HomeMy WebLinkAboutWWP2701901(9) SAN-1 Sanitary Sewer Tobin Ave. S. Ch*ange Orders it C.O. / 1 CITY OF RENTON PUBLIC, WORKS DEPARTMENT CONTRACT CHANGE ORDER AGREEMENT CONTRACT CAG 037-84 South Tobin St. Sanitary Sewer CONTRACTOR Ford Construction Co. SUMMARY OF PROPOSED CHANGE Close out ',gym referenced contract in conformance with the terms of letter from City of Renton to Ford Construction Co. dated Nay 9, 1985, and letter of concurrence from Ford Construction Co. dated May 20, 1985. Net Chanqes Change Order No. 1: 1. Sales tax on $6,505.70 previously paid for material on hand, 971 L.F. IS" P.Y.C. nipe. $6,505.70 x 0.081 - $526.96 2. Payment for 15"x6" P.V.C. tees delivered to City Shops _ 10 Each @ $67.00 = $670.00 x 8.1: Sales Tax = 5724.Z7 3. Less deduction for work not completed: (4153,438.63) Net Change Order No. 1: (-8152,187.40) All work, materials and measurements to be in accordance with the provisions of the Standard Specifications and Spec.al Provisions for the type of construction involved. MS211,s" cCDNTAACT— —�UR7EFAT�tiNfAA�T- TIFWT 1+�f�klCn ` - fi7WT�li bNITA JUNT I AMOUNT THIS ORDER I TOTAL AFTER CHANGE n5 5211 y43.'Ja (;S1 2,1 7.40) $59,355.65 — �__ r �, SIGNATURES: CONTRACTOR i i /, /.i ♦. _ DATE PROJECT ENGINEER iF,Et�' _ �. ��r.rrc/ _ DATE ri•J�a'lK� AD?ROVED BY _ DATE —"`-�� ub c MorTcs DTrecto�� i