Loading...
HomeMy WebLinkAboutC_Building Comments1 Jill Ding From:Robert Shuey Sent:Friday, September 26, 2025 7:19 AM To:Jill Ding Subject:PRE25-000313 • Building Review - Pre App/Pre Sub • Pre-Application Meeting Submittal v1 Jill my comments are as follows: Clarify statements in Heather Hirschy email dated 9-10-25. My responses are in RED: • Notification Required: The City of Renton must be notified prior to the installation of any FAS. The City will not approve installation unless the WA State L&I insignia or certification issued under Chapter 296-150 WAC is a2ixed to the structure. Is this to be submitted with a required permit, if so which one? A building permit is required for each FAS. The submittal documents shall show how the building will be anchored to the ground. Plans shall also show proposed ramps/stairs conforming to ADA standards and their anchorage. • State Approval: All FAS’s must have been approved by WA State L&I in accordance with state law and carry the required state insignia prior to installation within the City of Renton. Correct • Local Compliance: FAS’s must comply with all City of Renton development regulations, including zoning, siting, utility connections, and fire prevention standards under Title IV RMC. Correct • Permit(s) Required: Please confirm if building installation permits (2, one for each trailer) shall be obtained from the City. *Is review of a detailed site plan for each trailer placement and related connections required outside of what WA State L&I approves for each FAS structure (trailer and ADA access)? Yes. If so, is it possible to submit a building permit prior to receiving WA State L&I approval? It is possible if you have the required information to submit for the permit. Is it possible to condition the building permit to provide copies of the WA Sate L&I approval documents? We do not need the L&I building plans. We need engineer stamped drawings described under the first bullet. We can submit preliminary documents and specifications that WA State L&I will review as part of the building permit submittal but have them marked as such. Please advise • Additional permits: Demolition permits (2) for removal of two existing trailers. A grading permit (1) for minor site reconfiguration (approx. 200 CY) Permits are required for these items • Are ADA-compliant facilities (specifically, toilets) required in trailers? Yes, unless you can find an exemption to the accessibility regulations. • Please advise on fire prevention requirements for trailers. We plan to show hydrant locations at STP on a detailed site plan. Please contact the Renton Regional Fire Department for this question. Thank you, ROBERT SHUEY, CBO, Director of Development Services/Building O2icial City of Renton // Development Services Virtual Permit Center // Online Applications and Inspections cell 206-550-8523 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 2