Loading...
HomeMy WebLinkAboutC_DNSM_Applicant Letter_20250922 September 23, 2025 Anousheh Nawaz City of Renton 1055 S Grady Way Renton, WA 98057 SUBJECT: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION Kennydale Lakeline Sanitary Sewer Improvement Project, LUA25-000219, ECF, SSDP Dear Anousheh Nawaz: This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they have completed their review of the subject project and have issued a threshold Determination of Non-Significance-Mitigated with Mitigation Measures. Please refer to the enclosed ERC Report and Decision for more details. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on October 6, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the Environmental Determination is appealed, an appeal public hearing will be set and all parties of record will be duly notified in accordance with RCW 43.21C.110 and WAC 197-11-535. Anousheh Nawaz Page 2 of 2 September 23, 2025 If you have any further questions, please reach me at amorganroth@rentonwa.gov or at 425-430- 7219. For the Environmental Review Committee, Alex Morganroth Principal Planner Enclosure cc: City of Renton/ Owner(s) Joe Stowell/Applicant N. Bily, L. Baker/, C. Mbugua, J. DeMund / Parties of Record DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 www.rentonwa.gov NOTICE OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS-M: After review of the completed environmental checklist and other information on file, the City of Renton Environmental Review Committee (ERC) has determined that the proposed action has probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using the optional DNS process in WAC 197-11-355. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). Please note that the issuance of this determination DOES NOT constitute approval of the proposal. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: September 23, 2025 PROJECT NAME/NUMBER: Kennydale Lakeline Sanitary Sewer Improvement Project / LUA25-000219, ECF, SSDP / PR25-000049 PROJECT LOCATION: PROJECT LOCATION: 2725, 2727, 2731, 2801, 2805, 2807, 2811, 2815, 2827, 2905, 2921, 2931, 3001, 3003, 3005, 3007, 3009, 3011, 3013, 3015, 3101, 3103, 3107, 3111, 3115, 3119, 3205, 3209, 3213, 3217, 3233, 3307 Mountain View Ave N; 3401, 3405, 3411, 3501, 3601, 3605, 3607, 3611, 3613, 3619, 3625, 3703, 3707, 3709, 3711, 3713, 3715, 3717, 3719, 3805, 3811, 3815, 3821, 3825, 3827, 3837, 3901, 3905 Lake Washington Blvd N (APNSs: 0523059010, 3342104050, 3342104048, 3342104046, 3342104045, 3342104040, 3342104029, 3342104010, 3342104009, 3342103985, 3342103953, 3342103942, 3342103940, 3342103941, 3342103931, 3342103930, 3342103924, 3342103920, 3342103905, 3342103906, 3342103895, 3342103890, 3342103880, 3342103860, 3342103855, 3342103845, 3342103840, 3342103810, 3342103805, 3342103795, 3342103775, 3124059077, 3124059079, 3124059076, 3124059075, 3124059074, 3124059004, 3342700355, 3342700330, 3342700320, 3342700310, 3342700300, 3342700290, 3342700280, 3224059005, 3342700270, 3342700260, 3342700250, 3342700230, 3342700240, 3342700211, 3342700200, 3342700190, 3342700176, 3342700149, 3342700126, 3342700125, 3342700110, 3342700100, 3342700080, 3342700070, 3342700011) APPLICANT/PROJECT CONTACT PERSON: Anousheh Nawaz, City of Renton / 1055 S Grady Way Renton, WA 98057 / (425) 430-7279 / Anwaz@rentonwa.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://tin.al/AE4DV The applicant is requesting State Environmental Policy Act (SEPA) review and a Shoreline Substantial Development Permit (SSDP) for the Kennydale Lakeline Sewer System Replacement Project. The project site includes multiple parcels (noted above), City of Renton right-of-way, King County Parks property, and private property located between 3905 Lake Washington Blvd N and the north end of Gene Coulon Memorial Beach Park. The existing 4,680 -foot (4,680’) in-lake sewer system will be replaced with a new land-based low-pressure sewer system serving 56 properties and a public park. The proposed replacement system includes approximately 4,950 linear feet (4,950’) of new force main, 55 individual grinder pump stations, and associated electrical and utility improvements, to be constructed primarily within Mountain View Ave N and an unnamed access road east of the lake. The project will occur in two (2) phases: (1) upland construction of the new sewer system and (2) in-water decommissioning of the existing lake -line system. In-water work will be staged from barges and occur during the approved fish window (approximately July 16 to December 31). Temporary construction-related disturbance will total approximately 113,670 square feet in upland areas and 875 square feet in aquatic areas. Work would occur within and adjacent to Lake Washington, a Shoreline of the State. Shoreline designations on the site include Single -Family Residential, Urban Conservancy, and Aquatic. Work is anticipated to start in early 2026 and last up to 18 months. The project includes mitigation and restoration measures to ensure no net loss of shoreline ecological function. Supporting documents submitted with the application includes a SEPA Checklist, Vegetation Management Plan, Geotechnical Engineering Report, Arborist Report, and Lake Study. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on October 7, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4 -8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. PUBLIC HEARING: If the Environmental Determination is appealed, an appeal public hearing will be set and all parties of record will be duly notified in accordance with RCW 43.21C.110 and WAC 197-11-535. CONTACT PROJECT PLANNER: Alex Morganroth, Principal Planner, 425-430-7219, amorganroth@rentonwa.gov DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE -MITIGATED (DNS-M) Project File Numbers: LUA25-000219, ECF, SSDP/PR25-000049 Project Name: Kennydale Lakeline Sanitary Sewer Improvement Project Applicant/Contact: Anousheh Nawaz, City of Renton / 1055 S Grady Way, Renton, WA 98057 Project Location: 2725, 2727, 2731, 2801, 2805, 2807, 2811, 2815, 2827, 2905, 2921, 2931, 3001, 3003, 3005, 3007, 3009, 3011, 3013, 3015, 3101, 3103, 3107, 3111, 3115, 3119, 3205, 3209, 3213, 3217, 3233, 3307 Mountain View Ave N; 3401, 3405, 3411, 3501, 3601, 3605, 3607, 3611, 3613, 3619, 3625, 3703, 3707, 3709, 3711, 3713, 3715, 3717, 3719, 3805, 3811, 3815, 3821, 3825, 3827, 3837, 3901, 3905 Lake Washington Blvd N (APNs: 0523059010, 3342104050, 3342104048, 3342104046, 3342104045, 3342104040, 3342104029, 3342104010, 3342104009, 3342103985, 3342103953, 3342103942, 3342103940, 3342103941, 3342103931, 3342103930, 3342103924, 3342103920, 3342103905, 3342103906, 3342103895, 3342103890, 3342103880, 3342103860, 3342103855, 3342103845, 3342103840, 3342103810, 3342103805, 3342103795, 3342103775, 3124059077, 3124059079, 3124059076, 3124059075, 3124059074, 3124059004, 3342700355, 3342700330, 3342700320, 3342700310, 3342700300, 3342700290, 3342700280, 3224059005, 3342700270, 3342700260, 3342700250, 3342700230, 3342700240, 3342700211, 3342700200, 3342700190, 3342700176, 3342700149, 3342700126, 3342700125, 3342700110, 3342700100, 3342700080, 3342700070, 3342700011) Project Description: The applicant is requesting State Environmental Policy Act (SEPA) review and a Shoreline Substantial Development Permit (SSDP) for the Kennydale Lakeline Sewer System Replacement Project. The project site includes multiple parcels (noted above), City of Renton right-of-way, King County Parks property, and private property located between 3905 Lake Washington Blvd N and the north end of Gene Coulon Memorial Beach Park. The existing 4,680-foot (4,680’) in-lake sewer system will be replaced with a new land-based low- pressure sewer system serving 56 properties and a public park. The proposed replacement system includes approximately 4,950 linear feet (4,950’) of new force main, 55 individual grinder pump stations, and associated electrical and utility improvements, to be constructed primarily within Mountain View Ave N and an unnamed access road east of the lake. The project will occur in two (2) phases: (1) upland construction of the new sewer system and (2) in-water decommissioning of the existing lake-line system. In-water work will be staged from barges and occur during the approved fish window (approximately July 16 to December 31). Temporary construction-related disturbance will total approximately 113,670 square feet in upland areas and 875 square feet in aquatic areas. Work would occur within and adjacent to Lake Washington, a Shoreline of the State. Shoreline designations on the site include Single-Family Residential, Urban Conservancy, and Aquatic. Work is anticipated to start in early 2026 and last up to 18 months. The project includes mitigation and restoration measures to ensure no net loss of shoreline ecological function. Supporting documents submitted with the application includes a SEPA Checklist, Vegetation Management Plan, Geotechnical Engineering Report, Arborist Report, and Lake Study. Lead Agency: Date of Decision: City of Renton Environmental Review Committee Department of Community & Economic Development September 23, 2025 Docusign Envelope ID: A6950DB9-F338-45C7-991A-0D2425171124 SIGNATURES: Martin Pastucha, Administrator Public Works, Chair Date Anjela Barton, Fire Marshal Renton Regional Fire Authority Date Maryjane Van Cleave, Administrator Parks and Recreation Date Gina Estep, Administrator Date Community and Economic Development Environmental Review Committee Determination September 23, 2025 Page 2 of 2 Mitigation Measures: 1. The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional prior to the start of any construction. In addition, the applicant shall provide notification to Tribes’ cultural committee prior to the start of construction. The City of Renton Environmental Review Committee has determined that probable significant environmental impacts from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on October 7, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Docusign Envelope ID: A6950DB9-F338-45C7-991A-0D2425171124 9/22/2025 | 2:44 PM PDT 9/22/2025 | 3:00 PM PDT 9/22/2025 | 5:27 PM PDT