HomeMy WebLinkAbout21008 Storm Revision Memo_Approved To: Nathan Janders, PE From: Core Design Inc Date: August 20, 2025 Re: Towns on 12th - NE 12th Street Storm Revision This memo serves as justification for the design of the August 20, 2025 storm revision to the Towns on 12th Plans. This revision is necessary in order to minimize the potential ponding at the east end of the proposed road widening along the project frontage of NE 12th St. The proposed storm revision, as detailed in the revised civil plans dated August 20, 2025, includes installation of one catch basin along the new curb line of NE 12th St, approximately 7.5 feet from the end of the improvement, as well as a catch basin on the shared property line between Lots 1 and 10, beyond the east end of ROW 1, with 8-inch diameter ductile iron piping connecting these catch basins to existing catch basin 30. Route Justification The connection of this proposed conveyance to the on-site system has been determined to be the best option over the alternatives of connecting to the existing storm on the south side of NE 12th Street or to the east at the intersection of NE 12th Street and Union Ave NE. Connection south across NE 12th Street is not feasible due to the shallow existing storm, existing water within the ROW which would be in direct conflict with a storm crossing, and the newly placed overlay in that area. Connection east at the intersection of NE 12th Street and Union Ave NE has been dismissed as an option due to the impact to neighboring driveways and excessive distance, 280 feet, when compared to the proposed option which only requires 139 feet of pipe. As such, the proposed solution is the most efficient option with the least impact to offsite and public property. Vault Capacity Justification The final approved TIR included a treatment trade in order to justify the release of this area. This area swap is summarized in Table 1 below, as pulled from Section 4.1.3 of the final approved TIR for the project. Table 1 Approved TIR Treatment Trade Areas NE 12th Street Area Swap Released (sf) Collected (sf) Difference (sf) Difference (ac) Impervious (Road) 3,265 4,011 746 0.02 Pervious 1,366 3,854 2,488 0.05 Total Area 4,631 7,865 3,234 0.07 DEVELOPMENT ENGINEERING yqi 09/18/2025 J:\2021\21008\Documents\Engineering Reports\NE 12th Storm Revision Memo.docx In the proposed condition, The majority of the area previously categorized as “released” will be collected. The design change proposed no change to the upstream collected road area, therefore all area in excess of the original total released area will be treated as flow through for the vault. See Table 2 below for a summary of the new proposed condition. Table 2 Revised Treatment Trade Areas NE 12th Street Area Swap Target Surfaces Non-Target Surfaces Released (sf) Newly Collected (sf) Subtotal (sf) Newly Collected* (sf) Upstream Collected (sf) Subtotal (sf) Impervious 156 3,109 3,265 2,928 4,011 6,939 Pervious 73 1,293 1,366 0 3,854 3,854 Total Area 229 4,402 4,631 2,928 7,865 10,793 *Existing pavement between edge of existing pavement and centerline not subject to treatment. “Newly Collected” area is represented by green hatched area in the attached exhibit, totaling 7,330 square feet. All Non-Target Surfaces, less the Released Target Surfaces, as presented in Table 2 above, will be considered as flow through for the vault no subject to water quality or flow control. Since the design of the detention vault had already accounted for the treatment of the newly collected target areas, and the newly collected non-target areas are considered flow through, the existing vault design will function as designed and constructed to meet the flow control requirements. Size Justification In order to avoid the newly installed power within the right-of-way sidewalk, an 8-inch ductile iron pipe has been proposed rather than the 12-inch diameter minimum typically required within city ROW. This reduced diameter is proposed in order to maximize the available clearance between the recently installed power and the proposed pipe. The maximum capacity of the proposed 8-inch pipe at the minimum proposed slope, 0.55%, as calculated using Manning’s equation, has been compared to the 100-year peak flow of the Newly Collected Areas, tabulated in Table 2, as determined utilizing WWHM to ensure adequate conveyance capacity is provided. Per Manning’s equation, the capacity of an 8-inch ductile iron pipe (n-value of 0.012) flowing full at 0.55% is 0.973 cubic feet per second. The areas for use in WWHM to determine the 100-year flow to the proposed catch basin inlet (CB 30B) in the ROW have been simplified into Table 3 below from those presented in Table 2. Table 3 CB 30B Tributary Areas Target Areas (sf) Non-Target Areas (sf) Total (sf) Total (ac) Impervious 3,109 2,928 6,037 0.138 Pervious 1,293 0 1,293 0.030 Total Area 4,402 2,928 7,330 0.168 Per WWHM, the runoff rate for the 100-year storm from this tributary area is 0.1414 cubic feet per second. J:\2021\21008\Documents\Engineering Reports\NE 12th Storm Revision Memo.docx Figure 1 CB 30B Tributary Area Flow Rates Based on these results, the 100-year peak flow to the proposed inlet is 0.1414 cfs, less than the capacity of the proposed 8-inch diameter pipe of 0.973 cfs. Therefore, the proposed 8-inch pipe is adequately sized to convey runoff from the newly collected area. Sincerely, CORE DESIGN, INC. Holli Heavrin, PE DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321008