Loading...
HomeMy WebLinkAboutERC_4th_dimension_building_FINALDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map ERC_4th dimension building_FINAL ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC Meeting Date: September 22, 2025 Project File Number: PR25-000043 Project Name: 4th Dimension Building Land Use File Number: LUA25-000193, ECF, SA-H, RUV-H Project Manager: Jill Ding, Senior Planner Owner/Applicant: Jarnail Singh, Thindr LLC, 12704 Pacific Hwy SW, Lakewood, WA 98499 Contact: Martin Reimers, Concept Architecture, 2911 1/2 Hewitt Ave, Suite 2, Everett, WA 98201 Project Location: 4502 NE 4th St, Renton, WA 98059 (APN 1023059068) Project Summary: The applicant is requesting Hearing Examiner Site Plan Review, Environmental (SEPA) Review and a Reasonable Use Variance for the construction of a five- story mixed use building located at 4502 NE 4th St (APN 1023059068). A similar application was previously permitted under LUA19-000153, which subsequently expired. The subject parcel is 23,170 square feet in size and is in the Commercial Arterial (CA) zone and Urban Design District ‘D’. The applicant is proposing to construct an approximately 70-foot (70’) tall building that includes 49 structured parking spaces, approximately 6,108 square feet of ground-floor commercial space, and 26 apartment units on levels 2 through 5. The existing single-family structure would be demolished. Access to the site would be at the rear of the property from Bremerton Ave NE. The site contains a piped stream channel and sensitive slopes. The City of Renton (COR) Maps database shows an off-site stream located 80 feet (80’) to the east of the project site and a wetland also associated with the stream channel approximately 230 feet (230’) east of the site. The applicant is requesting a Reasonable Use Variance to allow the piped stream to be redirected to a new surface channel that would be constructed in the central portion of the site. Exist. Bldg. Area SF: N/A Proposed New Bldg. Area (footprint): Proposed New Bldg. Area (gross): 11,922 sq. ft. 65,984 sq. ft. Site Area: 23,170 sq. ft. (0.53 acres) Total Building Area GSF: 65,984 sq. ft. STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance - Mitigated (DNS-M). Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 2 of 12 ERC_4th dimension building_FINAL PART ONE: PROJECT DESCRIPTION / BACKGROUND The applicant is requesting Hearing Examiner Site Plan Review, Environmental (SEPA) Review and a Reasonable Use Variance for the construction of a 65,984 square foot five-story, mixed-use building located at 4502 NE 4th St (APN 1023059068). The subject parcel is 23,170 square feet in size and is located on the rectangular parcel at the northeast corner of NE 4th St and Bremerton Ave NE in the Commercial Arterial (CA) zone and the Urban Design District ‘D’ (Exhibit 2). The applicant is proposing to construct an approximately 70-foot (70’) tall building that includes 49 structured parking spaces, 6,108 square feet of commercial space, and 26 apartment units on levels 2 through 5 (Exhibit 2). Levels 1 through 3 would include eight (8) two- bedroom living units and level 5 would include two (2) large penthouse units for a proposed density of 59 dwelling units per net acre. The majority of the site is currently undeveloped and dominated by a dense thicket of Himalayan blackberry (Rubus armeniacus, FAC) and Japanese knotweed (Polygonum cuspidatum, FACU). Several large balsam poplar trees (Populus balsamifera, FAC), approximately 18 to 20 inches (18-20”) DBH , are located in the public right-of-way (ROW) along the western boundary of the parcel (Exhibit 4). The site contains an ecology block retaining wall which is located at the westside of the lot or at the adjacent west ROW which has an estimated height of around 12 feet (12’) and retains Bremerton Ave NE. The former single- family structure was demolished in 2024 (B23005488). The site topography includes a relative depression at the north-central portion of the lot with moderate to steep relatively minor slopes at the north and south sides of the lot. The proposed new building is designed to conform to the existing topography of the site. Vehicle access to the parking structure would be at the north end of the property via Bremerton Ave NE and pedestrian access would be from NE 4th St and Bremerton Ave NE. New public improvements include half-street frontage improvements on Bremerton Ave NE and NE 4th St. The soils consist of ablation till overlying lodgement till and the site contains both a piped stream channel and regulated slopes. The City of Renton (COR) Maps database shows an off-site stream located 80 feet (80’) to the east of the project site and a wetland also associated with the stream channel approximately 230 feet (230’) east of the site. The stream is also mapped as originating from an off-site wetland complex located approximately 180 feet (180’) further to the east. The off-site stream channel enters an approximately 24-inch (24”) diameter plastic pipe that extends underneath the central portion of the project site. The applicant is requesting a Reasonable Use Variance to allow the piped stream to be redirected to a new surface channel that would be constructed in the central portion of the site (Exhibit 3). The new building is proposed to be constructed with an open space under the building to accommodate the new stream channel and to provide additional storage during storm events. The new building would also provide access under the structure for maintenance and cleanout, and pumping access per City specifications. In addition, a stormwater detention vault would be constructed below the lowest parking level and discharge to the storm system that exists on the site. There are no significant trees on-site after the required 14.5 feet (14.5’) of ROW dedication on Bremerton Ave NE. Construction is expected to begin February 2026 (Exhibits 3 and 14). The applicant has submitted a Geotechnical Report with Infiltration Evaluation, Traffic Impact Analysis, Technical Information Report, and a Stream and Wetland Reconnaissance. Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 3 of 12 ERC_4th dimension building_FINAL PART TWO: ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS-M with a 14-day appeal period B. Mitigation Measures 1. The project construction shall comply with the recommendations found in the submitted Geotechnical Engineering Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018, and future addenda. 2. The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter to the Current Planning Project Manager stating that he/she has reviewed the construction and building permit plans submitted to the City and in their opinion the plans and specifications meet the intent of the report(s). 3. The geotechnical and structural design of the 4th Dimension Building, including the portion of the building providing compensatory storage, must be prepared in a way that will prevent damage to the subject building and surrounding properties resulting from seepage of water into the subbase materials, as well as potential settlement and erosion that might occur. Possible means of accomplishing this include providing a watertight concrete base slab and/or a waterproof liner beneath the open channel and compensatory storage area to prevent infiltration of water into the subbase material. The project's geotechnical and structural engineers must provide the City with a correspondence bearing a professional engineering stamp stating that in their opinion the project as designed will not result in property damage caused by settlement or erosion of the subbase material. 4. The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional with the civil construction permit for review and approval by the Current Planning Project Manager prior to permit issuance. In addition, the applicant shall provide notification to the Duwamish Tribe in the event that archaeological work or monitoring is performed on-site. 5. A prorated share of the traffic signal costs shall be collected from the proposed project, based upon the ratio of peak-hour vehicle trips that would be added by the project to the total project future baseline trips at the NE 4th St and Bremerton Ave NE intersection. The fee would be calculated based on the following formula: (New PM peak-hour trips) / (Total vehicle PM peak- hour trips for the signal) x (Cost of new signal and improvements). The prorated share of the traffic signal is $15,686.27 ((40/3,060) x 1,200,000 = $15,686.27). The fee shall be paid prior to temporary certificate of occupancy. Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 4 of 12 ERC_4th dimension building_FINAL C. Exhibits Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Architectural Plan Set Exhibit 3: Conceptual Civil Plan Set Exhibit 4: Conceptual Landscape Plans Exhibit 5: Geotechnical Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018 Exhibit 6: Stream and Wetland Reconnaissance, prepared by Raedeke Associates, Inc., dated June 25, 2019 Exhibit 7: Technical Information Report (TIR), prepared by Harmsen, LLC, dated April 25, 2025 Exhibit 8: Traffic Impact Analysis (TIA), prepared by Kimley-Horn and Associates, Inc., dated April 2025 Exhibit 9: Washington State Department of Fish and Wildlife (WDFW) Comment Letter, dated September 3, 2025 Exhibit 10: WDFW City Response, dated September 5, 2025 Exhibit 11: Duwamish Tribe Comment Letter, dated August 27, 2025 Exhibit 12: Duwamish Tribe City Response, dated September 5, 2025 Exhibit 13: Transportation Concurrency Test Memorandum, dated June 20, 2025 Exhibit 14: SEPA Environmental Checklist, prepared April 17, 2025 Exhibit 15: Variance Request Justification Exhibit 16: Advisory Notes D. Environmental Impacts The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1. Earth Impacts: According to the applicant’s Geotechnical Engineering Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018 (Exhibit 5), the site is suitable for the proposed development. The geotechnical engineer explored the soil and groundwater conditions at the subject parcel by excavating five (5) test pits by mini excavator at depths of up to nine feet and eight inches (9’ 8”) below ground surface (bgs). Soils observed at the test pits generally consisted of variable density silty soils and fills which include brick, wood, organic material, concrete and asphalt debris overlying apparent dense and competent till and gravelly sand and sandy gravel. The depth of fills ranged from two and one-half feet (2 ½’) at test pit TP-5 to around nine feet (9’) at test pit TP-3. According to Geo Group Northwest, the observed underlying soils match the USDA SCS soil description for Alderwood gravelly sandy loam (AgC) at the uplands and Everett very gravelly sandy loam (EvB) at the depression. Groundwater seepage was not encountered by Geo Group Northwest at test pits TP-1 through TP-3. However, significant groundwater seepage was Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 5 of 12 ERC_4th dimension building_FINAL encountered at a depth of seven feet (7’) bgs at test pit TP-4 and five feet (5’) bgs at test pit TP-5. According to Geo Group Northwest, the site’s silty soils are relatively impermeable in the uplands and the soils observed at the depression (lowland) portion of the site may have relatively high permeability, however, the groundwater level at this area is also relatively high, thereby reducing the effectiveness for an infiltration system. Due to the presence of silty soils overlying much of the site and the relatively high groundwater conditions, the geotechnical engineer does not recommend attempting to infiltrate stormwater at the subject site. Based upon Geo Group Northwest’s subsurface investigation, the project site has Site Class D soil (Stiff Soil) per the IBC based upon the observed subsurface soil conditions and provided that the buildings are constructed to bear on the competent soils. The primary geotechnical concern with regard to the design for the proposed building is the presence of loose and unacceptable fill soils which present risks of damage due to soil settlement, if not properly over-excavated and filled with compacted structural fill. These risks can be mitigated by constructing the building on top of an augercast pile foundation. It may also be an option for a portion of the building to be supported on a spread footing foundation, such as at the south side of the property, with the remainder of the building supported on a pile foundation at a depth of around 10 feet (10’) bgs and provided that competent soils are encountered at the foundation subgrades at the proposed spread footing areas. According to Geo Group Northwest, concrete grade beams should be used to connect the pile foundations and distribute the building loads. A structural concrete slab may be designed and constructed to support the slab loads and transfer these loads to the piling. Based upon the depth to competent soils observed at the test pits, pile lengths may be approximately 20-feet (20’) with a 10-foot (10’) embedment into the competent dense soil and a minimum diameter of 14 inches (14”). Geo Group Northwest concludes that the performance of piles depends on how and to what bearing stratum the piles are installed and that professional judgement and experience must be used as a basis for determining the embedment length and acceptability of a pile. Geo Group Northwest recommends that a geotechnical engineer be retained to monitor the pile installation operation, collect and interpret installation data, and verify suitable bearing stratum. In addition, the geotechnical engineer recommends that the contractor’s equipment and installation procedure be reviewed by Geo Group Northwest prior to pile installation to help mitigate problems that may delay work progress. According to the SEPA Environmental Checklist, the applicant is proposing approximately 500 cubic yards of cut and approximately 5,000 cubic yards of fill. In addition, approximately 2,000 cubic yards of existing fill would need to be removed and replaced with structural material in order to prepare the site for improvements (Exhibit 14). The project would result in roughly 72 percent (72%) impervious surfaces after project construction (Exhibit 2). Grading, erosion and sediment control standards of RMC 4-4-060 would mitigate dust, slope, and runoff impacts. The geotechnical report provided discussion and recommendations for infiltration evaluation, site preparation and earthwork, building pad improvement, spread footing foundations, conventional retaining walls and basement walls, slab-on-grade concrete floors, subsurface drainage, and augercast concrete pile foundations. Due to the geotechnical recommendations included in the provided report and supplemental letter, and to mitigate for potential impacts the project proposal could have on the site resulting from project construction, staff recommends as a mitigation measure that the project construction comply with the recommendations found in the submitted Geotechnical Engineering Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018, and future addenda. Two (2) additional SEPA mitigation measures are recommended to ensure that the geotechnical and structural engineers review the construction and building plans to verify the recommendations and specifications are consistent with the geotechnical report; and that the geotechnical and structural design of the 4th Dimension Building provides compensatory storage in a way that would prevent damage to the subject building and surrounding properties resulting from seepage of water into the subbase Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 6 of 12 ERC_4th dimension building_FINAL materials, as well as potential settlement and erosion that might occur. Possible means of accomplishing this include providing a watertight concrete base slab and/or a waterproof liner beneath the open channel and compensatory storage area to prevent infiltration of water into the subbase material. The project's geotechnical and structural engineers must provide the City with a correspondence bearing a professional engineering stamp stating that in their opinion the project as designed will not result in property damage caused by settlement or erosion of the subbase material. Mitigation Measures: 1. The project construction shall comply with the recommendations found in the submitted Geotechnical Engineering Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018, and future addenda. 2. The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter to the Current Planning Project Manager stating that he/she has reviewed the construction and building permit plans submitted to the City and in their opinion the plans and specifications meet the intent of the report(s). 3. The geotechnical and structural design of the 4th Dimension Building, including the portion of the building providing compensatory storage, must be prepared in a way that will prevent damage to the subject building and surrounding properties resulting from seepage of water into the subbase materials, as well as potential settlement and erosion that might occur. Possible means of accomplishing this include providing a watertight concrete base slab and/or a waterproof liner beneath the open channel and compensatory storage area to prevent infiltration of water into the subbase material. The project's geotechnical and structural engineers must provide the City with a correspondence bearing a professional engineering stamp stating that in their opinion the project as designed will not result in property damage caused by settlement or erosion of the subbase material. Nexus: State Environmental Policy Act (SEPA) Environmental Review; and RMC 4-4-060 Grading, Excavation, and Mining Regulations. 2. Air Impacts: It is anticipated that some short-term air quality impacts could be associated with site work and building construction required to develop this site. Project development impacts during construction may include dust as a result of grading and exhaust from construction vehicles and equipment. Dust control would be mitigated through the use of temporary erosion control measures or other common dust control measures to remediate impacts as needed. Long-term impacts would result from vehicular related traffic. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable. 3. Water a. Wetland, Streams, Lakes Impacts: The applicant submitted a Technical Memorandum for Stream and Wetland Reconnaissance, prepared by Raedeke Associates, Inc. (Raedeke), dated June 25, 2019 (Exhibit 6) with the project application. On June 4, 2019, Raedeke conducted a site investigation of the project to document the existing piped stream channel and to document any off-site streams or wetlands within the immediate vicinity. Raedeke observed a four-foot (4’) wide off-site stream channel approximately 80 feet (80’) east of the project site. The Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 7 of 12 ERC_4th dimension building_FINAL stream channel was not flowing at the time of their investigation and was found to be associated with an off-site wetland complex approximately 180 feet (180’) east of the project site. The wetland contains a palustrine, forested (PFO) vegetation community and is considered by Raedeke to be a seasonal pond with a wetland rating of a Category III because it scored a total of 17 points (4 points for habitat function) on the wetland rating form. As a result, Raedeke determined that the off-site wetland buffer does not extend onto the project site. According to Raedeke, the off-site stream appears to meet the criteria of a Type Ns (non-fish bearing, seasonal) stream. The off-site stream channel enters an approximately 24-inch (24”) diameter plastic pipe that extends underneath the central portion of the project site. The flow continues through a series of drainage pipes before discharging to Maplewood Creek, approximately 850 feet (850’) west of the site. Based on Raedeke’s review of historic aerial imagery, the on-site portion of the stream appears to have been piped sometime between the late 1960s and early 1980s as part of site development. Aerial imagery available from the Historic Aerials (2019) website also suggests that the stream historically flowed through the central portion of the project site and continued off-site further to the west. The applicant is requesting a Reasonable Use Variance to allow the piped stream to be redirected to a new surface channel that would be constructed in the central portion of the site (Exhibit 15). The new stream channel would be spanned by the new building that would be constructed over the open top of the channel (Exhibit 3). According to Raedeke, the existing 24-inch (24”) diameter culvert and pipe servicing the property are not adequate to accommodate water from the stream during heavy storm events. This results in water overtopping the culvert and ponding in the central portion of the site. The proposed building would be constructed with an open space under the building footprint to accommodate the new stream channel and provide additional storage during storm events. The open channel below the building would be required to be privately maintained. The new building would have access routes/hatches above the open channel and adjacent to Bremerton Ave NE to access and maintain the bottom of the channel. Clearance of 10 feet (10’) vertically (from highest elevation within horizontal clearance) and 15 feet (15’) horizontally, centered over the channel would be required by the City. In addition, an easement would be required to be provided to the City to allow the City to access the stream channel in an emergency. According to Raedeke, the overall project is anticipated to improve the flow of drainage across the site and reduce potential impacts from flooding on neighboring properties. Comments were received from the Washington State Department of Fish and Wildlife (WDFW) (Exhibit 9). WDFW commented that the project would require a Hydraulic Permit Application (HPA) for the removal of the piped stream segment and the construction of an open channel located under the proposed building. The project would need to apply for an HPA after completing the Environmental (SEPA) process. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable. b. Storm Water Impacts: The applicant submitted a Technical Information Report, prepared by Harmsen, LLC, dated April 25, 2025 (Exhibit 7) with the project application. Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard Area matching Forested Site Conditions and is within the Lower Cedar River Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2022 Renton Surface Water Design Manual (RSWDM). All nine (9) Core Requirements and the six (6) Special Requirements were discussed in the Preliminary Technical Information Report. Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 8 of 12 ERC_4th dimension building_FINAL The site topography includes a relative depression at the north-central portion of the lot with moderate to steep relatively minor slopes at the north and south sides of the lot (Exhibit 3). The topography of the site shows that most of the rainfall that falls on the site flows to a catch basin located centrally along the western edge of the site. According the TIR, the site and surrounding properties are developed and do not contribute significant surface runoff to the site. The entire site drains to the north and is within one (1) drainage basin. Runoff currently leaves the site in the 24-inch (24”) storm system that flows through the site. After development, the 24-inch (24”) storm system pipe would be removed and a new extension made to the storm system in Bremerton Ave NE using a 30-inch (30”) pipe. As previously discussed, an open channel would be extended under the building. Site runoff, after it is detained and treated, would flow to a new 30-inch (30”) pipe to replace the existing 24-inch (24”) storm system. The applicant would be required to provide a conveyance analysis for all proposed storm drainage conveyance systems including the concrete channel proposed below the building. The TIR Report analyzed existing conditions and proposed surface water collection and distribution. The geotechnical analysis of site soils found that the conditions on-site are not compatible with stormwater infiltration and recommended that the project not utilize infiltration. Therefore, the project proposes to implement a storm detention vault below the lowest parking level and discharge to the storm system to meet the Flow Control Duration – Forested Condition Area requirements. The site is located within a Basic Water Quality Treatment Area. By being a commercial project, it is required to meet the Enhanced Basic Water Quality standard. A BioPod Treatment System has been chosen to meet the runoff treatment requirements for the site runoff. The facility would be located in the northwest corner of the site near the access drive and would drain to the detention vault. A localized floodplain has been identified on-site due to the infrastructure constraints downstream. The project TIR notes that the infrastructure induced floodplain elevation is 394.87. The project would be required to maintain the compensatory storage volume on-site at a one-to-one (1:1) ratio. As previously discussed, the project has proposed to place the building on top of a pile foundation system in order to raise the building high enough to provide the required compensatory storage. An emergency overflow spillway, or similar system, would be required so that, in the event all discharge tight line systems are full or plugged, it would direct storm water into the roadway surface as opposed to the proposed building or upstream properties. Appropriate on-site BMPs would be required to help mitigate the new runoff created by this development. A preliminary drainage plan, including the application of on-site BMPs, has been included with the land use application. The final drainage plan and drainage report would be submitted with the civil construction permit application. The project proposal would be required to comply with the 2022 City of Renton Surface Water Design Manual (RSWDM). It is anticipated that any impacts to surface water flows would be adequately mitigated through the RSWDM, therefore no further mitigation is recommended. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable. 4. Environmental Health a. Noise Impacts: Short-term construction activity-related noise impacts would primarily result from the preparation of the building site and improvements made to the existing building. Construction activity hours are restricted to the hours between seven o’clock (7:00) a.m. and Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 9 of 12 ERC_4th dimension building_FINAL eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. Haul hours shall be restricted to the hours between eight-thirty (8:30) a.m. and three-thirty (3:30) p.m., Monday through Friday unless otherwise approved in advance by the Development Services Division. All noise levels would be required to comply with City of Renton code (Chapter 7 Noise Level Regulations) and Washington State code (WAC 173-60-040). The anticipated temporary noise impacts would be those commonly associated with mixed-use construction. Therefore, typical noise levels are anticipated to result in a less-than-significant noise impact. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable. 5. Historic and Cultural Preservation Impacts: No archaeological studies were submitted with the project application materials. Staff did receive comments from the Duwamish Tribe (Exhibit 11). The Tribe commented that the project site would be anticipated to have a low probability for the discovery of unknown archaeological deposits. The Tribe requests that an Inadvertent Discovery Plan (IDP) be prepared prior to the proposed construction activities due to the potential for archaeological resources being discovered on the project site. In addition, the Tribe would like to be notified in the event that archaeological work or monitoring is performed, and they would also like the opportunity to be present if an archaeologist is on-site. To ensure that any archaeological deposits are managed appropriately, staff recommends, as a SEPA mitigation measure, that the applicant submit an Inadvertent Discovery Plan prepared by a qualified professional with the civil construction permit for review and approval by the Current Planning Project Manager prior to permit issuance. The applicant shall provide notification to the Duwamish Tribe in the event that archaeological work or monitoring is performed on-site. Mitigation Measures: The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional with the civil construction permit for review and approval by the Current Planning Project Manager prior to permit issuance. In addition, the applicant shall provide notification to the Duwamish Tribe in the event that archaeological work or monitoring is performed on-site. Nexus: City of Renton Comprehensive Plan Goals and Policies LU-AA, LU-44, and LU-45; Chapter 27.53 RCW, Archaeological Sites and Resources; Chapter 27.44 RCW, Indian Graves and Records; Chapter 197-11 WAC, SEPA Rules; and Duwamish Tribe Comment, dated August 27, 2025. 6. Transportation Impacts: The applicant submitted a Traffic Impact Analysis, prepared by Kimley-Horn and Associates, Inc. (Kimley-Horn), dated April 2025 (Exhibit 8) with the project application. The submitted report indicated that at full build-out the proposed development would generate approximately 368 net new average weekday daily trips (ADT). During the weekday AM peak hour, the project would generate approximately 19 net new AM peak-hour vehicular trips (8 entering and 11 exiting). During the weekday PM peak hour, the project would generate approximately 40 net new PM peak-hour vehicular trips (21 entering and 19 exiting). The 4th Dimension Building development is proposed to have one (1) access to Bremerton Ave NE near the north edge of the property. The distribution of trips is based on existing count data and surrounding uses. It is anticipated that 70 percent (70%) of the development’s trips would travel to and from the west along NE 4th St. The remaining 30 percent (30%) of the development’s trips are anticipated to travel to and from the east along NE 4th St. It is possible that trips generated by the development Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 10 of 12 ERC_4th dimension building_FINAL could travel to and from the north along Bremerton Ave NE; however, the distribution represents the highest potential impact to the study intersections. As detailed in the report, the proposed project is not expected to lower the levels of service of the surrounding intersections included in the traffic study. The latest collision history from January 1, 2019 through June 30, 2024, was obtained from the Washington State Department of Transportation (WSDOT) at each of the study intersections. The collision rate has been calculated using the 24-hour turning movement counts. The data shows a total of 12 collisions at the study intersections in the immediate vicinity of the site. The other 11 crashes occurred at adjacent driveways and were not associated with the study intersection. There were no fatality collisions reported during the study period. The collision data shows that there was one (1) suspected serious injury (8% of collisions), no suspected minor injury collisions, two (2) possible injury collisions (17% of collisions), and nine (9) no apparent injury collisions (75% of collisions). The City’s NE 3rd – 4th Corridor Improvements Plan calls for a traffic signal at the intersection of NE 4th St at Bremerton Ave NE. Kimley-Horn completed a signal warrant analysis based on MUTCD guidelines. The signal warrant analysis was performed based on the Manual on Uniform Traffic Control Devices (MUTCD), 11th Edition guidelines. The signal warrant was performed for MUTCD Signal Warrant 1, MUTCD Signal Warrant 2, and MUTCD Signal Warrant 7. MUTCD Warrant 1 evaluates the warrant for a signal based on any eight-hours of an average day. MUTCD Warrant 2 evaluates the warrant for a signal based on any four-hours of an average day. MUTCD Warrant 1 and Warrant 2 were evaluated based on the posted speed limit of 35 mph on NE 4th Street. MUTCD Warrant 7 evaluates the warrant for a signal based on the severity and frequency of collisions. According to the TIA, the Bremerton Ave NE and NE 4th St intersection would not meet the signal warrants under 2025 existing, 2035 no-build, or 2035 build conditions. According to the TIA, site access at Bremerton Ave NE is anticipated to operate at acceptable LOS A under the future with development conditions. In addition, the analysis shows that the intersection of NE 4th St and Bremerton Ave NE currently operates at LOS F for both approaches and would remain at LOS F under the existing condition and future with development conditions. The TIA listed a few options to improve operations of the NE 4th St and Bremerton Ave NE intersection, including: • Restricting the northbound and southbound approaches to right-turn only, while still allowing left-turns from NE 4th St. • Restricting the intersection to right-turn only (i.e. restricting left-turns from NE 4th St). The traffic engineer concluded that both of these changes would also reduce the potential for the crash type that historically occurs at this intersection. On the other hand, restricting the northbound and southbound approaches to right-turn only would redirect traffic into neighborhoods to the north and south of NE 4th St and would cause additional travel distances for motorists. In addition, restricting the northbound and southbound approaches to right-turn only could also contribute to motorists deciding to make U-turns on NE 4th St to go the direction that was prohibited at the intersection. This would increase the potential for additional crashes especially for the rear-end type, which can be mitigated for by signalization. Bremerton Ave NE is located between the signalized intersections of Whitman Ct NE and Duvall Ave NE equally spaced at 600 feet (600') +/- to provide for good progression for a coordinated signal system to fit within the green band of the time/space diagram. Bremerton Ave NE provides access to large neighborhoods to the north and south of NE 4th St with businesses adjacent to the intersection. The project would affect intersection level of service by causing delays at the NE 4th St and Bremerton Ave NE intersection. New development would be responsible for paying for its fair share of cost for signal intersection improvements. According to the TIA, the development Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 11 of 12 ERC_4th dimension building_FINAL is anticipated to account for 368 of 38,224 daily trips at the intersection under the 2035 build conditions with 19 new AM peak hour trips and approximately 40 new PM peak hour trips after existing credit and pass-by reductions have been applied. The 4th Dimension Building, therefore, would have a proportionate share of the impact to the intersection of NE 4th St and Bremerton Ave NE of 0.96% (368 ADTs / 38,224 daily trips = 0.96%). Therefore, staff recommends a mitigation measure requiring that a prorated share of the traffic signal costs be collected from the proposed project, based upon the ratio of peak-hour vehicle trips that would be added by the project to the total project future baseline trips at the NE 4th St and Bremerton Ave NE intersection. The fee would be based on the following formula: (New PM peak-hour trips) / (Total vehicle PM peak-hour trips for the signal) x (Cost of new signal and improvements). The prorated share of the traffic signal is $15,686.27 ((40/3,060) x 1,200,000 = $15,686.27). The fee shall be paid prior to temporary certificate of occupancy. In addition, the applicant would be required to connect the proposed sidewalk on the north side of the Bremerton Ave NE frontage to the existing sidewalk along the Vision House property. This would require, at minimum, that a public access easement be obtained from the northern property owner. The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 13), which is based upon a test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, and payment of applicable Transportation Impact Fees at the time of building permit issuance. Mitigation Measures: A prorated share of the traffic signal costs shall be collected from the proposed project, based upon the ratio of peak-hour vehicle trips that would be added by the project to the total project future baseline trips at the NE 4th St and Bremerton Ave NE intersection. The fee would be based on the following formula: (New PM peak-hour trips) / (Total vehicle PM peak-hour trips for the signal) x (Cost of new signal and improvements). The fee shall be paid prior to temporary certificate of occupancy. Nexus: State Environmental Policy Act (SEPA) Environmental Review and RMC 4-6-060 Street Standards. 7. Police & Fire Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to the proposed development subject to the construction of code-required improvements and the payment of code-required impact fees (Exhibit 16). Mitigation Measures: None Nexus: N/A E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.” ✓ Copies of all Review Comments are contained in the Official File and may be attached to this report. The Environmental Determination decision will become final if the decision is not appealed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 City of Renton Department of Community & Economic Development 4th Dimension Building Staff Report to the Environmental Review Committee LUA25-000193, ECF, SA-H, RUV-H Report of September 22, 2025 Page 12 of 12 ERC_4th dimension building_FINAL Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on October 7, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: 4th Dimension Building Land Use File Number: LUA25-000193, ECF, SA-H, RUV-H Date of Meeting September 22, 2025 Staff Contact Jill Ding Senior Planner Project Contact/Applicant Martin Reimers Concept Architecture 2911 1/2 Hewitt Ave, Suite 2, Everett, WA 98201 Project Location 4502 NE 4th St, Renton, WA 98059 (APN 1023059068) The following exhibits are included with the ERC Report: Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Architectural Plan Set Exhibit 3: Conceptual Civil Plan Set Exhibit 4: Conceptual Landscape Plans Exhibit 5: Geotechnical Report with Infiltration Evaluation, prepared by Geo Group Northwest, Inc., dated May 14, 2018 Exhibit 6: Stream and Wetland Reconnaissance, prepared by Raedeke Associates, Inc., dated June 25, 2019 Exhibit 7: Technical Information Report (TIR), prepared by Harmsen, LLC, dated April 2025 Exhibit 8: Traffic Impact Analysis (TIA), prepared by Kimley-Horn and Associates, Inc., dated April 25, 2025 Exhibit 9: Washington State Department of Fish and Wildlife (WDFW) Comment Letter, dated September 3, 2025 Exhibit 10: WDFW City Response, dated September 5, 2025 Exhibit 11: Duwamish Tribe Comment Letter, dated August 27, 2025 Exhibit 12: Duwamish Tribe City Response, dated September 5, 2025 Exhibit 13: Transportation Concurrency Test Memorandum, dated June 20, 2025 Exhibit 14: SEPA Environmental Checklist, prepared April 17, 2025 Exhibit 15: Variance Request Justification Exhibit 16: Advisory Notes Docusign Envelope ID: 837632EC-2E7C-4F29-BAB1-CDA4F21A0828