 lest to a point ON me Soutnery
margin o1 sea S.W. 19m Street:
Thence, Scum 89•4e'50' East along said Southerly margin a distance of 211.72 test to the point of
beginning of the herein described parcel of land:
Thence, continuing South 89•48'50' East along said Southerly margin a distance of 707.88 feet to a
point an a curve to the right. fie center of winch bears South 0-11'10' 'West having a radius of 55.00
rest:
I
That", Southeasterly a mg the arc of =to curve throucn a central angle if 91'09-W. an arc length
of 87.50 feet to a point on the Wgsterry margin of Und Avenue S.W.: y
Them. South 01.2V: West along said Westerry margin a distance of 563.31 test,
Thence. North 89'39'42! West a distance A 385.19 feet to a point on a curve to the lair, the caner of
which bears South 73'27'04' West having a radius of 140.00 rest:
Thence, Northwesterly, Westerly and Southwesterly along said curve through a central angle of
117'0991', an arc length of 286.27 rest
r
Them North 43'4227'West a distance of 196.34 fast.,
Thence Norm 00.20'18' East a distance of 416.00 test to the point of beginning.
3 .
LID ParmetatiomStonehengs II
i
i
....xr•erss
_J
l . ..,. ;r ila, #I► A;&�
N , %
S.W. 19TH ST.
1 / v+E Co".
S Sy A9'So' E �.o+9.9f to
9O.90 l
E p 5 !9"1a SG'�-- YO.
91.39
. . atili -
n-er of
SOUTHGATE OFFICE PLAZA I
PHASES
W
ARIA:432151+So.FT.
Rio 9.91 ACRES M
^1�
1 °
I z
aw
e e
J
ry\Ej.
. 'SOUTHG ATE OFFlC r1 ErrE lAo S.W Z1ST ST.
nl PLAZA rJ. Gn t1 ._ S195.
���► �1 Q`S' G� Y
'e FHASEX.
SOUTHGATE OFFICE PLAZA I^_
AnEA:A+9,9Tx . PHASE T
9.ST ACRES
AREA:No.]]t•So.FT.
9.A1•ACRES
+ I
e�
i e e
°
z1
SAT.]o
A 19.A1
o
1003
�If�
� � 1
tt a
a�
a
Stir . t
I kg�'h
�..B4
�ri�r.`rr
PRECONSTRUCTION MEETING MINUTES
SOUTHGATE OFFICE PLAZA 11
i
�! ATTENDEES
Name Address I hone ..,t
i a
Richard Scales Vyyzis Co. 643-4300 '
3605-132nd Ave SE
Suite 3
Bellevue,WA 98008
� J
Mike Cooper Tucci&Sons 922-6676
4224 Waller Rd
Tacoma, WA 98443
Bob Stanton Horton Dennis&Assoc. 822-2525
320 2nd Ave S
Kirkland,WA 98033
Larry Kirby Collins Electric 282-4113
314 Nickerson
Seattle,WA 98109
y Gary Young City of Renton Construction Services 277-5577
II Marvin Burgy City of Renton Construction Services 235-2529
Jim Grav Renton Fire Prevention 235-2642
Terri Jones Renton Fire Prevention 235-2642
{ Dave Christensen City of Renton, Engineering 277-6212
Kim Scattarella City of Renton Storm Water 235-2631
Clint Morgan City of Renton Traffic 277-6216
Gregg Zimmerman City of Renton Plan Review 2T7-6178
Date of Conference: November 8, 1990
Name of Project: Southgate Office Plaza II
i Location: 2001 Lind Ave
Company Name: Vyzis Co.
Dis-iibution: To Attendees
i
GENERAL
1. The construction permit for this project has several conditions written into it.
These conditions will have to be satisfied prior to issuance of occupancy permit:
a) Complete traffic signal warrant analysis for SW 19th and Lind.
b) Street improvements for SW 19th Street are rsquired to be completed
prior to occupancy.
t .
a�
� f1y�
x 3
Pre-Con Southgate
Page 2
c) Restrictive coverants for participation in installation of a sewer line
along S.W. 19th Street, and for future participation in LID's#1 and#2
must be finalized to City satisfaction prior to occupancy.
2. A permit bond is required prior to construction in City tight-of-way.
3. Marvin Burgy mentioned that installation of the temporary erosion control
facilities are not in conformance to the approved drawings. The contractor
described site conditions that led to the changes. It was mentioned that any
changes should be previously reviewed and accepted by the City prior to
installation. City will meet with contractor at later date to evaluate cited
changes.
POWERi
I. Power Company was not represented at meeting. Electrical contractor
described the electrical plan.
2. Contractor will be doing trenching, the utility will install power lines.
U. S WEST
1. U.S. West was not represented at the meeting. All U.S. West installation will
i be on-site, none in the right-of-way. Much of.his has already been installed.
FIRE PREVENTION
I. Hydrants shall be bagged with burlap prior to beiig placed on line.
2. Fire Prevention Department will witness hydro-static test from double detector
check valve to bui'4ing entrance.
3. Upon completion testing, full volume flushing of fire line will be required.
Flushing water shall be released into sanitary sewer.
4. Maintain reasonable Fire Department access to site at all times. Contractor
noted that an ATB road has already been installed around the building.
5. All stationary fuel tanks on site will require permit from Fire Prevention and
proper containment will be required.
6. Fire Prevention should be given 48 hour advance notice for inspections.
9. Tucci stated that they will install fire water line within 5 feet of building. Fire
Prevention suggested that one contractor should install all the way to above the
building slab, since partial pressure tests wall not he accepted. The system must
be tested as an integral unit.
8. Maintain fire access to existing building at all times. -r
9. Inspection of the system is required before the hydro tests.
10. Hydrants should be placed in service prior to construction above floor slab.
The City will consider whether existing hydrants will be sufficient for fire
protection to allow construction above floor slab prior to commissioning new
hydrants.
TRANSPORTATION
L Applicant must complete traffic signal warrant analysis.
2. ITT Street improvements must be designed, approved and installed prior to
occupancy.
3. Restrictive convenant for participation in LID's 1 &2 was mentioned.
4. All lane closures shall be performed in accordance with Uniform Manual. City
inspector mast be notified well in advance of lane closures.
5- Approved traffic control plan should be implemented.
6. Work in city right-of-way is limited to between the hours of 8:30 a.m. to 3:30
p.m.
r.
t
Pm,Con Southgate
Page 3
i
s
STORM DRAINAGE
1. Install temporary erosion control facilities per approved plans.
2. Protect wetlands and surroundings from construction debris.
3. Consider early establishment of biofiltration Swale and seeding so that seeding
will be established.
4. Contractor intends to use PVC rain leaders and concrete storm pipe.
5. Contractor intends to use lasers and survey staking to establish line and grade.
As-builts will be kept as work progresses.
6. Catch basins should be Protected with filter fabric. Clean out catch basins upon
completion of construction.
7. Engineer will get project information from contractor for as-built drawings.
As-builts will require engineer's stamp.
SANITARY SEWER
1. Sewer line is a private sidesewer tying into existing manhole.
2. Lines 8" or larger require TV inspection. -
3. Air pressure test must be witnessed by inspector.
4. Manhole must be cleaned of construction debris.
5. Sewer line must be flushed thoroughly.
6. Backfrll in City right-of-way shall be 5/8" minus crushed rock to grade. May
hold rock P below grade in landscaped areas.
7. Use screw plugs instead of caps.
8. Use trench box where trench over 4' deep.
9. Contractor will use laser and staking for line and grade.
10. Inspection is required before back filling.
WATER
I. Pipe and fittings shall be poly wrapped.
2. Submit all changes to City and obtain approval prior to construction of change.
3. City does not allow megalugs.
C Pipelines must be polypigged, pressure tested,chlorinated and a water purity
sample taken. City picks up water purity test sample:and delivers to lab on
Wednesdays. Independent courier will be needed for delivery other than
Wednesdays. Water pressure test is 150 psi above static head, minimum 200
psi.
5. For tie-ins, contractor will excavate and provide materials. Actual tie-in will be `
performed by City crew.
6. All thrust blocks and pipelines must be inspected before backfill.
7. Bedding and backfill shall be in accordance w ater notes in plans. Use 5/8"
crushed rock backfill in right-of-ways.
8. Contractor will use City's chlorination pump and chlorine solution for
chlorinating water lines(50 ppm solution, 24 hour retention).
9. Flush mains into sanitary sewer only after chlorination. (t
10. City will allow two contractors(Speer and Pacific)to perform wet taps on City
water mains.
11. Final adjustment of all valve vaults, etc., will be required.
12. Layout staking should be by professional surveyor.
13. All fittings require thrust blocks.
t
r
r
cm of REnrtoH
RECEIVED
OF 17 1990
MacDONALO-MILLER COMPANY, INC.
SEATTi F WASHINGTON CORRESI)CINDE1KE 11fDION -
T0: City of Renton Bldg. Dept DATE: 12/14/90 CMa 2521-18
200 Mill Avenue South
Renton, WA 98055 SUBJECT: Southgate II
ATTENTION: Gay Heishman
Southgate II has an exterior trash area where cafeteria trash and waste fryer
oil are stored before pick-up by a disposal service. This area requires a
floor drain which is routed through a grease interceptor and then on to
sanitary sewer for the purpose of clean-up of potential grease spills.
The exterior trash area collects water from a less than 400 square foot area.
Metro's standard maximum area that can collect rainfall without special
approval is 200 square feet.
I received approval from Steve Joyce at Metro to install this drain and run it
to sanitary through an interceptor. Metro noted that their approval was [[
dependent on the City of Renton's approval. I called Ken Bindara and he said S
that the drain was acceptable with him and that I should send you copies of my
correspondence with Steve Joyce. With Ken Bindara's approval, we plan to
install the drain within the limitation of Metro's approval.
If you have any questions or comments, please feel free to call me at 763-
9400.
Enclosures
SIGNED BY John P. Seymour
Lead Engineer
REPLY:
t
V
SIGNED BY "
COPY TO: Terry Rennaker - MacDonald-Miller Company, Inc.
Bret Lovely - MacDonald-Miller Company, Inc.
Mark Peterson - SDL Corporation
Barry Aaronson - LMN
Doug Bonner - Vyzis 4
1
1Sl
sr 4
Ma 4
I
k
7
1
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION W�#�7�?�
CITY OF RENTON, WASHINGTON J
APPLICATION ONLY - UNTIL VALIDATED PERMIT
NUMBER
_�TvNF-I/9Nt F / (!'s//7?y) Ae cisr!/p t
a''neZ Location of Work
n VY /5 �O/mil , a
Address °- r 00 L
RENMAI
ve 55 c-i _
� 3 -
INSPECTIONS c/b006-13 FEES
Co ND I FI I Sam)
0 5 Mn.
MA CONSTRUCTION Sanitary Sewer/Storm Water Permits 5(7?.
CYSB FOIL Sw 19 k1w0 r-Alom Rig:rt-of-Way Construction o0
!o occupMIney, PERMIT Right-of-Way Inspection Fees s �7
Ve
Z V
MF-NA Fosz 13 jl mREQop� (Public Right-of-Way) Water Insp-ction/Approval Fee 1, s.
SPecwl Utility Conmection Fee, Water
F*A Water Latecomer Fee -e-
FVTVI E pA 77Cl/4-r/d Fe _ - Q Special Assessment District, water -a --
L1DY i 2 �EO.t/IAa PR a Date Issued 4
Imo` To o Sewer Inspection/Approval Fees
+J k5 MIC71 Co✓%(M//F fOR In _ _ Special Utility Connection Fee, Sewer�d—xy:
"wi�lItt�I/YE I piration 9 Date Sewer Latecomer Fee
EQV(R/S /BRIOR 70 OC(uF NCy Special Assessment District, Sewer -p-
� uAT 10 Syyrwr rftsRe t7'to Fte T4.
Z
Reference Data .:A..Z.(.C- IN Gry O ��
z, tl• e"J Special Deposit, Private Latecomer _e) -
M-�"•�"�A-3.SSI y•/9•LD_.,Iq..J Special Deposit, Cash Bond . -
'� S8r la.l. Bd C/ TOTAL FEE 3z 2S 3,9V
Description of Work and NwMer^of Feet �QrLSw� ,.{�/I,tM Oulgle-ll
/
Contractor
Business
T�ef_r `� so niS /n/�_ License 053
Address --1 Bond
— Y�y (AM L -AE A 5
r�co�rrlq . wA 9 5ry`f3 T9a 1�667c
IT IS UNDERSTOOD THAT THE CITY OF RENTON SHALL BE HELD HARMLESS OF ANY AND ALL
LIABILITY, DAMAGE UR INJURY ARISING FROM THE PERFORMANCE OF SAID WORK.
ANY WORK -WORMED WITHIN THE RIGHT-OF-WAY OR ON SEWER MAIN MUST BE DONE BY A
LICENSED, . ..PIED CONTRACTOR. LOCATE UTILITIES BEFORE RXCAVATING.
GR 2"S510 W inspection 24 HOURS In APPLICANT
advanp Gire permit a,bcalion aM IYpa W '
+upWion contact person and Phons t.AM w
PM.nssctgnr .rl I#,,natw@21S26I1. PUBLIC WORKS DIRECTOR
1 :ALL 235-2620 for street signs CALL BEFORE YOU DIG BY
46 and lighting. 48-HOUR LOCATORS
1-800-424-5555
atlWnAarw ++e.ar..•.. �_.
��-.�.;. s�r . '�!`r.�`' ��.�1�'�{►`�"fir...��
pl-
CITY OF RENTON
MEMORANDUM
DATE: November 2, 1990
TO: Larry Warren. City Attorney
FROM: Gregg Zimmerman, Supervisor
Plan Review
SUWEC[: SOUTHGATE OFFICE PLAZA II
SEWER PARTICIPATION AGREEMENT
The attached, with the attached changes from the Wastewater Utility, Sewer
Participation Agreement will be satisfactory in content. Please comment on legal
aspects.
Thanks.
czua
i
1
1
tC
4
Ii a
_ DATE:
..O `
t
J .
72.
tk� G. ♦• 1•, 1
A _ ■ _/ CCr
.. • :_w
4
l
�n
,
k
tCe
j.
F •
Y J
f
fr A. y
4
4 �•. r'Mtl "T. .tl
i
CALUL910M OF INSPECTION FEES �, _ !Q 6 S
5 - 5`3y
i _ . I.L r u ♦^ N/A3A
PROJECT T PROJECT REFERENCE
PAV1Nr. 6 STREET LIGHTING:
fy36,300xf,03l : 471165'0
�r603/
SANITARY SEWER f I�, 3-b
SroR� : ;g6, 22b-x/.o5/ /0`// 022
WATER, I L 2/ 7 ,7,z 8( _ /32// 76
TOTAL CONSTRUCTION COSTS: S '� 7a 3/ ,667
TDTAL I l CTION FEEFEE
FIRST 51OO,OOO& 2$ - $ 2,000
SECOND $100.000 e/ 511 - s S 2 3�Y
REMAINING $
TOTAL: $ a, 73a
CALCULATIONS,
PAVING t STREET LiGHTM
47y x ��b4s =#s'613 .a
72'5/b6Y
SANITARY L=�L
b-
n+,,s69
NATE6.
?35
BOND AMOUNT FOR 100% OF WORK IN R/W S
NUMBER OF STORM SEWER COHN. TO SYSTEM
L NUMBER OF SAM. SEWER CONN. TO BLDG.(S) --
PREPARED BY: DATE // --
D/1NSP-FEE kH:lf 6/12/99
t�
t
' SOUTH 9ATF nFFr�E -LAZA
4 'CHASE 11 SITEWORK
•T : t t t : :SECTION
�
JLE : ITEM DESCPIPTION :QUANTITY:U1ITsUN1T PRICE :EXTENSION :AMOUNT
.
---------------------------___1_______,____t________----------------,------------j aN 5N•r_
TEMPORARY EROSION CONTP.OL s 1 1
DETENTION POND : It EA t f964.00: 4964.130%
FILTER FABRIC 1 900s LF 1 66.00: $5.400.940:
t INTERCEPTOR SHALE 9001 LF i fl.c'S: sI.123.00:
I CHECK DAMS 1 6: EA t /150.00: 1900.001
TEMP. CULVERT 401 LF 1 $15.00! 4600.00:
POND BAFFLE 80t LF 1 $13.001 $1.200.06:
15" Clip 661 LF t 130.00: 11.8013.00:
TEMP. COMET. ENTERANCF t 2t EA i 12.406.00: $6-800.00:
RIP RAP : 401 TN s 120.00: 4800.00:
TEMP. OUTFALL : 1: EA 1 s500.00: 1500.00,
s t 1 t : I9.}J189 stP
1 1 t 1
t SANITARY SEWERS s , ; ct
1 8" PVC PIPE t 240- LF $33,00: s7,720.00: Q 1&,
s 6" PVC PIPE 401 EA t $32.00, $1.280.00t �/As,. .
6" CLEAN OUT s 2: EA $250.00: s500.00:
4B" DIA. MANHOLE 1: EA 112.300.30: se.300.00:
. CUM. TO EXIST. STUB It EA : 41.250.00: 11.250.00:
' : e 113.250.00
i
i STORM SEWER
. 9" CP t IT LF 421.50: 41.348.kt01 '
le" CP i 1380: LF i 1126.00: 735.880.00:
Is" t7 100: LF t 129.00: 420,300.001
TYPE I CS x 20: EA : 4700.00: S14.000.00:
TYPE It 49" CB 1 2t EA 1 11.5410.001 13.000.001
1 TYPE II 54" CB 1 1s EA 113,000.00t 93,04091.00!
RIP RAP 711 TN $30.00! 112,250.00:
1 HEADWALLS FOR 12" PtFE 21 EA 12.500.00: 15.000.00T
. 6" ROOF DRAINS 4501 LF 1116.001 17.200.90:
6" C.O. x 41 EA s250.00: 51.000.00:
DETENTION POND It EA f2.o00.'D0: $2.0P0,00:
s 810 FILTRATION SHALE 210t LF $5.00: 11,050.00:
1 t t t 196.228.-O
1
WATER SYSTEM ;
10" D1 PIPE t 6111 t $27.00: $16.497.00:
s 8" DI PIPE i 1963: 125.00: 426.625.00t
1 6" 01 PIPE 1 9e1 : $24.00: $2.160.00;
1 4" Of PIPE s 139, $24.00% 73,120.00:
FIRE HYDRANTS t ay( . 12,150.00: se,600,.00. bv, to-;
10" GATE VALVE 2: s2.300.00: 114.600.001
B" GATE VALVE 3: 412.10o.00t 16.300.001
1 4" GATE 'VALVE i L• 11.300.00: 41.30tA.00:
: 2" BLOW OFF 1 1! 14614.00t $460.001
t 8" DOUBLE DETECTOR CHECK VALVE: 1: 712.300.00: 012.800.L401
4" METER INCL. VAULT 1: 1 S9,B 1�1.001 4'+.810.001
t 1 s t 1 1X'CTE�'!4?
PAVING 1 1 t b?47.T.r
• , t
1 WEED LILLEP. 35800: SY : s.15t s5.370.60i
t FINISH �3R41)ING 1 23,w4i S't 1.85t s23.g00.0ltt
GRAVEL BASE(6") 91001 IN v 7 11.001 Hots,f dM:
1 RTF (?") '5200s TM t 030.001 /t56.P09 01 d'kh
BROOM. FLUSH L TACK t 28000t SY 1 1.20, 45.600.001
1 TOP LIFT CL 'B' 12"1 33001 IN t 133.501 s110.350.00;
1 LIQUID ASPHALT ESCALATION Slot TN 1 s25 GO: 112.750.001
EXTRUDED CURB S600: LF : $1.55: 410.230.00:
PAVEMENT MAFt INGS v .
SEf
1 L_ 46.ses.0¢1; 14.500.00:,A'"7ET SIDEunLk.S 2001 Sv : s23,0:a; f3.000.00t
zm4 e 1 CUR? : GUTTER loot LF 115.0nt 72.ui!0.0?t
yh," r, i REMOVE EXIST. AC PAVEMENT , rN t
8AWCUT E, IST. PAVEMENT LF t t
/ WHEEL CHAIR RAMPS t EA !
l ' SCORED CONC. CROSSWALKS t 1 SY t
\ 1 1436.34M.00
t
-----------_________________________-._i ---------------
TOTAL $656,139.0t
-Ib c'4
MEW
f-1
/QIGhT -0E -W4y
SOUTHGATE OFFICE PHASE II
OFFSITE WORK
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE E%TENSICN SECTION ANT.
1 WATER MAIN
1 12" Water Main 670 L.F. $36.00 $24,120.00
11711 2' Blow Ott 3 EA. $460.00 S3,300.00
12" Gate Valve w/ Manhole 2 EA. S2,250.M $4,500.00
Subtotal
Qd/ ZtA 7 �5c. �l, �G $30,0W.e0
SEWER CONNECTION
10" Pipe 0 L.F. $33.00 $330.00
Connect to existing stub 1 EA. S1,250.00 $1,250.00
Subtotal —
51,580.00
TOTAL
$31,580.00