HomeMy WebLinkAboutRS_Special_Inspections_Towns on 12th_20250911_v15deb7507-abf9-4519-84c2-2ee4aaee11b3
AAR TESTING AND INSPECTION, INC.
7126 180th Avenue NE, Suite C101, Redmond, WA 98052 | 425-881-5812
7960 29th Avenue NE, Suite 105, Lacey, WA 98516 | 360-539-7445
112 Olds Station Road, Suite 100, Wenatchee, WA 98801 | 509-888-4457
September 11, 2025
AAR Project Number:24-280
Building Official
City of Renton Building Department
1055 South Grady Way
Renton, WA 98057
Subject:Final Report
Towns on 12th
3916 NE 12th St
Renton
Permit No. B23004755
This is to advise you that special inspections are completed on the above referenced project. The following
inspections were required and copies of our inspection reports have been forwarded to you.
Reinforced Concrete
To the best of our knowledge all work inspected conformed to City of Renton approved plans, specifications, IBC
and related codes and/or verbal or written instructions from the Engineer of Record.
Sincerely,
AAR TESTING AND INSPECTION, INC.
Thanh Kieu
Project Manager
Teajalam (TJ) Gounden
President
cc: DR Horton, Anthony John Brandolini, ajbrandolini@drhorton.com
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/15/2024
Report
Number
LDC051524C
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
05/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/20/2024
44803620-E8F3-4968-BE96-DC0085ED5266
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Reinforcing Steel Vault slab with thickened footings and wall vertical dowels
Weather
Sunny
Temperature (°F)
73
Start Time
01:00 PM
End Time
DRAWINGS / DOCUMENTS REFERENCED
S1-S6 of approved plans
INSPECTION OBSERVATION / REMARKS
Verified reinforcing steel was placed in conformance for size, grade, spacing, splicing and clearances.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/15/2024
Report
Number
LDC051524C
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
05/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/20/2024
44803620-E8F3-4968-BE96-DC0085ED5266
PHOTOS
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/15/2024
Report
Number
LDC051524C
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
05/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/20/2024
44803620-E8F3-4968-BE96-DC0085ED5266
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/17/2024
Report
Number
NCK051724A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
05/19/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/21/2024
F3BE3ADD-E68F-4AA6-BEB5-CE79FFD407FE
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Detention Vault - Slab and Footings
Reinforcing Steel Detention Vault - Slab and Footings
Weather
Sunny
Temperature (°F)
56
Start Time
07:00 AM
End Time
DRAWINGS / DOCUMENTS REFERENCED
Approved Drawings: S1, S2, S4.
INSPECTION OBSERVATION / REMARKS
As requested, I was on site and performed the following inspections:
Reinforcing Steel Placement
Location: Detention Vault - Slab and Footings.
I reviewed the above noted drawings and inspected reinforcing steel for footing dimensions, bar placement, spacing, bar size and grade, lap
splices and clearances for concrete cover.
The contractor has placed #4 bars @ 18” each way at mid-depth in the 5” slab on grade. Exterior wall footings were reinforced with (3) #5
bars longitudinal bottom and #5 bars @ 18” o/c transverse. Interior walls were reinforced with (4) #5 bars longitudinal bottom and #5 bars @
12” o/c transverse. All bar sizes and grades, lap splices and clearances for concrete cover are per plans and specifications.
Concrete Placement
Location: Detention Vault - Slab and Footings.
Today the contractor placed concrete for the above noted locations. Miles Sand and Gravel supplied 190.25 cubic yards of concrete, mix
#18400F. Concrete was placed by boom pump and mechanically consolidated. Reinforcing steel mats were secured and remained in place
during concrete placement.
I observed concrete placement observation and performed concrete sampling and testing. I obtained a composite sample of concrete from the
3rd and 21st truck and performed temperature, slump and air content testing. 12 - 4x8 cylinder specimens of concrete were cast for
compressive strength testing. The cylinders are placed in cure boxes on site. The cylinders will be picked from the site the next day and
transported to AAR laboratory for further curing and testing.
Concrete Test Results are as follows:
Truck Number: #1135, Ticket Number: 1113646, Mix #: 18400F, Temperature: 69F, Slump: 6.5” and Air Content: 1.0%.
Truck Number: #1161, Ticket Number: 1113791, Mix #: 18400F, Temperature: 66F, Slump: 6.5” and Air Content: 1.1%.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/17/2024
Report
Number
NCK051724A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
05/19/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/21/2024
F3BE3ADD-E68F-4AA6-BEB5-CE79FFD407FE
PHOTOS
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/17/2024
Report
Number
NCK051724A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
05/19/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/21/2024
F3BE3ADD-E68F-4AA6-BEB5-CE79FFD407FE
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/17/2024
Report
Number
NCK051724A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
05/19/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/21/2024
F3BE3ADD-E68F-4AA6-BEB5-CE79FFD407FE
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/28/2024
Report
Number
SG052824C
Inspectors Signature Inspectors Name
Santiago Gonzalez
Report Date
05/28/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/30/2024
4785abbcc371f8db-1716950084946
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Reinforcing Steel Vault Walls for Cell 1,2, and West Half of Cell 3
Weather
Cloudy
Temperature (°F)
54
Start Time
01:00 PM
End Time
DRAWINGS / DOCUMENTS REFERENCED
S1,S2,S4,S6
INSPECTION OBSERVATION / REMARKS
I arrived on site to observe the placement of ASTM A615/A706, grade 60 reinforcing steel at the above mentioned locations.
Reinforcing steel was of proper size, grade, lap, spacing, location, clearance and secure pending formwork completion.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/28/2024
Report
Number
SG052824C
Inspectors Signature Inspectors Name
Santiago Gonzalez
Report Date
05/28/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
05/30/2024
4785abbcc371f8db-1716950084946
PHOTOS
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/31/2024
Report
Number
SAA053124B
Inspectors Signature Inspectors Name
Savid Acuna
Report Date
06/03/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/05/2024
c2d0d6419d6c5d4a-1717449743640
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Detention vault walls - Cells 1-3
Weather
Sunny
Temperature (°F)
56
Start Time
09:30 AM
End Time
03:00 PM
DRAWINGS / DOCUMENTS REFERENCED
Project drawing sheets S1, S2
INSPECTION OBSERVATION / REMARKS
As requested, I was on site for concrete placement observation, sampling, and testing.
The contractor placed concrete for the detention vault walls at cells 1-3. Miles supplied 139.25 cubic yards of concrete, mix # 18400F. Concrete
was placed by boom pump and consolidated with mechanical vibrator. I observed that clearances for reinforcing steel were maintained during
placement. I obtained and checked each truck’s delivery ticket as it arrived on site.
I obtained a composite sample of concrete from the first truck. I performed temperature and slump testing on the fresh concrete. Additionally,
I cast one set of 5 - 4x8 cylinder specimens of concrete for compressive strength testing at 7 and 28 days with one hold cylinder. Concrete
cylinders will remain on site in a cure box overnight. The cylinders will be picked up tomorrow and transported to AAR laboratory for further
curing and testing.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
05/31/2024
Report
Number
SAA053124B
Inspectors Signature Inspectors Name
Savid Acuna
Report Date
06/03/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/05/2024
c2d0d6419d6c5d4a-1717449743640
PHOTOS
Concrete ticket
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/10/2024
Report
Number
LDC061024A
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
06/12/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/15/2024
5AE3023D-36FD-45AB-8B82-B0BB9C836B00
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Reinforcing Steel Vault walls cells 3, 4 and 5
Weather
Cloudy
Temperature (°F)
53
Start Time
08:00 AM
End Time
DRAWINGS / DOCUMENTS REFERENCED
S2-S6 and associated keynotes
INSPECTION OBSERVATION / REMARKS
Verified reinforcing steel was placed in conformance with approved plans for size, grade, spacing, splicing and clearances.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/10/2024
Report
Number
LDC061024A
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
06/12/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/15/2024
5AE3023D-36FD-45AB-8B82-B0BB9C836B00
PHOTOS
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/10/2024
Report
Number
LDC061024A
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
06/12/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/15/2024
5AE3023D-36FD-45AB-8B82-B0BB9C836B00
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/10/2024
Report
Number
LDC061024A
Inspectors Signature Inspectors Name
Loren Chandler
Report Date
06/12/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/15/2024
5AE3023D-36FD-45AB-8B82-B0BB9C836B00
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/19/2024
Report
Number
NCK061924A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
06/20/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/21/2024
FEF19A35-AEAF-4000-AC17-DFAA4E805B26
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company D R Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior Concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Detention Vault -Walls (Cells 3,4 and 5)
Weather
Sunny
Temperature (°F)
57
Start Time
07:00 AM
End Time
DRAWINGS / DOCUMENTS REFERENCED
Approved drawings: S1,S2,S3,S4.
INSPECTION OBSERVATION / REMARKS
As requested, I was on site for concrete placement observation, sampling and testing.
The contractor placed concrete for the walls at the above referenced locations. Miles Sand and Gravel supplied 142 cubic yards of concrete, mix
# 18400F. Concrete was placed by boom truck and mechanically vibrated. I observed that clearances for reinforcing steel were maintained
during placement. I obtained and checked the truck’s delivery ticket when it arrived on site.
I obtained a composite sample of concrete from the first truck. I performed temperature, slump and air content testing on the fresh concrete.
Additionally, I cast one set of 5 - 4x8 cylinder specimens of concrete for compressive strength testing at 7 and 28 days with one hold cylinder.
Concrete cylinders will remain on site in a cure box overnight. The cylinders will be picked up tomorrow and transported to AAR laboratory for
further curing and testing.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/19/2024
Report
Number
NCK061924A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
06/20/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/21/2024
FEF19A35-AEAF-4000-AC17-DFAA4E805B26
PHOTOS
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/19/2024
Report
Number
NCK061924A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
06/20/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/21/2024
FEF19A35-AEAF-4000-AC17-DFAA4E805B26
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
06/19/2024
Report
Number
NCK061924A
Inspectors Signature Inspectors Name
Nathan Kingsbury
Report Date
06/20/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
06/21/2024
FEF19A35-AEAF-4000-AC17-DFAA4E805B26
1/1 4000 @ 28 Days
10.25
139.25
56
64 Design Target
6
10:17 AM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17189 A 6/7/2024 7 4.00 8.00 1.00 12.56 39,260 3,130 1 Chris London
C17189 B 6/28/2024 28 4.01 8.00 1.00 12.62 57,440 4,550 1 Chris London
C17189 C 6/28/2024 28 4.01 8.00 1.00 12.62 58,580 4,640 1 Chris London
C17189 D 6/28/2024 28 4.01 8.00 1.00 12.62 56,790 4,500 1 Chris London
C17189 E H
4,560
Y
Date Page 1/1
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
09:07 AM
16.6
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Curebox
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
15
Contractor
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING
07/01/24
Stu Swensen, CET
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
Yes
1135
1116627
10.25
4-6
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Detention vault walls - cells 1-3
Set No.
Sample Yardage
Superior Concrete
Nicole Mecum
D R Horton
11241 Slater Ave NE Suite 200
Miles
202
18400F
Mix Design Strength
CONCRETE MATERIALS REPORT
05/31/2024
SAA053124B1
Savid Acuna
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.
1/1 4000 @ 56 Days
32.25
190.25
52
69 Design Target
1
6.5
08:50 AM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17029 A 5/24/2024 7 4.01 8.00 1.00 12.62 41,890 3,320 1 Chris London
C17029 B 6/14/2024 28 4.00 8.00 1.00 12.56 65,750 5,230 2 Brandon Romero
C17029 C 7/12/2024 56 4.01 8.00 1.00 12.62 75,220 5,960 1 Chris London
C17029 D 7/12/2024 56 4.01 8.00 1.00 12.62 79,820 6,320 1 Chris London
C17029 E 7/12/2024 56 4.01 8.00 1.00 12.62 74,860 5,930 1 Chris London
C17029 F H
6,070
Y
Date Page 1/1
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
07:41 AM
16.2
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Cure box
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING
07/15/24
Stu Swensen, CET
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
Yes
1135
1113646
5
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Detention Vault - Slab and Footings
Set No.
Sample Yardage
Superior Concrete
Nicole Mecum
D R Horton
11241 Slater Ave NE Suite 200
Miles
202
18400F
Mix Design Strength
CONCRETE MATERIALS REPORT
05/17/2024
NCK051724A1
Nathan Kingsbury
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.
2/2 4000 @ 56 Days
164.25
190.25
56
69 Design Target
1.1
6.5
11:35 AM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17030 A 5/24/2024 7 4.01 8.00 1.00 12.62 38,740 3,070 1 Chris London
C17030 B 6/14/2024 28 4.00 8.00 1.00 12.56 60,740 4,840 1 Brandon Romero
C17030 C 7/12/2024 56 4.01 8.00 1.00 12.62 68,510 5,430 1 Chris London
C17030 D 7/12/2024 56 4.01 8.00 1.00 12.62 72,950 5,780 2 Chris London
C17030 E 7/12/2024 56 4.01 8.00 1.00 12.62 72,190 5,720 1 Chris London
C17030 F H
5,640
Y
Date Page 1/1
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
10:46 AM
30.8
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Cure box
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
15
Daniel Coleman
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING
07/15/24
Stu Swensen, CET
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
Yes
1161
1113791
5
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Detention Vault - Slab and Footings
Set No.
Sample Yardage
Superior Concrete
Nicole Mecum
D R Horton
11241 Slater Ave NE Suite 200
Miles
206
18400F
Mix Design Strength
CONCRETE MATERIALS REPORT
05/17/2024
NCK051724A2
Nathan Kingsbury
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.
1/1 4000 @ 28 Days
11
142
57
69 Design Target
1.2
6.5
08:15 AM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17359 A 6/26/2024 7 4.00 8.00 1.00 12.56 38,600 3,070 1 Chris London
C17359 B 7/17/2024 28 4.01 8.00 1.00 12.62 60,120 4,760 1 Chris London
C17359 C 7/17/2024 28 4.01 8.00 1.00 12.62 59,870 4,740 1 Chris London
C17359 D 7/17/2024 28 4.01 8.00 1.00 12.62 56,460 4,470 1 Chris London
C17359 E H
4,660
Y
Date Page 1/1
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
CONCRETE MATERIALS REPORT
06/19/2024
NCK061924A1
Nathan Kingsbury
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Detention Vault- Walls (cells 3,4,5)
Set No.
Sample Yardage
Superior Concrete
Nicole Mecum
D R Horton
11241 Slater Ave NE Suite 200
Miles Sand and Gravel
202
18400F
Mix Design Strength
Yes
1181
1121504
5
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)ActualProduct Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
Max Temp. (°F) Aggregate
Other
CONFORMING
NON-CONFORMING
07/18/24
Stu Swensen, CET
Average Strength
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
10
Brian Wagner
Compressive
Strength
Method
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
07:19 AM
17.2
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Cure box
Slump (In.)
Min. Temp. (°F)
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
AS071724C
Inspectors Signature Inspectors Name
Arash Sadoghi
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/26/2024
A76946C8-E7F8-4C54-8164-835FEDD0E167
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company DR Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Superior concrete Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Reinforcing Steel Perimeter side wall around, wall for opening pedestrian grate and manhole opening for
detection vault lid
Weather
Sunny
Temperature (°F)
78
Start Time
12:00 PM
End Time
01:30 PM
DRAWINGS / DOCUMENTS REFERENCED
Approved project drawings: S1, S2, S3, S4, S5 and S6
INSPECTION OBSERVATION / REMARKS
As requested, I was on site and performed the following inspection:
Reinforcing Steel Placement
Reviewed approved project drawings: S1, S2, S3, S4, S5 and S6
Location: Perimeter side wall around, wall for opening pedestrian grate and manhole opening for detection vault lid
I reviewed the above noted drawings and inspected reinforcing steel for perimeter side wall around, wall for opening pedestrian grate, manhole
opening and cast in place lid section. Bar size and grade, lap splices, bar placement, spacing and clearances for concrete cover are per plans
and specifications.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
AS071724C
Inspectors Signature Inspectors Name
Arash Sadoghi
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/26/2024
A76946C8-E7F8-4C54-8164-835FEDD0E167
PHOTOS
Inspected area Reinforcing
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
AS071724C
Inspectors Signature Inspectors Name
Arash Sadoghi
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/26/2024
A76946C8-E7F8-4C54-8164-835FEDD0E167
Reinforcing Reinforcing
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
AS071724C
Inspectors Signature Inspectors Name
Arash Sadoghi
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/26/2024
A76946C8-E7F8-4C54-8164-835FEDD0E167
Reinforcing Reinforcing
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
AS071724C
Inspectors Signature Inspectors Name
Arash Sadoghi
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/26/2024
A76946C8-E7F8-4C54-8164-835FEDD0E167
Reinforcing
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724A
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721245636530
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company DR Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Vault Closure Lid/Retaining Wall
Weather
Cloudy
Temperature (°F)
75
Start Time
11:30 AM
End Time
05:00 PM
DRAWINGS / DOCUMENTS REFERENCED
INSPECTION OBSERVATION / REMARKS
As requested, I was on site for concrete placement observation, sampling, and testing.
The contractor placed concrete for retaining wall/vault closure lid cell 1-5. Miles supplied 77 cubic yards of concrete, mix #1240AF. Concrete
was placed by boom pump truck and consolidated with mechanical vibrator. I observed that clearances for reinforcing steel were maintained
during placement. I obtained and checked each truck’s delivery ticket as it arrived on site.
I obtained a composite sample of concrete from the first truck. I performed temperature, slump and air content testing on the fresh concrete.
Additionally, I cast one set of 5 - 4x8 lab cure cylinder specimens of concrete for compressive strength testing at 7 and 28 days with one hold
cylinder. Concrete cylinders will remain on site in a cure box overnight. The cylinders will be picked up tomorrow and transported to AAR
laboratory for further curing and testing.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724A
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721245636530
PHOTOS
Specifications
Drawings
Ticket
Empty Vault Closure Lid/Retaining Wall
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724A
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721245636530
Empty Vault Closure Lid/Retaining Wall
Pouring Of Retaining Wall
Pouring Of Retaining Wall
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724B
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721248656380
CLIENT INFORMATION PROJECT INFORMATION
Contact Nicole Mecum Project No.24-280
Company DR Horton Project Name Towns on 12th
Address 11241 Slater Ave NE Suite 200 Address 3916 NE 12th St
City Kirkland City Renton
Contractor Permit No.B23004755
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Vault Closure Lid Cell 1 - 5
Weather
Cloudy
Temperature (°F)
81
Start Time
11:30 AM
End Time
05:00 PM
DRAWINGS / DOCUMENTS REFERENCED
INSPECTION OBSERVATION / REMARKS
As requested, I was on site for concrete placement observation, sampling, and testing.
The contractor placed concrete for vault closure lid cells 1 - 5. Miles supplied 9 cubic yards of concrete, mix #10550. Concrete was placed by
boom pump truck and consolidated with mechanical vibrator. I observed that clearances for reinforcing steel were maintained during
placement. I obtained and checked each truck’s delivery ticket as it arrived on site.
I obtained a composite sample of concrete from the first truck. I performed temperature and slump testing on the fresh concrete. Additionally,
I cast one set of 5 - 2x4 lab cure cylinder specimens of concrete for compressive strength testing at 7 and 28 days with one hold cylinder.
Concrete cylinders will remain on site in a cure box overnight. The cylinders will be picked up tomorrow and transported to AAR laboratory for
further curing and testing.
Items inspected are in conformance with approved plans, specifications, and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724B
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721248656380
PHOTOS
Specifications
Drawings
Ticket
Empty Vault Closure Lid
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection
Date
07/17/2024
Report
Number
BL071724B
Inspectors Signature Inspectors Name
Bobby Luke
Report Date
07/17/2024
Reviewers
Signature
Reviewed By
Teajalam (TJ)
Gounden
Reviewed Date
07/25/2024
340285a40a907273-1721248656380
Empty Vault Closure Lid
Pouring Of Vault Closure Lid
1/1 4000 @ 28 Days
11
75
83 Design Target
6
5.00
12:30 PM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17668 A 7/24/2024 7 4.00 8.00 1.00 12.56 33,340 2,650 2 Chris London
C17668 B 8/14/2024 28
C17668 C 8/14/2024 28
C17668 D 8/14/2024 28
C17668 E H
Date Page 1/1
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
11:08 AM
19
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
5
Nathaniel Herron
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING
07/29/24
Stu Swensen, CET
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
4000
Yes
1173
1128694
11.00
5.0
5.00
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Vault Closure Lid/Retaining Wall
Set No.
Sample Yardage
Nicole Mecum
DR Horton
11241 Slater Ave NE Suite 200
Miles
202
1240AF
Mix Design Strength
CONCRETE MATERIALS REPORT
07/17/2024
BL071724A1
Bobby Luke
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
As requested, I was on site for concrete placement observation, sampling, and testing. The contractor placed concrete for retaining wall/vault closure lid cell 1-5. Miles supplied 11 cubic yards of
concrete mix #1240AF. Concrete was placed by boom pump truck and consolidated with mechanical vibrator. I observed that clearances for reinforcing steel were maintained during placement. I
obtained and checked each truck’s delivery ticket as it arrived on site.
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.
1/1 9000 @ 28 Days
9
81
86 Design Target
9.00
04:00 PM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611 T106
C1758 T22
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C17669 A 7/24/2024 7 1.99 8.00 1.00 3.11 15,360 4,940 1 Chris London
C17669 B 8/14/2024 28
C17669 C 8/14/2024 28
C17669 D 8/14/2024 28
C17669 E H
Date Page 1/1
Sample ID
2X4 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
02:36 PM
32.01
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
At the time of testing, all samples were moist and intact.
AEA
Capping
Method
C173
20
Dan Barocio
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING
07/29/24
Stu Swensen, CET
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Sample
Mass
(kg.)
C-1231
By Whom
4000
Yes
1174
1128812
9.00
9.00
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Vault Closure Lid Cell 1-5
Set No.
Sample Yardage
Nicole Mecum
DR Horton
11241 Slater Ave NE Suite 200
Miles
202
10550
Mix Design Strength
CONCRETE MATERIALS REPORT
07/17/2024
BL071724B1
Bobby Luke
B23004755
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
24-280
Towns on 12th
3916 NE 12th St
Renton City
Permit No.
As requested, I was on site for concrete placement observation, sampling, and testing. The contractor placed concrete for vault closure lid cell 1-5. Miles supplied 9 cubic yards of concrete mix
#10550. Concrete was placed by boom pump truck and consolidated with mechanical vibrator. I observed that clearances for reinforcing steel were maintained during placement. I obtained and
checked each truck’s delivery ticket as it arrived on site.
Gridlines
Kirkland
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
Testing results relate only to the items inspected/tested. This report shall not be reproduced without written approval.