HomeMy WebLinkAboutConcrete Field Report_2025-09-24-Lindbergh High School Field Improvements-25B121-01_000005Inspection Information:
Inspection Date:09/24/2025 Time Onsite:13:00 Weather Conditions:70s, sunny
Inspection Performed: Concrete
Subcontractor:Lightworks Electric Continuous or Periodic:Continuous Inspection
Sheet(s):E1.01 Location / Area:Upper and lower baseball fields
Details:Level / Elevation:Foundation
Approved Plans Dated:
Report Profile:
Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No
RFI:Yes No Show Up:Yes No
Retest / Reinspection:Yes No Standby:Yes No
Remarks:
CONCRETE PLACEMENT: Continuous Inspection
MTC inspector on site, as requested, to observe the placement of approximately 10 CY of concrete with Mix Design ID #0934
supplied by CalPortland/282 into light pole base at the location noted above.
One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #5056 for field test results and
for more information.
Concrete was placed via concrete truck, was mechanically consolidated and finished by hand.
To the best of MTC inspector's knowledge, the abovedescribed work was performed in general accordance with project
specifications and approved plans.
Work in progress. Additional inspection needed.
✔
✔✔
✔✔
✔
Concrete Field Report RCCON00000500Report #:
Burlington
777 Chrysler Drive
Burlington, WA 98233
Phone: (360) 7551990
Client:
Renton School District No. 403
300 SW 7th St
Renton, WA 98057
Project:
25B12101 (Bldg Permit: B25002218)
Lindbergh High School Field Improvements
16426 128th Avenue Southeast
Renton, WA 98059
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written
approval.
Page 1 of 3Page 1 of 2
Inspection Information:Inspection Date:09/24/2025 Time Onsite:13:00 Weather Conditions:70s, sunnyInspection Performed: ConcreteSubcontractor:Lightworks Electric Continuous or Periodic:Continuous InspectionSheet(s):E1.01 Location / Area:Upper and lower baseball fieldsDetails:Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Reinspection:Yes No Standby:Yes NoRemarks:CONCRETE PLACEMENT: Continuous InspectionMTC inspector on site, as requested, to observe the placement of approximately 10 CY of concrete with Mix Design ID #0934supplied by CalPortland/282 into light pole base at the location noted above.
One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #5056 for field test results and
for more information.
Concrete was placed via concrete truck, was mechanically consolidated and finished by hand.
To the best of MTC inspector's knowledge, the abovedescribed work was performed in general accordance with project
specifications and approved plans.
Work in progress. Additional inspection needed.
Images:
Reported By:Andy Meadows Reviewed By:Kevin Walters
✔✔✔✔✔
✔
Concrete Field Report RCCON00000500Report #:
Burlington
777 Chrysler Drive
Burlington, WA 98233
Phone: (360) 7551990
Client:
Renton School District No. 403
300 SW 7th St
Renton, WA 98057
Project:
25B12101 (Bldg Permit: B25002218)
Lindbergh High School Field Improvements
16426 128th Avenue Southeast
Renton, WA 98059
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written
approval.
Page 2 of 3Page 2 of 2