October 11, 1985
TrI-State Conslructlon Inc.
959 - 118th Avenue N.E.
Bc Revue GA 98004
Subject:
Gentlemen:
Enclosed is the Meekly Statement of Working Days for the week ending
October 4, 1985.
Please note there are 21 working days remaining on the referenced contract
as Of October 4, 1985.
{VVe�rJy truly yours,
V Joe Armstrong
Project Engineer
:ckd
Enclosure
of RF
A
PUBLIC WORKS DEPARTMENT
OFS1GN/UTIIITY ENGINEERING 0 235-2631
O Jk MUNICIPAL BUILDING 200 MILLAVE.50. RENTOh WASH."D55
y e
P
1tfD SEPtEMe�
BARBARA Y. SHINPOCH
MAYOR
ocrober 11, 1985
Tri-State Conttructiun Inc.
959 - 108tb Avenue N.F..
Bellevue NA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working gays for the week ending
5epremner 27, 1985.
Please note there are 26 woeking days remaining on the referenced contract
As of aeptemnet 27. 1985
Very truly yours,
; �
e Armstrong�.
Project Engineer
:ckd
Enclosure
I it PUBLIC WORKS DEPARTMENT
Of SIGN/UTgrTY ENGINEERING • 2357631
p =R O MUNICIPAL BUILDING I"WILL AVE.So RENTON,WASH IW55
kP
a'E SFPt E'er
BARBARA Y. SHINPOCH
MAYOR
Tri-State Co:•structinn Inc.
959 - 108th Avenue N.E.
Bellevue WA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
September 20, 1985.
Please note there are 31 working days remaining on the referenced contract
as of September 20, 1985.
Very truly yours,
%Joe Armstrong
Project Engineer
:ckd
Enclosure
OF RF
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
p MUNICIPAL BUILDING 200 MItL AYE.SO RENTON.WASK I;"S
r;
fP
,tEO SE P�E�.
BARBARA Y. SHINPOCH
MAYOR
Trl-Stnto Constnutlon Inc.
959 - 1080h Avenue N.E.
Be11PVne WA 99004
Subject:
Gentlemen:
Enclosed is the Meekly Statement of Working Days for the week ending
September 13, 1985.
Please note ther, are 36 working days remaining on the ,referenced contract
as of September '3, 1985.
Very truly yours,
/"Joe Armstrong
Project Engineer
:ckd
Enclosure
CITY OF RENTON COATRXC
WEEKLY STATEMENT OF WORKING OATS:
CONTRACTOR Tri-State Construction Inc.
ADDRESS .._._...—_959 - IOAth_Av_enue N.E.
CITY STATE WA 98004 DATE
C no.r Newbw Fed..el-AN►.afoot NowN. Ni�..oy No.o•Cwnty 1 Ssat.o..n N..►e.
The following statement shows the number of waking days charged to you contract for do week
"ding -- ------- --__.._.._. ----------- . Ig—, -
On. aq v""M Condition w.kins 0". U..a.ka►ta D.y
C.".4 by we."w
W"*.r conditions
�Y
Tuesday
wednoeday
Tk"dsy
Frldey
Day. the r.o4_......................................................................
,.......
Days pr.wfa.sly t.gottod............................................_..............._......
Total dap to date ..............................................................................L
CURRENT STAT4S
Wotkme Days Speuh.d 1n Cenhatt...................._«.....,-..........._.......... 75
Appro..d E.t.t,von of T gym.
Total Awl,orl,od Time of Conrract _....................................._.._.-...., 75
L..,Wwkme Dap Cho,aa.....................................................
._.........
..wim0ne Days Ramammp ...................».-.............................................
Summary 4 wo.k's Activih.s:
'Sho.only..t.n.iens oppo.od by I.tHr Lom Hir.44uortors
"Use noeaNa tarots to show..rwn m tlmo
NOTE. The coon oNor will ba ollo.od 10 day. I,om dote of rhis report in which to portal in rrifine tho carmanes.of this
statement, otMrwise it shall be deem.d to ha.. been accepfed as caret,
DOT a.t t
ramy syatt �
UTY OF REN ON
WEEKLY STATEMENT Of WORKING GAYS:
CONTRACTOR Tri-State Construction Inc.
ADDRESS _959 -_108th Avenue N.E.
CITY Bellevue - STATE WA 98004 _ DATE_J
Nm .. Nq_N..or C L�-04B w - bv
The feftowing stateowttt shows the number of working days rhorped to your contnoct toy the week
coding ��__<12 _ , 198.z.
DM. -- —._._Do, eeelhv Ce.dnte. Visible,Dap Un.a.i•bl.Da,
Cam 4 by we.tbu er
p W.ubr CanLnem
/- ib Monday
c_/7 T"sdoy n
q- "A' Wednesday
Friday C./G'GY
Days this week .........................................................................
.�-»-. --.
Pays Frarioudy reported,......................«...........
......«...............»....«..» q _
Total days to dote ................................................................-.,..
CURRENT STAM
Wotkinp Dap Specified in Contra<I......................... .................... 75
App.ovd of Time.........................-..-_............................ ,. .
Total Autheds.d Time of Co,i 75
Le..Waking Day.Charge. ..----.-«--.- �'
..Wa 41ng Dora Remaining..................................._..........................._._.....
Summary al Weer, Actirin..:
P..l.<t east...
Show only e.tan noes appto..d by lett.t Goes Hoadq.wtors G/
Use a.gatiw totals to show orv.aa in time
NOTE: The canbacia, will be allawed 10 do,. Isom dole of this report in which to pretest in wtiting the cotroclness of this
statement, olMtwise it .hall be deem.d to hoe.been accepted as ewtoel.
DOT nmi.ee ne 14
CITY OF RENTON
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR Iri-State Construction Inc._
ADDRESS --__959 - 108th_Avenue N.E.
CITY _ _Bellevue _ STATE VA 98006 DATE
Cswttecs N.wko _ __ p.d.rol.AN M.i.ct WraAo MtpMq No.of Guts et.tensews"imr
CAG-068_85 . .._ ._ I _.._. .. _ _ _.. �__.. ._..�
The followfog statement shows tie number of waking days charged to your coniteet for de week
ending 19.;_
Do.. Dq W..A.Coaditian Wetktop Do,* lla.••bH.D•,
C....a kt w•ah.. at
Wtether Cendinans
MWWGY
-ro Twedey j, i
Tkaraday
—i3 Friday n
Days this week _..........................._..»...».....».........».»»»....»...».»......
Dot's pr.doudy raportsd.......................................
...».......................
Total dare to date ....................».....».....»...«.....»......................».....�. v '
CURRENT STATUS
Wutkinp Days Specified in Contract...................................................... 75 —
Approved Extension al Time.................................... ............................ >....
Total Amhetited Time of Co ittacl .............. 75
Let,W«king Day.Chaeas..._............................................................... -
..Wotking Days Remau.ing....................................»..................................... W
Summofy of Week's Activities:
Z lAJ�.
..he,Restate,
'Show soft' otendon. opprowd by lotto from N.adg.otos
'Us. negative lolal,to show ewnun in time
NOTE: The tnnb actor .,I. allowed 10 day, lrem date of this teparl in which to protest n writing the co.roctness of this
statement, otherwise it shall be daemtd to have been accepted as correct.
m prott
DOT ne.a.n nrre
M
CITY OF REfJTON
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR _ Tr1-State Construction Inc.
ADDRESS 959 - tOSth Avenue Rig,
CITY -- —
Bellevue._ _ STATE- JtA 9R000 --�---'--
C•nn•.r a•ms., - - - __ DATE
CAG-048-89 I f �« 1 Aii PgI•ss N..E«�Bi - _. ... ___._.__
s�W ty «C«mry St««••M MuN•. _�
The lallowiny slaletlrsnt shows the - - - --I -
----- ending rsretber of work-
I" days "Ill Yota contract for the week -
,_ Wrs{•p°�ys IM.ed•/4 Der
- C^oral 6,w.ar6o
Tvsdoy �s-
c.'- Wednesday C_7 . ✓`i.
�! Thurdny C7d�G ,
Friday
Day this'wah................. --.__--.
Day, pesviwsly rspartsd...................
......................«.. .r
T elal day.to Asls ..................... f .
-:URAENT is s•Lr,
W^rh.• t uys SP.ndud m Coni,acl.........................................-..._..........�75_._
•APProved E•tension el Lme
......._.._.-................................
T etal Auther4ed Tim• of Cemrael ...........-„�»„_ .W., -..»..
75
Len ww4iny Days Charses .............................»-.._..».........._.
aDay, Remomnp...................................
^
Smnm«y of Wad's A<ViviG.�s: .....».•...
only e.bnsiom approved by I•tlar hom N•adque.bn
Ilse napaViv Vetals to show ov«run in Vita•
NOTE 16e contractor -01 It. ollawed 10
Statement, otherwise iV shall be deemed to ha.a been o«ePt d as'c "". so Proton in wr
,hny the 1011-0ne1s of'hi,
.r n
M
OF RE•
PUBLIC WORKS DEPARTMENT
3
DESIGN/UTi,ITY ENGINEERING 0 235-2631
� .>R MUNICIPAL BUILDING 100 Mlll AVE SO. RENTON,WASH.9l053
9 p
P
��EO SE vrf`�
BARBARA Y. SMINPOCM
MAYOR
Tri-State Construc Uon Inc.
959 - 108th Avenue N.E.
Bellevue WA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Cays for the week ending
August 30, 1985.
Please note there are 45 working days remaining on the referenced contract
As of August 30, 1985.
Very truly yours,
'Joe Armstrong
Project Engineer
:ckd
Enclosure
CITY Of REN-10/f
WEEKLY STATEMENT OF WORKING DAYS
CONTRACTOR irl-State Const cuctton Inc.
ADDRESS _. _ 959 - 108th Avenue N.F..
CITY _ Be t ievue_ _ . STATE Na 480gg _ DATE
-- _
P,q.a Nowb7-1 NieArq 11..r Cwnq Srr.e.nr M.N..
II CAS-UG8 AS I! I
T he following srodenenr shows the number of working deYs charged to your contract for the wuh
ending - 19
Dea Dee, r.rh C.n4.ien � ■«bns Dqe Un.ea Al.Oq
C.w.d k' t4.rM.r
W.tt..,C.ndMrr.
Z7 Tuesday
�'i^�' Wednesday
t9 Thursday
Do's the, we.k .............................-.,.......,...........................................
Days p..mwly.•Ported.._....,.............................................................. L. .,..
Tarot dog. to flat.
CURRENT STATUS
Wading Do's Specaod in Comract.....................................................,.__. 75
Appro..d E.tension of Tim. ...... .........
Total Author4ud Tim. of Control ,..._.,.„.„,..„»,.,,�......_....„«..........-- 15
Lase Waking Do's Cherg.s _ ............._....._..«-„_............«..........-..... JG
rr Wmktng Defy, R•mmmng ..................................�.... „...-«..,................
Sumneory of Wuk'e AcNvitin:
Peelle..ifi. .
She- only s.trnuem app.eved br Ln.r from Neadgv«tsra
Use negative tomis 10 show oven un in tine.
NOTES The a.nt,oc,, .,If 6. allowed 10 fors f.em ditto oI the'rrPart in which to Pretest in wnring the correctness of this
stol.ment, oth«.qa it s6oll 6e deemed to hove 6a.n occ.pl.4 as tenet t.
ram Nino
i pF RF 1
PUBLIC WORKS DEPARTMENT
q & DESIGN/UTILITY ENGINEERING 0 235-2631
MUNICIPAL BUILDING 2Op MILL AVE.SO RENTON.WASH.9a055
q e
�rFO SE pS E`!e
BARBARA V. SHINPOCH
MAYOR
Trl-State Cnnstnlctlnn lnc.
959 - 108th Avenue N.E.
Bellevue WA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
August 23, 1985,
Please note there are 50 working days remaining on the referenced contract
as of August 23, 1985.
Very truly yours,
`Joe Armstrong
Project Enqineer
:ckd
Enclosure
CITY OF RENTON
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR_- Trl-State Construction Inc.
ADDRESS .._ 959 108th Avenue N.F.
CITY _. _ _ _ Be"evue STATE__�1A_2@SiSl4 DATE—,6
Cwt.at Nw.6o - a F.�..d A d p..i.st Mw6a f Niel. q IM...C•.nq I Shtu...wt Nrw►.. I
CAC-048-85
The folhwrirq slae�ajnm shows the mittber of wwkinE Boys charged to you_r'conhxl for the week
ending
_—Data 0.1 We.^.Cadutw Wat6Me Data U.wwMl.D.,
C..sd 6,West6.t w
r..th•r CwrdUlew.
ef-/y MendaY /ea.-r
u-7-C Tuesday
Wednesday
Thw sday
Ftidey
r
Days this we.h ................__...................................I.............................
. -.
Days p..iomly rspatted .............................._..........................._.
Total da,. to date ..................................................................................
CURR6NTSTATUS
Wot6ing Days Specified in Conhact._.................................................. 75
'Approved Extension of Time.................._............. -$?-
Total Amhwi.ed Tim. of Conitaet ..................................................... 75
Less Wmk.ng Days Charges................................»......._..__.............
"Wat6ln9 Days Remaining__........ `'"7
S...aq of Wa6's Acii.it,.c
♦..I..s 11"ims
She.only..temions .pp.o..d 6, I.tl., Lam Neadgvattvt
Use negalt..total.to she. o.atvn in time
NOTE The cemtaciw ..tl 6. alla.ed 10 do.. Loot date of ihls.'part in .hi<h la pwiesi i.waning the cort.clnns of.his
statement, other.ne o shop be d....d to haw been accepted as <onec t.
DOT 12,f ieed 11 1
h
CITY OF RENTON
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR_ Tri-State Construction Inc.
ADDRESS - _954_ 108th_Avenue N.E.
CITY _ Bellevue_ ---- --.- STATE WA, 98004 DATE
_ .�. ..,_
C.nxe<s Hw.t« fed«v1�Ald Lap<.Nr.Ae, Hl _ _.._-______ .. _.____.
I qh „No.«e.e.ty 1 fleleewwl Nw�►«
The fallowing statement shows tM number of working Boys cholged to yew contract for the week
ending
Dose--- ar w.ettle,eo a ilsoe IN.W.s Don 11...A.61.D., ------
Ceue.d bt'e.eth« at
Wo«her Cendnum
—� Mond., i.yGll/
P—G Tu.sdoy
T Wednesday ;.
_e Thursday
9 iridoy
Day. this reaY...........................................................................».......
Days peeriausly cepmted............ S
Tefol days to dale ..........................._.............................. ...............
....
CURRENT STATUS
Waking Days Specified in Contras............................„............ 75
`Approved E.tension of Time . _....................«............
«..._......,....... �._
Total Awls. ,.d Time of Cannael ,, 75
Les. Waking Days Charges.............................. ....._.. 'f"
..WorNnq Days Ramaininq ....................«_...................«..................�...... 55
Summary of Week"Act(ritur
i
Flows
M
`Show only oelen.imr s opprou.d by tell« hom Neodga«loes
"Use n.galire totals to show ouenun in time
NOTE The tontwtlor will be allowed 10 days (ran dale of this rep«l in which to prate.l to willing the coveclness of this
slatemoni. oth«win o shall bt doomed to hove been accepted as collect.
DOT rwmwmt
OF R'4.
,} z PUBLIC WORKS DEPARTMENT
i
_ DESIGN/UTILITY ENGINEERING 0 235-2631
r !R MUNICIPAL BUILDING 200 MILL AVE.a0 RENTON.WASH.99o55
9 E
P
,tEO SEP1f�0f'
BARBARA Y. SHINPOCH
MAYOR
Tri-State Construction Inc.
959 - 109th Avenue N.E,
he)Lovue WA 98006
Subject:
Gentlemen:
Enclosed is the Weekly Statement Of Working O:ys for the week ending
August 16, 1985.
Please rote there are 55 working days remaining on the referenced contract
a$ Of August 16, 1985.
Very truly yours,
/toe Armsti
Project Engineer
:ckd
Enclosure
OF RF,
A 1T
PUBLIC WORKS DEPARTMENT
_ OFSIGN/UTILITY ENGINEERING 0 235-2631
0 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.90055
� t
P
44tFO SEP1Elol4,
BARBARA Y. SHINPOCH August 12, 1985
MAYOR
Trf-State Construction Inc.
959 - 108th Avenue N.E.
Bellevue WA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week en,ing
August 9, 1995.
Please note there are Yr5 working days remaining on the referenced contract
as of August 9, 1985.
Very truly yours,
k
//Jmstrong
Project Engineer
:ckd
Enclosure
CITY �F RENTON
1
' WEEKLY STATEMENT OF WORKING DAYS.
1
CONTRACTOR —. Tri-State Constractim Inc. - _ --
ADDRESS .- -----.959_-108th_Av_ence N.B.___
CITY _------._.. ....._...Bsllsvy -___._____—_ STATE MA 98004 _._ .. -. DATE_.J�_f� s—
C.e.e.r Ner.ss f.J«.I.AiJ P.io.t N. N. NLeAwq W.w Cor.ry S.r.m.nr N..kr
The followirnq statement shows the nm'rbtr of waking dogs t:be:ged to "or contract la tho wrok
D.s. O1 Ws.M.co.Jin.e W.I"Oq. kl -.:,.L t.D..
C....4 by bate:
Wurhor C.nJ.�.On�
y- Mender QG, I
W.d...do,
vl-17 Friday ✓'f .��'iih y
Doys this wrrk 1
Days pr.viouslj repeated............._.................................._.........._.......
Totaldays to drb ..._....................................................................._....
CURRENT STATUS
Wor6nq Day, Sp.cihed in Cant-act__...... ..............................................
Appra..d E.tena,on of Tme ........................._..................I................
Total Aurhon.d Time of Contract __.„».._...._„..»..............-.--........» 75_...._._.
1-... War L,nq D.V.Chargos..._...........................»_......................
..__....
"W.hfnq Days R.ta,min O
Summary of Work'.Activities;
Prop..E.et.ra/
'Sho. ady ubn.iom oppro..d by Ions. Lom H.adqu.....
Uss n.gotiv I.I.I. to rho.e.u,un et Ynn.
HOYE. The contractor .dI b. all...d 10 day. Iron, dot. of h...port in r,hich to prmoo n wnhnp the con.ctnes, of thi.
stot.mad, otb.r..iu d shall It. desm.d to h... b..n ucc.pt.d a,cw,ell
m. }i
CITY OF RENTON CUN I RAC IU
i
MEEKLY STATEMENT OF WORKING DAYS:
I
t
CONTRACTOR Tri-State ConatrucUon Sac
ADDRESS __ -959.- loath Avenue N.E.
CITY ___ _.___._ fjgyyg.--- STATE WA 98004 DATE
_.
/.AG-048-8 5 Nh"er N..«Coa.•r Sr«.«..,sA,«S« _
The following statemettt shows the number of werkaq days ehdaged to yaw co itect-f01_the week
ending _ ..,
Data Do• puAn r«Aty o.r. Ww«YNM Do,
Caa.a4 4y stoats..r
ra.Z'C.adiNae.
Monday
._' .e. Tu.•day
Wednesday
Thursday
Day.this w.al ..........
Days c.pcaod `-
Total days to do,. ................_...,..
CURRENT STATUS
Worlmp Days
Approved E.ba•ion of Time ......................... •t"'"`.
Total Authorrted Lure of Cantroct _„_...................«. i5
Lon W«Imp Days Chaiyes . .___..............................................
••W«klttg Days R.mo.,,.4 ...........I.........._.. _.
Summ«y of W.ek'. Actiritiar.
►..Ivt lylntidr _—
Shoo only a.bnaens opprorad by lauor Go-
Us.neat N.total.to .ho. or«run in tlma
NOTE It,. comwctor will Its ollo..d 10 days bom data of this rep«I in which to pmast n wrvbne the con.ctn.0 al this
•tabm.nt, othe.wiw n •hall 6. d..m.d to her.been acc.pbd as c«rect.
ram qs ou
CITY OF RENTON CONTRACTOR
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR Tri-State Construction Inc.
ADDRESS 959__108th Avenue N.E.
CITY _.__ Bellevue STATE_WAA . .r.>k: r DATE 7-Z 9 -r3S
CeMr«t Ne.6e. ydael Yti1 MPq N„aber 1 Nyn«r a; w cavity $0is..I Naaber
The following stafeelerN shows On number of working days charged to your contract for flat week
ending ✓�' /y ZG -_ , 19 M
Opa —D r«tW C«din« Wanbreg Day Uitivitakribl.Win Der
We«d r re ilia eat
W«Meat C«diti«•
7-
Tw+day
7 - YA- Wednesday ,
7-2 5 Thursday, .. '
?- Zae Friday i.
Days this weeh.................................................-..........-............
.......__.. '
Drys previously r*owed.........................................
Total days to 41e ............... v
CURRENT STATUS
Working Days Specified in Contract..........._..........._......................... 75
Approved Extension of Tsam _........................_._...-._._-.-.......»............ -05--
Total AWhonud Time of Contract ......._.....„..._...-........................... — 75
Less Waking Days Charges..................._....... 7
"Working DasRemmni 70
Summery of Week's Activities:
prel«t E q
'Shoat only eaeosions approved by letter from Haadgo«ten
Use negative totals to show overrun in time
NOTE: The contractor .,If be ollowed 10 days Grin date of this repot in which to protest in writing the correctie s of this
aiatemant, otherwise I shall be deemed ro have been accepted as correct.
DOT B:aseear 1Ina
OF RE
lCi z PUBLIC WORKS DEPARTMENT
DESIGNiUTIUT, ENG'NEERING 0 235 2631
AL
MUNICIPAL BUILDING
9 200 Mltt AVE.SO. RENTON,WASH M55
e
$9S tE0 SEVTEEP
BARBARA Y. SHINPOCH P,1, 29, 19Pi
MAYOR
Tri-State Construction Inc.
959- I08th Avenue N.E.
Bellevue NA 98006
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
N,lv 26, 1985.
Please note there are 70 working days remaining on the referenced contract
as of July 26, 1985.
Very truly yours,
*Joestrong
Project Engineer
:ckd
Enclosure
OF RE.
A �T
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING O 235-2631
a MUNICIPAL BUILDING 200 MILL AVE.SO RENTON.WASH.99055
aq a
O �P
v�TED SE ptE
BARBARA Y. SHINPOCH
MAYOR
Tri-State Constriction Inc.
959 - loath Avenue N.E.
Bellevue WA 98004
Subject:
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
September 6, 1985.
Please note there are 41 working days remaining on the referenced contract
a5 of September 6, 1985.
Very truly yours,
//J� strong
Project Engineer
a `d
Enclosure