Minor Franchise Permit: MFP25004790
IVR Number: 25004790
Permit Information
Permit Name: Puget Sound Energy - Electric
105108516- Legacy Square - Entertainment StageAddress/Location:09/19/2025Application Date:7841800195Parcel Number: 510 S 3RD ST
Permit Type:10/01/2025Issue Date:Franchise
Permit Work Class:10/01/2026Expiration Date:Minor Utility
Job Number: 105108516Franchise Type:Electric
Description: Puget Sound Energy Electric CUSTOMER TO TRENCH ACROSS ROAD FROM V01 TO V02, REMAINING WORK ON
PRIVATE PROPERTY. CREW TO INSTALL NEW PRIMARY CABLE IN CONDUIT. ALL RESTORATION TO BE
COMPLETED TO CITY STANDARDS.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Permits Central 355 110th Ave NE
Bellevue, WA 98004
B: (425) 620-6742
H: (425) 620-6742
C: (425) 620-6742
Contact
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
Katie Zimmerman
9/19/2025
105108516
Jenny Chau (253) 208-9480
510 S 3rd St- Legacy Square - Entertainment Stage
Scott Warlick CED 10/1/2025
MFP25004790
Monday Friday 8:00am 3:00pm
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
•Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
•Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
•Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
•Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
•Applicant must comply with all conditions of the application.
•The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
•No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
•Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
•Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
•Applicant must have the approved TCP prior to commencing the work.
•Approved TCP must be at the work site during work hours.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
•At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
•When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
•Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
•Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
•Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
•Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
•Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
•Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
•Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
•Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
•Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
•Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
•Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
•If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
•Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
•All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
•Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
•Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
•Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
•Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
•Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
•For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
•Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
•Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
•Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
•Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
•Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8)for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
•City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
•Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
•Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
•The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
•If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
•TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
•Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
•TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
•TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
510 S 3rd St Renton WA 98057 USApkingpkingpkingpking19191616ONE WAYpkingS 3RD ST (SR 900)S 3RD ST (SR 900)S LOGAN STSMITHERS AVE Spkingpking17 172020MORRIS AVE S
island
V01V0212 12
12 12MORRIS AVE S
CROSS HERE
S/W CLOSED
R9-11ACROSS HERES/W CLOSEDR9-11AW20-1ROADWORKAHEADLEFT LANECLOSEDAHEADW20-5LW4-2LX'≥X'≥X'≥W20-1ROADWORKAHEADLEFT LANECLOSEDAHEADW20-5LW4-2LX'≥X'≥X'≥W20-1ROADWORKAHEADW20-1ROADWORKAHEADX'≥ARRW-BRDX'≥FROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS ALONG WORK AREARESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSURE1515NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVYURIY BASHTOVOY425-424-6425yuriy.bashtovoy@pse.com1 OF 2510 S 3RD ST, Renton, WA 980570 51413881209/19/2025Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:John CrofootCard No. IS 6 100071Card Exp. 10/10/28John.Crofoot@pse.com(425)424-6658PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHINX' FEET OF WORK AREA(USE SIGN SPACING CHART)W20-1
ROADWORKAHEADW20-1ROADWORKAHEADMFP25004790
510 S 3rd St Renton WA 98057 USApkingpkingpkingpking19191616ONE WAYpkingS 3RD ST (SR 900)S 3RD ST (SR 900)S LOGAN STSMITHERS AVE Spkingpking17 172020MORRIS AVE S
island
V01V0112 12
12 12MORRIS AVE S
ARRW-BRD
FROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS ALONG WORK AREAW20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1ROADWORKAHEADW20-1ROADWORKAHEADX'≥X'≥CROSS HERES/W CLOSEDR9-11ACROSS HERE
S/W CLOSED
R9-11ADETOURM4-9B
1515RESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVYURIY BASHTOVOY425-424-6425yuriy.bashtovoy@pse.com2 OF 2510 S 3RD ST, Renton, WA 980570 51413881209/19/2025Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:John CrofootCard No. IS 6 100071Card Exp. 10/10/28John.Crofoot@pse.com(425)424-6658NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHINX' FEET OF WORK AREA(USE SIGN SPACING CHART)W20-1
ROADWORKAHEADW20-1ROADWORKAHEADMFP25004790
280
504
505
507 509
306 601
S 3RD ST
SMITHERS AVE SMORRIS AVE S510
EOP EOP
EOPEOPEOP
EOPEOP
EOP
EOPEOPEOP EOP EOP
EOP
317824-165984
45 kVA 120/208V (ABC)
317803-165991
25 kVA 120/240V (C)
317806-166001
317804-165965
25 kVA 120/240V (B)JJJ
JJ317803-165991
25 kVA 120/240V (C)
CUSTOMER SUPPLIED
6" BEDDING OF 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
8' X 8' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
90°
R=60"
90°
R=60"55'155'130'PSE PROVIDED / CUSTOMER INSTALLED
1-4" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 340'
IN CUSTOMER PROVIDED TRENCH
PSE SUPPLIED & INST. 1-RUN 1/0 UG JKT CABLE ± 360'
(AØXXXXXX)
(BØXXXXXX)
(CØXXXXXX)
317824-165984
45 kVA 120/208V (ABC)
EOP EOP EOP EOP
EOP
EOP
EOP
EOP
EOP EOP EOP EOP EOP EOP
S 3RD ST
4' X 6' RECEIVING PIT
W/ 3.6 CUBIC YARDS OF SOIL DISPLACEMENT
2' X 2' WINDOW FOR EXISTING UTILITIES
.52 CUBIC YARD DISPLACEMENT EACH
1.56 CUBIC YARD TOTAL
2' X 2' WINDOW FOR EXISTING UTILITIES
.52 CUBIC YARD DISPLACEMENT EACH
1.56 CUBIC YARD TOTAL
2' X 2' WINDOW FOR EXISTING UTILITIES
.52 CUBIC YARD DISPLACEMENT EACH
2.08 CUBIC YARD TOTAL
2' X 2' WINDOW FOR EXISTING UTILITIES
.52 CUBIC YARD DISPLACEMENT EACH
2.08 CUBIC YARD TOTAL
4' X 4' WORK/ BORE PIT
W/ 2.4 CUBIC YARDS OF SOIL DISPLACEMENT
317803-165991
317824-165984
45kVA 120/208V (ABC)
510
25kVA 120/240V (C)
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 S GRADY WAY
RENTON, WA 98057
PAUL HINTZ 425-430-7436 105108516GAS
PHONE
CABLE TV
516523508 104371801
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JENNY CHAU
253-208-9480
JENNY.CHAU@PSE.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CHAU 253-208-9480 8/27/25
J. CHAU 253-208-9480 8/27/25
N/A N/A N/A
E. ORTIZ (714) 893-2405 8/27/25
TBD RENTON
LEGACY SQUARE - ENTERTAINMENT STAGE
3Ø PRI L/E, INSTALL PM XFMR, 400A METER
510 S 3RD ST, RENTON, WA 98057
N/A N/A
N/A 105108516
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
SE 18-T23N-R05E N/A N/A
2305E072 2305E076 2305E072NE GRA-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105108516514138812
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-15
12/16/24
215.00 204.00 156.00
0.91 0.91 0.91
215.91 204.91 156.91
00 1"2"
00 50'100'
CIRCUIT FEET ADDED: 340'
SQ. FOOTAGE: 790 SQ FT
PANEL SIZE: 400A
HEAT TYPE: ELECTRIC
EST. DEMAND: 15.7kW
LRC: 65A
% V. DROP: 1.5%
% FLICKER: 2.6%
SITE PLAN
SCALE: 1" = 50'
OVERHEAD CIRCUIT MAP 2305E076
SCALE: 6" = 1 MILE
JOB SITE
N
Vicinity Map
47.4797, -122.2101
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
SPAN SPECIFIC NOTES
SEE SITE PLAN, ONE-LINE DRAWING, AND TABLES
FOR NEW INSTALLS & REMOVALS
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01
-PROVIDE BORE PITS AT 'BP1' & 'BP2' (SEE PARTIAL PLAN).
-REQUIRED TO PROVIDE 8’ X 8’ WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V02
TRENCHING & CONDUIT.
-INSTALL ± 55' ONE RUN OF 4" SCH'L 80 HDPE CONDUIT FROM BP1 TO BP2
-TRENCH & INSTALL ± 285' ONE RUN OF 4" SCH'L 80 HDPE CONDUIT FROM BP2 TO V02
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS..
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
SITE SPECIFIC NOTES
AT V01: 317803-165991
-EXISTING VAULT AND EQUIPMENT TO REMAIN
-EXISTING 25KVA TUT TRF TO REMAIN
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
AT V02: 317824-165984
-INSTALL (1) HH 4'8" X 4'8" X 3'6" HH W/ GROUNDS PER STD 6045.5000 (PM3P15S)
-INSTALL (1) COVER HH 4'8' X 5'6" X 6" W/ 20" X 44" ACCESS (MID 7655200)
-INSTALL (1) 45KVA PADMOUNT TRF (MID: 6258000)
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (4) 501 TO 750 KCMIL CONNECTOR LUGS (MID 7651003)
-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)
-INSTALL GRID #
-CONNECT 1-RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED #600 SVC
M01 AT "510 3RD ST": NEW METER BASE
-PSE TO INSTALL 400A CT METER
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
45kVA 120/208v
6258000
V02
317824-165984
PARTIAL PLAN DETAIL
SCALE: 1" = 20'
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
V01 V02 4 1 340'2 0 0 0 430 469 3Ø 1/0AL JKT 360'XXX###XXX###XXX###-
4" PVC (FT) & BENDS =340'2 0 0 0 3Ø 1/0 AL JKT TOTAL (FT) =360'
3003221743Meter
MINIMUM HORIZONTAL CLEARANCES
FROM WATER
MAINS
FROM STORM
DRAIN
FROM SANITARY
SEWERS
POWER 5 FT 5 FT 5 FT
MINIMUM VERTICAL CLEARANCES
FROM WATER
MAINS
FROM STORM
DRAIN
FROM SANITARY
SEWERS
POWER 1 FT 1 FT 1 FT
SOIL DISPLACEMENT
FROM TO CUBIC YARDS
V01 V02 8.08
MFP25004790
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
ConduitEndsClosed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"105108516UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CHAU 253-208-9480 8/27/25
J. CHAU 253-208-9480 8/27/25
N/A N/A N/A
E. ORTIZ (714) 893-2405 8/27/25
TBD RENTON
LEGACY SQUARE - ENTERTAINMENT STAGE
3Ø PRI L/E, INSTALL PM XFMR, 400A METER
510 S 3RD ST, RENTON, WA 98057
N/A N/A
N/A 105108516
N/A 2 OF 2
KING N/A N/A CSPSKEPM
SE 18-T23N-R05E N/A N/A
2305E072 2305E076 2305E072NE GRA-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
ASPLUNDH CONSTRUCTION CORP.
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PM XFMR VAULT B-FLY DETAIL (V02)
SCALE: NONE
Prop 4" (V01)
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
V01-V02
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'
8'
4'-8"
3'-6"
4'-8"
6"
20"
4'-8"5'-6"
44"
Not to scale 6045.5000-1
3,600 lbs
1,657 lbs
VAULT & EXCAVATION DETAIL @ V02
front of vault
secondary prefered entry
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J- BOX CABLE ENTRY DETAIL
Not to scale
MFP25004790