Loading...
HomeMy WebLinkAboutIntake Checklistrentonwa.gov/permit | developmentengineering@rentonwa.gov | 425-430-7240 5/1/2023 | Page 4 of 6 CIVIL CONSTRUCTION PERMIT APPLICATION PROCESS AND SUBMITTAL REQUIREMENTS SECTION III: INTAKE CHECKLIST The applicant should contact the assigned City Development Engineer, prior to scheduling the Intake Meeng, if there are any quesons regarding submial requirements. All it ems are required unless waived by City staff. 1. Civil Construcon Permit Applicaon 2. Bond Quality Worksheet (.xlsx format) 3. Dra Copy of Easements 4. Dra Copy of Right-of-Way-Dedicaon 5. Street Lightning Calculaon 6. Plans: Organize the plans such that they are separated into type of improvement and drawing order. Each improvement type should include all plans, profiles, notes, secons, details, schedules, diagrams, etc. for that facility. All plans shall be designed in accordance with the City of Renton “Construcon Plan Draing Standards” as required per RMC 4-8-120. All plans required unless waived by City staff. The required order of drawings is as follows: a. Cover Sheet b. Sheet Index (If not on index sheet) c. Exisng Condions/Topography Plan d. Horizontal Control Plan e. Site Plan f. Temporary Erosion and Sediment Control Plan g. Grading Plan (may be combined with Temporary Erosion and Sediment Control Plan or Storm Drainage Plan) h. Conceptual Structural/Retaining Wall and/or Deteco n Vault Plans associated with Civil Improvements. i. Composite Ulity Plan j. Road/Paving/Storm Drainage Plan and Profiles (Large Projects May Require Separate Street Improvement and Storm Drainage. k. Wastewater and Water Ulity Plan and Profiles (Large Projects May Require Separate Wastewater and Water Plans) l. Plumbing Plan (Commercial/Industrial—for informaon only.) m. City Standard Details (Organized by Private vs. Public.) n. Street Lighng Plan and Details o. Signing and Channeliza on Plans and Details p. Landscaping Plan and Details q. Tree Retenon/Land Clearing (Tree Inventory Page.) r. Wetland or Stream Migaon Plan s. Miscellaneous Plans (Structural, Architectural, etc.) rentonwa.gov/permit| developmentengineering@rentonwa.gov | 425-430-7240 5/1/2023 | Page 5 of 6 CIVIL CONSTRUCTION PERMIT APPLICATION PROCESS AND SUBMITTAL REQUIREMENTS 7. Technical Informaon Report: The Technical Informaon Report (TIR) shall be a complete report in accordance with the current Surface Water Design Manual adopted by the City. Each sec on of the report shall be clearly idenfied and all supporng documents clearly indexed within the report. TIR shall include the following items as detailed in the Surface Water Design Manual: Secon 1: Project Overview a. Figure 1—TIR Worksheet b. Figure 2—Site Locaon c. Figure 3– Drainage Basins, Sub-basins, and Site Characteriscs Show acreage and boundaries of sub-basins Idenfy all site characteriscs Show exisng drainage poin ts to and from the site Show routes of exisng construcon, and fu ture flows at all discharge points, and downstream hydraulic structures. Topographic map as a base for the figure comparable to USGS or beer. Show (and cite) the length of travel from the farthest upstream end of the proposed storm system in the development to any proposed flow control facility. d. Figure 4—Soils (Show the soils within the following areas: The project site The area draining to the site The drainage system to downstream of the site for the distance of the downstream analysis. Secon 2: Condions and Requirements Summary Secon 3: Off-Site Analysis a. Task 1: Study Area Definion and Maps b. Task 2: Resource Review c. Task 3: Field Inspecon d. Task 4: Drainage System Descripon and Problem Descripons e. Migaon of Exisng or Potenal Problems Secon 4: Flow Control, Low Im pact Development (LID), and Water Quality Facility Analysis and Design a. Exisng Site Hydrology (Part A) - Topograp hical map with listed site informaon b. Developed Site Hydrology (Part B) - Data/narrave for developed site condions c. Performance Standards (Part C) - Summarize flow control and On-Site BMPs d. Flow Control System (Part D) - Illustrave sketch and documentaon. e. Water Quality System (Part E) - Illustrave sketch and documentaon. Secon 5: Conveyance System Analysis and Design Secon 6: Special Reports and Studies (Geotechnical Reports, Wetland Reports, Floodplains Analysis, etc.) Secon 7: Other Permits (Special Use, WSDOT, DOE Permit with WAR #, etc.) Secon 8: CSWPPP Analysis and Design rentonwa.gov/permit | developmentengineering@rentonwa.gov | 425-430-7240 5/1/2023 | Page 6 of 6 CIVIL CONSTRUCTION PERMIT APPLICATION PROCESS AND SUBMITTAL REQUIREMENTS a. ESC Plan Analysis and Design (Part A) b. SWPPS Plan Design (Part B) Secon 9: Bond Qualies, Facility Summaries, and Declaraon of Covenant a. City of Renton Bond Quanty Worksheet b. Flow Control and Water Quality Facility Summary Sheet and Sketch c. Declaraon of Covenant for Privately Maintai ned Flow Control and Water Quality Facilies d. Declaraon of Covenant for Private ly Maintained Flow Control BMPs Secon 10: Operaons and Maintenance Manual SECTION IV: RESOURCE Addional Design Resources and City Standards City of Renton Surface Water Design Manual (RSWDM) City of Renton Standard Details City of Renton Forms 2016 King County Stormwater Polluon Prevenon Manual Electronic File Standards Survey and Draing Standards