HomeMy WebLinkAboutMFP25002468.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25002468
IVR Number: 25002468
Permit Information
Permit Name: Puget Sound Energy - Electric
105107531- Hazen High School ModernizationAddress/Location:05/16/2025Application Date:1023059278Parcel Number: 1101 HOQUIAM AVE NE
Permit Type:09/17/2025Issue Date:Franchise
Permit Work Class:09/17/2026Expiration Date:Minor Utility
Job Number: 105107531Franchise Type:Electric
Description: Puget Sound Energy Electric Crew to install riser and termination on PO1 (318497 167371). Customer to trench and
install conduit from PO1 to exit right north. Crew to pull cable thru customer installed conduit. Restoration per City of
Renton standards.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
5/16/2025
Katie Zimmerman
105107531-Hazen High School Modernization
1101 Hoquiam Ave NE
Jenny Chau 253-208-9480
Monday Friday 8:00am 3:00pm
MFP25002468
Scott Warlick CED 9/17/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
NE 10TH STGRAHAM AVE NE
FIELD AVE NENE 9TH ST131315151515P01PV1W20-1ROAD
WORK
AHEAD W21-5SHOULDER
WORKX'≥X'≥W20-1ROADWORKAHEADX'≥FROM TOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS ALONG WORK AREA11 11 HAZENHIGHSCHOOLWORK IN PRIVATE PROPERTY0'50'25'NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVYURIY BASHTOVOY425-424-6425yuriy.bashtovoy@pse.com1 OF 11101 HOQUIAM AVE NE , Renton ,WA 98059 0 51498228604/29/2025Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated, ifindicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" (48" x 48"on 45 mph and over roadways) andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPPOLEMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:John CrofootCard No. IS 6 100071Card Exp. 10/10/28John.Crofoot@pse.com(425)424-6658MFP25002468
INGRESS & EGRESS EASEMENT REC. NO.20010529001667
SEWER EASEMENT REC.NO.20010529001666
SHIPPINGCONTAINER
6'GATE 6'CLF
4'CLFCRW4"PERFORATED PVC(TYP)(R)4"PERFORATED PVC(TYP)(R)4"PERFORATED PVC(TYP)(R)RAMP~ASPH~6'AW 6'AW6'AW
~GRAVE
L~
4"DEC
4"DEC
"POOL PARKING ONLY"
22'DWY
WMW(P)6"W(P)NO SIGNAL TO THENORTH(07/10/24)
10"
D
I
W
(
P
)
10"DI W(P)
10"DI W(P)
10
"
D
I
W
(
R
)
W(P)W(P)W(P)W(P)8"W(R)
WM(2)W(P)W(P)
8"W(R)8"W(R)
W(P)10"DI W(R)W(P)
W(P)W(R)CB TYPE 1RIM:459.90'IE 10"ADS(W):456.60'IE 10"PE(NE):456.55'BTM:455.20'
CB RIM:470.01'IE 4"IP ELBOW TRAP(N):467.55'IE 4"PE(S):467.50'
BTM:466.55'
CB RIM:462.89'IE 6"PE(S):460.20'H2O LEVEL:460.30'BTM:458.85'
CB RIM:463.26'(NO PIPES VISIBLE)*FILLED W/DEBRIS
SDMH RIM:464.05'IE 12"PE(N):450.50'IE 8"CP(NE):459.75'IE 12"PE(S):450.55'IE 8"PE(W):458.75'H2O LEVEL:450.85'BTM:449.55'
SDMH RIM:470.40'IE 8"CP(NE):455.40'IE 8"CP(SW):454.90'IE 6"PE(W):466.75'H2O LEVEL:454.90'BTM:454.65'
CB RIM:469.87'IE 6"PE(E):468.25'IE 4"PE(SE):468.25'IE 4"IP(S):468.25'H2O LEVEL:468.25'BTM:466.85'
IE 8"PVC(W):463.70'IE 8"PVC(E):461.36'8"PSD
CB TYPE 1RIM:462.89'
IE 6"PE(N):461.19'H2O:460.19'BTM:459.24'6"PSDCB TYPE 2(W/ CHIMNEY COVER)RIM:463.75'
IE 8"PE(NE):459.75'IE 8"PE(N):458.00'IE 8"PVC(E):457.90'H2O:457.90'BTM:456.55'
8"PSD8"PSD8"PSDCB TYPE 1RIM:463.58'IE 8"PE(SW):462.38'BTM:460.28'
CB TYPE 1RIM:463.07'IE 8"PE(N):458.67'IE 8"PE(S):458.67'BTM:457.07'8"PSDCB TYPE 1RIM:463.46'IE 8"PE(S):459.21'BTM:457.46'
SDMH RIM:468.91'(W/ CHIMNEY COVER)IE 12"CP(N):447.51'12"CP(W)(R)12"CMP(S)(R)H2O:447.51'BTM:445.41'12"PSD12"PSD12"PSD(R)12"PSD4"PS
D
6"PSD(R)IE 10"ADS(E):455.41'IE 10"PE(W):455.41'10"PSD
12"PSD4"PSD4"PSD12"PSD12"PSDCB RIM:469.94'
H2O:449.35' BTM:447.9'
12"PSD(R)
INLET (ROUND)
RIM:462.60'IE 4"PVC W/CAP(N):461.65'H2O:461.65'BTM:459.80'
SDCO4"PS
D
CB(R)4"PSD(R)4"P
S
D
(
R
)
CB TYPE 1RIM:459.90'IE 10"ADS(W):456.60'IE 10"PE(NE):456.55'BTM:455.20'
SSCO
SSMH RIM:470.47'IE 8"CP(E):459.80'IE 8"CLAY(W):459.60'
SSCO
SSMH RIM:464.26'8"CP(N,NE,S)COC:450.75'
SSMH RIM:470.49'
8"CP(NE,SW)COC:455.05'
SSMH RIM:469.06'(W/ CHIMNEY COVER)
8"CP(N)8"VC(W)(R)8"DI(E)(R)
COC:446.26'8"SS8"SS8"PSS8"PSS(R)8"SS8"PSS
8"PSS
SSMH RIM:476.51'8"CP(E,W),8"PE(S)IE 8"PE(S):462.60'COC:447.60'
8"PSS(R)8"PSS(R)8"-10"SSOHT
OHP
OHP&T
OHP&T
OHP&T
OHP&T
IRRIGATIONACCESS LID
ICB
ICB(2)ICB
ICB(2)IRRIGATIONACCESS LID
2"G(P)2"G(P)
2"G(P)2"G(P)2"G(P)G(R)G(R)4"G(R)
4"G(R)4"G(R)
SL
EV
ECD(P)
NO SIGNAL(06/2024)ECD(P)ECD(P)PP
CD
Ecd(P)
Ecd(P)
SLHH
PP
EJBOX
ELECTRICAL CABINETECD(P)ECD(R)30'30.0'FENCE COR ISON ⅊
FENCE CROSSES ⅊
FENCE CROSSES ⅊PARCEL C
PARC
EL I
LOT 2
CITY OF RENTON LLA NO.
LUA-00-148-LLA,
REC. NO.
20010529900002
PARCEL NO.:102305-9094OWNER:FACILITIES & OPERATIONS CTR
15' UTILITY EASEMENTREC. NO. 20060303000926
BENCHMARK "E"SET CHISELED "□"IN TBCTOP
TOP
TOP TOPTOPTOPTOP
TOP
TOP
TOP
TOP
TOE TOETO
ETOETOE
TOE
TOE
BRK
BRKBRKBRK
BRK
6"DEC10"DEC 8"DEC 8"DEC 6"DEC
5.0' HT STUMP
14"DEC
12",14",16"DEC
8"DEC
6"DEC 6"DEC
6"DEC
22"PINE
18"PINE
18"PINE
20"PINE
22"PINE
18"PINE
26"CON
24"CON
BENCHBENCHBENCHCSMETAL GRATE
RUNNING TRACKSURFACEMISC. MH BENCH3 ROW BLEACHER3.3' HT PADDED WOOD
BACKSTOP
CS
BENCH
3 ROW BLEACHERWOODRAMP3 ROW BLEACHERRUNNING TRACKSURFACERUNNING TRACKSURFACERUNNING TRACKSURFACERUNNING TRACKSURFACE
FLAGPOLE
5 ROW
BLE
A
C
HE
R
HOME PLATE
COL
BEN
C
H
CSCS
"RESERVEDPARKING"
"NO PARKING FIRE LANE"
"NE 10TH ST""FIELD AVE NE"
"HANDICAPPED PARKINGONLY"
ROCKERY
CRW CRWCRWBRW
CRW
CRW
CRW6"CRW
CRW
10-PS
9-PS
~GRAVEL~~GRAVEL~~DIRT~
~DIRT~
~DIRT~
~DIRT~~GRAVEL~BASEBALL DIAMOND
4'CLF6'CLF6'CLF6'CLF4'CLF4'GATE 4'GATE 4'CLF
10'CLF
4'CLF10'CLF10'CLF4'CLF
GATE
9'CLF
10'CLF
GATE
4'GATE
10'CLF
4'CLF10'CLF
10'CLF
4'CLF
GATE4'CLF4'CLF4'CLF4'CLF4'CLF4'GATE
4'CLF
8'CLF
10'CLFGATE4'CLF30'CLF
30'CLF9'CLF4'CLF4'CLF 6'CLF4'CLF 4'CLF
4'CLF
6'CLF
4'C
L
F
FFE:472.16'
6"
C
C6"CC6"CC
6"CC 6"CC
6"CC 6"CC
6"CC & 12"CG
6"CC & 12"CG
CC&CG
CC&CG
11.2'CW
~CON
C
~
~CONC~
~CONC~
5'CW
5'CW
CONCRETE EDGINGCONCRETE EDGINGCONCRETE EDGINGCONCR
E
T
E
E
D
GI
N
G
5'CW 18'DWY 18'DWY
5'CW
5'C
W
~CONC
~
~CONC~
CON
C
R
E
T
E
E
D
G
I
N
G
BLRD(2)
BLRD
BLRD
SHEDSHED
82.5'
45.3'40.5'106.6'16.2'50.0'50.0'29.6'~ASPH
~
~ASPH
~
~ASPH
~
~ASPH
~
~ASPH
~~ASPH~~ASPH~~ASPH
~
~ASPH
~
~ASPH
~
~ASPH
~
~ASPH~
N.E. 10TH ST.( A DEDICATED PUBLIC RIGHT OF WAY)
318570-167382
1500 kVA 277/480V (ABC)
318504-167384
318497-167371
X1023
T95419 (65T)318480-167412
25 kVA 120/240V (A)
PRE
14
CBANCBAN#4CU
#2ACSR
ROW
60'
318504-167384
318570-167382
1500 kVA 277/480V (ABC)
318497-167371
X1023
T95419 (65T)
CUSTOMER PROVIDED 9' X 11' WORKPIT
W/ 6" BEDDING OF CRUSH ROCK
CUSTOMER PROVIDED AND INSTALLED 1-4" HDPE
CONTINUOUS CONDUIT ±650'
CUSTOMER PROVIDED
4' X 4' WORKPIT
CUSTOMER PROVIDED 11' X 11' WORKPIT
W/ 6" BEDDING OF CRUSH ROCK
CUSTOMER PROVIDED AND INSTALLED 1-4" SCH'L 80
CONTINUOUS CONDUIT ±170' CUSTOMER PROVIDED
TRENCH
90°
R=60"±130'±5'90°
R=60"±35'318504-167384
318570-167382
1500 kVA 277/480V (ABC)
318497-167371
X1023
T95419 (65T)
PSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT
CABLE 870±'
(AØEKA493)
(BØEKA494)
(CØEKA495)
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
6/24/2024
395 333 428
43 43 43
438 376 471
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CIRCUIT FEET ADDED: 820'SITE SPECIFIC NOTES
P01 EXISTING 318497-167371:
- EXISTING 1969 45FT CL-1 POLE TO REMAIN
- INSTALL 3Ø 200A TERMINATION TSU3L1F, 6043.1000
- INSTALL (3) STIRRIPS (MID:2254100)
- INSTALL (3) 65T FUSES (MID:3412600)
- INSTALL SWITCH# T95419
- INSTALL (1) 4" RISER ON NEW STANDOFF BRACKET RIS4CSS, 6042.1000
PV1 NEW 318504-167384:3-20
- INSTALL HH 5' X 7' X 7' W/42" MH SVTBMH, 6051.1500
- INSTALL GRID#
V01 NEW 318570-167382: 3-19B, 1-08
- INSTALL 7' X 7' X 6'-2" VAULT W/ 8' X 10' COVER PM3P12D, 6045.5000
- INSTALL 8' X 10' COVER (MID:7917900)
- INSTALL GALVANIZED LADDER RACK (MID:9997916)
- SET 1500KVA, 277/480V PM XFMR (MID:6259400)
- INSTALL (3) L/B ELBOWS ELB10J, 6041.1000
- INSTALL (8) #501 - 7500KCMIL SECONDARY CONNECTOR BARS (MID: 7651003)
- INSTALL (64) BOLT KITS (MID:7651008)
- INSTALL GRID #
- CONNECT CUSTOMERS OWNED, INSTALLED, & MAINTAINED 10 - RUNS 600KCMIL
M01 NEW: # W MAIN
- PSE METER DEPT TO INSTALL (1) METER ON 3000A PANEL
SPAN SPECIFIC NOTES
SEE SITE PLAN, TABLES AND ONE LINES FOR INSTALL
CONDUIT DIAGRAM
NOT TO SCALE
00 1"2"
00 50'100'
CABLE DIAGRAM
NOT TO SCALE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
327,500
3000A
ELECTRIC
1012KW
65A
2.9%
0.2%
V01 ( XFMR 1)
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
PANEL # OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
M01 1 V01 10 600KCMIL
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
1500kVA 277/480v
6259400
V01
318570-167382
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jenny Chau
253-208-9480
jenny.chau@pse.com
514982286
PSE Locates Req'd
Developer Locates Req'd Yes
No
Yes
YesFlagging Req'd
Outages Req'd
JOB SITE
N
Vicinity Map
47.4993,-122.1547
Superior
NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.105107531105107531
Svc
Meter OP
104368776
3003029472
Owner / Developer Contact Info
officeATTN:
RENTON SCHOOL DISTRICT
300 SW 7th St
Renton WA. 98057
BEN PREHODA 206-406-6121
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-PROVIDE A 4' X 4' WORK PIT AT P01.
-PROVIDE A 9' X 11' WORKPIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT PV01.
-PROVIDE A 11' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01.
TRENCHING & CONDUIT.
-INSTALL ±170' 1-4" SCH'L 80 GREY PVC CONDUIT FROM P01 TO PV1
-INSTALL ±650' OF 1-4" HDPE CONDUIT FROM PV1 TO V01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
GUARD POSTS.
-CUSTOMER REQUIRED TO INSTALL GUARD POSTS AS SEEN ON PAGE #3
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (480Y/277V)
277V WINDINGS 480V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 1500kVA 0.1 --5.30 34,000 AMPS
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT
INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built
Actual Amount
Installed
(Conduit & Cable)
P01 PV1 4"1 170'X 3 0 0 1 128.2 115.8
PRI
12KV
1/0 UG 870'EKA493 EKA494 EKA495
PV1 V01 4"1 650'X 1 0 0 0 127 162.4
PRI
12KV
1/0 UG
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 9/23/24
Ray Reynolds 253-262-7409 9/23/24
N/A N/A N/A
Ray Reynolds -9/23/24
RW-138488 RENTON/KING
HAZEN HIGH SCHOOL MODERNIZATION
INSTALL(1) 3Ø XFMR & PULL VAULT, CONNECT SERVICES
1101 HOQUIAM AVE NE RENTON, WA. 98057
N/A N/A
N/A 105107531
AS NOTED 1 OF 3
KING N/A N/A CSPSKEPM
NW 10-23N-05E N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
516183421
516183422
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-CompleteLBDC
V01 318570-167382 PM3P12D
(7'x7'x6.167')
PAD-3P-12-277/480
-1500 (1500 kVA)3
PV1 318504-167384 Pull-1/0-SVSB20
(4.67'x4.67'x4')
MFP25002468
Conduit path may need
to be adjusted in the
field to avoid street
light bases and other
frontage improvements
RESTORATION PER CITY OF RENTON STANDARDS
9502
9515
9503
12631
127TH PL SESE 95TH WA
Y60'
R/W
75'
R/WABCB319195-166945
UNK(65T)
319199-166962
UNK(40T)
319203-166986
UNK (40T)
319193-166962
25 kVA 120/240V (C)
#4CU
#4CU
CCBA#4ACSROFF SITE - SITE PLAN
SCALE: 1" = 50'
SITE SPECIFIC NOTES
P02 EXISTING 319199-166962:1-08A
- EXISTING 1967 45FT CL-UNK POLE TO REMAIN
- TRANSFER SINGLE PHASE TAP WEST FROM C PHASE TO B PHASE
SPAN SPECIFIC NOTES
SEE SITE PLAN
00 1"2"
00 50'100'105107531UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 9/23/24
Ray Reynolds 253-262-7409 9/23/24
N/A N/A N/A
Ray Reynolds -9/23/24
RW-138488 RENTON/KING
HAZEN HIGH SCHOOL MODERNIZATION
INSTALL(1) 3Ø XFMR & PULL VAULT, CONNECT SERVICES
1101 HOQUIAM AVE NE RENTON, WA. 98057
N/A N/A
N/A 105107531
AS NOTED 2 OF 3
KING N/A N/A CSPSKEPM
NW 10-23N-05E N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1Mi
JOB SITE
N
Vicinity Map
47.5178, -122.1715
OFF SITE WORK
UNDERGROUND MAP
SCALE: NTS
JOB SITE
OFF SITE
WORK
MFP25002468
105107531Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
PM XFMR VAULT B-FLY DETAIL (V01)
SCALE: NONE
PROP 4" (P01)
PULL VAULT B-FLY DETAIL (PV1)
SCALE: NONE
Prop 4" (PV1)
10'-0"
7'-0"
8'-0"
8"
6'-2"11'
11'
TOP VIEW
5'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
2"
Excavation - 27 cubic yards
SIDE VIEW
6'-6"
Crushed
6"
Rock
FRONT OF TRANSFORMER
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE 2'-6"
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
GUARD POST INSTALLATION
Not to scale 0700.1600-03
18"
PAD &
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS 3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN 5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
PROP 4" (V01)
Customer Owned Services
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED TRANSFORMER
TRANSFORMER
APPROVED
AREA
NON-COMBUSTIBLE BUILDING WALLS & ROOF3'
3'
3'
TOP VIEW
6'MIN
VAULT LID
3'MIN
3'MIN
3'MIN
ROAD SIDE (PREFERRED)
FIELD SIDE (PREFERRED)
TOP VIEW VAULT LID
6775.0035.02Not to scale
Will maintain 36" Min. depth while directional drilling
36" Min
Depth
Final Grade
TYPICAL BORE COVER
TYPICAL BORE NOTE
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2
BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT
DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY.
PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE
POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL
HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING
CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND
PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO
REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK
BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS
PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT
OF WAY
NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE
TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE
INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY
HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC
RIGHT OF WAY.
NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL
CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND
STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT
HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT
OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A
DIFFERENT MINIUM SEPARATION.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 9/23/24
Ray Reynolds 253-262-7409 9/23/24
N/A N/A N/A
Ray Reynolds -9/23/24
RW-138488 RENTON
HAZEN HIGH SCHOOL MODERNIZATION
INSTALL(1) 3Ø XFMR & PULL VAULT, CONNECT SERVICES
1101 HOQUIAM AVE NE RENTON, WA. 98057
N/A N/A
N/A 105107531
AS NOTED 3 OF 3
KING N/A N/A CSPSKEPM
NW 10-23N-05E N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
6'-0"
4'-8"
7'-0"
1'-0"
7'-0"
22" from top of
cover to top of vault
Standard Manhole and Cover or
Heavy Duty Manhole Frame and Cover
6" and 12" Ring Risers
2720 lbs
Cover
6360 lbs
Vault
installed by manufacturer
Internal vault ground
1/0 THREE-PHASE PULLING/SPLICING VAULT
6051.1500-2 Not to scale (Full Traffic)
MFP25002468