HomeMy WebLinkAboutMFP25003411.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP25003411 IVR Number: 25003411 Permit Information Permit Name: PSE Electrical 720 Lind Ave SW Address/Location:07/03/2025Application Date:1923059060Parcel Number: 720 LIND AVE SW Permit Type:07/17/2025Issue Date:Franchise Permit Work Class:07/17/2026Expiration Date:Major Utility Job Number: 101177363 Description: PSE Electrical REVISION: REPLACING CABLES NO DIGGING: REMOVE\REPLACE FEEDER CABLES THROUGH VAULTS WITH EXISTING CONDUIT PV01 GRID 317594 to S01 GRID 317588 165785 CUT AND REMOVE CABLES PV01 GRID 317594 to S02 GRID 317587 165753; CUT AND REMOVE CABLES PV01 GRID 317594 to S03 GRID 317589 165676; PULL NEW FEEDER CABLES IN THRU EXISTING CONDUIT S03 GRID 317589 165676 to S02 GRID 317587 165753REMOVE\REPLACE FEEDER CABLES THROUGH EXISTING CONDUIT; S03 GRID 317589 166676 to PV03 GRID 317590 165604 NO DIGGING. REPAIRING B\O CABLE IN EXISTING VAULT @ V01 317594 165663 Contacts Name Address PhoneTypeBilling Katie Zimmerman Puget Sound Energy 1660 Park Lane Burlington, WA 98233 B: (425) 620-6742 C: (425) 620-6742 ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL PDA LLC 720 LIND AVE SW RENTON, WA 98057 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. PUBLIC WORKS DEPARTMENT Page 1 of 6 | Published: 2/25/2025 Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 2/25/2025 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK. FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING CITY HOLIDAYS. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be conducted within the City's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” 4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as described in the guidelines. Additional review time may be needed. By signing, I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application. Applicant’s Signature Date Applicant’s Name (Print) Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: ___________ Description of Work: 24 Hour Emergency Contact Name & Phone: Approval By: ______________________________________________ Date:____________________ PW/Transportation or CED/Development Engineering Division Potelco, Inc 6905 S 228th St Kent, WA 98466 Please See Attached Katie Zimmerman 9/15/2025 101177363-scope change 720 LIND AVE SW CATELYN OTTE 360-899-2339 MFP25003411 Monday Friday 8:00am 3:00pm Scott Warlick CED 9/25/2025 Page 2 of 6 | Published: 2/25/2025 This Page Intentionally Left Blank Page 3 of 6 | Published: 2/25/2025 APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS: GENERAL •Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State of Washington, including codes and regulations not described in this application. •Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to Washington State Department of Transportation (WSDOT) traffic control plans. •Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved TCPs including claims arising from towing of private vehicles and the acts of Applicant’s agents and employees. •Applicant must comply with all conditions of the application. •The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this application, Applicant is responsible to pay for legal counsel chosen by the City to defend against same. •No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include construction phasing and sequencing. •Previously approved TCPs cannot be combined into a new TCP without review and approval by the City. •Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with the updated date and time and/or any changes to TCP. •Applicant must have the approved TCP prior to commencing the work. •Approved TCP must be at the work site during work hours. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. •At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection equipment that meets current City’s standards at Applicant’s expense. •When not in use, temporary traffic control devices shall be removed or covered immediately. It is the Applicant’s responsible to cover any temporary traffic control devices when not applicable for the construction activities. Similarly, when work is suspended for short periods of time, traffic control devices that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City is not responsible for any private property from City assets and identifying the property owner. •Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours. At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times, unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary Page 4 of 6 | Published: 2/25/2025 pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be repaired at Applicant’s expense. •Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street Closure and Street Excavation for details. Applicant is responsible for coordinating with the property owners and/or residents prior to commencement of the work. •Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise approved. •Accessibility for emergency vehicles shall be maintained at all times. PUBLIC OUTREACH •Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430- 7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal) affecting the vehicle detection. •Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures or lane closures. •Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding weekends and holidays) prior to starting any work. •Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140 or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit operations or facilities. Notification information and guidelines can be found at: https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts. WORKING DAYS AND TIMES •Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below for details. •Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal within the traveled way. •If the City determines the closure hours adversely affect traffic during the work, the City may require to adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an arterial street. (See WSDOT Functional Classification Map: https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass) •Applicant may request the City for consideration of extended or modified working hours. Such request must be approved by the City before changing hours of work. CLOSURES •All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances). More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of the Renton Municipal Code (RMC). •Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than five (5) working days in advance of effective date and time, not including holidays, at location(s) as identified in the TCP. Other methods of displaying the messages shall be approved by the City. Page 5 of 6 | Published: 2/25/2025 •Road closure notice messages must include at least the following: ROAD WILL BE CLOSED MONTH/DAY – MONTH/DAY _AM - _PM •Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as the impact of the closure to the public. Applicant shall submit detour plans for road closures to accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road closures shall require additional temporary traffic control including advance notification, approach and detour signage. •Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the bags remain intact and shall replace damaged bags as needed or determined necessary by the City of Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of Renton Transportation Signal Maintenance (425-430-7423) prior to removal. UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS •Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated by City Transportation for the impacts of traffic signal operations and safety. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal operations. TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION •Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for each traffic signal controller to be programmed and tested by City Transportation staff before starting the work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or modification. TEMPORARY NO-PARKING •Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every hundred (100) feet at least seventy-two (72) hours in advance of effective date and time. •Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be attached to each Temporary No Parking Sign on the project site. •Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in this TCP. NIGHT WORK •Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7- 8)for night work. Process may take up to twelve (12) weeks. More information can be found at https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance. •City may require night work for TCPs that have severe traffic impacts on arterial streets. Page 6 of 6 | Published: 2/25/2025 •Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained on an arterial street. •Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will functionally reduce an arterial or high-volume collector street to only one lane of traffic. •The following configurations may require night work: Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high volume of left turns occur. Work at traffic signals that requires shifting two directions of traffic into left turn pockets. Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a single approach to the intersection. Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to the intersection. •If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the TCP. TRAFFIC CONTROL PLAN (TCP) FORMAT •TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings, taper tables and MUTCD illustrations, by themselves, are insufficient. •Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on the complexity of a project. •TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase when more than one TCP layout is submitted. •TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which consist of: Map(s) showing the location of the project and work area. All fonts shall be legible and a minimum 10-point font size. All symbols of viewing or printing shall be clear and contrasting. All streets shall be labeled, and layout must include a north arrow and scale. Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc. Show locations where the standard traffic control plans are applied. RRRR191911111111SW 7TH STSENECA AVE SW PV0311111111SW 7TH ST11111111SW 7TH ST11111111SW 7TH STTHOMAS AVE SW2020 W4-119maintain (2) 11' lanes CONETOPPERW4-119W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADX'≥X'≥X'≥RIGHT LANECLOSEDAHEADW20-5R W1-4LW20-1ROADWORK AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST.W20-1ROADWORKAHEADX'≥NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com1 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1 ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411 11111111RRRR 11 11 11 11 LIND AVE SW SW 7TH STRRRR191911111111SW 7TH STSENECA AVE SW PV03PV01S03BUS STOP BUS STOP 12121212LIND AVE SW 12121212SW 7TH ST11111111SW 7TH STc-curbW4-119W4-119W20-1ROADWORKAHEADX'≥W20-1ROAD WORKAHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST ANDDRIVEWAY ON LIND AVE SW.W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5R W4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com2 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1 ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411 11111111RRRR 11 11 11 11 LIND AVE SW SW 7TH STPV01S03BUSSTOP BUSSTOP 12121212SW 7TH ST11111111SW 7TH STc-curbW4-119W20-1ROAD WORK AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAYS CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER WEST ON SW 7TH ST ANDDRIVEWAY ON LIND AVE SW.W20-1ROADWORKAHEADX'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥USE MAXIMUM AVAILABLESPACE FOR SIGNSPV02BUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER EAST ON SW 7TH ST.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com3 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411 11 11 11 11 1111111111 SW 7TH STBUSSTOPS02S01SW 7TH STSW 7TH ST11 11 11 11 11W4-119W20-1ROADWORK AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREAW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥PV02Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com4 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1 ROADWORKAHEADW20-1ROADWORKAHEADMFP25003411 1111111111 1111111110111011 SW 7TH STSW 7TH STHARDIE AVE SW HARDIE AVE SWBUSSTOP BUSSTOP221111S02S01SW 7TH ST11 11 11 11 11W4-119W20-1ROAD WORK AHEADX'≥THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREAW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1 ROADWORKAHEADX'≥W20-1ROADWORKAHEADX'≥RESIDENT(S)/BUSINESS(ES) WILLBE INFORMED OF TEMPORARYDRIVEWAY CLOSUREBUSINESS(ES) DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAYFURTHER WEST ON SW 7TH ST.MOVE BUS STOP 115' EAST.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com5 OF 5720 Lind Ave, Renton, WA4 1201974309/10/2025Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG/BOX/VAULTVAULTPLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN600' FEET OF WORK AREAW20-1ROADWORKAHEAD W20-1ROADWORKAHEADMFP25003411 U0376 SW 7TH ST LIND AVE SW333 P# 1923059072720 P# 1923059060 225 P# 1923059104 105 P# 1923059017 SW 7TH ST SENECA AVE SW601 P# 2146000041 501 P# 1923059056 101177363 R1UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C OTTE 360-899-2339 8/22/25 L. NEELY 253-569-2523 8/22/25 N/A N/A N/A C OTTE 360-899-2339 8/22/25 N/A RENTON EAR15 CREW1S 720 LIND AV REPAIR CABLES 720 LIND AVE SW, RENTON WA, 98057 O-998487 N/A N/A 101177363 AS NOTED 1/2 KING N/A N/A QCSOKE SE-19-05-23 N/A N/A 2305E074 2305E076 2305E074 EAR-15 8/22/25 C OTTE ADD CABLE REPL & VAULT LID N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 12019743 101177363 N/A 108158346 594161568 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG SITE SPECIFIC NOTES -PV01 (317594-165663) - S01 (317588-165785) -CUT AND REMOVE CABLES 13473-74-75 (_______/L=_______) -PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______) -INSTALL CABLE TAGS EKM175, EKM176, EKM177 -PV01 (317594-165663) - S02 (317587-165753) -CUT AND REMOVE CABLES 51157-58-59 (_______/L=_______) -PV01 (317594-165663) - S03 (317589-165676) -CUT AND REMOVE CABLES 51145-46-47 (_______/L=_______) -S03 (317589-165676) - S02 (317587-165753) -PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______) -INSTALL CABLE TAGS EKM178, EKM179, EKM180 -S03 (317589-165676) - PV03 (317590-165604) -CUT AND REMOVE CABLES 51148-49-50 -PULL IN (3) NEW 750 FEEDER CABLES THROUGH EXIST CONDUIT (_______/L=_______) -INSTALL CABLE TAGS EKM181, EKM182, EKM183 -PV01 (317594-165663) -REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750) -S01 (317588-165785) -REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750) -S02 (317587-165753) -REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750) -S02 (317589-165676) -REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750) -PV02 (317589-165708) -REPLACE BO VAULT LID -PV03 (317590-165604) -REPLACE (3) 12 KV 750 ELBOWS (6041.1000 ELB750) FOREMAN TO CONTACT SYSOPS & CLOSE O#998487 AND 1135048870 WHEN JOB IS COMPLETED SITE PLAN A SCALE: 1:50 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT PV01 S01 750 KCMIL 1135 EKM175 EKM176 EKM177 # S03 S02 750 KCMIL 850 EKM178 EKM179 EKM180 S03 PV03 750 KCMIL 760 EKM181 EKM182 EKM183 TOTAL 4"2745 TOTAL LUBE # VICINITY MAP JOB SITE VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC PV01 317594 165663 EXISTING PULL VAULT EXISTING PULL VAULT 3 - REPLACE SPLICE & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS S01 317588 165785 EXISTING SWITCH EXISTING PMH-9 3 - 1/0 TERMS MAT ID: TER10JC 3 - REPLACE SPLICE & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS S02 317587 165753 EXISTING SWITCH EXISTING PMH-9 3 - 1/0 TERMS MAT ID: TER10JC 3 - REPLACE SPLICE & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS S03 317589 165676 EXISTING SWITCH EXISTING PMH-9 3 - 1/0 TERMS MAT ID: TER10JC 3 REPLACE SPLICE & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS PV02 317589 165708 EXISTING PULL VAULT EXISTING PULL VAULT REPLACE LID PV03 317590 165604 EXISTING PULL VAULT EXISTING PULL VAULT 3 REPLACE SPLICE & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS TOTALS :18 - ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE ABANDONED CABLE LEFT IN PLACE ABANDON CIRCUITRYFROMTO 13473 UNKNOWN PV01 S01 1135 NO NO 13474 UNKNOWN PV01 S01 1135 NO NO 13475 UNKNOWN PV01 S01 1135 NO NO 51157 UNKNOWN PV01 S02 790 NO NO 51158 UNKNOWN PV01 S02 790 NO NO 51159 UNKNOWN PV01 S02 790 NO NO 51145 UNKNOWN PV01 S03 60 NO NO 51146 UNKNOWN PV01 S03 60 NO NO 51147 UNKNOWN PV01 S03 60 NO NO 51148 UNKNOWN S03 PV03 760 NO NO 51149 UNKNOWN S03 PV03 760 NO NO 51150 UNKNOWN S03 PV03 760 NO NO TOTAL CIRCUIT FEET 8235 SITE PLAN B SCALE: 1:50MATCHLINE "A"(SEE THIS PAGE)AAMATCHLINE "A"(SEE THIS PAGE)AAMFP25003411RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR AØADM265 BØADM266 CØADM267 EXIST. TO REMAIN U0376 AØ13476 BØ13477 CØ13478 EXIST. TO REMAIN AØ13473 BØ13474 CØ13475 TO BE REPLACED AØ51157 BØ51158 CØ51159 TO BE REPLACED AØ51148 BØ51149 CØ51150 TO BE REPLACED AØ51145 BØ51146 CØ51147 TO BE REPLACED U0376 AØEKM175 BØEKM176 CØEKM177 AØEKM178 BØEKM179 CØEKM180 AØEKM181 BØEKM182 CØEKM183 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C OTTE 360-899-2339 8/22/25 L. NEELY 253-569-2523 8/22/25 N/A N/A N/A C OTTE 360-899-2339 8/22/25 N/A RENTON EAR15 CREW1S 720 LIND AV REPAIR CABLES 720 LIND AVE SW, RENTON WA, 98057 O-998487 N/A N/A 101177363 AS NOTED 2/2 KING N/A N/A QCSOKE SE-19-05-23 N/A N/A 2305E074 2305E076 2305E074 EAR-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY PRE CONST UG MAP: 2305E074 SCALE: 1:100 101177363 R1OVERHEAD CIRCUIT MAP: 2305E076 SCALE: 6" = 1 MILE JOB SITE PRE CONST UG MAP: 2305E074 SCALE: 1:100 ONE LINE DIAGRAM NOT TO SCALE MFP25003411