Major Franchise Permit: MFP25003411
IVR Number: 25003411
Permit Information
Permit Name: PSE Electrical 720 Lind Ave SW
Address/Location:07/03/2025Application Date:1923059060Parcel Number: 720 LIND AVE SW
Permit Type:07/17/2025Issue Date:Franchise
Permit Work Class:07/17/2026Expiration Date:Major Utility
Job Number: 101177363
Description: PSE Electrical REVISION: REPLACING CABLES NO DIGGING: REMOVE\REPLACE FEEDER CABLES THROUGH
VAULTS WITH EXISTING CONDUIT PV01 GRID 317594 to S01 GRID 317588 165785 CUT AND REMOVE CABLES
PV01 GRID 317594 to S02 GRID 317587 165753; CUT AND REMOVE CABLES PV01 GRID 317594 to S03 GRID
317589 165676; PULL NEW FEEDER CABLES IN THRU EXISTING CONDUIT S03 GRID 317589 165676 to S02
GRID 317587 165753REMOVE\REPLACE FEEDER CABLES THROUGH EXISTING CONDUIT; S03 GRID 317589
166676 to PV03 GRID 317590 165604 NO DIGGING. REPAIRING B\O CABLE IN EXISTING VAULT @ V01 317594
165663
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
PDA LLC 720 LIND AVE SW
RENTON, WA 98057
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
Katie Zimmerman
9/15/2025
101177363-scope change
720 LIND AVE SW
CATELYN OTTE 360-899-2339
MFP25003411
Monday Friday 8:00am 3:00pm
Scott Warlick CED 9/25/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
•Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
•Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
•Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
•Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
•Applicant must comply with all conditions of the application.
•The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
•No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
•Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
•Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
•Applicant must have the approved TCP prior to commencing the work.
•Approved TCP must be at the work site during work hours.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
•At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
•When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
•Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
•Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
•Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
•Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
•Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
•Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
•Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
•Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
•Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
•Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
•Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
•If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
•Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
•All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
•Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
•Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
•Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
•Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
•Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
•For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
•Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
•Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
•Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
•Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
•Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8)for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
•City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
•Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
•Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
•The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
•If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
•TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
•Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
•TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
•TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
RRRR191911111111SW 7TH STSENECA AVE SW
PV0311111111SW 7TH ST11111111SW 7TH ST11111111SW 7TH STTHOMAS AVE SW2020
W4-119maintain (2) 11' lanes CONETOPPERW4-119W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADX'≥X'≥X'≥RIGHT LANECLOSEDAHEADW20-5R W1-4LW20-1ROADWORK
AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST.W20-1ROADWORKAHEADX'≥NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com1 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1
ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411
11111111RRRR
11 11 11 11
LIND AVE SW SW 7TH STRRRR191911111111SW 7TH STSENECA AVE SW PV03PV01S03BUS
STOP
BUS
STOP
12121212LIND AVE SW
12121212SW 7TH ST11111111SW 7TH STc-curbW4-119W4-119W20-1ROADWORKAHEADX'≥W20-1ROAD
WORKAHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST ANDDRIVEWAY ON LIND AVE SW.W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5R W4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com2 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1
ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411
11111111RRRR
11 11 11 11
LIND AVE SW SW 7TH STPV01S03BUSSTOP
BUSSTOP
12121212SW 7TH ST11111111SW 7TH STc-curbW4-119W20-1ROAD
WORK
AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAYS CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER WEST ON SW 7TH ST ANDDRIVEWAY ON LIND AVE SW.W20-1ROADWORKAHEADX'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥USE MAXIMUM AVAILABLESPACE FOR SIGNSPV02BUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com3 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411
11 11 11 11
1111111111
SW 7TH STBUSSTOPS02S01SW 7TH STSW 7TH ST11 11 11 11 11W4-119W20-1ROADWORK
AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREAW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥PV02Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com4 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1
ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411
1111111111
1111111110111011
SW 7TH STSW 7TH STHARDIE AVE SW
HARDIE AVE SWBUSSTOP
BUSSTOP221111S02S01SW 7TH ST11 11 11 11 11W4-119W20-1ROAD
WORK
AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREAW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1
ROADWORKAHEADX'≥W20-1ROADWORKAHEADX'≥RESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER WEST ON SW 7TH ST.MOVE BUS STOP 115' EAST.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com5 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1ROADWORKAHEAD
W20-1ROADWORKAHEADMFP25003411
U0376
SW 7TH ST
LIND AVE SW333
P# 1923059072720
P# 1923059060
225
P# 1923059104 105
P# 1923059017
SW 7TH ST
SENECA AVE SW601
P# 2146000041 501
P# 1923059056
101177363 R1UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C OTTE 360-899-2339 8/22/25
L. NEELY 253-569-2523 8/22/25
N/A N/A N/A
C OTTE 360-899-2339 8/22/25
N/A RENTON
EAR15 CREW1S 720 LIND AV
REPAIR CABLES
720 LIND AVE SW, RENTON WA, 98057
O-998487 N/A
N/A 101177363
AS NOTED 1/2
KING N/A N/A QCSOKE
SE-19-05-23 N/A N/A
2305E074 2305E076 2305E074 EAR-15
8/22/25 C OTTE ADD CABLE REPL & VAULT LID
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
12019743 101177363
N/A
108158346
594161568
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
SITE SPECIFIC NOTES
-PV01 (317594-165663) - S01 (317588-165785)
-CUT AND REMOVE CABLES 13473-74-75 (_______/L=_______)
-PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______)
-INSTALL CABLE TAGS EKM175, EKM176, EKM177
-PV01 (317594-165663) - S02 (317587-165753)
-CUT AND REMOVE CABLES 51157-58-59 (_______/L=_______)
-PV01 (317594-165663) - S03 (317589-165676)
-CUT AND REMOVE CABLES 51145-46-47 (_______/L=_______)
-S03 (317589-165676) - S02 (317587-165753)
-PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______)
-INSTALL CABLE TAGS EKM178, EKM179, EKM180
-S03 (317589-165676) - PV03 (317590-165604)
-CUT AND REMOVE CABLES 51148-49-50
-PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______)
-INSTALL CABLE TAGS EKM181, EKM182, EKM183
-PV01 (317594-165663)
-REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750)
-S01 (317588-165785)
-REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750)
-S02 (317587-165753)
-REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750)
-S02 (317589-165676)
-REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750)
-PV02 (317589-165708)
-REPLACE BO VAULT LID
-PV03 (317590-165604)
-REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750)
FOREMAN TO CONTACT SYSOPS & CLOSE O#998487 AND 1135048870 WHEN JOB IS COMPLETED
SITE PLAN A
SCALE: 1:50
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
PV01 S01 750 KCMIL 1135 EKM175 EKM176 EKM177 #
S03 S02 750 KCMIL 850 EKM178 EKM179 EKM180
S03 PV03 750 KCMIL 760 EKM181 EKM182 EKM183
TOTAL 4"2745 TOTAL LUBE #
VICINITY MAP
JOB SITE
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
PV01 317594
165663
EXISTING
PULL VAULT
EXISTING
PULL VAULT 3 - REPLACE SPLICE & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
S01 317588
165785
EXISTING
SWITCH
EXISTING PMH-9
3 - 1/0 TERMS
MAT ID: TER10JC
3 - REPLACE SPLICE & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
S02 317587
165753
EXISTING
SWITCH
EXISTING PMH-9
3 - 1/0 TERMS
MAT ID: TER10JC
3 - REPLACE SPLICE & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
S03 317589
165676
EXISTING
SWITCH
EXISTING PMH-9
3 - 1/0 TERMS
MAT ID: TER10JC
3 REPLACE SPLICE & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
PV02 317589
165708
EXISTING
PULL VAULT
EXISTING
PULL VAULT REPLACE LID
PV03 317590
165604
EXISTING
PULL VAULT
EXISTING
PULL VAULT 3 REPLACE SPLICE & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
TOTALS :18 -
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
ABANDONED
CABLE LEFT IN
PLACE
ABANDON
CIRCUITRYFROMTO
13473 UNKNOWN PV01 S01 1135 NO NO
13474 UNKNOWN PV01 S01 1135 NO NO
13475 UNKNOWN PV01 S01 1135 NO NO
51157 UNKNOWN PV01 S02 790 NO NO
51158 UNKNOWN PV01 S02 790 NO NO
51159 UNKNOWN PV01 S02 790 NO NO
51145 UNKNOWN PV01 S03 60 NO NO
51146 UNKNOWN PV01 S03 60 NO NO
51147 UNKNOWN PV01 S03 60 NO NO
51148 UNKNOWN S03 PV03 760 NO NO
51149 UNKNOWN S03 PV03 760 NO NO
51150 UNKNOWN S03 PV03 760 NO NO
TOTAL CIRCUIT FEET 8235
SITE PLAN B
SCALE: 1:50MATCHLINE "A"(SEE THIS PAGE)AAMATCHLINE "A"(SEE THIS PAGE)AAMFP25003411RESTORATION PER CITY OF RENTON STANDARDS
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
AØADM265
BØADM266
CØADM267
EXIST. TO
REMAIN
U0376
AØ13476
BØ13477
CØ13478
EXIST. TO
REMAIN
AØ13473
BØ13474
CØ13475
TO BE
REPLACED
AØ51157
BØ51158
CØ51159
TO BE
REPLACED
AØ51148
BØ51149
CØ51150
TO BE
REPLACED
AØ51145
BØ51146
CØ51147
TO BE
REPLACED
U0376
AØEKM175
BØEKM176
CØEKM177
AØEKM178
BØEKM179
CØEKM180
AØEKM181
BØEKM182
CØEKM183
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C OTTE 360-899-2339 8/22/25
L. NEELY 253-569-2523 8/22/25
N/A N/A N/A
C OTTE 360-899-2339 8/22/25
N/A RENTON
EAR15 CREW1S 720 LIND AV
REPAIR CABLES
720 LIND AVE SW, RENTON WA, 98057
O-998487 N/A
N/A 101177363
AS NOTED 2/2
KING N/A N/A QCSOKE
SE-19-05-23 N/A N/A
2305E074 2305E076 2305E074 EAR-15
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY
PRE CONST UG MAP: 2305E074
SCALE: 1:100
101177363 R1OVERHEAD CIRCUIT MAP: 2305E076
SCALE: 6" = 1 MILE
JOB SITE
PRE CONST UG MAP: 2305E074
SCALE: 1:100
ONE LINE DIAGRAM
NOT TO SCALE
MFP25003411