HomeMy WebLinkAboutWWP2701941 �5-365
S--f SLII
BEGINNING
OF FILE
Fit F TITLE
S -3 /5
I b4 J/J
L.I.D. #328
Garden Avenue North
L.I.D. COST DISTRIBUTION
Construction Cost
$326,472.21
ADMINISTRATION COST
City Attorney
City Clerk 750.00
Finance 943.16
Puget Power 37.922.00
Utilities 16,800.00
Street Department -0-
Engineering Including Publication -0-
33,160.01
S-8��,75.1Y
TOTAL COST
�y $416,047.38
COST CHARGED DIRECTLY TO PROPERTY OWNERa[�L.t/�G+!-t'..�
"Pacific Car A foundry
Sanitary Sewer
T
8 18 616.44
12" Water Service, Fire Hydrant and
2" line for Irragation
7,000.00
Renton School District
Sidewalk and Drive way
Along North Property Line
1,925.14
-COS-I DISTRIBUTION_TO L.I.D_PORTION
Construction Cost
Pacific Car Sanitary Sewer $416,047.38
Boeing Water Service 18,616.44
Renton School District 7,000.00
Landscaping 1,925.14
Surveying 15,000 (40") 24,980.00
Mobilization 55,000 (40,) 6,000.00
Signal A Traffic Control 22,DO0.00
Puget Power 27,438.72
16,800.00
ini NT.58
Pacific car $291,; 08
Boeing 18,6 14
School District 7,O0u.00
TOTAL COST TO L.I.D. 1,925.14
3318,828.66
ENDING
OF FILE