Loading...
HomeMy WebLinkAboutWWP2701941 �5-365 S--f SLII BEGINNING OF FILE Fit F TITLE S -3 /5 I b4 J/J L.I.D. #328 Garden Avenue North L.I.D. COST DISTRIBUTION Construction Cost $326,472.21 ADMINISTRATION COST City Attorney City Clerk 750.00 Finance 943.16 Puget Power 37.922.00 Utilities 16,800.00 Street Department -0- Engineering Including Publication -0- 33,160.01 S-8��,75.1Y TOTAL COST �y $416,047.38 COST CHARGED DIRECTLY TO PROPERTY OWNERa[�L.t/�G+!-t'..� "Pacific Car A foundry Sanitary Sewer T 8 18 616.44 12" Water Service, Fire Hydrant and 2" line for Irragation 7,000.00 Renton School District Sidewalk and Drive way Along North Property Line 1,925.14 -COS-I DISTRIBUTION_TO L.I.D_PORTION Construction Cost Pacific Car Sanitary Sewer $416,047.38 Boeing Water Service 18,616.44 Renton School District 7,000.00 Landscaping 1,925.14 Surveying 15,000 (40") 24,980.00 Mobilization 55,000 (40,) 6,000.00 Signal A Traffic Control 22,DO0.00 Puget Power 27,438.72 16,800.00 ini NT.58 Pacific car $291,; 08 Boeing 18,6 14 School District 7,O0u.00 TOTAL COST TO L.I.D. 1,925.14 3318,828.66 ENDING OF FILE