Major Franchise Permit: MFP25004476
IVR Number: 25004476
Permit Information
Permit Name: JB0002045788 Comcast Cable Franchise Permit
Address/Location:09/04/2025Application Date:1923059063Parcel Number: 101 S GRADY WAY
Permit Type:09/24/2025Issue Date:Franchise
Permit Work Class:09/24/2026Expiration Date:Major Utility
Job Number: JB0002045788Franchise Type:Cable
Description: JB0002045788 Comcast proposes to proof and pull fiber through existing conduit and bore and place conduit with
fiber. Pothole all Existing utilities. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
ApplicantX
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Laurie Dietz
Comcast - Finance Questions
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Andrew Parker
comcast
410 Valley Ave NW
Puyallup, WA 98371
B: (253) 864-4249Contact
Silas Schroeder
Cannon Construction Inc
406 Porter Way
Milton, WA 98354
Contractor
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Electrical Contractor: CANNOCL7941N
Construction Contractor: CANNOCL791JK
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
(CPSRTA) SOUND TRANSIT 401 S JACKSON STREET
SEATTLE , WA 98104
Owner
Comcast - Billing 1701 John F Kennedy BLVD John F.
Kennedy Blvd
Philadelphia, PA 19103
B: (425) 918-1140Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP25004476
Scott Warlick 9/24/2025
RESTORATION PER CITY OF RENTON STANDARDS
POTHOLE ALL EXISTING UTILITIES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 |Published: 3/12/2025
Transportation Systems Division | 1055 South Grady Way, 5
th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/12/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORETHE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
MFP25004476
8:00amMondayFriday 3:00pm
Scott Warlick CED 9/24/2025
Page 2 of 6 |Published: 3/12/2025
This Page Intentionally Left Blank
Page 3 of 6 |Published: 3/12/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
Applicant must comply with all conditions of the application.
The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
Applicant must have the approved TCP prior to commencing the work.
Approved TCP must be at the work site during work hours.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work.If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 |Published: 3/12/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
Applicant must notify City Inspector (425-430-7203) at least twenty-four (24) hours before
commencing work.
Applicant must notify Transportation Signal Maintenance (425-430-7423) at least twenty-four (24)
hours before commencing work, if work affects traffic signal operations, including vehicle detection.
Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
three (3) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 |Published: 3/12/2025
Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 |Published: 3/12/2025
Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK:PROOF/PULL, BORE, POTHOLEHOURS OF TCP: 8AM-5PM24 HR CONTACT:KAYLA BUCKLEYCANNON CONTRUCTION253.221.2704KBUCKLEY@TEAMCANNON.COMJOB NUMBER: JB0002045788JOB ADDRESS: 720 WA-167, RENTONDESCRIPTION: PROOF/PULL BETWEENEXISTING VAULTS. BORE ACROSS RAINIERAVE S. POTHOLE AT MARKED LOCATIONS.41SHEET NUMBEROFLEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREABUS STOPROADWORKAHEADW20-1L245'X*X*X*RIGHTLANECLOSEDAHEADW20-5RW4-2RSPEEDLIMIT35RAINIER AVE S5'5'5'5'4'8'4'8'4'71072075076576573973913'11'13'SIDEWALKCLOSEDR9-9SIDEWALKCLOSEDR9-9R9-11LSIDEWALK CLOSEDAHEADCROSS HERER9-11RSIDEWALK CLOSEDAHEADCROSS HEREDETOURM4-9BRDETOURM4-9BLPLACE AT INTERSECTIONWITH S GRADY WAYPLACE AT INTERSECTIONWITH S GRADY WAYPLACE AT INTERSECTIONWITH SW 7TH STPLACE AT INTERSECTIONWITH SW 7TH STHARDIE
AVE
SWCANNON CONSTRUCTION LLCCONTROL SUPERVISORCERTIFIEDTRAFFICKAYLA BUCKLEY#000830 EXP.
4/30/2029MFP25004476
NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK: POTHOLEHOURS OF TCP: 8AM-5PM24 HR CONTACT:KAYLA BUCKLEYCANNON CONTRUCTION253.221.2704KBUCKLEY@TEAMCANNON.COMJOB NUMBER: JB0002045788JOB ADDRESS: 739 RAINIER AVE S, RENTONDESCRIPTION: POTHOLE AT MARKEDLOCATION42SHEET NUMBEROFLEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREABUS STOP4'4'L245'X*X*X*ROADWORKAHEADW20-1LEFTLANECLOSEDAHEADW20-5LW4-2LRAINIER AVE SHARDIE
AVE
SW13'11'12'739739750720710SPEEDLIMIT35CANNON CONSTRUCTION LLCCONTROL SUPERVISORCERTIFI
EDTRAFFICKAYLA BUCKLEY#000830 EXP. 4/30/2029MFP25004476
NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK: BORE,PROOF/PULL, POTHOLEL245'HOURS OF TCP: 8AM-5PM24 HR CONTACT:KAYLA BUCKLEYCANNON CONTRUCTION253.221.2704KBUCKLEY@TEAMCANNON.COMJOB NUMBER: JB0002045788JOB ADDRESS: 739 RAINIER AVE S, RENTONDESCRIPTION: BORE ACROSS RAINIER AVE S,POTHOLE AT MARKED LOCATION.PROOF/PULL BETWEEN EXISTING VAULTS.43SHEET NUMBEROFX*X*LEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREABUS STOP5'10'5'5'RAINIER AVE SHARDIE
AVE
SWX*ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2R73973970710573576576575075072071013'11'12'SPEEDLIMIT35ROADWORKAHEADW20-1SPEEDLIMIT25X*SIDEWALKCLOSEDR9-9R9-11LSIDEWALK CLOSEDAHEADCROSS HERER9-11RSIDEWALK CLOSEDAHEADCROSS HEREDETOURM4-9BRDETOURM4-9BLPLACE AT INTERSECTIONWITH S GRADY WAYPLACE AT INTERSECTIONWITH S GRADY WAYPLACE AT INTERSECTIONWITH SW 7TH STPLACE AT INTERSECTIONWITH SW 7TH STCANNON CONSTRUCTION LLCCONTROL SUPERVISORCERTIFI
EDTRAFFICKAYLA BUCKLEY#000830 EXP.
4/30/2029MFP25004476
NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK: UPGRADEHOURS OF TCP: 8AM-5PM24 HR CONTACT:KAYLA BUCKLEYCANNON CONTRUCTION253.221.2704KBUCKLEY@TEAMCANNON.COMJOB NUMBER: JB0002045788JOB ADDRESS: 301 S GRADY WAY, RENTONDESCRIPTION: UPGRADE EXISTING VAULT ATMARKED LOCATION.44SHEET NUMBEROFLEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREA5'5'L225'X*X*X*ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2RROADWORKAHEADW20-1X*S GRADY WAYLAKE
AVE
S140200200130111'11'SPEEDLIMIT35SPEEDLIMIT25X*ROADWORKAHEADW20-1PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.CANNON CONSTRUCTION LLCCONTROL SUPERVISORCERTIFIEDTRAFFICKAYLA BUCKLEY#000830 EXP. 4/30/2029MFP25004476
ADDRESS: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NAME: JB0002045788 - PRINTSDRAWING FILE LOCATION: Z:\SHARED\PROJECTS\CANNON\JB0002045788\JB0002045788_ROW\1 - CAD\PRINTS\JB0002045788_PRINTS.DWGSITE LOCATIONSHEET INDEX1 - COVER SHEET2 - GENERAL NOTES3 - LEGEND4/7 - DESIGN VIEWSSCOPE OF WORKPULL NEW 96CT FOC THROUGH EXISTINGCOMCAST CONDUIT AND VAULTS, BORE PLACINGNEW COMCAST CONDUIT AND FIBER CROSSINGRAINER AVE S. ALL CONSTRUCTION ANDRESTORATION TO MEET OR EXCEED CITY OFRENTON STANDARDS.AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------81SHEET NUMBEROFKnow what's below.Call before you dig.RCONTACTSN O R T HKAYLA BUCKLEYLEAD PERMIT DRAFTER/PROJECT COORDINATORKBUCKLEY@TEAMCANNON.COM253.221.2704SILAS SCHROEDERAREA SUPERVISORSSCHROEDER@TEAMCANNON.COMSHEET 4SHEET 5SHEET 6SHEET 7VICINITY MAP09/03/2025MFP25004476This permit is for Major construction work in the ROW and will be billed at an additional$158/HR for inspections. After hours and weekend work will be billed at $175/HRPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS
AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------82SHEET NUMBEROFKnow what's below.Call before you dig.RGENERAL NOTESGENERAL NOTES: The locations of utilities shown on these drawing are only approximate. CANNON COMPANIES hereby disclaims any responsibility to third parties for the accuracy ofthis information. Persons working in the area covered by this drawing must contact the statewide Call-Before-You-Dig System to ascertain the location of underground utilities prior toperforming any excavation.1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS ANDSPECIFICATIONS SET FORTH IN THE CITY OF RENTON REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OREASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY THE RENTON INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BYDESIGNEE OF PROJECT SPONSOR/OWNER.2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUESTEXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITHTHE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALL NOTIFY THERENTON INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IFREQUIRED.4. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF RENTON AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS ORADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5. THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, ANDONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION, TRENCHING, SHORING, TRAFFICCONTROL, AND SECURITY.7. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, OR OTHER AFFECTED PARTIESWHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.9. FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE CITY OF RENTON, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASINGPLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTORSHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION APRECONSTRUCTION CONFERENCE SHALL BE HELD WITH THE CITY OF RENTON.10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWNON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11. PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRTTRACKED FROM THE SITE.12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE ANDAVAILABLE TO THE RENTON INSPECTOR AT ALL TIMES.13. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THE ENGINEER FORCLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14. ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY.ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARDSURFACE OR LANDSCAPING.15. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF RENTON ENGINEERING DEPARTMENT STANDARD DETAILS ANDSPECIFICATIONS.16. ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT,CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE CITY OF RENTON.MFP25004476
AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------83SHEET NUMBEROFKnow what's below.Call before you dig.RLEGEND(XXX')N O R T H#F#F#FXX09/03/2025MFP25004476
RAI
N
E
R
A
V
E
S HARDIE AVE SWAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------84SHEET NUMBEROFKnow what's below.Call before you dig.R#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION.CONSTRUCTION NOTES1TIE INTO EXISTING VAULT AT PROPOSED LOCATION.MATCH TO SHEET5N O R T H1169'2PROOF/PULL 96CT FIBER THROUGH EXISTING CONDUIT.2PHOTO #1: FACING (E) ON THE (S) SIDE OF RAINIER AVE S.11209/03/2025MFP25004476
HARDIE AVE SWRA
I
N
I
E
R
A
V
E
SAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------85SHEET NUMBEROFKnow what's below.Call before you dig.R#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEETCONSTRUCTION NOTESRESTORATION NOTESARESTORE SOFT SURFACE PER COR STANDARDS.1'2'3'4'5'6'10'7'8'9'HORIZ. SCALE: 1"=20'-0"VERT. SCALE: 1"=5'-0"DESIGN PROFILEEXISTING GRADEROAD CLMATCH TO SHEET4MATCH TO SHEET 6
N O R T H75'142'1TIE INTO EXISTING VAULT AT PROPOSED LOCATION.2PROOF/PULL 96CT FIBER THROUGH EXISTING CONDUIT.3BORE PLACING NEW (2)-4" CONDUIT AND 96CT FOC.5
3
'11232AAPHOTO #2: FACING (W) ON THE (W) SIDE OF RAINIER AVE S.PHOTO #3: FACING (E) ON THE (S) SIDE OF RAINIER AVE S.23231132EX.12" WATEREX. ELEC.EX. COMM.EX. COMM.EX. COMM.EX. GASEX. STORM
EX. STORM
EX. ELEC.
EX. COMM.LAUNCH PITRECEIVE PITANGLE OF ENTRY = 18°25'50'25'50'100'100'RADIUS = 135'RADIUS = 135'1'1'.8'0.4'1.1'1.5'1.4'1.4'09/03/2025MFP25004476
RAINIER AVE SAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------86SHEET NUMBEROFKnow what's below.Call before you dig.R#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION.CONSTRUCTION NOTESMATCH TO SHEET5N O R T H1TIE INTO EXISTING VAULT AT PROPOSED LOCATION.2PROOF/PULL 96CT FIBER THROUGH EXISTING CONDUIT.21167'PHOTO #4: FACING (E) ON THE (S) SIDE OF RAINIER AVE S.41209/03/2025MFP25004476
S GRADY WAYAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 750 RAINIER AVE S, RENTON, WA 98057PROJECT NUMBER: JB0002045788PERMIT NUMBER: ----CANNON ENGINEER: KAYLA BUCKLEYCONFIDENTIAL/ PROPRIETARYSDKADR08/26/25------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.CANNON COMPANIES AND COMCAST DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------87SHEET NUMBEROFKnow what's below.Call before you dig.R#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION.CONSTRUCTION NOTES4UPGRADE EXISTING VAULT TO NEW 2436.RESTORATION NOTESARESTORE SOFT SURFACE PER COR STANDARDS.N O R T H4APHOTO #5: FACING (N) ON THE (N) SIDE OF S GRADY WAY.5409/03/2025MFP25004476