Loading...
HomeMy WebLinkAboutWWP2701999(93) 10 :1 BEGINNING OF FILE � '� Pro 2 LSO 31Y E. upelley Hwy . pAr�a..l a 1 , O Ric !� ►t~ z PUBLIC WORKS DEPARTMENT q DESIGN/UTILITY ENGINEERING 0 235-2631 MUNICIPAL BUILDING 300 MILL AVE.50. RENTON.WASM.99M b P rrFp 5Ev*E� BARBARA Y. SHINPOCH October 12, 19R1 MAYOR oi- 4Z< w Mr. Roger Gavin - 201 4th Place S. Renton, MA 9805- Sutject: LID 314 Temporary Construction Easement Parcel 21 Dear Mr. Gavi.l: Enclosed please find a temporary construction easement across the southerly five feet of your property as shown on the attached sketch which it is requested that you grant to the City of Renton. As part of LID 314 the City will be installing sanitary sewers in S.N. 16th St. and the process of physically installing said sewers necessitates securing the use of your property on a temporary basis. After the installation is completed your property will be restored to its original condition or better. If you desire additional information or would like to discuss the matter further please advise. Very truly yours, Donald G. Monaghan, P.E. Design Engineer DGM:pmp Y TEMPORARY CONSTRUMON EASEMENT THIS INSTRUWNT, made this day of 19 by and between and and and end hereinafter called "Grantor(s)", and the CITY OF RENTON, a Municipal Corporation• of King County, Washington, hereinafter called "Grantee". WITNESSETH: That said Grantor(s), for and in consideration of the sum of $ 1.00 (One and no/100 dollar) paid by Grantee, and other valuable cons[ ration, do ,y these presents, prant, bargain, sell, convey, and warrant unto the said Grantee, its successors and assigns, a temporary construction easement for a public utility (street improvement) with necessary appurtenances over, through, across and upon the following described property in King County, Washington, more particularly described as follows: A temporary construction, easement over the South 5 feet of the following described property: That portion of lot 29, block 22, Except the west 100 feet of said lot 29, of C.D. Hillman's Earlington Gardens Addition to the City of Seattle, Division No.l, according to the plat thereof recorded in Volume 17 of plats, page 74, records of King County, Washington; lying .northerly of a line parallel with and 45 feet northerly of the FL-line and lying easterly of a line parallel with anu 90 feet easterly of the EF-line; said FL-line and EF-line as defined and shown on the Washington State Highway Commission horizontal alignment maps of "Jet. SSH No.2-M to Jct. PSH No.2 in Renton", sheets 3 snd 4 of 10 sheets, and of "Primary State Highway No.S South 228th St. in Kent to Renton", sheet 8 of 14 sheets. Situated in the SW 114 of Section 19,Township 23 North, Range 5 East,...M. , in King County, Washington. Said temporary construction easement shall remain in fora during construction and until such time as the street improvement has been accepted for operation and maintenance by the Grantee but not later than June 30, 1983 TCE-1 L.Lw sM• 6. V4"oy NlNvslyr lA�yrr A•�e.4rrwv v 3� LL t I r r i 3 W /6^ ST -- ft-11wr 3 q a ' v � [.i.o. 3/4- E. VALtfr N/IHWAY 9"46ew&"Y +c t1 I v �r S a * ' v 1 � T O�,ou Lt 9poe c yn....'.. i 1 Mot, ,...., i S M 16 ' ST r4-4,«, h el 2 V ENDING OF FILE Pra � - LTD 3Iy �. Ualley Icy . ?Arc4A a1 , G P,*j ,r,