Loading...
HomeMy WebLinkAboutConcrete Field Report_2025-09-17-Lindbergh High School Field Improvements-25B121-01_000003Inspection Information: Inspection Date:09/17/2025 Time Onsite:05:00 Weather Conditions:Clear, 59 Inspection Performed: Concrete Subcontractor:Continuous or Periodic: Sheet(s):Location / Area: Softball & Baseball Fields Score Board Footings Details:Level / Elevation: Approved Plans Dated: Report Profile: Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No RFI:Yes No Show Up:Yes No Retest / Re­inspection:Yes No Standby:Yes No Remarks: MTC inspector on site, as requested, to observe the placement of approximately 7 CY of concrete with Mix Design ID #1250AF supplied by Miles into footings, at the location noted above. One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #4966 for field test results and for more information. Concrete was placed via truck’s chute, was mechanically consolidated with high­cycle vibrator, and finished by hand. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. ✔ ✔ Concrete Field Report RCCON­000003­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 1 of 3Page 1 of 2 Inspection Information:Inspection Date:09/17/2025 Time Onsite:05:00 Weather Conditions:Clear, 59Inspection Performed: ConcreteSubcontractor:Continuous or Periodic:Sheet(s):Location / Area:Softball & Baseball Fields Score Board FootingsDetails:Level / Elevation:Approved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoRemarks:MTC inspector on site, as requested, to observe the placement of approximately 7 CY of concrete with Mix Design ID #1250AFsupplied by Miles into footings, at the location noted above. One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #4966 for field test results and for more information. Concrete was placed via truck’s chute, was mechanically consolidated with high­cycle vibrator, and finished by hand. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: Reported By:Allen Choy Reviewed By:Kevin Walters ✔ ✔ Concrete Field Report RCCON­000003­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 2 of 3Page 2 of 2