HomeMy WebLinkAboutPN_Project_Narrative_250728_V2PROJECT NARRATIVE
1.Project Name: Bo De Temple Home Improvement Project
Project Location: 11410 SE PETROVITSKY RD
Renton, WA 98055
2.Scope of Project:
-Remodeling the interior of the single home to change the first floor to the
Buddha Hall for Buddha Service.
-Add on the ramp and stairs for the entrance of the first floor
-Add on shed on the north side of Existing Temple Building
3.Proposal Use: Worship Buddha Hall on the first floor of the property
including chanting and pray during service, listening to Dharma Talks, and
sitting meditation during meditation sessions.
4.Hours of operation: Sunday from 9:00 A.M to 3:00 P.M
5.Non-cooking facility. Members bring fruit, flowers to offer in the altar.
Members also bring foods from home to offer during weekly service and
annual special events.
6.Occupancy Capacity: maximum 20 - 25 members during weekly services,
maximum 40-50 members during special annual events.
7.Number of bathrooms: One uni-sex bathroom on first floor
8.Parking slots available: 8 - 10 slots, 2 handicap slots.
9.Project Value: Estimate $ 135,000.00
10. Time line to complete the project:
-Interior: As soon as Conditional Use permit approve.
-Exterior and on site improvement: when the weather permitted